March 27, 2014. Massachusetts Institute of Technology Research Reactor

Similar documents
July 31, Dear Dr. Biegalski:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, Palo Verde Nuclear Generating Station, Units 1, 2, and 3

OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 ENERCON SERVICES, INC. - NRC EVENT FOLLOWUP INSPECTION REPORT /

May 23, 2006 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

NUCLEAR REGULATORY COMMISSION. 10 CFR Part 73 [NRC ] RIN 3150-AJ37. Cyber Security Event Notifications

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Defense Logistics Agency; DLA Strategic Materials

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

****"" ",,~,..,- "1'>-0'1'..<, NUCLEAR REGULATORY COMMISSION /:! ('l WASHINGTON, D.C

Levy Nuclear Plant Units 1 and 2. COL Application. Part 1. General and Financial Information. Revision 7

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC

DRAFT REGULATORY GUIDE

NRC REGULATORY ISSUE SUMMARY , REQUESTING QUALITY ASSURANCE PROGRAM APPROVAL RENEWALS ONLINE BY ELECTRONIC INFORMATION EXCHANGE

Sara Brock Counsel for NRC Staff

June 27, Scott C. Flanders, Director Division of Site Safety and Environmental Analysis Office of New Reactors

Steven A. Arndt Division of Engineering Office of Nuclear Reactor Regulation

PUBLIC MEETING. details&code APPLICATIONS FOR NUCLEAR POWER PLANTS Regulatory Guide [Revision]

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1.

ARE VA AREVA INC. August 31, 2015 NRC:15:035. U.S. Nuclear Regulatory Commission Document Control Desk Rockville Pike Rockville, MD 20852

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

Crystal River Unit 3 License Transfer Notification of Transfer Date

NUCLEAR REGULATORY COMMISSION [EA ; NRC ] In the Matter of Northern States Power Company, Minnesota

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT / )

Security Requirements for Spent Fuel Storage Systems 9264

78776 Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices

1 Revision 4 dated 08/13/07

May 30, Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff

October 20, 2004 LOUISIANA ENERGY SERVICES - REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING PLAN

1J,4Zc6 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT

OWestinghouse. U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C February 1, 2010

Westinghouse - NEI ML To meet with Westinghouse to discuss their construction. scheduling software. TITLE. Sr.

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC June 16, 2011

REGULATORY GUIDE (Draft was issued as DG-1207, dated August 2012)

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C June 1, 2005

V K Raina. Reactor Group, BARC

AUDIT REPORT. Audit of NRC s Shared S Drive. OIG-11-A-15 July 27, 2011

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls

AoDI. December 9, 2015 NOC-AE CFR U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC

May 5, Mr. Brian Almon Public Utility Commission of Texas 1701 N. Congress Avenue P.O. Box Austin, Texas

Executive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15)

Proposal to Consolidate Post-Fukushima Rulemaking Activities

Options for Cyber Security. Reactors. April 9, 2015

March 20, On Wednesday, March 7, 2012, the U.S. Nuclear Regulatory Commission s staff held a public

May 7, SUBJECT: NRC INSPECTION REPORT FOR AREVA-NP GmbH / , NOTICE OF VIOLATION, AND NOTICE OF NONCONFORMANCE

MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate

Nuclear Information Records Management Association, Inc. 10 Almas Road, Windham, NH

NRC Cyber Security Regulatory

Ifred M. P~aglia Manager, Nuclear Licensing. March 14, 2013 NND

August 15, Docket No License No Control No

Transcription:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 27, 2014 LICENSEE: FACILITY: SUBJECT: Massachusetts Institute of Technology Massachusetts Institute of Technology Research Reactor SUMMARY OF MARCH 6, 2014, PUBLIC MEETING WITH MASSACHUSETTS INTITUTE OF TECHNOLOGY RE: DIGITAL INSTRUMENTATION AND CONTROL UPGRADE LICENSE AMENDMENT APPLICATION On March 6, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Massachusetts Institute of Technology (MIT) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of this meeting was to discuss the MIT design concept for their proposed digital instrumentation and control (I&C) upgrade. MIT stated that they plan to submit the associated license amendment request (LAR) in September 2014. A list of attendees is provided as an enclosure. MIT presented slides (See Agencywide Document Access and Management System (ADAMS) Accession No. ML14078A636) describing their current Instrumentation for neutron flux scrams. This system includes ten detectors and eight channels, six of which are used for reactor trip. These latter six are arranged in two groups of one-out-of-three coincident logic (i.e., period and power trips): Channels 1 and 2 are of the same design and are interchangeable. Each uses a fission chamber and an uncompensated ion chamber as the neutron sensing elements. The fission chamber is operated as a pulsed counter in the source range to provide visible neutron level indication at reactor startup. The uncompensated chamber is operated in the power range once the fission chamber saturates after a four decade power increase. Channel 3 uses an uncompensated ion chamber and provides a safety system scram initiated by its associated scram amplifier at a period between 10 and 11 seconds. Channels 4, 5, and 6 use uncompensated boron-lined ion chambers as the neutron sensing elements. Each high flux trip is set to provide a reactor scram at a detector output for that channel that corresponds to a reactor power of 6.6 megawatts. Channel 7 utilizes a compensated ion chamber as its neutron sensing element. This channel is the console operator's principal indication of reactor power. Channel 8 utilizes an uncompensated ion chamber as its neutron sensing element. Its principal function is to provide an indication of the reactor power level when offsite electrical power has been lost.

- 2 - Then MIT presented the plan for the new instrumentation, which includes four detectors and two-out-of-four coincident logic. The four detectors will be used for both period and power trips. Some discussion was held regarding a report previously docketed by MIT (ADAMS Accession No. ML13339A344). Specifically, the NRC staff pointed out that this report predominately addressed one piece of equipment (i.e., Mirion s DWK 250 system). The NRC staff expressed interest in the following additional information: 1) MIT s Plan (e.g., LAR outline) for the LAR. Specifically, how MIT is planning to address Draft Chapter 7 of NUREG-1537, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, which will be issued as an Interim Staff Guidance. 2) The NRC Staff expressed an interest in knowing what all of the configurable parameters were (Mirion and Applicant), and how the proper setting will be demonstrated. 3) MIT s Regulatory Evaluation. The NRC Staff recommended three topics for a subsequent Phase 0 meeting: 1) Coincidence logic boards a. Development b. Testing (e.g., Simplicity Elimination of consideration of common cause failure) 2) Existing Certifications (e.g., Technischer Uberwachungsverein e.v (TUV)) a. System Software Version Numbers b. Mirion Configurable Items c. User Configurable Items 3) NUREG-1537 Compliance Plan a. Outline for LAR b. Plan for Addressing Criteria in NUREG-1537 The meeting was attended by MIT staff, individuals representing Mirion Technologies (vendor), and NRC staff. Additional individuals participated in the meeting through audio teleconferencing.

- 3 - Members of the public were in attendance. Public meeting feedback forms were received. Please direct any inquiries to me at 301-415-3724, or Duane.Hardesty@nrc.gov. Docket No. 50-20 Enclosure: List of Attendees cc: See next page /RA/ Duane A. Hardesty, Project Manager Research and Test Reactor Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

- 2 - Members of the public were in attendance. Public meeting feedback forms were received. Please direct any inquiries to me at 301-415-3724, or Duane.Hardesty@nrc.gov. Docket No. 50-20 Enclosure: List of Attendees cc: See next page /RA/ Duane A. Hardesty, Project Manager Research and Test Reactor Licensing Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation DISTRIBUTION: Public AAdams, NRR PBlechman, NRR PRLB R/F RidsNrrOd GBowman, NRR RidsNrrDprPrta RidsNrrDpr DHardesty, NRR JThorp, NRR NCarte, NRR WSchuster, NRR RidsAcrsAcnw_MailCenter ADAMS Accession Nos.: Pkg.: ML14078A659; Meeting Notice: ML14056A550; Meeting Summary: ML14078A545; Meeting Handout: ML14078A636 (Non-Prop) NRC-001 OFFICE DPR/PRLB/PM DPR/PRLB/LA DPR/PRLB/BC DPR/PRLB/PM NAME DHardesty PBlechman AADAMS DHardesty DATE 03/20/2014 03/25/2014 03/26/2014 03/27/2014 OFFICIAL RECORD COPY

LIST OF MEETING ATTENDEES March 6, 2014 Meeting with Massachusetts Institute of Technology Digital Instrumentation & Control Upgrade Name Organization Duane Hardesty U.S. Nuclear Regulatory Commission (NRC) Alexander Adams, Jr. NRC Norbert Carte NRC William Schuster* NRC Thomas O Malley Mirion Technologies Roy Ray Mirion Technologies Franz Terheiden* Mirion Technologies Roderik Wiedemeier* Mirion Technologies Edward Lau Massachusetts Institute of Technology (MIT) Susan Tucker MIT Tom Newton MIT Shawn Hanvy MIT Dan Cronin* University of Florida Training Reactor (UFTR) Brian Shea* UFTR * *Participated via telecon

Massachusetts Institute of Technology Docket No. 50-20 cc: City Manager City Hall Cambridge, MA 02139 Department of Environmental Protection One Winter Street Boston, MA 02108 Beverly Anderson, Interim Director Radiation Control Program Department of Public Health Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129 John Giarrusso, Planning and Preparedness Division Chief Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611 Dr. Thomas H. Newton Director of Reactor Operations Massachusetts Institute of Technology Research Reactor MITNRL-NW 12 138 Albany Street Cambridge, MA 02139