1 Matilda Alexandrova * Liliana Stankova ** Angel Gelemenov *** Summary: The paper focuses on the management of project portfolios as a novel and complex area in the practice of project-oriented organizations. The paper s main goal is to review the role of project management office /PMO/ for enhancing the performance of organizational project portfolio. It considers several core issues and functions related to the process of implementation of PMO in a particular organization. A case study has been conducted in order to provide evidence about the benefits from the introduction of PMO in a company operating in the media sector. Results from the case study analysis shows that this approach to project management in a multi-project environment is to a large extent universal and can be successfully applied in similar organizational context. Key words: project management, project portfolio, project office. JEL Classification: M10, M20, O Introduction Project management plays a key role in contemporary company management operating in virtually all commercial or non- profit areas. A study of the World Bank (Bredillet et al., 2008) reports that 21% of the global Gross Domestic Product is related to capital operations which originate from project-based activities. This largely applies to the so called project-oriented organizations which operate portfolios of projects (Aubry et al., 2010). Put in the organizational context, the management of the project portfolio could be performed in different ways, among which the most innovative and highly effective one is the establishment of the Project Management Office /PMO/. The management of project portfolios is considered as a novel and complex area in organizational practices. Hence a variety of challenges emerged, which need to be tackled by managers, along with many opportunities for increasing the organizational effectiveness (Boneva, 2014). Some authors assert that within the project portfolio management area a range of research issues should be addressed, e.g. balancing of resources, project prioritization, decisions for selection of new projects in conditions of uncertainty, decisions for ceasing the implementation of failed projects, as well as the overall optimization of the scope and number of implemented projects in the portfolio (Cooper et al., 2000; Staneva et al., 2014). When too many projects are to be managed * Associate Professor, PhD, Department of Management, University of National and World Economy, [email protected]. ** Assistant Professor, PhD, Department of Management, University of National and World Economy, liliana. [email protected]. *** Master of Business Administration, graduate of the University of National and World Economy, [email protected]. 19
2 simultaneously by an organization and the resources are scarce, the project portfolio requires finding the precise balance of organizational resources. In the process of portfolio management the most difficult task is the prioritization it requires the regular reassessment of each project in the portfolio and project selection based on clear and adequate criteria. The main goal of this paper is to reveal the role of PMO for enhancing the effectiveness of project portfolio management. It focuses on the implementation of PMO in view of the following key issues: What is the need to establish a PMO within a particular organization? How an organization could implement PMO functions most appropriate to its specific environment? Which are the benefits from PMO implementation in respect of the strengthening of organizational capacity? The first section is devoted to the role of project office for the management of the project portfolio as considered in contemporary literature. The second section proposes a conceptual model of the process of transformation of PMO. The methodology is tested through a case study on the role of a media company PMO for increasing the effectiveness of project portfolio management. Finally, conclusions are presented with regard to the possible transformations of PMO and suggestions for their practical application. 2. Literature review The genesis of project portfolio management integrates knowledge from two main strands of theory: contemporary project management and financial investment theory. In this line, some principles and methods originating from investment portfolio management have been adopted within the field of IT projects (de Reyck et al., 2005) and projects for new products development (Cooper et al., 2001). Still, there is a lack of consensus about the terminology in project portfolio management concepts like "multi-project environment", "program management", and "project portfolio management" are under discussion in the specialized literature (Elonen and Artto, 2003). Portfolio management was treated as a collection of projects managed by a company a process related to decision making about project selection, prioritization, and exclusion from the portfolio (de Reyck et al., 2005). Thiry (2006) considers the project portfolio management as a process of resource analysis and allocation within the organization directed to achievement of organizational goals and thus maximizing the stakeholders value. Some authors have identified managerial problems which could be resolved by the practice of project portfolio management. Core managerial problems relate to the lack of connection between organizational strategy and project selection process resulting in disbalanced portfolios exhausting too much organizational resources. Other problems originate from the scarcity of resources and, in the same time, lack of priorities in decision making, insufficient data, information overflow, improper competencies, unsatisfactory commitment, unclear roles and responsibilities of project team members, and last but not least irrational or authoritative decision making (Elonen and Artto, 2003). Kendall and Rollins (2003) consider the lack of interconnection between project management and strategic planning. Project managers focus much more on the issues of scarce resources and related conflicts as well as on hindered multitask operations. They rarely pay attention to the strategic dimensions of prioritization and the resulting effective resource allocation. Indeed, very often organizational projects are aligned in little extent with the corporate strategy neither they are precisely balanced regarding the variety of 20 Economic Alternatives, Issue 1, 2015
3 organizational objectives set at the overall level of the portfolio. Levine (2005) identifies a set of issues related to mechanisms for implementation of project portfolio management, e.g. ranking of values and benefits, evaluating the scope of project portfolio, dealing with risks and uncertainty of projects and project portfolios, etc. Among the new insights in project management the concept of Project Management Office emerges as an effective solution for many problems in contemporary project portfolio management. Its conceptual definition is still under discussion and because of this, it is used interchangeable with other terms such as "project office", "program office", "project-oriented organization", "projectbased organization", etc. Ward (2000) defines "project office" as an organizational unit founded in order to manage a one or a series of projects and governed by a project/program manager. This definition is extended to Project Management Office / PMO/ by precisely assigning the following functions: to assist project managers, project teams, and different management levels in dealing with strategic organizational issues when implementing project management principles, practices, tools, and techniques (Ward, 2000). By introducing a PMO, a project oriented organization adopts an overall strategy termed by the concept of "management by projects". In a business or non-profit organization PMO emerges as a department or special team constituted within the organization which introduces and maintains standards related to project portfolio management. PMO emphasizes on standardization of project work throughout the various projects executed by the organization, and moreover, PMO supports project managers and teams to adopt professional standards of project management (PMI, 2008). PMO acts as a formal unit with centralized control and coordination which typically links top management to project management within the organizational structure (Singh et al., 2009). Introducing such an organizational entity like PMO is often a hard task because of the specifics of each organization each PMO needs to be unique in order to reflect the features of the organizational strategy and culture. As stated by Valle et al. (2008), PMO acts as a center of intelligence and coordination which links the strategic organizational goals to the expected project results by the mechanisms of project portfolio management. PMO roles and responsibilities extend from delivering support functions to project managers to taking the obligations for the direct management of one or more projects. In general, the literature on PMO focuses predominantly on a range of professional issues and technical implementation aspects. The majority of the sources treat mainly three topics: justification for introducing PMO as an organizational innovation; PMO roles and functions; particular steps for its introduction. The emergence of PMO is related to the expansion of the projectbased activities and the sophistication of the projects in the business world which brought in some degree of centralization (Marsh, 2000). Nonetheless, the reality of project management implementation is substantially diverse. Numerous distinctive functions have been identified where PMOs were found to have a core responsibility regarding some specific functions. Some authors indicate that PMO was found to have a main role in personnel management within projectoriented organizations (Huemann et al., 2007) as well as tighter connection to the control functions (Huemann & Anbari, 2007). PMOs have proved to operate effectively in respect of one major target of project portfolio management, namely, to appraise and prioritize the projects in order to 21
4 boost their inputs to the achievement of the organizational goals. Furthermore, the function of PMO to narrowly monitor the performance of the projects ensures that they would be effectively completed. This way the utilization of a PMO provides additional value to the general utility of project management, more specifically, the precise operating and tracking multiple projects, coordinating their cumulative interactions when utilizing organizational resources (table 1). Portfolio management through PMO shows also specific divergence from the traditional project management, e.g. focusing on the strategic issues of organizational vision and development as well as critical success factors supporting the long-term targets of the organization (SEI, 2011). 3. Project management office as an innovation tool As stated above, the basic unit to operate effectively the management of organizational project portfolio is the project management office. It is necessary to note that overall maintenance of a PMO provides an innovative tool for centralized management of the portfolio of projects executed by the organization. For the purposes of the present study, a basic definition of PMO provided by the Project Management Institute (2011) is accepted: "An organizing body or agency assigned by multiple responsibilities associated to centralized and coordinated management of projects". From our point of view, PMO s responsibilities can range from providing Table 1. Key differentiators of project portfolio management versus traditional project management Characteristic Project management Project portfolio management Scope Time Resources Tools Impact on change Industry evolution Control and manage scope against project specific requirements Manage tasks due dates and dependencies to ensure project delivery Utilize provided resources effectively and efficiently Project plans, budget spreadsheeds, project charters Manage change within the purview of individual project to control scope N/A Source: SEI (2011), p.2. Select projects with scope that supports organizational goals Monitor all project timelines against shortand long-term goals Monitor and manage resource utilization across the portfolio Dashboards, resource levelling, PPM applications Measure change across the entire organization to foster user acceptance Measure and evaluate future state against industry and portfolio The goal of introducing or upgrading a PMO is an exclusive organizational challenge which, in many cases, is a fragment of a more comprehensive organizational change. This way, a specific methodology accompanied by a revealing framework is necessary in order to apprehend the dynamic complexity of such a change (Hobbs et al., 2008). This paper adopts an approach to investigate a PMO in an organizational context with its challenges and perspectives. support for the management of projects to functions related to direct management of projects. This broad definition includes a large set of possible tasks for organizational design and programming that can be applied from the PMO for management of single and/ or portfolio of projects. Thus, this definition is not much tractable because it does not specify which organizational functions or activities are affected. The definition only 22 Economic Alternatives, Issue 1, 2015
5 reflects a lack of knowledge about the core impact of PMO and the lack of consensus on how to introduce it. This ambiguity stimulated the current study which focuses on the PMO exploring its specific roles for the organization. A common question such as "What are the factors of success of every PMO which satisfy any mix of different targets?" is too broad to allow research progress or for the generation of cumulative evidence for the future. Pellegrinelli (2011) made similar notes about the names "project" and "program" that using the wrong one and/or out of place limits the research results and does not allow placing them in a precise framework. Project management theory provides a limited number of models for a PMO based on specific typologies. The study of Gartner Research Group in year 2000 suggests 3 models: (a) project repository; (b) coach; (3) enterprise. Other authors suggest maturity models assuming a progressive enhancement of PMO s functions, like the Organizational Project Management Maturity Model (OPM3) proposed by the Project Management Institute (PMI, 2008). In order to stabilize its organizational role, a PMO should be encouraging to the infiltration of the project management culture through the whole organization. Only this way project portfolio management could be integrated into the organizational procedures at the required degree of effectiveness (Aubry et al., 2010). In practice, several basic models are established for the operation of PMO (Kendall and Rolling, 2003). A PMO applying the "PMO- information base" model plays the role of a repository for information about projects, methods and standards adopted in the project-oriented organization. Most often, the model is used in organizations which have low expressed centralization and decentralized operation of the functional units responsible for the implementation of projects in the portfolio. The model "PMO-Advisor" is an upgrade of the previous one and reflects the intentions of the leadership of the organization to implement the methodology of project management in its all functional divisions. In this case the PMO is the focal point for communications between these divisions. The Office is responsible for the creation of documents and monitoring the process of implementation of the projects. The model "PMO-Enterprise" requires more investment but creates a solid foundation, has well-defined objectives, standards and rules, and in addition, enjoys substantial support from senior management. A distinctive feature of the model from the previous two is that PMO has a leading role in the process of initiation and completion of projects, a leading role in the implementation of the project portfolio, and a function to detect and remove the narrow (critical) places that obstruct the work of the project teams. The Office collects the information necessary for its project portfolio and manages the information about all the important projects in the organization. 4. PMO at Media TV Co. Ltd. This study aims to examine the degree of development of project management practice in an international television media company, to outline the possibilities for building a project management system with a view to improving the activities of the organization in respect of the management of a portfolio of projects. The interest in the management of project portfolio is determined by the progressively increasing number of projects managed by the organization in particular in the media sector. Here a question arises as to what combination of projects could yield the best results and will help to achieve the objectives set by an international television company. 23
6 Because of the rapid development of this segment "Media" needs to host small, medium-sized and large projects at the same time, which operate by sharing organizational resources. This leads to the necessity to migrate from a system for management of individual projects to the project-oriented type of organization. Such organizations are characterized by a particular interaction between the functional and matrix elements in their organizational and management structures. The management of the project portfolio is different due to the enhanced interaction between its projects. The application of traditional approaches and methods for project management often proves ineffective in managing the large number of projects of different scale and subject matter. This raises the need for theoretical reflection, methodological and practical feasibility argumentation of changes in management approaches and methods, functions, organizational structures, etc. for successful realization of projects in a TV media company. It is here we observe evolution in the company s project management, particularly in the timeliness and importance of the problems associated with the construction and improvement of project portfolio in the media sector. This induces a need for a more detailed analysis, evaluation and identification of the approach for their execution. The purpose of this case study is to provide understanding about the way an organization could implement PMO functions which are most appropriate to their specific environment (both external and internal). Moreover, we suggest an identification of key stimulus to successful utilization of PMO functions which link the project goals to the organizational strategy. The type of this case study is exploratory as far as it outlines some directions and effects from the implementation of a PMO within a particular organization. The current study applies the method of in-depth interviews with 27 respondents: top managers, functional managers, project managers, members of project teams, etc. The purposive sampling design has been applied in order to select respondents with relevant experience individuals with participation in at least one project implemented by the company in focus. Understandings acquired by this research could be of particular help by offering constructive guidelines to top managers and PMO managers dealing with emerging issues of project portfolio management. In the media sector the implementation of a PMO implicates a dynamic interaction of project team members, business processes and high technologies. PMO supports processes such as initiation, planning, execution, monitoring and control in the organization. This case study tries to reveal how PMO functions contribute to the achievement of the organizational goals in the framework of budget and resource constraints as well as strict project deadlines. It is conducted by a qualitative method which explores the PMO implementation and execution of its functions. Such a method allows the researchers to utilize the flexibility of techniques permitting in-depth exploration and derivation of a variety of conclusions. The object of the current study is "Media TV Co. Ltd." which operates a number of projects related to the linear broadcasting: television channels, their migration from SD to HD, preparation of technical base for UHD, as well as entering the sector of "non-linear content delivery" to end mobile devices in parallel to the traditional TV. The choice of this company is motivated by the dynamic development of the media sector in Bulgaria and the necessity of introducing project-based activities in the operation of media business units. 24 Economic Alternatives, Issue 1, 2015
7 A number of facts support the hypothesis that a media viewer wants to receive more information about the observed content. If we compare the information that reaches a contemporary individual to the former generations, the same volume of information reaches our predecessors 100 years ago but for all their lifetime. The strategic goal of a media company is to meet the needs of consumers, so the problems are not just related to lack of technology but rather to the specific requirements of the customers. There was a significant progress in the development of safe and cost-effective technologies for optimizing the content delivery, however, increasing the resolution and the volume leads to an increase in speed transmission on the Internet, which in turn affects the end prices. TV Media Co. implements numerous projects, some of which are: y Upgrade of Network architecture by enhancing 8 times the transmission speed; yvirtualization of all servers; y Replacement of disk arrays to enhance the space 3 times; y Installation of a new type of the System for Delivery and Acceptance of the transmitted content; y Upgrade of the System for Integrated Content Management; y Centralization of corporate information in a common database; y Introduction of additional software for financial management; y Development of software for CRM and market trends analyses. The main argument for choosing the object of this study is the fact that organizations take advantage of project portfolio management as a form of complex solutions of certain tasks in a dynamic environment. TV Media Co. implements both external and internal projects which aim in creating new products and/or implementing organizational changes. Its organizational strategy is directed towards continuous improvement of the competitiveness, efficiency and expansion of its operations. In line with this, the main reason for the implementation of PMO in Media TV Co. reflects the identified need for a standardized approach to the management of the constantly increasing number of projects. These projects lifted the degree of complexity of all activities related to their management as well as the assignment of roles, document turnover, chains of commands, etc. On the other side, this amplified complexity is accompanied by limitation in available resources and emergence of problem situations. This way it became essential to establish one unit for analysis, coordination, and control of all major projects executed in Media TV Co. This organizational change should facilitate the work of Project Managers in their efforts to manage effectively their teams in a much better regulated internal environment and conflict resolution. In the process of change induced by the PMO establishment the need for urgent updating of the competences of project management experts has evolved. From some point of view, PMO appeared also as an opportunity for a career development for some employees. The PMO implementation in Media TV Co. resulted in enhanced project outcomes along with improved organizational performance and more efficient utilization of the organizational resources. Now the company has one centralized unit where the top management can turn to when a 25
8 particular project must be evaluated in the framework of the organizational project portfolio. Along with that, the project management procedures changed in order to provide normative basis for the PMO to implement unified standards on a broader scale of project operations. The results from the survey about the extent of project activities in the organization show that the largest share of respondents (48.6%) declare that their involvement in project-based activities is very high (61 to 80% of the total workload). This means that every second determines the organization as a project-oriented one. These data give us reason to conclude that project management is currently imposed as the main approach to the operations of the company. The experience of respondents in project management is revealed by the question: "How many projects implemented by your organization you have participated in?" the largest share of respondents were involved in up to 5 projects. It is known that the participation in more projects contributes to the accumulation of practical experience at both managers and members of project teams. Essential for the functioning of PMO is the formation of project-oriented culture and behavior in the organization. The next question is related to the type of projects. The large proportion of respondents (47,2%) indicated their participation in projects implementing a kind of introduction of a new technology or equipment. Obviously, such type of projects acts as the main driver of the formation of project-oriented organizational culture. The recent trend in activities of the company in the media sector is related to the reconstruction and modernization of the broadcasting program. For this reason, the percentage of respondents participating in projects related to the development and improvement of business processes is about one-third (31,8%). Significant share Table 2. Results regarding the execution of the timetables of projects in the portfolio Result about timetables % of respondents Projects meet the deadline 59,8 Projects finish earlier by 10-20% of the total term 7,2 Projects finish earlier by over 20% of the total term 4,5 Projects finish later by 10-20% of the total term 19,3 Projects finish later by over 20% of the total term 6,4 Don t know / Cannot answer 2,8 Table 3. Results regarding the execution of the budgets of projects in the portfolio Result about budgets % of respondents Projects spend according to the budget plan 41,3 Projects finish by 10-20% economies 5,2 Projects finish by over 20% economies Projects finish by 10-20% overspending 36,3 Projects finish by over 20% overspending 3,8 Don t know / Cannot answer 13,3 26 Economic Alternatives, Issue 1, 2015
9 of the interviewed persons (19.2%) also participate in groups of projects (programs). The experience of nearly one-fifth of the participants is in the management and realization of the project portfolio. In respect of the significance of the projects realized by the organization, the respondents are primarily grouped around high and medium statements regarding the projects importance (respectively, 48,2% and 35,3%). One eighth of the respondents identify the projects managed within the portfolio as vital for the organization. The evaluation of the results of these projects leads to conclusions about the relationship between the methodology of project management and practical aspects of its implementation. Under exploration are the life-cycle of the projects, the application of the timetable, the scope of project activities, the efficiency of project budgeting, etc. Table 2 shows that most of the projects in the portfolio of TV Media Co. are completed Table 4. Results regarding the achievement of the objectives of projects in the portfolio Result about objectives % of respondents Projects achieve practically 100% of the goals 69,5 Projects achieve an expanded set of goals 3,4 Projects fail to achieve only goals with minor importance 17,4 Projects fail to achieve goals with major importance 5,2 Don t know / Cannot answer 4,5 Table 5. Project resolution results worldwide in due term (59,8%). This could be explained by the practices of selection of reliable subcontractors, the financial capacity of the organization, and precise assignment of project tasks to subcontractors. Typically, project budgets cover the entire project lifecycle providing financial support to project activities and ensuring the achievement of the objectives set in the project plan. Compliance with budget restriction is generally important for any project within the portfolio. The evaluations provided by respondents show that a substantial share of the executed projects finish within the planned budget (41.3%). Rarely projects succeed to save a minor share of the planned expenditures. As expected, frequently the projects needed to overrun their financial plans (over one third), but this was in a low ratio to the total projected budget amount. Responses have been obtained also in respect of the achievement of predefined In % of total projects Successful Failed Challenged Time Cost Features Source: SGI (2013), pp
10 project objectives (table 4). The vast majority of respondents (almost 70%) indicated that the projects generally achieve practically all project targets. One should have in mind that the media sector with its specific nature of production and dissemination requires a very high rate of achievement of the objectives. In cases when such goals are not met, these are mainly targets with no substantial importance for the project. Many specific constraints, rules and regulations enacted within the media sector are imposed to the project teams managing and implementing projects which supports these findings. The results about the media company look much positively as compared to the world practices in project management. According to the 2013 Standish Report only 39% of projects were considered successful for year 2012, 18% have failed, and 43% were challenging, i.e. completed with some time and/or budget overruns (SGI, 2013). The positive trend since the lowest point (29% in 2004) for the successful projects can be explained by few major factors related to the improvement of the entire project environment (processes, methods, skills, team working, costs, tools, decisions, optimization, internal and external influences, etc.). Another vital determinant of the increments in success rates is the development of project management as a profession and expanded involvement of trained project management professionals (SGI, 2013). In the same time, no trend is observed in the dynamics of the rates estimated in respect of the main project success measures. The experts of the Standish Group review each challenged project finding that in year 2013 a slight increase in both cost and time overruns is observed. Cases of project overspending amplified from 56% to 59% for the period and cases with time overruns have increased their share up to 74% in Project delivered features decreased from 74% to 69% for The experts suggest an explanation of this result by the better focus of the project-oriented organizations on the high-value client requirements at the expense of other (considered of minor importance) project deliverables (SGI, 2013). The introduction of a special coordination unit in TV Media Co. as PMO to deal with the overall organization of planning, implementation, monitoring and control of projects in the portfolio was identified as a major task for the top management. This immediate conclusion is drawn by more than 70% of the respondents who are familiar with the modern forms and methods of project management. The implementation of the new trends in project management needs, however, special trainings that are aimed at creating the appropriate skills and competencies for the team members to work on complex dynamic projects. In relation to this, the senior management has recognized the benefits of project portfolio management that could strengthen the organizational capacities by: y Specialized training in project management; y Provision of anticipated information (e.g. monthly newsletters containing information on the projects to be implemented and will be implemented in organizations); yimproved quality control of the projects; 28 Economic Alternatives, Issue 1, 2015
11 y Targeted organizational change implemented through specific projects, etc. Conclusions On the basis of this study results we can suggest a general conclusion that the optimization of project management in an organization can be realized by the introduction of PMO. This is valid for the organization chosen as a subject of the study but can be extended to all other organizations which operate in a multiproject environment. Such an optimization requires the implementation of three types of activities /roles/ coordination, monitoring and support. To sum up, PMO is an organizational unit, normally at a higher level in the organizational hierarchy (if not at the highest management level), which can be assigned multiple tasks depending on the needs of the project-oriented organization. In order to improve its overall performance such type of organization should also ensure the mitigation of a major risk emergence of contradictory effects of the three simultaneous roles on project managers. Currently, the assistance necessary to support the operation of individual project managers by a PMO is well recognized by the project experts and managers within the analyzed organization. At the same time, they can become suspicious of receiving support from a unit that simultaneously takes decisions as well as monitors and controls their projects. Such a situation can induce some extent of disobedience of project managers and potentially can become an obstacle to efficiently achieve the objectives. To prevent this risk, all roles must be integrated and executed with a special focus on any problematic aspects emerging within the project portfolio. References Aubry, M., R. Müller, B. Hobbs, and T. Blomquist, Project management offices in transition, International Journal of Project Management, 28 (8), pp Boneva, S., First level control of projects implemented under the framework of European Territorial Cooperation programs in Bulgaria. In: Bulgarian Economy The Road to the Euro", UNWE Publishing Complex, Sofia, pp Bredillet, C., P. Ruiz, and F. Yatim, Investigating the development of project management: A time-distance analysis approach of G8, European G6, and outreach 5 countries, conference paper, Warsaw: 2008 PMI Research Conference. Cooper, R., Edgett, S., and E. Kleinschmidt, Portfolio management for new product development: Results of an industry practices study, Research and Technology Management, 31 (4), pp Cooper, R., Edgett, S., and E.Kleinschmidt, New problems, new solutions: Making portfolio management more effective, Research Technology Management, 43 (2), pp de Reyck, B., Grushka-Cockayne, Y., Lockett, M., Calderini, S., Moura, M., and A. Sloper, The impact of project portfolio management on information technology projects, International Journal of Project Management, 23(7), pp Elonen, S., and K.A. Artto, Problems in managing internal development projects 29
12 in multiproject environments, International Journal of Project Management, 21 (6), pp Hobbs, B., Aubry, M., and D. Thuillier, The project management office as an organisational innovation, International Journal of Project Management, 26 (5), pp Huemann, M., and F. Anbari, Project auditing: a tool for compliance, governance, empowerment, and improvement, Journal of Academy of Business and Economics, 7(2), pp Huemann, M., Keegan, A., and J.R. Turner, Human resource management in the project-oriented organization A review, International Journal of Project Management, 25(3), pp Kendall, G., and S. Rollins, Advanced Project and the PMO: Multiplying ROI at Warp Speed. J.Ross Publishing, Inc. Levine, H.A., Project Portfolio Management: A Practical Guide to Selecting Projects, Managing Portfolios, and Maximizing Benefits. San Francisco, CA: Jossey-Bass. Marsh, D., The programme and project support office. In: Turner, R.J., Simister, S.J. (Eds.), Handbook of Project Management. Gower: Aldershot, pp Pellegrinelli, S., What s in a name: project or programme?, International Journal of Project Management, 29 (2), pp PMI, Organizational Project Management Maturity Model: OPM3 Knowledge Foundation. Newtown Square, PA: Project Management Institute. SEI, Project (PPM): The Natural Evolution of Project Management. Systems Evolution Inc., PMI Virtual Library. Singh, R., Keil, M., and K. Vijay, Identifying and overcoming the challenges of implementing a project management office, European Journal of Information Systems, 18 (5), pp SGI, CHAOS Manifesto 2013: Think Big, Act Small. The Standish Group International, Inc. Staneva, D., Alexandrova, M., and G. Petkov, Local and Global Measures for Success and Reconstructive Determination of the Optimal Number of Partners in European Educational Projects, Economic Alternatives, Issue 2, pp Thiry, M., Managing portfolios of projects. In: Turner, J.R. (ed.), Gower Handbook of Project Management. Aldershot, UK: Gower Publishing. Valle, J., Silvia, W., and C. Soares, Project Management Office (PMO) Principles in Practice. AACE International Transactions, PM71. Ward, L., Project Management Term A Working Glossary. 2nd ed. ESI International. 30 Economic Alternatives, Issue 1, 2015
9 TH INTERNATIONAL ASECU CONFERENCE ON SYSTEMIC ECONOMIC CRISIS: CURRENT ISSUES AND PERSPECTIVES
Matilda Alexandrova Liliana Ivanova University of National and World Economy,Sofia, Bulgaria CRITICAL SUCCESS FACTORS OF PROJECT MANAGEMENT: EMPIRICAL EVIDENCE FROM PROJECTS SUPPORTED BY EU PROGRAMMES
USING PROJECT MANAGEMENT OFFICE (PMO) TO IMPROVE PROJECT MANAGEMENT ABILITIES
USING PROJECT MANAGEMENT OFFICE (PMO) TO IMPROVE PROJECT MANAGEMENT ABILITIES by Marzieh Babaeianpour Payam-e Noor University, Tehran, Iran E-mail: [email protected] and Shakib Zohrevandi Payam-e Noor
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
P3M3 Portfolio Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction
Assessing the Appropriate Level of Project, Program, and PMO Structure
PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects
Pharmaceutical Sales Certificate
Pharmaceutical Sales Certificate Target Audience Medical representatives Objective The objective of this program is to provide the necessary skills and knowledge needed to succeed as medical representatives.
Project Management Office: Seeing the Whole Picture
Cloud Solutions for IT Management WHITE PAPER Project Management Office: Seeing the Whole Picture Project Portfolio Management gives PMOs the tools and techniques to get lean in lean times. Executive Summary
Identifying Forces Driving PMO Changes Summary Report
Identifying Forces Driving PMO Changes Summary Report Monique Aubry a Brian Hobbs a Ralf Müller b Tomas Blomquist b a University of Quebec in Montreal, Montreal, Canada b Umeå School of Business, Umeå
Project Management: Back to Basics
About this research note: Technology Insight notes describe emerging technologies, tools, or processes as well as analyze the tactical and strategic impact they will have on the enterprise. Project Management:
Investigating the roles, responsibilities and practices of portfolio managers in Australia: A literature review and research outline
Bond University epublications@bond Library Services and IT Services papers Library Services 8-23-2010 Investigating the roles, responsibilities and practices of portfolio managers in Australia: A literature
Strategic Project Management Alex S. Brown, PMP Strategic Planning Office Manager, MSIG USA. Introduction. Strategic Planning at MSIG USA
Strategic Project Management Alex S. Brown, PMP Strategic Planning Office Manager, MSIG USA A nightmare for project managers: Introduction To spend time, money, and effort, execute a project To end on-time
A P3M3 Maturity Assessment for Attorney Generals Department Prepared by James Bawtree & Rod Sowden Dated 18 th November 2010
A P3M3 Maturity Assessment for Attorney Generals Department Prepared by James Bawtree & Rod Sowden Dated 18 th November 2010 Attorney Generals Department P3M3 report Page 1 1 Contents 1 Contents... 2 2
THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT
THE INTERNATIONAL JOURNAL OF BUSINESS & MANAGEMENT Performance Management Model for SMEs Rusaneanu Alexandra Ph.D. Student, Faculty of Cybernetics, Statistics and Economic Informatics, Bucharest University
Program Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
PASB Information Technology Strategy 2015-2019. Information Technology Services (ITS) January 2015
PASB Information Technology Strategy 2015-2019 Information Technology Services (ITS) January 2015 Table of Contents Executive Summary The Need for a New IT Strategy Vision for IT in PAHO Vision Statement
ISO, CMMI and PMBOK Risk Management: a Comparative Analysis
ISO, CMMI and PMBOK Risk Management: a Comparative Analysis Cristine Martins Gomes de Gusmão Federal University of Pernambuco / Informatics Center Hermano Perrelli de Moura Federal University of Pernambuco
Characteristics of Effective and Sustainable Teaching Development Programs for Quality Teaching in Higher Education
Characteristics of Effective and Sustainable Teaching Development Programs for Quality Teaching in Higher Education This presentation will address the following conference aim/question: What are the contextual
ACCOUNTING MODERNIZATION PREMISE OF AN EFFECTIVE GOVERNANCE SYSTEM OF ENTERPRISE
ACCOUNTING MODERNIZATION PREMISE OF AN EFFECTIVE GOVERNANCE SYSTEM OF ENTERPRISE MIHAELA UNGUREANU ALEXANDRU IOAN CUZA UNIVERSITY OF IASI [email protected] Abstract: Value of company is maximizing insofar
Frank P.Saladis PMP, PMI Fellow
Frank P.Saladis PMP, PMI Fellow Success factors for Project Portfolio Management The Purpose of Portfolio Management Organizational Assessment Planning a Portfolio Management Strategy The Portfolio Management
White Paper. PPP Governance
PPP Governance The Governance of Projects, Programs and Portfolios (PPP) (sometimes called project governance for convenience) is the sub-set of corporate and organisational governance 1 focused on assisting
Professional Project Portfolio Management
Roland Gareis ROLAND GAREIS CONSULTING; Silbergasse 30/3, A-1190 Vienna, Austria Tel: (+43-1) 367 70 22-0, Fax: (+43-1) 367 70 22-70 E-mail: [email protected] presented at the IPMA World Congress, Berlin,
FIXING PROJECT MANAGEMENT: A MUST-HAVE
FIXING PROJECT MANAGEMENT: A MUST-HAVE Consistent Standards are Key to Multi-Vendor Operating Models By Michelle Mack, Principal Consultant www.isg-one.com INTRODUCTION Today s complex multi-source operating
Chapter 4. The IM/IT Portfolio Management Office
Chapter 4 The IM/IT Portfolio Management Office Learning Objectives Identify some of the primary causes of IM/IT project failures. Describe the main differences between IM/IT project management, IM/IT
Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1. Ecole Centrale Paris, FRANCE
INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN, ICED 07 28-31 AUGUST 2007, CITE DES SCIENCES ET DE L'INDUSTRIE, PARIS, FRANCE Nydia González 1, Franck Marle 1 and Jean-Claude Bocquet 1 1 Ecole Centrale
PMI s PULSE OF THE PROFESSION IN-DEPTH REPORT THE HIGH COST OF LOW PERFORMANCE: THE ESSENTIAL ROLE OF COMMUNICATIONS ORGANIZATI ONAL AGILITY
PMI s PULSE OF THE PROFESSION IN-DEPTH REPORT THE HIGH COST OF LOW PERFORMANCE: THE ESSENTIAL ROLE OF COMMUNICATIONS ORGANIZATI ONAL AGILITY MAY 2013 EXECUTIVE SUMMARY In the context of organizational
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
TD Bank N.A. s Enterprise-Wide PMO Monitors Projects and Maintains Focus on Strategic Goals
WHITE PAPER TD Bank N.A. s Enterprise-Wide PMO Monitors Projects and Maintains Focus on Strategic Goals AT A GLANCE TDBNA first began using a project management office (PMO) to support its privatization
The Effects of the Project Management Office on Companies Performance - A Case Study on a Project-Oriented Company
Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 The Effects of the Project Management Office on Companies Performance
Strategic Alignment and Project Management Offices: Case Studies from Successful Implementations in Turkey
2013 46th Hawaii International Conference on System Sciences Strategic Alignment and Project Management Offices: Case Studies from Successful Implementations in Turkey Gamze Karayaz ISIK University [email protected]
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT OFFICES A PRACTICAL GUIDE TO SETTING UP A PMO (WITH EXAMPLES)
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT OFFICES A PRACTICAL GUIDE TO SETTING UP A PMO (WITH EXAMPLES) Developed by the Department of Health Informatics Directorate Informatics Capability Development
Project Management Competencies in the Project Oriented Organization
Project Management Competencies in the Project Oriented Organization In the project-based organization, project management (pm) competences are not only required by individuals, but also by project teams
Making A Case For Project Management
AN INTERTHINK CONSULTING WHITE PAPER Making A Case For Project Management An Overview Of Interthink Consulting's Project Management Business Case Approach Contents: Introduction Defining Organizational
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for
Project Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
TURKEY BUSINESS ANALYSIS REPORT 2015. Thinking Like the Business
TURKEY BUSINESS ANALYSIS REPORT 2015 Thinking Like the Business CONTENT Foreword Respondent Profiles Business Partnering Business Priorities Driving Change and Innovation Efficiency of Business Analysis
How Technology Supports Project, Program and Portfolio Management
WHITE PAPER: HOW TECHNOLOGY SUPPORTS PROJECT, PROGRAM AND PORTFOLIO MANAGEMENT SERIES 4 OF 4 How Technology Supports Project, Program and Portfolio Management SEPTEMBER 2007 Enrico Boverino CA CLARITY
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
The Role of Information Technology Studies in Software Product Quality Improvement
The Role of Information Technology Studies in Software Product Quality Improvement RUDITE CEVERE, Dr.sc.comp., Professor Faculty of Information Technologies SANDRA SPROGE, Dr.sc.ing., Head of Department
Inventory Management in Small and Medium-Sized Manufacturing Companies and Its Main Dilemmas
Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Inventory Management in Small and Medium-Sized Manufacturing Companies
TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide
Measures and Metrics for PMO Success
Project Management Office Summit Measures and Metrics for PMO Success Jim Kendrick, PMP, CMC President and Practice Leader 2009 P2C2 Group, Inc. [email protected] 301-942-7985 Also See Related Blog
Partnering for Project Success: Project Manager and Business Analyst Collaboration
Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,
The expression better, faster, cheaper THE BUSINESS CASE FOR PROJECT PORTFOLIO MANAGEMENT
Cloud Solutions for IT Management WHITE PAPER THE BUSINESS CASE FOR PROJECT PORTFOLIO MANAGEMENT How Progressive IT Organizations Are Using Hosted Solutions To Deliver On Time, On Budget, On Quota and
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,
Ten Critical Steps. for Successful Project Portfolio Management. RG Perspective
RG Perspective Ten Critical Steps for Successful Project Portfolio Management 11 Canal Center Plaza Alexandria, VA 22314 HQ 703-548-7006 www.robbinsgioia.com 2016 Robbins Gioia Across all sectors of the
The growing importance of EPMO (Enterprise Project Management Office) in today s organizations
The growing importance of EPMO (Enterprise Project Management Office) in today s organizations Abstract: This paper discusses the growing importance of Enterprise PMO in organizations. The paper highlights
Project, Program & Portfolio Management Help Leading Firms Deliver Value
in collaboration with Project, Program & Portfolio Help Leading Firms Deliver Value Managing Effectively & Efficiently Through an Enterprise PMO Program & Portfolio : Aligning IT Capabilities with Business
Best Practices in Change Management 2014 Edition
Best Practices in Change Management 2014 Edition Executive Overview A look at Prosci s latest change management research In Brief: Since 1998, Prosci has conducted eight benchmarking studies to discover
The Contextualization of Project Management Practice and Best Practice
The Contextualization of Project Management Practice and Best Practice Claude Besner PhD, University of Quebec at Montreal Brian Hobbs PhD, University of Quebec at Montreal Abstract This research aims
Transform Your Bank in Measurable Steps
Banking Transformation Framework Transform Your Bank in Measurable Steps Table of Contents 2 Establish a Platform for Transformation 3 Transform Your Business 3 Use the Reference Architecture As a Foundation
THE PLANNING OF A CUSTOMER RELATIONSHIP MANAGEMENT PROJECT: REQUIREMENTS AND OPPORTUNITIES
THE PLANNING OF A CUSTOMER RELATIONSHIP MANAGEMENT PROJECT: REQUIREMENTS AND OPPORTUNITIES Professor PhD Adriana OLARU Lecturer Alexandru CAPATINA Dunărea de Jos University of Galati, Romania Abstract:
pm4dev, 2007 management for development series Project Management Organizational Structures PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series Project Management Organizational Structures PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology
Setting up and operationalisation of Enterprise PMOs
Setting up and operationalisation of Enterprise PMOs A. Why an EPMO? Entities in private and non-profit/ governmental sectors need to constantly address change due to external and internal forces. These
12 A framework for knowledge management
365 12 A framework for knowledge management As those who work in organizations know, organizations are not homogenous entities where grand theoretical systems are easily put in place. Change is difficult.
Chapter 1 Introduction to the Study
` Chapter 1 Introduction to the Study 1.1. Introduction The convergence of computer and communications technologies of the late 20th century has profoundly affected information creation, distribution,
From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification
From Body of Knowledge to Embodied Knowledge: Leveraging the Project Management Professional (PMP) Certification By Jennifer Tucker, PMP OKA (Otto Kroeger Associates), [email protected] Abstract. The
Benefits of conducting a Project Management Maturity Assessment with PM Academy:
PROJECT MANAGEMENT MATURITY ASSESSMENT At PM Academy we believe that assessing the maturity of your project is the first step in improving the infrastructure surrounding project management in your organisation.
Managing the IT Project Portfolio:
EDUCAUSE Center for Applied Research Research Bulletin Volume 2009, Issue February 10, 2009 Managing the IT Project Portfolio: A Project Ranking Methodology Randall Alberts, Georgia State University 4772
The challenges of becoming a Trusted Digital Repository
The challenges of becoming a Trusted Digital Repository Annemieke de Jong is Preservation Officer at the Netherlands Institute for Sound and Vision (NISV) in Hilversum. She is responsible for setting out
Strategic PMOs Play A Vital Role In Driving Business Outcomes A Part Of PMI s Thought Leadership Series
A Forrester Consulting Thought Leadership Paper Commissioned By Project Management Institute (PMI) November 2013 Strategic PMOs Play A Vital Role In Driving Business Outcomes A Part Of PMI s Thought Leadership
A LITERATURE REVIEW ABOUT RECOGNIZING HIGH-POTENTIAL PROJECT MANAGERS AND HOW TO KEEP THEM ON BOARD
A LITERATURE REVIEW ABOUT RECOGNIZING HIGH-POTENTIAL PROJECT MANAGERS AND HOW TO KEEP THEM ON BOARD J.F. Spoelstra Hogeschool Rotterdam Minor Project- en programmamanagement 2013 In January 2012 ESI announced
Inside Track Research Note. In association with. Enterprise Storage Architectures. Is it only about scale up or scale out?
Research Note In association with Enterprise Storage Architectures Is it only about scale up or scale out? August 2015 About this The insights presented in this document are derived from independent research
Bridging the Gap Between Design and Use Processes: Sector-Based Problems of a CRM Oriented Approach
Bridging the Gap Between Design and Use Processes: Sector-Based Problems of a CRM Oriented Approach Kerem ERCOSKUN *, Alaattin KANOGLU **, Abstract: Architectural Design and Facility Management are seen
Project Management and Scrum A Side by Side Comparison by Anne Loeser, October 2006
Project Management and Scrum A Side by Side Comparison by Anne Loeser, October 2006 For decades, software development projects have followed the classic waterfall method in which software development initiatives
The Enterprise Project Management Office
The Enterprise Project Management Office A Conceptual Review Dick Patterson [email protected] 1 Report Overview Almost all enterprises are confronted by accelerating change. An effective, Enterprise
Issues in Information Systems
TAXONOMY OF MULTIPLE LEVELS OF SWOT ANALYSIS IN PROJECT MANAGEMENT Ganesh Vaidyanathan, Indiana University South Bend, [email protected] Asghar Sabbaghi, Indiana University South Bend, [email protected]
Agile Master Data Management A Better Approach than Trial and Error
Agile Master Data Management A Better Approach than Trial and Error A whitepaper by First San Francisco Partners First San Francisco Partners Whitepaper Executive Summary Market leading corporations are
ALIGNING BUSINESS AND IT A MANAGEMENT
Feature Ikumi Miyagi, CGEIT, CRISC, is the chief executive officer (CEO) of K.K. AStar and KK AStar Institute. Hiroshi Monden, CISA, CIA, CRMA, is an internal auditor of a public corporation. Mitsuko Azuma,
Systematic and Holistic IT Project Management Approach for Commercial Software. Theresa Kraft Lawrence Technological University
Systematic and Holistic IT Project Management Approach for Commercial Software Theresa Kraft Lawrence Technological University Agenda IT Project Failure Rates Literature Review Research Justification Research
Understanding risk exposure using multiple hierarchies. Introduction
Understanding risk exposure using multiple hierarchies David Hillson PhD PMP FAPM FIRM MCMI FRSA Director, Risk Doctor & Partners Introduction Risk management is recognised as an essential contributor
CUSTOMER RELATIONSHIP MANAGEMENT OF SELECT LIFE INSURANCE COMPANIES
I n t e r n a t i o n a l J o u r n a l o f M a n a g e m e n t F o c u s 1 CUSTOMER RELATIONSHIP MANAGEMENT OF SELECT LIFE INSURANCE COMPANIES G. RAJU Asst. Professor of Business Administration, St. Thomas
Application Overhaul. Key Initiative Overview
Scott D. Nelson Research Managing Vice President This overview provides a high-level description of the Application Overhaul Key Initiative. IT leaders can use this guide to understand how to develop an
How To Develop An Enterprise Architecture
OSI Solution Architecture Framework Enterprise Service Center April 2008 California Health and Human Services Agency Revision History REVISION HISTORY REVISION/WORKSITE # DATE OF RELEASE OWNER SUMMARY
Banking Application Modernization and Portfolio Management
Banking Application Modernization and Portfolio Management Key Challenges and Success Factors As part of their long-term strategic plans, banks are seeking to capitalize on their legacy applications. Acquired
Creating a Project Management Office (PMO)
Creating a Project Management Office (PMO) By Jane Walton Managing Director, Clarity Decisions LLC Table of Contents Executive Summary... 3 Creating a PMO... 4 The Foundation Understand the Cultural Context...
Presented By: Leah R. Smith, PMP. Ju ly, 2 011
Presented By: Leah R. Smith, PMP Ju ly, 2 011 Business Intelligence is commonly defined as "the process of analyzing large amounts of corporate data, usually stored in large scale databases (such as a
All available Global Online MBA routes have a set of core modules required to be completed in order to achieve an MBA.
All available Global Online MBA routes have a set of core modules required to be completed in order to achieve an MBA. Those modules are: Building High Performance Organisations Management and Organisational
Virtualization. Key Initiative Overview
Philip Dawson Research Vice President Virtualization brings flexibility, agility and increased capabilities to enterprise users. IT leaders can use this overview to assess their virtualization needs and
Course Description Bachelor in Public Administration
Course Description Bachelor in Public Administration 1606202 New Public Management This course is designed to give students the opportunity to understand the theoretical foundations of new public management,
META DATA QUALITY CONTROL ARCHITECTURE IN DATA WAREHOUSING
META DATA QUALITY CONTROL ARCHITECTURE IN DATA WAREHOUSING Ramesh Babu Palepu 1, Dr K V Sambasiva Rao 2 Dept of IT, Amrita Sai Institute of Science & Technology 1 MVR College of Engineering 2 [email protected]
Strategic Communications Audits
Strategic Communications Audits Prepared for the Communications Consortium Media Center Julia Coffman October 2004 Nonprofit organizations are now continuously being challenged to be more strategic in
Project Risk Management
Risk Advisory Services Project Risk Management James O Callaghan October 2006 RISK ADVISORY SERVICES (year) KPMG (member firm name if applicable), the (jurisdiction) member firm of KPMG International,
The role of project management offices (PMOs) in healthcare system
ISSN: 2347-3215 Volume 3 Number 6 (June-2015) pp. 429-435 www.ijcrar.com The role of project management offices (PMOs) in healthcare system Samad Agha Mohamadi 1, Seyed Yaser Hariri 2, Raheleh Mousavi
5 Key Ways Web-Based Project Portfolio Management & Application Portfolio Management Solutions Make IT More Strategic & Cost Effective
5 Key Ways Web-Based Project Portfolio Management & Application Portfolio Management Solutions Make IT More Strategic & Cost Effective Cloud Solutions for IT Management About Innotas: Innotas provides
STRATEGIC INTELLIGENCE WITH BI COMPETENCY CENTER. Student Rodica Maria BOGZA, Ph.D. The Bucharest Academy of Economic Studies
STRATEGIC INTELLIGENCE WITH BI COMPETENCY CENTER Student Rodica Maria BOGZA, Ph.D. The Bucharest Academy of Economic Studies ABSTRACT The paper is about the strategic impact of BI, the necessity for BI
OPTIMUS SBR. Optimizing Results with Business Intelligence Governance CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE.
OPTIMUS SBR CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. Optimizing Results with Business Intelligence Governance This paper investigates the importance of establishing a robust Business Intelligence (BI)
Guide on Developing a HRM Plan
Guide on Developing a HRM Plan Civil Service Branch June 1996 Table of Contents Introduction What is a HRM Plan? Critical Success Factors for Developing the HRM Plan A Shift in Mindset The HRM Plan in
To have or not to have a PMO - is that the right question? Transforming knowledge into action. To have or not to have a PMO 1
To have or not to have a PMO - is that the right question? Transforming knowledge into action To have or not to have a PMO 1 Cranfield University 2013 All rights in this written material are Reserved.
Enterprise Architecture: A Governance Framework
Enterprise Architecture: A Governance Framework Part I: Embedding Architecture into the Organization Sohel Aziz, Thomas Obitz, Reva Modi and Santonu Sarkar The whitepapers arei related to two sessions
Project Portfolio Management: James C. Brown Sr. Manager, Research PMO Pioneer Hi-Bred International
Project Portfolio Management: Metrics that Work James C. Brown Sr. Manager, Research PMO Pioneer Hi-Bred International Agenda PPM Interest What is Project Portfolio Management? Challenges Myths Benefits