1 Responses to Inquiries RFP Software Quality Assurance Managed Services 1. Questions with specific reference to documentation in the RFP Question/ Clarification What else does the application environment include, other than items listed (ERM.Webbased applications)? How many test scripts currently for each system? How frequent are the production releases? Is there a production release for every build? Are all systems accessible from off-site locations via web or VPN? INPRS Comments Refer to Section Current Technical Environment for additional information. The number of test scripts varies based on the changes in each release. Anecdotally, we will see 300 scripts per application per release. This number can vary significantly based on complexity and scope of the release. Each cycle has to build new sets of scenarios with corresponding scripts. The regression scenarios are reusable for each system. The regression scenarios are reusable for each system. As examples, today that represents 80 scripts for ERM, 150 for EBS, 100 for INPAS and 75 for Web applications. Monthly Code releases for each system and Data fixes release every week. There will be emergency releases depending on production issues. The final build that passes QA/UAT for each release will be deployed to production Page 1
2 Please explain the format of the joint sessions to be held the week of Feb 9 th. Will these be individual with each vendor or in group forum? Please elaborate by listing key stakeholders who are part of INPRS IT leadership. In case the respondent submits the bid as a consortium of subcontractors/ partners, is it expected that the Financial Statements of all parties be disclosed or will that of the Prime vendor alone suffice? With reference to Creativity in alternative pricing is encouraged to align with the creativity of the proposed solution. Any alternative pricing formats should be in addition to the required pricing in the B.4 format, please clarify whether such creativity is allowed to be exercised to make B.4 more appealing to the parties and/ radically alternate pricing models including the likes of Transactional Pricing, Outcome based Pricing can also be offered? a) Please define Optional/ Periodic Services. b) Please clarify reason/ basis for listing Performance Testing and Data Migration Testing as Optional/ Periodic Services. Individual vendor Format: Q&A with INPRS staff and vendor. This is the vendor s meeting to discuss/validate their approach and for the vendor to ensure the RFP response is appropriate and on target. Director level and higher Financial Statements for all involved parties are required. For consistency in comparing responses, INPRS requires and will utilize the B.4 models. Creativity is encouraged and alternative structures can be considered as the RFP moves into final negotiations. a) Items we don t expect to be part of base cost and will be outside of base cost. b) Not expected as part of every monthly release. Given that INPRS welcomes creative and innovative solutions in all aspects of this RFP, and openness of INPRS in locating service provider staff off-site (within the United States) is the Respondent allowed to structure and quote part of the services as on-site and the rest off-site within the US? Page 2
3 a) Please elaborate on the relevant, current Knowledge Management system and practices at INPRS. Not one in place for now. b) Kindly also list strategic changes envisaged in the Knowledge Management system for the next 3-5 years. Does INPRS have plans to transition the integrated apps on Web services into standard SOA based services? Will the Service Provider have SQA responsibility for all systems listed in Section 3.3.2? a) Does INPRS have estimate or measure of the size of each application/system/component (eg, function points, feature points, LOC s, etc)? b) Are documented requirements/specifications available for each system/module/component? If so, what standard is being followed for the same? (eg, SRS, use cases, process flow diagrams ) Architectural discussions around SOA are underway but no formal decision has been made at this time. a) We don t measure them by these metrics. (eg, function points, feature points, LOC s, etc)? b) we have a documented BRD (Business Requirement document) and FRD (Functional Requirement document) c) No c)does INPRS have clearly specified and documented levels or goals for non-functional requirements? a) Does INPRS have resources such as Walkthrough's of all systems, modules and components, with screen shots and work flow diagrams - to train QA/testing staff for Sufficient Application knowledge? b) Can INPRS commit sufficient time of development managers, production managers and/or other relevant staff to the QA/Testing team for clarifications, understanding, trouble shooting, etc. a) b) The SOW indicates that there have been No automation is currently in place. No studies have Page 3
4 attempts at automation and that the named vendor would be tasked with leveraging automation. Have there been any feasibility studies to determine if the applications and manual test beds are good candidates for automation? There were not tools mentioned that exist currently for automation so not sure what has already been done in this area. Can you elaborate? a) When was the INPRS Modernization program completed? What is the planned life of all systems/modules/components? b) What is the Testing Infrastructure currently available for INPRS QA? Is this dedicated or shared? c) Can details of all Test Assets available be provided? VIZ: i) tools, ii) # of test cases/scripts by system/module/component, iii) test reports, iv)hardware servers & desktops dedicated for testing been done and INPRS expects the Vendor to come in as part of their processes to plan for and engage automated testing. INPRS has a basic belief that the applications are viable for some use of automated testing. a) 2013; N/Ab) Dedicated c) No not at this point. d) IT operations team e) No automation currently in place f) No g) No h) INPRS d) Is there a dedicated team/ point of authority responsible for provisioning hardware and software stack required for migration of the Test target (application/system under test) to the Testing Environment for conducting the tests? e) What is the current level of automation? How many automated test scripts are available by system/module? If available, on what tools & scripting language are these scripts built on? f) Have any Test enablers or Test harnesses been built that allows testing of portions of a system or a cluster of systems in the absence of one or more system(s) or components that are part of the cluster? If so please give details. g) Have any simulators been built for the Page 4
5 purpose described in f above? h) Is Data validation currently done by the INPRS DBA & team or is this expected to be covered by the vendor services? Please share the rationale of INPRS retaining Security testing (penetration testing) and Enduser participation in user acceptance testing. With reference to The INPRS Software Quality Assurance function currently has 14 personnel, including 2 dedicated INPRS employees and 12 contractors from ilab, is it an explicit expectation on part of INPRS that the respondent revisit the # of FTEs required as part of their response? Please confirm that the two INPRS employees mentioned as part of the QA Team are the ones boxed as one of the three Quality Assurance Team Lead s and Quality Assurance Employee. What is the basis/ rationale for moving from BugZilla to ServiceNow for defect and issue tracking? Please elaborate on There has been some preliminary testing with automation. a) Please elaborate on the planning process for estimating Builds drops every month. b) How are Fixes categorized? Please elaborate. Further, please share an indication of best case, worst case and average case effort (in terms of and defining FTE or Full Time Equivalent) in relation to each category of Fix, by looking at data for the past 24 calendar months. INPRS wants to retain control of these areas. For the INPRS employees, one will be retained as QA Manager and the other is expected to be hired by awarded firm. INPRS expects the respondent to determine their resource levels required to meet the needs of the RFP. These figures have been provided as additional information to the vendors of existing resource levels. Confirmed Service Now is the long term solution being utilized across INPRS IT Determining what automation could be used in the QA organization. Several products were evaluated. The determination was made to include tools and selection into this RFP. a) Based on capacity of team b) Refer to page #19 for fixes/builds Page 5
6 Can you make the scope matrix available in electronic form? With reference to The current QA team participates in various Requirement and Design sessions in order to provide a more robust testing strategy earlier in the process, please clarify the exact role/s and responsibility of the QA Team in such participation. With reference to Any UAT failure is documented by reason and reviewed, please detail such a process. Also, who reviews it at various points in the process? INPRS requires QA participation to understand requirements and design documentation which results in better preparation for QA activities. All UAT Failures are documented and categorized by reason such as Requirements issue, Missed Requirement, Defect, etc. At the end of each month, the IT Solution Delivery Director is provided a report to anticipate patterns that need addressed. a) Does INPRS have a dedicated Release manager? Can you share the detailed release calendars along with environment and components of each release bundle clearly laid down? b) Does INPRS have dedicated Change manager & configuration manager? Can you share the Change management and configuration management process? c) Can you share a detailed description of the INPRS UAT process? What are the roles & responsibilities of INPRS FTE s and current vendor FTE s? a) INPRS has a dedicated Release manager. Sharing release calendar is not necessary at this stage. b). Sharing this information is not required at this stage. c) INPRS QA Manager will provide oversight to the QA process and assists the business in the UAT process. Roles and Responsibilities of FTE s and current vendor FTE s: Develop test scripts System testing Assist business users in UST process Participate in requirements/design reviews With reference to It is expected that the Respondents should reply to the what as requested Page 6
7 Scope Matrix will evolve based on the service provider s solution proposed and will be accepted before being incorporated into the final agreement for Services, does the Respondent have flexibility to propose changes to the What as well (apart from the How )? a) Please confirm if the allocation of responsibilities indicated between SP and INPRS is based on an assumption of steady state, i.e. the incumbent vendor and relevant INPRS team/s having completed the transition to the new SP? as this is critical to how the response will be evaluated. The Respondent is also able to offer alternate solutions for consideration in what is delivered. a) b) Open for discussions as part of response. b) Is the Respondent allowed to alter the Principal Activities list, including clustering such activities, in order to enhance the efficacy of the proposed solution and delivery of such services? Provide overall INPRS testing strategy and architecture is listed as an INPRS responsibility. Is it mandatory to follow this testing strategy? or does the vendor have discretion /choice in this? Describe INPRS Test Data creation and maintenance process, including stated goals and measures if any. Is the vendor responsible for Test Data only for UAT or for all test types? What standards are specified by INPRS for test scripts? Is this mandatory for the vendor to follow or can a format/standard be proposed? Is Usability Testing included in scope? What is INPRS measure & metric for coverage? What is INPRS measure & metric for complexity? Who has responsibility for impact analysis? Open for suggestions but the basic tenets of the strategy will have to be met in some demonstratable fashion. INPRS is responsible for test data INPRS is open for suggestions and sees this type of knowledge transfer as a component of the managed services partnership. Considered as part of system testing. INPRS has no specific measures. INPRS Does INPRS conduct refactoring or re- Page 7
8 architecting based on impact analysis? Please list which, if any, of the listed Principal Activities are currently reviewed by end users of INPRS system/s? a) Given INPRS s stated intent to encourage creativity and innovation, will INPRS be open to allowing the Respondent, if need be, to propose an Outcome based pricing using Quality Assurance related Principal Activities as the key pricing head, with all other activities rolling into it? End users write the UAT test scripts and subsequently execute them. a) Respondent is open to propose any alternatives they feel would add value to the conversation as long as they also respond to the specific pricing as originally requested. b) No b) In the past 4 years, has any independent Quality Assurance Audit and/ Process Review been carried out? Please share results, if. With reference to Describe your organization s approach with transition to another service provider or back in-house at the end of the contract, is the expectation to evaluate the Respondent s ability to Build- Own-Operate-Transfer or Build-Operate- Transfer? To that extent the ownership of tools and processes will vary (Refer: What happens with tools and processes?) With reference to What is the service provider s suggested approach for transition governance? is there an earlier standard, approach at INPRS that can be referenced by the Respondent? If so, please share details. a) Please share at least one sample report from each report type, listed under Description. b) Please elaborate on key trends that emerge from these reports in the last 12 months. INPRS is interested in how the Respondent would see the activities and responsibilities surrounding the ending of a managed services agreement. No a) Looking for Respondent to bring these to INPRS as part of their offering. b) QA changes and trends in market place c) c) Further, please confirm that these reports can be a point of discussion during the Joint solution sessions. a) Will INPRS disclose the Evaluation factors In section 4.3, INPRS has provided the only specific Page 8
9 to all respondents? b) If yes, at what stage will it be so shared? And how? disclosure at the level of detail that will be provided to respondents c) Further, are these Evaluation factors subset/ part/ whole of Specific criteria (Refer: 4.3, Page 39 of the RFP)? Will INPRS be open to evaluating a proposal for a five year contract if the Respondent is able to demonstrate the merits of such a proposal, in the best interest of all parties to truly reap gains from a Managed Services model during and through such a period? The Respondent has a US wide training and career development program for inner city minority women, transitioning them into careers for QA and IT. However, the Respondent firm is not a minority, woman, and disabled-owned firm. In light of the above, would INPRS view staffing on the project involving minority women, if so embarked upon by the Respondent, favorably and in line with 4.2? Please confirm that Section 13 will be effective only for those parts/ whole of responses marked Confidential as per 1.1 In case of provision to set up an off-site (Offsite-Indiana) or near-site (Offsite-Other US) facility to effect delivery of services, will the rental for such a premise qualify as an exception for INPRS to pay the Contractor in advance, as in reference to Any provision requiring payment in advance, except for rent? With reference to The Contractor shall be paid at the rate of for performing the duties set forth above, please confirm that INPRS is open to revisiting and reviewing this clause in case of a Fixed Bid and/ non ratebased contracts. With reference to Should the Contractor fail to continue to perform its responsibilities regarding all nondisputed work, without delay, any additional costs incurred by the System or the Contractor as a result of such failure to The intent of the proposal request is to receive the best offer from each vendor based on the established criteria. The length of term of the contract could be a point of negotiation upon award. Section 4.2 relates to state standards for MBE/WBE businesses. If the Respondent is MBE/WBE certified, it should provide such certification. Respondent should feel free to provide any and all pertinent information about their workforce that they feel adds value to INPRS understanding of their response. No, INPRS offers on-site space as needed. INPRS expects all costs to be built into the pricing and does not anticipate paying for rent. This is a provision of our sample base contract included in the RFP. We encourage creativity in alternative pricing to align with the proposed solution. Please reference Section 2.4 of the RFP for additional information. If Contractor fails to perform its responsibilities and INPRS incurs costs as a result of that nonperformance, INPRS may hold the Contractor liable Page 9
10 proceed shall be borne by the Contractor, and the Contractor shall make no claim against the System for such costs, please confirm whether this is an unlimited liability for the Contractor. for those costs. Please confirm that All documents, records, programs, data, film, tape, articles, memoranda, and other materials developed or licensed by the Contractor prior to execution of this Contract and re-used and/ extensively leveraged for execution of this Contract will not qualify as work for hire. Are you looking to replace your current vendor? Since I am new at this--it looks like the State is required to bid this out so I was not sure if there was a dissatisfaction issue. (not sure you can share this but thought I would ask). Is the July 1 date the date that transition starts, or the date when transition should be completed? Is there a preference given to staffing this with Indiana based employees? If so, is the existing employee that would convert to the vendor's employee expecting to remain in the building? Materials owned or licensed by Contractor prior to execution of this Contract will not be considered work for hire. Materials developed under the contract will be treated as work for hire. INPRS is looking for vendors who can provide all required services which is not how past services were delivered. INPRS has established this date as the target for transition to be completed. The existing employee is Indiana based. We look to the Vendor to respond as to how that fits into their proposed solution with regards if he is onsite or in another facility. 2. General questions related to the RFP Section/ Reference Does INPRS maintain production measures such as incident rate, problems, resolution, failures, etc.? If so, are you willing to share the same? Does INPRS conduct analysis on production data to relate failures with defects, tracing the same to specific systems, modules and Question/ Clarification Not required for RFP response In some cases. Not required for RFP response Page 10
11 components? If so, can this be shared? How does INPRS measure level of quality of its systems? What are the current Quality levels of each INPRS system, as defined by its measures? Is INPRS willing to share project artifacts including configuration items and source code for advanced quality analysis? What is the Level of Quality of INPRS systems post development but prior to QA and testing and debugging? How much was paid for these services by the current vendor, ilab, for the past two years? Currently not in place Not available RFP responses should be based on materials furnished to date. Currently not in place This information is not available as the current vendor has not supplied all of the RFP requested services in the past. Their efforts have been under a staff augmentation model only. Will current vendor ilab be allowed to compete for this renewal contract? What is the budget for these services for each of the next two years? Please provide a copy of the RFP in MS Word format. This RFP is open to all interested parties. This budget has not been determined yet and will be based upon results of the RFP process. INPRS has released RFP for Software Quality Assurance Managed services. It is available in PDF and Word format here: If you have issues with downloading the file, please inform our Procurement staff. Page 11
RFP# 917-051-020115-05 CONSULTING SERVICES FOR ORACLE E-BUSINESS SUITE R12 UPGRADE QUESTION AND ANSWER RFP Reference Question GSFA Response
RFP# 917-051-020115-05 CONSULTING SERVICES FOR ORACLE E-BUSINESS SUITE R12 UPGRADE QUESTION AND ANSWER RFP Reference Question GSFA Response 1 Section 1.1.2, Pg. 1 Does GSFA plan to have a dedicated DBA
Infrastructure Technical Support Services. Request for Proposal
Infrastructure Technical Support Services Request for Proposal 15 May 2015 ISAAC reserves the right to reject any and all proposals, with or without cause, and accept proposals that it considers most favourable
Request for Offers (RFO) Addendum
Request for Offers (RFO) Addendum RFO Number: RFO0095 Addendum Number: 1 Date of Addendum: _10/21/2015 Original Due Date, Time: 10/26/2015, 2:00pm Revised Date, Time: _10/26/2015, 2:00pm Title: _MNLARS
Document Reference. Section Number. Question # Section Heading. The IV&V Contractor will provide. project management services to the III.B.4.
Addendum 1 s and Answers Independent Verification and Validation (IV&V) Services Bureau of Health Services Financing RFP 3000003817 Proposal Due Date/Time: January 6, 2016, 4:00 p.m. CT Heading in 1 RFP
Attachment 7 Requirements Traceability Matrix (RTM) ATMS RFP. New York State Department of Transportation Advanced Traffic Management System
Attachment 7 Requirements Traceability Matrix (RTM) ATMS RFP New York State Department of Transportation Advanced Traffic Management System i 1. INTRODUCTION This Requirements Traceability Matrix (RTM)
Submitted Vendor Questions and Answers, RFP 111 (IT Project Consulting)
Submitted Vendor Questions and Answers, RFP 111 (IT Project Consulting) Vendor A 1) Is there an incumbent? 2) The dates on page 22 and 26 are not consistent with the current date. Do you plan to issue
Electronic Medical Record (EMR) Request for Proposal (RFP)
Electronic Medical Record (EMR) Request for Proposal (RFP) SAMPLE Proposal Due: [INSERT DESIRED DUE DATE] Table of Contents SECTION 1 RFP INFORMATION... 2 I. Introduction... 2 A. Purpose and Background...
KMS Implementation Roadmap
KMS Implementation Roadmap Sample Excerpt Prepared by: The Knowledge Compass, Inc. TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 5 1.1 Overview 5 1.2 Project Goals & Objectives 5 1.3 Implementation Approach 5
RFP Q & A for BUDGET DEVELOPMENT SOFTWARE 1. Cover page (page 1): Would SCBE considers a 3 week extension to the July 1st deadline?
1. Cover page (page 1): Would SCBE considers a 3 week extension to the July 1st deadline? A. Yes, Monday, July 22, 2015. Please see Addendum I. 2. Cover page (page 1): What is TIME REQUIRED FOR DELIVERY
March 26, 2013 ADDENDUM NO. 1. RFP #MWJ1304 PeopleSoft Campus Solutions Implementation Project Office of Information Technology
March 26, 2013 ADDENDUM NO. 1 RFP #MWJ1304 PeopleSoft Campus Solutions Implementation Project Office of Information Technology All proposals are due Monday, April 1, 2013, by 12:00 p.m. to: City Colleges
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
Colorado Department of Health Care Policy and Financing
Colorado Department of Health Care Policy and Financing Solicitation #: HCPFRFPCW14BIDM Business Intelligence and Data Management Services (BIDM) Appendix B BIDM Project Phases Tables The guidelines for
1. Regarding section 1.6 (Page 7), what level of support (onsite or remote) is required?
Responses to questions in reference to the Governor s Office of Storm Recovery Managed Information Technology Network and Application Development Support Services Request for Proposal dated June 17, 2014
RFP Milestones, Instructions, and Information
This Request for Proposal is being issued by the Lower Colorado River Authority (LCRA). LCRA is a conservation and reclamation district of the State of Texas created pursuant to Article XVI, Section 59,
Request for Proposal Managed IT Services 7 December 2009
Request for Proposal Managed IT Services 7 December 2009 BuzzBack, LLC 25 West 45 th Street Suite 202 New York, NY 10036 Table of Contents 1 Summary... 1 2 Proposal Guidelines and Requirements... 1 2.1
Oracle ERP Support Benchmark Findings
Appendix K Oracle ERP Support Benchmark Findings City of Virginia Beach ComIT Master Technology Plan (Appendix K) 1 City of Virginia Beach Oracle ERP Support Benchmark Findings 23 September 2013 Prepared
AGILE SOFTWARE TESTING
AGILE SOFTWARE TESTING Business environments continue to rapidly evolve, leaving many IT organizations struggling to keep up. This need for speed has led to an increased interest in the Agile software
Region 7 Education Service Center Request for Proposal (RFP) For Generator Installation
Region 7 Education Service Center Request for Proposal (RFP) For Generator Installation Purpose The purpose of this Request for Proposal (RFP) is to invite prospective vendors to submit a proposal to supply
Re: RFP # 08-X-39202 MOTOR VEHICLE AUTOMATED TRANSACTION SYSTEM (MATRX) FOR MVC ADDENDUM #10
State of New Jersey DEPARTMENT OF THE TREASURY JON S. CORZINE DIVISION OF PURCHASE AND PROPERTY BRADLEY I. ABELOW Governor PURCHASE BUREAU State Treasurer P.O. BOX 230 TRENTON, NEW JERSEY 08625-0230 September
Template K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
REQUEST FOR PROPOSALS (RFP) for SOFTWARE QUALITY ASSURANCE MANAGED SERVICES RFP NUMBER 14-15
REQUEST FOR PROPOSALS (RFP) for SOFTWARE QUALITY ASSURANCE MANAGED SERVICES RFP NUMBER 14-15 RELEASE DATE: January 9, 2015 DEADLINE FOR INQUIRIES: January 23, 2015 3:00 PM EST DEADLINE FOR INTENT TO BID:
APPOINTMENT OF SERVICE PROVIDERS TO PROVIDE AN ENTERPRISE PROJECT PORTFOLIO MANAGEMENT (EPPM) SOLUTION
Questions and Answers RFP NUMBER: RAF/2014/00020 DESCRIPTION: APPOINTMENT OF SERVICE PROVIDERS TO PROVIDE AN ENTERPRISE PROJECT PORTFOLIO MANAGEMENT (EPPM) SOLUTION PUBLISH DATE: 04 July 2014 VALIDIY PERIOD:
Education Data Portal ( EDP ) Data Dashboard Solutions
NYSED DATA DASHBOARD SOLUTIONS RFP Attachment 6.8 Statement of Work Template THIS IS STATEMENT OF WORK dated [Date] (the SOW ) to the Contract dated [Date] (the Agreement ) between NEW YORK STATE EDUCATION
How To Write An Oor Ebusiness Ebusiness Solution
Q1. Is it a mandatory requirement to be an Oracle ebusiness Certified Partner or will you accept proof of successful implementations with Oracle, i.e., can use pre-existing setups and application security
IT Project: System Implementation Project Template Description
2929 Campus Drive Suite 250 IT Project: System Implementation Project Template Description Table of Contents Introduction... 2 Project Phases... 3 Initiation & Requirements Gathering Milestone... 3 Initiation
SOFTWARE DEVELOPMENT PLAN
SOFTWARE DEVELOPMENT PLAN This document outline is based on the IEEE Standard 1058.1-1987 for Software Project Management Plans. This is the controlling document for managing a software project, and it
REQUEST FOR PROPOSAL-INFORMATION TECHNOLOGY SUPPORT SERVICES
Isothermal Planning & Development Commission (IPDC) REQUEST FOR PROPOSAL-INFORMATION TECHNOLOGY SUPPORT SERVICES Proposals will be received by the IPDC for Information Technology Support Services. Interested
Custom Software Development Approach
Custom Software Development Approach Our approach to custom software development combines benefits from several standard development process models. We tend to have a well-defined, predictable and highly
FSW QA Testing Levels Definitions
FSW QA Testing Levels Definitions 1. Overview This document is used to help determine the amount and quality of testing (or its scope) that is planned for or has been performed on a project. This analysis
Cost effective methods of test environment management. Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA
Cost effective methods of test environment management Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA 2013 Agenda Basic complexity Dynamic needs for test environments Traditional
Applying CMMI SM In Information Technology Organizations SEPG 2003
Applying CMMI SM In Information Technology Organizations Mark Servello, Vice President Jim Gibson, Senior Consultant ChangeBridge, Incorporated Page 1 Portions Copyright 2002 Carnegie Mellon University
UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL. September 24, 2010
UNITED STATES DEPARTMENT OF EDUCATION OFFICE OF INSPECTOR GENERAL September 24, 2010 AUDIT SERVICES FINAL ALERT MEMORANDUM TO: Danny Harris Chief Information Officer Office of the Chief Information Officer
CITY OF STARKE. Project # 2016-02
CITY OF STARKE Project # 2016-02 Request for Proposals For Enterprise Content Management System 209 N. Thompson Street Post Office Drawer C Starke, Florida 32091 00 Contents CITY OF STARKE REQUEST FOR
Offers received without the entire completed three-page RIVP Generated Bidder Certification Form attached may result in disqualification.
LOI # B04076 Solicitation for Information 14 July 04 TITLE: Enterprise Content Management Platform and Services Submission Deadline: 4 August 04 @ 9:30 AM PRE-BID CONFERENCE: NO Questions, in Microsoft
3.1. Broad Use. 3.2. Presence
City of Asheville Specifications Enterprise Asset Management RFP # 298-WaterAssetManagement July 1, 2016 Jade Dundas, Water Resources Director (828) 259-5955 Table of Contents 1. Introduction... 2 2. General
Request for Proposal Brand USA Human Resources Information System December 2015
Request for Proposal Brand USA Human Resources Information System December 2015 INTRODUCTION Brand USA is a public-private not for profit organization created by the Travel Promotion Act of 2009. The mission
Enterprise Information Technology Security Assessment RFP Answers to Questions
Enterprise Information Technology Security Assessment RFP Answers to Questions GENERAL QUESTIONS Q: How do the goals of the security assessment relate to improving the way VEIC does business? A: Security
Vendor Questions and Responses
Vendor Questions and Responses 1. What server are you planning to use for this environment? IBM, Microsoft, Linux/Unix The RFP requests all interested vendors to submit proposals to provide software, storage,
CounselorMax and ORS Managed Hosting RFP 15-NW-0016
CounselorMax and ORS Managed Hosting RFP 15-NW-0016 Posting Date 4/22/2015 Proposal submission deadline 5/15/2015, 5:00 PM ET Purpose of the RFP NeighborWorks America has a requirement for managed hosting
Mississippi, Rhode Island, Maine Unemployment Insurance Consortium. Independent Verification and Validation Request For Proposal
Mississippi, Rhode Island, Maine Unemployment Insurance Consortium Independent Verification and Validation Request For Proposal Circulation Date March 23, 2015 Bidders Pre-Bidders Webinar April 1, 2015;
Request for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
Request for Proposal (RFP) K3311 Disaster Recovery as a Service (DRaaS)
1. SCHEDULE EVENT Request for Proposal (RFP) K3311 Disaster Recovery as a Service (DRaaS) DATES & TIME Issue Solicitation April 27, 2015 Question & Answer Period April 27 May 4, 2015 Complaint Period Begins
CONNECTICUT LOTTERY CORPORATION REQUEST FOR PROPOSALS RE: LEGAL SERVICES RFP # CLC 201307
CONNECTICUT LOTTERY CORPORATION REQUEST FOR PROPOSALS RE: LEGAL SERVICES RFP # CLC 201307 ISSUE DATE: SEPTEMBER 9, 2013 PROPOSAL DUE DATE: OCTOBER 10, 2013 BY 2:00 PM EASTERN TIME The Connecticut Lottery
Smarter Balanced Assessment Consortium. Recommendation
Smarter Balanced Assessment Consortium Recommendation Smarter Balanced Quality Assurance Approach Recommendation for the Smarter Balanced Assessment Consortium 20 July 2012 Summary When this document was
CITY OF FRISCO PURCHASING DIVISION
May 31, 2013 Addendum #1 Questions and Answers RFP #1306-059 Enterprise Discovery for Electronic Records Questions and Answers CITY OF FRISCO PURCHASING DIVISION 1. The RFP states to use either AC, FR,
QA Engagement Models. Managed / Integrated Test Center A Case Study
1 QA Engagement Models Managed / Integrated Test Center A Case Study 2 Today s Agenda» Background» Overview of QA Engagement Models MTC & ITC» The Journey to Steady State» Transition Approach» Challenges
!"#$%&'(%)*$+ :%;$)*%<&%6 4.7&68'9"/6")& 0)1.%$2.3*%./'4"55*)6 ,&+-%$+./ !"#$%&##'()*+&## Figure 1: Five OSP Dimensions
!""#!$%&'(#)$*+,(-*(.&%/# &0*$1!"#$%&'(%)*$+ :%;$)*%
F. No. E 12020/03/2015-E&A Food Safety and Standards Authority of India
F. No. E 12020/03/2015-E&A Food Safety and Standards Authority of India (A Statutory Authority established under the Food Safety & Standards Act, 2006) Establishment Division FDA Bhawan, Kotla Road, Near
Hosted Contact Center RFQC 98000-0000001097 Questions and Answers
Hosted Contact Center Q&A s 1-4, Released 4/24/14 1. Appendix A I noticed that on the Appendix A there is only 5 pages and that pages 6 and 7 are not yet provided. Will they be updated soon? 2. Section
RFP-00118 ADDENDUM NO. 1
INTERNAL SERVICES DEPARTMENT PROCUREMENT MANAGEMENT SERVICES 111 NW 1 ST Street Suite 1300 Miami, Florida 33128-1974 Telephone: 305-375-4725 Fax: (305) 375-5688 RFP-00118 ADDENDUM NO. 1 DATE: March 26,
Introduction to SOA governance and service lifecycle management.
-oriented architecture White paper March 2009 Introduction to SOA governance and Best practices for development and deployment Bill Brown, executive IT architect, worldwide SOA governance SGMM lead, SOA
Terrace Consulting Services
Terrace Consulting Services Overview: Every project will require some degree of Planning before Implementation can begin. Analysis and Planning are essential in order to confirm requirements, define the
AGILENT SPECIFICATIONS INFORMATICS SOFTWARE SUPPORT AND SERVICES GOLD-LEVEL
AGILENT SPECIFICATIONS INFORMATICS SOFTWARE SUPPORT AND SERVICES GOLD-LEVEL The following terms set forth the specifications under which Agilent will provide support and services to customers who are under
The CITY OF OLIVETTE web site was originally designed and produced in in the late 1990 s and updated in 2011.
REQUEST FOR PROPOSAL WEB SITE DESIGN, DEVELOPMENT & HOSTING April 1, 2015 1. SUMMARY The CITY OF OLIVETTE, MISSOURI is accepting proposals to design, develop, and host the City s web site (www.olivettemo.com).
Request for Proposals
Request for Proposals Title: RFP #: 2010-HR-001 Issue Date: January 4, 2010 Due Date/Time: January 28, 2010 2 p.m. Issuing Agency: Harnett County Human Resources Department 102 E. Front Street P.O. Box
Attachment G - Required Response Format for ERP Implementation Service Providers
Page 1 of 5 Attachment G - Required Response Format for ERP Implementation Service Providers A. Transmittal Letter The Transmittal Letter must address the following topics: 1. Summary of Ability and Willingness
allowed. Request for inclusion and consideration of ISO 2008:9001 quality certification. CMMI Level 5 : 10 Marks CMMI Level 3 : 07 marks ISO: 05
Corrigendum for the Tender for Web Based Project Monitoring Tool & MIS System Bidders Clarification Sl. Clause /Page no Tender Clause Clarification Sought Clarification No. 1 Page No:4 No consortium Consortium
RFP 20764 Help Desk and Field Support Question and Answers
RFP 20764 Help Desk and Field Support Question and Answers RFP 20764 - Provide Help Desk and Field Support 1) I could not find the Proposal Form mentioned on page 6 item number 1 and on page 7 item a and
High Definition Video Production for the Ontario College of Trades (the College) Request for Proposal (RFP) No. OCOT/CM/2015-01
High Definition Video Production for the Ontario College of Trades (the College) Request for Proposal (RFP) No. OCOT/CM/2015-01 Date Issued: May 19, 2015 A. INTRODUCTION The Ontario College of Trades (the
How To Write An Slcm Project Plan
SLCM 2003.1 Artifacts in a Nutshell ( as of 01/21/2005) Project Development Phases Pension Benefit Guaranty Corporation s (PBGC) System Life Cycle Methodology (SLCM) is comprised of five project development
C009992 IV&V for EMR Implementation Questions and Answers
1 Requirements C009992 IV&V for EMR Implementation Would a list of small s be provided to interested vendors? And the list of vendors to s. A short list of potential s is located table 1-1 on page 13 of
Enterprise SM VOLUME 1, SECTION 5.1: MANAGED TIERED SECURITY SERVICES
VOLUME 1, SECTION 5.1: MANAGED TIERED SECURITY SERVICES 5.1 MANAGED TIERED SECURITY SERVICES [C.2.7.4, M.2.1.3] Level 3 will support the GSA s Multi-Tier Security Profiles (MTSP) initiative in accordance
REQUEST FOR PROPOSALS. Information Technology Managed Services Provider
REQUEST FOR PROPOSALS Information Technology Managed Services Provider INTRODUCTION Through this Request for Proposals ( RFP ), Rhode Island Housing seeks proposals from qualified firms ( Firms ) to provide
C. La Plata County is exempt from all state taxation including state sales and use tax.
Informal Bid (Request for Quotes) Drupal Hosting and Development Service Project Number 12-062-2201 Let Date: August 17, 2012 Bid Deadline: 2:00 p.m. August 30, 2012 I. Administrative Information A. La
REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SECURITY CONSULTING BID INSTRUCTIONS
REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SECURITY CONSULTING BID INSTRUCTIONS NOVA SCOTIA LIQUOR CORPORATION 93 CHAIN LAKE DRIVE HALIFAX, NOVA SCOTIA B3S 1A3 NSLC REFERENCE NO: SR-39-H-15 NSLC Contact:
Software as a Service Decision Guide and Best Practices
Software as a Service Decision Guide and Best Practices Purpose of this document Software as a Service (SaaS) is software owned, delivered and managed remotely by one or more providers [Gartner, SaaS Hype
Addendum No. 1 to Packet No. 9-13 Call Center Messaging System
Addendum No. 1 to Packet No. 9-13 Call Center Messaging System The following clarifications, modifications and/or revisions to the above project shall be considered a part of the original specifications:
Table of Contents. CHAPTER 1 Web-Based Systems 1. CHAPTER 2 Web Engineering 12. CHAPTER 3 A Web Engineering Process 24
Table of Contents CHAPTER 1 Web-Based Systems 1 The Web 1 Web Applications 2 Let s Introduce a Case Study 3 Are WebApps Really Computer Software? 4 Are the Attributes of WebApps Different from the Attributes
Q&A SOW for Mobile Strategy
1. Does the STATE expect the vendors to provide a Fixed Price quote or can the vendors provide a T&E quote with fixed hourly rates for each resource type? A. The State/MN.IT expects a fixed price for this
Understanding the Software Contracts Process
Understanding the Software Contracts Process By John Seidl, Partner Tompkins Associates More and more often, companies are purchasing supply chain software from commercial software vendors rather than
RFP Attachment C Classifications
RFP 1. Applications IT Architect Analyzes and designs the architecture for software applications and enhancements, including the appropriate application of frameworks and design patterns and the interrelationships
REQUEST FOR PROPOSAL (RFP) ELECTRONIC HEALTH RECORD SYSTEM (EHRS) ON DEMAND TECHNICAL SERVICES RFP #OPS14-004. September 29, 2014
REQUEST FOR PROPOSAL (RFP) ELECTRONIC HEALTH RECORD SYSTEM (EHRS) ON DEMAND TECHNICAL SERVICES RFP #OPS14-004 September 29, 2014 QUESTIONS/STATEMENTS AND ANSWERS 1. Question(s)/Statement(s): Is this RFP
Request for Proposal 911- SUPPLEMENTAL ALI DATABASE MANAGEMENT SERVICES AND SUPPORT
Request for Proposal 911- SUPPLEMENTAL ALI DATABASE MANAGEMENT SERVICES AND SUPPORT Luzerne County 9-1-1 Communications Center LUZERNE COUNTY, PENNSYLVANIA DUE DATE: 2:00 P.M., Friday, MARCH 25th, 2011
Enterprise Scheduler Rev. 0 Bid #24078582. Scope of Work
Scope of Work I. Scope of Solicitation II. Instructions to Offerors III. Scope of Work / Specifications IV. Terms and Conditions - Special V. Appendices to Scope of Work (if required) VI. Bidding Schedule
Request for Information (RFI) for a. Ticket Tracking System for Provider Network Data Systems RFI # 16320
Request for Information (RFI) for a Ticket Tracking System for Provider Network Data Systems RFI # 16320 July 21, 2015 New York State of Health Corning Tower, Empire State Plaza, Room 2580 Albany, NY 12237
HIPAA SECURITY RISK ANALYSIS FORMAL RFP
HIPAA SECURITY RISK ANALYSIS FORMAL RFP ADDENDUM NUMBER: (2) August 1, 2012 THIS ADDENDUM IS ISSUED PRIOR TO THE ACCEPTANCE OF THE FORMAL RFPS. THE FOLLOWING CLARIFICATIONS, AMENDMENTS, ADDITIONS, DELETIONS,
RFP # FAR226005 - Addendum #4 Enterprise Resource Planning (ERP) Software and Services
Purpose of this Addendum: Vendor Inquiries and responses are provided. Where appropriate, the impacted section(s) of the RFP have been inserted to reflect the amended language. Clarification has also been
1 OPPORTUNITY SUMMARY
REQUEST FOR PROPOSALS: MANAGED SERVICES FOR INFRASTRUCTURE AND IT SUPPORT SERVICES Posting Date: Thursday, January 7, 2016 Due Date: Friday, February 5, 2016 1 OPPORTUNITY SUMMARY The Massachusetts Clean