Certification rules for the mark

Similar documents
Pursuant to Convention No. 108 of the Council of Europe for the protection of persons with regard to the automated processing of personal data;

Requirements set for account holders and representatives of emissions trading accounts

Public Audit (Wales) Act 2004

Account Opening form Partnerships

Spillemyndigheden s Certification Programme Change Management Programme

1 SUBJECT AND FIELD OF APPLICATION SPECIAL RULES CERTIFICATION ACCORDING TO THE STANDARDS EN 9100 EN 9110 EN

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN

FIRE BEHAVIOR CERTIFICATION OF THERMAL INSULATION MATERIALS

Table of Contents. 1 P a g e

Quality Assurance Agreement (QAA)

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

How To Use An Online Server On Anet (Francis Francean) On A Pc Or Macbook Online (For Pc) On An Pc Or Ipnet (For Macbook) On Line) On Pc Or Pc Or Onnet

GUIDELINES FOR THE ADMINISTRATION OF INSURANCE AGENTS

Buying property Guide

Resources Based, Manufacturing and Consumer Goods Industries Chemicals Industry

Chapter 3 Financial Year

ENTITLEMENT TO PARTICIPATE IN THE ANNUAL GENERAL MEETING

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

CORPORATE ACCOUNT. ...we make the difference

How to Prepare Yourself For the 1st Year Citizenship Examination (AP)

REGULATIONS ON GENERAL SHAREHOLDERS MEETING Open Joint Stock Company Novolipetsk Steel (new revision)

CERTIMETIERSARTISANAT and ELECTRONIC SIGNATURE SERVICE SUBSCRIPTION CONTRACT SPECIFIC TERMS AND CONDITIONS

CLIENT / PROJECT MANAGER AGREEMENT

SPECIFIC AGREEMENT No./.. 1 ON A GRANT FOR AN ACTION

COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES

Tax update. Financial Transaction Tax Intended settlement date option: notification requirements. Important. Background

OECD SERIES ON PRINCIPLES OF GOOD LABORATORY PRACTICE AND COMPLIANCE MONITORING NUMBER 10 GLP CONSENSUS DOCUMENT

Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria

INFORMATION GOVERNANCE POLICY

NOTICE OF JOINT SHAREHOLDERS MEETING

INTERNATIONAL STANDARD ON RELATED SERVICES 4400 ENGAGEMENTS TO PERFORM AGREED-UPON PROCEDURES REGARDING FINANCIAL INFORMATION CONTENTS

Tender for the scanning & data capture of archive microfilms Supplier Background Questionnaire

CURRENT ACCOUNT OPENING DOCUMENT (LOCAL & FOREIGN CURRENCIES) CORPORATE ACCOUNT (PRIVATE & PUBLIC SECTORS)

PROXY / REPRESENTATIVE CARD. Particulars of Shareholder

PROPOSALS FOR GENERAL MANDATES TO BUY BACK SHARES AND TO ISSUE SHARES AND NOTICE OF ANNUAL GENERAL MEETING

GUIDANCE ON PERFORMING AUDITS ON BEHALF OF THE AGSA

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification

Methods Commission CLUB DE LA SECURITE DE L INFORMATION FRANÇAIS. 30, rue Pierre Semard, PARIS

INSURANCE ACT R.S.A. c. I16

Sales Agency Contract

Securities (Electronic Signature and Reporting) Regulations, Chapter 1: Interpretation

NATIONAL INTELLECTUAL PROPERTY OFFICE OF SRI LANKA

Qualified Persons in the Pharmaceutical Industry Code of Practice 2009, updated August 2015

AMMENDED CONVENING NOTICE FOR THE GENERAL MEETING OF THE SHAREHOLDERS OF SOCIETATEA NATIONALA NUCLEARELECTRICA S.A. Whereas

Malta Resources Authority Millennia, Aldo Moro Road, Marsa MRS 9065 Malta Telephone: (356) Fax: (356) Call for Quotations

Chapter 1 GENERAL INTERPRETATION

The NF Mark referential is constituted of this Certification Rules, the relevant standards and of the General Rules of the NF Mark.

Application for registration Building contractor (company)

Project reporting in FP6

COMMISSION REGULATION (EU) No /.. of XXX

-«Trustee Authority»: Entity that defines and regulates the conditions of assignment and use of Domain Names, applying to each particular Extension.

Align Technology. Data Protection Binding Corporate Rules Processor Policy Align Technology, Inc. All rights reserved.

TENDER NUMBER: ITT/SACU/015/2015/O Information and Communication Technology (ICT) Audit IT Effectiveness Review

PIKTRAKK GENERAL CONDITIONS OF SUBSCRIPTION TO THE MONITORING SERVICE FOR PUBLICATINONS ON THE INTERNET WITH THE DEBT RECOVERY SERVICE

Invitation to Express Interest CABLE BRIDGES STADIUMS

Application for Renewal or Extension of Certification

GRTGAZ NETWORK TRANSMISSION CONTRACT

BUDGET HEADING INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS

Service Management Policy

EEA Life Settlements Fund PCC Limited

SECTION 4: CLAIMS MANAGEMENT

CHAPTER II. - International Transfer of Players

Contract Terms and Conditions Of Engagement Of Limited Company Suppliers

LICENCE AGREEMENT FOR THE USE OF THE EKOENERGY LABEL

Wales Patient Access Scheme: Process Guidance

Rules for the certification of event sustainability management system

TENDERS ARE INVITED FOR INFORMATION TECHNOLOGY CONSULTANCY SERVICES

23. The quality management system

Spillemyndigheden s Certification Programme Change Management Programme

CZECH REPUBLIC ACT ON BONDS

Business Ethics Conduct Guide Gifts.&.Hospitality Guidelines

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

STATUTE OF THE POLISH ACCREDITATION COMMITTEE

Private Health Insurance Intermediaries. Document 2: Self-Audit Questionnaire. Version 2

Business Ethics Conduct Guide User guide on Ethics Alert

APPROVED Sberbank Supervisory Board decision Minutes No. dated September Sberbank Corporate Secretary Regulations

NABL NATIONAL ACCREDITATION

Wine Proficiency test Organization 2009

Explanatory leaflet WHEN AND WHERE TO SEND YOUR RETURN AND PAY YOUR WITHHOLDING TAX

Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system

Please retain for your reference Terms and Conditions for the Royal Mail Consumer Redirection Service and Special Circumstances Redirection Service

OECD Series on Principles of GLP and Compliance Monitoring Number 8 (Revised)

Schweizerische Informatikkonferenz Conférence Suisse sur l'informatique Conferenza Svizzera sull Informatica

Sub: Appointment as an Independent Director on the Board of GMR Infrastructure Limited

Rules for the certification of asset management systems

Internal Regulation of BONUS Baltic Organisations Network for Funding Science EEIG

ORIENTAL BANK OF COMMERCE (A GOVT. OF INDIA UNDERTAKING)

A reservation request accompanied by its accepted payment shall be deemed a firm order.

APPLICATION FORM ASSESSMENT OF PSYCHOLOGY QUALIFICATIONS

Transcription:

Identification No.: NF148 Version No.: 2 Date of approval: 13/12/2012 Edition date: 19/12/2012 Certification rules for the mark Validation of analysis methods Application to water analysis APPENDIX Validation, extension or modification applications Certification Body: AFNOR Certification 11 rue Francis de Pressensé 93571 La Plaine Saint Denis Cedex - France Telephone: +33 1 41 62 80 00 Fax: +33 1 49 17 90 00 http://www.afnor-validation.com http://www.afnor.org certification@afnor.org

Certification rules NF148 Appendix 1 page 1/10 This appendix specifies the content of the certification application to be presented to AFNOR Certification by the applicant. The application must be drafted in French or in English and sent to the following address: AFNOR Certification 11 rue Francis de Pressensé 93571 La Plaine Saint Denis Cedex France It includes the following chapters: 1 - general information about the applicant and the expert laboratory chosen by the applicant (please see standard document A), 2 - a letter of commitment from the applicant which is also signed by his legal representative in the European Economic Area (EEA), if the applicant is outside of the EEA (please see standard document B), 3 - detailed identification of the origin and the nature of all of the chemicals and materials which may be needed to implement this method and which are not supplied by the manufacturer, 4 - * a description of the method which is the subject of the application and the reference method (please see standard document D), 5 - ** a preliminary draft study drawn up according to the guidelines in the document "Requirements regarding the preliminary and inter-laboratory studies carried out by an expert laboratory". Only documents 3, 4 and 5 are presented to the Technical Board. * The items in standard document D can also be included in the preliminary draft study specified in point 5. ** The delivery of the preliminary draft study may be postponed. However, this document must be sent to AFNOR Certification at least one month before the presentation date. In the case of a modification or extension application, this must be drafted by the holder according to the model letter in standard document C, accompanied by a commitment by his legal representative in the European Economic Area (EEA) if the holder is from outside the EEA. The application must be drafted in French or in English and sent to the address mentioned above. If applicable, documents 1, 3, 4 and/or 5 must be filled in or modified. The certification and extension applications are examined in accordance with sections 4 and 5 of the certification rules.

Certification rules NF148 Appendix 1 page 2/10 STANDARD DOCUMENT A GENERAL INFORMATION ABOUT THE APPLICANT 1 NAME OF THE COMMERCIAL ANALYSIS METHOD CONCERNED 2 APPLICANT'S CORPORATE NAME (Company responsible for putting the product to be validated on the market) - Corporate name: - Address: - Legal representative's name and capacity (1) : - Telephone: - Fax: - E-mail: - SIRET no. (French business registration number) (2) : - Intracommunity VAT number (3) : 3 PRODUCTION SITE (to be completed if different from applicant designated above) - Corporate name: - Address: - Legal representative's name and capacity (1) : - Telephone: - Fax: - E-mail: - SIRET no. (French business registration number) (2) : - Intracommunity VAT number (3) : 4 CORPORATE NAME OF THE REPRESENTATIVE IN EUROPE (to be completed if the applicant is based outside of the EEA) - Corporate name: - Address: - Legal representative's name and capacity (1) : - Telephone: - Fax: - E-mail: - SIRET no. (French business registration number) (2) : - Intracommunity VAT number (3) : (1) The legal representative is the individual legally responsible for the company (2) To be entered for French companies (3) Essential for countries in the European Economic Area (EEA)

Certification rules NF148 Appendix 1 page 3/10 5 PRINCIPAL RAW MATERIAL SUPPLIER(S) All of the suppliers must be listed, as must the products that they produce. The principal raw materials are specified in 3.3.5.1 of the certification rules. NB: This information will remain strictly confidential at AFNOR Certification. Supplier no. 1 Name: Address: Product manufactured: Name - Telephone: of official: Telephone: Certification (4) : Fax: E-mail: Supplier no. 2 Name: Address: Product manufactured: Name - Telephone: of official: Telephone: Certification (4) : Fax: E-mail:......... (4) Specify whether the supplier is ISO 9001 and/or ISO 13485 certified, and attach the corresponding certificates. 6 NAME OF THE EXPERT LABORATORY CHOSEN BY THE APPLICANT The list of expert laboratories approved for carrying out the validation studies for the domain concerned is available on request from AFNOR Certification. - Name and address of the expert laboratory: - Contact: - Telephone: - Fax: - E-mail:

Certification rules NF148 Appendix 1 page 4/10 STANDARD DOCUMENT B Validation application to be drafted on applicant's headed letter paper (Include the letter on page 6/10 if the applicant is outside of the EEA) The Managing Director AFNOR Certification 11 rue Francis de Pressensé 93571 La Plaine Saint Denis Cedex France SUBJECT: APPLICATION FOR THE RIGHT TO USE THE NF VALIDATION MARK INCLUDED: Technical dossier Dear Madam, May I please ask you to process this validation application dossier for the analysis method hereafter known as: Name of the analysis method:... Area of application requested (Scope):..... [If applicable, in relation to the following reference method:...] I hereby declare that I am familiar with the general rules of the NF VALIDATION mark, the certification rules of the NF VALIDATION mark (application to water anaysis) and its appendices. I commit myself to: - complying with the requirements of the said documents, throughout the duration of the right to use the NF VALIDATION mark, as well as the decisions taken or to be taken in application of the requirements by AFNOR Certification when instructed by the Technical Board, - informing AFNOR Certification of any significant change to the organisation of manufacturing and monitoring processes and, in general, the quality management of the validated method, - facilitating the tasks to be undertaken by the auditors mandated by AFNOR Certification in light of the certification rules and its appendices, - drafting in either English or French all of the documents concerning the products in question and the organisation of their quality management as well as providing an interpreting service during the audits carried out by the auditors mandated by AFNOR Certification (if a language other than French or English were to be used), - complying wholly and unreservedly with the decisions taken in accordance with the general rules of the NF VALIDATION mark, the certification rules of the NF VALIDATION mark and its appendices, - settling the amounts established in the financial framework of the certification rules for the NF VALIDATION mark and making any subsequent payments demanded of me in compliance with these certification rules.

Certification rules NF148 Appendix 1 page 5/10 I also commit myself to respecting the deadlines decided by AFNOR Certification (ACE) concerning the organisation of Technical Board meetings as follows: 1. The expert laboratory shall send the draft preliminary study document to ACE, before the deadline decided by ACE (in general 3 to 4 weeks before the meeting date) 2. The expert laboratory shall send the preliminary study report or the inter-laboratory study report (and any additions) or any other necessary document (such as draft technical notices, etc.) to ACE, before the deadline decided by ACE (in general 3 to 4 weeks before the meeting date) I take notice that AFNOR Certification will only put on the next meeting agenda the validation files (draft study or study report) for which the complete documents are published before the deadline. Consequently only completed studies the results of which are known when drafting the meeting agenda shall be part of the next meeting agenda. Any study not completed when drafting the agenda will not be presented at the next meeting. Its presentation shall be delayed to another meeting. This procedure aims to guarantee the best organisation for Technical Board meetings. Yours faithfully, (If applicable (1) :) On (date).in (place) Name and signature of the legal representative of the applicant On (date).in (place) Name and signature of the legal representative of the manufacturer (1) If the applicant markets the product and is not the manufacturer of said product, the certification application is made jointly with the manufacturer (see 4.2.1 of the certification rules).

Certification rules NF148 Appendix 1 page 6/10 Letter to be included if the applicant is outside of the EEA (on the applicant's headed letter paper) The Managing Director AFNOR Certification 11 rue Francis de Pressensé 93571 La Plaine Saint Denis Cedex France SUBJECT: APPLICATION FOR THE RIGHT TO USE THE NF VALIDATION MARK JOINT COMMITMENT INCLUDED: Technical dossier Dear Madam, The analysis method.which is the subject of the attached application for usage rights dated... will be sold in the European Economic Area (EEA) through (1) : Company's full name and address:...... I authorise Mr or Mrs.. (named in person) to act on my behalf when in contact with AFNOR Certification for all issues regarding the validated methods which are sold throughout the EEA. I agree to immediately report any change of the aforementioned representative to AFNOR Certification. I thereby commit myself, jointly and severally with the aforementioned company, to complying with the general rules of the NF VALIDATION mark, the certification rules of the NF VALIDATION mark and its appendices for the domain concerned, as defined in the attached usage rights application. Yours faithfully, On (date) in (place) Name and signature of the legal representative of the applicant To be preceded by the handwritten text "Fit for Representation" On (date) in (place) Name and signature of the aforementioned representative To be preceded by the handwritten text "Fit for acceptance of the representation" (1) The manufacturer must appoint a physical person who represents him in the EEA (see 4.2.1 of the certification rules).

Certification rules NF148 Appendix 1 page 7/10 STANDARD DOCUMENT C Extension application to be drafted on applicant's headed letter paper (Include the letter on page 9/10 if the applicant is outside of the EEA) The Managing Director AFNOR Certification 11 rue Francis de Pressensé 93571 La Plaine Saint Denis Cedex France SUBJECT: APPLICATION FOR THE EXTENSION OF THE RIGHT TO USE THE NF VALIDATION MARK FOR A VALIDATED ANALYSIS METHOD INCLUDED: Technical dossier Dear Madam, On the. (validation date), the right to use the NF VALIDATION mark was granted for the following method: - Full trade name:.. - Certificate no.: - Scope:.. - [If applicable, reference method: ] - Manufactured in the plant..., located at... (plant's complete address), which is under my authority. Choose one of the following options (1), (2) or (3): (1) I would like to apply for an extension to the right to use the NF VALIDATION mark for the following reason: Modification of the validated analysis method - Listing of the modifications made to the validated method: - Full trade name of the modified method (if different from the previous one):... - Manufactured in the plant..., located at... (plant's complete address), which is under my authority. I hereby declare that no other modification has been made to this alternative method. This new method replaces does not replace the initially validated method.

Certification rules NF148 Appendix 1 page 8/10 (2) I would like to apply for an extension to the right to use the NF VALIDATION mark for the following reason: Extension of the scope of this validated analysis method for the following area(s): I hereby declare that no other modification has been made to this alternative method. (3) I would like to apply for an extension to the right to use the NF VALIDATION mark for the following reason: Modification of the validated analysis method AND extension of the scope: - Listing of the modifications made to the validated method: The scope is extended to: - Full trade name of the modified method (if different from the previous one):... - Manufactured in the plant..., located at... (plant's complete address), which is under my authority. I hereby declare that no other modification has been made to this alternative method. This new method replaces does not replace the initially validated method. Yours faithfully, (If applicable (1) :) On (date).in (place) Name and signature of the legal representative of the applicant On (date).in (place) Name and signature of the legal representative of the manufacturer (1) If the applicant markets the product and is not the manufacturer of said product, the certification application is made jointly with the manufacturer (see 4.2.1 of the certification rules).

Certification rules NF148 Appendix 1 page 9/10 Letter to be included if the applicant is outside of the EEA (On the applicant's headed letter paper) The Managing Director AFNOR Certification 11 rue Francis de Pressensé 93571 La Plaine Saint Denis Cedex France SUBJECT: APPLICATION TO EXTEND THE RIGHT TO USE THE NF VALIDATION MARK JOINT COMMITMENT INCLUDED: Technical dossier Dear Madam, The analysis method.with certificate reference no.... subject of the attached application to extend the usage rights dated... will be sold in the European Economic Area (EEA) through (1) : Company's full name and address:...... I authorise Mr or Mrs.. (named in person) to act on my behalf when in contact with AFNOR Certification for all issues regarding the validated methods which are sold throughout the EEA. I agree to immediately report any change of the aforementioned representative to AFNOR Certification. I thereby commit myself, jointly and severally with the aforementioned company, to complying with the general rules of the NF VALIDATION mark, the certification rules of the NF VALIDATION mark and its appendices for the domain concerned, as defined in the attached application for extension of the usage rights. Yours faithfully, On (date) in (place) Name and signature of the legal representative of the applicant To be preceded by the handwritten text "Fit for Representation" On (date) in (place) Name and signature of the aforementioned representative in the EEA. To be preceded by the handwritten text "Fit for acceptance of the representation" (1) The manufacturer must appoint a physical person who represents him in the EEA (see 4.2.1 of the certification rules).

Certification rules NF148 Appendix 1 page 10/10 This document must include: 1. A descriptive section which must present: STANDARD DOCUMENT D - the principle behind the commercial analysis method, a diagram or a photo of the method, indepth instructions of use for the method (operating manual, technical notice, etc.), any restrictions on the use of the method and the method's history (first manufacturing and first sale dates), - the scope requested for validation, - [If applicable, the reference method's description or number, if a standard is concerned,] - items indicating the originality and interest of the commercial analysis method (e.g. a list of users) and approximate costs. 2. A bibliographical section which must include (if applicable) - a list of publications, - a summary of these publications which could contribute to the preliminary study as outlined in the corresponding validation protocol (see 3.2). 3. In the case of a validation granted by another body (for example: AOAC, etc.), the following minimum requirements are needed: - the AOAC validation reference, specifying the programme followed if applicable (example for AOAC: Official methods, AOAC Performance Tested Methods, etc.), - a certificate form this body stating that the validation is still valid and has not been annulled, expired or modified since the validation date, - a description of the reference method used for the validation (if applicable), - the list of products tested during the validation study.