7010 COMPUTER STUDIES



Similar documents
7010 COMPUTER STUDIES

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

Investigate Requirements for Software Solutions

1 INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN

0417 INFORMATION AND COMMUNICATION TECHNOLOGY 0417/01 Paper 1 (Written), maximum raw mark 120

MARK SCHEME for the October/November 2008 question paper 9706 ACCOUNTING

IT2404 Systems Analysis and Design (Compulsory)

MARK SCHEME for the October/November 2011 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/23 Paper 2, maximum raw mark 120

MARK SCHEME for the October/November 2008 question paper 0452 ACCOUNTING. 0452/03 Paper 3, maximum raw mark 100

Cambridge General Certificate of Education Ordinary Level 7010 Computer Studies November 2013 Principal Examiner Report for Teachers

0452 ACCOUNTING 0452/02 Paper 2, maximum raw mark 100

MAHATMA GANDHI UNIVERSITY SCHOOL OF DISTANCE EDUCATION (MGU CBCSS UG SDE 2012)

Systems Investigation and Analysis. Systems Development. What is it? Why Plan?

MARK SCHEME for the October/November 2012 series 9709 MATHEMATICS. 9709/13 Paper 1, maximum raw mark 75

MARK SCHEME for the May/June 2010 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/22 Paper 22, maximum raw mark 120

9694 THINKING SKILLS

MARK SCHEME for the November 2005 question paper ACCOUNTING

9707 BUSINESS STUDIES

Appendix M INFORMATION TECHNOLOGY (IT) YOUTH APPRENTICESHIP

Web Load Stress Testing

0450 BUSINESS STUDIES

MARK SCHEME for the October/November 2010 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/11 Paper 1, maximum raw mark 120

MARK SCHEME for the May/June 2011 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/11 Paper 1, maximum raw mark 120

GCE APPLIED ICT A2 COURSEWORK TIPS

MARK SCHEME for the May/June 2010 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/21 Paper 21, maximum raw mark 120

0450 BUSINESS STUDIES

MARK SCHEME for the October/November 2010 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/22 Paper 2, maximum raw mark 120

ZIMBABWE SCHOOL EXAMINATIONS COUNCIL. COMPUTER STUDIES 7014/01 PAPER 1 Multiple Choice SPECIMEN PAPER

0417 INFORMATION AND COMMUNICATION TECHNOLOGY

MARK SCHEME for the May/June 2010 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/11 Paper 11, maximum raw mark 120

Swirl. Multiplayer Gaming Simplified. CS4512 Systems Analysis and Design. Assignment Marque Browne Manuel Honegger

MARK SCHEME for the May/June 2008 question paper 0452 ACCOUNTING. 0452/02 Paper 2, maximum raw mark 90

Critical Path Analysis & PERT Charts (taken from

INFORMATION SYSTEMS. Written examination. Friday 12 November 2004

0417 INFORMATION AND COMMUNICATION TECHNOLOGY

9084 LAW. 9084/23 Paper 2, maximum raw mark 50

Roadmap. Software Engineering. Software Engineering. Project Life Cycle. Database. Project Lifecycle

A system is a set of integrated components interacting with each other to serve a common purpose.

MARK SCHEME for the October/November 2012 series 9709 MATHEMATICS. 9709/11 Paper 1, maximum raw mark 75

9706 ACCOUNTING. Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for Teachers.

Oracle IVR Integrator

Assignment 2: Microsoft Project Toolset. Eric Palmer & Mahindra Bheodari. Kennesaw State University. IS 8100 Spring 2015

Information Systems Development Process (Software Development Life Cycle)

Applications Programs

A PROJECT PRESENTATION ON ONLINE MOVIE TICKET BOOKING SYSTEM. Submitted To : Department Of Computer Science

9707 BUSINESS STUDIES

Candidate A Exemplar Work

ONLINE SUPPLEMENTAL BAPPENDIX PROJECT SCHEDULES WITH PERT/CPM CHARTS

9699 SOCIOLOGY 9699/22 Paper 22 (Data Response), maximum raw mark 50

MARK SCHEME for the May/June 2007 question paper 9699 SOCIOLOGY. 9699/02 Paper 2 (Data Response), maximum raw mark 50

SYLLABUS. Cambridge IGCSE Computer Studies. For examination in June and November 2014

Configuration Manual

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education. Paper 1 May/June hours

OKLAHOMA SUBJECT AREA TESTS (OSAT )

9707 BUSINESS STUDIES

(Refer Slide Time: 01:52)

0510 ENGLISH AS A SECOND LANGUAGE

Process / Operation Symbols

9231 FURTHER MATHEMATICS

MARK SCHEME for the May/June 2011 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/21 Paper 2, maximum raw mark 120

Project Time Management

TECHNICAL SUPPORT GUIDE

Algorithms, Flowcharts & Program Design. ComPro

0452 ACCOUNTING. 0452/22 Paper 2, maximum raw mark 120

SPECIMEN A451 GENERAL CERTIFICATE OF SECONDARY EDUCATION COMPUTING. Duration: 1 hour 30 minutes. Unit A451: Computer systems and programming

performs a variety of complicated tasks, may lead and direct the work of others, may report directly to a project

How To Build A New System For A College

2003 HSC Notes from the Marking Centre Software Design and Development

MARK SCHEME for the May/June 2010 question paper for the guidance of teachers 0452 ACCOUNTING. 0452/12 Paper 12, maximum raw mark 120

GlobalSCAPE DMZ Gateway, v1. User Guide

Systems Analysis and Design

COURSE TITLE: (OLS 207) INFORMATION SYSTEMS ANALYSIS, DESIGN AND EVALUATION


Linux - CentOS 6 Install Guide

NEFSIS DEDICATED SERVER

THE BCS PROFESSIONAL EXAMINATIONS Certificate in IT. October Examiners Report. Information Systems

Chapter 6 Essentials of Design and the Design Activities

Linksys Wireless G WRT54G

Certified Information Systems Auditor (CISA)

MARK SCHEME for the May/June 2007 question paper 0452 ACCOUNTING. 0452/03 Paper 3, maximum raw mark 100

Software INTERACT. MachineLogic. The Shortest Distance Between Man and Machine

Project management Project Management

NETWORK ENABLED EQUIPMENT MONITOR

NXT Controller Manual IP Assignment in WAN Environments Application Note

MARK SCHEME for the May/June 2006 question paper 0452 ACCOUNTING

IP Configuration Manual

OCR LEVEL 3 CAMBRIDGE TECHNICAL

Managing Projects. With. MinuteMan Project Management Software

0510 ENGLISH AS A SECOND LANGUAGE (ORAL ENDORSEMENT)

Computerisation and Performance Evaluation

Internet Explorer Settings for use with Privia

Using SonicWALL NetExtender to Access FTP Servers

Planning BACnet networks

RPL Candidate Self-Evaluation

7115 BUSINESS STUDIES

PLCs and SCADA Systems

Project Management Dr. James A. Bednar

Transcription:

CAMBRIDGE INTERNATIONAL EXAMINATIONS GCE Ordinary Level MARK SCHEME for the October/November 2012 series 7010 COMPUTER STUDIES 7010/32 Paper 3, maximum raw mark 60 This mark scheme is published as an aid to teachers and candidates, to indicate the requirements of the examination. It shows the basis on which Examiners were instructed to award marks. It does not indicate the details of the discussions that took place at an Examiners meeting before marking began, which would have considered the acceptability of alternative answers. Mark schemes should be read in conjunction with the question paper and the Principal Examiner Report for Teachers. Cambridge will not enter into discussions about these mark schemes. Cambridge is publishing the mark schemes for the October/November 2012 series for most IGCSE, GCE Advanced Level and Advanced Subsidiary Level components and some Ordinary Level components.

Page 2 Mark Scheme Syllabus Paper 1 (a) (i) up to three points from: - Gantt charts which show all stages/tasks to be done - Gantt charts which show key project milestones - number of days to do a task/complete project - progress of tasks as % complete - progress versus expected time to do work - how tasks are all linked together - Gantt charts allow deduction of critical path (ii) up to three points from: - PERT chart Project Evaluation and Review Technique - PERT charts show milestones (in their correct order) if not given in (i) - events are numbered sequentially - events are linked by activities - PERT charts show the critical path(s)/ shows shortest path for project completion (if not given in (i)) Max 4 points overall [4] (b) type of software one mark - project management software/spreadsheet description or example of use one mark e.g. - identifies tasks that must be completed on time - easy updating of Gantt or PERT charts etc. [2] (c) For each of two methods: one mark per method one mark for identifying how the method will be used for this case study one mark for a further explanation. Method Use - questionnaires - produce series of questions to give to patients/receptionists/doctors - no need for analyst to be present can leave questionnaires to be completed and collect later - responses can be anonymous etc. Method Use - interviewing/meetings - ask receptionists/doctors a number of face to face questions - allows questions to be tailored to the individual - allows follow up questions to be asked etc.

Page 3 Mark Scheme Syllabus Paper Method - document search Use - gather information from documents/paperwork used in existing appointment booking system - allows procedures to be studied first hand - allows close scrutiny of all paperwork/files etc. Method Use - observation (not doctors) - watch receptionists doing their day to day tasks//patients arriving for their appointments - gives first hand knowledge of how system works etc. [6] (d) For each of two items: one mark per item of hardware one mark per reason why it would be needed Item Reason Item Reason Item Reason - Network Interface Card - to allow a computer to access the network - hub - connects segments of a LAN - switch - connects segments of a LAN (with reduced data collisions) Item - server Reason - various functions print, file etc. [4] (e) (i) up to four points - appropriate screen title - offered both male and female - confirm and try again - navigation buttons - clarity of instructions - good layout (ii) up to four points - appropriate screen title - offered all 31 days - can see all days of the month clearly If not given in (i) - confirm and try again - navigation buttons - clarity of instructions - good layout Max 4 per screen, 8 in total [8]

Page 4 Mark Scheme Syllabus Paper (f) One mark for every two correct symbols A B C D E F G H Process/operation Disk storage Keyboard/manual entry Hard copy output Sort Input/output Terminator/ Start and Stop Connector 0, 1 - no marks 2, 3 - one mark 4, 5 - two marks 6, 7 - three marks 8 - four marks [4] (g) One mark per process, max 4 - Checking patient number and password - Selection of doctor - Offering appointment - Selection of appointment - Sorting and printing out/displaying list of appointments for a doctor One mark per input, max 2 - Patient Number - Password - Selection of Doctor - Selection of appointment time/date One mark per data store, max 2 - Patient file/database - Appointment file/database - Doctor file/database - Database (only if none of the above were given) One mark per output, max 2 - appointment (screen not paper) - lists for each doctor (screen or paper) [8]

Page 5 Mark Scheme Syllabus Paper (h) Up to three points from: - advocate the use of strong passwords - encryption - use of firewall - vet employees (because of possibility of malpractice) - use of secure protocol e.g. HTTPS [3] (i) Up to three marks for reasons given (MUST match up with choice) Off-the-shelf software chosen for the following reasons: - appointment booking software readily available - already fully tested and de-bugged - usually less expensive to buy - technical support online/by phone - usually compatible with other existing software - community of knowledge available Bespoke software chosen for the following reasons: - can be tailored to meet the exact requirements of the doctors clinic - in contact with the actual programmers if there is a problem - software can develop as it is used - doesn t contain unwanted features [3] (j) For each of three examples of test data: one mark per example one mark per reason, which must match example given - AB1234 - this checks that system can accept appropriate inputs - AB12345 - this checks that the data is the right length - 1234AB - this checks that data has the right format [6] (k) For each of four items that should be included in technical documentation one mark per item one mark per reason - program listing/coding - so alterations can be made - programming language(s) used - so the application can be recompiled - flowchart/algorithm/pseudo-code - so that the logic can be altered if required

Page 6 Mark Scheme Syllabus Paper - System flowchart - to give overview of whole system - Data Flow Diagram - to show movement of data through the system - hardware requirements/ allow example such as memory requirement - for testing any alterations - software requirements - for testing any alterations - known bugs in the system - so they can be removed - list of variables used (and their meaning/description)/data dictionary - so that alterations don t spawn new errors - file structures - so that files and file sizes can be checked - sample runs/test plan/testing (with results and actual test data used) - so that tests can be re-run when alterations are made - validation rules - so that any extra inputs can be subject to similar validation - input/output formats - so that any extra ones/alterations can follow the same format [8] (l) One mark for each of two methods One mark for each reason given to a maximum of two, which must match chosen method Direct changeover - no need to run 2 systems side by side - immediate benefits from new system - less disruptive for receptionists/doctors - more likely to work since it will have been fully tested first Parallel implementation - operate both systems together side by side - good for training receptionists/doctors since both systems can be compared - if new system fails have old manual system as a back up Pilot implementation - adopt new system at one clinic - can easily re-introduce old system if problems occur - makes sure system fully works before adopting at another clinic Phased implementation e.g. - part of system (e.g. patient arrivals) introduced initially for trials - if it is OK, gradually introduce other parts of the new system - if a problem occurs, can stop using it any stage - allows receptionists/doctors to gain confidence in its operation [4]