Transforming Asset Information Management
|
|
|
- Cleopatra Hardy
- 10 years ago
- Views:
Transcription
1 Transforming Asset Information Management How integrated information management throughout the asset lifecycle cuts costs and improves reliability and safety
2 Summary Catalyst For decades, the fragmentation of stakeholders and business processes throughout the asset lifecycle has created information siloes and applications in all asset-intensive industries. One of the problems is that the life expectancy of many assets is counted in decades, much longer than the IT systems that manage them. As a result, legacy information management systems run alongside new systems, which are often incompatible. The result is inefficiency, sub-optimal employee safety, and a huge incremental increase in operating costs throughout an asset s life. A number of factors are challenging this status quo. Increased pressure to reduce operating costs, aging infrastructure and workforce turnover, increasing public scrutiny, complexity of operations, and health and safety concerns are forcing these industries to invest in new business processes. This paper highlights the problems caused by siloed information, applications, and people in asset-intensive industries, such as petrochemical, process facilities, power generation plants and utilities. It recommends that the integration of planning, design, construction and operations data with enterprise asset management can help address many of the issues facing the industry. This paper was written in conjunction with Dassault Systèmes and ABB, which have developed an integrated strategy for Dassault Systèmes business platform and industry solutions, most importantly asset lifecycle management (ALM), and ABB s enterprise asset management (EAM) software. In addition, two senior executives responsible for plant operations were interviewed about potential benefits. Ovum view A number of issues are created for asset-intensive industries when asset management is functionally separated from planning, design, construction, and operations. An integrated approach to asset information brings substantial flexibility to business information, and allows asset owners to use existing data in ways that were previously impossible. There are many use cases that demonstrate that the new whole is vastly greater than the sum of its parts; however, these are not the only opportunities. Integration transforms previously inaccessible data into a fully updated and accessible commodity, allowing operators to reinvent the way they want to work. The integrated ALM-EAM approach is in keeping with the ISO55000 guidance for asset-related information management, and forms part of a wider initiative to more closely integrate people, systems, and data across organizations and between different companies. Dassault Systèmes and ABB s pioneering approach to integrated applications and data promises to revolutionize asset management. We reviewed several business cases with industry experts, who confirmed the considerable value to be gained from this integrated approach, throughout the life of an asset. Key messages Asset-based industries are beginning to address the inefficiencies caused by data silos. ALM-EAM integration pays dividends throughout the asset lifecycle, from asset handover, through operations and maintenance, to decommissioning. Operators must embrace the challenge of ALM-EAM integration by improving data quality and selectively implementing the approach where the highest returns will be made.
3 Asset-based industries are beginning to address the inefficiencies caused by data silos Disparate systems along the asset lifecycle creates data silos The asset lifecycle consists of the following phases: project planning and design construction operations and maintenance (O&M) decommissioning. Each phase is populated by numerous stakeholders using diverse business processes. Historically many different IT systems have been used to support these processes, which create different types of information and data. The O&M phase of the asset lifecycle is characterized by repetitive business processes that focus on maximizing the return on investment from assets and crews. EAM solutions have been specifically designed to support O&M s unique requirements and create highly structured data sets. The planning and design, construction, and decommissioning phases are more project-focused, as are major asset upgrades and refurbishments. Data is created in many formats, both structured and unstructured, by diverse applications including project management, planning and construction scheduling, compliance with requirements, simulation and testing, multi-disciplinary design, and more. Because each IT system independently generates data, and business processes are rarely independent from one another, this data has to be reformatted from one system before it can be used by another. The incompatibility of different systems and a lack of incentives mean that different stakeholders across the asset lifecycle even those within the same organization typically do not share data. Fig 1: Historically, asset lifecycle management has been linear
4 Siloed information management creates operational inefficiencies Significant inefficiencies can result when stakeholders do not share data. The handover of an asset from constructor to operator provides a useful example. In a perfect world, an operator should be given all design- and construction-related documentation, and business process information in compatible, searchable formats. In practice, operators lack complete as-built information: they often are given manuals and as-built drawings in hardcopy, CAD files that are incompatible with asset management systems, and digitized versions of hardcopy manuals that lack basic search functionality (such as the associated metadata to enable search). Large volumes of design and construction data may not be transferred at all, or, if it is, operators struggle to extract value from the data due to its diverse nature. As a result, information regarding equipment history is locked away in silos, often underexploited, leading to significant inefficiencies in O&M. Configuration management in the nuclear industry provides us with a useful example. The IAEA states that the successful long-term operation of a nuclear power plant is predicated on good configuration management, which in turn relies on the retention of as-designed, as-built, and asmaintained data throughout the life of the asset. Fig 2: Configuration Management An accurate configuration gives the operator insight into the modifications made over the life of equipment and systems. It allows for more detailed planning prior to maintenance, shortens the time the plant is shut down, reduces staff costs associated with maintenance, minimizes staff exposure to radiation, reduces uncertainties in the planning process, and as a consequence reduces planning and health and safety risks.
5 However, most nuclear assets were built before configuration management tools were available, and approaches to configuration management, including the retention of design information, were deficient. As a result, many modifications are not reflected in asset documentation and, to determine an asset's configuration, operators waste significant time manually correlating information from multiple sources. Plant operators can only paint a partial picture of their assets configuration due to incomplete, and disparate data. There is an increased risk of missing modifications made to an asset, which can lead to unnecessary and extensive delays during the maintenance project. With hundreds or thousands of staff on site for major maintenance, exceptions can cause huge cost increases. Some industry experts estimate that engineers spend up to 60% of their time during a planning analysis project just finding the relevant documentation. Most of this time can be saved if configuration is digitally managed. Fragmented information management also leads to problems when an operator is subject to a regulatory audit or inspection: the process of gathering information to demonstrate the traceability of information. Furthermore, overall regulatory compliance becomes harder when information management is not centralized. The industry must recognize the risks associated with a lack of integration and data governance For decades, asset-intensive industries have operated under the most rigorous regulatory environment, but have failed to recognize the inherent risks of disparate information management. However, the industry is changing. In 2004 the Institute of Asset Management and the British Standards Institution codified these best practices in the PAS55 standard. PAS55 evolved over the next decade until 2014, when the International Standards Organization took over responsibility and published its ISO55000 Standard for Asset Management. The ISO blames the parlous state of information management squarely on the lack of forethought by asset managers, which in turn is symptomatic of the lack of good asset management practices. It believes that unexpected outages or protracted repair times are clear indicators that asset management is suboptimal. The ISO also recognizes that the disconnect between the ALM and owner/operator worlds has led to inaccessible, disparate, and out-of-date information. Managing this data will be a challenge to most asset-intensive organizations, but is imperative for good asset management. ISO55000 requires organizations to bring enterprise information up to date and made available to those who need it, when it is needed. Organizations must determine (their) information requirements to support Asset Management Systems and the achievement of organizational objectives. Its recommendations are to: use a formal document management system to include all relevant documentation from design drawing through to maintenance reports specify, implement, and maintain processes for managing information determine the requirements for alignment of financial and non-financial terminology relevant to asset management throughout the organization ensure consistency and traceability between the financial and technical data and other relevant non-financial data. align technical property data with other corporate data systems.
6 ALM-EAM integration pays dividends throughout the asset lifecycle ALM-EAM integration makes the whole greater than the sum of its parts Although data and applications have historically remained in silos, today the most advanced ALM platforms integrate data without the need for major data preparation. It is now possible to create a single view of an asset, throughout the entire lifecycle. ALM-EAM integration bridges the disconnect between the worlds of engineering and construction and O&M, improving visibility across the value chain. However, this is not just an exercise in data storage efficiency: there are many benefits to this integration that were simply not possible before. A single data repository improves the consistency, quality, and traceability of information in a rapidly changing and demanding environment. People can access all the information they require for the activities they need to carry out. Figure 3: ALM-EAM integration creates a feedback loop in the asset lifecycle
7 Asset handover becomes more efficient Previously, we discussed how siloed information management affects the efficiency of asset handovers. Integrated asset information enables a fully digital handover process, by requiring all stakeholders to make all relevant information available in a digital format, which is fully searchable and stored in a single repository. This approach is demonstrably more efficient: a mutual customer of Dassault Systèmes and ABB experimented with the automatic load of an EAM configuration from an engineering data repository saving in the region of 5 6m, when compared with manual data entry. Although this customer has not fully implemented ALM-EAM integration, this test gives a good indication of the expected savings from a digital handover. While historically a lot of paper and spreadsheet files have been passed from construction companies to the operator, a handover based on integrated ALM-EAM is managed within a single, shared solution. The single repository removes the requirement for the manual exchange of as-built drawings, manuals, and other hardcopy documents. An added benefit is that if the document repository is used from the beginning of a project, operators have much earlier access to review documents, reducing the need for bulk data loads during the final handover. Asset configurations are determined accurately during O&M Engineers can waste significant time trawling through disparate data to determine the current configuration of an asset while the plant is in operation. While EAM is the current system of record for all modifications to a plant, many operators do very little with this data. An integrated ALM-EAM approach automatically updates asset configuration in ALM using EAM data, and vice-versa. By doing so, a facility s entire workforce engineers, maintenance managers, and operators have access to consistent information. Again, this is not just about efficient information storage in a single repository: the real benefit comes from the creation of a collaborative environment where staff can share information more efficiently, manage requirements and dependencies, identify risks, create multi-view classifications, and more. During the handover of a new build or on a refurbished plant, Dassault Systèmes and ABB s clients assets can now be configured digitally. We mentioned previously the significant savings during a digital handover; however, many long-term benefits can be derived from improved information management. An EAM-based configuration is updated continuously with ALM-based design information from regular asset modifications. Conversely, ALM can monitor significant operating activities from EAM-based data. Thanks to this approach, Dassault Systèmes and ABB estimate a significant reduction in operator hours of 20 25% by decreasing the time spent looking for data, redoing work because of the wrong information, and more. 4D planning optimizes maintenance projects Historically, maintenance projects were planned using EAM and, for more advanced asset operators, a separate 3D simulation of the project. The two systems were never integrated, so the output from one system lacked the insight of the other, except through manual integration. Planning is very time consuming, and relies heavily on the knowledge stored in maintenance teams heads. ALM-EAM integration provides O&M staff access to technologies previously only available in engineering offices. The 4D maintenance planning process relies heavily on this integrated and open approach. We spoke with an industry expert who investigated the use of a 4D planning approach during major planned outages. He believes that the use of interactive planning for maintenance
8 projects directly integrated with EAM is far more detailed, accurate, and efficient, reducing downtime by up to two days for a four-week outage. 4D maintenance planning is a radical change to current planning, depicting in advance how an asset is modified over time during the maintenance event. All available data is integrated including maintenance operatives knowledge connecting 3D simulations directly with business data such as planned work orders, tasks, and resources. These simulations improve the efficiency of planned maintenance in the following ways: Identify potential bottlenecks and exceptions in advance: significant delays can occur if a maintenance crew is dispatched to carry out a task, only to find an obstruction prevents them from completing it. The work order will likely be delayed, or even cancelled, for schedules to be rerun to account for exceptions. Identifying exceptions in advance speeds the return to operation Improve efficiency through more effective resource planning: A 4D simulation allows an operator to identify how many operatives will be required on site to perform particular tasks, and provide an accurate estimation of how long they will be needed on site. This stops overcrowding in the asset, reduces unnecessary exposure in hazardous environments, and allows operators to more accurately calculate the cost of individual contractors. Minimize exposure to hazardous conditions: operators can model in advance the duration of maintenance tasks in hazardous environments. Exposure can be reduced by optimizing the routes different operatives take through a complex facility, for example by directing them away from a dangerous area. React faster to unplanned event: faster and more efficient rescheduling is possible if an unplanned event occurs during a maintenance event. Operators can quickly identify workarounds and assign new tasks to crews to achieve the initial maintenance goals. ALM-EAM integration enhances the value of 3D training Employee training can be enhanced by the ALM-EAM integration, particularly for pre-maintenance briefings and emergency preparedness. Virtual training provides operators with a cheaper and safer environment in which employees can familiarize themselves with assets and particular maintenance tasks. Most asset-intensive industries have an aging workforce that is being replaced by new recruits and temporary workers, who need significant training. Experienced employees who visit scores of sites during the course of a year will also benefit from training on asset-specific maintenance tasks. By integrating ABB EAM with Dassault Systèmes business platform, an operator can access work orders created in EAM to create a real-time 3D simulation to step through activities in a virtual environment. In this way, employees can perform tasks in the right order in a risk-controlled environment. Each task can be reviewed by the relevant crews before an asset is shut down. Although historically this planning was done with little more than a whiteboard, a virtual environment shows employees what the task actually looks like. Dassault Systèmes and ABB believe this new approach to training significantly improves site safety and the cost-effectiveness of maintenance. They estimate that improved training can save an operator around 6,000 man hours during a major maintenance event.
9 ALM-EAM integration adds significant value to asset decommissioning In nuclear power, for example, the decommissioning process is unique and often one part of an asset continues to operate while another is dismantled. In addition, the majority of assets will have their licenses extended well beyond their original decommission date; many assets may operate for up to 60 years. When the time comes to decommission, regulatory disclosure is as essential as it is unavoidable. However, it is dangerous to second-guess future regulatory requirements, so current strategies are to retain all asset information, albeit in a sub-optimal way. It is essential that operators use an information system that can retain and maintain asset-related data over many decades. An integrated ALM-EAM approach helps operators better manage decommissioning: the synchronized data helps reconstruct historical data, using integrated and interoperable information. Data retrieval is far more efficient, and more complete data sets reduce risk. Analytics optimize processes for new and existing assets Asset owners can exploit the rich insights ALM-EAM integration brings to improve business processes throughout an asset s lifecycle. Operators building new plants can learn a great deal from the information created in existing installations, but only if this data is collected and stored in formats that allow it to be analyzed. Because the ALM-EAM integration creates a current and detailed configuration of each asset, operators can mash up data from an entire fleet, analyze the historic context of each piece of equipment, and optimize future business processes in new and existing assets over the full lifecycle of a plant. For instance: operators can model how an asset s configuration changes over time designers can use this context to include within the original design the requirements for efficient future modifications operators can analyze previous handovers to identify what previously caused significant delay, to better manage future handovers. In the same vein, past decommissioning processes can be analyzed to optimize future asset decommissioning. Operators must embrace the opportunity of ALM- EAM integration Data quality improvements are critical We have spoken to many companies undertaking digital transformations, similar to the ALM-EAM integration discussed in this report. Each company recognized that business-as-usual was no longer tenable, that digitization was a necessity for a 21st century utility, and that the quality of their asset information had to be dramatically improved to maximize benefits. ALM-EAM integration requires operators to fully digitize and index paper drawings related to a particular asset, fill gaps where no information exists, and invest in meta- and master-data management tools to ensure documents are searchable and data quality remains high. Mobile laser scanning can help accelerate the digitization of, and access to, 3D data. Advanced search
10 functionality automates many manual processes, and can substantially reduce the man-hours spent searching for information. While a digital transformation relies on a transformation in data quality, these data cleansing projects can at first appear daunting. It is therefore important for operators to take a staged approach to data cleansing, with clear goals that help deliver the quickest time-to-value Operators should also ensure that inappropriate business processes do not subsequently spoil their data quality efforts. A concurrent business process change management program is strongly recommended as part of any data cleansing project, to change the processes that impair information quality. Although the implementation of ALM-EAM integration requires significant effort, we believe that most operators will see a positive return on their investments in just a few years. The return on investment will be significantly shorter for major upgrade or refurbishment projects, which could deliver a positive return within the same timeframe as the project itself. Integrate ALM with EAM during your next transformational project We do not expect all operators to integrate ALM with EAM immediately across all of their assets. Its adoption will happen where it makes most sense to do so. We strongly recommend all new asset builds should include a ALM-EAM integration: the approach should deliver a large return on investment over the asset s life, if it is adopted at the start of the planning stage. It will also help operators during major refurbishment projects. Finally, there is a strong argument for an operator to adopt this approach as a part of EAM or ALM software replacements or improvement. We recommend asset owners perform a full risk assessment, identifying existing pain points, and calculate the expected return on investment that ALM-EAM integration will deliver. Ensure your vendors roadmaps embrace a future where ALM and EAM are integrated Each large-scale asset is unique. It has its own business processes and physical construction; even for similar assets, the companies involved in the design, construction, operations, and maintenance will likely be different each time; the suite of IT systems used across an asset s lifecycle will also be different, creating information in different formats. Consequently, each project is unique: there is no out-of-the-box integration. Therefore, IT vendors must develop their products in readiness for an integrated approach. As a consequence it is critical that operators ensure their IT vendors product roadmaps include a detailed strategy to integrate with other applications. Operators should work with their vendor partners to develop integration strategies, and press for change where gaps exist.
11 Appendix Author Stuart Ravens, Principal Analyst, Utilities Technology Ovum Consulting We hope that this analysis will help you make informed and imaginative business decisions. If you have further requirements, Ovum s consulting team may be able to help you. For more information about Ovum s consulting capabilities, please contact us directly at [email protected]. Copyright notice and disclaimer The contents of this product are protected by international copyright laws, database rights and other intellectual property rights. The owner of these rights is Informa Telecoms and Media Limited, our affiliates or other third party licensors. All product and company names and logos contained within or appearing on this product are the trademarks, service marks or trading names of their respective owners, including Informa Telecoms and Media Limited. This product may not be copied, reproduced, distributed or transmitted in any form or by any means without the prior permission of Informa Telecoms and Media Limited. Whilst reasonable efforts have been made to ensure that the information and content of this product was correct as at the date of first publication, neither Informa Telecoms and Media Limited nor any person engaged or employed by Informa Telecoms and Media Limited accepts any liability for any errors, omissions or other inaccuracies. Readers should independently verify any facts and figures as no liability can be accepted in this regard - readers assume full responsibility and risk accordingly for their use of such information and content. Any views and/or opinions expressed in this product by individual authors or contributors are their personal views and/or opinions and do not necessarily reflect the views and/or opinions of Informa Telecoms and Media Limited.
12 CONTACT US INTERNATIONAL OFFICES Beijing Dubai Hong Kong Hyderabad Johannesburg London Melbourne New York San Francisco Sao Paulo Tokyo
Case Study: Vitamix. Improving strategic business integration using IT service management practices and technology
Improving strategic business integration using IT service management practices and technology Publication Date: 17 Sep 2014 Product code: IT0022-000180 Adam Holtby Summary Catalyst For Vitamix, a key driver
On the Radar: Tamr. Applying machine learning to integrating Big Data. Publication Date: Sept. 2014 Product code: IT0014-002934.
Applying machine learning to integrating Big Data Publication Date: Sept. 2014 Product code: IT0014-002934 Tony Baer Summary Catalyst Traditional data integration approaches may not scale for Big Data.
2015 Global Payments Insight: Bill Pay Services. With big change comes big opportunity
2015 Global Payments Insight: Bill Pay Services With big change comes big opportunity Catalyst Payments are at a crossroads The payments market is changing. From cash to checks, to charge and credit cards,
Financial services perspectives on the role and real impact of cloud
Financial services perspectives on the role and real impact of cloud Executive Summary Ovum has recently concluded an independent and in-depth survey of 400 senior CIOs within financial services institutions
Enterprise Content Management: The Suite Perspective
Enterprise Content Management: The Suite Perspective Publication Date: 04 Dec 2015 Product code: IT0014-003079 Sue Clarke Summary Catalyst The Ovum Decision Matrix: Selecting an Enterprise Content Management
HP s revitalized workforce optimization suite is worth a fresh look
HP s revitalized workforce optimization suite is worth a fresh look Publication Date: 27 Jul 2015 Product code: IT0020-000139 Keith Dawson Ovum view Summary When contact center buyers look to acquire workforce
SWOT Assessment: BMC Remedy v9
SWOT Assessment: BMC Remedy v9 Analyzing the strengths, weaknesses, opportunities, and threats Publication Date: 17 Aug 2015 Product code: IT0022-000489 Adam Holtby Summary Catalyst BMC Software is an
SWOT Assessment: Alfresco, Alfresco One, v5.0
SWOT Assessment: Alfresco, Alfresco One, v5.0 Analyzing the strengths, weaknesses, opportunities, and threats Publication Date: May 5 th, 2015 Product code: IT0014-003012 Sue Clarke Summary Catalyst When
Web Application Firewalls: The TCO Question
Web Application Firewalls: The TCO Question Ovum looks into total cost of ownership for WAFs Rik Turner Summary Catalyst Ovum has carried out a series of interviews with companies in North America, Europe,
On the Radar: Alation harnesses crowdsourcing and machine learning to speed data access
On the Radar: Alation harnesses crowdsourcing and machine learning to speed data access Summary Catalyst As organizations widen their net and analyze more data sources, it becomes all too easy for business
Ovum Decision Matrix: Selecting an Enterprise File Sync and Share Product, 2014 15
Ovum Decision Matrix: Selecting an Enterprise File Sync and Share Product, 2014 15 Excerpt prepared for Egnyte, Inc. Publication Date: 28 Aug 2014 Product code: IT0021-000018 Richard Edwards Summary Catalyst
On the Radar: Pulse Secure
Secure access management for corporate and personal endpoints on company networks Publication Date: 17 Jul 2015 Product code: IT0022-000431 Rik Turner Summary Catalyst Pulse Secure is a developer of secure
The Future of Payments 2015: Financial Institutions. The Payments Value Chain is Driven by Customers
The Future of Payments 2015: Financial Institutions The Payments Value Chain is Driven by Customers 1 Catalyst Payments Are at a Crossroads The payments market is changing. From cash to checks, to charge
Winning with Emerging CRM Channels. An Ovum White Paper
Winning with Emerging CRM Channels An Ovum White Paper Introduction If there has been one constant over the past five years, it is the shift in how consumers interact not just with each other, but how
On the Radar: CipherCloud
Cloud access security delivered on enterprise gateways Publication Date: 18 Feb 2015 Product code: IT0022-000305 Rik Turner Summary Catalyst CipherCloud develops cloud visibility and security technology
On the Radar: ForgeRock
Identity management for B2C and the Internet of Things Publication Date: 03 Dec 2015 Product code: IT0022-000500 Rik Turner Summary Catalyst ForgeRock develops identity and access management (IAM) technology
SWOT Assessment: BeyondTrust Privileged Identity Management Portfolio
SWOT Assessment: BeyondTrust Privileged Identity Management Portfolio Analyzing the strengths, weaknesses, opportunities, and threats Publication Date: 11 Jun 2015 Product code: IT0022-000387 Andrew Kellett
Asset and Plant Lifecycle Management
IBM Software Enterprise Content Management April 2010 Asset and Plant Lifecycle Management 2 Asset and Plant Lifecycle Management Executive summary The IBM Asset and Plant Lifecycle Management (APLM) solution
How To Rank Customer Analytics Vendors
Ovum Decision Matrix: Selecting a Customer Analytics Solution for Telcos, 2015 16 Publication Date: 10 Sep 2015 Product code: IT0012-000135 Adaora Okeleke Summary Catalyst Telcos quest for a competitive
Outperform Financial Objectives and Enable Regulatory Compliance
SAP Brief Analytics s from SAP SAP s for Enterprise Performance Management Objectives Outperform Financial Objectives and Enable Regulatory Compliance Drive better decisions and streamline the close-to-disclose
AVEVA NET Accesses and Manages the Digital Asset. Executive Overview... 3. Project Risk: Inaccessible, Unreliable Information... 4
ARC WHITE PAPER By ARC Advisory Group JUNE 18, 2013 AVEVA NET Accesses and Manages the Digital Asset Executive Overview... 3 Project Risk: Inaccessible, Unreliable Information... 4 AVEVA NET Focuses on
Bentley Systems Launches AssetWise Initiative for Operating and Sustaining Infrastructure Assets
ARC VIEW MARCH 19, 2010 Bentley Systems Launches AssetWise Initiative for Operating and Sustaining Infrastructure Assets By Tom Fiske and Russ Novak Summary As more and more owner-operators shift their
Agile enterprise content management and the IBM Information Agenda.
Transforming your content into a trusted, strategic asset Agile enterprise content management and the IBM Information Agenda. Delivering a common information framework for uncommon business agility Highlights
Data Center Automation: Market Landscape and Maturity Model
Data Center Automation: Market Landscape and Maturity Model Assessing the organizational readiness and market in data center automation Publication Date: 16 Dec 2015 Product code: IT0022-000569 Roy Illsley
Mastering Complex Change and Risk through Smarter Engineering Collaboration
Mastering Complex Change and Risk through Smarter Engineering Collaboration January 2010 Mastering Complex Change and Risk through Smarter Engineering Collaboration Page 2 With explosive population growth,
How To Understand The Implications Of Outsourced Testing
Ovum Decision Matrix: Selecting an Outsourced Testing Service Provider, 2014 2015 Author: Thomas Reuner Summary Catalyst The emergence of comprehensive outsourced testing of software applications, in which
Optimizing Asset Value and Performance with Enterprise Content Management
SAP Brief SAP Business Suite SAP Extended Enterprise Content Management by OpenText Objectives Optimizing Asset Value and Performance with Enterprise Content Management Improving asset management with
SELECTING SOFTWARE FOR AIM: ASSET INFORMATION MANAGEMENT
WHITE PAPER SELECTING SOFTWARE FOR AIM: ASSET INFORMATION MANAGEMENT Selecting software for AIM: Asset Information Management By Christian Klingspor, Product Manager, IFS AB Any industry, enterprise or
ARC VIEW. The Next Generation of ALIM: Connecting the Digital Asset. Keywords. Summary. By Dick Slansky and Paula Hollywood
ARC VIEW MARCH 3, 2016 The Next Generation of ALIM: Connecting the Digital Asset By Dick Slansky and Paula Hollywood Keywords ALIM, CAPEX, OPEX, TOTEX, Digital Asset, Asset Reliability, Asset Performance,
2016 Global Payments Insight Survey: Merchants and Retailers. Changing the merchant experience
2016 Global Payments Insight Survey: Merchants and Retailers Changing the merchant experience 1 Catalyst Payment players need to rethink roles and relationships The payments industry has always been an
Keep Enterprise Assets Productive with Effective Master Data Governance
SAP Brief SAP s for Enterprise Information Management SAP Master Data Governance, Enterprise Asset Management Extension by Utopia Objectives Keep Enterprise Assets Productive with Effective Master Data
Managing the Product Value Chain for the Industrial Manufacturing Industry
An Oracle White Paper June 2011 Managing the Product Value Chain for the Industrial Manufacturing Industry Contributing Authors: John DaDamio, Oracle PLM/PIM Applications Pre-Sales Kerrie Foy, Oracle PLM/PIM
PROACTIVE ASSET MANAGEMENT
PROACTIVE ASSET MANAGEMENT A pathway to optimized reliability and world-class business performance Oracle Utilities Work and Asset Management 2 Effective work and asset management ensures mission-critical
Understanding the real risk for asset-intensive companies
IBM Software Thought Leadership White Paper December 2011 Understanding the real risk for asset-intensive companies Five myths behind the value of ERP solutions as an asset management tool 2 Understanding
Industry Solutions Process Manufacturing Flexible and Agile Engineering Document Control for Efficient, Safe and Compliant Plants
Industry Solutions Process Manufacturing Flexible and Agile Engineering Document Control for Efficient, Safe and Compliant Plants Industry Solutions Key Challenges Facing Process Manufacturing High energy
Improve Field Performance at A Lower Operating Cost with Oracle Utilities Mobile Workforce Management
Improve Field Performance at A Lower Operating Cost with Oracle Utilities Mobile Workforce Management Oracle Utilities Mobile Workforce Management provides fully integrated, realtime, best-of-breed planning,
Lowering business costs: Mitigating risk in the software delivery lifecycle
August 2009 Lowering business costs: Mitigating risk in the software delivery Roberto Argento IBM Rational Business Development Executive Valerie Hamilton IBM Rational Solution Marketing Manager and Certified
INFORMATION CONNECTED
INFORMATION CONNECTED Business Solutions for the Utilities Industry Primavera Project Portfolio Management Solutions Achieve Operational Excellence with Robust Project Portfolio Management Solutions The
The Benefits of a Unified Enterprise Content Management Platform
An Oracle White Paper July 2011 The Benefits of a Unified Enterprise Content Management Platform Executive Overview Documents, emails, spreadsheets and presentations are created faster than we can count
Best Practices in Release and Deployment Management
WHITEPAPER Best Practices in Release and Deployment Management Mark Levy Through 2016, a lack of effective release management will contribute up to 80% of production incidents in large organizations with
Content Management for SAP Business Suite powered by SAP HANA
SAP Brief Extensions SAP Extended Enterprise Content Management by OpenText Objectives Content Management for SAP Business Suite powered by SAP HANA Link all types of content to workflows and processes
Managing Utility Capital Projects Using Enterprise Project Portfolio Management Solutions
An Oracle White Paper January 2012 Managing Utility Capital Projects Using Enterprise Project Portfolio Management Solutions Executive Overview Utility executives worldwide face a precarious balancing
Enhance visibility into and control over software projects IBM Rational change and release management software
Enhance visibility into and control over software projects IBM Rational change and release management software Accelerating the software delivery lifecycle Faster delivery of high-quality software Software
An integrated approach to managing today s energy and utility assets
IBM Software Thought Leadership White Paper September 2011 An integrated approach to managing today s energy and utility assets IBM Maximo Asset Management addresses physical, human and technology challenges
ORACLE HUMAN RESOURCES ANALYTICS
ORACLE HUMAN RESOURCES ANALYTICS KEY FEATURES & BENEFITS FOR BUSINESS USERS Oracle Human Resources Analytics intelligence dashboards provide strategic workforce performance information. Determine key factors
Product Lifecycle Management in the Food and Beverage Industry. An Oracle White Paper Updated February 2008
Product Lifecycle Management in the Food and Beverage Industry An Oracle White Paper Updated February 2008 Product Lifecycle Management in the Food and Beverage Industry EXECUTIVE OVERVIEW Companies in
OSS/BSS market overview and vendor landscape, 2Q13-1Q14
www.ovum.com OSS/BSS market overview and vendor landscape, 2Q13-1Q14 Market overview 2 Publicly announced OSS/BSS contracts, 2Q13 1Q14 Source: Ovum 3 The global OSS/BSS market, 2Q13 1Q14 Overall, the number
How To Manage Content Management With A Single System
The Benefits of a Unified Enterprise Content Management Platform An Oracle White Paper June 2010 The Benefits of a Unified Enterprise Content Management Platform A unified enterprise content management
Bridging the gap between compliance and innovation. ENOVIA PLM solutions for life sciences
Bridging the gap between compliance and innovation ENOVIA PLM solutions for life sciences Contents 3 Executive summary 4 Integrating compliance and innovation: a critical business challenge 6 An end-to-end
Getting Smart About Revenue Recognition and Lease Accounting
SAP Thought Leadership Paper Revenue Recognition and Lease Accounting Getting Smart About Revenue Recognition and Lease Accounting What the Rule Changes Mean for Your Business Table of Contents 4 New Rules
ORACLE SUPPLY CHAIN AND ORDER MANAGEMENT ANALYTICS
ORACLE SUPPLY CHAIN AND ORDER MANAGEMENT ANALYTICS KEY FEATURES & BENEFITS FOR BUSINESS USERS Provide actionable information to conduct intelligent analysis of orders related to regions, products, periods
Why enterprise data archiving is critical in a changing landscape
Why enterprise data archiving is critical in a changing landscape Ovum white paper for Informatica SUMMARY Catalyst Ovum view The most successful enterprises manage data as strategic asset. They have complete
Automotive Engineering Change: The Key to Cost Reduction for Competitive Advantage
Engineering Change: The Key to Cost Reduction for Competitive The automotive industry has seen significant change over the last couple of decades, but looking to the future, there will be even more significant
NEOXEN MODUS METHODOLOGY
NEOXEN MODUS METHODOLOGY RELEASE 5.0.0.1 INTRODUCTION TO QA & SOFTWARE TESTING GUIDE D O C U M E N T A T I O N L I C E N S E This documentation, as well as the software described in it, is furnished under
CA Service Management Solutions 14.1
CA Service Management Solutions 14.1 CA Technologies Publication Date: 06 Apr 2016 Product code: IT0022-000623 Adam Holtby Summary Catalyst IT functions are subject not only to the enterprise-wide mandate
WHITE PAPER. From Building Information Management to Facilities Management
October 2011 WHITE PAPER. Management to Facilities Management A look at the benefits to be found by fostering the links between Building Information Modelling (used by the construction industry) and Computer
Asset management for local government
IBM Software Government Thought Leadership White Paper Asset management for local government Achieving unified enterprise asset management with IBM Maximo software 2 Asset management for local government
How To Understand The Internet Of Things
www.ovum.com The Internet of Things: Understanding the evolving value chain Jamie Moss, Senior Analyst, Consumer Technology & IoT Gary Barnett, Chief Analyst, Software, Ovum Ovum s Internet of Things (IoT)
Automated Firewall Change Management. Ensure continuous compliance and reduce risk with secure change management workflows
Automated Firewall Change Management Ensure continuous compliance and reduce risk with secure change management workflows JANUARY 2015 Executive Summary Firewall management has become a hot topic among
Resource Management for the Oil and Gas Industry
SAP Brief SAP Business Suite SAP Workforce Scheduling and Optimization by ClickSoftware Objectives Resource Management for the Oil and Gas Industry Optimized workforce scheduling with SAP software Optimized
An Enterprise Resource Planning Solution (ERP) for Mining Companies Driving Operational Excellence and Sustainable Growth
SAP for Mining Solutions An Enterprise Resource Planning Solution (ERP) for Mining Companies Driving Operational Excellence and Sustainable Growth 2013 SAP AG or an SAP affi iate company. All rights reserved.
A discussion of information integration solutions November 2005. Deploying a Center of Excellence for data integration.
A discussion of information integration solutions November 2005 Deploying a Center of Excellence for data integration. Page 1 Contents Summary This paper describes: 1 Summary 1 Introduction 2 Mastering
Managing Paper at Its Roots: Extending Beyond Document Management to Enterprise Content Compliance
Managing Paper at Its Roots: Extending Beyond Document Management to Enterprise Content Compliance Global Headquarters: 5 Speen Street Framingham, MA 01701 USA P.508.935.4445 F.508.988.7881 www.healthindustry-insights.com
How mobility improves the insurance sales process
How mobility improves the insurance sales process White Paper Stephanie Wolf Business consultant, IBM Business Consulting Services Page 2 Page 3 Contents 3 Executive summary 3 Becoming an on demand business
The Value of Optimization in Asset Management
Experience the commitment white PAPER The Value of Optimization in Asset Management Better decisions to help utilities balance costs, risks, opportunities and performance May 2015 cgi.com Improving the
Ovum Decision Matrix: Selecting an Outsourced Testing Service Provider, 2014 15
Ovum Decision Matrix: Selecting an Outsourced Testing Service Provider, 2014 15 Publication Date: 06 Jan 2015 Product code: IT0019-003398 Thomas Reuner Summary Catalyst The emergence of comprehensive outsourced
ALL OF YOUR WORK. OPTIMIZED.
ALL OF YOUR WORK. OPTIMIZED. Mobilize, Dispatch, and Collaborate in Real Time During Complex and Routine Work Oracle Utilities Mobile Workforce Management 2 Work Done the Right Way. All the Time. Improve
Fortune 500 Medical Devices Company Addresses Unique Device Identification
Fortune 500 Medical Devices Company Addresses Unique Device Identification New FDA regulation was driver for new data governance and technology strategies that could be leveraged for enterprise-wide benefit
Simplify IT and Reduce Costs with Automated Data and Document Archiving
SAP Brief SAP Extensions SAP Archiving by OpenText Objectives Simplify IT and Reduce Costs with Automated Data and Document Archiving An easier way to store, manage, and access data and documents An easier
Beyond BOM 101: Next Generation Bill of Materials Management whitepaper
An Arena Solutions whitepaper www.arenasolutions.com whitepaper Summary In the world of product development and manufacturing, the bill of materials (BOM) is a critical product information record for both
Siemens PLM Software. Energy and utilities. PLM solutions for tough industry challenges and sustained business growth. siemens.
Siemens PLM Software Energy and utilities PLM solutions for tough industry challenges and sustained business growth siemens.com/plm Global megatrends in energy Demographic change, resource scarcity and
Industry Solutions Construction Project Collaboration and Document Control Solutions for the Construction Sector
Industry Solutions Project Collaboration and Document Control Solutions for the Sector Industry Solutions McLaren Software Setting Standards New Opportunities, New Challenges Whether it be architects,
Driving Excellence in Implementation and Beyond The Underlying Quality Principles
SAP Thought Leadership Paper SAP Active Quality Management Driving Excellence in Implementation and Beyond The Underlying Quality Principles 2014 SAP AG or an SAP affiliate company. All rights reserved.
PLM and ERP Integration: Business Efficiency and Value A CIMdata Report
PLM and ERP Integration: Business Efficiency and Value A CIMdata Report Mechatronics A CI PLM and ERP Integration: Business Efficiency and Value 1. Introduction The integration of Product Lifecycle Management
The Critical Impact of Cloud for Insurance on Business Transformation
The Critical Impact of Cloud for Insurance on Business Transformation Charles Juniper, Senior Insurance Analyst Executive summary Cloud technology and its role within the insurance industry has generated
Achieving Control: The Four Critical Success Factors of Change Management. Technology Concepts & Business Considerations
Achieving Control: The Four Critical Success Factors of Change Management Technology Concepts & Business Considerations T e c h n i c a l W H I T E P A P E R Table of Contents Executive Summary...........................................................
IBM Maximo Asset Management solutions for the oil and gas industry
IBM Software Oil and Gas IBM Maximo Asset solutions for the oil and gas industry Helping oil and gas companies achieve operational excellence 2 IBM Maximo Asset solutions for the oil and gas industry Highlights
Industry Solutions Oil and Gas Engineering Document Control and Project Collaboration Solutions for Oil and Gas
Industry Solutions Oil and Gas Engineering Document Control and Project Collaboration Solutions for Oil and Gas Industry Solutions Managing the complexity of major capital projects in today s oil and gas
ENTERPRISE MANAGEMENT AND SUPPORT IN THE TELECOMMUNICATIONS INDUSTRY
ENTERPRISE MANAGEMENT AND SUPPORT IN THE TELECOMMUNICATIONS INDUSTRY The Telecommunications Industry Companies in the telecommunications industry face a number of challenges as market saturation, slow
