Beechmont Park Project



Similar documents
ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

City of Hillsboro Inflow and Infiltration Elimination Program

SANITARY SEWER BACKUP. Causes & Prevention

Sanitary Sewer Smoke Testing

Home Drainage & Causes of Basement Flooding. Water

BASEMENT FLOODING. Prevention Guide for. Homeowners

CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

OVER-HEAD SEWER ASSISTANCE GRANT

How To Install An Overhead Sewer

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM

First in Service First in Safety

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

Rainwater is directed away from walls at surface. Any water infiltrating is captured in drains below foundation

Time of Sale Inspections

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

Corporate Report. Report from Transportation and Environmental Services, Environmental Services

A Century of Progress with Pride

Lansdowne Stormwater UPDATE

How To Get A Flood Risk Reduction Rebate

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

Preventative Plumbing Program Guide

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources.

ARLINGTON HEIGHTS MUNICIPAL CODE CHAPTER 22 SEWERS

Sanitary Sewer Service Guide Information you need to know about sanitary sewer service and how to prevent sewer backups

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Downspout Disconnection Program FAQs

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

Sanitary Sewer Master Plan

Village of Rantoul Backwater Valve Program

BASEMENT FLOODING PART II: Reducing Flooding Risks on Your Property HISTORIC CHICAGO BUNGALOW ASSOCIATION

SEWER BACKUP PREVENTION PROGRAM

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Review of Footing Drain Disconnection Projects

ORDINANCE NO AN ORDINANCE AMENDING CITY CODE CHAPTER RELATING TO REQUIREMENTS FOR PRIVATE LATERAL SEWER LINES.

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS

Basement Flooding Protection. Subsidy Program. Information and Application. For more information:

SEWER BACKUPS WHAT TO DO AND HOW TO PREVENT

CITY OF DULUTH PRIVATE SEWER SERVICE GRANT PROGRAM PROGRAM GUIDELINES

later damage - Loss ControL

SEWER SERVICE LINE REPLACEMENT PROGRAM PROCEDURE Revision No. 1 - Effective January 4, 2016

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

EAST BAY REGIONAL SEWER PROGRAM

PREVENTING WET OR FLO ODED BASEMENTS

SEWER BACKUP PREVENTION PROGRAM

BACKFLOW PREVENTION PROGRAM

Mitigating Basement Backups

CODE OF REGULATIONS OF THE NORTHEAST OHIO REGIONAL SEWER DISTRICT TITLE III SEPARATE SANITARY SEWER CODE

Name: Date: P.O. Box 2449, San Antonio, Texas (210) Number of Taps

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

SEWER BACK UP PREVENTION PILOT PROGRAM

Protect Your Home From Flooding. A guide for Lethbridge Residents

Whitefish Bay Private Property Program. June 6 th, 2011 Village Board Meeting Presented by Joan B. Hawley, P.E.

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015

The Town of Lakeshore Basement Flooding Information to Residents

Water Damage A Rising Concern

City of Colfax ORDINANCE NO. 499 ORDINANCE REQUIRING TESTING, INSPECTION, REPAIR AND REPLACEMENT OF BUILDING SEWER LATERALS

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

BILL NO. B ORDINANCE NO TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

Johnson County Wastewater s. BackUp. Prevention Program A continuing partnership to help protect properties from sanitary sewer backups.

Fact Sheet. Basement Flooding - General Information. Visit our Web site at

SANITARY SEWER SPECIFICATIONS

What Causes Foundation Leaking?

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

AN UPDATE ON LOUISVILLE MSD s BASEMENT BACKFLOW PREVENTION PROGRAM 10 YEARS AND 6,700 INSTALLATIONS LATER

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS

JULY 24, 2009 WEST-END FLOODING INVESTIGATION ACTION PLAN. Presentation to Insurance Companies 19 January 2012

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

School Construction Authority Architecture & Engineering

DRAFT Public Outreach Document for What s an SSMP?

APWA: shall refer to the American Public Works Association. ASTM: shall refer to the American Society for Testing and Materials.

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

Downspout to storm sewer. Leaky laterals

VILLAGE OF ARLINGTON HEIGHTS. Sewer Back-up Rebate Program

Protect your home from basement flooding

Dry Weather Flow from Footing Drains and Service Connections

Transcription:

Beechmont Park Project

Foundation Drain Project Why pre -1972 homes are chosen in your neighborhood? Results of pilot study in your area showed the majority of homes built prior to 1972 within your neighborhood had foundation drains connected directly to the building sewer. As a result, Storm water Inflow / Infiltration (I&I) in sanitary sewers takes up capacity in the sewer pipes and ends up at the wastewater treatment plants where it must be treated like sewage, and basically reducing capacity in sewer pipes. Moreover, these flows result in higher capital expenditures and potential rate increases on customers like yourself.

Foundation Drain Problems Chronic problems with inflow and infiltration : Inflow is storm water that rapidly flows into sewers via prohibited connections such as roof drain downspouts, foundation drains, sump pumps, and storm drain crossconnections, as well as through holes in manhole covers and larger defects in the sanitary sewer system. Infiltration is groundwater that seeps more slowly into sewer pipes through holes, cracks, joint failures, and faulty connections. Sanitary sewers not designed to carry storm water. Problems excess storm water flow overwhelms the sanitary sewer system: Results in sanitary sewer overflows and basement flooding. I&I, if not prevented, can require major capital improvements to correct and result in higher treatment costs (and potentially higher rates to our customers).

Vicinity of Project Project Area: Southwestern section of the Hall Run sewershed at intersection of Mt Carmel Tobasco Rd and Clough Pike, just West of I-275. Group 1 Initial Notifications to be mailed on or about July 15, 2015 Group 2 Initial Notifications to be mailed on or about August 15, 2015 Group 3 Initial Notifications to be mailed on or about September 15, 2015

Foundation Drain Disconnection Program Beechmont Park 347 homes were identified for foundation drain testing. It is required that the property owner should remove the connection (if there is any found). Recognizing that such improvements can be a substantial cost to property owners, the Water Resources Department may provide reimbursement for the separation of foundation drains. September 1, 2010 County Commissioners approve change in sewer regulations: Water Resources Department can contribute up to $3,500 for foundation drain separation in pre-1972 homes.

Project Components Beechmont Park Dye Testing and Televising This will be conducted in an effort to determine if your home s foundation drain is connected to the sanitary sewer system. Camera launched up building sewer towards foundation. Water with green dye injected at base of foundation. Green dye evident when foundation drain is connected to building sewer. We video and document each case.

How does the Foundation Drain Disconnection Program work? Water Resources Department responsible for sewer mains/manholes and lateral from main sewer to edge of right-of-way. Property Owner responsible for building sewer from edge of right-ofway to house. Water Resources Department (WRD) to determine that connection exists by dye testing. Section 3.6 of the WRD Rules & Regulations requires property owners to cooperate with testing performed to identify sources of I/I.

How does the Foundation Drain Disconnection Program work? Property owner is notified of required disconnection and reimbursement policy. Property owner sends corrective action plan to WRD for review/approval. Identify work to be done, who does the work, estimated cost. Property owner or licensed contractor can do work. Clermont County General Health District, Plumbing Division, inspects work. When completed and approved, WRD reimburses property owner for pre-approved amount, up to $3,500. General Homeowner Corrective Action Needed: Excavate / expose physical connection. Disconnect foundation drain / seal opening in building sewer. Install sump pump / connect foundation drain to sump pump. Discharge sump pump to ground, creek, storm sewer, etc.

How does the Foundation Drain Disconnection Program work? Allowable Expenses: Excavation work. Disconnection of foundation drain. Installation of an interior or exterior sump pump. Yard restoration, seed/straw. Repair of structures altered by approved activities. Any permit, application and inspection fees. Expenses not Allowed: Electrical Improvements. Property drainage improvements. Improvements to structures or property not affected by approved activities. Improvements to structures or property above the condition at start of the project. Disconnection of roof downspouts or sump pumps. Disconnection of foundation drains installed on or after January 1, 1972. Long term maintenance costs.

Typical Foundation Drain Disconnection Diagrams

Time Frame Project to be completed within 2 years; begin scheduling dye tests immediately. Scheduling on volunteer basis at first. Property Owners given 18 months to correct from date of notice that connection is verified (If not complete within 18 months, may not be eligible for reimbursement). After 2 years, disconnections will be required; reimbursement funds may not be available. Enforcement of Testing and Disconnection: Penalty for Failure to Permit Testing: WRD Rules & Regulations 3.6.1.3 discontinue water service. Penalty for Failure to Correct Deficiencies: WRD Rules & Regulations 3.6.1.5 discontinue water service. Improper discharge into the collection system can constitute a misdemeanor with every day of improper discharge a separate violation. WRD Rules & Regulations 3.6.7.5 In order to qualify for reimbursement, foundation drain disconnection must be competed within 18 months of written notification.

To Schedule Dye Tests Contact: Fred Moukahal, Program Manager, I/I Division Phone: (513) 732-7880 Email: fmoukahal@clermontcountyohio.gov