1 White Paper: ENTERPRISE SOLUTIONS IMPLEMENTING ERP SYSTEMS IN THE PUBLIC SECTOR: NINE SURE WAYS TO FAIL OR SUCCEED
2 IMPLEMENTING ERP SYSTEMS IN THE PUBLIC SECTOR: NINE SURE WAYS TO FAIL OR SUCCEED IN THIS WHITE PAPER: PAGE Public leaders have become more sophisticated and more cautious about implementing enterprise Introduction 1 Still Too Many Failures 2 Common Mistakes and How To Avoid Them 2 Mistake 1: Assume There Is a Natural Constituency for ERP 3 Mistake 2: Treat Technology as the Key Challenge to Success 3 Mistake 3: Skimp on the Front End Preparing for Implementation 4 Mistake 4: Try To Do Everything at Once 5 Mistake 5: Provide the Bare Minimum of Support for Users 5 Mistake 6: Underestimate the Level of Resources Required 6 Mistake 7: Overestimate How Many Best Practices You Will Adopt 6 Mistake 8: Take a Myopic View of the Project 7 Mistake 9: Let Deadlines Slip 7 Final Thoughts 8 BearingPoint s Long-Term Commitment to Public Services 8 resource planning (ERP) systems in recent years for good reason. While the industry has made tremendous strides in the last decade, there are still too many failures. What can you do to avoid the mistakes of the past and realize the real benefits of an ERP solution? BearingPoint s State and Local Government and Education practice has identified nine mistakes that account for the majority of failed implementations. Introduction Are you considering implementing an ERP solution? Do you know that you need an ERP solution, but are afraid to take the risk? Are you just waiting to get past other burning issues? If so, you are in good company. Most states are planning, implementing or operating ERP systems, according to a 2002 survey conducted by the National Association of State Auditors, Comptrollers and Treasurers. And local governments and nonprofit institutions are right behind. Why? Today s public leaders understand that they cannot afford to manage their organizations in departmental or agency silos. Instead, they seek ways to manage the enterprise as a whole. The goal WHITE PAPER 1
3 IMPLEMENTING ERP SYSTEMS IN THE PUBLIC SECTOR: is to implement best practices for each business process across all agencies in order to: Streamline financial and administrative systems. Allow individual agencies to share information in a standardized way. Eliminate multiple systems and reduce duplication. Reduce costs. FIGURE 1. SYSTEMS IMPLEMENTATIONS: STILL RISKY Source: The Standish Group, % Failed Not implemented Never used 34% Successful 51% Challenged Over budget Over schedule Under-delivered Other organizations have already demonstrated the power of ERP systems to achieve such results. For example, industry benchmarks show that generating purchase orders using ERP applications can produce savings of more than 80 percent over the cost of manual processing. Still Too Many Failures At the same time, public leaders have become more sophisticated and more cautious about implementing ERP solutions in recent years for good reason. While the industry has made tremendous strides in the last decade, there are still too many failures. A 2003 report of the Standish Group shows that 15 percent of all information technology (IT) projects failed in 2002, and an additional 51 percent did not deliver the desired results on time or within budget (see Figure 1). Only 34 percent succeeded. For large, complex ERP implementations, this percentage will be smaller. What can you do to avoid the mistakes of the past and realize the real benefits of an ERP solution? BearingPoint s State and Local Government and Education practice has identified several common mistakes that account for the majority of failed implementations. Common Mistakes and How To Avoid Them For years, BearingPoint s 10 Commandments of ERP Implementation have provided our publicsector clients with a helpful starting point. These commandments outline basic principles for assuring implementation success principles that have since become conventional wisdom: I. Thou shall ensure the senior executive s strident sponsorship before proceeding. II. Thou shall make your ERP implementation a business transformation project, not an IT project. III. Thou shall anoint the most talented business manager in the organization as project manager. IV. Thou shall decide issues quickly and decisively. V. Thou shall communicate, communicate, communicate and communicate more. VI. VII. Thou shall ensure that your technical infrastructure is sufficiently robust before implementing an ERP solution. Thou shall not change the ERP source code. VIII. Thou shall test the configured ERP software until exhaustion. 2 BEARINGPOINT
4 NINE SURE WAYS TO FAIL OR SUCCEED IX. Thou shall plan user training and assign sufficient resources to this activity. X. Thou shall set reasonable user and executive expectations. Now our clients want more specifics about how to put these principles into action. This document is BearingPoint s response. In the following pages, we drill down another level of detail to explain what works and, just as important, what does not in the real world. Mistake 1: Assume There Is a Natural Constituency for ERP Success Strategy: Actively build a base of support for the project If you brought together all the agencies, divisions and departments and asked how many wanted to implement standard business processes across the enterprise, what do you think you would hear? Dead silence. At least, that is what has happened in other public-sector organizations that undertook large ERP implementations. The agencies tend to be strongly opposed to losing control of administrative operations and each can justify why its unique mission merits special attention. How can the public sector reap these benefits? Since there is no natural constituency that puts the needs of the enterprise ahead of its own, you have to build one. Someone at the very top of the organization must have the vision, understand the benefits and get the message out. This leader has to say and mean There is no turning back. We are going to do this. Period. Mistake 2: Treat Technology as the Key Challenge to Success Success Strategy: Focus on the real challenges people and process from the start The technical challenges of implementation are a simple matter compared with the human challenges (see Figure 2). In fact, where implementations have failed, 70 percent of the reasons stem from neglect of the human side of the equation, the Gartner Group reports. Among the causes: Inadequate training and preparation. Little or poor change management. Lack of communication. FIGURE 2. THE HIERARCHY OF IT CHALLENGES IN GOVERNMENT While agencies do differ in important respects, they share many business requirements. All have to manage a budget, recruit people, distribute payroll, generate purchase orders and so on. ERP solutions provide a standard, uniform way of performing these functions, so the enterprise can reduce duplication, produce meaningful information and cut administrative costs. Harder Easier POLITICS/TURF PROCESS TECHNOLOGY Source: Gartner Research, WHITE PAPER 3
5 IMPLEMENTING ERP SYSTEMS IN THE PUBLIC SECTOR: FIGURE 3. SOME DELIVERABLES INVOLVED IN CHANGE MANAGEMENT BEFORE GO-LIVE Project Launch High-level Design Detailed Design Develop/Prepare for Go-live Assess and Monitor Risk Stakeholder analysis Organizational risk assessment Pre-go-live audit Mobilize and Align Leaders Case for change Governance model Leadership strategy Leadership action plans Engage Stakeholders Start-up communications Team onboarding and training Mobilization plan Promotional campaign plan Communication toolkit Awareness events Deployment onboarding and training Deployment toolkit Validation events Go-live preparation events Prepare Workforce Knowledge transfer plan Training strategy Workforce transition strategy Workforce impact assessment Training plan and curriculum Training development Job design Workforce transition plan Workforce assessment and selection Training delivery Address Organizational Implications Organization and human resource inventory Future organizational model Performance management model Low levels of user involvement. Adversarial relationships with private-sector partners. Poor project management. That is why change management is such a critical factor in successful implementation. And when we say change management, we do not mean sending out a monthly newsletter reporting on the project s progress. We are talking about a rigorous methodology designed to involve key participants at all levels, maintain a two-way dialogue between the project team and stakeholders, and prepare people to make the transition. Contrary to the conventional wisdom, change management is not just a matter of common sense or smoke and mirrors. It is a discipline based on the experience of other organizations. Figure 3 indicates some of the deliverables involved in change management before go-live. Mistake 3: Skimp on the Front End Preparing for Implementation Success Strategy: Invest in documenting current business processes There is no way around it. Planning and preparing for an ERP project is a complex and resource- 4 BEARINGPOINT
6 NINE SURE WAYS TO FAIL OR SUCCEED intensive undertaking. But if you do not invest in these activities what we call Phase Zero you are setting yourself up for problems down the line, when they are more difficult and costly to address. One of the key steps in planning is evaluating how you do business today. This involves not only the procedures outlined in business manuals but the processes people are using in practice. You have to determine how the work is actually being done; otherwise, you will be taken by surprise when you develop the system. As you document the current state, be careful to distinguish between two kinds of business processes: competitive advantage and commodity. Those in the first group, the key processes that run your business and add value, must be protected. For the remaining processes, which will make up the vast majority, the organization should accept the best practices built into the selected package. Mistake 4: Try To Do Everything at Once Success Strategy: Implement in waves, beginning with core functions If there is one thing we have learned over the last two decades, it is that the big-bang, all-at-once approach to systems implementation is extremely risky. For public-sector organizations, where golive must be a success, phased implementation is a better way to go. Implementing waves of functionality specific modules serve multiple purposes: Early successes build support and momentum. Problems can be corrected before moving on. Training activities can be staged to make efficient use of resources. Phased implementation puts a reasonable load on the help desk and support staff. ERP solutions can also be implemented in waves of business units. We suggest you identify the most eager agencies and include them in the first group, then adjust to ensure heterogeneous representation. Since ERP projects affect large numbers of people, and few organizations have the capacity to train everyone at once, the phased approach can spread out the burden on training bandwidth. When you implement in waves, the members of the first group can serve as mentors to prepare and train the next wave. Another problem arises when organizations insist on including all functionality at the initial go-live date. You would do much better by concentrating on getting the system up and running with the basic functionality. By keeping it simple, you can declare success, get people on board and add more features as you move forward. It is a little like driving a new car: If you had to read the whole manual before driving, you may never get out of the garage. Remember, transformation does not take place the day you flip the switch. This is an ongoing journey where the end-state vision becomes clearer the closer you get to it. As you better understand what you have just implemented, your vision will continue to mature. Mistake 5: Provide the Bare Minimum of Support for Users Success Strategy: Meet or exceed users expectations for support WHITE PAPER 5
7 IMPLEMENTING ERP SYSTEMS IN THE PUBLIC SECTOR: Users expect and will tolerate some problems: unfamiliar screens, forgetting what they learned, not knowing how to do things the new way, and lower productivity in the early days. What they will not tolerate is lack of support they expect a help desk. We recommend giving them more: SWAT teams in the field to help them through the first days or weeks. High transaction areas should be staffed with project team members clearly identified by T-shirts and caps. With the team right there, users do not even have to pick up the phone to get their questions answered. Training is a similar matter. While everyone agrees that training is important, it is how you conduct training that determines what users learn and remember, as well as their attitude to the project. The natural tendency is to teach the transaction: for example, how to enter an invoice. But users want to understand the business process, including how you move from purchase to payment. When you put the transaction in context, it is easier to relate to, understand and remember. Our experience also shows that simulations are not an effective way to teach. In fact, users are likely to rebel and demand hands-on experience with live data. They want to conduct real transactions in a sandbox system with real data. Finally, do not waste your money on reproducing large binders of useful information. Users will not read it. Instead, they want short, easy-to-scan documents that cover how-to basics. Every organization underestimates what it will take to implement an ERP solution. While the budget people carefully calculate the direct costs software, tools, hardware and consultants they overlook many indirect costs. Take personnel, for example. An implementation will consume much more staff, among a much larger group, than those dedicated full-time to the project. Most organizations make the mistake of assuming that the project staff will be able to do everything it did before the ERP implementation project started. In fact, the rest of the staff will have to take on those responsibilities. The best thing you can do is set realistic expectations early on, letting managers and staff know what is ahead, so they can prepare to help. Defining requirements also takes a huge staff toll. Few clients realize that they will need a requirements workshop for each business process that will be affected by the new system. There can be up to 50 business processes, and each workshop will take one-half to two days and involve roughly 20 people which adds up to thousands of staff hours. And this does not take into account training another element that takes people away from their day-to-day responsibilities. Whether it is computerbased or instructor-led classroom training, you can expect each employee to require two hours, two days or two weeks of training. It adds up in ways that few executives imagine. Mistake 6: Underestimate the Level of Resources Required Success Strategy: Take into account the many hidden costs Mistake 7: Overestimate How Many Best Practices You Will Adopt Success Strategy: Be realistic in identifying the right ERP package for your organization 6 BEARINGPOINT
8 NINE SURE WAYS TO FAIL OR SUCCEED Every ERP solution includes industry best practices basic business rules for managing finances, human resources and procurement, for example, that have been proven over time. But when evaluating an ERP package, it is important to be realistic. The real issue is not how many best practices are built into the package, but how many your organization will actually implement, and how many compromises you will decide to make. Sometimes there is a reason for not making a change, for legal or contractual reasons or the precedents of the past. In most cases, however, changes to the basic package are not necessary. They are simply the organization s way of holding on to the familiar practices and processes of the past. To accommodate the familiar, the organization must write a complex user exit or program to replicate current processes. And every time you modify the software to create a user exit, you slow down the project, add costs and impact future upgrades. In other words, changes quickly increase your total cost of ownership. To get the highest return on your investment, you need to evaluate the options carefully, avoid modifications wherever possible and set realistic expectations for payback. on the big picture as well, and this means paying attention to external factors that will impact the project. Budget health. An ERP project is a multiyear undertaking, crossing budget cycles. It is essential that funding be committed for the duration of the project. Administrative changes. In government, there may be a change in leadership and structure over the course of the project. The project design should take such timelines into account, building in the major functionality before the administration changes. Legal compliance. This is a good time to review some of the laws that have been on the books for years and to build legal compliance requirements for the system and to validate that the system meets the current legislative structure. Labor contracts. Determine when contracts are renegotiated and be aware that the ERP implementation may quickly become a focus for employee unions. By considering the long term and planning ahead, you can create a plan that overcomes these bumps to produce a successful implementation. Mistake 8: Take a Myopic View of the Project Success Strategy: Keep your eye on the big picture and how it can impact your project ERP implementations are complex, highly visible and vital to an organization s success. It is easy to get buried in the business of drafting requests for proposals, evaluating responses and implementing the selected solution. But leaders must keep an eye Mistake 9: Let Deadlines Slip Success Strategy: Treat milestone dates as sacred Business units agencies, departments, divisions and programs will always have reasons why they cannot meet the project deadlines. But once you start to let the schedule slide, you create a climate where it will happen again and again. WHITE PAPER 7
9 IMPLEMENTING ERP SYSTEMS IN THE PUBLIC SECTOR: This is why it is so important to treat milestone dates as sacred. While you should never compromise on quality, you must create a sense of urgency throughout the project. We recommend that you accomplish this by requiring all milestone changes to be justified and approved by the steering committee, a group of high-level executives committed to the project s success. You can help accelerate the process by giving project team leaders the authority to make day-today decisions without an elaborate approval process. Final Thoughts Organizations with leaders willing to make the tough calls and burn the boats making it clear that failure is not an option are the ones now reaping the benefits. You can join them. Here are a few final thoughts to help you along the way: ERP projects will set your operational direction for at least the next 10 years. ERP projects are complex, resource-intensive and risky. Risk can be mitigated through strong executive sponsorship, communication and involvement of stakeholders, and good project management. Tough decisions must be made to realize the benefits of ERP. This is about transforming the way a government does business, not installing software. An ERP project will require agencies to cooperate in ways they never imagined. Process changes require changes in roles and responsibilities. Not all benefits will be realized on go-live day. Transformation is never-ending, and benefits will be realized along the way. BearingPoint s Long-Term Commitment to Public Services Over the years, BearingPoint has worked with virtually every state, hundreds of large local governments and many of the country s top universities, helping them build business and technology strategies, re-engineer business processes, integrate systems and realize results. Many states have utilized BearingPoint teams as part of statewide or agency-level system implementations. Within our State and Local Government and Education practice, we serve clients in distinct areas, including: Finance and administration. E-government. Transportation. Health and human services. Public safety and justice. Education. Retirement. Our Public Services practice is a cornerstone of our company, accounting for 35 percent of BearingPoint s total revenues for fiscal year If processes do not change, no benefits will be realized. 8 BEARINGPOINT
10 Business and Systems Aligned. Business Empowered. BearingPoint is a leading global business advisor, systems integrator and managed services provider. Our experienced professionals help organizations around the world set direction to reach their goals and create enterprise value. By aligning their business processes and information systems, we empower our clients with the right business solutions to gain competitive leadership advantage delivering measurable results in an accelerated time frame. To learn more, contact us at BRNGPNT ( from outside the United States and Canada) or visit our Web site at STRATEGY, PROCESS & TRANSFORMATION CUSTOMER RELATIONSHIP MANAGEMENT SUPPLY CHAIN MANAGEMENT ENTERPRISE SOLUTIONS TECHNOLOGY INFRASTRUCTURE & INTEGRATION MANAGED SERVICES BearingPoint 1676 International Drive McLean, VA BRNGPNT BearingPoint, Inc. All rights reserved. Printed in the United States. C2871-PS USRD391
FAILURE TO LAUNCH: Why Companies Need Executive Onboarding
FAILURE TO LAUNCH: Why Companies Need Executive Onboarding FAILURE TO LAUNCH: Why Companies Need Executive Onboarding Employee onboarding is beginning to receive the attention its due, as more companies
SEVEN WAYS THAT BUSINESS PROCESS MANAGEMENT CAN IMPROVE YOUR ERP IMPLEMENTATION SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND
SEVEN WAYS THAT BUSINESS PROCESS MANAGEMENT CAN IMPROVE YOUR ERP IMPLEMENTATION SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION 3 EFFECTIVELY MANAGE THE SCOPE OF YOUR IMPLEMENTATION
WHITEPAPER EMR IMPLEMENTATION: SUCCESS DEMANDS A CLINICAL APPROACH
WHITEPAPER EMR IMPLEMENTATION: SUCCESS DEMANDS A CLINICAL APPROACH The Best Healthcare Providers Begin with the End in Mind. Clinical experts look at a patient and see the whole person, not simply the
OPTIMUS SBR. Optimizing Results with Business Intelligence Governance CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE.
OPTIMUS SBR CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. Optimizing Results with Business Intelligence Governance This paper investigates the importance of establishing a robust Business Intelligence (BI)
SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND
SEVEN WAYS TO AVOID ERP IMPLEMENTATION FAILURE SPECIAL REPORT SERIES ERP IN 2014 AND BEYOND CONTENTS INTRODUCTION................................ 3 UNDERSTAND YOUR CURRENT SITUATION............ 4 DRAW
Best Practice: Strengthening Human Resources in Public School Systems
REPORT UPDATED: MARCH 29, 2010 CITY: NEW YORK CITY POLICY AREA: EDUCATION BEST PRACTICE Project Home Run was a two-year initiative undertaken by the New York City Department of Education (DOE) to transform
15 Principles of Project Management Success
15 Principles of Project Management Success Project management knowledge, tools and processes are not enough to make your project succeed. You need to get away from your desk and get your hands dirty.
ERP Implementation Risk: Identifying, Monitoring and Remediating Issues Throughout the Project to Ensure Success
ERP Implementation Risk: Identifying, Monitoring and Remediating Issues Throughout the Project to Ensure Success Introduction From hardware and software implementation to support services, organizations
04 Executive Summary. 08 What is a BI Strategy. 10 BI Strategy Overview. 24 Getting Started. 28 How SAP Can Help. 33 More Information
1 BI STRATEGY 3 04 Executive Summary 08 What is a BI Strategy 10 BI Strategy Overview 24 Getting Started 28 How SAP Can Help 33 More Information 5 EXECUTIVE SUMMARY EXECUTIVE SUMMARY TOP 10 BUSINESS PRIORITIES
14 TRUTHS: How To Prepare For, Select, Implement And Optimize Your ERP Solution
2015 ERP GUIDE 14 TRUTHS: How To Prepare For, Select, Implement And Optimize Your ERP Solution Some ERP implementations can be described as transformational, company-changing events. Others are big disappointments
Financial and Cash Management Task Force. Strategic Business Plan
Financial and Cash Management Task Force January 30, 2009 Table Of Contents 1 Executive Summary... 4 2 Introduction... 6 2.1 External Reports on Project Aspire... 7 2.1.1 Council on Efficient Government
40 Tips for Evaluating and Purchasing New ERP and Business Management Software
40 Tips for Evaluating and Purchasing New ERP and Business Management Software Essential Things to Consider When Selecting the Right Financial Accounting and ERP Software for Your Company Your financial
Point of View: FINANCIAL SERVICES DELIVERING BUSINESS VALUE THROUGH ENTERPRISE DATA MANAGEMENT
Point of View: FINANCIAL SERVICES DELIVERING BUSINESS VALUE THROUGH ENTERPRISE DATA MANAGEMENT THROUGH ENTERPRISE DATA MANAGEMENT IN THIS POINT OF VIEW: PAGE INTRODUCTION: A NEW PATH TO DATA ACCURACY AND
Strategic Employee Onboarding: First Impressions Are Everything
ONBOARDING Strategic Employee Onboarding: First Impressions Are Everything Cornerstone OnDemand Whitepaper Series 2007 Cornerstone OnDemand, Inc. All Rights Reserved. Table of Contents Onboarding: More
Change Management the missing link in electronic procurement implementations
Change Management the missing link in electronic procurement implementations Government Procurement in the Americas Conference October 28-29, 2015 1 What is the main reason financial/procurement system
Sage ERP X3 I White Paper
I White Paper Optimize Your ERP System: How to Avoid the Implementation Sins By Jeff Law, CPIM, Senior Manager, Consulting Services The Premier Provider of Effective Business Software Solutions National
Project Management Issues in the Finance Transformation Arena
Project Management Issues in the Finance Transformation Arena Projects, and the ability to deliver them on time and on budget, not only represent an ongoing challenge for any organization, but also require
Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com
Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.872.8200 F.508.935.4015 www.idc.com EXECUTIVE INSIGHTS Knowledge Transfer Enables Enterprise Performance Michael Brennan INTRODUCTION
Performance Audit Concurrent Review: ERP Pre-Solicitation
Performance Audit Concurrent Review: ERP Pre-Solicitation April 2002 City Auditor s Office City of Kansas City, Missouri 24-2001 April 10, 2002 Honorable Mayor and Members of the City Council: We conducted
WHERE S THE ROI? Leveraging Benefits Realization Activities to Optimize Your Organization s Investment in ERP Software
WHERE S THE ROI? Leveraging Benefits Realization Activities to Optimize Your Organization s Investment in ERP Software In today s increasingly competitive business environment, investments in ERP are becoming
ERP 101: A Primer for Busy Executives
ERP 101: A Primer for Busy Executives Arthur J. Herbert, III, PMP Edwin T. Cornelius, III, Ph.D. When considering an ERP implementation, busy institution executives need a crash course. The purpose of
The 2015 Manufacturing ERP Report
The 2015 Manufacturing ERP Report. All rights reserved. No unauthorized reproduction without the author s written consent. All references to this publication must cite Panorama Consulting Solutions as
When companies purchase an integrated learning
Feature 2. Project team members are required to perform their regular responsibilities in addition to committing their time to the implementation. Organizations can overcome these challenges if they find
AN ENVOY WHITE PAPER TOTAL COST OF OWNERSHIP A SAAS B2B WHOLESALE ECOMMERCE PLATFORM
AN ENVOY WHITE PAPER TOTAL COST OF OWNERSHIP A SAAS B2B WHOLESALE ECOMMERCE PLATFORM 02 Executive Summary There has been a great deal written about determining the total cost of ownership (TCO) of implementing
Customer Experience Strategy and Implementation
Customer Experience Strategy and Implementation Enterprise Customer Experience Transformation 2014 Andrew Reise, LLC. All Rights Reserved. Enterprise Customer Experience Transformation Executive Summary
WHITE PAPER. 7 Keys to. successful. Organizational Change Management. Why Your CRM Program Needs Change Management and Tips for Getting Started
7 Keys to successful Organizational Change Management Why Your CRM Program Needs Change Management and Tips for Getting Started CONTENTS 2 Executive Summary 3 7 Keys to a Comprehensive Change Management
E TE T R E PR P IS I E S E R ES E O S URCE E P L P A L NNIN I G
االله الرحمن الرحيم بسم ENTERPRISE RESOURCE PLANNING SYSTEMS OVERVIEW Omer Omarabi January 2010 Agenda IT Planning & Challenges In Sudan What is an ERP System? Why You Need an ERP System? How to get your
Final. North Carolina Procurement Transformation. Governance Model March 11, 2011
North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes
Developing Policies, Protocols and Procedures using Kotter s 8 step Change Management Model
2013 Developing Policies, Protocols and Procedures using Kotter s 8 step Change Management Model Marion Foster Scottish Practice Management Development Network [Pick the date] IMPLEMENTING CHANGE POWERFULLY
EMA Service Catalog Assessment Service
MORE INFORMATION: To learn more about the EMA Service Catalog, please contact the EMA Business Development team at +1.303.543.9500 or [email protected] The IT Service Catalog Aligning
Achieve Economic Synergies by Managing Your Human Capital In The Cloud
Achieve Economic Synergies by Managing Your Human Capital In The Cloud By Orblogic, March 12, 2014 KEY POINTS TO CONSIDER C LOUD S OLUTIONS A RE P RACTICAL AND E ASY TO I MPLEMENT Time to market and rapid
P3M3 Portfolio Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction
Simply Sophisticated. Information Security and Compliance
Simply Sophisticated Information Security and Compliance Simple Sophistication Welcome to Your New Strategic Advantage As technology evolves at an accelerating rate, risk-based information security concerns
HR Technology Strategies that Work in Healthcare. Background
HR Technology Strategies that Work in Healthcare Shawn Davis Intermountain Healthcare Background Shawn Davis Director, HR Workforce Solutions & Analytics IHRIM Board of Directors (2009-2011) HRIP Certification
Process Ownership and Service Ownership
Process Ownership and Service Ownership Maximizing the Value of Key Roles A Third Sky White Paper By Lou Hunnebeck, ITIL Expert and Service Design 2011 Author, VP ITSM Vision & Strategy for Third Sky,
White Paper. Table of Contents
Table of Contents Introduction 1 Best Practices for ERP Implementation 2 Understand business processes and key requirements. 2 Build a business case for ERP with a positive ROI 3 Ensure proper project
DIGITAL STRATEGY SUMMARY 2014-2015
DIGITAL STRATEGY SUMMARY 2014-2015 Maria MacGunigal, CIO OUR STORY: We are at an important point in history where technology is pervasive in almost all aspects of our lives. Government is expected more
What is project management?
The 13 Golden Rules of Successful Project Management The Association for Project Management defines project management as the way of managing change. By definition, therefore, project-oriented companies
RO-Why: The business value of a modern intranet
RO-Why: The business value of a modern intranet 1 Introduction In the simplest terms, companies don t build products, do deals, or make service calls people do. But most companies struggle with isolated
Agency for State Technology
Agency for State Technology 2015-2018 Statewide Information Technology Security Plan The Way Forward Rick Scott, Governor Jason M. Allison, State CIO Table of Contents From the Desk of the State Chief
Why Choose the Oracle Taleo Recruiting Cloud?
Agenda Executive Summary This presentation provides an overview of the fixed scope offering of Oracle s Fusion HCM Cloud solution from METSCON IT Systems METSCON is a key partner of Oracle in the HCM space
Strategic Direction 7 Vision for Shared Administrative Services
Strategic Direction 7 Vision for Shared Administrative Services Strategic Direction 7 - Centralize the System s business/administrative functions, where appropriate, in order to leverage resources and
3 Keys to Preparing for CRM Success: Avoid the Pitfalls and Follow Best Practices
CRM Expert Advisor White Paper 3 Keys to Preparing for CRM Success: Avoid the Pitfalls and Follow Best Practices Ten years ago, when CRM was nascent in the market, companies believed the technology alone
Managing Change in ERP Projects
Managing Change in ERP Projects Ask the executive sponsor of an enterprise resource planning (ERP) project about the most important factors for success, and odds are good that change management will be
Department of Human Resources
Workforce Services Workforce Policy and Planning Department Management/ Human Resource Information Systems Employee Relations Employment Compensation and Workforce Analysis Employee Benefits Organizational
Implementing ERP in Small and Mid-Size Companies
Implementing ERP in Small and Mid-Size Companies This is an excerpt from the April 1, 2001 issue of CIO Magazine ERP Implementation in 10 Easy Steps. 1. Ask the board of directors for an arbitrary but
Department of Finance & Management Strategic Plan V.3.3
Department of Finance & Management Strategic Plan V.3.3 Planning Period: 2012 2015 Table of Contents Message from the Commissioner... 3 Department Overview... 4 Department Strategic Planning Process...
Best Practice for a Successful Talent Management Technology Implementation
Best Practice for a Successful Talent Management Technology Implementation Contents 1 How to Prepare 2 Document Your Current Process 3 Replicate vs. Reinvent 4 Consider Employee Impact 5 Gather Your Data
Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
EMR Physician Planning Guide. Version 1.2
Version 1.2 About this Guide OntarioMD has created the Physician EMR Planning Guide to assist physicians who are in the process of planning and implementing an EMR. The Guide provides high level advice
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
Driving Excellence in Implementation and Beyond The Underlying Quality Principles
SAP Thought Leadership Paper SAP Active Quality Management Driving Excellence in Implementation and Beyond The Underlying Quality Principles 2014 SAP AG or an SAP affiliate company. All rights reserved.
Technology Services Strategic Plan
Technology Services Strategic Plan 2014 Table of Contents A Changing Landscape... 3 Values... 4 Technology Services Goals... 5 Employee Engagement... 6 Operational Efficiency... 7 Agency Satisfaction...
Agile Master Data Management TM : Data Governance in Action. A whitepaper by First San Francisco Partners
Agile Master Data Management TM : Data Governance in Action A whitepaper by First San Francisco Partners First San Francisco Partners Whitepaper Executive Summary What do data management, master data management,
How to Select and Implement an ERP System
How to Select and Implement an ERP System Prepared by 180 Systems Written by Michael Burns 180 Systems WHAT IS ERP?... 3 ANALYSIS... 4 VENDOR SELECTION... 6 VENDOR DEMONSTRATIONS... 8 REFERENCE CALLS...
MAXIMIZING VALUE FROM SAP WITH SUPPLY CHAIN COLLABORATION IN A SOFTWARE-AS-A-SERVICE MODEL. An E2open White Paper. Contents.
White Paper MAXIMIZING VALUE FROM SAP WITH SUPPLY CHAIN COLLABORATION IN A SOFTWARE-AS-A-SERVICE MODEL An E2open White Paper 2 2 4 6 Contents Executive Overview Issues and Challenges Resolution Plan for
Best Practices in EHR Implementations
WHITE PAPERS FOR REAL PEOPLE Best Practices in EHR Implementations by TIM LIDDELL VICE PRESIDENT, PROVIDER DEPLOYMENT BETSY CROSS DIRECTOR, PROVIDER DEPLOYMENT CONTENTS The SaaS Delivery Model... 1 January
This page was left intentionally blank.
This page was left intentionally blank. Workforce Planning Model Steps What This Step Accomplishes 1. Define the Scope Determines our focus could be long or short term could be a specific business unit
A discussion of information integration solutions November 2005. Deploying a Center of Excellence for data integration.
A discussion of information integration solutions November 2005 Deploying a Center of Excellence for data integration. Page 1 Contents Summary This paper describes: 1 Summary 1 Introduction 2 Mastering
ERP. Key Initiative Overview
Jeff Woods Research Managing Vice President This overview provides a high-level description of the ERP Key Initiative. IT leaders can use this overview to better understand what they need to do to prepare
White Paper Build A Change Management Office
Building Change Capability We make it happen. Better. White Paper Build A Change Management Office 9 Steps to Make Your Change Efforts Stick May 2014 Better Change Management Developing a Change Management
A Compelling Case for AP Automation in the Cloud
WHITE PAPER A Compelling Case for AP Automation in the Cloud ROCC Computers Ltd Stanford Gate South Road Brighton BN1 6SB Tel: 01273 274716 Email: [email protected] Author: Andrew Westhead Date : February
CFO Services: A Practical Guide for Accountants. Penny Breslin, MBA Paula White, MBA, CPA Foreword: Chris Frederiksen, CPA
CFO Services: A Practical Guide for Accountants Penny Breslin, MBA Paula White, MBA, CPA Foreword: Chris Frederiksen, CPA Copyright MoneyPenny, LLC 2014 1 Contents CFO Services Introduction... 4 What Do
WHITE PAPER Business Process Services: A Successful Transition Is the Foundation of World- Class Outsourcing cgi.com
WHITE PAPER Business Process Services: A Successful Transition Is the Foundation of World- Class Outsourcing A summary of the key transition questions asked by our clients In this paper, we examine five
Learning to Delegate
Learning to Delegate Overview Tips for managers on how to delegate Why is delegation necessary? Why do many managers have a hard time delegating? What to delegate What not to delegate How to delegate Give
Workforce Management: Controlling Costs, Delivering Results
Workforce Management: Controlling Costs, Delivering Results Organizations today must balance the need to run an efficient and costeffective operation while remaining agile and flexible to meet both customer
The importance of selecting the right ERP solution
The importance of selecting the right ERP solution The benefits of selecting and successfully implementing the right ERP solution for your business are widespread. The right ERP solution, tailored to suit
Process Validation Workshops. Overview Session
Process Validation Workshops Overview Session 2 Session Objectives: Prepare staff for participating in a Process Validation Workshop Clarify the Purpose of Process Validation Workshops Clarify Expected
How To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
California Department of Corrections and Rehabilitation Enterprise Information Services. Business Information System Project
California Department of Corrections and Rehabilitation Enterprise Information Services Business Information System Project Initiation: January 2001 Completion: December 2012 2013 NASCIO Recognition Award
NCOE whitepaper Master Data Deployment and Management in a Global ERP Implementation
NCOE whitepaper Master Data Deployment and Management in a Global ERP Implementation Market Offering: Package(s): Oracle Authors: Rick Olson, Luke Tay Date: January 13, 2012 Contents Executive summary
An example ITIL -based model for effective Service Integration and Management. Kevin Holland. AXELOS.com
An example ITIL -based model for effective Service Integration and Management Kevin Holland AXELOS.com White Paper April 2015 Contents Introduction to Service Integration and Management 4 An example SIAM
Banking Application Modernization and Portfolio Management
Banking Application Modernization and Portfolio Management Key Challenges and Success Factors As part of their long-term strategic plans, banks are seeking to capitalize on their legacy applications. Acquired
Michigan s HR Optimization Project--NASCIO Case Study
Executive Summary Michigan s Human Resource (HR) Optimization Project was an interdepartmental initiative to increase the effectiveness and efficiency of statewide HR services delivery, by building upon
BIM Pilot Getting Started Guide. For Construction Professionals. next
BIM Pilot Getting Started Guide For Construction Professionals Moving to BIM can seem like a daunting task. This guide provides a simple framework that helps you get started putting BIM into practice in
Training Programs for Enterprise-Wide Change
Training Programs for Enterprise-Wide Change Top Five Requirements for Programs that Deliver Prepared by VisionCor, Inc. 1 Contents Summary... 3 Before We Get Started... 3 Program Principles... 4 Business
CARLETON UNIVERSITY POSITION DESCRIPTION. Position Title: Manager, HR Systems Position No.: 298879. Approved by:
CARLETON UNIVERSITY POSITION DESCRIPTION Position Title: Manager, HR Systems Position No.: 298879 Reports to: Department: Assistant Director HR, Talent Programs Human Resources Approved by: (Incumbent/Date)
Project Governance Plan Next Generation 9-1-1 Project Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1)
Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1) Date: October 1, 2014 Version: 3.1 DOCUMENT REVISION HISTORY Version Date Changes Updated By 0.1 02/13/014 Initial
STATE OF HAWAII CHIEF INFORMATION OFFICER AND THE OFFICE OF INFORMATION MANAGEMENT AND TECHNOLOGY UPDATE ON THE INFORMATION TECHNOLOGY STRATEGIC PLAN
STATE OF HAWAII CHIEF INFORMATION OFFICER AND OFFICE OF INFORMATION MANAGEMENT AND TECHNOLOGY REPORT ON UPDATE ON THE INFORMATION TECHNOLOGY STRATEGIC PLAN DECEMBER 2011 SUBMITTED TO THE TWENTY-SIXTH STATE
Adopting a Continuous Integration / Continuous Delivery Model to Improve Software Delivery
Customer Success Stories TEKsystems Global Services Adopting a Continuous Integration / Continuous Delivery Model to Improve Software Delivery COMMUNICATIONS AGILE TRANSFORMATION SERVICES Executive Summary