Engineering Software Enables Designing for the Deep



Similar documents
18 Best Practices When Applying Process Modeling to Overpressure Protection and Relief Networks

Visibility and Integration - The Key Ingredients for a Successful Supply Chain

Enhancing Performance Management in the Batch Process Industries

Exporting and Importing Spreadsheets with Aspen Capital Cost Estimator

MES Technology Enhancements that Mitigate the Big Data Challenge

Reduce Capital Cost Overruns with Repeatable Engineering Designs

Establishing Asset Management Metrics to Drive Business Improvements

Jump Start: Aspen HYSYS Dynamics V7.3

Jump Start: Activated Economics in Aspen HYSYS V8.4

Aspen Collaborative Demand Manager

Delivering a Competitive Edge Across the Supply Chain

Aspen InfoPlus.21. Family

Jump Start: Storage Tank Protection in Aspen HYSYS and Aspen Plus

Addressing Information Management Challenges to Improve Manufacturing Performance

Turning Data into Knowledge: 7 Key Attributes of Successful Visualization with Dashboards & KPIs

Jump Start: Aspen Simulation Workbook in Aspen HYSYS V8

The Story Behind the Data

Managing Water Supply and Demand with Innovative MES Software

Generate optimal production schedules to maximize profitability and meet service levels

Extending the Value of MES Technology into New Applications

An Integrated Approach to Modeling Pipeline Hydraulics in a Gathering and Production System

Aspen Utilities. Energy Management and Optimization System for energy intensive industry sectors. The Challenge: Reduction of Production Costs

Turn data into profit with the industry s most comprehensive MES solution on the market

AES Simulation & Optimization Steady-State

Breakthrough Solenoid Valve Technology for Upstream Oil and Gas Heating Equipment

SULFUR RECOVERY UNIT. Thermal Oxidizer

Optimizing Flare System Performance at the Valero Sunray Refinery

Power Generation Industry Economic Dispatch Optimization (EDO)

Training for Operations and Maintenance

OUR CONVERSATION TODAY

Reliability Modeling Software Defined

Presentation Outline. Background

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

Energy Efficiency Opportunities

Introduction to Computational Fluid Dynamics (CFD) for Combustion. (801)

Airflow Simulation Solves Data Centre Cooling Problem

Establishing of the expansive gas supply chain that combines upstream, midstream and downstream operations

Pöyry Point of View: Shaping the next future. How will Lancashire shale gas impact the GB energy market?

Background. 179 million gallons saved for make-up water

Saeid Rahimi. Effect of Different Parameters on Depressuring Calculation Results. 01-Nov Introduction. Depressuring parameters

Putting a chill on global warming

Recommended Practice for Software Acquisition

IBP 2778_10 HIGH EFFICIENCY ON CO2 REMOVAL IN NATURAL GAS WITH UCARSOL SOLVENTS Thiago V. Alonso 1. Abstract. 1. Introduction

Aspen Exchanger Design & Rating Family

Steam System Best Practices Condensate System Piping

How To Make A High Co 2 Gas Blend

CALDON LEFM 380Ci Gas Ultrasonic Flow Meter. Integrating experience, proven technology and innovation

gasnetworks.ie Methodology for forecasting gas demand

Optimize Pipeline Hydraulics with Multiphase Flow Modeling

Select the Right Relief Valve - Part 1 Saeid Rahimi

Liquid Applied Internal Flow Coatings for Oil Transmission Lines

Brisbane Mining Club June Lunch 2014 David Knox Managing Director & CEO, Santos Limited

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

Yokogawa Draws Up Transformation 2017, a New Mid-term Business Plan Three reforms for growth

Boosting the Energy efficiency of a Server Room: experimental + virtual approach.

Ways to Improve the Bid and FEED Phases of Capital Projects

DATA CENTER ASSESSMENT SERVICES

SECTION 1 COMPANY OVERVIEW

An Industry White Paper

Electric Process Heaters & Engineered Systems

Oil Gas expo 2015 is comprised of 13 Main tracks and 131 sub tracks designed to offer comprehensive sessions that address current issues.

Measurement & Analytics. VIS Multiphase Flow Meter High gas content applications solved with no radioactive source - Measurement made easy

How To Improve Your Engineering

WANT TO STRENGTHEN YOUR CUSTOMER RELATIONSHIPS? THE RIGHT SALES STRATEGY WILL HELP

No. Name Description Main input Data Main Output Data. cooling duty, process in/out temperature, inlet air temperature

Some Criteria for Choosing a Steam Boiler for a Microbrewery

PROJECT EXPERIENCE Development/Transaction Support United States MANAGING DIRECTOR

How To Run A Power Plant

Construction Services. Furnishing Energy Solutions

SUPERSONIC GAS CONDITIONING - COMMERCIALISATION OF TWISTER TECHNOLOGY

Understanding Process and Design Interactions The key to efficiency improvements and low cost revamps in ethylene plants

Agile Manufacturing for ALUMINIUM SMELTERS

2012 Honeywell Users Group Asia Pacific Mayur Agrawal The Secret to Effective Process Engineering

Data Center. Ultra-Efficient chilled water system optimization. White paper. File No: Date: december 03, 2015 Supersedes: new Date: new

Air-sourced 90 Hot Water Supplying Heat Pump "HEM-90A"

System Assessment Capabilities for Fossil Fuel Power Stations

Data center management suite. Providing optimal control and efficiency to data center management.

TABLE OF CONTENT

Data center lifecycle and energy efficiency

CO 2 transport i rør Flow assurance

NSPS Subpart OOOO: Applicability and Compliance Basics

News of Plumbing Heating Cooling Industrial Piping Distribution

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

Equipment Performance Monitoring

Effective Materials Management

Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station

Technical Evaluation of C3-MR and Cascade Cycle on Natural Gas Liquefaction Process

Profitability Through Supply Chain Excellence

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

85 F 80 F 50% 75 F 70 F 73.0/ F 10% Figure 1

How To Make A Pressure Relief Valve

COOKING THE ROOF CFD BEYOND THE WHITE SPACE

Yokogawa in the Midstream Industry

Your asset is your business. The more challenging the economy, the more valuable the asset becomes. Decisions are magnified. Risk is amplified.

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

Optimization of Natural Gas Processing Plants Including Business Aspects

Transcription:

An Industry White Paper By Kevin Gomez, Editor PACE Magazine, Cirrus Media, Australia The content of this paper originally appeared in PACE Magazine, February 26, 2013. www.pacetoday.com.au

Overview What links together sour gas, declining fuel pressure and blowdowns in the oil and gas industry? Well, they're just some of the challenges in major projects that Australia's biggest contractor, WorleyParsons, has grappled with in recent times. The company recently won yet another contract with BG Group's $20 billion Curtis LNG facility in Queensland and new CEO Andrew Wood is proud that his company is one of the few that can do major project end-to-end delivery. A key strategy behind much of WorleyParsons' success is embracing all five phases of the project asset lifecycle - Identify, Evaluate, Define, Execute, and Operate. Supporting this strategy is a suite of products from AspenTech. The AspenTech Solution In 2003, WorleyParsons deployed core aspenone Engineering applications, Aspen HYSYS and Aspen Basic Engineering (ABE), at four global design centres, starting with the Melbourne office. The initial focus was on basic simulation and the production of PFDs (Process Flow Diagrams), datasheets, and equipment list deliverables, as well as the importing of heat and material balance data from conceptual design. After an initial test, the AspenTech solution was expanded and used on increasingly large and complicated projects. One of the tools employed for the Curtis Island project was Aspen HYSYS (Aspen Process Modeller), which introduced the approach of steady state and dynamic simulations in the same platform, thereby taking process simulation to another level. The data from Aspen HYSYS is integrated into Aspen Basic Engineering (ABE) then maintained in a single, up-to-date central repository and shared by all team members in any location worldwide. HYSYS information is automatically interfaced into ABE, eliminating any data redundancy and recapturing errors. WorleyParsons used this to model a gas processing train where there was a declining inlet gas pressure. The challenge was to determine how much flow could be pushed through the gas processing train as a function of the declining inlet gas pressure. The team outlined the capability of the export compressors, because those were viewed as a potential bottleneck. By modelling the compressors dynamically in Aspen HYSYS and HYSYS Dynamics, with data such as export pressures or discharge pressures, they were able to build the model to the requirements at the front end of the plant. Figure 1: CFD of subsea cooler and outside heat transfer coefficient 2

This included modelling elements like gas heat exchangers, low temperature separators and inlet separators. The team was therefore able to generate pressure drops through all of those equipment items as a function of inlet conditions such as inlet arrival pressure and flow rate. Nathan Smith, Engineering Manager - Process at WorleyParsons Hydrocarbons joined the company eight years ago when AspenTech products were already well and truly entrenched at the company. "Ultimately we were able to grow the operating envelope, not just from the compressor set but from the entire gas train, then marry that up with the deliverability of the gas wells to tell the customer how much gas they were able to process over the tailing life of the well." The intuitive user interface of Aspen HYSYS is a drawcard. WorleyParsons are able to train a range of employees to use the software with a fairly good degree of accuracy very quickly. "Also, the level of definition is good; we can apply things like discrete pressure drops across specific unit items," explains Smith. "It's very easy to set up pipe segments and model pressure drops, so it has the functionality yet the intuitive interface." Collaboration is Key Aspen HYSYS can also be combined with products from other companies as was the case in a subsea project on which WorleyParsons were the engineers. As it emerges from the well, water contained in natural gas mixes with the sour component of the gas (high concentration of H 2 S), and condenses due to the cooling from the subsea environment. This can then corrode the upstream section of the carbon steel pipeline. Figure 2: CFD of subsea cooler and seawater temperature 3

WorleyParsons used Aspen HYSYS in combination with CFD Modeller package from another vendor to model a subsea cooler made out of a corrosion resistant alloy. A length of corrosion resistant alloy was placed subsea near the gas well just sitting on top of the sea bed. The gas is cooled such that the rate of condensation under water is dramatically reduced below 50 C. Once the gas was cooled down to less than 50 C, it was possible to run that gas in a carbon steel pipeline going to the gas plant onshore. Effectively, the raw gas is pre-cooled in a corrosion resistant alloy. It is then possible to run the remainder of the pipeline in carbon steel, saving enormous costs, because there is going to be far less condensation of the water and little or no corrosion. "We used HYSYS to model the forced convection heat transfer effects inside the subsea cooler," explains Smith. "We used computational fluid dynamics from another package to model the natural convection effects of a hot pipe spool under water." The sea water absorbed the heat from the gas and, by pairing up Aspen HYSYS with the CFD Modeller, the WorleyParsons team were able to design the length of spool required to cool the gas from its 90 C flowing temperature to below 50 C. A mechanical subsea cooler has since been designed and installed and the wells are soon to start up. "The well is going to be starting up shortly," notes Smith, "and we're all keen to see how that subsea cooler performs." Conclusion: Risk Levels Met WorleyParsons was asked to provide engineering services for a gas plant that was seeking to add a second processing train but wished to retain their existing high pressure vent system. The WorleyParsons team used the Aspen Flare System Analyzer to understand both the operating velocities and the hydraulics. Figure 3: CFD of subsea cooler and seawater temperature 4

The built up back pressures were calculated in certain segments of the vent system to determine how much of the proposed plant could be integrated into the existing vent system. A sequence of gas blowdowns was developed to ensure that the design pressures or any velocity constraints in the vent system were not exceeded. A blowdown is an emergency reaction if the operators detect gas is being released from equipment or if there is fire detected on a gas plant, they will open up valves to direct the gas through the vent system. This reduces the likelihood of the adverse scenario growing or escalating. This emergency escalation prevention directs fuel that is inherently in the gas plant to a controlled release point which is the vent system. "If we're going to integrate different or new equipment items into the gas plant, we couldn't blowdown the entire plant all at once," explains Smith. "That would exceed the mechanical design pressure of the system and it would also exceed certain velocity constraints of that vent system." So the team used Aspen Flare System Analyzer to work out how much of the plant could be blown down at any one time. They also worked out when the peak pressures would subside so that they could then trigger subsequent blowdowns of other areas of the gas plant. "What we ended up with was a sequence - a plant area versus time on where we can blow the plant down and still use the existing vent system," notes Smith (pictured above). They were able to tell the customer how long it would take to blowdown the entire facility and also ensure that the existing vent system had sufficient integrity to deal with the process. "We then took those results and applied that to the risk review of the plant fuel over the time of the event and were able to confirm that the time that it took to blowdown the plant was satisfactory and it met their risk levels," concluded Smith. About the Author Kevin Gomez is an electronics engineer by training. Kevin has worked extensively in B2B publishing in Asia and in Australia across a range of technology and engineering media titles. He is active on a number of LinkedIn groups and welcomes interaction with the process control community. 5

About AspenTech AspenTech is a leading supplier of software that optimizes process manufacturing for energy, chemicals, engineering and construction, and other industries that manufacture and produce products from a chemical process. With integrated aspenone solutions, process manufacturers can implement best practices for optimizing their engineering, manufacturing, and supply chain operations. As a result, AspenTech customers are better able to increase capacity, improve margins, reduce costs, and become more energy efficient. To see how the world s leading process manufacturers rely on AspenTech to achieve their operational excellence goals, visit www.aspentech.com. Worldwide Headquarters Aspen Technology, Inc. 200 Wheeler Road Burlington, MA 01803 United States phone: +1 781 221 6400 fax: +1 781 221 6410 info@aspentech.com 2013 Aspen Technology, Inc. AspenTech, aspenone, the Aspen leaf logo, the aspenone logo, and OPTIMIZE are trademarks of Aspen Technology, Inc. All rights reserved. 11-3251-0313 Regional Headquarters Houston, TX USA phone: +1 281 584 1000 São Paulo Brazil phone: +55 11 3443 6261 Reading United Kingdom phone: +44 (0) 1189 226400 Singapore Republic of Singapore phone: +65 6395 3900 Manama Bahrain phone: +973 17 50 3000 For a complete list of offices, please visit www.aspentech.com/locations