1 Water Quality Monitoring Plans ABAG/CSRMA Sewer Summit November 13, 2014 Doug Humphrey, Humphrey Consulting Overview Background Regulatory Requirements 2 Background 2006 WDR - Need to improve O&M of Collection Systems and require SSO Reporting 2013 MRP - Further improve systems and reporting and monitoring of SSOs - Water Quality Monitoring Plans required 3 1

2 Regulatory Requirements 2006: WDR for Collection Systems - SSO Reporting - SSMP Preparation 2008: Monitoring & Reporting Amended - Two Hour Notification 2013: MRP Amended 4 Regulatory Requirements 2013 MRP Amendment Notification Over 1000 gals. to waters Reporting SSO Categories changed, Technical reports for SSOs > or = 50k gals., no spill certification, questionnaire updates Recordkeeping SSOs, SSMP implementation & changes, water quality monitoring, telemetry records 5 Regulatory Requirements 2013 MRP Amendment Water Quality Sampling within 48 hours of notification of Category 1 SSO in which 50,000 gallons or more are spilled to surface waters Develop and implement an SSO water quality monitoring plan (WQMP) to assess impacts of such SSOs 6 2

3 Regulatory Requirements 2013 MRP Amendment WQMP To comply with subsection D.7(v) of the SSS WDRs, the enrollee shall develop and implement an SSO Water Quality Monitoring Program to assess impacts from SSOs to surface waters in which 50,000 gallons or greater are spilled to surface waters. The SSO Water Quality Monitoring Program, shall, at a minimum: 1. Contain protocols for water quality monitoring. 2. Account for spill travel time in the surface water and scenarios where monitoring may not be possible (e.g. safety, access restrictions, etc.). 7 Regulatory Requirements 2013 MRP Amendment WQMP 3. Require water quality analyses for ammonia and bacterial indicators to be performed by an accredited or certified laboratory. 4. Require monitoring instruments and devices used to implement the SSO Water Quality Monitoring Program to be properly maintained and calibrated, including any records to document maintenance and calibration, as necessary, to ensure their continued accuracy. 8 Regulatory Requirements 2013 MRP Amendment WQMP 5. Within 48 hours of the enrollee becoming aware of the SSO, require water quality sampling for, at a minimum, the following constituents: i. Ammonia ii. Appropriate Bacterial indicator(s) per the applicable Basin Plan water quality objective or Regional Board direction which may include total and fecal coliform, enterococcus, and e-coli. 9 3

4 WQMP (Plan) Components Lab Selection and Logistics Sampling Protocols/Procedures Constituents to be Analyzed Equipment -Calibration Recordkeeping Technical Reports Training 10 Lab Selection & Logistics Agency or Contractor or both? After hours needs to be considered Holding times Transporting samples to lab 11 Sampling Procedures SOP? Transport as well as sample Chain-of-Custody Forms 12 4

5 Constituents to be Analyzed Bacteriological Ammonia Any others? 13 Equipment Calibration & Maintenance Probes Forms (document) 14 Recordkeeping SOPs Chain-of-Custody forms Sampling Forms & Worksheets SSO Reports 15 5

6 Technical Reports SOP who is responsible? Identify responsibilities for items in advance Forms? Template, in advance 16 Training Sampling technique Sampling transport & logistics Forms 17 Which Bacteriological Analyses to perform? - Total Coliform - Fecal Coliform - Enterococcus Water Quality Criteria look at Basin Plan 18 6

7 When to stop sampling after SSO events? - Water quality standards - Upstream, downstream results - County health, Regional Board staff input 19 Background Sampling outside of SSO events? - Likelihood of SSO events - Sensitivity of water bodies - Safety, accessibility concerns 20 Background Sampling 21 7

8 Sample at lower thresholds (<50k gals.) than MRP requirements? - CDs, settlement agreements with third parties? - County Health department? - Regional Board? - Agency preference? 22 Who will perform sampling? - Collection system field staff? - Lab, PT, or WWTP staff? - Training needed to ensure quality of samples 23 Who will complete technical reports? - Collection system supervisors? - Engineering staff? - Combination of staff? - Ensure appropriate information is obtained; identify what will be included well in advance 24 8

9 Questions? 25 Additional Information Doug Humphrey, Humphrey Consulting:

APPENDIX 4 Water Quality Monitoring Program Plan

APPENDIX 4 Water Quality Monitoring Program Plan APPENDIX 4 Water Quality Monitoring Program Plan As required by SWRCB Order No. WQ 2013-0058-EXEC, this plan shall be implemented by the BCPUD immediately upon discovery of any Category 1 SSO of 50,000

More information

STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD ORDER NO. WQ 2013-0058-EXEC

STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD ORDER NO. WQ 2013-0058-EXEC STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD ORDER NO. WQ 2013-0058-EXEC AMENDING MONITORING AND REPORTING PROGRAM FOR STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS The

More information

Element 3: OVERFLOW EMERGENCY RESPONSE PLAN

Element 3: OVERFLOW EMERGENCY RESPONSE PLAN Element 3: OVERFLOW EMERGENCY RESPONSE PLAN The section of the SSMP discusses the City s overflow emergency response plan, which is included in full in Appendix B. This section fulfills the Overflow Emergency

More information

Sanitary Sewer Overflow (SSO) Reduction Program. Division of Water Quality State Water Resources Control Board

Sanitary Sewer Overflow (SSO) Reduction Program. Division of Water Quality State Water Resources Control Board Sanitary Sewer Overflow (SSO) Reduction Program Division of Water Quality State Water Resources Control Board Overview Background on Statewide SSO Reduction Program Roles and Responsibilities Monitoring

More information

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD CENTRAL VALLEY REGION MONITORING AND REPORTING PROGRAM NO. R5-2002-0042 NPDES NO.

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD CENTRAL VALLEY REGION MONITORING AND REPORTING PROGRAM NO. R5-2002-0042 NPDES NO. CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD CENTRAL VALLEY REGION MONITORING AND REPORTING PROGRAM NO. R5-2002-0042 NPDES NO. CA0084816 FOR The Discharger shall not implement any changes to this Program

More information

How To Write A Water Board Water Management Plan

How To Write A Water Board Water Management Plan Sanitary Sewer Overflow (SSO) Reduction Program Revised Sanitary Sewer System Waste Discharge Requirements State Water Resources Control Board 1001 I Street, Sacramento, CA 95814 1 Overview Proposed Revisions

More information

Sanitary Sewer Overflow (SSO) Reduction Program and Enforcement. State Water Resources Control Board 1001 I Street, Sacramento, CA 95814

Sanitary Sewer Overflow (SSO) Reduction Program and Enforcement. State Water Resources Control Board 1001 I Street, Sacramento, CA 95814 Sanitary Sewer Overflow (SSO) Reduction Program and Enforcement State Water Resources Control Board 1001 I Street, Sacramento, CA 95814 Overview 1. Sanitary Sewer Systems WDR Basic Requirements, 2. Statewide

More information

ELEMENT 5: OVERFLOW EMERGENCY RESPONSE PLAN

ELEMENT 5: OVERFLOW EMERGENCY RESPONSE PLAN ELEMENT 5: OVERFLOW EMERGENCY RESPONSE PLAN This section sets forth the BCPUD s Sanitary Sewer Overflow Emergency Response Plan and fulfills the SWRCB Element 5 SSMP requirements. SWRCB REQUIREMENTS FOR

More information

Notification Requirements for CMSA NPDES Permit Exceedances and Collection System Sanitary Sewer Overflows Date: April 2, 2008 (Revised July 10, 2012)

Notification Requirements for CMSA NPDES Permit Exceedances and Collection System Sanitary Sewer Overflows Date: April 2, 2008 (Revised July 10, 2012) Requirements for CMSA NPDES Permit Exceedances and Collection System Sanitary Sewer Overflows Date: April 2, 2008 (Revised July 10, 2012) 1. Purpose To outline the Agency s notification and reporting requirements

More information

Date Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09

Date Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09 Date Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09 SAMPLE SANITARY SEWER OVERFLOW RESPONSE S.O.P. TABLE OF CONTENTS SECTION 1: PURPOSE SECTION 2: SPILL RESPONSE SECTION

More information

Sewer System Management Plan

Sewer System Management Plan Sewer System Management Plan September 2013 Update Prepared by EOA, Inc. and District Staff Sewer System Management Plan September 2013 Update Prepared by EOA, Inc. and District Staff Table of Contents

More information

Richardson Bay Sanitary District. Sanitary Sewer Overflow Response Plan. Revision No. 2

Richardson Bay Sanitary District. Sanitary Sewer Overflow Response Plan. Revision No. 2 Richardson Bay Sanitary District Sanitary Sewer Overflow Response Plan Revision No. 2 Prepared by: Water andenvironment Revised: August 2009 Original: October 2008 Sanitary Sewer Overflow Response Plan

More information

STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS

STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS The State Water Resources Control Board, hereinafter referred to as

More information

SEWER SYSTEM MANAGEMENT PLAN

SEWER SYSTEM MANAGEMENT PLAN EL TORO WATER DISTRICT SEWER SYSTEM MANAGEMENT PLAN STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ OCTOBER 2014 TABLE

More information

Statewide Sanitary Sewer Overflow Reduction Program Annual Compliance Update

Statewide Sanitary Sewer Overflow Reduction Program Annual Compliance Update Appendix 1 Statewide Sanitary Sewer Overflow Reduction Program Annual Compliance Update EXECUTIVE DIRECTOR S REPORT State Water Resources Control Board May 2010 1 TABLE OF CONTENTS 1. INTRODUCTION 3 2.

More information

Enforcement Options and Compliance Audits

Enforcement Options and Compliance Audits Sanitary Sewer Overflow (SSO) Enforcement Options and Compliance Audits Central Valley Clean Water Agency Conference May 20, 2010 Mark Bradley, Chief Special Investigations - Unit Office of Enforcement

More information

SEWER SYSTEM MANAGEMENT PLAN

SEWER SYSTEM MANAGEMENT PLAN SEWER SYSTEM MANAGEMENT PLAN Prepared for San Bernardino Community College District February, 2010 SEWER SYSTEM MANAGEMENT PLAN Prepared for the San Bernardino Community College District Holmes International

More information

City of Laguna Beach: Overflow Emergency Response Plan. Table of Contents

City of Laguna Beach: Overflow Emergency Response Plan. Table of Contents City of Laguna Beach: Overflow Emergency Response Plan Table of Contents Sanitary Sewer Overflow Emergency Response Plan (ref. SWRCB Order No. 2006-0003-DWQ Element VI) 1. Purpose 2. Policy 3. Definitions

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE CITY OF CLAYTON SEWER SYSTEM MANAGEMENT PLAN (SSMP) PROPOSALS MUST BE RECEIVED BY: FRIDAY, 01/17/2014 AT 4:00 PM SSMP Request for Proposal Released 12/18/2013

More information

City of San Carlos Sanitary Sewer Management Plan

City of San Carlos Sanitary Sewer Management Plan City of San Carlos Sanitary Sewer Management Plan APPENDIX A Element 6: OVERFLOW EMERGENCY RESPONSE PLAN Prepared by: Department of Public Works City of San Carlos - Sanitary Sewer Management Plan City

More information

University of California Santa Cruz

University of California Santa Cruz University of California Santa Cruz Sewer System Management Plan May 2009 Rev July 2013 Rev May 2014 UCSC SSMP 052014.doc 2 Table of Contents 1.0 Goals of the SSMP Page 4 2.0 Organization Page 4 3.0 Legal

More information

JASON IKEN CITY OF HOUSTON TXWARN 1

JASON IKEN CITY OF HOUSTON TXWARN 1 LESSONS LEARNED FROM RESPONSE TO HURRICANE IKE IN HOUSTON THE TEXAS WATER/WASTEWATER AGENCY RESPONSE NETWORK Pflugerville, Texas June 28, 2013 Jason Iken, P.E., Senior Assistant Director Wastewater Operations

More information

CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN

CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN June 2009 Prepared For: The City of Coronado Public Services 101 B Avenue Coronado, California 92118 Prepared By: 9275 Sky Park Court, Suite 200 San Diego,

More information

CITY OF ALHAMBRA. Sewer System Management Plan

CITY OF ALHAMBRA. Sewer System Management Plan CITY OF ALHAMBRA Sewer System Management Plan Updated April 2014 This page intentionally left blank Table of Contents INTRODUCTION... 2 SECTION I: GOALS... 3 SECTION II: ORGANAZATION... 4 SECTION III:

More information

Survey Results. TO: SSO WDR Task Force FROM: CWEA Staff SUBJECT: GWDR SSO Survey Analysis DATE: February 9, 2010

Survey Results. TO: SSO WDR Task Force FROM: CWEA Staff SUBJECT: GWDR SSO Survey Analysis DATE: February 9, 2010 Survey Results TO: SSO WDR Task Force FROM: CWEA Staff SUBJECT: GWDR SSO Survey Analysis DATE: February 9, 2010 CWEA, BACWA, CASA, CVCWA, SCAP and Tri Tac jointly conducted a survey in the summer of 2009

More information

BOLINAS COMMUNITY PUBLIC UTILITY DISTRICT

BOLINAS COMMUNITY PUBLIC UTILITY DISTRICT BOLINAS COMMUNITY PUBLIC UTILITY DISTRICT SEWER SYSTEM MANAGEMENT PLAN DEVELOPMENT PLAN AND SCHEDULE GOALS AND ORGANIZATION INTERIM DOCUMENT April 2008 TABLE OF CONTENTS List of Tables... 4 List of Figures...

More information

SEWER SYSTEM MANAGEMENT PLAN (SSMP)

SEWER SYSTEM MANAGEMENT PLAN (SSMP) SEWER SYSTEM MANAGEMENT PLAN (SSMP) AND SEWER OVERFLOW RESPONSE PLAN (SORP) CITY OF ESCONDIDO 2009 Updated April 2014 California Regional Water Quality Control Board San Diego Region NPDES Permit No. CA0107981

More information

Sewer System Management Plan (SSMP)

Sewer System Management Plan (SSMP) Sewer System Management Plan (SSMP) City of Santa Ana Water Resources Division 4/10/2014 Prepared Under the Supervision of: Nabil Saba, P.E. Water Resources Manager Table of Contents/Definitions/Abbreviations

More information

Irvine Ranch Water District Sewer System Management Plan June 2013

Irvine Ranch Water District Sewer System Management Plan June 2013 Irvine Ranch Water District Sewer System Management Plan June 2013 Preparation Supported By: Table of Contents Chapter 1 Introduction... 1-1 1.1 Organization of SSMP... 1-1 1.2 System Overview... 1-1 1.3

More information

I. RECEIVING A CALL/RECORDING VITAL INFORMATION (ADMIN. AND OPERATIONS)

I. RECEIVING A CALL/RECORDING VITAL INFORMATION (ADMIN. AND OPERATIONS) ORO LOMA SANITARY DISTRICT STANDARD PROCEDURE No. I.A.8 Effective: 02/18/92 Amended: 01/2014 SUBJECT: COLLECTION SYSTEM SERVICE CALL RESPONSE, AND SANITARY SEWER OVERFLOW RESPONSE, HANDLING AND REPORTING

More information

SECTION VI OVERFLOW EMERGENCY RESPONSE PLAN

SECTION VI OVERFLOW EMERGENCY RESPONSE PLAN WEST VALLEY SANITATION DISTRICT SEWER SYSTEM MANAGEMENT PLAN SECTION VI OVERFLOW EMERGENCY RESPONSE PLAN Overflow Emergency Response Plan The District s Overflow Emergency Response Plan (OERP) is a stand-alone

More information

DRAFT Changes to 25 Pa. Code Chapter 252 For Discussion Purposes Only January 21, 2015 CHAPTER 252. ENVIRONMENTAL LABORATORY ACCREDITATION

DRAFT Changes to 25 Pa. Code Chapter 252 For Discussion Purposes Only January 21, 2015 CHAPTER 252. ENVIRONMENTAL LABORATORY ACCREDITATION CHAPTER 252. ENVIRONMENTAL LABORATORY ACCREDITATION Subchapter A. GENERAL PROVISIONS B. APPLICATION, FEES AND SUPPORTING DOCUMENTS C. GENERAL STANDARDS FOR ACCREDITATION D. QUALITY ASSURANCE AND QUALITY

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

City of Chico Sanitary Sewer Overflow Response Plan (Appendix D of the City of Chico Sewer System Management Plan)

City of Chico Sanitary Sewer Overflow Response Plan (Appendix D of the City of Chico Sewer System Management Plan) CITY OFCHICO INC.1872 City of Chico Sanitary Sewer Overflow Response Plan (Appendix D of the City of Chico Sewer System Management Plan) Adopted July 21, 2009 1 st Audit July 21, 2011 City of Chico Sanitary

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

Presented below are water quality standards that are in effect for Clean Water Act purposes.

Presented below are water quality standards that are in effect for Clean Water Act purposes. Presented below are water quality standards that are in effect for Clean Water Act purposes. EPA is posting these standards as a convenience to users and has made a reasonable effort to assure their accuracy.

More information

APPENDIX B OVERFLOW EMERGENCY RESPONSE PLAN

APPENDIX B OVERFLOW EMERGENCY RESPONSE PLAN Sewer System Management Plan - Appendices UC Berkeley Collection System APPENDIX B OVERFLOW EMERGENCY RESPONSE PLAN Overflow Emergency Response Plan (OERP) OVERFLOW EMERGENCY RESPONSE PLAN December 2015

More information

City of Los Altos Sewer System Management Plan

City of Los Altos Sewer System Management Plan City of Los Altos Sewer System Management Plan February 2015 This page intentionally left blank. LIST OF REVISIONS Revision No. 2 3 4 Description of Revision Revision of telephone numbers and text issues,

More information

Sanitary District No.5 of Marin County SSMP

Sanitary District No.5 of Marin County SSMP 2014 Sanitary District No.5 of Marin County SSMP Tony Rubio Sanitary District No.5 of Marin County 6/1/2014 INTRODUCTION...7 SSMP Requirement Background...7 Document Organization...7 District Service Area

More information

City of Mebane Wastewater Collection and Treatment Facility

City of Mebane Wastewater Collection and Treatment Facility City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014 - June 30, 2015 City of Mebane Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2014

More information

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,

More information

How To Write A Sewer System Management Plan

How To Write A Sewer System Management Plan UNIVERSITY OF CALIFORNIA, MERCED SEWER SYSTEM MANAGEMENT PLAN NOVEMBER 2012 UNIVERSITY OF CALIFORNIA, MERCED TABLE OF CONTENTS 1.0 GOAL... 1-1 1.1 REGULATORY BACKGROUND... 1-1 1.2 PURPOSE AND GOALS OF

More information

City of Buellton Sewer System Management Plan, Revision 0 April 22, 2010 Audit Report. December 20, 2012. Prepared By:

City of Buellton Sewer System Management Plan, Revision 0 April 22, 2010 Audit Report. December 20, 2012. Prepared By: City of Buellton Sewer System Management Plan, Revision 0 April 22, 2010 Audit Report December 20, 2012 Prepared By: CERTIFICATION I certify under penalty of law that this document and all attachments

More information

City of Modesto Utilities Department Sanitary Sewer Management Plan

City of Modesto Utilities Department Sanitary Sewer Management Plan City of Modesto Utilities Department Sanitary Sewer Management Plan (SSMP) Updated November 2014 Executive Summary DATE ISSUED: 4-6-09 DATE REVISED: 10-02-2014 WASTEWATER COLLECTIONS APPROVED BY: Robert

More information

CITY OF POMONA SANITARY SEWER OVERFLOW EMERGENCY RESPONSE PLAN

CITY OF POMONA SANITARY SEWER OVERFLOW EMERGENCY RESPONSE PLAN CITY OF POMONA SANITARY SEWER OVERFLOW EMERGENCY RESPONSE PLAN September 2008 Revised October, 2013 Prepared For: The Public Works Department 148 North Huntington Street Pomona, California 91768 (This

More information

CITY OF MONTEREY SANITARY SEWER MANAGEMENT PLAN

CITY OF MONTEREY SANITARY SEWER MANAGEMENT PLAN CITY OF MONTEREY SANITARY SEWER MANAGEMENT PLAN February 2013 Table of Contents I. GOALS... 3 II. ORGANIZATION... 3 III. LEGAL AUTHORITY... 4 IV. OPERATIONS AND MAINTENANCE PROGRAM... 6 V. DESIGN AND PERFORMANCE

More information

Sewer System Management Plan SSMP

Sewer System Management Plan SSMP Sewer System Management Plan SSMP Revised August 2014 Originated July 2009 TABLE OF CONTENTS Introduction... 1 System Description... 1 Document Organization... 1 Goal... 3 Organization... 4 Authorized

More information

UNIVERSITY OF CALIFORNIA, DAVIS MEDICAL CENTER SANITARY SEWER MANAGEMENT PLAN. UCDMC Sanitary Sewer Management Plan 1

UNIVERSITY OF CALIFORNIA, DAVIS MEDICAL CENTER SANITARY SEWER MANAGEMENT PLAN. UCDMC Sanitary Sewer Management Plan 1 UNIVERSITY OF CALIFORNIA, DAVIS MEDICAL CENTER SANITARY SEWER MANAGEMENT PLAN UCDMC Sanitary Sewer Management Plan 1 TABLE OF CONTENTS 1.0 GOAL... 4 1.1 REGULATORY BACKGROUND 1.2 PURPOSE AND GOALS OF SSMP

More information

VALLEY SANITARY DISTRICT SEWER SYSTEM MANAGEMENT PLAN (SSMP) Section 1 SSMP GOALS

VALLEY SANITARY DISTRICT SEWER SYSTEM MANAGEMENT PLAN (SSMP) Section 1 SSMP GOALS VALLEY SANITARY DISTRICT SEWER SYSTEM MANAGEMENT PLAN (SSMP) Section 1 SSMP GOALS In compliance with State Water Resource Control Board Statewide General Waste Discharge Requirements Order No. 2006-0003-DWQ

More information

Tim Schneller, P.E. GBA Engineers and Architects

Tim Schneller, P.E. GBA Engineers and Architects Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.

More information

Drinking Water Quality Management Plan Review and Audit Guideline

Drinking Water Quality Management Plan Review and Audit Guideline Drinking Water Quality Management Plan Review and Audit Guideline This publication has been compiled by Queensland Water Supply Regulator, Department of Energy and Water Supply. State of Queensland, 2013.

More information

Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.

Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Parlier, CA 93648 Wastewater ID # 5SSO11453 1 Goals 1.1 Regulatory Requirements

More information

How To Get Water In Los Angelesa

How To Get Water In Los Angelesa LOS ANGELES COUNTY DEPARTMENT OF PUBLIC HEALTH ENVIRONMENTAL HEALTH Bureau of Environmental Protection Drinking Water Program 5050 Commerce Drive, Baldwin Park, CA 91706 (626) 430-5420 Fax (626) 813-3016

More information

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY

More information

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title: READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions

More information

A White Paper Describing a Watershed-based Monitoring Network Design for the Purgatoire River Basin

A White Paper Describing a Watershed-based Monitoring Network Design for the Purgatoire River Basin A White Paper Describing a Watershed-based Monitoring Network Design for the Purgatoire River Basin This white paper summarizes a watershed-based monitoring network design for the Purgatoire River Basin,

More information

Sanitary Sewer Overflow Response Plan

Sanitary Sewer Overflow Response Plan Appendix B City of West Sacramento Public Works and Community Development Sanitary Sewer Overflow Response Plan For the City of West Sacramento s Sanitary Sewer Collection System City of West Sacramento

More information

CITY OF BUELLTON. Sewer System Management Plan Revision 2. Public Version. May 28, 2015 PREPARED BY

CITY OF BUELLTON. Sewer System Management Plan Revision 2. Public Version. May 28, 2015 PREPARED BY CITY OF BUELLTON Sewer System Management Plan Revision 2 Public Version PREPARED BY SEWER SYSTEM MANAGEMENT PLAN 5 YEAR UPDATE SSMP Revision 2 The Sewer System Management Plan, Revision 2 was created with

More information

Emergency Response Plan

Emergency Response Plan Emergency Response Plan Third revised version placed in the Public Document Repository on July 1, 2011 I certify under penalty of law that this document and all attachments were prepared under my direction

More information

Biosolids Management Program Manual

Biosolids Management Program Manual PAGE 1 Biosolids Management Program Manual For the District of Columbia Water and Sewer Authority Version # Revision Date 20XXMoDa 1 06/30/2003 Original Record of Revisions Nature of Revisions 2 08/31/2006

More information

CITY OF VERNON Spill/Release Response Procedure Revised August 6, 2009

CITY OF VERNON Spill/Release Response Procedure Revised August 6, 2009 CITY OF VERNON Spill/Release Response Procedure Revised August 6, 2009 PURPOSE General regulatory and procedural guidance for City of Vernon representatives who respond to sewage, hazardous material, or

More information

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations Purpose and Objective The FWEA Utility Council formed the SSO Sub-Workgroup to provide a venue to discuss the increase

More information

City of Chico Sanitary Sewer Overflow Response Plan. (Appendix D of the City of Chico Sewer System Management Plan)

City of Chico Sanitary Sewer Overflow Response Plan. (Appendix D of the City of Chico Sewer System Management Plan) City of Chico Sanitary Sewer Overflow Response Plan (Appendix D of the City of Chico Sewer System Management Plan) Updated July 2014 City of Chico Sanitary Sewer Overflow Response Plan Table of Contents

More information

Sanitary Sewer Maintenance Plan City of Imperial Beach

Sanitary Sewer Maintenance Plan City of Imperial Beach Sanitary Sewer Maintenance Plan City of Imperial Beach June 2008 Audit Report Update May 2010 (Chris Helmer) Audit Report Update June 2012 (Chris Helmer) Audit Report Update October 2014 (Chris Helmer)

More information

NEVADA CITY WASTEWATER TREATMENT INQUIRY

NEVADA CITY WASTEWATER TREATMENT INQUIRY NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated

More information

Sanitary Sewer Overflow (SSO) Contingency and Emergency Response Plan (CERP)

Sanitary Sewer Overflow (SSO) Contingency and Emergency Response Plan (CERP) Sanitary Sewer Overflow (SSO) Contingency and Emergency Response Plan (CERP) Department of Watershed Management (DWM) Capacity, Management, Operations, and Maintenance (CMOM) Program December 2012 Version

More information

Smart About Salt Certified Contracting Company

Smart About Salt Certified Contracting Company Application for Certification and Annual Renewal Smart About Salt Certified Contracting Company Company Operating Name (to be listed on SAS website) Company Legal Name (if different from above) Address

More information

Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans Maine Department of Environmental Protection Program Guidance On Combined Sewer Overflow Facility Plans OVERVIEW The objective of a Combined Sewer Overflow (CSO) Facility Plan is to abate CSO discharges

More information

Laboratory Facility Cleaning and Maintenance Guidelines

Laboratory Facility Cleaning and Maintenance Guidelines Laboratory Facility Cleaning and Maintenance Guidelines Version 1.0 TRIM file number D11/55006 F Sc Document No Short description Relevant to Approved by Responsible officer Responsible office Date introduced

More information

Sanitary Sewer Overflows Response to EPA Rule Making

Sanitary Sewer Overflows Response to EPA Rule Making Massachusetts Water Resources Authority Sanitary Sewer Overflows Response to EPA Rule Making October 15, 2010 MASSACHUSETTS WATER RESOURCES AUTHORITY SUMMARY OF EPA RULE MAKING SUMMARY OF MWRA, ADVISORY

More information

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014)

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014) STEP 1 Immediately call EH&S at (510) 642-3073 with the following details of the incident: Name of First Responder Phone Number of First Responder Location of Spill Is the spill potentially greater than

More information

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1 INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to

More information

Contractor Signature: Title:

Contractor Signature: Title: LITTLETON/ENGLEWOOD WASTEWATER TREATMENT PLANT SPILL PREVENTION, COUNTERMEASURE, CONTROL AND CLEAN-UP DOCUMENT SUBMISSION The Littleton/Englewood Wastewater Treatment Plant (L/EWWTP) requires that all

More information

Quality Management Systems for Seed Testing Laboratories: Presented to the 2010 CSAAC Meeting. Valerie Martz Senior Laboratory Accreditation Officer

Quality Management Systems for Seed Testing Laboratories: Presented to the 2010 CSAAC Meeting. Valerie Martz Senior Laboratory Accreditation Officer Quality Management Systems for Seed Testing Laboratories: Presented to the 2010 CSAAC Meeting Valerie Martz Senior Laboratory Accreditation Officer Outline 1. Quality Management Systems (QMS): Generic

More information

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN I. PURPOSE The Municipality / Authority has structured this Sanitary Sewer Overflow Response Plan to satisfy

More information

Sewer System Management Plan (SSMP) Development Guide

Sewer System Management Plan (SSMP) Development Guide J U L Y 2 0 0 5 SAN FRANCISCO BAY REGIONAL WATER QUALITY CONTROL BOARD in cooperation with BAY AREA CLEAN WATER AGENCIES Sewer System Management Plan (SSMP) Development Guide San Francisco Bay Regional

More information

Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]

Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number] Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]

More information

Division of Public Health Administrative Manual

Division of Public Health Administrative Manual PURPOSE To establish a protocol for the development of a written Division of Public Health Hazard Communications Program at each applicable office or laboratory workplace and to assure that employees are

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

Sanitary Sewer System Management Plan

Sanitary Sewer System Management Plan Sanitary Sewer System Management Plan Prepared by: Environment, Health and Safety Division Environmental Services Group October 2009 Ernest Orlando Berkeley, CA 94720 This work was supported by the Director,

More information

The Delaware Valley Early Warning System Kelly Anderson, Philadelphia Water

The Delaware Valley Early Warning System Kelly Anderson, Philadelphia Water The Delaware Valley Early Warning System Kelly Anderson, Philadelphia Water 2015 Exchange Network National Meeting Supporting the Business of Environmental Protection September 29 October 1, 2015 Sheraton

More information

Sewer System Management Plan

Sewer System Management Plan Provo City Sewer System Management Plan July 2016 Update TABLE OF CONTENTS Sewer System Management Plan... 4 Introduction... 4 Definitions... 4 General SSO Requirements... 5 SSO Reporting Requirements...

More information

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS Page No. 1.0 BACKGROUND...1 2.0 INTRODUCTION - SEPTAGE RECEIVING STATION...1

More information

Electronic copies on the Sharepoint are considered controlled. All other copies are to be considered uncontrolled

Electronic copies on the Sharepoint are considered controlled. All other copies are to be considered uncontrolled Title: Element 12 BMP Documentation and Document Control City of Grand Rapids Environmental Services Department Policies and Procedures Created by: Dave Harris Approved by: William R. Kaiser Policy Number:

More information

Student Involvement: Middle / Secondary Laboratory Safety Activities

Student Involvement: Middle / Secondary Laboratory Safety Activities 5. Students prepare worksheets using MSDSs of chemicals they will use in the science lab following Table 24 Student Practice in Reading an MSDS, Pg 100, Science Laboratory Safety Manual S&SCS. Science

More information

Sanitary Sewer Management Plan

Sanitary Sewer Management Plan Ramona Municipal Water District Sanitary Sewer Management Plan Revised July 14, 2009 Prepared by: Alice Benson Wastewater Operations Manager Jon Miller Wastewater Collection Supervisor Table of Contents

More information

Archiving of Research Documentation

Archiving of Research Documentation Suspension, Termination & Completion Standard Operating Procedure VERSION / REVISION: 2.0 EFFECTIVE DATE: 28 05 12 REVIEW DATE: 28 05 14 AUTHOR(S): CONTROLLER: APPROVED BY: Clinical Trials Manager; Recruitment

More information

Control of Drug Use in Natural Gas & Liquefied Natural Gas STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS

Control of Drug Use in Natural Gas & Liquefied Natural Gas STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS Control of Drug Use in Natural Gas & Liquefied Natural Gas STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS James J. Malachowski, Administrator RULES AND REGULATIONS

More information

Public Works Department

Public Works Department Public Works Department r ~ Consideration ~ of Resolution ~ ~ AGENDA ~ ITEM: ~ 9-bi ~ : Authorizing Execution of a Coiltract Award for a Water Distribution System Leak Detection MEETING DATE: September

More information

Sanitary Sewer Overflow Enforcement : A National Perspective

Sanitary Sewer Overflow Enforcement : A National Perspective Sanitary Sewer Overflow Enforcement : A National Perspective LOREN DENTON, CHIEF MUNICIPAL ENFORCEMENT BRANCH WATER ENFORCEMENT DIVISION U.S. ENVIRONMENTAL PROTECTION AGENCY Topics Covered 2 SSOs National

More information

Lansdowne Stormwater UPDATE

Lansdowne Stormwater UPDATE Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing

More information

Title 22: HEALTH AND WELFARE

Title 22: HEALTH AND WELFARE Title 22: HEALTH AND WELFARE Chapter 157-A: HEALTH AND ENVIRONMENTAL TESTING LABORATORY HEADING: PL 1991, c. 499, 2 (new) Table of Contents Subtitle 2. HEALTH... Part 2. STATE AND LOCAL HEALTH AGENCIES...

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

COUNTY SANITATION DISTRICT NO. 2-3 SEWER SYSTEM MANAGEMENT PLAN UPDATE FEBRUARY 2014. (Certified: March 11, 2014)

COUNTY SANITATION DISTRICT NO. 2-3 SEWER SYSTEM MANAGEMENT PLAN UPDATE FEBRUARY 2014. (Certified: March 11, 2014) COUNTY SANITATION DISTRICT NO. 2-3 SEWER SYSTEM MANAGEMENT PLAN UPDATE FEBRUARY 2014 (Certified: March 11, 2014) Page 1 EXECUTIVE SUMMARY Page 2 Document Version Control This (SSMP) is a living document

More information

Calibration Service Selection Guide

Calibration Service Selection Guide Calibration Service Selection Guide Certification of Accreditation available for download at www.ricelake.com/accreditation. Answer Questions to determine the calibration service you need Need accredited*

More information

EQR PROTOCOL 1: ASSESSMENT OF COMPLIANCE WITH MEDICAID MANAGED CARE REGULATIONS

EQR PROTOCOL 1: ASSESSMENT OF COMPLIANCE WITH MEDICAID MANAGED CARE REGULATIONS OMB Approval No. 0938-0786 EQR PROTOCOL 1: ASSESSMENT OF COMPLIANCE WITH MEDICAID MANAGED CARE REGULATIONS A Mandatory Protocol for External Quality Review (EQR) Protocol 1: Protocol 2: Validation of Measures

More information

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0

More information

Chassahowitzka Headspring Restoration Project ERP Appendix 1 (Dredge Plan) Revisions

Chassahowitzka Headspring Restoration Project ERP Appendix 1 (Dredge Plan) Revisions Chassahowitzka Headspring Restoration Project ERP Appendix 1 (Dredge Plan) Revisions Prepared for: Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34604-6899 Prepared by:

More information

1 Quality Assurance and Quality Control Project Plan

1 Quality Assurance and Quality Control Project Plan 1 Quality Assurance and Quality Control Project Plan The purpose of this section is to describe the quality assurance/quality control program that will be used during the system specific field testing

More information