Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller



Similar documents
NORTH CAROLINA INTERCONNECTION PROCEDURES, FORMS, AND AGREEMENTS. For State-Jurisdictional Generator Interconnections. Effective June 16, 2009

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Physical Address: City: State: Zip Code:

Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

TERMS AND CONDITIONS

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Electric Rate Schedule

NORTH LITTLE ROCK ELECTRIC DEPARTMENT NET METERING RULES

Project Name: Nortrax Section Project No: SURGE PROTECTION DEVICES Page 1

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

Photovoltaic Incentive Program

Interconnection Service - Frequently Asked Questions

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

Distributed Energy Resources Interconnection Systems: Technology Review and Research Needs

Deep Dive on Microgrid Technologies

Distributed Generation Interconnection Manual

AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW A INTERCONNECTION CLASSIFICATIONS...

ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

ALL STAR ELECTRIC COMPANY 10,000 Trumbull SE, Suite #F Albuquerque, NM (505) voice & fax NM License

FIT TIER 2 Application

Plumas Sierra Solar Rebate Program Guidebook 2015

Green Energy Program Participating Contractor Application Form

To complete the process for a net metering interconnection, please follow the steps below:

Session 10: General Overview of Interconnection Standards & Grid Codes for High Penetration PV October 21, 2015 Santiago, Chile

Public Overview of the EMerge Alliance Data/Telecom Center Standard Version 1.0

MicroFIT Connection Application Guidelines

SPECIFICATION COG-2007

PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY

CalMod Design-Build Electrification Services

High Intensify Interleaved Converter for Renewable Energy Resources

Guidelines and Instructions to Fill out UI Application for Small ZREC Tariff YEAR 4

Rebates are available on a first come, first-serve basis. There are a limited number of rebates available in 2010.

Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers

Arc Terminator Active Arc-Resistant Switchgear

NOTICE OF INTENT Department of Revenue Policy Services Division. Income Tax Credits for Wind or Solar Energy Systems (LAC: 61:I.

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Solar Solutions and Large PV Power Plants. Oscar Araujo Business Development Director - Americas

2014 NEC Analysis Part 1

Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

IEEE Smart Grid Series of Standards IEEE 2030 TM (Interoperability) and IEEE 1547 TM (Interconnection) Status. #GridInterop

LTR Series Uninterruptible Power Systems 700 VA KVA. General Specification

Rule Fast Track Analysis for National Life Insurance Co.

REC Eligibility Application Result #Alec Smith

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

Smart Inverters Smart Grid Information Sharing Webcast

Unified requirements for systems with voltages above 1 kv up to 15 kv

TERMS AND CONDITIONS

Solar Power Plant Design and Interconnection

Technical Requirements. For Generating Facilities Interconnecting. To The Distribution System. Salt River Project

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

ABB Inc. April 19, 2011 Slide 1

Duke Energy Carolinas. Inverter Based Generation Interconnection

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies

Solar Panel Installations

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

POINT OBSTRUCTION LIGHTS SOL LED SOLAR POWERED RED OBSTRUCTION SYSTEM

The easy way to build switchgear and controlgear assemblies in compliance with the regulations

Overview of Standards for CO Detection Products

Request for Proposals for Photovoltaic System Installation

SUSTAINABLE TECHNOLOGY

The reliability of the grid

TABLE OF CONTENTS 1.0 INTRODUCTION PURPOSE DEVIATION INTERTIE PROTECTION REQUIREMENTS... 4

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

EssPro Energy Storage Grid Substation The power to control energy

Sample - No Commercial Use

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A

We're with you... solar. Call today FOR THE LIFE OF THE SYSTEM YEAR WARRANTY * YEAR OLD BACKED BY CSR BRADFORD CSR A AUSTRALIAN COMPANY

Additional Solar System Information and Resources

REQUEST FOR PROPOSALS SOLAR POWER PURCHASE AGREEMENT (PPA)

PV SOLAR RESOURCE GUIDE FOR RURAL DISTRIBUTORS IN TN

Engineering innovation

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS

Performance Test Protocol for Evaluating Inverters Used in Grid-Connected Photovoltaic Systems

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide

Net Energy Metering Southern California Edison

AC COUPLED HYBRID SYSTEMS AND MINI GRIDS

IEEE Electromagnetic Compatibility Standards (Active & Archive) Collection: VuSpec

Ontario Electrical Safety Code 25 th Edition/ 2012

Transcription:

Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller A fee of $0.00 must accompany this application Date: Section 1: Customer Information Section 2: Engineering firm (If applicable) Section 3: Contact (If different from Interconnection Customer)

Section 4: Planned Installer Information Generating Facility Installer: Phone (Day): Phone (Cell): Licensed Electrician: Phone (Day): Phone (Cell): Section 5: Generating Facility Information Installation Address (if different than above): GVP customer account number: Inverter Manufacturer: Inverter Model: Generator Size (Nameplate): kw Single Phase Three Phase System design capacity (DC rating): kw Prime mover: Photovoltaic Reciprocating Engine Fuel Cell Turbine Other Energy Source: Solar Wind Hydro Other Is the equipment UL1741 Listed? Yes No Inverter Location: Site control documentation shall be submitted with the Interconnection request Planned Installation start date: The 10 kw inverter process is available only for inverter-based generating facilities no larger than 10 kw that meet the codes, standards, and certification requirements attached to this application or Grand Valley Power has reviewed the design or tested the proposed generating facility and is satisfied that it is safe to operate.

List the components of the generating facility that are currently certified: Equipment type and size Certifying entity 1. 2. 3. 4. 5. I hereby acknowledge that the above information is true and correct. Signed (Equipment Vendor): Date: Name (Printed): Company: Section 6: Certifications I hereby certify that, to the best of my knowledge, the information provided in this Application is true. I agree to abide by the terms and execute the Interconnection Service Agreement, and return the Certificate of Completion when the Generating Facility has been installed. Signed (Customer): Name (Printed): Date: Deliver or Mail Completed Application to: Grand Valley Power, 845 22 Road. P. O. Box 190, Grand Junction, CO 81502 Notification of Acceptance or Rejection will be given within 10 days of GVP receiving application Section 5: Grand Valley Power Approval and Inspection (to be completed by GVP) Application Approved by: Date: System Inspection by: Date: Grand Valley Power waives inspection/witness test? Yes No

CERTIFICATION CODES & STANDARDS 1. IEEE1547 Standard for Interconnecting Distributed Resources with Electric Power Systems (including use of IEEE 1547.1 testing protocols to establish conformity) 2. UL 1741 Inverters, Converters, and Controllers for Use in Independent Power Systems 3. IEEE Std 929-2000 IEEE Recommended Practice for Utility Interface of Photovoltaic (PV) Systems NFPA 70 (2005), National Electrical Code 4. IEEE Std C37.90.1-1989 (R1994), IEEE Standard Surge Withstand Capability (SWC) Tests for Protective Relays and Relay Systems 5. IEEE Std C37.90.2 (1995), IEEE Standard Withstand Capability of Relay Systems to Radiated Electromagnetic Interference from Transceivers 6. IEEE Std C37.108-1989 (R2002), IEEE Guide for the Protection of Network Transformers 7. IEEE Std C57.12.44-2000, IEEE Standard Requirements for Secondary Network Protectors 8. IEEE Std C62.41.2-2002, IEEE Recommended Practice on Characterization of Surges in Low Voltage (1000V and Less) AC Power Circuits 9. IEEE Std C62.45-1992 (R2002), IEEE Recommended Practice on Surge Testing for Equipment Connected to Low-Voltage (1000V and Less) AC Power Circuits 10. ANSI C84.1-1995 Electric Power Systems and Equipment Voltage Ratings (60 Hertz) 11. IEEE Std 100-2000, IEEE Standard Dictionary of Electrical and Electronic Terms 12. NEMA MG 1-1998, Motors and Small Resources, Revision 3 13. IEEE Std 519-1992, IEEE Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems 14. NEMA MG 1-2003 (Rev 2004), Motors and Generators, Revision 1

CERTIFICATION OFGENERATOR EQUIPMENT PACKAGES 1. Generating Facility equipment proposed for use separately or packaged with other equipment in an interconnection system shall, subject to the other criteria in this Attachment 3, be considered Certified for interconnected operation only if (1) it has been tested in accordance with industry standards for continuous utility interactive operation in compliance with the appropriate codes and standards listed in Attachment 2 by any Nationally Recognized Testing Laboratory (NRTL) recognized by the United States Occupational Safety and Health Administration to test and certify interconnection equipment, (2) it has been labeled and is publicly listed by such NRTL at the time of the interconnection Interconnection request, and (3) such NRTL makes readily available for verification all test standards and Procedures it utilized in performing such equipment certification, and, with Interconnection Customer approval, the test data itself. The NRTL may make such information available on its website and by encouraging such information to be included in the manufacturer s literature accompanying the equipment. 2. The Interconnection Customer must verify that the intended use of the equipment falls within the use or uses for which the equipment was tested, labeled, and listed by the NRTL. 3. Certified equipment shall not require further type-test review, testing, or additional equipment to meet the requirements of this interconnection Procedure; however, nothing herein shall preclude the need for an on-site commissioning test by the Parties to the interconnection nor follow-up production testing by the NRTL. 4. If the Certified equipment package includes only interface components (switchgear, inverters, or other interface devices), then a Interconnection Customer must show that the generator or other electric source being utilized with the equipment package is compatible with the equipment package and is consistent with the testing and listing specified for this type of interconnection equipment. 5. Provided the generator or electric source, when combined with the equipment package, is within the range of capabilities for which it was tested by the NRTL, and does not violate the interface components' labeling and listing performed by the NRTL, no further design review, testing or additional equipment on the Interconnection Customer side of the point of common coupling shall be required to meet the requirements of this interconnection Procedure. 6. An equipment package does not include equipment provided by Grand Valley Power.