Detour Gold Provides New Life of Mine Plan for Detour Lake

Similar documents
CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER. TD Securities Mining Conference January 26-27, 2016

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

AVINO SILVER & GOLD MINES LTD.

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

(NYSE-MKT:XRA, TSX:XRC,

Acquisition of Rice Lake. December 2015

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

2015 FOURTH QUARTER REPORT BUILDING VALUE

How To Know If Goldcorp Is A Successful Company

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

NEWS RELEASE. Centerra Gold 2015 Year-End Reserve and Resource Update

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

CANADA S INTERMEDIATE GOLD PRODUCER. Denver Gold Forum 2015 September 20-23

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

Lydianinternational.co.uk TSX:LYD. Corporate Presentation June

Endeavour Management Presentation

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

First Quarter 2015 Investor Conference Call May 7, 2015

Mako Project, Eastern Senegal Completion of Scoping Study

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Corporate Presentation October 2015

2015 Third Quarter Results Webcast October 29, 2015

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014

Copper and Gold at Our Core

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Economic Highlights (In US$ unless otherwise indicated)

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

Denver Gold Show September 24, 2013

Q Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions

DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

For Immediate Release. Superior Plus Corp. to Acquire Canexus Corporation Enhancing and Expanding the Specialty Chemicals Platform

Corporate Presentation September 28, 2015

How To Mine And Treat Ore From Castle Hill Stage 1

RAGING RIVER EXPLORATION INC. ANNOUNCES 2015 YEAR END RESERVES AND UPDATED 2016 GUIDANCE

BIOX ANNOUNCES 2016 FIRST QUARTER RESULTS

China Gold International Resources Corp. Ltd.

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

Q Results November 12, 2015 FNV TSX/NYSE

Corporate Presentation January 25, 2016

FORWARD-LOOKING STATEMENTS

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

Savannah North Scoping Study Looking into the future 3 February 2016

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

AGNICO-EAGLE MINES LIMITED

SILVER STANDARD REPORTS THIRD QUARTER 2015 RESULTS

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

For personal use only

Q Financial Results Conference Call

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

Second Quarter 2015 Investor Conference Call August 7, 2015

Focusing on Near Term Production and Exploration in Quebec

Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

PRESS RELEASE SEMAFO FOR IMMEDIATE RELEASE. SEMAFO Reports 2011 Cash Flow from Operations of $172 Million

MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION

Antapaccay Precious Metals Stream

Cau+onary Notes. Avnel Gold MINING LIMITED 2 TSX:AVK

2012 Results Conference Call Presentation. 15 February 2013

Aurvista Gold Plans Significant Exploration Program at Douay

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

FOR IMMEDIATE RELEASE

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

Management Discussion and Analysis for the quarter ended March 31, 2015

TASEKO ANNOUNCES SECOND QUARTER RESULTS FOR FISCAL 2007

KATANGA MINING ANNOUNCES 2013 YEAR END RESULTS AND COMMITMENT OF GLENCORE TO EXTEND AND INCREASE LOAN FACILITIES

Almonty Industries Inc. to Acquire Woulfe Mining Corp. and become the Leading International Tungsten Company

GUYANA GOLDFIELDS INC.

Trip to Pulacayo. Pulacayo - Paca

Corporate Presentation November 2015 TSX: ORA

Corporate Presentation U.S. Marketing

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Bengal Energy Fourth Quarter and Fiscal 2016 Year End Results

NEWS RELEASE TAHOE RESOURCES AND LAKE SHORE GOLD ANNOUNCE BUSINESS COMBINATION

Golden Band Resources Inc.

Canadian Oil Sands Reports Over $1 Billion of Cost Savings Achieved at Syncrude Year to Date

GALANE GOLD LTD. MANAGEMENT S DISCUSSION AND ANALYSIS For the three and nine months ended September 30, 2015

Annual General and Special Meeting

Q3 Highlights. Company earnings during the quarter totaled $3.3 million ($0.01 per share).

Resources Rising Stars

Supply, Logistics, Marketing and Information Technology. Executive General Manager Commercial and West Africa

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

news release November 9, 2015

ELECTRA GOLD LTD. MANAGEMENT DISCUSSION AND ANALYSIS QUARTER ENDED JUNE 30, 2014

Management s Responsibility for Financial Reporting

Building our Future. Investor Presentation. November Efemçukuru Gold Mine, Turkey

Transcription:

January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan ( ) for its Detour Lake mine located in northeastern Ontario. All dollar amounts are in Canadian dollars unless otherwise stated. US$ refers to United States dollars. New Life of Mine Plan A National Instrument 43-101 ("NI 43-101") technical report for the new life of mine ( ) plan will be filed today on SEDAR (www.sedar.com) and posted on the Company s website (www.detourgold.com). Highlights Proven and probable open pit reserves increased to 16.4 million ounces contained gold Average annual gold production of approximately 655,000 ounces over Average annual gold production of approximately 617,000 ounces in next three years 23-year mine life with mill throughput increasing from 56,000 to 63,000 tpd in 2019 total site costs of US$690 per ounce produced 1 capital costs of $1.1 billion (excluding closure costs) After-tax NPV5% of $3.9 billion, using long-term gold price of $1,475/oz We are very pleased to report this new life of mine plan, stated Pierre Beaudoin, COO of Detour Gold. For the first time, the Technical Report was prepared by Detour Gold s technical team. We were successful in delivering a gold production profile above 650,000 ounces per year and a mine plan that significantly reduces the front-end strip ratio. This was possible by integrating West Detour, formerly known as Block A. We now have an increased reserve and mine life and a significantly de-risked operation which yields a higher net present value. De-risked New Life of Mine Plan The key differences with the prior plan (February 2014) are as follows: Reduced operational risks: Lowered maximum mining rate from 140 to 124 million tonnes (Mt) Reduced waste to ore strip ratio for the first 9 years from 4.8:1 to 4.0:1 (a reduction of 160 Mt of waste) Incorporated second feed source from the West Detour deposit Operating costs based on 3 years of operational experience Increased plant throughput capacity to 23 Mt (post-2018) from 22.3 Mt (post-2017) Re-allocated capital in next 9 years (a portion of the capital originally required for the Detour Lake pit is transferred to the West Detour pit) 1 Refer to the section on Non-IFRS Performance Measures at end of the news release. 1/6

Added processing of fines from the low grade stockpiles ( LG Fines ) to the operation starting in 2019 (1 Mt per year) Use of West Detour pit for waste stockpiles and tailings deposition Key Inputs from Plan New (01/2016) Prior (02/2014) 1 Economic Assumptions (long-term) Gold price (US$/oz) $1,200 2 $1,200 Exchange rate (US$/Cdn$) 1.23 3 1.10 4 Electricity ($/kwh) $0.04/$0.08 5 $0.05/$0.08 6 Diesel fuel ($/L) $0.80 7 $0.95 Income/mining tax rate (%) 25/10 25/10 Net Smelter Royalty (%) 2.0 2.0 Mine Parameters Total mined (Mt) 2,214 8 1,956 Ore mined (Mt) 490 429 Strip ratio (waste:ore) 3.5 3.6 Ore milled (Mt) 514 9 437 Average gold grade (g/t) 0.99 1.03 Estimated gold recovery (%) 91.9 92.2 Total recovered gold (M oz) 15.1 13.3 Mine life (years) 23 20 Average annual gold production (oz) 655,000 665,000 Costs Capital costs (including mine closure) ($ M) 1,225 1,022 Total site costs (US$/oz produced) 10 690 736 (1) Adjusted to commence in 2016 by removing 2014 and 2015 production and costs. (2) Gold price estimated at US$1,075/oz for 2016, US$1,150/oz for 2017, US$1,200/oz for 2018+. (3) US$/C$ exchange rate estimated at 1.33 for 2016, 1.25 for 2017, and 1.23 for 2018+. (4) US$/C$ exchange rate of 1.08 for 2016 and 1.10 for 2017+. (5) Electricity costs estimated at $0.04/kWh for 2016-24 and $0.08/kWh for 2025+. (6) Electricity costs estimated at $0.05/kWh for 2016-19 and $0.08/kWh for 2020+. (7) Diesel fuel estimated at $0.75/L in 2016 and 2017 and $0.80 for 2018+. (8) Excludes LG Fines from the mineralized waste stockpiles. (9) Includes 20 Mt of LG Fines processed over. (10) Refer to the section on Non-IFRS Performance Measures at end of the news release. 2015 Year-end Mineral Reserves Mineral reserves increased 10% from year-end 2014 with the addition of the West Detour project and the processing of LG Fines. The mineral reserves for the Detour Lake mine and West Detour project are summarized below (refer to the table and notes at end of news release for additional details on the mineral resources and reserves). As at December 31, 2015 Tonnes (millions) Grade (g/t Au) Contained Gold (000 s oz) Proven and Probable Reserves Detour Lake Mine (+ stockpiles) 445.5 1.01 14,480 West Detour project 48.8 0.98 1,529 LG Fines 20.0 0.60 386 Total P&P 514.3 0.99 16,395 Note: Mineral reserves estimated using a gold price of US$1,000/oz at a US$/C$ exchange rate of 1.10. 2/6

Mine Production Plan The mining of the Detour Lake pit in parallel with the West Detour pit results in an optimal mine production plan. The processing of LG fines adds a third source of ore and contributes to achieving a plant throughput capacity of 23 Mt. Mining rates are expected to peak at 124 Mt per year over the, with the next 9 years at an average of 114 Mt per year. For Detour Lake, the ultra-class haulage truck fleet is projected to increase from the current 25 to 29 CAT 795 trucks in 2017 with no additional shovels beyond the current two electric rope shovels and three hydraulic shovels. The mining fleet for West Detour consists of smaller equipment (up to 30 trucks CAT 777) and two new hydraulic excavators (CAT 6030). The permitting and consultation process for West Detour is progressing, with mining (pre-stripping) projected to commence in 2018. The Company will continue to stockpile material grading between 0.40 to 0.50 g/t Au (estimated at 113 Mt averaging 0.45 grams per tonne (g/t Au) over ) in order to process the LG Fines. In the plan, the processing of LG Fines commences in 2019 at a rate of 1 Mt per year. The ultimate plant capacity is projected at 23 Mt per year (60,000 tonnes per day (tpd) from runof-mine and 3,000 tpd from the LG Fines). The mine plan assumes a gradual ramp-up between 2016 and 2019. Summary of the mine production plan: Description 3-Year Average 2016-18 2019-21 2022-24 2025-27 2028-30 2031-33 2034-36 2037-38 Average Ore milled (Mt) 21.4 23.0 23.0 23.0 23.0 23.0 23.0 18.1 22.4 514 Head grade (g/t Au) 0.98 0.89 1.06 0.89 0.87 1.06 1.15 1.08 0.99 0.99 Gold recovery (%) 91.5 92.0 92.0 92.0 92.0 92.0 92.0 92.0 91.9 91.9 Gold production (k oz) 617 607 721 604 589 719 781 580 655 15,072 Total Total mined (Mt) 104.8 119.4 118.8 123.2 118.7 88.5 51.5 19.4 96.3 2,214 Strip ratio (waste:ore) 3.8 4.9 3.5 4.9 5.5 2.5 1.4 0.5 3.5 3.5 Operating and Capital Costs The most significant change from the prior study is an increase in mining costs over the ($2.76/t vs $2.60/t mined) mainly as a result of lower assumed productivities and increased operating costs for the smaller sized West Detour fleet. Approximately 75% of operating costs are based in Canadian dollars and 25% have US dollar exposure. Capital costs over the are estimated at $1.1 billion (excluding closure costs), of which $104 million is for West Detour. Capital costs over the next three years are estimated at $314 million, of which $80 million is for West Detour. Approximately 60% of capital costs are based in Canadian dollars and 40% having US dollar exposure, and are variable depending on the delivery of the US dollar denominated mining fleet. Total site costs 1 for the period 2016 to 2018 and over the are projected to average US$812 and US$690 per ounce produced, respectively. 1 Refer to the section on Non-IFRS Performance Measures at end of the press release. 3/6

Summary of operating and capital costs: Description Units 3-Year Average Average Total 2016-18 2019-21 2022-24 2016-38 2016-38 Mining Unit Costs 1 $/t mined 2.74 2.58 2.54 2.76 - Processing Unit Costs 1 /t milled 8.34 7.20 7.19 8.14 - G&A Unit Costs 1 $/t milled 2.83 2.45 2.43 2.47 - Site Operating Costs 2 $ M 529 539 534 512 11,767 Capital Costs 3 $ M 105 62 28 53 1,225 Total Site Costs 1,4 $ M 634 601 562 565 12,992 US$/oz 812 803 632 690 690 (1) Refer to the section on Non-IFRS Performance Measures at end of the press release. (2) Includes all site costs including bullion delivery, refining and costs related to agreements with Aboriginal communities. (3) Includes closure costs. (4) Costs per ounce are reported in US dollar per ounce produced. US$/C$ exchange rate of 1.33 in 2016, 1.25 in 2017 and 1.23 in 2018+. Economic Sensitivity Analysis The economic cash flow model, based on a long-term gold price of US$1,200/oz and a US$/C$ exchange rate of 1.23, generates an after-tax net present value (NPV) at a 5% discount rate of $3.9 billion. The economics of the Detour Lake operation are most sensitive to changes in gold price, the Canadian and US dollar exchange rate and mine operating cost changes. The sensitivity analysis shows that: a $100/oz gold price change impacts the after-tax NPV5% by approximately $500 million a $0.20/t mined change impacts the after-tax NPV5% by approximately $200 million Qualified Persons A NI 43-101 compliant Technical Report will be filed today on the Company s website and on SEDAR. For further information or details regarding technical information associated with the Detour Lake mine and development of the West Detour project, refer to the Technical Report. The report was prepared by the Detour Gold Technical Services Department, led by Drew Anwyll, Senior Vice President Technical Services, a Qualified Person (QP) under National Instrument 43-101. Mr. Anwyll has reviewed and approved the content of this news release. Workshop Presentation The Company will host a workshop presentation today at 10:00 AM E.T. to review the plan. The details of the webcast are as follows: Go to www.detourgold.com and click on the Webcast link on home page For further information, please contact: Paul Martin, President and CEO Laurie Gaborit, Director Investor Relations Tel: (416) 304.0800 Tel: (416) 304.0581 Detour Gold Corporation, Commerce Court West, 199 Bay Street, Suite 4100, P.O. Box 121, Toronto, Ontario M5L 1E2 4/6

Detailed Mineral Reserve and Resource Tables (Effective December 31, 2015) Mineral Reserves Tonnes (millions) Grade (g/t Au) Contained Gold Ounces (000 s oz) Detour Lake Mine Proven 89.2 1.26 3,603 Probable 351.6 0.95 10,779 Stockpiles 4.8 0.64 98 Total P&P 445.5 1.01 14,480 West Detour Proven 1.8 0.99 56 Probable 47.0 0.97 1,473 Total P&P 48.8 0.98 1,529 LG Fines Probable 20.0 0.60 386 Total P&P 514.3 0.99 16,395 Mineral Resources Tonnes (millions) Grade (g/t Au) Contained Gold Ounces (000's) Detour Lake Mine Measured 17.4 1.33 746 Indicated 66.2 1.00 2,125 M+I 83.6 1.07 2,871 West Detour Measured 0.4 0.85 10 Indicated 36.5 0.86 1,005 M+I 36.9 0.86 1,015 Total M+I 120.5 1.00 3,886 Detour Lake Mine Inferred 33.7 0.81 875 West Detour Inferred 8.6 0.89 246 Total Inferred 42.3 0.82 1,121 Notes: 1. Mineral resources and reserves were completed by Detour Gold in conformity with generally accepted definitions and guidelines given in the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Mineral Reserves as required by NI 43-101. 2. Mineral reserves were estimated using a gold price of US$1,000/oz and mineral resources were estimated using a gold price of US$1,200/oz at a US$/C$ exchange rate of 1.10. 3. Mineral reserves and resources were based on a cut-off grade of 0.50 g/t Au. 4. Mineral reserves included an average mining dilution of 5.3% from 2016 to 2018 and 4% for 2018+, at a diluting grade of 0.20g/t Au. Mining ore loss of 5% also included. 5. Only Probable LG Fines scheduled in the mine plan were reported as mineral reserves. The LG fines reserves were based on a cut-off grade of 0.40 g/t Au. 6. Mineral resources are reported exclusive of mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. 7. Totals may not add due to rounding. Information Concerning Estimates of Mineral Reserves and Resources The mineral reserve and resource estimates reported in this news release were prepared in accordance with Canadian National Instrument 43-101Standards of Disclosure for Mineral Projects ( NI 43-101 ), as required by Canadian securities regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission ( SEC ) applies different standards in order to classify mineralization as a reserve. In particular, while the terms measured, indicated and inferred mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, inferred mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes inferred mineral resources, except in rare cases. 5/6

Non-IFRS Financial Performance Measures The Company has included certain non-ifrs measures in this news release. The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an improved ability to evaluate the underlying performance of the Company. The non-ifrs measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers. Total site costs, total site costs per ounce and various unit costs Detour Gold reports total site costs and total site costs per ounce on a produced basis in this news release. Total site costs include production and operating costs such as mining, processing, site general and administration, bullion shipment, refining, agreements with Aboriginal communities, capital costs (excluding closure costs) and net of silver sales. These are exclusive of depreciation and depletion. The Company calculates total site costs per ounce as the sum of total site costs (as described above) divided by the total gold ounces produced. Gold ounces produced are noted before delivering the royalty in kind ounces. Detour Gold reports the following unit costs: Mining unit costs: calculated as mining costs divided by total tonnes mined (ore + waste). Processing unit costs: calculated as process costs (excluding bullion delivery and refining) divided by the total tonnes milled. G&A unit costs: calculated as site G&A costs (excluding costs related to agreements with Aboriginal communities) divided by total tonnes milled. Other companies may calculate this measure differently as a result of differences in underlying principles and policies applied. Forward-Looking Information This press release contains certain forward-looking information as defined in applicable securities laws (referred to herein as forward-looking statements ). Specifically, this press release contains forward-looking statements regarding average annual gold production of approximately 655,000 ounces; average annual gold production of approximately 617,000 ounces in next three years; mill throughput of 63,000 tpd in 2019; capital costs of $1.1 billion (excluding closure costs); a waste to ore strip ratio for the first 9 years of 4.0:1; plant throughput capacity of 23 Mt (post-2018); mining rates peaking at 124 Mt per year over the ; average mining rates of 114 Mt per year over the next nine years; an increase in the ultra-class haulage truck fleet; the commencement of mining (pre-stripping) of West Detour in 2018; the processing of LG Fines commencing in 2019 at a rate of 1 Mt per year; an ultimate plant capacity of 23 Mt per year; approximately 75% of operating costs being based in Canadian dollars and 25% being based in US dollars; capital costs of $1.1 billion (excluding closure costs) over the ; capital costs over the next three years of $314 million; and average total site costs for the period 2016 to 2018 and over the of US$812 and US$690 per ounce produced, respectively. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Detour Gold s ability to predict or control and may cause Detour Gold s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled Description of Business - Risk Factors in Detour Gold s 2014 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and capital costs; the Company s ability to attract and retain skilled staff; the mine development schedule; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; timing of the receipt of regulatory and governmental approvals for development projects and other operations; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements. 6/6