A Contract for Just Digging a Hole



Similar documents
The FIDIC Suite of Contracts

IN FIDIC 99 RED BOOK COULD IT BE SUPERVISION CONSTRUCTION. Dr. Munther M. Saket. The Role of the Engineer

Speaker: CHRISTOPHER WADE, Chief Engineer, SWECO International, Stockholm, Sweden l, and Chairman of FIDIC Contracts Committee

The FIDIC Form of Contract. The Fourth Edition of the Red Book. 2nd Edition. Nael G. Bunni

TENDER DOCUMENTS. Procurement of Works. Small Contracts (Small Value, Short Duration and Low Risk) Public Procurement Board.

PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS

1.1 In these Terms and Conditions, the following words shall have the following meanings:

Measured development Construction and Engineering Training Supplement Guide

FIDIC users guide A practical guide to the 1999 Red and Yellow Books. Brian W. Totterdill

inform practice note SUBCONTRACTING ARRANGEMENTS Content Synopsis: Practice Note # 7 May 2007 (Version 1 - May 2007) construction industry development

Conditions of Contract for CONSTRUCTION

Terms & Conditions Verder B.V. ( ) Filed at the Chamber of Commerce on

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

MDB Harmonised Particular Conditions

Contractor s Claims Under The FIDIC Contracts For Major Works

Nominated Subcontractors on International Projects: Approaches to Risk Allocation

GENERAL TERMS AND CONDITIONS (version 3.0)

FIDIC S GREEN BOOK CLAUSES 6, 13 & 14

Outsourcing: key legal issues and contractual protections

A. UK, EUROPEAN AND INTERNATIONAL CONTRACT FORMS. I. Fédération Internationale des Ingénieurs-Conseils (FIDIC)

Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement

CONTRACTUAL CHANGES CONTROL VALUE AND MANAGE RISKS

Guidance Notes for the NEC Engineering and Construction Contract

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS

The New Standard Construction Contracts: NZS3910, 3916 and 3917

Basic Guide. General Conditions of Contract for Construction Works (GCC 2004)

THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION GENERAL CONDITIONS OF CONTRACT FOR BUILDING WORKS $ EDITION

Shtokman Development AG

15. Competent Court The competent court within the district of the Seller s place of business takes cognizance of all disputes which may arise

GENERAL CLAUSES AND CONDITIONS FOR ESA CONTRACTS

General Conditions Of Contract for Use in the Procurement and Erection of Plant at Site in the United Kingdom

TERMS AND CONDITIONS OF PURCHASE FOR CONSTRUCTION WORKS OF SIEMENS-GROUP AUSTRIA ISSUED DECEMBER 2012

General Terms and Conditions for Turbines and Steel Water Plants

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard

CONTRACT FOR CONSULTANCY SERVICES. Section 1 Form of Contract

GOVERNMENT OF MALAYSIA STANDARD FORM OF DESIGN & BUILD / TURNKEY CONTRACT (PWD FORM DB/T)

DESIRING to intensify economic cooperation between both States;

Risks in International Consultancy Appointments: The FIDIC White Book

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

Terms and Conditions of Sale

NEC3 Engineering & Construction Contract An Overview

General Terms and Conditions of Sales and Delivery (Version July 2009)

General Terms and Conditions of Peak Payroll Services B.V. In these General Terms and Conditions:

Single Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy

General Terms and Conditions for Ziviltechniker (Architects and Chartered Engineering Consultants) Services (hereafter: Terms)

Taking Action. Dispute resolution, legal action and claims for negligence

Terms & Conditions Domain Names, Web Hosting, Project Consultancy

DUIF S FLORIST ARTICLES B.V.

GENERAL TERMS AND CONDITIONS BDO Accountants & Belastingadviseurs B.V.

VOLVO CONSTRUCTION EQUIPMENT. CARETRACK LICENCE (Version 3 April 2010)

HONG KONG HOUSING AUTHORITY GENERAL CONDITIONS OF CONTRACT FOR BUILDING WORKS 2013 EDITION

TECHNICAL KNOWLEDGE BASE (TKB) USER AGREEMENT BETWEEN

Bonds. Brian E. Rawling, Brian E. Rawling & Associates

SHORT FORM of Contract

Writing - The Law of a Contract

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

SM031 APPENDIX G4. Procedures for introducing a consultant s deed of professional care (DoPC) into a D&C contract following Contract Award

GENERAL LOGISTICS CONDITIONS

A Guidance Note to. Conditions of Contract for Consultancy Services (2005)

MultiModal Liability RaetsMarine The fixed premium P&I specialist

Article 1: Subject. Article 2: Orders - Order Confirmation

WATERFRONT WORKERS (COMPENSATION FOR ASBESTOS RELATED DISEASES) ACT

(INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03

FIDIC's New Suite of Contracts - Clauses 17 to 19 Risk, Responsibility, Liability, Indemnity, Insurance and Force Majeure

Bills of Quantity. D. Atkinson December Nature of Bills

Standard Conditions of Appointment. Architect s Copy ONLINE VERSION ONLINE VERSION ONLINE VERSION. for an Architect (CA-S-07-A)

General Terms and Conditions for Supplier Credit Insurance GTC S

Holman Fenwick Willan CONSTRUCTION CAPABILITY

PROTOCOL ON CLAIMS, LEGAL PROCEEDINGS AND INDEMNIFICATION. To the. Framework Agreement

Contract Management. Brief 22. Public Procurement. September 2011

INDEX. bonded contract, 289 insureds, 243. misrepresentation, 291 obtaining, 242

CONTRACT CONDITIONS FOR LOGISTICS (2014)

TUPE 2006 Detailed Analysis

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

PROTECTION & INDEMNITY INSURANCE

NEC3: The Engineering and Construction Contract An overview

C1.2 CONTRACT DATA PROVIDED BY EMPLOYER (ECC3)

Article 2. Offers and quotations

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff. Risk Allocation in Construction Contracts

DRV Accountants & Adviseurs General terms and conditions Corporate Finance Versie

NORWEGIAN SUBSEA CONTRACT NSC 05 CONDITIONS OF CONTRACT

PREFACE. The Contract for the Supply and Delivery of Goods has been prepared for use in supplies contracts which have the following characteristics:

7.4.1 Be required to make exhaustive or continuous on-site reviews;

General Terms of Purchase. of HAN University of Applied Sciences

This document must be read in conjunction with Beacon Consulting s Fee Proposal. Together they form the Rules and Conditions of Service Delivery.

AGREEMENT WITH A SELF-EMPLOYED CONTRACTOR FOR CONSULTANCY SERVICES

INTERNATIONAL COMMITTEE OF THE RED CROSS

OFFICE OF GAS AND ELECTRICITY MARKETS TRANSITIONAL TENDER REGIME FOR OFFSHORE TRANSMISSION ASSETS DRAFT DATA ROOM POPULATION GUIDELINES

Clinical Trial Compensation Guidelines

TERMS OF ENGAGEMENT FOR LIMITED COMPANY CONTRACTOR

Thames Water Utilities Limited. Settlement deed

Australian Standard. General conditions of contract for design and construct. AS (Incorporating Amendment No. 1)

Building Work Contractors Act 1995

So You Want to Do Business with the Saudi Government

REQUEST FOR QUOTATION/ PURCHASE ORDER

Managing construction procurement risks

Waterfront Workers (Compensation for Asbestos Related Diseases) Act 1986

GENERAL PURCHASING TERMS AND CONDITIONS for products and services BOSKALIS A. GENERAL PROVISIONS

5. Conferment of rights and duties resulting from the contract to third parties by the Orderer need prior written affirmation by the Contractor.

Transcription:

A Contract for Just Digging a Hole Constantijn P.I.M. Dolmans A Contract for Just Digging a Hole Abstract In 1999 FIDIC published four new standard forms of contract: EPC Turnkey Projects; Plant and Design-Build with Design by the Contractor; Construction with Design by the Employer (the former FIDIC Red Book); and the Short Form of Contract. This new work does not meet specific dredging and reclamation work needs. Consequently, FIDIC formed a Task Group to examine the possibility of a contract customised for the dredging industry. In the tradition of FIDIC, the new FIDIC Form of Contract for Dredging and Reclamation Works has been carefully developed by this Task Group and is now available in a test edition. Special thanks go to Philip Jenkinson from WS Atkins (Dredging Task Group Leader) for his valuable comments, and to the other members of the FIDIC Dredging Task Group: Tony Sanders of Mouchel, Edward Corbett of Corbett & Co. on behalf of FIDIC and Pieter Boer of Royal Boskalis Westminster on behalf of IADC. Constantijn Dolmans graduated from Leiden University in fiscal law (1995) and has a professional degree in insurance. He had worked as a costcontroller for BFI (currently SITA, a waste company) since 1992, when in 1997 he joined IADC. One of his first tasks was to comment upon FIDIC s draft for a new Conditions of Contract for Construction and he then became a member of FIDIC s Dredging and Reclamation Contract Task Group. Constantijn Dolmans Introduction For the smooth execution of a dredging project one cannot do without a strong and clear contract. The objectives of this contract should be (Bray et al.): - to describe accurately the work to be done and the conditions under which it is to be done; - to apportion risk; and - to provide a fair and equitable method of payment for that work when it is completed satisfactorily. FIDIC, the International Federation of Consulting Engineers, has a long history in publishing standard forms of contract for engineering construction. FIDIC was founded in 1913 as an association for national member associations in engineering and has at present a membership coming from nearly 70 countries. Their first standard forms were published in 1957. Editions in 1969 and in 1977 of the so-called Red Book included explicit provisions for dredging and reclamation works. However, the Fourth Edition of the Red Book in 1987 did not include these dredging provisions. To meet the specific requirements of dredging projects, IADC (International Association of Dredging Companies) published a Users Guide to this Fourth Edition of FIDIC s Red Book in 1990. This cooperation between the IADC and FIDIC provided the basis for developing the present publication (Figure 1). THE NEW FIDIC CONTRACTS In 1999 FIDIC published four new standard forms of contract, the Conditions of Contract for: - EPC Turnkey Projects; - Plant and Design-Build with Design by the Contractor; - Construction with Design by the Employer (the former FIDIC Red Book); and - the Short Form of Contract. 3

Terra et Aqua Number 85 December 2001 high operational costs inevitably means higher than normal risks in the event of change on a project. The very nature of dredging activities, i.e. at various depths underwater, creates difficulties in obtaining accurate information regarding sub-soil conditions. Climatic and physical operating conditions such as wave height have a higher impact than on most other construction operations, particularly with regard to safety for workers. THE FIDIC DREDGING CONTRACT; A LEGAL FRAMEWORK The need for a special short and simple dredging contract was clear. IADC contacted FIDIC about the possibility of a separate FIDIC dredging contract and a Task Group was formed. On the strong basis of FIDIC s Short Form of Contract, the Task Group produced the FIDIC Form of Contract for Dredging and Reclamation Works. The test edition of this dredging contract was published in June 2001. The formal first edition is to be published a year later, taking into consideration the comments that may arise from the test edition. The contract is published under full responsibility of FIDIC and the ultimate decisions on the form and content of the document rests with FIDIC s Executive Committee. Input to the contract has been given, not only by IADC, but also by consulting engineers, employers and organisations like the World Bank. Figure 1. The cover of the new FIDIC Form of Contract for Dredging and Reclamation Works, Test Edition 2001. In the past, the Fourth Edition of the Red Book has often been used as a basis for contracts for dredging and reclamation works. However, IADC felt that its successor the new Contract for Construction with Design by the Employer was not suitable for application to dredging and reclamation works. The new Contract for Construction has an extensive size. One might say, It is just a little bit too large for just digging a hole under water. Furthermore, in this new Contract for Construction, no special attention is given to the wide variety of circumstances in dredging and reclamation works. The dredging industry is a specialised, capital-intensive sector of the construction industry. The execution of a dredging project not only necessitates technical knowledge associated with civil engineering construction projects but also maritime expertise about the operation of a dredging vessel and compliance with international maritime shipping law. The logistics of ensuring continuous sufficient work for the specialised fleet coupled with the massive capital investment and The aim has been to produce a fair, balanced and straightforward document which includes all essential commercial provisions. It may be used for all types of dredging and reclamation work and ancillary construction with a variety of administrative arrangements. Under the usual arrangements for this type of contract, the Contractor constructs the Works in accordance with design provided by the Employer or by his Engineer. As in the construction industry in general, more and more works are contractor-designed. Therefore, the form may easily be altered into a contract that includes, or wholly comprises, contractor-designed Works. The essential part of a dredging contract is formed by the description of the activity itself; the specifications, drawings and design of the work. The FIDIC Form of Contract for Dredging and Reclamation Works provides a legal framework to this. It governs the general obligations and responsibilities of the contracting parties. The document starts with an Agreement a simple document that incorporates the tenderer's offer and its acceptance. All relevant data should be included in the Appendix to the Agreement. References to documents forming part of the contract such as the specification and the drawings are also made in this 4

A Contract for Just Digging a Hole Employer Ruled by FIDIC Contract assignment and compliance with duties mutual obligations and responsibilities NOT Ruled by FIDIC Contract Engineer instructions Contractor Figure 2. Relationships between parties to the Contract and the Engineer. Appendix. The General Conditions are expected to cover all essential elements of the legal framework. Nevertheless, every situation is unique. Modifications may be required in some jurisdictions or may be necessary to suit special circumstances. Users are able to introduce Particular Conditions if they wish to handle such special cases or circumstances. CONTRACT PARTIES AND THE ENGINEER The FIDIC Form of Contract for Dredging and Reclamation Works is a two-party contract between the Employer and the Contractor. However, contrary to FIDIC s Short Form, provision is made for an Engineer, as is usual for dredging and reclamation works. Although this Engineer is not a party to the contract, he has an important role in the execution of the work (Figure 2). The Role of the Engineer The FIDIC Dredging Form gives the Engineer several duties and authorities, such as: - approval of contractor s design; - the authority to instruct variations to the Contractor; - the issuing of Taking Over Certificates; and - the certification of payments. This important role especially when executed by an experienced engineer is to the benefit of both Employer and Contractor. The Employer is ensured of expert advice and the Contractor has an experienced partner with whom to work, resulting in a more costefficient execution of the dredging project. The issuing of Taking Over Certificates and certification of payments by the Engineer may often be necessary in projects that are externally financed by government bodies or international organisations such as the World Bank. However, if there is no need for an Engineer in the Contract in smaller projects an experienced Employer may want to act for himself directly the FIDIC Dredging Form can be easily adjusted to a contract without an Engineer. In line with the other major FIDIC Contracts, the Engineer is no longer expected to be an impartial person or organisation. After years of discussion, FIDIC broke with the tradition of the impartial Engineer. The close relationship between the Employer, who pays the bill, and the Engineer made the independence of the Engineer questionable in practice. It does not mean that in the new FIDIC Contracts the Engineer may do whatever he wants. The Dredging Form states: The Engineer and any assistants shall exercise their duties and authority in a fair manner in accordance with the Contract. If disputes or differences between the Employer and the Contractor, including dissatisfaction with decisions of the Engineer, cannot be settled amicably, the FIDIC Dredging Form provides for resolution of the dispute by a Dispute Adjudication Board (DAB). This DAB has in fact taken over the impartial decisional role of the Engineer in case of disputes. Should the decision of the DAB not satisfy one or both parties to the Contract, the FIDIC Dredging Form provides for international arbitration under the Rules of Arbitration of the International Chamber of Commerce. RISKS AND RESPONSIBILITIES Within the execution of a dredging project there may never be a situation in which all required information is available. Unexpected events, whether caused by nature or people, may occur. These uncertain factors 5

Terra et Aqua Number 85 December 2001 CONTENTS of the FIDIC FORM OF CONTRACT for DREDGING and RECLAMATION WORKS AGREEMENT Offer Acceptance Appendix GENERAL CONDITIONS General Provisions Definitions The Contract Persons Dates, Times and Periods Money and Payments Other Definitions Interpretation Priority of Documents Law Communications Statutory Obligations The Employer Provision of Site Permits and Licences Site Data Employers Authorised Person The Engineer The Engineer s Duties and Authority Instructions Approvals The Contractor General Obligations Contractor s Representative Subcontracting Performance Security Design by Contractor Contractor s Design Responsibility for Design Defined Risks Time for Completion Execution of the Works Programme Extension of Time Late Completion Taking-Over Completion Taking Over Certificate Taking Over Part of the Works Remedying Effects Remedying Defects Dredging Works Uncovering and Testing Variations and Claims Right to Vary Valuation of Variations Early Warning Contractor s Right to Claim Variation and Contractor s Claim Procedure Employer s Claims Contract Price and Payment Valuation of the Works Advance Payment Monthly Statements Interim Payments Payment of Retention - Dredging Works Payment of Retention - Other Works Final Payment Currency Delayed Payment Default Default by Contractor Default by Employer Insolvency Payment upon Termination Risk and Responsibility Contractor s Care of the Works Contractor s Indemnities Limit of Contractor s Liability Force Majeure Insurance Arrangements Failure to Insure Resolution of Disputes Adjudication Notice of Dissatisfaction Arbitration Index of Sub-Clauses Particular Conditions Rules for Adjudication Notes for Guidance Annexes - Forms of Securities 6

A Contract for Just Digging a Hole in the execution of construction projects are risks. The purpose of any contract is to allocate these risks between the parties to the contract. Risks can best be borne by the party that is best able to handle the risks. Technical risks, for instance, like the safety of a dredging vessel, may be best controlled by the Contractor, whereas an Employer may have better knowledge of the specific conditions of the Site where the project has to be executed (Figure 3). Of course, the best means of avoiding unexpected situations is by informing each other as adequately as possible. Therefore the FIDIC Dredging Form gives the Employer the obligation to supply the Contractor with all Site data relevant to the execution of the work prior to tendering. The Contractor is responsible for the interpretation of these data and for making thorough enquiries as far as practicable taking into account cost and time. Contractor's share of risk & duties Low High Employer's share of risk & duties Low Contract Price Figure 3. Contractor s and Employer s shares of the risks and duties: the more risk for the Contractor the higher the price. High Low High Sometimes one party can more easily fulfil an essential condition for the execution of the project than the other party. In dredging projects the Employer, for instance a port authority, can often obtain the permits and licences needed for the execution of the work more readily. The FIDIC Dredging Form therefore makes the Employer responsible for this activity. Figure 4. Major dredging projects today often involve multiple vessels from several companies, working 24 hours a day, 7 days a week. The FIDIC Form of Contract addresses the need for clarity in contractual agreements amongst all parties.

Terra et Aqua Number 85 December 2001 Of course, circumstances differ from project to project (Figure 4). The allocation of risk must fit the specific project and the General Conditions of the FIDIC Dredging Form should be adjusted by Particular Conditions when necessary. However, the allocation of risk should remain fair and practicable. In a project where the Employer is responsible for almost everything, there is little incentive for optimal performance by the Contractor. On the other side of the balance, an Employer that transfers all the risks and duties to the Contractor will have to pay a very high price. In that case there is little flexibility for variation and the project will certainly be expensive. Liability The fact that one party bears the risk for an event that happens or has not fulfilled his duty in other words that party is responsible does not automatically mean the party is liable for the consequences and that these consequences result in a valid claim under the contract. The Dredging Form is clearer on this subject than the other FIDIC Forms of Contract. A clear view of risks and liability is of course very important in the execution of dredging projects where small things can have major consequences in time and money. Responsibility may lead to a liability when a party suffers a loss as a consequence of inappropriate action of the responsible party. Sometimes, when a party suffers a loss as a consequence of certain events like adverse climatic conditions, this may also lead to liability of the responsible party (Figure 5). When a party is liable he should indemnify the other party for his loss according to the conditions of the contract. The way the indemnification a valid claim should be calculated may already have been agreed in the contract, particularly in the Appendix. Insurance arrangements may cover the indemnifications that have to be paid by one party to the other. The general provision in the FIDIC Dredging Form is that the Contractor effects these insurances before the work starts. The FIDIC Dredging Form takes care of the specific needs in dredging projects related to insurance. In general, the marine insurance policy of the Contractor will cover hull and machinery and often liability for the dredging vessels. For dredging works, insurance of the Works, Materials, Plant and Fees (as in a normal Construction All-Risk or Contract Works Insurance) is not possible. You cannot insure a hole under water. But when non-dredging works are involved, the FIDIC Dredging Form also requires insurance of these during the construction. Of course, damage to other property of the Employer, death or injury to the Employer, Engineer or their personnel and third-party liability should also be insured under the FIDIC Dredging Form. Members of the FIDIC Dredging Task Group Philip Jenkinson graduated from Oxford University in Engineering Science, qualified as a Chartered Civil Engineer, and is now a Principal Consultant with WS Atkins. He became Task Group leader for FIDIC s Short Form of Contract and most recently leader of the Dredging and Reclamation Contract Task Group. Tony Sanders OBE is a chartered quantity surveyor and Director of Dispute Management of Mouchel Consulting, specialised in civil engineering. Prior to joining the Dredging Task Group, he worked with FIDIC on the Orange Book and the Short Form of Contract. He is a member of the FIDIC President s List of Approved Adjudicators and the FIDIC List of Experts. Edward Corbett MA MSc FCI Arb, studied law at Oxford University and is the principal of Corbett & Co, a practice specialising in international construction law. He authored FIDIC Fourth Edition - A Practical Legal Guide and is now working on a Guide to the Orange Book. He is a member of the International Bar Association's committee on the FIDIC contract as well as the Task Group for the Short Form and Dredging Form of Contracts. Pieter Boer graduated as civil engineer from Delft University (1964),started at the Public Works Department of Rotterdam. He then switched to Hydronamic bv and continued his career within the Royal Boskalis Westminster group, becoming Director of Boskalis International in 1986. Retired from Boskalis, he is currently chairman of IADC s legal committee and as such was asked to join the Dredging Task Group. Constantijn Dolmans, author of this article, is Assistant to the Secretary General of the IADC and as such was invited to be a member of the Dredging Task Group. 8

A Contract for Just Digging a Hole Figure 5. Adverse climatic conditions, be it tropical storms or icey waters, as seen here, can have an influence on the risks involved in a dredging operation. Defects liability A specific responsibility that may lead to liability of the Contractor is a defect of the work. As under the other FIDIC Forms, the Contractor has to remedy at no cost to the Employer any defects due to the Contractor s Design, Materials, Plant or his (lack of) workmanship. Figure 6. Risks and responsibilities in the FIDIC Dredging Form. Normally, this obligation ends one year after taking over the project or the relevant part of the project. However, remedying defects after demobilisation of high value dredging equipment may lead to unreasonably high costs for the Contractor if remobilisation of this equipment is required. Furthermore, natural processes may also have their effect on the completed dredging work which may lead to defects that could not have been foreseen. Therefore, under the FIDIC Dredging Form, the Contractor has no obligation to remedy defects in dredging works after the completion date of these works. This does not mean that the Contractor will not be held liable for the defect after completion. When the Contractor is liable, he may still have to indemnify the Employer. duties responsibility liability indemnity risks When the contract involves more than dredging works only, a clear distinction should be made in the specifications and the drawings between dredging works and non-dredging works. The FIDIC Dredging Form explicitly insurance 9

Terra et Aqua Number 85 December 2001 Figure 7. Dredging works are often a part of larger construction projects, such as this fixed link bridge in Argentina. The FIDIC contract asks for a clear distinction between dredging and non-dredging works. asks for such a distinction (Figure 7). It may appear to be in favour of the Contractor that there is no time period allocated for notification of defects after completion of dredging works. However, this condition is also very much for the benefit of the Employer, as the existence of a defects notification period for dredging works would certainly increase the contract price. Nevertheless, the Employer has to be indemnified when he suffers a loss as a consequence of defects in dredging works due to one of the Contractor s responsibilities. Conclusion Thanks to the cooperation of FIDIC and IADC as well as other organisations and persons, there is once again a standard construction contract that meets the special requirements of dredging and reclamation projects. In large projects where dredging and reclamation are just a part of the work, one of the other FIDIC contracts may still be suitable. However, even in these cases, the straightforward provisions and clear conditions of the FIDIC Dredging Form may help to design particular conditions for these standard contracts to meet specific dredging needs. circumstances, the FIDIC Dredging Form can easily be adjusted and particular conditions can be added. In addition, comments from users may in the future improve the FIDIC Dredging Form even further. References FIDIC (1999). Conditions of Contract for Construction (for Building and Engineering Works designed by the Employer); Conditions of Contract for Plant and Design-Build (for Electrical and Mechanical Plant and for Building and Engineering Works designed by the Contractor); Conditions of Contract for EPC Turnkey Projects; Short Form of Contract. FIDIC (2001). Form of Contract for Dredging and Reclamation Works. Bray, R.N., Bates, A.D. and Land, J.M. (1997). The Dredging Contract. Dredging, a Handbook for Engineers, 2nd Editon. UK. pp 313-345. The FIDIC Form of Contract for Dredging and Reclamation Works creates a fair and balanced legal framework for the optimal execution of dredging and dredging related projects. In general the provisions will suit most dredging projects. When needed due to specific 10