A Response to Staffordshire Fire and Rescue Service by Matthew Ellis, Staffordshire s Police and Crime Commissioner

Size: px
Start display at page:

Download "A Response to Staffordshire Fire and Rescue Service by Matthew Ellis, Staffordshire s Police and Crime Commissioner"

Transcription

1 A Response to Staffordshire Fire and Rescue Service by Matthew Ellis, Staffordshire s Police and Crime Commissioner New Delivery Model Community Safety Options 2015 Introduction and Background Staffordshire Fire and Rescue Service (SFARS) have recently sought the views of the local community in response to its consultation on a new delivery model for the service. As with all publicly funded services, austerity, changing demand patterns and other factors will result in all organisations considering how they provide their services to the public. The fire service has like policing, experienced cost pressures and decreasing budgets. There is no doubt that under such circumstances it is right that the service reviews its operating model and looks to respond appropriately to the challenges faced. I welcome this opportunity to contribute to the consultation on the future of fire and rescue services in Staffordshire and Stoke on Trent. In considering the consultation document I have tried to understand the basis upon which these service delivery options have been made and the financial constraints that SFARS is under. This has included reviewing Staffordshire Fire Authority minutes, press announcements, previous consultations and other reviews relating to the wider fire service. The consultation document has proposed a Staffordshire Fire and Rescue Service that delivers its services through a different workforce (size and mix) and a different asset base (estate, vehicles). There is an all or nothing option presented (33 stations / 42 appliances down to 15 stations / 15 appliances and changes to workforce mix i.e. no retained fire fighter roles) and also consultation documents that examine the future of nine individual stations. It is clear that if the all or nothing option is accepted, it would automatically preclude the need for considering further the nine local consultations. However, if this option is rejected, as I believe it should be, then the other documents fail to create a clear and cohesive strategy and present an uncoordinated plan. I am also unclear from reading the consultation document how the new 5.1 million proposals to build and develop more estate at Biddulph and Stafford over the next 12 months fits with the proposals put forward. These new builds are referred to in the documents, but given the proposed reduction in estate I would like to better understand the rationale for continuing with these commitments particularly as they would add to ongoing revenue costs. We can no doubt jointly agree that the focus of public safety, should always be, managing risk, protecting, and making our communities safer. This is not simply delivered through one emergency service, but through the collaborative and integrated effort of all service partners. Staffordshire Police and Fire have a history of working together on complex incidents and 1

2 major public events and are implementing integrated delivery proposals in selective areas e.g. transport. However, in my view there is much more that can be achieved for the benefit of residents in Staffordshire if a fully integrated police and fire service came to be, with a greater proportion of the overall resource pot committed to the frontline. The Consultation Documents The demand on the service has significantly decreased over recent years; within a five year period incidents have fallen by 51%. In 2009/2010 there were 16,884 incidents (beginning of PF1) but by 2012/2013 there was a significant drop in incidents of nearly 3,000 (-17.35%) to 13,949. This decline continued though to 2014/2015 where a there were a further 5697 (- 40.9%) fewer incidents reported giving an annual incidents number of just over 8,000. Stations and Appliances Currently, SFARS provides prevention, protection, and response arrangements for Staffordshire and Stoke on Trent from 33 stations, which supports 42 fire appliances in addition to a range of special appliances. The all or nothing option presented would reduce the number of stations to 15 supporting 15 fire appliances. It is understood that this proposal is underpinned by fire service software that calculates risk, tasking, coverage and response. The results have indicated best fit for a response base of fifteen stations. However, despite this option being put forward with this underpinning support, it is also highlighted that this option would result in the Service not achieving our attendance standard for life incidents on an additional 36 calls per year for the first attendance and 56 calls per year for the second appliance. Questions must be asked as to the reasoning for a proposal that is already destined to fail and the contradictory statements made? In order that I might better understand the stations identified for potential closure and those that would no longer have a response requirement, my office has compiled the following table, and highlighted the remaining stations with a white background and closures in pink. These stations have further been categorised under which building plan it came under. We also note from the consultation that SFARS continue to make considerable investment in [the] remaining stations. PFI 1 Stations Refurbished Stations PFI 2 Stations Existing Stations Burslem Barton-under-Needwood Burton Ipstones Cannock Cheadle Chase Terrace Biddulph* Hanley Wombourne Codsall Abbots Bromley Kidsgrove Longnor Kinver Tutbury Newcastle Leek Stafford ± Rising Brook Lichfield Eccleshall Sandyford Loggerheads Gnosall Tamworth (Belgrave) Longton Brewood Tamworth (Mercia) Penkridge Uttoxeter Rugeley Stone 2

3 * This includes a 5.1m DCLG grant funded projects at Biddulph and Stafford for 2015/2016 Capital Budget. ± It is understood that Stafford is excluded from the PFI projects as it was funded by Asda as part of a 3 million agreement in exchange for the old fire station grounds at Lammascote Road, Stafford and is around 15 years old. Of the total PFI 1 builds, nearly one third (three stations) will be closed to response requirements, and of the PFI 2 builds, over one half will be closed (six stations) and of the refurbished stations, one will be closed. In my view this calls into question the serious strategic judgement of both the Fire Authority and Staffordshire Fire and Rescue Service. Despite a 25 years financial commitment for each PFI build, (including on-going estate maintenance and private management fees), it would seem that costs will be borne by the communities of Staffordshire and Stoke and Trent without the response provision. Questions need to be answered as to why, when the country was experiencing its most damaging recession in living memory, and experiencing acute austerity, did the PFI strategy continue? Whilst, it may be that discussions for the first programme of PFI were too far-gone between 2008 and 2009, to be able to withdraw from the scheme, the further round of PFI builds announced in 2011 and 2012, at a time when the incident demand was significantly falling and the impact of austerity was clearer, appears unwise at best. To increase significantly the number and long-term investment into stations only to cut them within three years lacks robustness, challenge and scrutiny. Reflecting on these financial issues, David Greensmith, Director of Finance, Assets and Resources for Staffordshire Fire Service, said in 2013: The net construction cost for the 11 sites is 29.6m. The PFI has been signed for a 25-year period commencing fully from March The final concession date is February The full unitary charge will commence when all stations have been completed with a total unitary charge payable of 127m payable during this period. This includes all capital costs, fees, lifecycle and facilities management costs during the 25-year period. (Express and Star 17/08/2013). Clearly this refers to 11 builds, and does not include the further 10 PFI and 4 refurbishment constructions. At present, SFARS commit at least 12% ( 5.2 million) of their budget to property and estates, which is a significant part of the overall budget and has a long-term nature to it because of the PFI commitments. One other aspect of the rationale for the builds was that the new stations will sit at the heart of the community and have been designed to be inviting and welcoming to the public. If a Community Fire Station (CFS) is to be reassigned or decommissioned there will naturally be a concern at the community level, but the consultation fails to address this heart of the community question. While the option to reduce appliances from 42 to 15 is substantial, any reduction in appliance numbers must be done on the basis of risk based evidence. Through the fire software, this calculation has already been undertaken, but the rationale has not been included fully in the consultation, or at least not clearly. With incident demands dropping by 51% since 09/10 it is right that an assessment of this nature occurs; however, it would have been helpful for more information on how the outcome was arrived at. 3

4 Whole-time, Part Time & Retained Fire Firefighters The consultation document proposes a move to a permanently staffed service, removing retained fire fighters (RFF) entirely. There are currently 499 fully trained on-call fire fighters covering mainly rural, off-peak hours and fire safety initiatives. In terms of whole-time fire fighters, there are 300, which will be increased by a further 90 under the proposal. With fewer overall fire fighters, the flexibility of the service will in my view suffer, especially if illness, training commitments, or other demands take fire fighters away from operational duties. It is noted that crew switching may alleviate some of the pressure, in that some fire fighters will be able to use a wider range of tools and appliances, including special appliances. As well as managing with smaller frontline numbers, my other concern is that the roles of permanent and retained fire fighters are different. Sir Ken Knight s 2013 report 1. Knight took account of the efficiencies and the future of the Fire Service in England and Wales, and acknowledged that whole-time crewing is starting to change to more flexible models and I was pleased to see a level of innovative thinking here (Knight, 28). Retained fire fighters are also a good example of making community engagement more effective; Knight goes further and says, retained duty staff, or on-call fire fighters are the backbone of provision for many fire and rescue authorities as calls have dropped, therefore, the on-call system has become more expensive on a per call basis but it still provides excellent value for money fire and rescue authorities need to think about what call volume they consider justifies a whole-time service. (Knight, p.31). In terms of cost and flexibility a retainer is currently 10 per cent of a whole-time fire fighter s salary, with additional payments made for training and attendance at incidents. (Knight, p.31). The important role of retained fire fighters is also reflected in a SFARS FOI response in This highlighted the role of retained fire fighters, who spend a considerable amount of time undertaking community safety over a wide range of activities and they have specific budgets to deliver these sorts of activities The consultation document does not identify how these activities will be carried out in the absence of the retained role. This is a significant gap, given the importance of early intervention and prevention. 1 Sir Ken Knight OBE, Facing the Future: Findings from the review of efficiencies and operations in fire and recuse authorities in England report (2013). 4

5 Summary In my view the consultation document creates and leaves a number of unanswered questions and lacks an underlying rationale that supports the proposals being made. Those questions are identified above, but primarily concern the following: - The contradictory nature of the all or nothing proposal and the lack of cohesiveness of the individual station proposals; The PFI based financial issues that arise, in particular the commitments and requirements place on SFARS as a result of the long-term contractual arrangements and how these align with the proposals; The lack of clarity of the impact on local communities arising from the proposals; The rationale behind the proposed changes to workforce mix, given the messages in the Knight report and in particular the impact on preventative work. I am also of the view that the financial challenges faced, which appear to be the main driver behind the proposals could be considered from an alternative perspective, that being around building an integrated service with Staffordshire Police, making the most of the opportunities that true integration could realise. I say a little more about these opportunities below. Opportunities for Integration and Collaboration Evidently, the need to move away from traditionally independent services is now necessary, towards a more collaborative, integrated public safety service. There is good evidence that supports innovation of this kind; for example, a good working relationship can already be seen in Northamptonshire, where both the Fire and Police senior management teams have co-located to police headquarters. Furthermore an active programme for joint police and fire stations is being developed in Northamptonshire. Such an approach can also ensure that back office operations become more joined up, processes simplified, and duplication reduced. For example, Hampshire Fire and Rescue Service, Police, and the local county council expect to save up to 4 million a year with this approach. Direct benefits can be listed within three main categories: 1. Delivering a more preventative and early service to those in need of support A joined up service with an integrated response will use resources more effectively to ensure that victims of crimes, fires and anti-social behaviour receive an earlier and more preventative response and better standards of service. Utilising the different capabilities and capacities that the two services have will enable a more seamless approach to meet resident need, with better communication between those staff and officers on the ground. 2. Managing demand and maximising frontline resources A more joined up service will be capable of responding more flexibly and appropriately to demand. In Northamptonshire, it is estimated that more effective demand management will 5

6 enable productivity savings equating to 305 Officers or 16.5 million in public involvement and prevention activities. 3. Rationalising support activities A more joined up service will be capable of driving out non-frontline savings by combining and integrating services. In Staffordshire, this has already started with a joining together of transport servicing, repair and maintenance services, which is expected to deliver nearly 1 million of shared cashable savings and improved service at the same time. Other significant opportunities might include the following: - A single management team, Combined call centre & control room operations, Combined estates and property, Shared learning and development teams, HR Support, Communications, Joined up procurement, financial and insurance, Improved customer insight and business intelligence, Bringing together of governance, leadership, processes and policies, A joint approach to community engagement and volunteering. My view is that a very different approach to the future needs of the service and the opportunities that integration can create is required. The proposals put forward by SFARS do not consider this alternative approach, but there is an opportunity to do so. Matthew Ellis Staffordshire s Police and Crime Commissioner 22 nd May

STAFFORDSHIRE HEALTH OVERVIEW SCRUTINY MEETING 8 April 2015

STAFFORDSHIRE HEALTH OVERVIEW SCRUTINY MEETING 8 April 2015 STAFFORDSHIRE HEALTH OVERVIEW SCRUTINY MEETING 8 April 2015 The last year as proved to be a very challenging year for the West Midlands Ambulance Service both regionally and within Staffordshire. Challenges

More information

Asset Management Strategy

Asset Management Strategy Greater Manchester Fire and Rescue Service Asset Management Strategy 2013-2015 Appendix 1 Document Version Control Document Version Date Written by 0.1 June 2012 Andrea Heffernan 0.2 December 2012 Andrea

More information

Staffordshire Pharmacy Opening Times Christmas and New Year Bank Holidays

Staffordshire Pharmacy Opening Times Christmas and New Year Bank Holidays Staffordshire Pharmacy Opening Times Christmas and New Year s Christmas Friday Burntwood Chasetown Pharmacy, 23 High Street, Chasetown, WS7 8XE Closed 09:00-13:00 Closed 13:00-15:00 Night Pharmacy, Swan

More information

7. BUSINESS CASE FOR A JOINT PROPERTY VEHICLE

7. BUSINESS CASE FOR A JOINT PROPERTY VEHICLE Cabinet 6 March 2014 7. BUSINESS CASE FOR A JOINT PROPERTY VEHICLE Relevant Cabinet Member Relevant Officer Recommendation Mr J P Campion Director of Resources 1. The Cabinet Member with Responsibility

More information

Staffordshire Moorlands Service Delivery Overview & Scrutiny Panel Superfast Staffordshire Highlight Report

Staffordshire Moorlands Service Delivery Overview & Scrutiny Panel Superfast Staffordshire Highlight Report AGENDA ITEM 9 Staffordshire Moorlands Service Delivery Overview & Scrutiny Panel Superfast Staffordshire Highlight Report 2 nd July 2014 Executive Summary The Superfast Staffordshire project is now in

More information

AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007

AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 PAGE: 1 REPORT TO: SUBJECT: BY: AUDIT & PERFORMANCE REVIEW COMMITTEE ON 26 TH SEPTEMBER 2007 ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 To provide the Audit and Performance Review

More information

Asset Management Strategy 2015-2018

Asset Management Strategy 2015-2018 Asset Management Strategy 2015-2018 1 Foreword I am pleased to present the Asset Management Strategy. It is recognised that the management of assets is key to achieving my goals and objectives. The effective

More information

Monthly Update for the Voluntary Youth Sector in Staffordshire. September Update

Monthly Update for the Voluntary Youth Sector in Staffordshire. September Update Monthly Update for the Voluntary Youth Sector in Staffordshire September Update Want to have a say in decisions made in your local area? SCVYS are holding 4 events for young people in 4 areas: Please click

More information

4 Year Capital Programme 2014-2018

4 Year Capital Programme 2014-2018 4 Year Capital Programme 2014-2018 January 2014 1. Introduction The Commissioner is supportive of capital expenditure which improves the efficiency and effectiveness of the service provided to the public

More information

DIGITAL STRATEGY 2014-2017

DIGITAL STRATEGY 2014-2017 DIGITAL STRATEGY 2014-2017 Digital Strategy CONTENTS Introduction 1 Our Vision 3 Benefits 5 Our Digital Design Principles 6 Our Strategy 8 Our Key Enablers 11 INTRODUCTION SFRS uses digital technology

More information

National Contact Management Strategy

National Contact Management Strategy National Contact Management Strategy 2012 NCMS 2012 NOT PROTECTIVELY MARKED 4 National Contact Management Strategy (NCMS) This document has been produced by the Association of Chief Police Officers (ACPO)

More information

Managing ICT contracts in central government. An update

Managing ICT contracts in central government. An update Managing ICT contracts in central government An update Prepared by Audit Scotland June 2015 Auditor General for Scotland The Auditor General s role is to: appoint auditors to Scotland s central government

More information

Welsh Fire and Rescue Services Road Safety Strategy 2015-2020

Welsh Fire and Rescue Services Road Safety Strategy 2015-2020 All Wales Call Challenge Welsh Fire and Rescue Services Road Safety Strategy 2015-2020 GWASANAETH TÂN AC ACHUB Canolbarth a Gorllewin Cymru Mid and West Wales FIRE AND RESCUE SERVICE 2 Contents Executive

More information

Mobile Technology in Policing. Home Office and National Policing Improvement Agency REPORT BY THE COMPTROLLER AND AUDITOR GENERAL

Mobile Technology in Policing. Home Office and National Policing Improvement Agency REPORT BY THE COMPTROLLER AND AUDITOR GENERAL REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1765 SESSION 2010 2012 27 JANUARY 2012 Home Office and National Policing Improvement Agency Mobile Technology in Policing Mobile Technology in Policing

More information

Buckinghamshire & Milton Keynes Fire Authority

Buckinghamshire & Milton Keynes Fire Authority Annual Performance Monitoring Report 2014/15 ITEM 13 Buckinghamshire & Milton Keynes Fire Authority MEETING Executive Committee DATE OF MEETING 29 July 2015 OFFICER LEAD MEMBER SUBJECT OF THE REPORT Julian

More information

A review of service reform in Scottish fire and rescue authorities

A review of service reform in Scottish fire and rescue authorities A review of service reform in Scottish fire and rescue authorities Key messages/prepared for the Accounts Commission March 2007 1 Key messages Introduction 1. A National Joint Council (NJC) agreement in

More information

REPORT TO: STAFFORDSHIRE AND STOKE ON TRENT PARTNERSHIP NHS TRUST BOARD MEETING. TO BE HELD ON: WEDNESDAY 29 October 2014

REPORT TO: STAFFORDSHIRE AND STOKE ON TRENT PARTNERSHIP NHS TRUST BOARD MEETING. TO BE HELD ON: WEDNESDAY 29 October 2014 REPORT TO: STAFFORDSHIRE AND STOKE ON TRENT PARTNERSHIP NHS TRUST BOARD MEETING TO BE HELD ON: WEDNESDAY 29 October 2014 Enclosure: 06 Subject: Safe Nursing Staffing Strategic Goal: (tick as applicable)

More information

Report to: PERFORMANCE COMMITTEE Date: 17 th December 2015 Report By: DACO IAIN VINCENT, HEAD OF TRAINING AND EMPLOYEE DEVELOPMENT

Report to: PERFORMANCE COMMITTEE Date: 17 th December 2015 Report By: DACO IAIN VINCENT, HEAD OF TRAINING AND EMPLOYEE DEVELOPMENT Report to: PERFORMANCE COMMITTEE Date: 17 th December 2015 Report By: DACO IAIN VINCENT, HEAD OF TRAINING AND EMPLOYEE DEVELOPMENT Subject: CASE STUDY - REVIEW OF PERFORMANCE MANAGEMENT ARRANGEMENTS WITHIN

More information

A responsible, sign. team up. front. Committing to where we re going and putting our hearts into what we do. We get engaged every day.

A responsible, sign. team up. front. Committing to where we re going and putting our hearts into what we do. We get engaged every day. 4 NZ Transport Agency Statement of intent 214 18 A responsible, collaborative and agile organisation In order to deliver our desired targets and results effectively and efficiently, we continue to invest

More information

Internal Audit Progress Report Performance and Overview Committee (19 th August 2015) Cheshire Fire Authority

Internal Audit Progress Report Performance and Overview Committee (19 th August 2015) Cheshire Fire Authority Internal Audit Progress Report (19 th August 2015) Contents 1. Introduction 2. Key Messages for Committee Attention 3. Work in progress Appendix A: Risk Classification and Assurance Levels Appendix B:

More information

Max for main heading 24pt bold Annual Report 2013/14

Max for main heading 24pt bold Annual Report 2013/14 Title Health, of Report/document Safety and Wellbeing two lines Max for main heading 24pt bold Annual Report Sub title of Report/document 2013/14 two lines for sub heading 18pt Arial 23/9/14 Page 1 of

More information

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service Agenda Item 8 Page 1 of 13 MEETING MEETING DATE SUBJECT REPORT BY Essex Fire Authority 7 September 2011 Relocation of Service Control The Chief Fire

More information

place-based asset management

place-based asset management place-based asset management Managing public sector property to support aligned local public services TOWN HALL CIPFA, the Chartered Institute of Public Finance and Accountancy, is the professional body

More information

Assessment Report CUSTOMER SERVICE EXCELLENCE. UK.CSE.AR2 Issue 2 Page 1 of 19

Assessment Report CUSTOMER SERVICE EXCELLENCE. UK.CSE.AR2 Issue 2 Page 1 of 19 Assessment Report CUSTOMER SERVICE EXCELLENCE UK.CSE.AR2 Issue 2 Page 1 of 19 Oxfordshire County Council - Oxfordshire Fire & Rescue Address: County Hall, New Road, Oxford,, OX1 1ND Standard(s): CSE Accreditation

More information

TRUST BOARD PUBLIC SEPTEMBER 2014 Agenda Item Number: 163/14 Enclosure Number: (4) 2015/16 Business Planning Board Discussion Paper

TRUST BOARD PUBLIC SEPTEMBER 2014 Agenda Item Number: 163/14 Enclosure Number: (4) 2015/16 Business Planning Board Discussion Paper TRUST BOARD PUBLIC SEPTEMBER 2014 Agenda Item Number: 163/14 Enclosure Number: (4) Subject: Prepared by: Sponsored & Presented by: Purpose of paper Key points for Trust Board members Options and decisions

More information

Conference Room, Office of the Police & Crime Commissioner, Clemonds Hey, Oakmere Road, Winsford, CW7 2UA. Agenda Page

Conference Room, Office of the Police & Crime Commissioner, Clemonds Hey, Oakmere Road, Winsford, CW7 2UA. Agenda Page MANAGEMENT BOARD Friday 18 December 2015 9.00am Conference Room, Office of the Police & Crime Commissioner, Clemonds Hey, Oakmere Road, Winsford, CW7 2UA Agenda Page 1 NOTES OF MANAGEMENT BOARD ON 9 DECEMBER

More information

Managing early departures across Welsh public bodies

Managing early departures across Welsh public bodies 10 February 2015 Archwilydd Cyffredinol Cymru Auditor General for Wales Managing early departures across Welsh public bodies I have prepared and published this report in accordance with the Government

More information

North West Fire and Rescue Management Board Newsletter. Issue 1 November 2008

North West Fire and Rescue Management Board Newsletter. Issue 1 November 2008 North West Fire and Rescue Management Board Newsletter Issue 1 November 2008 North West Fire and Rescue Management Board Newsletter Issue 1 November 2008 Welcome to the first edition of the North West

More information

Corporate Director Environment & Community Services

Corporate Director Environment & Community Services CABINET Meeting date: 23 July 2015 From: Corporate Director Environment & Community Services DIGITAL STRATEGY 1.0 EXECUTIVE SUMMARY 1.1 This paper presents Cabinet with a draft Digital Strategy for approval.

More information

Summary Medium Term Financial Strategy 2014/15 to 2016/17

Summary Medium Term Financial Strategy 2014/15 to 2016/17 Summary Medium Term Financial Strategy 2014/15 to 2016/17 1 Greater Manchester Fire and Rescue Authority Summary Medium Term Financial Strategy 2014/15 2016/17 Introduction Our budget requirements for

More information

Appendix 5. Brighouse and Elland. Fire Station. Business Case

Appendix 5. Brighouse and Elland. Fire Station. Business Case Appendix 5 Brighouse and Elland Fire Station Business Case At a Glance the Key Points for this Proposal Proposal: Key Points: The construction of a new fire station to replace Brighouse and Elland fire

More information

People Strategy 2013/17

People Strategy 2013/17 D a t a L a b e l : P U B L I C West Lothian Council People Strategy 2013/17 Contents 1 Overview 2 2 Council Priorities 8 3 Strategy Outcomes 10 1 Engaging and motivating our employees 13 2 Recognised

More information

Improving access to finance for small and medium-sized enterprises

Improving access to finance for small and medium-sized enterprises Report by the Comptroller and Auditor General Department for Business, Innovation & Skills and HM Treasury Improving access to finance for small and medium-sized enterprises HC 734 SesSIon 2013-14 1 November

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

The Government's Drug Strategy

The Government's Drug Strategy Report by the Comptroller and Auditor General HC 297 SesSIon 2009 2010 march 2010 Tackling problem drug use Report by the Comptroller and Auditor General Tackling problem drug use HC 297 Session 2009-2010

More information

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service Agenda Item 8 Page 1 of 9 MEETING Audit, Governance & Review Committee AGENDA ITEM 8 MEETING DATE 11 December 2013 REPORT NUMBER SUBJECT REPORT BY

More information

Contact for further information: Chris Lee, 07876844078, Adult Services, Health and Wellbeing Directorate, chris.lee@lancashire.gov.

Contact for further information: Chris Lee, 07876844078, Adult Services, Health and Wellbeing Directorate, chris.lee@lancashire.gov. Report to the Cabinet Member for Health and Wellbeing and the Cabinet Member for Adult and Community Services Report submitted by: Director of Public Health Date: 16 September 2014 Substance Misuse Tier

More information

ICT Digital Transformation Programme

ICT Digital Transformation Programme Officer and Date Item Cabinet 11 th May 2016 Public ICT Digital Transformation Programme Responsible Officer: Clive Wright, Chief Executive Email: Clive.wright@shropshire.gov.uk Tel: 01743 252007 1.0 Summary

More information

Annex 1. South East Business Services Business Case

Annex 1. South East Business Services Business Case South East Business Services Business Case 1 113 Contents 1. Executive Summary... 3 2. Purpose... 3 3. Background information... 3 4. Vision... 5 5. Partnership Creation and Delivery Challenges... 7 6.

More information

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy

DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for

More information

STOCK POLICY. 1. Framework. 1. Aims of the Stock Policy 2. Definition of Stock 3. Scope of the Stock Policy 4. Legislation 5. County Council Policies

STOCK POLICY. 1. Framework. 1. Aims of the Stock Policy 2. Definition of Stock 3. Scope of the Stock Policy 4. Legislation 5. County Council Policies STOCK POLICY 1. Framework 1. Aims of the Stock Policy 2. Definition of Stock 3. Scope of the Stock Policy 4. Legislation 5. County Council Policies 2. Staffordshire Library & Information Service 1. Libraries

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum.

(2) That the contract runs from 1 April 2015 for an initial period of seven years. The value of the contract will be in the order of 10m per annum. Cabinet Member for Corporate Relations Redesign of Facilities Management Services April 2014 Report by Director Service Operations and Principal Manager Facilities Management Ref No: CR02(14/15) Key Decision:

More information

REPORT TO: POLICY AND RESOURCES COMMITTEE ON 28TH MARCH 2007

REPORT TO: POLICY AND RESOURCES COMMITTEE ON 28TH MARCH 2007 ITEM:13 PAGE: 1 REPORT TO: POLICY AND RESOURCES COMMITTEE ON 28TH MARCH 2007 SUBJECT: BY: ASSET MANAGEMENT CHIEF FINANCIAL OFFICER 1. REASON FOR REPORT 1.1 This report provides details of progress over

More information

Annual Governance Statement

Annual Governance Statement Annual Governance Statement 2014/15 1 Fareham Borough Council Civic Offices, Civic Way, Fareham PO16 7AZ Scope of Responsibility Fareham Borough Council is responsible for ensuring that its business is

More information

FIRE SERVICE EMERGENCY COVER UK OPERATIONAL DEPLOYMENT PROJECT

FIRE SERVICE EMERGENCY COVER UK OPERATIONAL DEPLOYMENT PROJECT FIRE SERVICE EMERGENCY COVER UK OPERATIONAL DEPLOYMENT PROJECT Dennis Davis OBE OStJ QFSM CEng CIMgt FIFireE (Life) MInstE 1. ABSTRACT 1.1 This extensive project has explored a rationale of risk-based

More information

Meeting 2/07/10. consider and discuss the report s recommendations (as relevant to HE and HEFCW) and initial proposals for addressing these

Meeting 2/07/10. consider and discuss the report s recommendations (as relevant to HE and HEFCW) and initial proposals for addressing these For discussion PricewaterhouseCoopers Report Review of the cost of administering the education system in Wales Disclosable Meeting 2/07/10 Agenda Item 13 Reference No HEFCW/10/62 1 Issue This paper presents

More information

STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL. Report to Cabinet. 9 th January 2007

STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL. Report to Cabinet. 9 th January 2007 AGENDA ITEM 9.3 STAFFORDSHIRE MOORLANDS DISTRICT COUNCIL Report to Cabinet 9 th January 2007 TITLE: The Role of City Development Companies in English Cities and City-Regions A Consultation PORTFOLIO: OFFICER:

More information

Firefighter fitness standards and assessment

Firefighter fitness standards and assessment Firefighter fitness standards and assessment Consultation response December 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with

More information

Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said,

Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said, Cabinet Meeting on Wednesday 16 December 2015 Support Services Service and System Replacement Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said, As a well-run

More information

SOUTH WALES FIRE AND RESCUE SERVICE STRATEGIC PLAN 2015-2020

SOUTH WALES FIRE AND RESCUE SERVICE STRATEGIC PLAN 2015-2020 SOUTH WALES FIRE AND RESCUE SERVICE STRATEGIC PLAN 2015-2020 MAKING SOUTHWALES WALES SAFER BY BY REDUCING RISK RISK MAKING SOUTH SAFER REDUCING WWW.DECYMRU-TAN.GOV.UK 3 Foreword Huw Jakeway Chief Fire

More information

HM Revenue and Customs. Asset Management Strategy. February 2008

HM Revenue and Customs. Asset Management Strategy. February 2008 HM Revenue and Customs Asset Management Strategy February 2008 Page 1 Contents Page Introduction 3 1. Capital Stock Survey 3 1.1 Condition of Assets 3 1.2 Departmental Asset Register 4 1.2.2 Net book value

More information

Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014

Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014 TFA document Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014 Tripartite Formal Agreement between: Walsall Healthcare NHS Trust NHS West Midlands Department of Health Introduction

More information

How are companies currently changing their facilities management delivery model...?

How are companies currently changing their facilities management delivery model...? Interserve and Sheffield Hallam University market research 2012 Page 2 www.commercial.interserve.com How are companies currently changing their facilities management delivery model...? we have a strategy

More information

Buckinghamshire & Milton Keynes Fire Authority

Buckinghamshire & Milton Keynes Fire Authority ITEM 6 Buckinghamshire & Milton Keynes Fire Authority MEETING Executive Committee DATE OF MEETING 18 March 2015 OFFICER LEAD MEMBER SUBJECT OF THE REPORT David Sutherland, Acting Director of Finance and

More information

How To Manage A Fire Risk

How To Manage A Fire Risk Greater Manchester Fire and Rescue Service Integrated Risk Modelling 2013/14 Contents Contents... 1 Introduction... 2 Our Legal Responsibilities... 2 Integrated Risk Management... 3 Integrated Risk Assessment

More information

Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07

Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07 Performance Detailed Report Date Last saved: 12/10/2007 13:18:00 Property asset management Audit 2006/07 - Audit Commission descriptor to be inserted by Publishing- Document Control Author Filename Bob

More information

Building Schools for the Future. Communications and Engagement Plan

Building Schools for the Future. Communications and Engagement Plan Building Schools for the Future Communications and Engagement Plan 1.0 Project Background BSF is a unique transformational project that will transform teaching and learning for young people, teachers and

More information

Staffordshire Waste Partnership Phone Application Business Case. Staffordshire Waste Partnership. Phone Applications.

Staffordshire Waste Partnership Phone Application Business Case. Staffordshire Waste Partnership. Phone Applications. Staffordshire Waste Partnership Phone Applications Business Case 1 Contents 1. Background... 3 2. Aims... 3 3. Objectives... 3 4. Approach... 3 5. Proposals... 4 6. Recommendations... 7 7. Stakeholders...

More information

Private sector partnering in the police service

Private sector partnering in the police service PRACTICAL GUIDE Private sector partnering in the police service A practical guide to major business partnering, custody partnering and consultancy support 2 Private sector partnering in the police service

More information

Succession Planning Policy and Procedure

Succession Planning Policy and Procedure Succession Planning Policy and Procedure Reference No. P08:2012 Implementation date 07022013 Version Number V1.0 Reference No: Name. Linked documents P14:2002 Police Staff Recruitment and Selection Policy

More information

CABINET 9 APRIL 2013 BUSINESS LOAN FUND REPORT OF THE CHIEF EXECUTIVE

CABINET 9 APRIL 2013 BUSINESS LOAN FUND REPORT OF THE CHIEF EXECUTIVE E CABINET 9 APRIL 2013 BUSINESS LOAN FUND REPORT OF THE CHIEF EXECUTIVE Purpose of the Report PART A 1. To seek approval for the establishment of a Business Loan Fund for small business in Leicestershire.

More information

Community Safety Strategy 2010-15

Community Safety Strategy 2010-15 Community Safety Strategy 2010-15 SUSTAINING EFFECTIVE PROTECTION AND PREVENTION DURING A PERIOD OF ECONOMIC AND SOCIAL DECLINE David Mallin Head of Community Safety 1 Contents 1 INTRODUCTION 4 PAGE 2

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

Consultation Document. Retained Firefighters pension settlement: A consultation to provide access to a modified pension scheme in Wales

Consultation Document. Retained Firefighters pension settlement: A consultation to provide access to a modified pension scheme in Wales Number: WG19518 Welsh Government Consultation Document Retained Firefighters pension settlement: A consultation to provide access to a modified pension scheme in Wales Date of issue: 23 August 2013 Action

More information

Procurement Strategy 2013-2017 Delivering Social Value for our Community

Procurement Strategy 2013-2017 Delivering Social Value for our Community Procurement Strategy 2013-2017 Delivering Social Value for our Community Making Bath & North East Somerset an even better place to live, work and visit 1 Picture courtesy of Bath & News Media Group Our

More information

Registered Nurses and Health Care Support Workers. A summary of RCN policy positions

Registered Nurses and Health Care Support Workers. A summary of RCN policy positions Registered Nurses and Health Care Support Workers A summary of RCN policy positions 2 Registered Nurses and Health Care Support Workers - A summary of RCN policy positions Overview Overview This briefing

More information

Building Resilient Families and Communities- A Performance Management Framework

Building Resilient Families and Communities- A Performance Management Framework Building Resilient Families and Communities- A Performance Management Framework April 2013 Document details Document version Version 7 Date revised Contributors: 31 st May 2013 Sharon Moore Staffordshire

More information

The West Midlands Ambulance Service Authority - A Summary of Recommendations

The West Midlands Ambulance Service Authority - A Summary of Recommendations Committee and Date (Healthy Communities Scrutiny Committee 26 th July 2011) Cabinet 19 th October 2011 12.30 pm Item Public 6.1 Report of the West Midlands Ambulance Service Task and Finish Group Responsible

More information

Business Plan for Strategic Human Resources - March 2012 to 30 September 2013

Business Plan for Strategic Human Resources - March 2012 to 30 September 2013 Business Plan for Strategic Human Resources - March 2012 to 30 September 2013 1. Introduction 1.1 The Service s key responsibilities are to: 1.2 Context Design & deliver people and organisational development

More information

Dynamic: Dynamic risk management is carried out by all personnel at an operational incident.

Dynamic: Dynamic risk management is carried out by all personnel at an operational incident. Dynamic Risk assessment overview Introduction The dynamic management of risk is about decision making. Prior to involvement at operational incidents, members are required to be fully trained and conversant

More information

Attached is the 2015-16 business plan for Transport Services for consideration by OPCC. (Please see attached)

Attached is the 2015-16 business plan for Transport Services for consideration by OPCC. (Please see attached) Financial Performance Programme 2014-15 Report to: the Office of the Police and Crime Commissioner for Essex Report from: Essex Police Meeting Date: 21 st May 2015 Topic: Transport Services 15-16 Business

More information

Developing the workforce to support children and adults with learning disabilities described as challenging

Developing the workforce to support children and adults with learning disabilities described as challenging Developing the workforce to support children and adults with learning disabilities described as challenging Professor Lisa Bayliss- Pratt Director of Nursing- Health Education England Health Education

More information

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer

More information

E: Business support and access to finance

E: Business support and access to finance E: Business support and access to finance 41 The North East Local Enterprise Partnership area benefits from a committed workforce, a good business environment and a competitive cost base. However, the

More information

Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary)

Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary) Appendix 1 Business Case to Support the Relocation of Mental Health Inpatient Services in Manchester (Clinical Foreword and Executive Summary) Together we are better Foreword by the Director of Nursing

More information

Highway Network Management Plan 2008 to 2017

Highway Network Management Plan 2008 to 2017 Herefordshire Council Environment Directorate Highway Network Management Plan 2008 to 2017 Michael Hainge Director of Environment Brockington, Hafod Road, Hereford March 2008 1 Table of Contents 1 Executive

More information

Public Sector Outsourcing. The way of the Future? Gavin Snell Capita Dave Rumble Serco

Public Sector Outsourcing. The way of the Future? Gavin Snell Capita Dave Rumble Serco Public Sector Outsourcing The way of the Future? Gavin Snell Capita Dave Rumble Serco Public Sector Marketplace Drivers Developments Requirements Rising cost of welfare and healthcare Wider approach to

More information

Customer Management Strategy (2014-2017)

Customer Management Strategy (2014-2017) Customer Management Strategy (2014-2017) Version 1.1 Page 1 Foreword As technology improves, the demand for Council services to be available online and accessible 24/7 will increase as our customers choose

More information

Corporate Governance Service Business Plan 2011-2016. Modernising Services

Corporate Governance Service Business Plan 2011-2016. Modernising Services Corporate Governance Service Business Plan 2011-2016 Modernising Services Index 1. Executive Summary 3 2. Vision and Strategy 4 3. Service Overview 3.1 What Services do we and Will we Deliver? 5 3.2 How

More information

Review of compliance. Mid Staffordshire NHS Foundation Trust Stafford Hospital. West Midlands. Region:

Review of compliance. Mid Staffordshire NHS Foundation Trust Stafford Hospital. West Midlands. Region: Review of compliance Mid Staffordshire NHS Foundation Trust Stafford Hospital Region: Location address: Type of service: Regulated activities provided: Type of review: West Midlands Mid Staffordshire NHS

More information

18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester.

18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester. Environmental & Community Services Select Committee 18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester. Present: Mr Tyler (Chairman) Mr Barrett-Miles Mr

More information

In good health. Public health teams in local authorities Year 2. February 2015

In good health. Public health teams in local authorities Year 2. February 2015 In good health Public health teams in local authorities Year 2 February 2015 Foreword The public health workforce is at the heart of both improving and protecting the public s health and as such the views

More information

Digital Inclusion Programme Started. BL2a

Digital Inclusion Programme Started. BL2a PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects

More information

National Contact Management Strategy

National Contact Management Strategy National Contact Management Strategy 2010 National Contact Management Strategy (NCMS) This document has been produced by the National Policing Improvement Agency (NPIA) on behalf of the Association of

More information

Fleet Strategy 2015-2018

Fleet Strategy 2015-2018 Fleet Strategy 2015-2018 Foreword I am pleased to introduce the Fleet Strategy for Cheshire Constabulary, with its focus very firmly upon supporting frontline operations in the most cost efficient way.

More information

Corporate Director Health and Care Services

Corporate Director Health and Care Services COUNTY COUNCIL Meeting date: 16 th January 2014 From: Corporate Director Health and Care Services CUMBRIA ALCOHOL STRATEGY 1.0 EXECUTIVE SUMMARY 1.1 In 2009 partners involved in tackling alcohol related

More information

Decisions 1. Permission to tender for a recruitment partner to supply 15 permanent social work practitioners with a contract value of 159,000.

Decisions 1. Permission to tender for a recruitment partner to supply 15 permanent social work practitioners with a contract value of 159,000. ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 28 th October 2015 Title Report of Wards Status Recruitment of Children s Social Work Practitioners Nicola Francis, Family Services Director All Public Enclosures

More information

Cabinet Meeting - 16 th July 2014 Staffordshire Business Loan Fund Update

Cabinet Meeting - 16 th July 2014 Staffordshire Business Loan Fund Update Cabinet Meeting - 16 th July 2014 Staffordshire Business Loan Fund Update Councillor Mark Winnington, Cabinet Member for Economy and Infrastructure said: Creating the right conditions for economic growth,

More information

Appendix 1: Performance Management Guidance

Appendix 1: Performance Management Guidance Appendix 1: Performance Management Guidance The approach to Performance Management as outlined in the Strategy is to be rolled out principally by Heads of Service as part of mainstream service management.

More information

Guidance on the template contract for social impact bonds and payment by results

Guidance on the template contract for social impact bonds and payment by results Guidance on the template contract for social impact bonds and payment by results Introduction These guidance notes have been prepared to assist users of the Cabinet Office template contract. The guidance

More information

Health Business Services. Operational Plan 2015

Health Business Services. Operational Plan 2015 Health Business Services Operational Plan 2015 2014 1. Health Business Services Priorities for 2015 System Wide Priorities Improve quality and patient safety with a focus on: - Service user experience

More information

A RESPONSIBLE, COLLABORATIVE AND AGILE ORGANISATION

A RESPONSIBLE, COLLABORATIVE AND AGILE ORGANISATION 44 NZ Transport Agency Statement of intent 215 19 A RESPONSIBLE, COLLABORATIVE AND AGILE ORGANISATION In order to deliver our desired targets and results effectively and efficiently, we continue to invest

More information

Technology Review Feedback Vale of Glamorgan Council

Technology Review Feedback Vale of Glamorgan Council Technology Review Feedback Vale of Glamorgan Council Audit year: Annual Improvement Assessment 2011 Issued: October 2011 Document reference: 538A2011 Status of report The person who delivered the work

More information

Funding local authorities to support former Independent Living Fund recipients: the former ILF Recipient Grant

Funding local authorities to support former Independent Living Fund recipients: the former ILF Recipient Grant Funding local authorities to support former Independent Living Fund recipients: the former ILF Recipient Grant Technical consultation response: LGA and ADASS February 2016 About the LGA and ADASS 1. The

More information

Managing and removing foreign national offenders

Managing and removing foreign national offenders Report by the Comptroller and Auditor General Home Office, Ministry of Justice and Foreign & Commonwealth Office Managing and removing foreign national offenders HC 441 SESSION 2014-15 22 OCTOBER 2014

More information

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot

JOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:

More information

CABINET June 2nd 2015 EXECUTIVE SUMMARY OF AGENDA ITEM 6

CABINET June 2nd 2015 EXECUTIVE SUMMARY OF AGENDA ITEM 6 CABINET June 2nd 2015 EXECUTIVE SUMMARY OF AGENDA ITEM 6 Report title: CUSTOMER AND STOCK DATABASE SYSTEM RENEWAL (LIBRARY MANAGEMENT SYSTEM) Wards affected: All Strategic Director: Alison Comley Report

More information

Flood Evacuation Strategy Hawkins Lane, Burton on Trent

Flood Evacuation Strategy Hawkins Lane, Burton on Trent Flood Evacuation Strategy Hawkins Lane, Burton on Trent Tesco Stores Ltd 10-Apr-14 Issue and Revision Record Rev Date Changes Originator Checker Approver - 10.09.10 N/A BS GB NK A 10.04.14 Amended to suit

More information

SFRS BOARD MEETING DECISION LOG

SFRS BOARD MEETING DECISION LOG SFRS BOARD MEETING DECISION LOG PURPOSE Decisions made at the meetings of the Board of the Scottish Fire and Rescue Service (SFRS) are recorded in the minutes of these meetings and published on the SFRS

More information