1 EDISON Deliverable D4.4.1, D4.4.2, D4.5.1, D4.5.2, ELECTRIC VEHICLES IN A DISTRIBUTED AND INTEGRATED MARKET USING SUSTAINABLE ENERGY AND OPEN NETWORKS CONCEPT STUDY ON FAST CHARGING STATION DESIGN Type: Report Identifier: D4.4.1, D4.4.2, D4.5.1, D4.5.2, Classification: Final Version: 1.2 Access Public Editors: Steffen Lind Kristensen, Siemens A/S Anders Foosnæs, Danish Energy Association Per Nørgård, DTU-Risø Oliver Gehrke, DTU- Risø Anton Schmitt, Siemens AG Date: 30/08/2011 Copyright EDISON Consortium All Rights Reserved Page 1 of 40
2 EDISON Deliverable D4.4.1, D4.4.2, D4.5.1, D4.5.2, 1 TABLE OF CONTENTS 1 Table of contents Executive summary Introduction Selected scenarios General observations Basic functionality Fast charging station concepts AC busbar concept DC busbar concept Fast charging station investment costs Two concepts AC bus or DC bus Cost of the grid connection Cost of the bus bar Cost of the primary AC / DC converter Cost of the secondary AC / DC converter Cost of the secondary DC / DC converter The cost of the charging spot Comparisons of investment costs Actors External communication From the grid operators perspective Full grid Access Limited grid Access EV charging spots as a new costumer category Future perspectives From the fast charging station owners perspective...25 Copyright EDISON Consortium All Rights Reserved Page 2 of 40
3 7.2.1 Full grid access Limited grid access Internal communication & control No local energy storage Full grid access or limited grid access With local energy storage Full grid access Limited grid access Communication standards COP 15 concept Electrical vehicle (EV) interfaces charging spot (CS) interfaces Interfacing between COMBOX and TM 1703 Mic Pilot Pin connectivity Communication between EV and UI implemented in COP 15 concept Conclusion...40 Copyright EDISON Consortium All Rights Reserved Page 3 of 40
4 2 EXECUTIVE SUMMARY EDISON The Edison Project is an international research project partly publicly funded by the Danish transmission system operator (TSO) Energinet.dk's research program FORSKEL. In the EDISON project Danish and international competences will be utilised to develop optimal system solutions for EV system integration, including network issues, market solutions, and optimal interaction between different energy technologies. Electric vehicles (EVs) provide a unique opportunity to reduce the CO 2 emissions from the transport sector. At the same time, EVs have the potential of playing a major role in an economic and reliable operation of an electricity system with a high penetration of renewable energy. EVs will be a very important balancing measure in enabling the Danish government s energy strategy, which implies 50% wind power penetration in the electric power system. Report The objective of this report is to evaluate the technologies needed for control and operation of fast charging stations. In particular the communication and control functions between the grid, the central charging stations and the vehicles, as well as the internal control and operation will be investigated. Outcome The result of the research during this project has shown that the recommended hardware solution is the AC busbar concept. If a battery bank is located together with the fast charging station, the flexibility in the control schedules are much higher. 3 INTRODUCTION In this report we have looked into the complexity of controlling and operating a fast charging station. Focus has been on the communication and control functions between the grid, the central charging stations and the vehicles (in particular the batteries). The report looks into various hardware concepts for fast charging stations in order to be able to make a cost analysis for fast charging stations. The cost of grid connection is also covered as we needed to look at these in order to design the control functions between the grid, the central charging stations, and the vehicles. Detailed information relating communication to external actors as well as internally in the fast charging station is a part of the report. Information of the ongoing standardisation activity concerning fast charging stations is also included. During the Edison project we have realised also test scenarios in order to test and verify our theories of how to design the fast charging station. The chapter COP 15 Concept describes how we designed the first intelligent AC charger to control charging of electrical vehicles. This implementation was presented at the COP 15 UN Climate Conference in Copenhagen Copyright EDISON Consortium All Rights Reserved Page 4 of 40
5 4 SELECTED SCENARIOS 4.1 GENERAL OBSERVATIONS A fast charging station is almost like a conventional gas station. However, it provides energy to electrical vehicles (EVs) instead of fuel to normal cars with combustion engine. The fast charging station will be designed with several charging spots so that a number of EVs can be charged at the same time. There are two possibilities for fast charging of EVs. One is the usage of a three phase AC current and conversion to DC inside the car. The other possibility is transferring DC current to the car with the suitable voltage level for the battery. In the first case, the transfer of the power is technically easy but for the conversion to DC a bulky inverter is needed inside the EV. The size of the inverter increases with the level of power. While using DC power for transfer, a DC inverter is not necessary inside the car. On the downside a complex interface between EV and charger has to be utilised for that solution. The fast chargers are of high power in order to transfer as much energy as possible for every charge. A limitation is however given by the battery itself. A charging with high currents, res. high power will reduce the life-time. Therefore, at the moment, the maximum power transfer is 50 kw. Due to the ongoing improvement of the batteries we might in the future see chargers up to 200 kw located in the fast charging station. With 50 kw it will take approx. 15 minutes to charge a battery so that the EV will be able to drive 100 km. In the future scenario, with the 200 kw charging, this may only need few minutes. All control schemes recommended are based on the idea that the fast charging station has to give as high a profit as possible. We have considered that there are two possible basic hardware architectures. It is also an option to add a local battery bank in both hardware layouts. As the main purpose of the fast charging station is to provide the vehicle user with energy as quickly as possible, V2G is not an option. V2G means that the EV will transfer power to the grid instead of receiving it. As a result the battery will be partially discharged instead of charged. Roaming service, market strategies etc. are not part of this report. 4.2 BASIC FUNCTIONALITY The fast charging station is in need of the following functionalities: 1. Communication towards external actors. This will be described in detail in chapter Internal control This will be described in detail in chapter Protection Each fast charging spot is equipped with an AC/DC or DC/DC converter. The charging spot must, depending on technology, be equipped with protection equipment. Primary protection devices have to be installed in the charger cabinet to ensure safety. Copyright EDISON Consortium All Rights Reserved Page 5 of 40
6 Following protection equipment should be installed depending on technology: - Overvoltage protection - Undervoltage protection - Overcurrent protection - Short circuit protection - Earth fault protection If any fault occurs the charging spot must switch off immediately in order to ensure full safety and should operate independently from the BMS (Battery Management System) located in the EV. Additionally the DC part within the fast charging station including the cable connection to the EV is disconnected from ground. Together with the DC part of the vehicle this forms an isolated terra net (IT net). The advantage of an IT net is that a bypass between one of the power lines and ground will not lead to a significant current flow. A short circuit will only occur if both power lines, DC + and DC -, show a ground fault. Therefore the IT net of the fast charging station is observed by an insulation monitor. 4. Metering We recommend that the subject metering is done in the same way as for AC charging. This should be done according to Danish legislation (Meters MUST be fixed installation). The standard used should be IEC 62056, electricity metering, data exchange for metering, reading and loading. On the user interface of the charging spot it must be possible to see the meter value, hereby enabling the vehicle user to log how much power is procured at any given time. 5. Forecast The fast charging station automation will have a forecast function, which should include market indications of when the prices are high and when the prices are low. Moreover the forecast function could include information relating to the grid connection, enabling the fast charging station to automatically control when to use the grid for loading power and when to use the local battery bank, if one is installed. 6. Payments/Roaming We have not evaluated how the payments/roaming should be performed. We assume that in the beginning all payments are done in cash or by credit card. Copyright EDISON Consortium All Rights Reserved Page 6 of 40
7 4.3 FAST CHARGING STATION CONCEPTS The fast charging station concept is based on the following design: If we look at a fast charging station with 20 chargers each of 50 kw, the total power consumption will be 1 MW. With this power consumption normally the transformer would be connected to the 10 kv grid. So the fast charging station will be connected to the grid via a 10/0.4 kv transformer. The transformer will be connected to a busbar. We will evaluate if the busbar should be of the AC or DC type. The functionality of the busbar is to distribute the electrical power within the fast charging station. It is a strip of copper or aluminium that conducts electricity between the transformer and the charging spots. The size of the busbar determines the maximum amount of current that can be safely carried. In our configuration the busbar can have a diameter of 400 mm² for the AC busbar and 800 mm² for the DC busbar. This is calculated using the above mentioned power and voltage levels and in accordance to the IEC standard used for busbar design. In the charging spots an AC/DC or a DC/DC converter is needed in order to transform the voltage to the correct DC voltage level needed to charge the EVs. Charging of the EV battery will be done with DC charging directly on the EVs battery pack. Copyright EDISON Consortium All Rights Reserved Page 7 of 40
8 4.3.1 AC BUSBAR CONCEPT The traditional substation layout is as follows: An AC busbar, on which the charging spots are connected, is connected to the grid using a 10/0,4 kv transformer. In the charging spots an AC/DC converter is needed in order to transform the voltage to DC. Then the EV battery is connected to the charging spot (CS), charging the EV with DC directly on the EVs battery pack. In case a battery bank is requested, an AC/DC converter is needed between the busbar and the battery bank in order to connect the battery to the busbar in the fast charging station. In order to disconnect the CS from the grid an AC circuit Breaker is needed for each charging spot. For each CS a filter is needed to ensure proper power quality. For more details see figure 1. Figure 1. Hardware layout AC busbar Copyright EDISON Consortium All Rights Reserved Page 8 of 40
9 4.3.2 DC BUSBAR CONCEPT An alternative substation layout could be as follows: Instead of an AC we suggest a DC busbar solution. Here we have a large AC/DC converter and one DC busbar on which the charging spots are connected. For each charging spot a DC/DC converter is needed in order to connect more than one vehicle at the same time. The reason for this is that the voltage level of the EV battery varies depending of the state of charge of the battery. The more charged the battery is, the higher is the voltage level. However, the voltage level on the busbar side of the DC/DC converter is always the same for all charging spots. While the voltage level in the charging spot is higher than the voltage level in the EV, the EV battery will be charged. If it was the other way around the battery would be discharged. The EV battery is connected to the charging spot, charging the EV with DC directly on the EVs battery pack. In case a battery bank is requested a DC/DC converter is also needed. The DC/DC converter will be located between the busbar and the battery bank in order to connect the battery to the busbar in the fast charging station. The battery bank can be loaded when the energy price is low and discharged when the energy price is high. In chapter 7 and 8 we look into more details in the advantages of a battery bank. In order to disconnect the CSs from the grid an AC circuit breaker is needed. This could be located between the transformer and the AC/DC charger. Also, in order to ensure proper power quality, one filter located at the transformer is needed, to ensure proper power factor correction and to eliminate unwanted harmonics to be transmitted to the grid. For more details see the figure below. Copyright EDISON Consortium All Rights Reserved Page 9 of 40
10 Figure 2. Hardware layout DC busbar Copyright EDISON Consortium All Rights Reserved Page 10 of 40
11 5 FAST CHARGING STATION INVESTMENT COSTS 5.1 TWO CONCEPTS AC BUS OR DC BUS The investment costs for two different fast charging station concepts are compared: The concept with a common AC bus the AC bus concept and the concept with a common DC bus the DC bus concept (Figure 3). As many of the components are the same for both concepts, the cost comparisons are only made for those components that differ. The total costs indicated are thus not for the entire station, but only for those components taken into account. The comparisons between the two concepts are made with different bus voltage (U bus ), charging power capacity (P c ) and number of charging spots (N) (Table 1). Figure 3: Illustration of the components taken into account in the investment cost comparison between the AC bus concept and the DC bus concept. The investment costs for the following components have been estimated and taken into account in the comparison: - Grid connection, including transformer (common for both concepts) - Primary AC / DC converter (only for the DC bus concept) - Secondary AC / DC converters (only for the AC bus concept) - Secondary DC / DC converters (only for the DC bus concept) - The charging spots (common for both concepts) Copyright EDISON Consortium All Rights Reserved Page 11 of 40
12 The AC bus concept The DC bus concept Grid voltage U grid 10 kvac 10 kvac Bus voltage U bus 0.7 / 2 kvac 0.5 / 2 kv Charging power P c 100 / 200 / 300 kw 100 / 200 / 300 kw Number of charging spots N 3 / 5 / 10 3 / 5 / 10 EV battery voltage U bat 350 Vdc 350 Vdc Table 1: The values of the parameters used in the comparisons of the investment costs for the two concepts. The grid voltage (U grid ) is assumed to be 10 kv, and the voltage of all the EV batteries (U bat ) are assumed to be 350 V. For simplification, the capacity of the grid connection (P grid ) is assumed to be: where P c is the charging power capacity and N is the number of charging spots. Copyright EDISON Consortium All Rights Reserved Page 12 of 40
13 5.2 COST OF THE GRID CONNECTION The investment cost of the grid connection covers the 10 kv breakers, the line filters, the 10 kv transformer and the overload protection. The total grid connection cost is estimated at 1000 DKK/Ampere, corresponding to 33 DKK/kW or kv - Figure 4 (Source: Dansk Energi). 5 Cost ( /kw) Grid 10 kv (MW) Figure 4: Relative investment cost of the grid connection (@ 10 kv grid voltage). (Source: Dansk Energi) 5.3 COST OF THE BUS BAR The investment costs for the 3 phase AC and the DC bus bars have been estimated by Siemens for bus different current levels based on a copper price of 12 /kg, a bus bar with number of outlets one higher than the number of charging spots - Table 2. The Power capacity of the AC bus bar is given at cosϕ=0,8. Pac is the charging power capacity for the AC bus, and Pdc for the DC bus. Copyright EDISON Consortium All Rights Reserved Page 13 of 40
14 Bus AC bus DC bus Cost Cost Pac Pac Pdc Pdc 400 V 500 V AC bus DC bus 2p 10p 2p 10p A MW MW /outlet /outlet kw kw kw kw 400 0,22 0, ,44 0, ,11 1, ,66 1, ,77 2, ,88 3, ,10 4, Table 2: The cost of bus bars per outlet for different bus current levels and 400 Vac or 500 Vdc line-line voltage, and with indication or the corresponding bus power and charging power for 2 or 10 charging spots. (Source: Siemens) The cost per outlet increases only slightly with the power capacity. 50 Bus bar cost Cost per outlet ( /kw) Charging power (kw) AC bus 2p AC bus 10p DC bus 2p DC bus 10p Figure 5: Investment cost per outlet of the common bus relative to the charging power (@ 400 Vac or 500 Vdc bus bar voltage). (Source: Siemens) The relative cost of the bus bar decrease with the charging power capacity and with the number of charging spots. Copyright EDISON Consortium All Rights Reserved Page 14 of 40
15 5.4 COST OF THE PRIMARY AC / DC CONVERTER A primary AC / DC converter is only used in the DC bus concept, and only a single unit is needed (Figure 3). The capacity of the primary AC / DC converter is assumed to be the same as the grid connection capacity. No specific cost data are available. Cost is extrapolated from the cost of the secondary AC/DC converter (Source: Siemens). 5.5 COST OF THE SECONDARY AC / DC CONVERTER Secondary AC / DC converters are used only in the AC bus concept and in a quantity corresponding to the number of charging spots N (Figure 3). The secondary AC / DC converter covers the AC and DC filters. The cost per unit at different power levels and AC voltages has been estimated by Siemens - Table 3 and Figure 6. No data available for 100 Vac. Power 400V 690V 1000V 400V 690V kw k k k /kw /kw ,2 32,5 Table 3: The estimated cost per uni-directional AC-DC converter at different power levels and AC voltages. (Source: Siemens) Copyright EDISON Consortium All Rights Reserved Page 15 of 40
16 Uni-directional AC / DC converter 60 Cost ( /kw) V 690V Power (kw) Figure 6: Investment cost of a uni-directional AC / DC converter. No cost date available for 100 Vac. (Source: Siemens) The relative cost decrease with increasing AC voltage level and with increasing charging power level. 5.6 COST OF THE SECONDARY DC / DC CONVERTER Secondary uni-directional DC / DC converters are used only in the DC bus concept and in a quantity corresponding to the number of charging spots N (Table 1). No specific cost data are available. The best guess is to use the same cost figures as for the uni-directional AC / DC converter at corresponding power capacity - Table 3 and Figure 6 (Source: Siemens). 5.7 THE COST OF THE CHARGING SPOT The charging spots are designed for battery voltages in the range Vdc, corresponding to the currents indicated in Figure 7 for different charging power levels. Copyright EDISON Consortium All Rights Reserved Page 16 of 40
17 The cost for the charging spot 400 V / 500 A / 200 kw) is estimated at DKK or 2700 per charging spot DKK for equipment and DKK for installation work (Source: Siemens) Charging current Current (A) Power (kw) 300V 500V Figure 7: The charging currents for different battery voltages and charging power levels. 5.8 COMPARISONS OF INVESTMENT COSTS As the cost of the grid connection and the costs of the charging spots are independent of the concepts, the comparisons are made for the investment cost for the converters and the bus bars only (Table 4 and Figure 8). With the cost figures as indicated above, the AC-bus solution will always be slightly cheaper than the DC-bus solution. For the AC concept the cost per charging spot does not depend on the number of charging spots. In general, the relative cost (per kw) reduces with the charging power level. Copyright EDISON Consortium All Rights Reserved Page 17 of 40
18 Power 2p 10p AC - 2p AC - 10p DC - 2p DC - 10p AC - 2p AC - 10p DC - 2p DC - 10p kw kw kw k k k k /kw /kw /kw /kw Table 4: The estimated total cost of the AC to DC conversion for the two concepts for different charging power levels and different number of charging spots. 250 Total AC -DC conversion costs Cost per post ( /kw) Charging power (kw) DC -2p DC -10p AC -2p AC -10p Figure 8: Total costs of the converters and the bus bar for the AC-bus and the DC-bus concepts for different charging power capacities and different number of charging spots (2 and 10), based on the cost figures as indicated above. Copyright EDISON Consortium All Rights Reserved Page 18 of 40
19 6 ACTORS Since several chargers are connected to the same busbar in the fast charging station, there will be a need for central control, hereafter called fast charging station control. The functionality of this fast charging station control is as follows: Trade electricity with the electricity retailer Retrieve information from the distribution system operator (DSO) regarding grid constraints Inform the vehicle user of the energy prices by using a user interface (UI) Control the charging spots and the use of the battery bank if one is installed. The fast charging station control is also responsible for the control schedules explained in details in Chapter 7 and Chapter 8. Although the ISO/IEC is only approved as a Committee Draft (CD) we use the actors defined in this standard, also for the fast charging station. As described above we have the following Actors: Electric Vehicle (EV) Electric vehicle Vehicle user Person or legal entity using the vehicle and providing information about driving needs (e.g. range and availability) and therefore consequently influences charging patterns Electricity retailer Body to conclude the energy supply contract with the customer Distribution System Operator (DSO) Operator responsible for the voltage stability in the distribution grid (medium and low voltage power grid) Charging Spot (CS) The physical unit to that the EV is connected in order to transfer energy to the vehicle. Copyright EDISON Consortium All Rights Reserved Page 19 of 40
20 All the above actors are already specified in the commenting draft of the ISO/IEC standard.the Committee Draft (CD) of the ISO/IEC defines DC charging of EVs in Mode 4. However, at present the standard only covers the communication between one DC charging spot and one EV, therefore we have additionally defined the following actors: User Interface (UI) The user interface will inform the vehicle user of the current energy price. This could be by using smart phone APPs, navigator systems or a billboard which is already known today from conventional gas stations. We have not evaluated which system is the best to use. Fast charging station controller (FCSC). The fast charging station controller has the following tasks: Trade electricity with the electricity retailer, retrieve information from the DSO regarding grid constraints, inform the vehicle user of the energy prices by using a user interface (UI) and finally control the charging spots and the use of the battery bank if one is installed. Copyright EDISON Consortium All Rights Reserved Page 20 of 40
21 7 EXTERNAL COMMUNICATION 7.1 FROM THE GRID OPERATORS PERSPECTIVE The DSOs have the following income components to cover costs and a reasonable return on investments within the revenue cap defined by the authorities: grid connection fee (paid once by the costumer at the time of grid connection or an increase in the maximum capacity of the installation) Subscription fee (invoiced continuously, covers for example metering costs and costumer service) grid tariff (invoiced continuously, covers e.g. grid operation costs and grid maintenance cost) Section 7.1 will mainly focus on the grid connection fee FULL GRID ACCESS At the moment a grid connection for a fast charging station would be treated just as a grid connection for any other consumer. The general rule for grid connections is that the costumer should pay the costs that it is imposing on the grid. The price of a grid connection depends on which voltage level the costumer is connected to (PCC point of common connection). The industry separates between A, B and C costumers: A0 A1 A2 B1 B2 C Figure 9. Definition of A, B and C costumers Copyright EDISON Consortium All Rights Reserved Page 21 of 40
22 In an industry guide by the Danish Energy Association the following example is given showing the variation of costs of the grid connection for different costumer categories: A-level 10 kv (expansion) B1 -level 10 kv B2 -level 0,4 kv C- level P.C.C. Specific Average cost 594 kr/a 746 kr/a 746 kr/a 202 kr/a Total 594 kr/a 746 kr/a 948 kr/a. Adm. cost. 149 kr/a 187 kr/a 237 kr/a Unit price 743 kr/a 933 kr/a Avg.. unit price 954 kr/a kr/a Figure 10. Price examples of different costumer categories 1 1 These prices are revised annually. The exchange rate is approximately 7,5 DKK/Euro. Copyright EDISON Consortium All Rights Reserved Page 22 of 40
23 The Danish Energy Association reports an industry standard for the grid connection fee for C costumers ex spot every year to the Danish energy Regulatory Authority. The figures for 2009 and 2010 can be seen in the table below: Category Reported for 2009 Reported for 2010 Single family house / summer house DKK DKK Small/row house DKK DKK Apartment DKK 8350 DKK Youth-/ senior homes DKK 4400 DKK Single phase connection DKK 1450 DKK Standard tariff for industry DKK/A * 950 DKK/A * * Industry pays a connection fee equal to single family houses for the first 25 A (at 400 V) and the specified tariff for additional amps of maximum capacity. Each DSO can however report own prices to the Danish energy Regulatory Authority if they want to deviate from the standard figures reported by the Danish energy Association. It is recommended that DKK/A is used in the calculations regarding bus bar design and energy storage in this report LIMITED GRID ACCESS As a step towards integrating more consumption into in the regulating market, the DSOs can now offer an alternative grid connection to electrical boilers located in combined heat and power plants. This new type of grid connection is called limited grid access and means that the costumers, who e.g. connect a boiler, avoid the normal connection fee if the connection and operation does not inflict uncovered cost on the local distribution company. All costs related to the connection and control of the boiler is covered by the plant. These costs among others include: online measurements, reprogramming of SCADA system (supervisory control and data acquisition), communication lines between DSO control centre and remote terminal unit (RTU) at the boiler site. To get this advantage the costumer needs to allow automatic and manual disconnection of the boiler by signal from the DSO, and in some cases an automatic cap signal that limits the allowable power usage on the boiler, based on online measurements in identified bottlenecks in the network. Furthermore, if the available capacity in the grid decreases for any reason, the capacity available to the boiler will be reduced accordingly. The financial risk is solely placed on the costumer. However, it is difficult to implement this scenario in the calculations regarding bus bar design and energy storage since the grid connection cost will depend on the actual case, and since there will be a financial risk for the investor (if access capacity is no longer available due to load increase or rebuild of the network). Copyright EDISON Consortium All Rights Reserved Page 23 of 40
24 7.1.3 EV CHARGING SPOTS AS A NEW COSTUMER CATEGORY The 25 th of May 2011 the Danish DSOs proposed a change of the grid connection rules for charging spots. In order to implement these changes they need to be approved by the Danish energy Regulatory Authority. The proposal contains two important changes (the latter being very relevant for fast charging station s): 1. Costumers that have a separate grid connection for their EV on their cadastre, will have the possibility of utilising their existing capacity of delivery (for the house installation), thus avoiding an extra grid connection fee for the new installation. 2. The DSOs will work towards defining charging spots in public space as its own costumer category with its own calculation method for the connection fee. This calculation method will consider the expected low utilisation for the coming years and that the coincidence factor for several charging spots will be low. This will mean that charge spots will pay a lower grid connection fee (DKK/A) than they do in the current system. This initiative is suggested to be valid for a limited number of years as a test period. If this proposal is accepted, and the grid connection cost for charging spots are reduced, the incentive for installing a battery bank to cope with a connection capacity that is lower than the peak demand of the charger is reduced FUTURE PERSPECTIVES Looking further into the future, the DSOs might develop new tariff systems that will increase the incentives for installing a battery bank in combination with the fast charging station. Suggested developments for such tariff systems and development of the electricity market are described in two reports from WP2.3. Copyright EDISON Consortium All Rights Reserved Page 24 of 40
25 7.2 FROM THE FAST CHARGING STATION OWNERS PERSPECTIVE Taking a look at the external communication from the fast charging station owner s perspective, we have realised that the only external actors, to which the fast charging station gateway needs to communicate, are as follows (see also chapter 6): Electricity retailer DSO CS UI Vehicle User Also, the fast charging station will be connected to the grid either with full grid access or with limited grid access. We expect that all new installation will be with full grid access. However, future power demands and changes in the infrastructure might lead to a situation where the fast charging station is connected with limited grid access FULL GRID ACCESS In case the fast charging station is connected with full grid access, the communications towards the external actors are as follows: 1. The fast charging station owner trades with the electricity retailer, hereby making a price agreement. 2. The fast charging station owner now announces the price. 3. The EV will need fuel and hence connect to the charging spot. 4. Financial settlement is performed. 5. In case of an increase or decrease in prices a new price is traded with the electricity retailer. 6. The fast charging station owner now announces the new price. 7. The EV will need fuel and hence connect to the charging spot. 8. Financial settlement is performed Copyright EDISON Consortium All Rights Reserved Page 25 of 40
26 Figure 11. Control Schedule for External Communication, Full grid Access. This is also known as a price demand solution. It will however be difficult to force extra business due to these price adjustments unless they are of significant difference LIMITED GRID ACCESS In case the fast charging station is connected with limited grid access, the communications towards the external actors are as follows: 1. The fast charging station owner trades with the electricity retailer, hereby making a price agreement. 2. The fast charging station owner now announces the price. 3. The EV will need fuel and hence connect to the charging spot. Copyright EDISON Consortium All Rights Reserved Page 26 of 40
27 4. Financial settlement is performed. 5. If the DSO informs of a grid constraint, the fast charging station owner now announce the new price. This price will be higher as the fast charging station is in a situation where it is unable to make as much profit as before. The reduced amount of power available for selling will be compensated by the higher price. 6. The EV will need fuel and hence connect to the charging spot. 7. Financial settlement is performed Figure 12. Control Schedule for External Communication, limited grid access. This is also known as a bottleneck in the grid. A bottleneck in the grid means that the upper grid is unable to provide the demanded power. This might happen in case of cable failure or overloaded power lines. Copyright EDISON Consortium All Rights Reserved Page 27 of 40
28 8 INTERNAL COMMUNICATION & CONTROL The following chapters will look at the internal control needed to enable the fast charging station to operate optimal regarding profit. The aim of the fast charging station control is to procure the energy at lowest rate and to sell at highest rate. Also, in case of a bottleneck which affects the ability to provide maximum power to the charging spots, the fast charging station control must assist in providing the best charging pattern possible. The following chapters will look at the different charging scenarios and define the best charging pattern possible in respect of gaining the highest profit for the fast charging station owner. 8.1 NO LOCAL ENERGY STORAGE FULL GRID ACCESS OR LIMITED GRID ACCESS When the fast charging station has no local energy storage installed, there are no differences in the control schedule whether or not the grid connections are full or limited. But if several EVs are connected to the charging spot in the fast charging station, hereby using the maximum power of the fast charging station, the control schedule may be influenced. If the DSO informs of a grid constraint (this is also known as a bottleneck in the grid.), the internal control should operate as follows: 1. The fast charging station control must make a priority control of the charging spots. 2. Action 1: Close/shutdown all charging spot which are not in use. 3. If this does not solve the problem, following action must be taken. 4. Action 2: Start to serve the EVs after priority. Copyright EDISON Consortium All Rights Reserved Page 28 of 40
29 Figure 13. Control Schedule for Internal Communication, No local energy storage. There are several ways to do priority controlled action. We have discussed the possibilities and have the following suggestions: 1. The first EV to connect to the CS will be the first EVs to be served. 2. The % of power available will be equally divided between the connected EVs, hereby increasing the charging time slightly for all EVs and not increasing the charging time significantly for a few EV owners. 3. Gold Card contract means that the fast charging station owner has provided you with better agreements towards charging your EV. Those drivers will be charged with priority. 8.2 WITH LOCAL ENERGY STORAGE FULL GRID ACCESS If the fast charging station is equipped with local energy storage and full grid access, we will not experience a problem providing the needed energy. However, hence the fast charging station is equipped with a local energy storage, we are able to operate using price demand signals. The internal control should operate as follows: 1. The fast charging station owner trades with the electricity retailer, hereby making a price agreement. 2. If the price is lower than normal, the fast charging station owner will store this energy in the battery bank. Copyright EDISON Consortium All Rights Reserved Page 29 of 40
30 3. The EV will need fuel and hence connect to the charging spot. 4. If the price is low the fast charging station will provide power from the grid. 5. If the price is high the fast charging station will provide power from the battery bank, as long as the capacity is sufficient. 6. When the battery power is lower than the power needed to charge all the EVs connected to the fast charging station, it will charge from the grid. Fast Charging Station Controller Electricity Retailer DSO CS Battery Bank EV Trading of energy/ Price agreement made The price is lower than normal, energy to be stored in battery bank The car needs fuel and connects to the charging spot The car needs fuel and connects to the charging spot If price is lower than normal: Provide power from grid If price is higher than normal: Provide power from battery bank If power in battery bank < power needed switch to power from grid Figure 14. Control Schedule for Internal Communication, with local energy storage, Full grid Access. By operating as the above it will be possible to implement a price Demand solution in the fast charging station. Copyright EDISON Consortium All Rights Reserved Page 30 of 40
31 8.2.2 LIMITED GRID ACCESS All though all indications show that a fast charging station always will be installed in an area where there is full grid access, there might be a future scenario in which this is not the case. It could occur that the fast charging station was initially built in an area of full grid access. Due to changes in the infrastructure, the fast charging station is now equipped with local energy storage and limited grid access. If the fast charging station is equipped with local energy storage and limited grid access, we should experience a mix of issues related to the operation. Here we will experience both, the need for operating by using the price demand signals, but also we experience the problem relating to bottlenecks. In order to be able to operate both using price demand and operating when there are bottlenecks, the following operation must be performed: 1. The fast charging station owner trades with the electricity retailer, hereby making price agreements. 2. If the price is lower than normal, the fast charging station owner will store this energy in the battery bank. 3. The EV will need fuel and hence connect to the charging spot. 4. If the price is low the fast charging station will provide power from the grid. 5. If the price is high the fast charging station will provide power from the battery bank, as long as the capacity is sufficient. 6. When battery power is lower than the power needed to charge all the EVs connected to the fast charging station, it will charge from grid. This is the operation using price demand signals., Under normal conditions (without bottleneck) this is the best way of operation: 7. Several EVs are connected to the charging spot in the fast charging station. Hereby using the maximum power of the fast charging station. 8. The DSO informs of a grid constraint. 9. The fast charging station control must make a priority control of the charging spots. 10. Action 1: Close/shutdown all charging spot which are not in use. 11. If this does not solve the problem, following action must be taken. 12. Action 2: Start to serve the EVs after priority. There are several ways to do priority controlled Action, we have discussed the possibilities and have following suggestions: 4. The first EV to connect to the CS will be the first EV to be served. Copyright EDISON Consortium All Rights Reserved Page 31 of 40
32 5. The % of power available will be equally divided between the connected EVs. Hereby increasing the charging time slightly for all EVs and not increasing the charging time significantly for a few EV owners. 6. Gold Card contract means that the fast charging station owner has provided you with better agreements towards charging your EV. Those drivers will be charged with priority. Fast Charging Station Controller Electricity retailer DSO CS Battery Bank EV Trading of energy/ Price agreement made The price is lower than normal, energy to be stored in battery bank The car needs fuel and connects to the charging spot The car needs fuel and connects to the charging spot If price is lower than normal: Provide power from grid If price is higher than normal: Provide power from battery bank If power in battery bank < power needed switch to power from grid The car needs fuel and connects to the charging spot The power needed is the maximun power for the fast charging station Information of grid constraint Action 1: Close/shotdown all Cs which are not in use Action 2: Start serving Evs after priority Figure 15. Control Schedule for Internal Communication, with local energy storage, limited grid access. This is the solution to a bottleneck in the grid. Copyright EDISON Consortium All Rights Reserved Page 32 of 40
33 9 COMMUNICATION STANDARDS In the Edison consortium we have endorsed the use of international norms and communication standards, such as the IEC standards. This is to ensure well documented and easy implemented communication interfaces. At the moment lots of activities are ongoing relating to the communication standards, in particular the IEC and the IEC Throughout the Edison project we have had a lot of discussions, both internally in our work package WP4 but also with other Edison partners in the other work packages, where we concluded the usefulness of both protocols. The IEC standard covers communication to De-centralised Energy Resources (DER). During the whole Edison project we discussed intensively that an Electrical Vehicle (EV) was to be regarded as a DER. Based on this and the current standardisation activities relating to the IEC we have evaluated that the IEC standard can be used in the fast charging station scenario for the communication between the fast charging station controller and the external actors. Furthermore, for adaptation of this standard several Logical Nodes (LN) had to be added. A Logical Node describes the functionality of the object which needs to be used. However in the current version of the standard there are no suitable LNs which reflects the EV e.g. State Of Charge (SOC). In regard to the communication between EV and the charging spot, we have evaluated that the best option for communication protocol is the IEC 61851/IEC JWG We base the conclusion on the above mentioned discussion and our success in making the test setup which was presented at the COP 15 conference. In chapter 10 you can read more details about our COP 15 implementation. In electrical engineering and power system automation, the International Electrotechnical Commission standards define systems used for telecontrol (supervisory control and data acquisition). Such systems are used for controlling electric power transmission grids and other geographically widespread control systems. By use of standardized protocols, equipment from many different suppliers can be made to interoperate. IEC standard could be used as the communication standard between fast charging station and external actors as an alternative. IEC is a communication standard for the design of operating, controlling and protection of electrical substation automation. Looking at the hardware design of the fast charging station it is similar to the electrical substations. Hence this standard is suitable for the communication internally between fast charging station controller and hardware components described in chapter 4. Below we have made an overview of recommended standards for communication: From fast charging station to external actors IEC with extra logical nodes reflecting EVs; IEC Copyright EDISON Consortium All Rights Reserved Page 33 of 40
34 From EV to charging spot IEC and ISO/IEC JWG Internal in the station (operation, control & protection) IEC (Station Bus) Copyright EDISON Consortium All Rights Reserved Page 34 of 40
35 10 COP 15 CONCEPT At the COP 15, UN Climate Conference in Copenhagen, we showed the first AC charger which could intelligently control charging of electrical cars. We implemented the concept in close cooperation between Eurisco working in WP 5 and Siemens working in WP4. The task for WP5 is to look into the communication between the charging spot and the electric vehicle. The objective was to present a working demonstration model of a central charging station including EV, the user of the vehicle and the grid operator. The system consisted of the following actors, grid operator (DSO), user interface (UI), charging spot (CS), and electrical vehicle (EV). SICAM 230 SERVER Grid Operator (DSO) SICAM 230 WEB SERVER TM 1703 Mic LAN Eurisco Backend Server WLAN Hardwire ComBox ComBox Smart Phone Electrical Vehicle (EV) Charging Spot (CS) Figure 16. The COP 15 Concept User Interface (UI) Copyright EDISON Consortium All Rights Reserved Page 35 of 40
36 We developed the communication between CS and EV based on the protocol IEC The communication between the DSO and the CS was based on IEC At the time of COP15 no electric vehicle was equipped for intelligent charginga ComBox was build into the test car. We will explain the functionality of the ComBox in the EV in more details later in this chapter. In the charging spot 2 hardware modules were installed, a second ComBox and the TM 1703 Mic. The functionality of the TM 1703 Mic was to ensure that the plug placed in the CS, is not energized if no EV is connected to it. The reason for this was that the CS would be located in the public area and by law no plugs must be under power in the public area. We will explain the functionality of the ComBox in the CS in more details later in this chapter. The UI was consisting of 2 hardware components, the Eurisco backend server and the smart phone. This enabled the EV user/owner to observe and operate the charging process of the EV. To simulate the grid operation of the DSO, we installed a standard SCADA application of the SICAM 230 family. On this application it was possible to remotely see the state of charge of the EV. It was also possible to operate the Tm 1703 remotely, e.g. to start and stop charging of the EV if needed ELECTRICAL VEHICLE (EV) INTERFACES In the EV the following interfaces were supported by the ComBox. Pilot Signal, PE ground RS232 interface to the BMS to figure out battery charging state; Communication controller will read battery charging state 10.2 CHARGING SPOT (CS) INTERFACES In the CS the following interfaces were supported. Pilot Signal, PE ground ComBox controller logic TM 1703 Mic controller Meter (PAC 3200) with Ethernet interface connection for accessing meter data by ComBox. Connection to backend server Ethernet (internet connection) between ComBox and backend server. SICAM 230 server IEC communication between TM1703 Mic and SICAM 230. Copyright EDISON Consortium All Rights Reserved Page 36 of 40
37 10.3 INTERFACING BETWEEN COMBOX AND TM 1703 MIC The target of the COP 15 implementation was to minimise the impact between the ComBox on the TM 1703 Mic. Especially we want to assure: That the operation of the ComBox does not conflict with the TM 1703 Mic, i.e. that a switch or relay is not commanded to be on by one controller and off by the other. Therefore two input signals and two output signals were added to the TM 1703 Mic as an interface to the ComBox. Electrically, these signals were potential-free relay contacts, which were closed when activated. The following is the TM 1703 Mic view of these signals: Input START_CHARGING. This is a trigger signal to indicate that the user has authenticated and that power on the plug should be provided. The signal is a pulse command with the duration of 1sec and is triggered on the falling edge. The behaviour of the TM 1703 Mic should be as if a user has authenticated using the chip card and has then pressed the start button Input STOP_CHARGING. This is a trigger signal to indicate that the charging should end. The signal is a pulse command with the duration of 1sec and is triggered on the falling edge. As a result, the TM 1703 Mic should de-energize the power plug. If both signals (START_CHARGING and STOP_CHARGING) are activated the ComBox indicates that an EV with no communication controller is connected to the charging spot. This status will be permanently indicated during the whole charging time and the signals are not pulsed as in the cases described above. In the case both signals are activated, the charging spot has to perform the normal authentication procedure via chip card before the power plug can be activated. Output CHARGING_STATUS. This signal provides information to the ComBox whether a charging is in progress. If activated, the ComBox will not send a START_CHARGING request. If activated, the ComBox will send a STOP_CHARGING request in case it has initiated the charging before. Output CHARGING_ERROR. This signal provides information to the ComBox that an error occurred. In the case the signal is on and the EV arrives at the charging spot, it will not connect to the charging spot. The charging spot displays this situation to the user by a red LED placed on the charging spot. In case the signal is activated during charging the ComBox will force the EV to disable charging. This procedure insures that, if the charging spot reactivates the Miniature Circuit Breaker (MCB), no current will flow immediately. Copyright EDISON Consortium All Rights Reserved Page 37 of 40
European Distribution System Operators for Smart Grids. Position paper on Electric Vehicles Charging Infrastructure
European Distribution System Operators for Smart Grids Position paper on Electric Vehicles Charging Infrastructure European Distribution System Operators for Smart Grids Position paper on ELECTRIC VEHICLES
More informationFuture grid infrastructure Field tests of LVDC distribution
Future grid infrastructure Field tests of LVDC distribution LUT LVDC Research Group: Andrey Lana, Pasi Nuutinen, Antti Pinomaa, Tero Kaipia, Pasi Peltoniemi, Aleksi Mattsson, Jarmo Partanen Introduction
More informationSOLARCARE SERIES PRODUCT AND APPLICATION GUIDE
SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE for solar energy management LEATEC Delivering Solutions for Energy Management SOLAR ENERGY DATA CENTER BUILDING 4 to8 String Monitoring with 0.% Accuracy
More informationTotally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply. www.siemens.com/siestorage
Totally Integrated Power SIESTORAGE The modular energy storage system for a reliable power supply www.siemens.com/siestorage Totally Integrated Power (TIP) We bring power to the point. Our products, systems,
More informationSCADA Systems Automate Electrical Distribution
SCADA Systems Automate Electrical Distribution PC-based supervisory control and data acquisition systems increase uptime, cut costs and improve utilization. A White Paper from InduSoft Fabio Terezinho
More informationDemand Response Management System Smart systems for Consumer engagement By Vikram Gandotra Siemens Smart Grid
Demand Response Demand Response Management System Smart systems for Consumer engagement By Vikram Gandotra Siemens Smart Grid siemens.com/answers The Siemens Smart Grid Suite DRMS part of Grid Application
More informationLTR Series Uninterruptible Power Systems 700 VA - 2.1 KVA. General Specification
08/17/12 Rev2 LTR Series General Specification 700 VA to 2.1 KVA 1.0 General LTR Series Uninterruptible Power Systems 700 VA - 2.1 KVA General Specification This specification describes the features and
More informationEuropean Conference on Nanoelectronics and Embedded Systems for Electric Mobility. Grid Integration of Electric Vehicle Infrastructure
European Conference on Nanoelectronics and Embedded Systems for Electric Mobility Grid Integration of Electric Vehicle Infrastructure European Conference on Nanoelectronics and Embedded Systems for Electric
More informationSmartGrids SRA 2035. Summary of Priorities for SmartGrids Research Topics
SmartGrids SRA 2035 Summary of Priorities for SmartGrids Research Topics Version 19 June 2013 Setting Priorities related to SRA 2035 research areas and topics The following section reports on the conclusions
More informationPreparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector
Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: Carsten.Agert@next-energy.de
More informationEnel s experience on smart grids
Enel s experience on smart grids Projects and Strategy Shenzhen, September 2014 Agenda Enel profile Overview of smart grid technologies Smart Grids and Smart Cities projects in Italy and Europe 2 Enel:
More informationIl Progetto INTEGRIS. Risultati e nuove prospettive per lo sviluppo delle Smart Grid October 2nd 2013 Brescia
Il Progetto INTEGRIS. Risultati e nuove prospettive per lo sviluppo delle Smart Grid October 2nd 2013 Brescia From INTEGRIS a solution architecture for energy smart grids Jean Wild - Schneider Electric
More informationAFRICAN UTILITY WEEK March 2011 Challenges with electricity supply: The role of the City of Cape Town
AFRICAN UTILITY WEEK March 2011 Challenges with electricity supply: The role of the City of Cape Town Alderman Clive Justus, Executive Mayoral Committee Member: Utility Services, City of Cape Town Content
More informationMETER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES
METER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES Sebnem RUSITSCHKA 1(1), Stephan MERK (1), Dr. Heinrich KIRCHAUER (2), Dr. Monika STURM (2) (1) Siemens AG Germany Corporate
More informationSIRFN Capability Summary National Renewable Energy Laboratory, Golden, CO, USA
SIRFN Capability Summary National Renewable Energy Laboratory, Golden, CO, USA Introduction The National Renewable Energy Laboratory (NREL) is the U.S. Department of Energy s primary national laboratory
More informationQuick Connect. quick - simple - efficient. www.g-mw.de
Quick Connect quick - simple - efficient www.g-mw.de Phone: +49 9103 7129-0 Fax: +49 9103 7129-207 Innovative connection technology to plug three single-phase current transformers to multifunctional power
More informationConnection method for charging systems a key element for electric vehicles
Connection method for charging systems a key element for electric vehicles By Claude Ricaud and Philippe Vollet > Abstract At the heart of the energy and environmental challenges, the electric vehicle
More informationCoordinated and Optimized Control of Distributed Generation Integration
Coordinated and Optimized Control of Distributed Generation Integration Hui Yu & Wenpeng Luan China Electric Power Research Institute July, 2015 1 Background and introduction 2 Coordinated control of distributed
More informationemobility WAGO Leading the Charge
emobility WAGO Leading the Charge Six Steps to a Full Battery WAGO supports every aspect of charging from: TO-PASS GPRS Modem, VPN Router, 761-520 Identification / Registration /Authorization RFID SMS
More informationEnergy Depot GmbH PRODUCT AND APPLICATION GUIDE. Total Monitoring Solution for PV. Delivering Solutions for Energy Management
Energy Depot GmbH Delivering Solutions for Energy Management PRODUCT AND APPLICATION GUIDE Total Monitoring Solution for PV SOLAR LOGGER & ANALYSIS DC STRING MONITORING Residential Comprehensive Solar
More informationEmirates Aluminium starts up World s first fully integrated power distribution system from ABB
Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s
More informationControl Development and Modeling for Flexible DC Grids in Modelica
Control Development and Modeling for Flexible DC Grids in Modelica Andreas Olenmark 1 Jens Sloth 2 Anna Johnsson 3 Carl Wilhelmsson 3 Jörgen Svensson 4 1 One Nordic AB, Sweden, andreas.olenmark@one-nordic.se.
More informationManagement of electric vehicle fleet charging
Management of electric vehicle fleet charging March 2011 / White paper by Maël Cazals and Gilles Vidalenche Make the most of your energy SM Revision #1 Contents Introduction... p 3 What is an electric
More informationManagement of electric vehicle fleet charging
Management of electric vehicle fleet charging March 2011 / White paper by Maël Cazals and Gilles Vidalenche Make the most of your energy Table of contents Introduction... p 2 What is an electric vehicle?...
More informationSCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks
SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks Introduction SCADA (Supervisory Controlled and Data Acquisition) controlled multi-step metalenclosed automatic capacitor
More informationDocumentation. M-Bus 130-mbx
Documentation M-Bus 130-mbx Introduction The mx M-Bus module is part of the mx Smart Slot communications family. With the integrated SmartSlot technology, mx systems ag offers automatic consumer data read-out
More informationStandards in Marine Power Systems. APEC 2014 Session IS2.1 Power Electronic Standards Roger Dougal University of South Carolina Columbia, SC 29208
Standards in Marine Power Systems APEC 2014 Session IS2.1 Power Electronic Standards Roger Dougal University of South Carolina Columbia, SC 29208 Need is Driven by Electrification Oasis of the Seas DDG
More informationWind-Diesel Hybrid System Options for Alaska. Steve Drouilhet National Renewable Energy Laboratory Golden, CO
Wind-Diesel Hybrid System Options for Alaska Steve Drouilhet National Renewable Energy Laboratory Golden, CO Wind-Diesel Hybrid Power Systems Basic Concept A wind-diesel hybrid system combines wind turbine(s)
More informationMedium voltage products UniSec for Smart Grid Air-insulated medium-voltage secondary distribution switchgear
Medium voltage products UniSec for Smart Grid Air-insulated medium-voltage secondary distribution switchgear Index 3 Overview 4 Standard Levels 6 Monitoring & Control 7 Measurements 8 Protection & Logic
More informationTesting Intelligent Device Communications in a Distributed System
Testing Intelligent Device Communications in a Distributed System David Goughnour (Triangle MicroWorks), Joe Stevens (Triangle MicroWorks) dgoughnour@trianglemicroworks.com United States Smart Grid systems
More informationThyristor-controlled power supplies and battery chargers
Thyristor-controlled power supplies and battery chargers Input voltage: 115 / 230 VAC, single phase, 50 / 60 Hz or 208 / 400 / 480 VAC, three phases, 50 / 60 Hz Output voltage: 12 / 24 / 48 / 60 / 72 /
More informationDigital Metering: a key enabling factor to foster RES development
RES4MED Days, Rabat September 16th, 2014 Digital Metering: a key enabling factor to foster RES development Simone Aibino Area Manager Europe, Mediterranean Countries & USA CESI SpA Consulting Division
More informationPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources Executive summary Many utilities are turning to Smart Grid solutions such as distributed energy resources (DERs) small-scale renewable energy sources and energy
More informationStrategic Microgrid Development for Maximum Value. Allen Freifeld SVP, Law & Public Policy Viridity Energy 443.878.7155
Strategic Microgrid Development for Maximum Value Allen Freifeld SVP, Law & Public Policy Viridity Energy 443.878.7155 1 MICROGRIDS Island Mode Buying and Selling Mode Retail Cost Structure to Maximize
More informationARRA Grant Case Studies SMUD s Smart Grid Program
. ARRA Grant Case Studies SMUD s Smart Grid Program Jim Parks December 2012 Powering forward. Together. About SMUD 600,000 customers 1.4 million population $1.4 billion in revenues 900 mi 2, 2331 km 2
More informationCharge Controller CC611/CC612 Preliminary datasheet
Preliminary datasheet Preliminary datasheet CC61x_D00xxx_00_D_XXE_preliminary/04.2015 Product description The ender charge controller CC611 is the main component of a charging point and is designed for
More informationRealization of control center HMIs by using IEC 61850 and CIM data bases for communication and data handling
Realization of control center HMIs by using IEC 61850 and CIM data bases for communication and data handling A. Naumann, Otto-von-Guericke-University, Magdeburg V. Kostenko, Delphin-Informatika, Moscow
More informationISIO 200. Binary Input/Output (I/O) Terminal with IEC 61850 Interface
ISIO 200 Binary Input/Output (I/O) Terminal with IEC 61850 Interface Compact and Easy ISIO 200 Put your Binary I/Os where you need them ISIO 200 is a simple and versatile binary I/O terminal with IEC 61850
More informationFACOGAZ Association of European Gas Meter Manufacturers
Page 1 of 13 GAS SMART METERING SYSTEM DRAFT MARCOGAZ/FACOGAZ POSITION PAPER FINAL 1. Introduction Marcogaz Members representing more than 100 million installed domestic gas meter in Europe owned by Distribution
More informationThe Quest for Energy Efficiency. A White Paper from the experts in Business-Critical Continuity
The Quest for Energy Efficiency A White Paper from the experts in Business-Critical Continuity Abstract One of the most widely discussed issues throughout the world today is the rapidly increasing price
More informationBig Data Collection and Utilization for Operational Support of Smarter Social Infrastructure
Hitachi Review Vol. 63 (2014), No. 1 18 Big Data Collection and Utilization for Operational Support of Smarter Social Infrastructure Kazuaki Iwamura Hideki Tonooka Yoshihiro Mizuno Yuichi Mashita OVERVIEW:
More informationContext: significant penetration of DG = increased risks for system security
Distributed Generation: towards an effective contribution to power system security IEEE Tampa GM 2007: Panel on Impact of Dispersed Generation on Power System structure & security Bruno Meyer Outline Context:
More informationDC Fast Charging Best Practices
DC Fast Charging Best Practices Greenlots. Intelligent Charging Networks Accelerate EV Adoption. Open Standards Communication Network Management Easy Driver Access OCPP communication between charger and
More informationNuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, zeljko.jurkovic@nek.si Abstract Various regulations and standards require from electrical power system of the
More informationABB PV + Storage REACT-3.6/4.6-TL 3.6 to 4.6 kw
Solar inverters ABB PV + Storage REACT-3.6/4.6-TL 3.6 to 4.6 kw PV energy, combined with energy storage systems, can help increase self-consumption and energy selfsufficiency*. One of the biggest challenges
More informationebus-high Power Charging Solutions from Siemens
Krefeld, 20.04.2015 ebus-high Power Charging Solutions from Siemens siemens.com Siemens ebus infrastructure Introduction "ebus infrastructure" part of urban transport within Mobility Division Global HQ
More informationRemote Monitoring and REC 501 Control Unit Product Guide
Remote Monitoring and Control Unit REC 501 Product Guide Issued: May 1999 Status: Updated Version: B/06.11.2001 Data subject to change without notice Features Remote control and monitoring unit for the
More informationGeneral Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING
More informationADMS(Advanced Distribution Management System ) in Smart Grid
ADMS(Advanced Distribution Management System ) in Smart Grid 柯 佾 寬 博 士 Yi-Kuan Ke, Ph.D. 2014/03/28 Smart Grid Solution Smart Grid Solution Overview Smart Grid Solutions Smart Network Operation - Distribution
More informationMonitoring & Control of Small-scale Renewable Energy Sources
Small Scale Renewable Energy Sources and Energy Saving: 6-17 th July 2009 Monitoring & Control of Small-scale Renewable Energy Sources Dr G A Taylor Brunel Institute of Power Systems Brunel University,
More informationNetVision. NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management. Solution Datasheet
Version 2.0 - October 2014 NetVision Solution Datasheet NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management According to analyst firm Berg Insight, the installed base
More informationContainerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime
Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime Containerized Infrastructure for Business-Critical Continuity Are you deploying a remote site faster than you can
More informationINTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN
INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN Yun CHEN SMEPC,State Grid China daddygirl@126.com ABSTRACT From the background of intelligent distribution network construction,
More informationAnthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948
SMARTER GRID AND SMARTER STORAGE HOW DO BUSINESS AND TECHNOLOGY MEET? Anthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948 Introduction The technical
More informationElectric Vehicle Charging Solutions
GE Energy Industrial Solutions Electric Vehicle Charging Solutions GE imagination at work The Electric Vehicle Picks up Speed Moving Power from the Grid to the Road Over the next five years, virtually
More informationUbiquitous Computing in Business Processes Part V
Ubiquitous Computing in Business Processes Part V Prof. Dr. Lutz Heuser AGT Germany Prof. Dr. Zoltán Nochta SAP AG Darmstadt January 16, 2015 Outline 1. Smart Grids and Energy Management Overview Common
More informationVenteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks. www.venteea.fr/en/
Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks www.venteea.fr/en/ Lille, le 26 novembre 2015 Agenda Project overarching objectives The consortium The added value
More informationSYSTEM MONITORING Locally and remotely
StecaGrid 300 StecaGrid 500 StecaGrid 2000+ StecaGrid 2010+ StecaGrid 2020 StecaGrid 3000 StecaGrid StecaGrid 4200 StecaGrid StecaGrid 10000+ 3ph StecaGrid 8000 3ph StecaGrid 10000 3ph monitoring StecaGrid
More informationContent. Research highlights and demonstrations
Content SGEM Overview Cleen Ltd Smart Grids is changing the way we do business Consortium and key facts Connection to other SG activities and standardization Phased evolution approach build on the Finnish
More informationATTACHMENT G. Network Operating Agreement
ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service
More informationCommunicate and view data from meters with one simple device
Communicate and view data from meters with one simple device PowerLogic EGX300 integrated gateway-server Web Monitoring Communications Plug and Play Plug into your energy usage with a simple mouse click
More informationSmart buildings in smart grids KNX City. Rafael Marculescu May 2013
Smart buildings in smart grids KNX City Rafael Marculescu May 2013 Smart grids - definition A smart grid is a digital, self-healing energy system that delivers electricity or gas from generation sources,
More informationWhat Matters for Successful Integration of Distributed Generation
What Matters for Successful Integration of Distributed Generation Thomas Ackermann Energynautics GmbH, Germany t.ackermann@energynautics.com Expert User of DIgSILENT PowerFactory for Power Systems Studies
More informationSolarEdge Export Limitation Guide
SolarEdge Export Limitation Guide Europe and APAC Version 2.0 Disclaimers Disclaimers Important Notice Copyright SolarEdge Inc. All rights reserved. No part of this document may be reproduced, stored in
More informationMinistry of National Infrastructures. Charging of Electric Vehicles. Policy Principles
Ministry of National Infrastructures Charging of Electric Vehicles Policy Principles Contents Contents 1. Status and future prospects Overview 1.1 The electric vehicle (EV) market in Israel 1.2 Actions
More informationVOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB
More informationSecure Machine to Machine Communication on the example of Smart Grids
Corporate Technology Secure Machine to Machine Communication on the example of Smart Grids 10.ITG Fachtagung Zukunft der Netze 2011, Steffen Fries Siemens AG, CT T, GTF IT Security : +49 89 636 53403 :
More informationHalf the cost Half the carbon
Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within
More informationECCN Exclusive Product Webinar Electric Vehicle Supply Equipment. Agenda. Presenter Introduction
This is a photographic template your photograph should fit precisely within this rectangle. ECCN Exclusive Product Webinar Electric Vehicle Supply Equipment 2008 Eaton Corporation. All rights reserved.
More informationRISH EM 3490 DS Dual Source Energy Meter RISH EM 3490 DS. Application : Product Features:
Application : RISH Master 3490 DS measures important electrical parameters of Utility (in normal mode) & Generators (in Power back up) in three phase and single phase Network & replaces the multiple analog
More informationOPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:
Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission
More informationInverter / Charger Installation General Operations and AC and DC Connections
Inverter / Charger Installation General Operations and AC and DC Connections The Inverter is just one piece. Sometimes, a tendency is to mount the inverter and batteries, and make it work It is better
More informationELECTRIC VEHICLE CHARGING SOLUTIONS FOR FLEETS
ELECTRIC VEHICLE CHARGING SOLUTIONS FOR FLEETS Plug-in electric vehicles or EVs are ideal for fleet managers for numerous reasons: they are more energy efficient; they are less costly to operate and require
More informationWhite Paper. Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid
White Paper Convergence of Information and Operation Technologies (IT & OT) to Build a Successful Smart Grid Contents Executive Summary... 3 Integration of IT and OT... 4 Smarter Grid using Integrated
More informationFOSS leading energy sustainability: A challenging venture for a promising future
FOSS leading energy sustainability: A challenging venture for a promising future 28/10/2015 Towards a Transatlantic E-Mobility Market Vehicles and Grids of the Future Dr Venizelos Efthymiou, venizelo@ucy.ac.cy,
More informationInvestor day. November 17, 2010. Energy business Michel Crochon Executive Vice President
Investor day November 17, 2010 Energy business Michel Crochon Executive Vice President We built a global leadership in medium voltage and grid automation with Areva Distribution MV switchgears & systems
More informationEssPro Energy Storage Grid Substation The power to control energy
EssPro Energy Storage Grid Substation The power to control energy EssPro Grid gives you the power to control energy helping to keep smart grids in balance Maximizing the value and performance of energy
More informationGain energy insight and control with PowerLogic. PowerLogic EGX300 integrated gateway-server
Gain energy insight and control with PowerLogic PowerLogic EGX300 integrated gateway-server Plug into your energy usage with a simple mouse click The PowerLogic EGX300 is an integrated gateway-server that
More informationThe Rollout of Charging Infrastructure for EVs Plugging into Europe
The Rollout of Charging Infrastructure for EVs Plugging into Europe Mark Daly Demonstration Projects Manager ESB ecars Electricity Supply Board ESB founded in 1927 Ardnacrusha expected to provide Irelands
More informationSmart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013
Smart solutions for fleets of all types & sizes of power generation Marcus König, E F IE SGS / September 2013 Instrumentation, Controls & Electrical The Siemens structure: Four Sectors close to the customer
More informationExecutive summary 2. 1 Introduction 4
Flexible Networks for a Low Carbon Future Future Network Monitoring Strategy September 2015 Contents Executive summary 2 Glossary 3 1 Introduction 4 2 Fundamental principles of monitoring 5 2.1 LCT monitoring
More informationCyber Security of the Smart Grid
Cyber Security of the Smart Grid Design Document May 12-21 11/4/11 Group Members John Majzner Daniel Kosac Kyle Slinger Jeremy Deberg Team Advisor Manimaran Govindarasu Graduate Students Adam Hahnad Siddharth
More informationAutomatic start of a generator
Automatic start of a generator General description This application note will help you to set your Xtender for an automatic start of a generator as per different parameters such as the output power, the
More informationInformation & Control Technology Platform for Public Infrastructure
Hitachi Review Vol. 61 (2012), No. 3 167 Information & Control Technology Platform for Public Infrastructure Yoshihiro Mizuno Kojin Yano Kazuya Okochi Yuichi Mashita OVERVIEW: To achieve a well-balanced
More informationStorage Battery System Using Lithium ion Batteries
Offices and schools Utilities / Renewable energy Storage Battery System Using Lithium ion Batteries Worldwide Expansion of Storage Battery System s Commercial Buildings Residential The Smart Energy System
More informationPCAN-B10011S Bus Converter High-speed CAN to Truck Trailer CAN. User Manual. Document version 2.1.0 (2013-11-15)
PCAN-B10011S Bus Converter High-speed CAN to Truck Trailer CAN User Manual Document version 2.1.0 (2013-11-15) Products taken into account Product Name Model Part number PCAN-B10011S IPEH-002041 CANopen
More informationTRACTION NETWORK MONITORING AND PROTECTION SYSTEM SMTN-3 CITY ELECTRIC TRANSPORT RAILWAYS METRO INDUSTRY
TRACTION NETWORK MONITORING AND PROTECTION SYSTEM SMTN-3 CITY ELECTRIC TRANSPORT RAILWAYS METRO INDUSTRY 2 TRACTION NETWORK MONITORING AND PROTECTION SYSTEM Traction network monitoring and protection system,
More informationCLASS Voltage Regulation Scheme. 27 February 2014
CLASS Voltage Regulation Scheme 27 February 2014 Functional Specifications and Voltage Regulation Scheme for the Autonomous Substation Controllers (ASCs) Date: 27 February 2014 Page 2 of 26 Table of Contents
More informationFusible Disconnect Switch
Circuit Breakers Circuit breakers are used in panelboards and switchboards to provide circuit protection and provide a means of energizing and de-energizing a circuit. Siemens Sentron molded case circuit
More informationEngineering innovation
Eaton's Electrical Engineering Services & Systems Solutions Focus Seamless Solutions for Reliable, Efficient and Safe Power Systems Engineering innovation Progressive solutions for today s power systems
More informationACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012
ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012 The most ambitious energy plan of the world In March 2012 a historic new Energy Agreement was reached in Denmark. The Agreement
More informationAMI and DA Convergence: Enabling Energy Savings through Voltage Conservation
AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation September 2010 Prepared for: By Sierra Energy Group The Research & Analysis Division of Energy Central Table of Contents Executive
More informationWireless Communications for SCADA Systems Utilizing Mobile Nodes
, pp. 1-8 http://dx.doi.org/10.14257/ijsh.2013.7.5.01 Wireless Communications for SCADA Systems Utilizing Mobile Nodes Minkyu Choi Security Engineering Research Support Center, Daejon, Republic of Korea
More informationRelion. Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE
Relion Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE Fast substation busbar protection with IEC 61850 and GOOSE Falu Elnät AB applies new power
More informationESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe
NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3
More informationUSER MANUAL CHARGING STATIONS FOR ELECTRIC VEHICLES
USER MANUAL CHARGING STATIONS FOR ELECTRIC VEHICLES 204.CAxxx 204.CBxxx 204.UBxxx 204.WBxxx MP36289 1 ZP90856-GB-6 INDICE 1 SYSTEM DESCRIPTION... 4 1.1 MODES OF OPERATION... 4 2 USER INTERFACE... 6 2.1
More informationThe State of the Electrical Grid in Washington State. Michael Pesin, PMP, P.E. Seattle City Light
The State of the Electrical Grid in Washington State Michael Pesin, PMP, P.E. Seattle City Light April 24, 2014 *Seattle City Light *National and Washington State Electrical Grid Today *Smart Grid *Pacific
More information/ The personal storage solution for 24H Sun. / Dynamic Peak Manager. / Smart Grid Ready THREE-PHASE
Perfect Welding Solar Energy Perfect Charging FRONIUS ENERGY PACKAGE The personal storage solution for 24H Sun. PC board replacement process SnapINverter technology Integrated data communication Dynamic
More informationElectricity Terminology. Simplifying energy management
Simplifying energy management AMR Automated Meter Reading - automatic collection of data from meters which is transferred to a central database for billing and/or analysis. Balancing Mechanism The mechanism
More informationPV Meets EV. David Katz AEE SOLAR FOUNDER AND CTO
David Katz AEE SOLAR FOUNDER AND CTO TYPES OF ELECTRIC VEHICLES Hybrid Electric Vehicles HEV s HEV s have been on the market for over 10 years. They have a battery powered electric motor coupled with a
More information