ERROR AND OMISSION POLICY University of Illinois

Similar documents
STANDARD CONTRACT EXECUTION FORMS

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

CONTRACT ADMINISTRATION AND MANAGEMENT GUIDE

Memorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E.

GUIDELINES TO UNIVERSITY OF MARYLAND CONSULTANT AGREEMENT <$5,000

BYLAWS OF NVM Express, Inc. A Delaware nonprofit corporation

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

PN /16/ CRITICAL PATH METHOD PROGRESS SCHEDULE

City of Powell Request for Proposals for a Total Compensation Survey

Construction Performance Bond. THIS CONSTRUCTION PERFORMANCE BOND ( Bond ) is dated, is in the penal sum of. Sample Preview CONTRACTOR: Address

New Jersey Administrative Code. Encumbrance Accounting and Certifications of Availability of Funds

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS M. D. ANDERSON CANCER CENTER SERVICE PROVIDER for A PROJECT OF LIMITED SIZE OR SCOPE

CONTRACTORS STATE LICENSE BOARD Blanket Performance and Payment Bond Approved Final Text

OASIS PETROLEUM INC. SHORT-SWING TRADING AND REPORTING POLICY (Adopted as of May 17, 2010)

BUSINESS ASSOCIATE AGREEMENT WITH TRANSFUSION FACILITIES

State of Illinois Vendor Payment Program. Program Terms December 13, 2012

State of Rhode Island and Providence Plantations DEPARTMENT OF BUSINESS REGULATION Division of Insurance 233 RICHMOND STREET PROVIDENCE, RI 02903

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

388 Blohm Ave. PO Box 388 Aromas CA (831) FAX (831) ADDENDUM NO. 1


AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES. THIS AGREEMENT, effective this 20th day of April in the year, 2015, between:

Design Development Agreement

CHAPTER 179. BE IT ENACTED by the Senate and General Assembly of the State of New Jersey: 1. R.S.34: is amended to read as follows:

4. Chief Financial Officer (CFO). The employee designated by the OJA Executive Director as Division Director of Financial Services.

ATTACHMENT A ADMINISTRATIVE MEMORANDUM SELECTION OF INDEPENDENT CONTRACTORS

SPECIAL - PURPOSE LIMITED LIABILITY COMPANY AGREEMENT OF. LLC

WORKERS' COMPENSATION SECURITY FUND ACT Act of Jul. 1, 1937, P.L. 2532, No. 470 Cl. 77 AN ACT

IN THE CIRCUIT COURT THIRD JUDICIAL CIRCUIT MADISON COUNTY, ILLINOIS PART FIVE - LAW DIVISION AMENDED COURT RULES

The Designer estimates reaching satisfactory completion of the Services within six weeks of the Effective Date.

SERVICE PROVIDER AGREEMENT WITNESSETH. WHEREAS, the COUNTY desires to obtain the services of said PROVIDER as further described herein referred to as

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

CONSOLIDATED BILLING BUSINESS PROCESSES (UTILITY RATE READY)

DENVER URBAN RENEWAL AUTHORITY GUIDELINES FOR UTILIZATION OF SMALL BUSINESS ENTERPRISES IN URBAN REDEVELOPMENT PROJECTS.

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

CARDTRONICS, INC. POLICY ON COMPLIANCE WITH SHORT-SWING TRADING AND REPORTING LAWS. Amended and Restated as of November 13, 2013

National Stock Exchange, Inc. Waive-In Equity Trading Permit Holder Application

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K

PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS

STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

E-SIGN and EFT Disclosures and Online/Mobile Banking User Agreement

IMPORTANT! - Please use the attached Application for Payment. All payment requests must be submitted on our form. Thank you!

NOTICE OF BOND SALE $30,000,000 FLORIDA GULF COAST UNIVERSITY FINANCING CORPORATION

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

INSIDER TRADING AND BLACKOUT POLICY

INVOLUNTARY MEDICAL WITHDRAWAL

CLAIMS. Table of Contents

MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION ELECTRONIC SIGNATURE AGREEMENT

First Source Capital Mortgage, Inc.

CONTRACT POLICES & PROCEDURES MANUAL CONTRACT POLICIES AND PROCEDURES MANUAL

Personal Online Banking / Bill Pay Terms And Conditions

NOTICE OF SALE ALABAMA PUBLIC SCHOOL AND COLLEGE AUTHORITY

SAMPLE CONTRACT FOR CONSTRUCTION WITH GUARANTEED MAXIMUM PRICE (GMP) BETWEEN

OSWEGO COUNTY PURCHASING DEPARTMENT

CLEARING MEMBERSHIP AGREEMENT

Case KG Doc 373 Filed 11/20/15 Page 1 of 2 UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF DELAWARE. Chapter 11

Laborers Annuity Plan for Northern California 220 Campus Lane, Fairfield, CA Telephone: (707) Toll Free: 1-(800)

SERVICES AGREEMENT Agreement Consultant MBA SERVICES Consultancy Terms Consultant Notification Form FEES EXPENSES

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

INSIDER TRADING AND REPORTING POLICY

Title 1, Chapter 57 of the Texas Administrative Code

Texas Department of Transportation

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

THE CITY UNIVERSITY OF NEW YORK FERPA RELEASE FORM PERMISSION FOR ACCESS TO EDUCATIONAL RECORDS

Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION

Icetrak Fax to Contract Terms and Conditions

IN THE UNITED STATES DISTRICT COURT FOR THE SOUTHERN DISTRICT OF TEXAS HOUSTON DIVISION

Members, Council of Presidents. Advertisements for Architect/Engineer and Construction Manager Services and Calls for Bid

LIBERTY BANK ONLINE BILL PAYMENT ( BILL PAYMENT SERVICE ).

BUSINESS ASSOCIATE AGREEMENT

How To Design An Affordable Housing Rehabilitation Project

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

DASHBOARD CONFIGURATION SOFTWARE

THE UNIVERSITY OF UTAH INDEPENDENT CONTRACTOR SERVICES AGREEMENT INSTRUCTIONS

SECTION CONSTRUCTION SCHEDULE B. Part 1 - General Work Included Related Requirements Reference Standards...

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for

How To Use The Automatic Clearing House System (Ach) Electronically

New Jersey Educational Facilities Authority Request For Proposal Arbitrage Compliance Services

Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR:

Reclamation Manual Directives and Standards

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT PROFESSIONAL SERVICES. Part I: Qualifications Information

Request for Proposal (RFP) for Contract Management

Operating Agreement. WXYZ Company, LLC, a [State] Limited Liability Company

INSIDER TRADING AND BLACKOUT PERIOD POLICY STINGRAY DIGITAL GROUP INC. APRIL 21, 2015

PAN AMERICAN SILVER CORP. STOCK OPTION AND COMPENSATION SHARE PLAN. In this Plan, the following terms shall have the following meanings:

Manage Deliverables - Construction Step 6. July 12, 2012

Contract for Capital Purchase N [reference of the COMPANY]

TOWN OF WINDSOR REQUEST FOR QUOTES. Drying Bed Construction

CALIFORNIA SCHOOL FINANCE AUTHORITY CHARTER SCHOOL REVOLVING LOAN FUND PROGRAM LOAN AGREEMENT NUMBER

Transcription:

CAPITAL PROFESSIONAL SERVICES CONSULTANT (PSC) ERROR AND OMISSION POLICY University of Illinois Effective February 6, 2014 University Policy Statement: The policy and procedures of the University of Illinois require that a PSC s performance on a project be reviewed and damages assessed when the cumulative value of change orders due to PSC Errors and/or 30% of Omissions is equal to or exceeds 3% of the original construction bids. Modification: Neither this policy nor its process may be modified without the prior written approval of the University Office of Capital Programs & Real Estate Services. Background: In accordance with University Policy design errors and omissions that exceed minor levels on a project merit a review of the Professional Services Consultant s (PSC) performance and possible recovery of University cost due to the errors and omissions. PSC error and omission are defined as follows: PSC Error is defined as a change in buildings/systems design, detailing, or documentation in the contract documents that requires repurchase of materials, reconstruction of work in place, or revisions during the construction/warranty process to make the project work properly and that is the result from incorrect information or a lack of information. (See Appendix A for examples) PSC Omission is defined as a change or that portion of a change in buildings/systems design that could/should have been included initially in the contract documents and that does not require repurchase of materials or reconstruction of work in place and that is the result from incorrect information or a lack of information. (See Appendix A for examples). Exception: Costs due to programmatic changes made after completion of the bid documents, user changes, staff changes scope, or unforeseeable conditions are not considered an error or omission. Costs to comply with codes or standards that changed after issuance of the bid documents are not considered an error or omission. Delivery or schedule changes are not considered an error or omission except when they result from an error or omission. The University of Illinois has determined allowable acceptable limits for error and omission change orders that are acceptable without prejudice to the PSC, and require neither an assessment nor waiver of any assessment by the Project Manager (PM). On projects where the criteria are met, the CCU representative(s) shall either: 02/14 1

1. Assess the PSC the cost of the PSC Error change orders that they are directly responsible for that exceeds the allowable limits. Assess the PSC 30% of the PSC Omission change orders that exceed the allowable limits. This shall be accomplished by a modification to the PSC contract; and, if included as part of a final modification, the assessed amount shall be clearly shown in the calculations on the modifications. (See Appendix B for example); or 2. Waive the assessment. Waivers of any or all assessment(s) shall be documented in writing and indicate the factors that support the waiver of the assessment. 3. Based on the amount of the assessment above, approval of the assessment or waiver shall be as follows: Procedures: Sr. Associate Vice President of Business & Finance No Limit Assistant Vice President UOCP&RES Up to $30,000 PM/CCU Representative Up to $ 5,000 1. It is the PM s responsibility to classify all change orders. The PM shall consult with the CCU representative(s) and the project team as appropriate for determining the classification. The PM shall indicate on the Construction Contract Change Order form (See Appendix C) the appropriate classification. 2. The PM shall consider the PSC's overall performance and the complexity of the project, when making determination and/or recommendations on any waiver requests. Any error or omission classification disputes between the PSC and PM/CCU representatives may be changed with the written approval of the UIC Vice Chancellor for Administration, UIUC Executive Director of Facilities and Services, or UIS Associate Chancellor of Administrative Affairs. 3. Prior to the PSC s final payment and as part of the PSC s contract close out package, the PM shall initiate a memorandum documenting the disposition of any and all assessments on projects that exceeded the error and/or omission limits. This memorandum shall in all instances be submitted to, and if applicable, approved by, both the Senior Associate Vice President of Business and Finance and the respective campus representative as follows: UIC Vice Chancellor for Administration, UIUC Executive Director of Facilities and Services, or UIS Associate Chancellor of Administrative Affairs and state the amount to be assessed or waived. 4. The PSC shall be notified of any assessment by the PM prior to the final close out of the contract. Assessments shall be incorporated by a modification to the contract and the amount assessed clearly noted. 02/14 2

5. The PSC may appeal the assessment to the UIC Vice Chancellor for Administration, UIUC Executive Director of Facilities and Services, or UIS Associate Chancellor of Administrative Affairs upon notification from the PM of the pending modification to the contract. 6. A copy of the final PSC contract modification showing the assessment was either executed, or a memorandum from the PM indicating the approval of a waiver of the assessment, shall be included with the final voucher. 7. The PM shall use the University financial tracking system to monitor PSC error and omission change orders to ensure potential assessments do not exceed PSC contract funding. 8. PSC error and omission may affect the PSC performance evaluation. Policy Statement: All firms including sub-consultants, selected under the QBS Act, shall be formally evaluated at the conclusion of all projects. The results of the evaluation shall be given to firms evaluated and each firm shall have an opportunity to respond in writing. Firms may be evaluated at interim milestones, and the evaluation shared with the firms. All evaluations and responses from the firms shall be kept on file, and not made available to persons or firms outside the University. The QBS Act specifically exempts these evaluations and responses from the Freedom of Information Act. Evaluations by the Campus Construction Units resulting in less than acceptable performance plus any imposed assessments shall be forwarded for informational purposes to the University Office of Capital Programs & Real Estate Services. 02/14 3

Appendix A PSC Error and Omission Examples The following examples are intended for illustrative purposes only and shall not be deemed an inclusive list of PSC Errors and/or Omissions. Any determination(s) as to whether Errors and/or Omissions exist shall be made in accordance with the Error and Omission Policy and such determination(s) shall in no way be governed by the examples contained in this Appendix. PSC Error: PSC Error is defined as a change in buildings/systems design, detailing, or documentation in the contract documents that requires repurchase of materials, reconstruction of work in place, or revisions during the construction/warranty process to make the project work properly and that is the result from incorrect information or a lack of information. Example (1): Steel has been fabricated in accordance with contract documents and approved shop drawings but it is determined that the steel will not meet the functional requirements of the project. The cost to re-fabricate or replace the steel is considered an error. Example (2): A partition has been constructed and it is later determined that it should have been specified with a fire rating. The cost to remove and reconstruct the partition or any portion or components of the partition is considered an error. Example (3): A change to the MEP system(s) that requires reorder of materials or reconstruction of work in place. The cost of reordered materials of any restock value and the cost to reconstruct work in place are considered errors. Example (4): The cost to accelerate the work if the change impacts the critical path and will delay completion of the project past the established completion date is considered an error. PSC Omission: PSC Omission is defined as a change or that portion of a change in buildings/systems design that could/should have been included initially in the contract documents and that does not require repurchase of materials or reconstruction of work in place and that is the result from incorrect information or a lack of information. Example (1): It is determined that the steel, if fabricated in accordance with contract documents and prepared shop drawings will not meet the functional requirements of the project. Any and all costs related to reissuing the shop drawings are considered an error borne by the PSC. Additional costs related to the fabrication and/or erection of the steel are considered an omission. Example (2): The construction documents show a non-fire rated partition and it is determined prior to construction of the partition that it should have been specified with a fire rating. The added cost to construct the partition with the required fire rating is considered an omission. Example (3): A change to the MEP system(s) that is identified prior to installation and does not require reorder of materials or equipment or reconstruction of work in place. Any and all costs related to reissuing coordination drawings is considered an error borne by the PSC. The costs related to additional materials, equipment and/or installation are considered an omission. 02/14 4

Appendix B PSC Error and Omission Damage Assessment Example The following example is intended for illustrative purposes only. Any determination(s) as to whether Errors and/or Omissions exist and any Assessment(s) related thereto shall be made in accordance with the Error and Omission Policy. Such determination(s) shall in no way be governed by the example contained in this Appendix. The value of errors and 30% of the value of omissions are summed. The portion of the sum that exceeds 3% of the total value of the original construction bids is charged to the PSC. Example: Total value of original construction bids $1,000,000 Cost of changes due to errors $30,000 Cost of changes due to omissions $40,000 3% of the value of the original construction bids $30,000 Sum of errors and 30% of omissions Errors $30,000 Omissions (30% of $40,000) $12,000 Total $42,000 Total charged to the PSC $12,000 (sum of errors and 30% of omissions less $30,000) 02/14 5

APPENDIX C CHANGE ORDER EXAMPLE UNIVERSITY OF ILLINOIS CONSTRUCTION CONTRACT CHANGE ORDER for Contractor (no assignment) Project Name Contractor Name/ Address PSC Project No. UI Change Order No. UI RFP/EWA No. Change Order Amount UI Document No. UI Encumbrance No. UI Project No. Division of Work Contractor Project No. The above referenced contract is hereby amended to provide for the following described change(s) upon the terms set forth below: Contractor shall provide: (SCOPE) Original Calendar Days to Complete the Work Original Contract Amount $ Increase/(Decrease) in Calendar Days by Previous Change Orders Total of Previous Change Order(s) $ Increase/(Decrease) in Calendar Days by this Change Order Increase/(Decrease) by this Change Order $ Current Calendar Days to Complete the Work Revised Contract Amount $ Revised Substantial Completion / / As changed hereinabove, the above referenced contract shall continue in full force and effect. CLASSIFICATION (for UI use only) Client PSC Error CM Error Code/Stds Unforeseen Request Conditions Staff PSC CM Delivery/ Closeout Changes/ Omission Omission Schedule Scope BUDGET/SCOPE (for UI use only) Does NOT affect project budget and/or scope Affects project budget and/or scope (see attached documentation) Chart * Fund * Organization * Account * Program * Activity Location THE UNDERSIGNED HEREBY CERTIFY THAT THIS CONTRACT CHANGE ORDER IS GERMANE TO THE ORIGINAL CONTRACT AS SIGNED AND THAT THE CIRCUMSTANCES NECESSITATING THIS CONTRACT CHANGE ORDER WERE NOT REASONABLY FORESEEABLE AT THE TIME THE CONTRACT WAS SIGNED. THIS CONTRACT CHANGE ORDER IS IN THE BEST INTEREST OF THE UNIVERSITY OF ILLINOIS AND IS AUTHORIZED BY LAW. PSC/CM/Contractor Approvals University of Illinois Approvals Contractor Campus Construction Manager (CM) (if applicable) UOCP&RES (Change Orders $50,000 or more) Professional Services Consultant (PSC) Board of Trustees of the University of Illinois - Comptroller If this change is $250,000 or more, the following additional University of Illinois signatures are required: Robert A. Easter, President Thomas R. Bearrows, University Counsel Document Source: Template No Changes Contract Type: Capital Contract Sub Type: Construction Form approved by Legal Counsel - UOCP&RES 02/14