1 GEOTECHNICAL DESIGN MANUAL CHAPTER 7 ENGINEERED GRANULAR MIXES NYSDOT Geotechnical Page 7-1 June 17, 2013
2 (Intentionally left blank) NYSDOT Geotechnical Page 7-2 June 17, 2013
3 Table of Contents 7.1 OVERVIEW Recycled Material SUBBASE COURSE Design Development Stability Durability Frost Susceptibility Strength Resistance to Pumping Material Requirements Blast Furnace Slag Substitution Allowances Recycled Portland Cement Concrete Aggregate (RCA) Reclaimed Asphalt Pavement (RAP) Glass Aggregate Corian Open-Graded Subbase Natural Base Course Stabilization Bituminous Stabilized Course Soil Cement Course SELECT GRANULAR SUBGRADE Pavement Design Development Subgrade Resilient Modulus, M r Material Requirements Substitution Allowances Subgrade Stabilization Hydrated Lime Stabilized Subgrade UNDERDRAIN FILTER MATERIAL Design Development Material Requirements Substitution Allowances SELECT GRANULAR FILL AND SELECT STRUCTURAL FILL Design Development Select Granular Fill as Pipe Backfill Select Structural Fill Material Requirements Substitution Allowances NYSDOT Geotechnical Page 7-3 June 17, 2013
4 Table of Contents 7.6 STONE FILLING AND RIP RAP Design Development Material Requirements Substitution Allowances MATERIAL ACCEPTANCE Quality Assurance (QA) Stockpile Approval Statistical Analysis of Sampling Procedure Source Approval Visual Disparity of Samples Random Location of Samples Method for Random Location Samples for Critical Structures REFERENCES NYSDOT Geotechnical Page 7-4 June 17, 2013
5 7.1 OVERVIEW Engineered granular mixes have been developed by the NYSDOT for specific engineering applications. Gradation affects many properties of an aggregate such as density, physical stability and permeability. Therefore, the grain size distribution of a material can be important in understanding its physical properties. Gradation describes the distribution of the different size groups within a soil sample. A soil may be well- or poorly-graded. Each of these materials may be desirable in different engineering applications. Well-Graded: soils containing a good range of all representative particle sizes between the largest and the smallest. All sizes must be represented, and no one size should be either overabundant or missing. Poorly-Graded: soils which either contain a narrow range of particle sizes or have some intermediate sizes lacking. o Uniformly-Graded: soils with a limited range of particle sizes. o Gap-Graded, Step-Graded, or Skip-Graded: soils that have some intermediate size or sizes not well represented or missing. In addition to grain size distribution, plasticity has a significant effect on the engineering properties of a material. The plasticity index (PI) is the size of the range of water contents where the soil exhibits plastic properties. The PI is the difference between the liquid limit and the plastic limit (see NYSDOT GDM Chapter 6). As the PI of an inorganic soil increases, so does the amount of clay. As the PI lessens towards zero, the amount of clay and silt are likewise diminished to insignificant amounts. This chapter addresses the principles and methods used in developing designs for the following applications: Subbase Course Select Granular Subgrade Underdrain Filter Material Select Granular and Select Structural Fill Stone Fill and Rip Rap In addition to developing designs of specific requirements for natural material that apply to the above engineering applications, the NYSDOT has also investigated and designed specific requirements for allowable substitutions of recycled materials. This chapter also addresses the NYSDOT Quality Assurance testing program instituted to ensure the receipt and use of quality granular materials on Departmental projects. NYSDOT Geotechnical Page 7-5 June 17, 2013
6 7.1.1 Recycled Material The policy for the use of recycled materials in engineered granular mixes is set by the Geotechnical Engineering Bureau. It is an important topic, both politically and economically. The NYSDOT strives to meet the demand to use recycled materials, but has to temper that effort with consideration of performance and operational concerns. The basic categories of recycled materials are: 1. Products containing recycled materials (i.e. snow plow blades made of recycled rubber, noise barriers consisting of recycled plastic, etc.) 2. Construction materials consisting wholly or in part of recycled materials. This category may be broken down further into two sub-categories: a. Recycled materials generated from past work performed in accordance with NYSDOT specifications, and incorporated into new NYSDOT work. Examples include reclaimed asphalt pavement (RAP) from asphalt millings, and aggregate made from crushed concrete pavement, known as recycled Portland cement concrete aggregate (RCA). b. Recycled materials generated outside NYSDOT, but proposed for incorporation into work done by or managed by NYSDOT. Examples include dredge spoils, fly ash, crushed glass, municipal solid waste (MSW) combustor ash, and shredded or chipped tires. The public, responding to reports of the devastation of the rain forest, the growing hole in the ozone layer, and other assaults on the environment, is more educated and environmentally conscious than ever. On a local level, people fight (and win) battles to close existing landfills and prevent new ones from being opened. On a national level, more stringent solid waste regulations are forcing the closing of existing landfills. Political leadership at the national and state levels are very much aware of these issues and are increasingly bringing pressures to bear on any organization or group that has any possibility of incinerating, burying, or inappropriately disposing these materials. The NYSDOT has a policy in place that permits the evaluation and use of these waste materials in a controlled manner. The use must not compromise the basic function and longevity of the infrastructure, and be able to be implemented without incurring additional costs or hardship on the taxpayers. It is important to realize that although the NYSDOT uses millions of tons of material in its projects annually, it is not feasible to totally replace natural materials with recycled materials. To be considered suitable for highway use, a waste material must exhibit the proper engineering characteristics, consistently satisfy specification requirements, provide an acceptable level of performance, be available in sufficient quantity to make the effort worthwhile, and be economically competitive with available construction materials without harming the environment. NYSDOT Geotechnical Page 7-6 June 17, 2013
7 The NYSDOT is open to the evaluation of waste material for use on NYSDOT projects. The Department will approach each evaluation objectively, and will perform the evaluation in accordance with the objectives and intent stated in the Policy statement. Waste or recycled materials used by the NYSDOT should be sound engineering materials and, when used alone or in conjunction with other materials, should provide durable, predictable performance results. These materials must satisfy specification requirements, exhibit proper engineering characteristics, provide an acceptable level of performance, and be economically competitive with naturally occurring construction materials. The continued successful use of any recycled material must be profit-driven. It will not be the NYSDOT s general policy to fund the utilization of recycled materials, except in the special case of a pilot or demonstration project. The proper evaluation and eventual acceptance of the use of any material is a gradual process. Eventual and continued acceptance will be based on evaluation of long-term performance of the facility in which the material is used. Proposed and actual use of waste or recycled materials must meet FHWA, EPA and NYSDEC regulations. For some materials, this means getting a Beneficial Use Determination (BUD) from the DEC. The use of recycled materials should be environmentally clean, and may not pose an additional hazard to the taxpayers. It is possible that such use may potentially pose a hazard or danger to workers and/or equipment during construction. The eventual approval of each specific use will depend on the successful implementation of safety procedures that minimize additional hazards to health, safety, and equipment. Evaluation and acceptance of each use of recycled materials will be based on existing quality and performance standards. However, evaluation techniques may and should be adjusted on a case-by-case basis when appropriate. Current standards are written for natural materials that are appropriate for a wide range of applications. In order to properly and fairly evaluate recycled materials, a change in thinking is necessary. Occasionally, a recycled material will perform in a similar or even superior manner to its naturally occurring counterpart, but in a more limited number of applications. Life cycle costs should be equivalent or less than those from the use of standard construction materials. Cost analyses should take into account first instance costs, maintenance costs, expected service life, and quantifiable performance characteristics. It is not acceptable to blend in even minor amounts of unsound or deleterious materials in products, pavements, or structures when such practice may adversely affect performance or lower current quality standards. NYSDOT Geotechnical Page 7-7 June 17, 2013
8 Suitable quality control/quality assurance (QC/QA) procedures should be included in all specifications using recycled materials. 7.2 SUBBASE COURSE Subbase Course is the layer of aggregate material of the pavement structure placed on the subgrade. Subbase is often the main load-bearing layer of the pavement structure. Its role is to spread the load evenly over the subgrade. This material is typically unbound granular material and is very important for the useful life of the road. Unbound an unbound granular material does not need additional admixtures for proper performance as a base course. The materials functionality is a result of its quality, designed gradation, thickness, and method of placement. Bound a bound granular material utilizes a binding agent to address deficiencies in the native granular material in order to properly perform as a base course. Common binding agents include asphalt emulsion or Portland cement. The subbase layer is typically 12 in. thick. The subbase course is used to provide support for PCC slabs and as a structural component for HMA pavements. The ideal subbase is strong, uniform, stable, frost-resistant, and free-draining. Strength is derived from the gradation of the material and its placement. Uniformity is provided by stockpiling subbase material (i.e. stockpiled material is obtained from the same source and the stockpile testing requirements are intended to ensure that the performance of the product in its final position is consistent, predictable, and meets expectations over the lifetime of the installation). The free-draining characteristic depends on the percentage of fine particles (fines). Unfortunately, a granular material derives more of its strength by packing the voids with fines. Because of the allowance of up to 10% fines and the concerted compaction effort, the subbase is considered a low-permeable layer, not free draining. Gradation of subbase material, particularly of the component passing the No. 200 sieve, is a compromise of competing needs, complicated by the availability of material statewide. Material designed to be free draining (i.e. open-graded) have lesser amounts of material passing the No. 200 sieve. However, such material can develop unstable areas and can rut during paving operations. Also, such material is not available in some areas of the state, leading to increased costs due to transport or additional processing. Subbase stability benefits from some material passing the No. 200 sieve, but too much leads to frost problems. NYSDOT s requirement of a maximum of 10% passing the No. 200 sieve, as stated in the Standard Specifications, represents a reasonable compromise that provides good stability, adequate frost resistance and sufficient drainage. Materials meeting this requirement are readily available statewide. NYSDOT Geotechnical Page 7-8 June 17, 2013
9 7.2.1 Design Development The gradations of subbase course types have been designed to be: Readily compactable in unconfined layer (i.e. well-graded, stable, etc.), Non-frost-susceptible, and Pump-resistant under Portland cement concrete pavement. The NYSDOT Standard Specification was developed to accept any kind of material that will meet all of the above requirements, eliminate various special specifications, and provide the Contractor options regarding the kind of material, gradation band, and placement as one or two courses Stability A stable base is one which is trafficable under the loads of heavy construction equipment and readily compactable with modest efforts. Advantages of having adequate stability: Subbase course better able to support construction equipment because it can physically act as a layer to a greater degree. More easily compacted and trimmed to grade. Higher subgrade resilient modulus, M r, in service under pavements (see NYSDDOT GDM Section Pavement Design Development). Because of a better granular-interlocked structure within the layer which can better resist displacement under traffic loads when saturated. Fines cannot go into suspension and move, causing differential loss of support for pavement. Based on previous statement, normal frost heaving will have little residual effect Durability Frost Susceptibility Repeated freeze-thaw cycles can weaken and, over time, break-down the pavement structure if attention is not paid to the construction materials. Spring break-up is the direct result of detrimental frost action in the subgrade soil immediately underlying the pavement of a highway. Frost action may be divided into two phases: freezing of the soil water, and thawing of the soil water. Practically all surface soils of New York State undergo some frost action, the magnitude of which is dependent upon the locally prevailing climate and rainfall. From a highway engineering standpoint, frost action becomes detrimental when either or both of the following effects result: 1. The freezing phase is accompanied by a noticeable heaving of the road surface, or 2. The thawing phase is accompanied by a noticeable softening of the road surface. NYSDOT Geotechnical Page 7-9 June 17, 2013
10 In the freezing phase, there are three conditions (all of which must exist) before frost heaving can occur: 1. A sufficiently cold climate to allow freezing temperature to penetrate below the road surface into the base and subgrade. 2. A supply of water into the freezing zone. 3. A material which is frost-susceptible and lying within the freezing zone. In the thawing phase, loss of support occurs when the bearing capacity of some layer beneath the road surface, upon thawing, is so reduced below its normal summer value that is it no longer able to properly support the overlying layers, and, consequently, displaces when a wheel load is applied to the road surface. If any one of these conditions is completely eliminated, there will be no noticeable heave. New York State is subjected to a cold climate, which obviously cannot be altered. Therefore, Condition #1 cannot be eliminated. Condition #2 can be reduced by adequate and proper drainage in the form of ditches, culverts, and underdrains. Since all bases and subgrades normally contain some moisture or water in their voids, and because this water cannot be entirely eliminated by adequate drainage facilities, particularly when such facilities are frozen and blocked with snow and ice, Condition #2 can never be entirely eliminated in our relatively humid climate. However, it is not the normal soil water which causes the spectacular and noticeable frost heaves on our highway, because water only expands 9% in volume when freezing and this water comprises only a low percentage of the soil mass. Since the normal volume of water is small, a 9% increase in such volume cannot account for the tremendous increase in volume caused by the formation of large lenses of ice in the freezing zone and as evidenced by a very noticeable heaving of the surface. Water must be supplied, usually from below and the sides, to enable these ice lenses to form. The supply of much of this water can be cut off from the freezing zone by adequate highway drainage. The importance of adequate and proper drainage facilities in reducing or minimizing frost heave cannot be overemphasized. Condition #3 mentions frost-susceptible soil within the zone of freezing. A frost-susceptible soil is one that: a. Because of the size of its particles, or gradation, i.e. the coarseness or fineness of its structure, permits and encourages the flow of water through it by capillary action, and consequently, supplies the water necessary to promote the formation of ice lenses in the freezing zone, and/or b. Because of its structural characteristics, loses a large percentage of its summer bearing capacity when the water within the soil thaws after being frozen during the winter. Actually, it is possible for some New York State soils to thus suffer a considerable reduction in summer bearing capacity, without the addition of any water, as a consequence of shifting from the freezing phase to their normal moisture content. NYSDOT Geotechnical Page 7-10 June 17, 2013
11 Soils may be divided into two groups: non-frost-susceptible and frost-susceptible. The only soils that can be considered non-frost-susceptible are very clean mixtures of open graded crushed stone. These materials drain readily by gravity to low moisture contents and, even when saturated, the freezing of the water in the voids only causes negligible expansion, and this expansion only causes a negligible decrease in bearing capacity and internal stability when the pore water thaws. The remainder of the soils of New York State are frost-susceptible to varying degrees, depending upon many factors. Frost-susceptible soils may range from those only moderately frost-susceptible, such as some glacial tills and dirty sands and gravels, to those highly frost-susceptible, such as fine sands, silts and rock flour. It is obvious that practically all of New York State has frost-susceptible soils. If frost-susceptible soil within the freezing zone were removed and replaced with a non-frostsusceptible, clean sand and gravel to the full depth of frost penetration, no heave would occur, regardless of the degree of drainage. This would be one method of preventing frost heave. However, since frost penetration ranges to a depth of 5 ft. in some areas of the State, replacing frost-susceptible soils can be very expensive. See NYSDOT GDM Section 7.3 Select Granular Subgrade. Not all frost heave is detrimental to a highway pavement. If the pavement is raised uniformly, over considerable distances by frost action, no bumps or rolls are evident and the riding qualities of the pavement are not affected. In fact, the heave is apparent to no one unless levels are taken in the summer and winter. Heaving, if uniform, is not generally destructive to the pavement, nor does it present a hazard to traffic. Heave is only destructive and troublesome when it is differential or sharply varying, during the freezing or frozen phase. Differential or local heaving is most apparent and occurs at locations such as: a. At transitions from cut to fill. b. In earth cuts where the ditches are inadequate or non-existent. c. In cuts through laminated, broken and folded rock formations. d. Over culvert pipes. e. Adjacent to driveways damming highway ditches, because the driveway culvert is blocked or non-existent. f. Wherever there is an abrupt and drastic change in subgrade material, subbase thickness, and drainage conditions. To address these potential problem areas, the NYSDOT utilizes acceptable and proven standard design and construction methods. NYSDOT Geotechnical Page 7-11 June 17, 2013
12 Strength In turning the focus from frost heave to loss of support, there are two conditions or requirements, both of which are necessary for loss of support to occur: 1. The thawing zone located within the depth of frost penetration of a frost-susceptible material. Melt water cannot drain due to the still frozen bottom layers and the soil becomes saturated and looses most of its bearing capacity (or supporting strength) such that it cannot satisfactorily support the stress of a wheel load applied to the road surface. 2. Detrimental traffic loads. If either of these conditions is eliminated, loss of support will not occur. Condition #1 can be addressed by designing and constructing any highway such that the surface will satisfactorily support, during the spring thaw, the probable traffic distribution, a certain percentage of which may impose maximum legal wheel loads. Pavements, bases and subgrades of the roads in New York State must be designed and constructed for the most critical time of the year, the spring thaw. If a road serves satisfactorily during the spring thaw each year, it will be more than adequate the rest of the year. Any method of pavement and base thickness design or determination that does not take into account frost action is not adaptable to New York State roads. In general, I. For highways on frost-susceptible soils, which includes virtually all of New York State, no pavement section; i.e. wearing course, base and subbase, should be less than 15 in. thick. This minimum thickness should only be used under optimum soil conditions, and where the anticipated traffic is very light and where no heavy truck traffic is anticipated (less than 2 million 18,000 lb. equivalent single axial load (ESAL s) over the design life). As the soil conditions become less favorable, and as the anticipated wheel loads and traffic-density increase, heavier pavement thicknesses, approaching 24 in. will be required. Highly frost-susceptible soils may require a pavement thickness as much as 36 in. II. After subtracting the thickness of the wearing course, no pavement section should have less than 12 in. of clean non-frost-susceptible granular material. The remainder of the section below this may be composed of moderately frost-susceptible granular material. III. The drainage facilities of any highway should be adequate. Generally speaking, the grade line should not be less than 48 in. above the bottom of the adjacent ditches, if feasible. If 48 in. is not feasible, 24 in. should be the minimum. IV. The design and construction of any highway should include those features necessary to eliminate abrupt changes in subgrade material and drainage conditions in order to minimize local frost heaves, bumps, and rolls. NYSDOT Geotechnical Page 7-12 June 17, 2013
13 In regard to the above suggestions, the specifications for the non-frost-susceptible material should require a natural or processed clean sound sand and gravel, having from 30% 65% passing the ¼ in. sieve and absolutely not more than 10% passing the No. 200 sieve. The upper portion of the non-frost-susceptible material layer may consist of broken stone, but the bottom portion should be a well-graded material to prevent migration of the fines from the subbase or subgrade into the broken stone. The specifications for the moderately frost-susceptible granular material should require that not more than 70% pass the No. 40 sieve and not more than 15% pass the No. 200 sieve. Condition #2, detrimental traffic loads, can be addressed by limiting the wheel loads allowed on any road, during the spring thaw, to that value which experience has shown to be the maximum the road will satisfactorily support. This may be an option on Local roads where moneys available in the town budget, for highway purposes, are insufficient to provide for the construction of highways having the pavement thickness and drainage facilities necessary to minimize spring break-up under unrestricted, but legal, wheel loads. Counties may resort to posting certain vulnerable roads, in order to prevent their destruction during the spring thaw. As with any other law, the effectiveness of the various sections of the Vehicle and Traffic Law is only as good as enforcement and the cooperation of the public. Posting certain roads, and thereby excluding from these roads vehicles imposing wheel loads that would be detrimental to them during the spring thaw, has been successful in certain areas Resistance to Pumping Pumping under Portland cement concrete pavement with intact joints should not occur with any acceptable gradation under the specifications because the stability requirements are more severe than the requirements to avoid pumping Material Requirements The NYSDOT Standard Specifications provide the material requirements for subbase course. The old, and still commonly used, term Item 4 was discontinued in There are four different subbase types based on materials, processing, and/or placement location. For Types 1, 3 and 4, the materials consist of approved Blast Furnace Slag, Stone, Sand, and Gravel, or blends of these materials. For Type 2, the materials consist of approved Blast Furnace Slag or of Stone which is the product of crushing or blasting ledge rock, or a blend of Blast Furnace Slag and of Stone. NYSDOT Geotechnical Page 7-13 June 17, 2013
14 Sieve Size Percentage Passing by Weight Designation Type 1 Type 2 Type 3 Type 4 4 in in in ¼ in No No Blast Furnace Slag Table 7-1 Subbase Gradation for Various Types Blast furnace slag is formed when iron ore or iron pellets, coke and a flux (either limestone or dolomite) are melted together in a blast furnace. ASTM C125 Definition of Terms Relating to Concrete and Concrete Materials defines blast furnace slag as the non-metallic product consisting essentially of silicates and alumino silicates of calcium and other bases that is developed in a molten condition simultaneously with iron in a blast furnace. During the period of cooling and hardening from its molten state, different forms of slag products are produced such as air-cooled blast furnace slag (ACBFS), expanded or foamed slag, pelletized slag, and granulated blast furnace slag. Both ACBFS and expanded blast furnace slag can be used as a conventional aggregate in embankment fill and subbase. This material requires minimal processing to satisfy conventional soil and aggregate engineering requirements. However, the history of the use of blast furnace slag in New York State includes only minimal implementation, solely in Region 5, and is now seldom used due to limited availability. Blast furnace slag is considered an exempt hazardous waste under 6 NYCRR Part Identification and Listing of Hazardous Wastes, (e) (2) (iv) Substitution Allowances The following materials are an acceptable replacement for Types 1, 3 and 4. Only one alternate shall be selected for use per stockpile. Alternate A: Recycled Portland Cement Concrete Aggregate (RCA) where the material is at least 95%, by weight, of RCA and is free from organic and other deleterious material. This material may contain up to 5% by weight asphalt pavement and/or brick. Alternate B: Recycled Portland Cement Concrete Aggregate (RCA) where the material is a mixture of RCA with stone, sand, gravel or blast furnace slag. This material may contain up to 5% by weight asphalt pavement and/or brick. NYSDOT Geotechnical Page 7-14 June 17, 2013
15 Alternate C: Reclaimed Asphalt Pavement (RAP) having a maximum top size of 2 in. at the time of placement. Alternate D: Blends of Blast Furnace Slag, Stone, Sand, and Gravel, with not more than 30% by weight of glass. Glass shall be crushed to a maximum particle size of ⅜ in. Alternate E: Blend of Alternate A with not more than 5% by weight of Corian having a maximum top size of 2 in. Alternate F: Blend of Alternate B with not more than 5% by weight of Corian having a maximum top size of 2 in Recycled Portland Cement Concrete Aggregate (RCA) Crushed Portland cement concrete from highway reconstruction projects or construction demolition sites is trucked to an aggregate supplier equipped with crushers, and processed into recycled Portland cement concrete aggregate (RCA). After processing, the recycled material is very similar to granular material obtained from naturally occurring sources. Since the early 1990 s, the growth in the use of RCA as subbase material indicates that it is an economical resource in its own right. Contractors pay Producers to accept Portland cement concrete debris, and later purchase RCA from Producers at a lower cost than for other granular materials. In 1988 New York State passed the Solid Waste Management Act, regulating the use of RCA. This law could have considered the placement of this material to be construed as creating a landfill, subjecting its use to a permitting process with a lengthy checklist for control procedures. However, because this material had been successfully used since 1982, the NYSDEC considers RCA to be essentially free from contaminants. RCA (and RAP and glass in subbase) are considered to be pre-determined BUDs in regulation 6 NYCRR (b)(5) and (b)(11). Producers only need to obtain a license and can then file for a beneficial use exemption for the permitting process Reclaimed Asphalt Pavement (RAP) The NYSDOT makes economical use of reclaimed asphalt pavement (RAP), the asphalt-cement concrete removed by milling machines during pavement rehabilitation. These millings, with the consistency and appearance of a stabilized granular material, are usually of sufficient quality and meet performance requirements. This material can be used as an unbound subbase material, but is more common as an aggregate in Hot Mix Asphalt (HMA) or Cold Mix Asphalt (CMA). RAP has proven to be a valuable component to these mixes. RAP (and RCA and glass in subbase) are considered to be predetermined BUDs in regulation 6 NYCRR (b)(5) and (b)(11). NYSDOT Geotechnical Page 7-15 June 17, 2013
16 Glass Aggregate Glass aggregate and blends thereof are strong, safe, and economical. The main source of crushed glass utilized in the construction industry is via glass cullet. Glass cullet is comprised of the mixed colored glass fragments resulting from the breakage of colored glass containers, typically collected at Municipal Recovery Facilities (MRFs). Glass cullet, if properly sized and processed, can exhibit characteristics similar to that of gravel or sand. In 1991, Executive Order #142 directed all State Agencies to make maximum use of recycled materials. In 1994, the NYSDOT issued an Engineering Bulletin (EB ) allowing crushed glass to be recycled on construction projects as a substitute for natural aggregates as part of a blended product. Subbase material may be a blend of Blast Furnace Slag, Stone, Sand, and Gravel, with not more than 30% by weight of glass. In addition, glass may be incorporated into embankments if it is thoroughly mixed with other suitable material so that glass constitutes no more than 30% by volume anywhere in the embankment. Glass additions in subbase (and RCA and RAP) is considered to be pre-determined BUD in regulation 6 NYCRR (b)(5) Corian Corian sheet and shape production lines produce many colors throughout the day and week. Each time a line is started up, shut down, or transitions between colors a quantity of liquid mix ( lbs.) is diverted from the casting machine to a container where it cures. When the new color has purged the old color from the filling hose the flow is returned to the casting machine. This material is collected in purge drums where it solidifies and is landfilled. The composition of the material is identical to Corian sheets and shapes (tested for BUD No ). Shape drums: always solid, white or off white. These drums are loaded directly into a roll-off container and landfilled. Sheet drums: many different colors. Sometimes they expand (look like head on a draft beer) during cure based on temperature. The sheet purge drums are currently taken to a facility where they are broken with a hydraulic hammer to ensure no drums have soft centers. The material is then loaded into a roll-off container and taken to a landfill. The shape purge drums are transported to a facility in roll-off containers for grinding and recycling under BUD No Prior to grinding, all material is downsized with a hydraulic hammer on a steel plate adjacent to the Corian collection area. The material is downsized to facilitate grinding in the horizontal impact crusher. This material is ground, screened and used per the BUD. NYSDOT Geotechnical Page 7-16 June 17, 2013
17 7.2.3 Open-Graded Subbase As stated previously, because of the allowance of up to 10% fines, subbase is considered a lowpermeable layer and is not free-draining. To address situations where this attribute will be detrimental to the pavement structure (e.g. natural occurring springs or very shallow watertable), the NYSDOT has developed requirements for an open-graded subbase course. A special specification provides the material requirements for the open-graded subbase course. Sieve Size Designation Percentage Passing by Weight 1 ½ in. 100 ½ in ¼ in No Table 7-2 Open-Graded Subbase Gradation Some permeability testing has been performed on samples taken from construction projects. Permeability test results provide an approximate value of 100 ft./day as compared to the NYSDOT Standard Specification which averages approximately 2 ft./day or less as computed in Figure 7-1. Utilizing the permeability of 2 ft./day, it would take a drop of water 11 days to travel from the centerline of a normal-crowned pavement to the outside of a 10 ft. shoulder versus approximately 5 ⅓ hours using a permeability of 100 ft./day. This material has some inherent disadvantages which should be reviewed prior to specifying its use: Material becomes unstable if utilized unprotected in the direct support of traffic loads in a work zone traffic control pattern, particularly where starting and stopping of vehicles occur. Supply is limited, particularly where there are no quarries nearby. Suppliers can find it challenging to make the material because it requires a change in their normal operation. Use in certain conditions such as pavement widening results in a non-uniform pavement section. This could result in differential frost heaves, particularly in the northern portion of New York State. NYSDOT Geotechnical Page 7-17 June 17, 2013
18 Figure 7-1 Nomograph for Estimating Coefficient of Permeability of Granular Drainage and Filter Materials (NCHRP Synthesis #96: Pavement Subsurface Drainage Systems) NYSDOT Geotechnical Page 7-18 June 17, 2013
19 7.2.4 Natural Base Course Stabilization The NYSDOT has investigated the use of bound native aggregates as a cost-effective means for rehabilitating low to medium traffic volume highways. When the native aggregate is not of satisfactory gradation for compliance with the subbase specification, it may be blended with an additive in order to stabilize the mix. Note that although the Standard Specifications contain requirements for natural base course stabilization, these methods have not been used by the NYSDOT since the early 1980 s Bituminous Stabilized Course The NYSDOT Standard Specifications contain the requirements for mixing and placing this stabilized material. Bituminous stabilization refers to a process by which a controlled amount of bituminous material is thoroughly mixed with an existing granular material to form a stable base. Bitumen increases the cohesion and load-bearing capacity of the granular soil. Each stockpile of granular material used for a stabilized course must be evaluated by the Geotechnical Engineering Bureau to determine an appropriate application rate. Geotechnical Control Procedure GCP-16 establishes the State-wide procedure for the recommended application rate of additive(s) and for inspection and calibration of soil stabilization plants. This process has not been used by the Department since the 1980 s Soil Cement Course The NYSDOT Standard Specifications contain the requirements for mixing and placing this stabilized material. Soil cement, a.k.a. cement-modified soil or cement-treated aggregate base, is a dense, highly compacted mixture of aggregate, Portland cement, and water. The stiffness of the soil cement course acts to distribute loads over a wider area, reducing subgrade stresses and allows the base to maintain its original grade. This process has not been used by the Department since the 1980 s. 7.3 SELECT GRANULAR SUBGRADE The subgrade is the foundation for the pavement structure. In cut situations, the subgrade is comprised of the subgrade surface. In fill situations, the subgrade is comprised of not only the subgrade surface but also the subgrade area. Figure 7-2 provides a road section, segmented into a cut and fill situation, identifying the subgrade surfaces and subgrade area respectively. Controls are imposed on the materials placed within the subgrade area. NYSDOT Geotechnical Page 7-19 June 17, 2013
20 Figure 7-2 Road Section Depicting Subgrade Surface and Subgrade Area Subgrade Surface: the surface of the road section upon which the select materials and/or subbase are placed. Subgrade Area: that portion of an embankment situated above either of the following: A. A line located 2 ft. below the subgrade surface and extended to the intersection with the embankment side slopes or, B. The embankment foundation, whichever is higher. Embankment Foundation: the surface upon which an embankment is constructed after all of the following preparation work is completed: A. Clearing and grubbing, B. Removal of structures and obstructions, C. Sod and topsoil removal (if required), D. Unsuitable material removal (if required), E. Construction lift (working platform, if required), and F. Benches. The purpose of the subgrade area is to provide a uniform, stable platform on which to place the pavement structure and to minimize differential frost heaves. Methods to improve the subgrade area are as follows: 1. Reduce the amount of water in the subgrade area. Improve drainage by creating roadside ditches to a depth of 4 ft., measured from the pavement edge to the ditch flow line. Underdrains and crushed stone trenches may be used to lower the water table in cut sections. Also note when modifying a ditch cross section, that it is important to consider the traversability of the section relative to the design clear zone. 2. Minimize differential frost heaves or increase load-bearing capacity. The most common method is to remove (undercut) unstable (saturated) materials and replace them with select granular subgrade material. NYSDOT Geotechnical Page 7-20 June 17, 2013
21 Subbase material alone or in combination with a geotextile may also replace removed material. Rock in the subgrade area is either removed or is fragmented and drained (called Rock Subgrade Fragmentation). Transition sections at culverts and in boulder removal areas are also used to provide uniformity. 3. Stabilize subgrade. Stabilize the subgrade with rollers that are 30 to 50 ton proof-roller type compactors. Mix in-situ material to break up stratified layers into more uniform material. Clayey soils can be stabilized by adding lime. If subgrade improvement appears warranted, the Designer should always contact the Regional Geotechnical Engineer for subgrade improvement recommendations Pavement Design Development Subgrade Resilient Modulus, M r The subgrade resilient modulus, M r, is a measure of the stiffness of the subbase and subgrade soils. It is a necessary component for determining the pavement thicknesses of HMA pavements. The higher the M r, the stronger the subgrade soil, and the better support it will provide to the pavement. The Designer should contact the Regional Geotechnical Engineer to obtain a value for the subgrade resilient modulus, M r. For reconstruction projects, M r values can be determined by either taking soil samples (by comparing blow counts with visual descriptions) or Falling Weight Deflectometer (FWD) testing along the proposed project route. FWD testing is conducted by the Highway Data Services Bureau of the Office of Technical Services. For new projects or widenings, M r values can be found by taking soil samples. As indicated in Table 7-3, M r values below 4,000 psi may signify a fine-grained soil. Poorly drained soils will also have lower M r values. M r values below 3,000 psi indicate soft soil, probably with poor drainage, and offers weak subgrade support. M r values from 5,000 to 7,000 psi are characteristic of fine to medium-grained soil and are typical values for most NYS roadway subgrades. NYSDOT Geotechnical Page 7-21 June 17, 2013
22 Soil Type Strength Resilient Modulus, Friction Angle 1 (deg.) Cohesion (psf) M r (psi) Gravel (HB 20+) None 9000 Sandy Gravel (LB10-) Sand (HB 15+) None 7000 Silty Sand (LB10-) Silt (HB 15+) None 6000 Sandy Silt (LB10-) Clayey Silt (HB 10+) Silty Clay (LB10-) Clay None (HB 10+) (LB10-) Organic Silt None None NA Peat None None NA 1 HB= High Blows LB= Low Blows Table 7-3 Resilient Modulus, M r, for Various Soil Types Material Requirements The NYSDOT Standard Specifications provide the material requirements for select granular subgrade. The material consists of rock, stone, slag, cobbles, or gravel, substantially free of shale or other soft, poor durability particles. Well-graded rock may be used for this item with particles not exceeding 12 in. in its greatest dimension nor ⅔ of the loose lift thickness, whichever is less. All materials, other than well-graded rock, furnished under this item have no particles greater than a 6 in. maximum dimension. For the portion passing the 4 in. square sieve, the material meets the gradation provided in Table 7-4. Sieve Size Designation Percentage Passing by Weight ¼ in No No Table 7-4 Select Granular Subgrade Gradation NYSDOT Geotechnical Page 7-22 June 17, 2013
23 Substitution Allowances The following materials are an acceptable replacement for natural material: Alternate A: Recycled Portland Cement Concrete Aggregate (RCA) where the material is at least 95%, by weight, of RCA and is free from organic and other deleterious material. This material may contain up to 5% by weight asphalt pavement and/or brick. Alternate B: Recycled Portland Cement Concrete Aggregate (RCA) where the material is a mixture of RCA with stone, sand, gravel or blast furnace slag. This material may contain up to 5% by weight asphalt pavement and/or brick. Alternate C: Reclaimed Asphalt Pavement (RAP) having a maximum top size of 2 in. at the time of placement. RCA is described in NYSDOT GDM Section Recycled Portland Cement Concrete Aggregate (RCA) and RAP is described in NYSDOT GDM Section Reclaimed Asphalt Pavement (RAP) Subgrade Stabilization Hydrated Lime Stabilized Subgrade The NYSDOT Standard Specifications contain the requirements for the in-place mixing of hydrated lime with the existing subgrade material to produce a stabilized pavement foundation course. The introduction of lime can have positive short-term and long-term effects on certain types of soils. Short-term effects include soil modification of plasticity and swell reduction and a drying effect. Long-term effects include soil stabilization resulting from a prolonged pozzolanic reaction generating a strength gain. The area to be stabilized is graded and shaped and then scarified and pulverized to accept the lime. If the depth of lime stabilization exceeds 6 in., the subgrade soil in excess of the 6 in. depth is removed, placed in windrows and processed as an additional lift. The hydrated lime is applied to the pulverized material by the approved method and rate. The spreading equipment is to uniformly distribute the lime without excess loss. The primary mixing operation is completed within four hours after application of the lime. The hydrated lime is to be uniformly incorporated into the subgrade to the full depth of treatment in such a manner that the result is a homogeneous, friable mixture of subgrade soil and lime, free from clods or lumps. Immediately after the primary mixing operations are completed for the full depth of treatment, the surface of the subgrade is shaped and lightly sealed with a pneumatic-tired or smooth steel wheel roller. The surface is crowned so as to properly shed water if rain occurs. NYSDOT Geotechnical Page 7-23 June 17, 2013
24 Following primary mixing operations, the stabilized course is allowed to cure to allow the lime to properly react with the subgrade soil. During the curing period, the surface of the material is kept moist to prevent drying and cracking, and maintained in a properly sealed and crowned condition. Immediately after the completion of the curing period, the stabilized course is completely mixed and pulverized to the full depth of stabilization. Secondary mixing continues until the material is properly mixed and blended. Once complete, the surface of the treated subgrade is kept continuously moist until the subbase course material is to be placed and compacted This process has not been used by the Department since the 1980 s. 7.4 UNDERDRAIN FILTER MATERIAL Underdrains are narrow trenches filled with clean aggregate material that is both pervious to water and capable of protecting the trench from infiltration by the surrounding soil. See GDM Chapter 20 for more information on groundwater depletion drains Design Development A filter pack is an envelope of sand or gravel, which is designed and placed to separate surrounding material from entering a particular subsurface zone while permitting the free-flow of groundwater. Filter pack design is based on filter criteria originally proposed by Terzaghi (US Army Corps of Engineers, 1941 see Johnson, 1963). The design process involves the following: Permeability Criterion: The particle diameter of the 15 percent size of the filter material (d 15f ) should be at least four times as large as the diameter of the 15 percent size of the soil material (d 15s ) see NYSDOT GDM Chapter 20: Equation 7-1 d15 f 4 d15s This requirement would make the filter material roughly more than ten times as permeable as the soil. Retention or Stability Criterion: The 15 percent size of the filter material (d 15f ) should not be more than four times as large as the 85 percent size of the soil material (d 85s ) see NYSDOT GDM Chapter 20: NYSDOT Geotechnical Page 7-24 June 17, 2013
25 Equation 7-2 d15 f 4 d85s This requirement would prevent the fine soil particles from washing through the filter material. The gradations of the underdrain filter materials have been designed to adequately filter the varying New York State subgrade materials (subsoils). The following is a list of applicable underdrain materials: Underdrain Filter Material, Type 1 used to filter existing subsoils of a well-graded mixture, predominately consisting of Sandy GRAVEL or Gravelly SAND. Underdrain Filter Material, Type 2 - used to filter existing subsoils of a well-graded mixture, predominately consisting of Silty FINE SAND or a Sandy SILT. Underdrain Filter Material, Type 3 - used to filter existing subsoils of a well-graded mixture, predominately consisting of SILT or CLAY Material Requirements The NYSDOT Standard Specifications provide the material requirements for underdrain filter material. There are three different underdrain filter material types whose applications are based on the existing subsurface soils to be drained. The underdrain filter material consists of crushed stone, sand, gravel, or screened gravel meeting the gradations provided in Table 7-5. Sieve Size Percentage Passing by Weight Designation Type 1 Type 2 Type 3 1 in ½ in ⅜ in. 100 ¼ in No No No No No No No No No. 200 (wet) 0-3 Table 7-5 Underdrain Filter Material Gradation NYSDOT Geotechnical Page 7-25 June 17, 2013
26 Substitution Allowances The following material is an acceptable replacement for Types 1 or 2. Alternate A: Crushed glass backfill meeting the gradation requirements of Table 7-6. Sieve Size Designation Percentage Passing by Weight ½ in. 100 ⅜ in No Table 7-6 Underdrain Filter Material, Glass Substitution Gradation Glass aggregate is described in NYSDOT GDM Section Glass Aggregate. Alternate B: Corian backfill meeting the gradation requirements of Underdrain Filter Material, Types 1 or 2 (see Table 7-5). Corian is described in NYSDOT GDM Section Corian. 7.5 SELECT GRANULAR FILL AND SELECT STRUCTURAL FILL Select granular fill is typically used as pipe backfill. The design of a buried pipe assumes a certain response to loads from a pipe/soil composite structure. Proper controls of the trench excavation, pipe laying, pipe joining and backfill compaction are essential to the success of the installation. The type of backfill material and its proper compaction are likely to dominate the structural performance of both pipe and soil. The desired constant pressure around the pipe and uniform support of the pipe in the longitudinal direction are the major objectives of a successful installation. Select structural fill is typically used as abutment or retaining wall backfill. The design of an abutment or retaining wall is developed to resist anticipated loads based primarily on the material properties of the backfill soil. The material placed behind an abutment or retaining wall must be a select, free-draining, granular material. Retaining walls are commonly designed to resist the active earth pressure development by the select structural fill on the wall. Select granular fill and select structural fill have the same material requirements. The need for two separate item numbers is a derivation of Engineering Shares a grouping of items that relate to one another in some way (e.g. items that are all associated with a highway, bridge, specific work site location or items to be paid for with specified funds such as Federal Aid or a utility). Highway work is typically designed, detailed and estimated by a Design Squad, whereas Bridge work is typically designed, detailed, and estimated by a Structures Squad. The highway work typically includes pipe installations, which require appropriate backfill material. The bridge work NYSDOT Geotechnical Page 7-26 June 17, 2013
27 typically includes abutment construction, which requires appropriate backfill material. Although the appropriate backfill material is the same for both applications, the quantities (and the two shares) are kept separate to eliminate any miscommunications regarding how items are being paid for in the final contract document Design Development Select Granular Fill as Pipe Backfill The performance of pipe installations depends largely on the quality of the compacted fill in the embedment zone. The denser the fill, the more likely surcharge and live wheel loads will be distributed away from the pipe by the adjacent soil. In addition, the denser the fill, the less likely pipe deformation will occur. Select granular fill used as pipe backfill material is identified in Figure 7-3 as the pipe Embedment. This area encompasses the pipe and defines the pipe/soil composite structure. Figure 7-3 Pipe Terms (Corrugated Polyethylene Pipe & Installation Guide, Plastic Pipe Institute ) NYSDOT Geotechnical Page 7-27 June 17, 2013
28 Using the terms identified in Figure 7-3 for the Embedment material: Bedding: Bedding material is required to establish line and grade and to provide firm pipe support. Uniformity of the underlying soil that forms the trench bottom avoids stress concentrations and irregular pipe deformations that non-uniformity may cause. Differential settlements may compromise the structural integrity of a buried pipe. A proper foundation is the starting point for eliminating that possibility. To ensure uniformity, the trench bottom is over-excavated and replaced with a layer of properly compacted bedding material for the full width of the trench. This also eliminates the potential of large protruding boulders exerting point loads on the pipe. The bedding control line (BCL) is a horizontal line located below the invert which represents the bottom elevation for bedding material placement and top elevation of undercut backfill, where required. The location of the BCL and the actual bedding thickness vary with pipe size and wall thickness. See Standard Sheet Installation Details for Reinforced Concrete Pipes and Standard Sheet Installation Details for Corrugated and Structural Plate Pipe and Pipe Arches. Haunch: The haunching area of the pipe/soil composite structure provides the majority of the resistance against soil and traffic loadings. The backfill in the haunch area should be shoveled and hand-tamped with a haunch tamping tool to ensure that no voids remain. Figure 7-4 Haunch Support Initial Backfill: Initial backfill materials must provide adequate pipe support and protect the pipe from stones or cobbles in the final backfill. The extent of the initial backfill material depends on the location of the subgrade surface. The embedment s select granular fill is extended 12 in. above the top of pipe, or to the subgrade surface, whichever is less. NYSDOT Geotechnical Page 7-28 June 17, 2013
29 Final Backfill: If the top of the pipe embedment is lower than the subgrade surface, then final backfill material is placed above the pipe embedment material to meet the subgrade surface. The material used for final backfill material is suitable excavated material from the trench excavation. Select granular fill has been developed to be an integral part of the pipe/soil composite structure given the variety of performance requirements it must meet while addressing the various types of pipes available for use Select Structural Fill Satisfactory performance of fill type retaining walls is a result of accurately predicting load configurations for the site-specific design analysis and obtaining and installing construction materials corresponding to the design analysis assumptions. Load vectors and weight counterbalances for fill type retaining walls are largely dependent on the soil properties of the compacted fill placed directly behind (and on top of the heel, if appropriate) the wall. Figure 7-5 Forces on an Earth Retaining System (Earth Retaining Systems, GEC No. 2) NYSDOT Geotechnical Page 7-29 June 17, 2013
30 The process of slow, continuous deformation or yielding of a soil mass under constant stress is defined as soil creep. It is known that nearly all soil structures undergo a certain amount of creep. The rate of soil creep depends on factors such as the gradient, water absorption and content, type of material, etc. To address these factors, backfill material for fill type retaining walls ideally consists of relatively free-draining sands and gravels (i.e. cohesionless soils). These soils drain rapidly, are not susceptible to excessive frost action, nor creep movements, and are easily placed and compacted in confined areas. A certain amount of water offers cohesion to the sand, which binds the sand particles together. However, the presence of too much water fills the voids between the grains creating a slip plane between the particles. As mentioned above, this is addressed by utilizing a free-draining backfill material and providing a positive drainage outlet. In contrast, cohesive backfills are difficult to compact. Additionally, in order to design a wall with cohesive backfill, extreme caution is necessary in selecting pressures between the active and at-rest cases (to assume the most unfavorable condition). Cohesive backfills designed for active earth pressures will continue to move gradually (creep) throughout the structures lifespan as it is exposed to water, either through rainwater percolation or rising groundwater elevation. The creep of the cohesive backfill is caused by the expansion of materials when they are exposed to water. Clay expands when wet, then contracts after drying. The expansion portion exerts pressure while the contraction results in consolidation at the new offset (hence movement). Select structural fill has been developed to be an integral part of the fill type retaining wall system by providing predictable soil parameters for use in the design of the various types of structures, e.g. concrete cantilever (cast-in-place or precast), gravity, or prefabricated wall systems Material Requirements The NYSDOT Standard Specifications provide the material requirements for select granular and select structural fill. There are two different types of select granular fill whose applications are based on the type of pipe the material will be supporting. In addition, some pipe material requires a complete substitution from select granular fill (e.g. plastic water main installations utilize Sand Backfill as depicted on Standard Sheet Water Main Pipe Installation Details). Select granular and select structural fill material meet the gradation requirements of Table 7-7 and consist of rock, stone, slag, cobbles, or gravel, and are substantially free of shale or other soft, poor-durability particles. Sand Backfill material gradation has also been included in Table 7-7. NYSDOT Geotechnical Page 7-30 June 17, 2013
31 Sieve Size Designation Typical Select Granular Fill or Select Structural Fill Select Granular Fill used as Backfill for Corrugated Aluminum Pipe Sand Backfill used as Backfill for Plastic Water Main Percentage Passing by Weight Percentage Passing by Weight 4 in in. 100 ½ in. 100 ¼ in No No Percentage Passing by Weight Table 7-7 Select Granular Fill, Select Structural Fill, and Sand Backfill Material Gradation Substitution Allowances The following materials are an acceptable replacement for natural material: Alternate A: Recycled Portland Cement Concrete Aggregate (RCA) where the material is at least 95%, by weight, RCA and is free from organic and other deleterious material. This material may contain up to 5% by weight asphalt pavement and/or brick. Alternate B: Recycled Portland Cement Concrete Aggregate (RCA) where the material is a mixture of RCA with stone, sand, gravel or blast furnace slag. This material may contain up to 5%, by weight asphalt pavement and/or brick. RCA is described in NYSDOT GDM Section Recycled Portland Cement Concrete Aggregate (RCA). 7.6 STONE FILLING AND RIP RAP Bank and Channel Protection design addresses the construction of blankets and walls of erosionresistant materials to prevent undesirable erosion of earth exposed to flowing water. Unchecked erosion can damage and destroy highways, bridges, culverts and other facilities. Therefore, it is important to construct the protective works such that they will fulfill their mission. In preparing the design of a highway project, the Designer usually has to design channels to carry water. Such channels range from small roadside drainage ditches or gutters to major river relocations. In addition, highway embankments and structures often have to be located in or adjacent to existing rivers, streams, lakes, reservoirs or other bodies of water. NYSDOT Geotechnical Page 7-31 June 17, 2013
32 A newly constructed channel or a natural channel modified by man will generally experience accelerated erosion of the banks and scour of the bottom at some locations, while sediments will be deposited at others. A channel may be modified by changing its width or alignment, or by construction in or adjacent to the channel which will alter the natural flow boundaries at any flow stage. Failure to consider in design the erosive power of water may have the following adverse consequences: Damage to, or destruction of, the facility. Damage to adjacent property. Pollution of surface waters by eroded soils. Stone fill lining is a cluster of stone satisfying rather tight dimensional limits, positioned into a lining either by dumping or individually placing the stones in such a manner that the stones resting on the foundation soil or bedding layer, support other stones. As a result, the lining consists of more than a single layer of stones, and the underlying material is not exposed if downslope creep takes place or individual stones are displaced by ice action. An additional advantage of stone lining, under certain conditions, is its coarse surface texture which dissipates the energy of water flowing over it, thus reducing its velocity. The erosion resistance of stone linings depends on the average size of the stone, gradation, surface roughness and on channel geometry. Rip rap is individual stones placed in a single layer on the surface to be protected. Rip rap is placed to prevent scour or erosion of the bed, banks, shoreline of streams or rivers or near structures such as bridge abutments or piers. It is positioned in a well-knit, compact, uniform layer to achieve suitable hydraulic performance and maintain stability against hydraulic loading. Rip rap is intended to absorb and deflect the hydraulic energy before it reaches the defended structure Design Development Geotechnical Design Procedure (GDP-10) Bank and Channel Protective Lining Design Procedures provides the designer with guidelines for erosion-resistant design. The gradations of stone filling have been designed to be able to resist a range of forces exerted by the water while also preventing the washing out of underlying materials through the openings between particles. The flow velocity for a given stone size depends also on the flow conditions (uniform, gradually varying or rapidly varying) which are determined by the curvature of the channel alignment and the presence of obstructions in the channel. The gradation of stone filling (fine), stone filling (light), and bedding material are obtainable from rock cuts or stone quarries with a minimum of processing. Stone filling is an especially economical material if it can be obtained within the limits of the project (on site). The suitability of the excavated rock for stone filling items should be evaluated during design by the Departmental Geotechnical Engineer or a Departmental Engineering Geologist. NYSDOT Geotechnical Page 7-32 June 17, 2013
33 There is a benefit in having a well-graded stone fill as lining material, with individual stones ranging from a size equal to the thickness of the lining down to 1 in. spalls. This type of material forms its own filter that prevents the underlying finer materials from washing out through the lining and thoroughly chinks the stone together. Experiments referred to in NCHRP Report 108, Tentative Design Procedure for Rip-Rap-Lined Channels, HRB, 1970, indicate that a wellgraded dumped stone lining can be considerably thinner than a uniformly graded dumped stone lining and will still provide equivalent protection against washing out of the underlying material Material Requirements The NYSDOT Standard Specifications provide the material requirements for stone fill and rip rap. Stone fill and rip rap material is obtained from an approved source and inspected by an Engineering Geologist. Geotechnical Control Procedure (GCP-14) Procedure for Control of Stone Filling and Rip Rap Items provides the procedures to be followed for the control of the gradation and soundness requirements of these items. Particles sizes and gradations for stone filling are identified in Tables 7-8 and 7-9. Stone Filling Item Fine Light Medium Heavy Stone Size Percent of Total by Weight Smaller than 8 in Larger than 3 in Smaller than No. 10 sieve 0-10 Lighter than 100 lbs Larger than 6 in Smaller than ½ in Heavier than 100 lbs Smaller than 4 in Heavier than 600 lbs Smaller than 6 in Table 7-8 Stone Filling Gradation NYSDOT Geotechnical Page 7-33 June 17, 2013
34 Specified Weights and Sizes 600 lbs. d=18 in. d=23 in. d=15 in. d=23 in. d=27 in. 300 lbs. d=15 in. d=18 in. d=12 in. d=18 in. d=21 in. 150 lbs. d=12 in. d=15 in. d=9 in. d=15 in. d=17 in. 100 lbs. d=10 in. d=13 in. d=8 in. d=13 in. d=15 in. d = 8 in. 50 lbs. 25 lbs. 100 lbs. 25 lbs. 16 lbs. d = 6 in. 20 lbs. 10 lbs. 40 lbs. 10 lbs. 7 lbs. Table 7-9 Stone Filling Approximate Shape to Weight Correlations Particle sizes and gradations for rip rap (identified in Table 7-10) are more particular to address placement, interlocking and development of a specific overall surface. The material is to consist of stones shaped as nearly as practicable in the form of right rectangular prisms. One dimension of each of the stones furnished is to be at least equal to the thickness of the rip-rap identified by the Designer. Stone Weight Gradation Spread Heavier than 300 lbs percent of total by weight 100 lbs. 300 lbs. Remainder of stones Substitution Allowances Table 7-10 Rip Rap Gradation The following materials are an acceptable replacement for fine stone fill and light stone fill: Air-cooled blast furnace slag, cobbles or gravel having at least one fractured face per particle are acceptable substitutes for stone under these items, provided that the soundness and gradation requirements are met. 7.7 MATERIAL ACCEPTANCE The purpose for sampling and testing construction materials is to determine the physical properties. For engineered granular mixes, the Contractor shall furnish the Engineer, at the preconstruction meeting, the sources of supply, types and contract pay item(s) of materials which it proposes to use in the work in order to ensure that the materials are obtained from approved sources or that required inspection or approval will be completed in a timely manner. NYSDOT Geotechnical Page 7-34 June 17, 2013
35 All materials used in the work are to meet the quality requirements described in Standard Specification Section 733 Earthwork Materials. Materials are inspected, sampled, and tested by the procedural directives issued by the Department, specifically Geotechnical Control Procedure (GCP-17) Procedure for the Control and Quality Assurance of Granular Materials. The initial acceptance of a material in no way precludes further examination and testing of the material at any time the Engineer suspects that the material is no longer properly represented by the accepted sample. The acceptance at any time of any materials will not bar its future rejection if it is subsequently found to be defective in quality or uniformity. Ideally, the engineered granular mix is controlled during its manufacturing and/or processing by a quality control (QC) program. The purpose of the Supplier s QC program is to provide data on the physical properties of the material and to allow adjustments to their operations to comply with the specification requirements. However, the Department s level of confidence in the supplied engineered granular mix is low if there is no exchange of information regarding operations, no ability to control and/or monitor sampling intervals, or no guarantee in delivery of the specifically processed engineered granular mix to the specific project location. Additional steps are required to boost the level of confidence. Quality Assurance (QA) is defined by the American Association of State Highway and Transportation Officials (AASHTO) as all those planned and systematic actions necessary to provide confidence that a product or facility will perform satisfactorily in service Quality Assurance (QA) Quality assurance (QA) refers to the overall system for ensuring project quality. The core elements of a QA program consist of: Contractor/Supplier QC Personnel Qualification/Certification Laboratory Accreditation/Qualification Independent Assurance Agency/Owner Acceptance Dispute Resolution The NYSDOT has established a QA Program in accordance with 23 CFR 637 to ensure the materials and workmanship incorporated into each Department project are in conformity with the approved plans and specifications. The controls for the various construction materials are specific to the type and application. The material types are sensitive to permeability, segregation and contamination and the requirements are intended to ensure that performance of the product in its final position is consistent, predictable, and meets expectations over the lifetime of the installation. For example, subbase material must have similar drainage and stability characteristics both longitudinally and between the roadbed limits so that the pavement structure is adequately and uniformly drained and supported. Similarly, backfill for Mechanically Stabilized Earth Structures (MSES) must have consistent physical, and, for systems utilizing metal reinforcing straps or mesh, electro-chemical properties to ensure that the overall structure is constructable, and meets predicted, long-term performance requirements. NYSDOT Geotechnical Page 7-35 June 17, 2013
36 As mentioned in NYSDOT GDM Section 7.7 Material Acceptance, a Supplier assumes full responsibility for all quality control (QC) activities for the production of the material. QC activities include ensuring the material meets the specification requirements for which it is manufactured, as well as a plan to manage the inventory. QC is defined as all Contractor/Vendor operational techniques and activities that are performed or conducted to fulfill contract requirements. Independent Assurance (IA) is the auditing of the project deliverables quality and is an added phase in the process that not only ensures the Department that the specifications were met, but also supports the effectiveness of the QC program administered by the Contractor s Supplier. IA of engineered granular mixes involves collecting samples and performing testing at various points in the process. Depending on the Item, this can include some or all of the following: Source evaluation Stockpile sampling and testing Sampling and testing material on the contract site. This may be from on the grade or from behind a structure after placement by the Contractor, or at any other location where the material is being stored or used. Failure of material to meet specification requirements at any point in the QA process will result in rejection of that material. Stockpiled material must be free from organic and other deleterious material (which includes, but is not limited to, wallboard, wood, plastic and metal). Recycled Concrete Aggregate (RCA) likewise must be free of deleterious material but may contain up to 5%, by weight, of recognizable pieces of brick and/or asphalt pavement. Stockpiled material may be rejected without testing for failure to meet all requirements listed in Geotechnical Control Procedure (GCP-17) Procedure for the Quality Control of Stockpiled Granular Material. Material may be rejected based on visual inspection by a Departmental Geotechnical Engineer, or his/her Representative. Samples will not be collected. Written documentation will be provided to the Engineer (for contract specific stockpiles) or the Contractor/Supplier (for non-contract specific stockpiles) describing the reason for the rejection. Photographs and/or other evidence can also be provided to support a decision to reject a material. In June, 1951, a pavement performance study was conducted by the Geotechnical Engineering Bureau (formerly Soil Mechanics Bureau) on a section of the New York State Thruway. The existing Portland cement concrete pavement, which was placed in the late 1940 s, showed extensive signs of distress. The study concluded that the foundation course gravel was the primary cause for the premature failure of the pavement. The gravel used was basically fine with a high plasticity index and a significant portion passing the No. 200 sieve. As a result, the NYSDOT s IA program was developed out of necessity to address failures and continues to be assessed and revised. The responsibility for the testing and approval of granular material was given to the Geotechnical Engineering Bureau on August 1, 1951 by General Instruction No NYSDOT Geotechnical Page 7-36 June 17, 2013
37 The same General Instruction gave the responsibility for the investigation and sampling of the granular sources to the Regional Offices. In April, 1967, a pavement evaluation was conducted on a project in Region 7 and the cause for the premature failure was attributed to the subbase course not meeting the specification requirements. As a result, a statewide uniform sampling procedure for subbase material was established by the Geotechnical Engineering Bureau. The earliest version of Geotechnical Control Procedure (GCP-17) Procedure for the Quality Control of Stockpiled Granular Material was published in April, The manual developed by the State for documenting compliance with the specification requirements involves sampling and testing of granular materials in lots. The intent of the manual is to accept the lot if 95% of the material meets the specification requirements (i.e. all the material has to meet the specification requirements with a 95% confidence level). After publication, the results obtained from the FHWA-sponsored record sampling program over a number of years indicated a failure rate for gradation of 5% ±. This indicates that the State s assurance procedure substantially meets the objectives of 95% compliance with the material specification requirements. In addition, an early review of the Granular Material Evaluation and Documentation records of 1500± stone and gravel stockpiles sampled identified that 17% ± failed. An observation from the above data is that the QC at the Contractor and /or Supplier level is not adequate to ensure meeting specification requirements, whereas the State s QA procedure is within its designed limits. The Geotechnical Engineering Bureau continues to assess and revise the IA program as needed Stockpile Approval To ensure quality, engineered granular mixes are either stockpiled to be inspected, sampled, and tested or the source of the material is evaluated. The procedural directives issued by the Department, specifically Geotechnical Control Procedure (GCP-17) Procedure for the Control and Quality Assurance of Granular Materials outlines the procedures. The purpose of stockpiling material is to allow the Department to effectively evaluate engineered granular mixes, in a timely manner, to ensure that it meets specification requirements. Stockpiling is required for applications where the quality of the material is critical for the longterm performance of the structure (e.g. subbase under pavement, underdrain, and MSES backfill). Off-site manufacturing in the construction industry is described as an Off-site Construction Technique (OSCT). Construction, in this case the processing of engineered granular mixes, takes place at a different location than the location of use. OSCT processing occurs in a gravel pit or quarry specifically equipped for this type of processing. Individual stockpiles of granular mixes are processed and evaluated at the source and then transported to the site for placement. NYSDOT Geotechnical Page 7-37 June 17, 2013
38 Since manufacturing takes place off-site, the Supplier is in full control of the material, processing equipment and methods of stockpile construction, which should lead to a high quality, predictable product. OSCT reduces project construction time as the engineered granular mixes are processed either ahead of time or concurrently with site preparation. In addition, the amount of site disruption is decreased as less work is performed on-site. During the OSCT processing, the Engineer inspects the construction of stockpiles and then requests approval of the stockpile from the Regional Geotechnical Engineer. Inspection of the construction of stockpiles may also be performed by the Regional Geotechnical Engineer. The Regional Geotechnical Engineer supervises the sampling and arranges for the testing of the stockpiles. Note that other controls, in addition to the sampling requirements, are necessary in order for the NYSDOT to be confident that the engineered granular mixes placed in the work meets specification requirements. These include: Chain of Custody This describes the documentation process by which the NYSDOT ensures that the material being placed in the work is from a given approved stockpile. This process is the responsibility of the Contractor and Supplier, and it may include the employment of Contractor staff at the stockpile source, and the use of delivery tickets. The effects of handling on the material It is the responsibility of the Contractor/Supplier to make sure that the methods used for delivering and handling the material do not result in a significant change in the material s properties, such that the material goes out of spec due to segregation of particles. The NYSDOT may employ QA procedures, such as sampling material placed on the grade, to ensure that the material placed still meets specification requirements Statistical Analysis of Sampling Procedure The defined sampling procedure described in Geotechnical Control Procedure (GCP-17) Procedure for the Control and Quality Assurance of Granular Materials has been developed and analyzed by the NYSDOT to ensure the non-biased, uniform actions exercised by a Sampler result in a representative sampling of the overall stockpiled material. As stated in the Development of Granular Materials Assurance Program, Soil Mechanics Bureau Technical Report #42, November, 1988, the statewide uniform sampling procedure was developed by analyzing the test results of samples obtained from extensively sampling two stockpiles. There were numerous random samples obtained from each pile and statistical routines were performed to determine the number of samples that would be required to statistically predict the natural variability of the material in the stockpile. The analysis indicated that a level of confidence of 95% could be obtained with 4 samples. Additionally, the Geotechnical Engineering Bureau (formerly Soil Mechanics Bureau) requested the Engineering Research and Development Bureau to statistically analyze four sampling methods used on a single stockpile. As stated in the Statistical Analysis of Stone Subbase NYSDOT Geotechnical Page 7-38 June 17, 2013
39 Sampling Methods, Engineering Research and Development Bureau, Client Report 17, June, 1987, The statistical tests performed in this investigation indicate that overall the four stone subbase sampling methods produce similar results. In addition, the location in the stockpile did not have a strong influence on the outcome of the sieve analysis Source Approval To assure quality, engineered granular mixes are either stockpiled to be inspected, sampled, and tested, or the source of the material is evaluated. The procedural directives issued by the Department, specifically Geotechnical Control Procedure (GCP-17) Procedure for the Control and Quality Assurance of Granular Materials outlines the procedures. The purpose of evaluating a source is to allow the Department to effectively determine characteristics of the engineered granular mix, in a timely manner, to ensure that it meets specification requirements. As mentioned in NYSDOT GDM Section Stockpile Approval, Off-site manufacturing in the construction industry is described as an Off-site Construction Technique (OSCT). OSCT evaluation occurs in a gravel pit or quarry specifically equipped for processing granular mixes. Each year, a list of granular material sources, which are anticipated to be used for upcoming NYSDOT contracts, is submitted by the Regional Geotechnical Engineer to the Geotechnical Engineering Bureau. The Geotechnical Engineering Bureau responds with the required number of samples to be collected and forwarded for testing. Material from each Source will be evaluated for Magnesium Sulfate Soundness and Plasticity Index before it is allowed to supply non-stockpiled material to NYSDOT contracts. This evaluation is valid for a 12-month period. The evaluation samples are obtained under the direction of the Departmental Geotechnical Engineer. The number and location of samples are dependent upon the topography of the area, stratification of the deposit and quality of the material. Samples are chosen to characterize the quantity of material required. OSCT evaluation of approved sources allows for reduced project construction times as the engineered granular mixes do not have to be (re)tested for quality. Items which are not stockpiled, but which require conformance to a particular gradation, need only be sieve-tested by project-level earthwork inspection personnel Visual Disparity of Samples Approval of a stockpile does not relieve the Contractor of the responsibility to place, in its final position, an engineered granular mix conforming to all the specification requirements for the intended item. If the Engineer observes material being placed on the grade that appears to be outside of the specification requirements, or sees a visual difference in the material, a request to the Regional Geotechnical Engineer may be made to obtain quality assurance (QA) samples at any location. NYSDOT Geotechnical Page 7-39 June 17, 2013
40 If test results from QA samples indicate that the engineered granular mix does not meet specification requirements, that material is rejected. Determination of the amount and extent of rejected material depends on the importance of the application (i.e. MSES backfill requirements are more critical than those for backfill around a concrete pipe), as well as on the nature of the deviation from the specifications. Possible consequences could include, but would not be limited to: Requiring the Contractor to remove and replace the material placed that day; Requiring the Contractor to conduct an investigation to determine the full extent of the unacceptable material, followed by removal and replacement; Issuance of a Stop Work order by the Engineer Random Location of Samples The Department may elect to take samples from the grade at any time as part of the overall QA process. This will not be limited to conditions described in NYSDOT GDM Section Visual Disparity of Samples. As outlined in the NYSDOT Standard Specifications, all materials furnished are to be in reasonably close conformity with the material requirements, including tolerances. Mid-range specification values are to be considered the design values from which any deviations are allowed. It is the intent of the specifications that the materials and work quality is to be uniform in character and conform as nearly as realistically possible to the prescribed target value or to the middle portion of the tolerance range. The purpose of the tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons. For example, although maximum and minimum values are specified in the MSES backfill requirements, the production and processing of the material and the performance of the work shall be controlled so that material will not predominantly be of borderline quality or dimension. It is the responsibility of the Contractor/Supplier to make sure that the methods used for delivering and handling the material do not result in a significant change in the material s properties, such that the material goes out of spec due to segregation of particles. The Department reserves the right to sample and test material on the contract site in order to be confident that the material placed in the work meets specification requirements Method for Random Location Samples for Critical Structures Because of the critical importance of backfill placed for Mechanically Stabilized Earth System (MSES) applications, the Department will always take additional samples from behind the new structure, during its construction, for additional testing. The frequency and approximate location (station, offset, and elevation) of these additional samples will be determined by the Geotechnical Engineering Bureau s General Soils Laboratory Supervisor based on a history of the source and the quantity of material being placed. NYSDOT Geotechnical Page 7-40 June 17, 2013
41 Geotechnical Control Procedure (GCP-20) Procedure for Taking Random Samples of Backfill Material for Mechanically Stabilized Earth Systems provides the uniform procedure for taking random samples of backfill material, including how to determine and randomly select sublots to eliminate bias. 7.8 REFERENCES Bohl, T.M., Statistical Analysis of Stone Subbase Sampling Methods, New York State Department of Transportation, Engineering Research and Development Bureau, Client Report 17, June, Burnett, R.A., Dwyer, D.F., Fighting Frost Problems in New York State Pavements, Cold Regions Engineering, Putting Research Into Practice, ASCE, Proceedings of the Tenth International Conference, Chesner, W.H., Collins, R.J., MacKay, M.H., User Guidelines for Waste and Byproduct Materials in Pavement Construction, US Department of Transportation, Federal Highway Administration, Publication No. FHWA-RD , April, Fuller, W. B., and Thompson, S. E., The Laws of Proportioning Concrete, Transactions of ASCE, ASCE, Vol. 59, 1907, pp Geotechnical Engineering Bureau, Development of Granular Materials Assurance Program, New York State Department of Transportation, Office of Technical Services, November, Geotechnical Engineering Bureau, Recycled Material Policy, Evaluation, Use and History, New York State Department of Transportation, Office of Technical Services. Geotechnical Engineering Bureau, Procedure for Control of Stone Filling and Rip Rap Items, Geotechnical Control Procedure GCP-14, New York State Department of Transportation, Office of Technical Services, Geotechnical Engineering Bureau, Procedure for Determining Application Rates, Calibration and Inspection for Soil Stabilization Plants, Geotechnical Control Procedure GCP-16, New York State Department of Transportation, Office of Technical Services, Geotechnical Engineering Bureau, Procedure for the Control and Quality Assurance of Granular Materials, Geotechnical Control Procedure GCP-17, New York State Department of Transportation, Office of Technical Services, NYSDOT Geotechnical Page 7-41 June 17, 2013
42 Geotechnical Engineering Bureau, Procedure for Taking Random Samples of Backfill Material for Mechanically Stabilized Earth Systems, Geotechnical Control Procedure GCP-20, New York State Department of Transportation, Office of Technical Services, Geotechnical Engineering Bureau, Bank and Channel Protective Lining Design Procedures, Geotechnical Design Procedure GDP-10, New York State Department of Transportation, Office of Technical Services, Grana, R.S., Region 8 Use of Open-Graded Subbase, New York State Department of Transportation, Soil Mechanics Bureau, March, Hofmann, Wm.P., Can Spring Break Up Be Prevented How?, Association of Town Annual Meeting, February Johnson, A.I, Filter Pack and Well Screen Design, United States Department of the Interior, Geological Survey, Hydrologic Laboratory, 1963: Plastic Pipe Institute, Corrugated Polyethylene Pipe & Installation Guide, National Cooperative Highway Research Program (NCHRP), Rip Rap Design Criteria, Recommended Specifications, and Quality Control, Report No. 568, Transportation Research Board of the National Academies. New York State Standard Sheets, Department of Transportation, Design Quality Assurance Bureau, Rafalowski, M., Construction Quality Assurance for Design-Build Highway Projects, TechBrief, U.S. Department of Transportation, Federal Highway Administration, Publication No. FHWA- HRT : Sabatini, P.J., Elias, V., Schmertmann, G.R., Bonaparte, R., Earth Retaining Systems, Geotechnical Engineering Circular No. 2, US Department of Transportation, Federal Highway Administration, Publication No. FHWA-SA Swift River Associates, Request for an Amendment to Beneficial Use Determination (BUD No ), Summary of Corian Purge Drum Operation, September, NYSDOT Geotechnical Page 7-42 June 17, 2013
43 Weaver, R.J., Behind the New Subbase Specification, Regional Soils Engineers 1973 Annual Meeting, January, Wheeler, J.J., Jr., Waste Materials in Highway Construction Lessons from New York State, TR News: From Refuse to Reuse Recycling and Reuse of Waste Materials and By-Products in Transportation Infrastructure, No. 184, May-June, NYSDOT Geotechnical Page 7-43 June 17, 2013
CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).
Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State
DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS
304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing
Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE
GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: [email protected] Module - 4
Division 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
PAVEMENT STRUCTURE DESIGN GUIDELINES
PAVEMENT STRUCTURE DESIGN GUIDELINES Technical Circular T- 01/15 (Replaces Technical Circular T-01/04) Final Update: Jan. 26, 2015 Geotechnical, Materials and Pavement Engineering TABLE OF CONTENTS 1.0
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6
03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf
Soils, Foundations & Moisture Control
Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations
AGREGADOS RECICLADOS MITOS Y REALIDADES
The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT Note: This guide specification is intended for use in the U.S. It describes construction of permeable interlocking concrete pavers on a permeable,
CLASS II BASE COURSE - Section 302
CLASS II BASE COURSE - Section 302 Class II Base Courses are similar to Class I Base Courses, with the exception that placement on a subgrade layer built in accordance with Specification Section 305 is
A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
PROPERTIES AND MIX DESIGNATIONS 5-694.200
September 1, 2003 CONCRETE MANUAL 5-694.200 5-694.210 PROPERTIES OF CONCRETE PROPERTIES AND MIX DESIGNATIONS 5-694.200 Inspectors should familiarize themselves with the most important properties of concrete:
SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
APPENDIX G SETTLEMENT
APPENDIX G SETTLEMENT TABLE OF CONTENTS G.1 IN T R O D U C T IO N... 1 G.2 MATERIAL PLACEMENT AND COMPACTION... 1 G.2.1 Incom pressible M aterials... 1 G.2.2 Compressible Materials... 2 G.2.3 Soil P lacem
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS Pervious interlocking pavers.doc Note: This guide specification for U.S. applications describes construction of permeable interlocking ceramic pavers
Expected Service Life and Performance Characteristics of HMA Pavements in LTPP
Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Submitted to: Asphalt Pavement Alliance Prepared
COMPREHENSIVE PAVEMENT DESIGN MANUAL
COMPREHENSIVE PAVEMENT DESIGN MANUAL Chapter 9 - Subsurface Pavement Drainage (Limited Revisions) Revision 1 July 2, 2002 Pages Changes CHANGES TO CHAPTER 9 Contents List of Figures and Tables included.
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
Aggregates for Path Construction
Aggregates for Path Construction Technical Information Note No. 7 October 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT A. The requirements for construction of permeable interlocking concrete pavement: 1. Install the interlocking
CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction
California Groundwater Association An NGWA Affiliate State PO Box 14369 Santa Rosa CA 95402 707-578-4408 fax: 707-546-4906 email: [email protected] website: www.groundh2o.org CGA Standard Practices Series
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for
No allowance will be made for classification of different types of material encountered.
PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and
SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS
TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service
asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of
USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE
USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Functions of a Filter Retain particles of the base
Construction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
ENCE 4610 Foundation Analysis and Design
This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength
Section 300 Base Courses
Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
Building Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
Installation PowerPoint for Grasscrete Formers
Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold
Final Report Evaluation of I-Pave Low Volume Road Design Software
Final Report Evaluation of I-Pave Low Volume Road Design Software May 2015 Michael I Darter, William R. Vavrik, Dinesh Ayyala 2015 2014 Applied Research Associates, Inc. 1 Objectives 1. Obtain all documentation
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA October 21, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS
TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...
Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia
Roller-Compacted Concrete Pavement: Design and Construction Pavement Thickness esign and RCC-Pave Software Gregory E. Halsted, P.E. Pavements Engineer Portland Cement Association October 24, 2006 Atlanta,
OHIO ASPHALT PAVING CONFERENCE
OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
PERMEABLE INTERLOCKING CONCRETE PAVEMENT
[NOTE TO SPECIFICATION WRITER: This guide specification for the use of permeable interlocking concrete pavers for pedestrian and vehicular traffic application was developed based on the use of an open-graded
GRADATION OF AGGREGATE FOR CONCRETE BLOCK
GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published
Soils and Aggregates Division
Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled
c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.
Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,
Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks
Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Schedule What is Fly Ash Slurry Injection (FASI) Thermal Cracks and Why They Depress Pavement Rehab Strategies Special Provisions Upcoming Projects
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES
SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
NRC INSPECTION MANUAL
NRC INSPECTION MANUAL INSPECTION PROCEDURE 88001 LLUR ON-SITE CONSTRUCTION PROGRAM APPLICABILITY: 2600, 2801 88001-01 INSPECTION OBJECTIVES 01.01 To determine by direct observation if on-site construction
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM
GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM SECTION 32 14 13.19 AquaPave Permeable Interlocking Concrete Pavement Note: This guide specification is for the
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)
POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS
HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems
9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
Underground Installation of PE Piping
Chapter 7 265 Chapter 7 Introduction Piping systems are prevalent throughout our everyday world. Most of us think of piping systems as underground structures used to convey liquids of one sort or another.
SUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/13/15 Topic: Permeable interlocking pavers Manual: Design & Specs Manual Location: Design Section 5L-1; Spec Section 7080 Requested Revision: Reason for
GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design
GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
Permeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
Pavement Rehabilitation Selection Rehabilitation Techniques
Pavement Rehabilitation Selection Rehabilitation Techniques Bituminous Pavement Rehabilitation Techniques Overlays Bituminous Concrete Pre-overlay Treatments Mill and Overlay Mill and Inlay Recycling Options
Pervious Concrete Pavement Maintenance and Operations Guide
Pervious Concrete Pavement Maintenance and Operations Guide NRMCA Pervious Concrete Pavement Maintenance and Operations Guide Pervious concrete pavement is a Portland cement-based, rigid permeable pavement
Use of Marginal Materials & Fly ash in Road Works
Use of Marginal Materials & Fly ash in Road Works U.K.Guru Vittal Sr. Principal Scientist Central Road Research Institute New Delhi 110 025 [email protected] Introduction Issue Development Vs. Environment
Section 902. AGGREGATES
902.01 Section 902. AGGREGATES 902.01. General Requirements. The Department may re-inspect and retest aggregates regardless of inspection at the producing plant. Provide safe access to the material for
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
Advancements in Permeable Pavements
Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains
LID-01 Permeable Paving Systems
Greenville County Technical Specification for LID-01 Permeable Paving Systems 1.0 Permeable Paving Systems 1.1 Description Permeable Paving Systems are a best management practice that captures stormwater
Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance
Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance Rongzong Wu, David Jones, Hui Li and John Harvey University of California Pavement Research Center Prepared