Water Supplies Department Active WSD Capital Works Contracts



Similar documents
Supported Employment Service (As at August 2014)

List of Aided Special Schools (2015/2016)

Allied Environmental Consultants Limited Green Building Certification and Consultancy Project Job Reference

Additional and Planned Places of Rehabilitation Services (From January to June 2015)

Sponsorship and Exhibition Opportunities. Showcase your brand at the biggest NEC event in Asia Pacific NEC ASIA PACIFIC USERS GROUP CONFERENCE

Company Name Address Telephone No.

HONG KONG HOUSING AUTHORITY

The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million

Property Development

Data Analysis for Healthcare: A Case Study in Blood Donation Center Analysis

Clearing Code and Branch Code

Central and Western District

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks

A. What to do if you have a problem with an HA hospital/hospital staff, Where to lodge a complaint

2015 Application Information and Admission Arrangement for Non-JUPAS Sub-degree and Undergraduate Programmes 1 (as at )

District Address Tele No. (+852) G/F YU SUNG BOON BLDG CENTRAL DES VOEUX ROAD MELBOURNE PLAZA

SHOP NOS. S8-S12,UPPER FLOOR OF EAST FOOTBRIDGE, & SHOP NO. S30 ON SECOND FLOOR, KORNHILL PLAZA, 1-2 KORNBILL ROAD

Hong Kong Mobile Market. Users Behavioral Pattern. Mobile Campaign Optimization

Legislative Council House Committee. Lead in Drinking Water Incidents

List of Proposed ArchSD Projects for the Refurbishment of Government Buildings

Vehicle Maintenance Workshops Charter Subscriber List A Pages 1 of 13

Information for Community Care Fund Medical Assistance Programme Application for HA Drug Items

Cataract Surgeries Programme HA List of Private Ophthalmologists

Smoking (Public Health) (Designation of No Smoking Areas) (Amendment) Notice 2014

4) The personal data disclosed in this list should not be used for any unrelated purposes.

Fire Service Installation Contractors CLASS 2

Existing Self-storage Sites are 10,000 sq ft or less

Services and Contact Details of Voluntary Residential Drug Treatment and Rehabilitation Centres

Examples of major projects with environmental permits :

H ng Kong GLOBAL SWITCH

Legislative Council Panel on Security

Company Name Address Telephone No.

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Nombre Categoria Estado Ciudad Domicilio Red Proveedor

Facilities Provided by Holders of Private Recreational Leases

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress

Programme on Source Separation of Commercial and Industrial Waste List of Properties and Buildings Receiving Certificate

CHAPTER 4 RADIATION MONITORING AND ASSESSMENT

CONTENTS. Corporate Information 2 Management Discussion and Analysis 4 Unaudited Condensed Consolidated Statement of

Planning for Office Land in Hong Kong

Facilities Provided by Holders of Private Recreational Leases (as at July 2012)

Legislative Council Panel on Security Creation of a permanent Chief Superintendent of Police post of the Cyber Security and Technology Crime Bureau

Transit Oriented Development and Value Capture Hong Kong

Proper Keeping of Wage and Employment Records

Unless otherwise defined in this announcement, terms defined in the Prospectus have the same meanings when used in this announcement.

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

List of contractors/acoustic consultants having implemented successful noise abatement works in 2001

Legislative Council Panel on Education Start-up Loan for Post-secondary Education Providers

Grease and Oil Wastes Problems andsolutions A grease trap is a device used for removing oil and grease from wastewaters. Grease traps perform this

A Guide to Application. for. Places of Public Entertainment Licences. for Places Other Than Cinemas and Theatres

ACQWS Paper No. 20 Total Water Management Strategy in Hong Kong

List of Participating Schools for Organising 2015/16 Enriched IT Activities Programme

Services and Contact Details of Voluntary Residential Drug Treatment and Rehabilitation Centres

ENVIRONMENTAL PROTECTION IN HONG KONG

Mai Po Inner Deep Bay Ramsar Site Waterbird Monitoring Programme

Examination of Estimates of Expenditure

Chapter 4: Working in Hong Kong

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Analysis One Code Desc. Transaction Amount. Fiscal Period

Inquiry Information Name SUPER XXX ENTERPRISES LIMITED Registered Room XXXX, XX/F., CCT Telecom Building, 11 Wo Shing Street, Fotan, Shatin, N.T.

WANG ON GROUP LIMITED ( 宏 安 集 團 有 限 公 司 ) *

Examination of Estimates of Expenditure

HOW TO APPLY FOR THE HONG KONG OFFER SHARES

Risk Management for Contractors in Marine Projects

Hong Kong College of Pathologists

Bioethics Conference Contribution of medical education to end of life care: July 15

Prospectus Company Hong Kong Stock Exchange HKSCC U.S. Securities Act Stabilizing Manager

Fire Service Installation Contractors CLASS 1

Executive Management s Report Railway Operations

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Specializing. Annual Report Stock Code: 406. (Incorporated in Bermuda with limited liability)

Enduring Power of Attorney and Court Order under Part II of the Mental Health Ordinance

EDUCATION FOR NON-CHINESE SPEAKING CHILDREN

PROJECT MANAGEMENT OF A MAJOR MASS TRANSIT PROJECT - KCR WEST RAIL

A Guide for Students Seeking Summer Jobs 暑 期 工 作 錦 囊

Hong Kong Prime Office Monthly Report. June 2011 RESEARCH OFFICE MARKET RALLY SUSTAINS

NOTICE OF LISTING ON THE GROWTH ENTERPRISE MARKET OF THE STOCK EXCHANGE OF HONG KONG LIMITED BY WAY OF PLACING AND PUBLIC OFFER

APPLICATION FOR PERMISSION UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE (CAP. 131) GUIDANCE NOTES

Real Estate Agency Industry Statutory Minimum Wage: Industry-specific Reference Guidelines

PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES. Executive Summary

NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE

MTR Corporation Interim Results 13 August 2015

DISCLOSEABLE TRANSACTION PROVISION OF FINANCIAL ASSISTANCE

Ex-gratia payment scheme for phasing out pre-euro IV diesel commercial vehicles. Notes for Application

List of Non-Government (Voluntary) Organizations Providing Clinical Psychology Services (April 2010)

START SIMPLE. Use this guide and all our online resources to find everything you need to know about shipping with FedEx

Relevant. Development Name and Location. Requirement(s) under Lease

Fast Facts. Background CCB. CCB (Asia) About CCB

CHAIRMAN S STATEMENT. I announce that provisions of approximately HK$1,153. million has been made for the property development

Urban Renewal Strategy

Pre-placement Workshop Rehabilitation Services in Hong Kong. Stephen Wong Caritas- Hong Kong

5. Services for Exhibitors

MicroPort Scientific Corporation

List of Access Officer (for Publication) -

Transcription:

No. Title Active WSD Capital s Location of or Start 17/WSD/14 Improvement to waterworks facilities at Lantau South and Sha Tin Fuk Shing 42.600 16-Nov-15 Nov-18 Lantau South and mainlaying at Keung South Shan and Sha Tin South 4/WSD/15 Improvement of the Power Supply and Control System at Western Fresh Water and Salt Water Pumping Station Pok Fu Lam Wing Cheong Electrical & ing 17.520 13-Oct-15 Aug-17 7/WSD/15 Supply and Installation of a Hydropower Tuen Mun Torishima (Hong 10.960 2-Oct-15 Feb-17 Generator at Tuen Mun Water Treatment Kong) Limited 3/WSD/15 In-situ Reprovisioning of Sha Tin Water Treatment (South ) - Advance Shatin - Ming Hing Civil - Vasteam Joint Venture 998.318 30-Oct-15 Mar-19 8/WSD/13 Improvement of the Power Supply and Control System at Telegraph Bay Fresh Water Pumping Station Telegraph Bay Wing Cheong Electrical and ing 7.180 15-Sep-15 Dec-17 Last Revision : 16.11.2015 Page 1 of 10

No. Title 10/WSD/14 Construction of Pressure Management and District Metering Installations in Aberdeen, Central, Eastern, Western, Sai Wan, Red Hill, Kowloon West, Tsuen Wan, Sai Kung and Tuen Mun Major Fresh Water Supply Zones Active WSD Capital s Location of Aberdeen, Central, Eastern, Western, Sai Wan, Red Hill, Kowloon West, Tsuen Wan, Sai Kung and Tuen Mun or Start 310.156 15-Jul-15 Jul-20 14/WSD/14 Civil at Sheung Shui, Tai Po Tau, Ma On Shan and Tseung Kwan O & Mainlaying at Magazine Gap Sheung Shui, Tai Po Tau, Ma On Shan, Tseung Kwan O and Magazine Gap Cheerful Technology Limited 30.000 20-May-15 Feb-17 11/WSD/14 Improvement of Low Voltage Power Supply System at Yau Kom Tau Water Treatment Yau Kom Tau REC 16.491 25-Feb-15 Nov-16 9/WSD/14 Improvement of the Power Supply and Control System at Tuen Mun Salt Water Pumping Station Tuen Mun Torishima (Hong Kong) Limited 14.430 13-Feb-15 Mar-17 10/WSD/13 Preventive Maintenance, Upgrading and Associated Ground Investigations for WSD Slopes, 2012-2013 Programme Hong Kong Island, Kowloon, New Territories and Outlying Islands Chun Wo Construction & Co. Ltd. 190.000 12-Dec-14 Aug-18 Last Revision : 16.11.2015 Page 2 of 10

No. Title Active WSD Capital s Location of or Start 13/WSD/14 Provision of Sodium Hypochlorite Tseung Kwan O REC 5.835 30-Oct-14 Apr-16 Solution Dosing System at Tseung Kwan O Salt Water Pumping Station 8/WSD/14 Replacement of Monitoring and Control Ngau Tam Mei Water Maxson Company 10.702 29-Sep-14 Mar-17 Equipment at Ngau Tam Mei Water Treatment Limited Treatment 5/WSD/14 Mainlaying at Lan Nai Wan, and Construction of Fresh Water Tank at Sham Tseng and Annex Building at Telegraph Bay Fresh Water Pumping Station Sham Tseng, Pok Fu Lam and Shek O Cheerful Technology Limited 26.600 10-Sep-14 Apr-16 7/WSD/14 Replacement of Fresh Water Pump Nos. 10 Sha Tin Torishima (Hong 23.970 19-Aug-14 Feb-16 & 11 and Station Main M4 at Sha Tin No. Kong) Limited 2 Fresh Water Pumping Station 3/WSD/14 Replacement of Chlorine Scrubber System at Yau Kom Tau Water Treatment Yau Kom Tau ATAL Limited 8.540 3-Sep-14 Jan-16 Last Revision : 16.11.2015 Page 3 of 10

Active WSD Capital s No. 6/WSD/14 Title Enhancement of Piping Systems for Cheung Sha Shaft Raw Water Pumping Station and Ching Cheung Road Temporary, Peng Chau and Tong Shui Road Fresh Water Pumping Stations Location of Lantau Island, Cheung Sha Wan, Peng Chau and North Point or REC Start 10.462 7-Aug-14 Jul-16 2/WSD/13 Improvement of Power Supply System at Sheung Shui Water Treatment Sheung Shui CLP Ltd 11.500 10-Dec-13 Oct-15 9/WSD/13 Water supply to Pak Shek Kok reclamation area, Tai Po - stage 2 phase 2 Tai Po Kwan On U-Tech Joint Venture 78.450 31-Dec-13 Dec-16 7/WSD/13 Supply and Installation of Fresh Water Pipework in Shun Lee Tsuen Fresh Water Pumping Station, Telegraph Bay Fresh Water Pumping Station and Western Fresh Water & Salt Water Pumping Station Shun Lee Tsuen, Telegraph Bay, Western Wenden Service Company, Limited 9.230 29-Nov-13 Jan-16 5/WSD/13 Replacement and Rehabilitation of Water Mains, Stage 4 Phase 1 and Stage 4 Phase 2 - Mains in Northern and Eastern New Territories Yuen Long, North District, Tai Po, Sai Kung, and Sha Tin Hsin Chong Tsun Yip Joint Venture 433.276 29-Nov-13 Feb-16 Last Revision : 16.11.2015 Page 4 of 10

No. Title Active WSD Capital s Location of or Start 1/WSD/13 Improvement of Fresh Water Supply to Cheung Chau & Chi Man China Road - China 181.800 24-Oct-13 Mar-17 Cheung Chau Wan Pipeline Joint Venture 6/WSD/13 Replacement and Rehabilitation of Water Mains, Stage 4 Phase 1 - Mains in Kwai Tsing, Tsuen Wan and Tuen Mun Kwai Tsing, Tsuen Wan and Tuen Mun 126.869 23-Oct-13 Dec-15 16/WSD/11 Replacement and rehabilitation of water mains, stage 4 phase 2 - submarine mains and associated works among Peng Chau, Sunshine Island and Hei Ling Chau Peng Chau, Sunshine Island and Hei Ling Chau Wo Hing Construction 411.504 30-Sep-13 Jan-16 4/WSD/11 Construction of Butterfly Valley Fresh Sham Shui Po and Kowloon Kwan On - China 336.440 24-Sep-13 Apr-16 Water Primary Service Reservoir City Geo Joint Venture Extension and Associated Mainlaying 3/WSD/13 Mainlaying near She Shan Tsuen, Tai Po Tai Po Tsun Yip Construction 74.990 10-Sep-13 Jul-16 Last Revision : 16.11.2015 Page 5 of 10

Active WSD Capital s No. 7/WSD/12 Title Construction of Pressure Management and District Metering Installations for Large Housing Estates and New Territories Villages in Tsuen Wan West, Tuen Mun, Sai Kung, Aberdeen, Shatin and Sheung Shui & Fanling Major Fresh Water Supply Zones Location of Tsuen Wan West, Tuen Mun, Sai Kung, Aberdeen, Shatin, Sheung Shui & Fanling or Lam Construction Start 327.210 29-Jul-13 May-17 3/WSD/12 Replacement and rehabilitation of water Hong Kong Island Excel 467.374 15-Mar-13 Dec-15 mains, stage 4 phase 1 - remaining mains on Hong Kong Island 15/WSD/10 Expansion of Tai Po Water Treatment and Ancillary Raw Water and Fresh Water Transfer Facilities - Design and Build of New Stream II Tai Po China State - ATAL Joint Venture 3,252.137 6-Feb-13 Aug-17 15/WSD/11 Replacement and rehabilitation of water Island District Kwan On 214.423 4-Oct-12 Dec-15 mains, stage 4 phase 2 - mains on Outlying Construction Islands 12/WSD/11 Replacement and rehabilitation of water Sha Tin, Tai Po, Yuen Long Wo Hing 475.716 27-Jun-12 Dec-15 mains stage 4 phase 2 - Dongjiang mains and North District Construction Co., and mains along Fan Kam Road Ltd. Last Revision : 16.11.2015 Page 6 of 10

No. Title 14/WSD/11 Replacement and rehabilitation of water mains, stage 4 phase 2 - mains in West Kowloon Active WSD Capital s Location of Sham Shui Po and Yau Tsim Mong or Company Ltd. Start 571.818 25-Jun-12 Dec-15 10/WSD/11 Replacement and Rehabilitation of Water North District, Tai Po and Excel 345.329 26-Apr-12 Dec-15 Mains Stage 4 Phase 1 - major mains in Sai Kung eastern New Territories 11/WSD/11 Replacement and rehabilitation of water Tsuen Wan and Kwai Tsing Pollard - CNCEC 739.931 23-Feb-12 Nov-15 mains stage 4 phase 2 - mains in Tsuen Joint Venture Wan and Kwai Tsing 13/WSD/11 Replacement and rehabilitation of water mains, stage 4 phase 2, mains in East Kowloon Wong Tai Sin, Kowloon City and Kwun Tong Company Ltd. 588.988 30-Jan-12 Dec-15 9/WSD/11 Uprating of Wan Chai Salt Water Supply Wan Chai and Central mid- Yick Hing 165.600 20-Jan-12 Feb-17 System - Mainlaying level Construction Last Revision : 16.11.2015 Page 7 of 10

Active WSD Capital s No. 3/WSD/11 Title Construction of Pressure Management and District Metering Installations in Western, Central, Eastern, Sai Wan, Kowloon West and Tsuen Wan East Major Fresh Water Supply Zones Location of Western, Central, Eastern, Sai Wan, Kowloon West and Tsuen Wan East or Gammon Construction Ltd. Start 291.550 30-Sep-11 Jun-15 10/WSD/10 Replacement and Rehabilitation of Water Sha Tin and Sai Kung Kwan On U-Tech 425.927 22-Aug-11 Dec-15 Mains, Stage 4 Phase 1 - Mains in Sha Tin Joint Venture and Sai Kung 9/WSD/10 Replacement and rehabilitation of water Tuen Mun and Yuen Long Chun Wo 431.235 29-Jul-11 Dec-15 mains, stage 4 phase 1 - major mains in Construction and western New Territories Co Ltd 12/WSD/10 Replacement and rehabilitation of water mains, stage 4 phase 1 - mains in Eastern and Southern Districts Eastern and Southern Districts Chun Wo Construction and 543.443 18-Jul-11 Dec-16 14/WSD/10 Replacement and rehabilitation of water mains, stage 4 phase 1 - mains in East Kowloon Wong Tai Sin, Kowloon City and Kwun Tong Company Ltd. 599.189 18-Jul-11 Dec-15 Last Revision : 16.11.2015 Page 8 of 10

No. Title 11/WSD/10 Replacement and rehabilitation of water mains, stage 4 phase 1 - mains in Central & Western and Wan Chai Districts Active WSD Capital s Location of Central & Western and Wan Chai Districts or Start 569.294 31-May-11 Dec-16 13/WSD/10 Replacement and rehabilitation of water West Kowloon, Kwai Tsing Excel 616.758 26-Apr-11 Dec-15 mains, stage 4 phase 1, mains in West and Tsuen Wan Kowloon, Kwai Tsing and Tsuen Wan 8/WSD/10 Replacement and rehabilitation of water mains, stage 4 phase 1 - mains in Tuen Mun, Yuen Long, North District and Tai Po Tuen Mun, Yuen Long, North District and Tai Po Hsin Chong Construction 449.904 26-Apr-11 Dec-15 8/WSD/08 Replacement and Rehabilitation of Water East Kowloon Lam Woo & Co. 204.477 23-Sep-09 Dec-15 Mains, Stage 3 Mains in East Kowloon Ltd. (Package B) 6/WSD/08 Replacement and Rehabilitation of Water West Kowloon Wo Hing 598.257 3-Jun-09 Dec-15 Mains, Stage 3 Mains in West Kowloon Construction Co. (Package B) Ltd. Last Revision : 16.11.2015 Page 9 of 10

No. Title 14/WSD/08 Replacement and Rehabilitation of Water Mains Stage 3 - Mains in Tuen Mun and Yuen Long 28/WSD/06 Replacement and Rehabilitation of Water Mains, Stage 2 Mains on Hong Kong Island North and South West Active WSD Capital s Location of or Tuen Mun and Yuen Long Chun Wo Construction and Quarry Bay, North Point, Chun Wo Causeway Bay, Wan Chai, Construction and Central, The Peak, Kennedy Co., Town, Pok Fu Lam, Kong Ltd. Sin Wan, Wah Fu, Aberdeen and Ap Lei Chau Start 275.000 11-Feb-09 Sep-15 362.948 30-Jun-07 Jul-15 Last Revision : 16.11.2015 Page 10 of 10