EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection



Similar documents
SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Beacon Hill Sewer District Standard Specifications

2006 Codes. Please verify the following before calling for inspection

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

Top 10+ Mistakes of DWV plumbing design

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

CONSTRUCTION CHECKLIST Residential Plumbing Rough-In September 2004

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

CHAPTER 11 STORM DRAINAGE

Town House Center Highway North Huntingdon, PA 15642

INSPECTION CHECKLIST Residential Plumbing Rough In April 2011 Mercer Island Mill Creek Sammamish Snohomish County Snoqualmie Woodinville

CHAPTER 11 STORM DRAINAGE

City of Edmonton Page 1 of 5 Foundation Drain Discharge Collection System Guideline November, 2005

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Jay R. Smith Mfg. Co.

SECTION FACILITY STORM DRAINAGE PIPING

minimum deductible may be increased significantly.

Town of Beaumont. Lot Grading Guidelines

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods

SECTION STORM DRAIN SYSTEM

Foundation Drainage. Gable Roof Runoff. Hip roof Runoff. By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

The minimum reinforcement for the stem wall is the placement of:

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

What Causes Foundation Leaking?

Home Drainage & Causes of Basement Flooding. Water

Constructing Cistern Installations

Site Grading and Drainage to Achieve High-Performance Basements

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA (7300 Short Road, Serene Lakes)

LS 2540 SEWER LATERALS AND INSPECTION TEES

2. What building projects are exempted? (permit not required)

Protect your home from Basement flooding

Sewage Compliance Form Instructions

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

later damage - Loss ControL

SEWER BACKUP PREVENTION PROGRAM

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACK UP PREVENTION PILOT PROGRAM

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

C I T Y O F P E A R S A L L

2014 British Columbia Building Code Changes

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH (440)

SANITARY SEWER SPECIFICATIONS

ONE AND TWO FAMILY DWELLINGS Plumbing July, 2007

Basement Moisture Problems

R E S I D E N T I A L H O U S I N G

Protect your. home from. basement. have you done everything you can?

Chapter 7 Plumbing Connections

SECTION STORM DRAINAGE SYSTEM

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS

CHAPTER 5. Storm Sewer

Element D Services Plumbing

bout your HOUSE Avoiding Basement Flooding CE 50

Architectural Processing and Inspections for Home Mortgage Insurance

PREVENTING WET OR FLO ODED BASEMENTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

Note: All dimensions are nominal. All weights are for shipping purposes only. Availability is subject to change.

Residential Building Permit Guide

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

Preventing water damage in the basement

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Crawford Inspection Services C.C.B. #

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Lansdowne Stormwater UPDATE

good to know... SEWER BACKUP A guide to protecting your home

PLUMBING ROUGH IN INSPECTION

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION GRAVITY SANITARY SEWERS

Preventing Basement Flooding

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

Best Basement Water Management Practices

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

DIVISION 22 PLUMBING PLUMBING EQUIPMENT Domestic Water Heaters

Transcription:

EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection

1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED units, clearly marked with the manufacturer s name i.e. "Menzies", Canada Metal, etc. Shop-made unidentifiable drains are not acceptable. Roof and decks must be framed to drain away from the building and/or curbs and into the required drains. See building inspector for details. Make allowance for expansion and contraction by providing either an O ring connection or a combination of a flexible coupling and expansion joint as close to the roof as practical. Permit, water test, inspection, and anti-sweat jacket required. Sizing to B.C. Plumbing Code 2012 (Minimum 2 ) Where a roof or deck drain passes through the interior of a building it shall be run in DWV-weight pipe, following plumbing code rules, and provisions shall be made for insulating each leader to prevent condensation damage. Insulation is to be inspected by the plumbing inspector after the piping has been approved. All roof and deck drains must drain to the storm system not to the drain tile, sidewalk, deck, driveway, etc. Emergency overflow drain required for each roof/deck area. Minimum 2 diameter, and the overflow cannot connect to the primary drain. 2. FLOOR DRAINS When a hot water tank is located on a concrete floor, a minimum 3 trapped floor drain shall be provided near the tank, preferably connected to the storm system. A minimum 4 trapped floor drain shall be provided for each crawl space area subject to flooding, this drain must be connected to the storm system. Sanitary floor drains require priming, see sketch for acceptable solutions. Document # 398735v1 PAGE 1

3. DRAIN TILE a) Installation and Material Drainage permit required. This permit must be in place to call a damp proofing inspection. Acceptable material; rigid perforated plastic sewer pipe. All piping to be graded back to the sump minimum 1/16 /ft. (½%) All joints to be primed and glued (purple primer, grey glue). Directional fittings shall be used. No dead ends permitted; if a line must be ended it must terminate with a 4 clean out at finished grade. Pipe to be installed with holes down into 3 of drain rock and 8 of clean drain rock on top and sides. DWV-weight pipe shall be used to cross under a driveway where there will be less than 18 of cover over it (pipe can be drilled). All piping must be firmly and continuously supported at the time of inspection. Pipe shall be laid on drain rock, undisturbed soil, concrete footing, or bedrock. TOP OF PIPE TO BE EXPOSED FOR FIRST INSPECTION b) Layout Guide Ends of tile lines are to enter the storm sump separately and no dead ends are permitted anywhere in the system. All drain tile lines and branches are to be installed so that the top of the pipe is lower than the bottom of the slab that it is serving. Ts and Ys in the system must be arranged in such a way that all parts of the drainage system are accessible to a sewer cleaning machine cable. Document # 398735v1 PAGE 2

The ideal situation would be a single line of drain tile starting at the sump, completely circling the foundation and terminating back in the sump. However, many houses are designed with multiple levels and crawl space areas making additional branches necessary to protect each level. When you have read this guideline should you have any additional questions regarding storm drainage, please call your plumbing inspector. c) Exterior Roof Drains Exterior roof drains shall be run in PVC sewer pipe. All piping to be graded at 1/8 /ft. (1%). Piping shall be continuously supported on drain rock, or hung on ¾ galvanized straps at 4 ft. O.C. All piping shall be primed and glued (purple primer, grey glue). Use Ys. And 45s, not Ts and 90s d) Storm Water Sump A concrete sump shall be provided for each drain tile system. The sump is to be placed within 6 ft. of the building unless previous approval has been granted by the plumbing inspector. Each end of drain tile pipe to enter the sump separately to facilitate the cleaning of drain tile. See drawing #P-1 for details and sizing requirements. For large driveways an additional drain may be required at or near the property line. (To be determined by our Engineering Department.) Document # 398735v1 PAGE 3

DRIVEWAY CATCH BASIN A minimum 18 inside diameter catch basin shall be provided for each driveway that does not drain to a street or lane. All trench drains shall drain to a catch basin. Size the outlet to the BC Plumbing Code 2012 (4 pipe will handle most driveways). See drawing #P-2 for details. Drain to sump or storm piping (not drain tile). 4. STORM AND SANITARY SEWERS Piping to run as directly as possible. Clean-outs to be provided every 85 ft. and shall be extended to final grade. Additional clean outs required for changes in direction greater than 45. Clean-outs in a driveway are to be protected with a metal road box. Pipe shall be laid straight; maximum curve that will be permitted is 2 per length out of alignment. Only approved pipe, fittings, connections, and glue shall be used. Piping is to be firmly and continuously bedded at the time of inspection. Lightwall or sewer grade piping is to be bedded in sand or pea gravel. After inspection an additional 12 of bedding material shall be hand placed on pipe and compacted before machine filling. (See 6A for additional requirement for lightwall pipe). Minimum 2 ft. of cover required for light wall sewer pipe. Document # 398735v1 PAGE 4

TESTING REQUIREMENTS FOR SEWERS a) Light Wall Sewer Pipe Provide test Ys at Municipal connections. Plug off Ys with mechanical test plugs. Water test to 5 ft. above grade at upstream end (storm and sanitary). Inspection. Back fill trench to final grade. Second inspection if water test is holding at second inspection, plugs may be removed, clean out fittings installed in test Ys, and back-fill completed. b) Heavy Wall 500 Series D.W.V. Weight Pipe Remove and discard factory installed plugs in inspection chambers. 5 ft. head test required on sanitary sewer only. Inspection with pipe in trench. If inspection passes, remove test plug, install clean out fitting in test Y and back fill trench. 5. STORM SEWER TERMINATION Every storm drainage system shall drain to a storm sewer, a drainage ditch, a stream, to the ocean (indirectly), or a dry well. Note: dry well approval must be obtained from the authority having jurisdiction before installation and an engineered design is required, complete with B-1, B-2 and C-B. THERE ARE NO COMBINED SEWERS IN WEST VANCOUVER Where a storm sewer is terminated in a ditch or stream, a minimum of 5 ft. of DWV-weight pipe shall be installed on the downstream end to prevent breakage. Where gravity flow is not possible a duplex pump system must be installed. The pump shall be sized and specified by a Professional Engineer. Only the Document # 398735v1 PAGE 5

portion of piping that cannot drain by gravity may be pumped. The discharge pipe must be pressure pipe and installed below frost level. An alarm panel must also be installed. 6. WATER SERVICE PIPE Minimum size service for a single family dwelling is ¾ ID for up to 21 fixture units ( poly or pex). All dwellings with automatic fire sprinklers will have a much larger water service, the size of which must be determined by the design engineer, minimum 1 ½. Minimum cover permitted for water service pipe is 24 this includes under a carport or unheated garage slab. Water service pipe to be sleeved in 75# utility sleeving or bedded in sand or dirt containing no rocks or abrasive material (Big O flexible pipe is also an acceptable sleeving material). Water service piping running through crushed rock either inside or outside the building must be sleeved. No petroleum based products such as damp proofing spray, and tar-based caulking compound are to come in contact with a plastic water service. Replacement of the pipe will be required if this happens. If you are planning to install an irrigation system, install and cap a tee at this time as it is very difficult to tap into a large diameter water service once it has been backfilled. Document # 398735v1 PAGE 6

Document # 398735v1 PAGE 7

Document # 398735v1 PAGE 8

Document # 398735v1 PAGE 9

Document # 398735v1 PAGE 10

Document # 398735v1 PAGE 11