1 and retail Property SUMMARY Costing Energy Efficiency Improvements in Existing Commercial Buildings This research was commissioned by the IPF Research Programme JULY 2012
2 This research was funded and commissioned through the IPF Research Programme This Programme supports the IPF s wider goals of enhancing the understanding and efficiency of property as an investment. The initiative provides the UK property investment market with the ability to deliver substantial, objective and high-quality analysis on a structured basis. It encourages the whole industry to engage with other financial markets, the wider business community and government on a range of complementary issues. The Programme is funded by a cross-section of 22 businesses, representing key market participants. The IPF gratefully acknowledges the support of these contributing organisations:
3 Summary IPF Research Programme July Investment Property Forum
4 Research Richard Quartermaine, Sweett (UK) Limited Azita Dezfouli, Sweett (UK) Limited David Sutton, Sweett (UK) Limited Project steering group Louise Ellison, Quintain Estates & Development PLC Gerry Blundell, Consultant Tim Coffin, Universities Superannuation Scheme Pam Craddock, IPF Disclaimer This document is for information purposes only. The information herein is believed to be correct, but cannot be guaranteed, and the opinions expressed in it constitute our judgement as of this date but are subject to change. Reliance should not be placed on the information and opinions set out herein for the purposes of any particular transaction or advice. The IPF cannot accept any liability arising from any use of this document.
5 contents 1. Introduction 1 2. Energy, CO 2 and commercial buildings CO 2 emissions from commercial buildings Improvement opportunities for landlords Modelling CO 2 emissions and energy consumption 3 3. Building selection and research method Buildings analysed Commercial building refurbishments Costing process and assumptions Capital cost Lifecycle costs and energy savings 6 4. Key findingss Summary Energy efficiency quick wins Individual improvements to office buildings Individual improvements to retail buildings Individual improvements to industrial/warehouse buildings Conclusion 12
6
7 1 1. INTRODUCTION In recent years, brand new, highly efficient office buildings have tended to grab the headlines when discussing improved energy performance in commercial properties. Opportunities to reduce energy consumption in existing buildings have been underpublicised for a variety of reasons, the most notable being a lack of available cost data, appropriateness of certain technologies and their respective energy savings, perceived level of disruption to occupiers and the who pays, who gains issue between landlords and tenants. In January 2009, the Investment Property Forum (IPF) published a report investigating the costs of making energy efficiency improvements to existing commercial buildings. The primary aims of the orginal research 1 were to identify the key improvements that could be made to existing commercial buildings and the building types that presented the greatest opportunities to reduce carbon dioxide (CO 2 ) emissions. Since its publication, the research has been used to support strategic decision making by the property and investment community through iddentifying those buildings in a portfolio that can yield the largest CO 2 savings for the least cost. The research has been of particular value to investment fund managers, asset managers, property managers and letting agents. In the past three years, regulations, incentives and Government initiatives have evolved and are driving a much greater interest in improving the energy performance of existing buildings. Key drivers include: Revised Building Regulations 2010 (and a proposed future change in 2013/14) that will mean that existing buildings will all demonstrate a lower EPC rating when re-assessed; Introduction and subsequent changes made to the Feed In Tariff incentive scheme for solar photovoltaic panels and wind turbines plus a new incentive for the production of renewable heat known as the Renewable Heat Incentive; Proposed simplification of the CRC Energy Efficiency Scheme; Imminent implementation of the Green Deal innovative funding mechanism, whereby owners and occupiers of buildings can take out finance to fund energy efficiency improvements with the repayment obligation being attached to the electricity meter rather than the party applying for the finance; and Government plans to introduce a minimum energy performance standard preventing landlords from letting commercial properties with F and G EPC ratings from 2018 at the latest. The aim and objectives of the updated research are consistent with the original research to provide the same value to users as before. However, attention to certain additional objectives is necessary to respond to the changed environmental agenda affecting existing commercial buildings. Two additional areas of focus of the work are: 1. Identifying the cost and improvement measures required to improve EPC ratings from the baseline position for the building types analysed. 2. Determining what EPC/CO 2 reduction targets should be set now to prevent a building being either F or G rated in The study analyses a number of commercial building types and the findings are presented from the perspective of a landlord, investor, developer or owner occupier. Therefore, only the base specification of each building has been assessed and not the CO 2 emissions produced by the tenants own equipment, nor how to reduce them. 1 Costing Energy Efficiency Improvements in Existing Buildings, IPF London, 2009
8 2 Costing Energy Efficiency Improvements in Existing Commercial Buildings 2. Energy, CO 2 and commercial buildings 2.1 CO 2 emissions from commercial buildings In 2003, commercial buildings were responsible for around 14% of total CO 2 emissions in the UK (source: BRE, 2006). Remaining emissions were produced by transport (33%), domestic buildings (26%), industrial processes (22%) and public and other buildings (5%). Total emissions from commercial buildings can be further sub-divided as presented in Figure 2.1. Figure 2.1: CO 2 emissions from commercial buildings 11% 13% 15% 33% Factories Retail Hospitality Warehouses Commercial offices 28% Source: BRE, 2006 CO 2 emissions are most significant from the stock of and retail buildings, accounting for over 60% of all emissions from the commercial sector. 2.2 Improvement opportunities for landlords The actions of both landlords and tenants have a direct influence on the energy consumption within a building and, in turn, the CO 2 emitted. The landlord has sole control over the performance of the building fabric, whereas the tenant is solely responsible for using the building in terms of hours of use, density of occupants, IT equipment efficiency and setting internal temperatures. However, both landlords and tenants have some influence on the energy efficiency of the installed building services insofar as the landlord may install the electrical and mechanical systems and the tenant will run them to suit their occupational requirements. A tenant may also influence the specification of the installed building services where, for example, an office development has been built to a shell and core specification by a developer or where a retail unit has been let on a shell only basis. There are significant opportunities for landlords to improve the energy efficiency of the commercial buildings they let to tenants. Key buildings are offices, supermarkets, retail warehouses, light industrial buildings and warehouses. Factories and many retail buildings were excluded from the study because the vast majority of their emissions result from building operations by the tenant (for example, factory processes and refrigeration equipment) rather than from the building. A more detailed discussion of the decision to omit these is included in the full research report.
9 3 2. Energy, CO 2 and commercial buildings 2.3 Modelling CO 2 emissions and energy consumption Part L of the Building Regulations and Energy Performance Certificates (EPCs) only regulate and predict a proportion of CO 2 emissions in a building as shown in Figure 2.2. Specifically, only heating, cooling, hot water, ventilation and lighting energy consumption is accounted for and standard working hours and occupancy are assumed. The modelling process therefore does not include any allowance for the occupants equipment or appliances or account for extended working hours for example. Figure 2.2: Building energy consumption measures by Part L, EPCs and DECs 2 Actual total energy use Design prediction (Part L & EPC) Actual rated energy use (DEC) Predicted regulate CO 2 Unregulated CO 2 Extra occupancy Inefficiencies Special & working hours functions Regulated energy use includes modelled heating, hot water, cooling, ventilation and energy Unregulated energy use includes plug load, server rooms, security, external lighting, lifts, etc. Extra occupancy and equipment and extra operating hours (e.g. evening/weekend working) Inefficiencies from poor control, bad commissioning, bad maintenance, etc. Special functions (separable energy uses) include trading floors, server rooms, cafeteria, etc. A Display Energy Certificate (DEC), currently only mandatory for public buildings or buildings with public tenants, measures almost all elements of actual energy use in a building whereas an EPC includes a theoretical prediction of how a building could perform if realistically upgraded. An EPC therefore reflects the scale of influence a landlord has to affect energy consumption and CO 2 emissions in a building. 2 Carbon Trust (2011), Closing The Gap, available from the Carbon Trust website (ref CTG047)
10 4 Costing Energy Efficiency Improvements in Existing Commercial Buildings 3. Building selection and research method 3.1 Buildings analysed The types of commercial building analysed have been largely maintained as per the original study but with certain revisions. Two key changes are: 1. The number of office types analysed has been reduced to produce more consolidated results based on the findings of the original study. 2. The introduction of an office building compliant with the 2006 Part L regulations to investigate how the 2010 revised regulations will impact upon its EPC rating. Since the original work was published, Part L of the Building Regulations has been revised (in 2010). This revision means that new non-domestic buildings must achieve on average a 25% reduction in CO 2 emissions compared with the 2006 regulations. The change also signifies that buildings constructed prior to the introduction of the 2010 regulations would achieve a poorer EPC rating if they were to be reassessed now. This is because a building that is compliant with the latest regulations will score either a B or C rating (depending on the servicing strategy) but the change in regulations will mean that the building is comparatively less efficient, so it will be lower on the EPC scale (i.e. D- or E-rated for example). It should be noted that the buildings modelled are best-fit representations of the existing stock and not case studies of actual buildings. These models represent a building that is let by a landlord to a tenant and do not consider how the tenant uses the building or the implications of IT and other equipment they install. Figure 3.1 gives a notional representation of the base buildings analysed in the update study. Figure 3.1: Example buildings representing the base building models Office 1 Reflects mid-town and West End offices, which are predominantly period, dating from pre Heating system only. Office 2 Partly glazed air-conditioned early 1990s, narrow-plan office. Compliant with 1990 Part L Building Regulations.
11 5 3. Building selection and research method Office 3 Fully glazed deep-plan air-conditioned office. Compliant with 2002 Part L Building Regulations. Office 4 As Office 3 but compliant with 2006 Part L Building Regulations. Retail Single storey with lighting, heating and air conditioning. Limited windows. Office and warehouse space included. Compliant with 1990 Part L Building Regulations. Industrial/warehouse Single storey with lighting and heating. Limited windows or rooflights. Offices included. Compliant with 1990 Part L Building Regulations. 3.2 Commercial building refurbishments The refurbishment of an existing building to meet a market standard specification would naturally reduce operational CO 2 emissions. The definition of market standard is the minimum energy efficiency standard a building could be refurbished to, given available technology, and to meet regulations. It does not include any plant, systems or equipment that are more energy efficient compared to other versions on the market, which, in most cases, would come at an increased cost. For example, replacing a 20 year old boiler with a market standard boiler will see a reduction in gas consumption because the new version will be typically 90% efficient compared to 65% for the old model. However, a 95% efficient boiler could be specified as part of the refurbishment, which would be more expensive but would save more energy. This study examines the reduction in CO 2 emissions resulting from a market standard refurbishment and the additional reduction that can be achieved if enhanced energy efficiency improvements are specified.
12 6 Costing Energy Efficiency Improvements in Existing Commercial Buildings 3. Building selection and research method 3.3 Costing process and assumptions Capital costs The basis of the research was to assess the costs associated with making certain energy efficiency improvements that are typically beyond the scope of a market standard refurbishment. To demonstrate which of these improvements were most cost effective, it was necessary to quantify the extra over capital cost of the upgrade compared with the respective like-for-like replacement under a market standard refurbishment. The extra over cost was derived from the difference between the capital cost of the upgrade and the capital cost of the standard refurbishment item. These costs were estimated individually for each building type modelled and represent the total cost to a client of construction work (i.e. cost to the landlord). All costs are current at Q price levels. The extra over capital cost has also been calculated for those improvements that could be carried out whilst a tenant is (or multiple tenants are) in occupation of the building. Most improvements can be carried out during evenings and weekends although there would be an extra cost for undertaking work at these times Lifecycle costs and energy savings For each energy efficiency improvement, the operational costs and energy savings were also calculated. Previously, the internal rate of return (IRR) and discounted payback period were calculated in order to indicate investment potential. The update study shows all costs and savings on an undiscounted basis and provides enough data to allow the user to calculate the financial metrics to suit their own particular requirements. In particular, the detailed results include the additional capital cost of each improvement, estimated life of the installation, gas, electricity and CO 2 savings (in terms of reduced CRC payments) and available incentives (where applicable). Current and projected future gas and electricity prices as published by the Department for Energy and Climate Change (DECC) were used to estimate the likely financial benefit from the energy saved under two energy price scenarios.
13 7 4. Key findings 4.1 Summary A key objective of the update study was to identify the cost of improving the EPC rating for each building. This required: The modelling of the building s baseline EPC rating; An assessment of how a market standard refurbishment (i.e. no extra expenditure on energy efficiency beyond meeting regulatory compliance) would inherently improve the EPC rating; and Establishing the additional cost and benefit of specifying a series of enhanced energy efficiency improvements. Summary results for all buildings are presented in Table 4.1. Table 4.1: Additional capital cost to improve EPC ratings when refurbishing existing commercial buildings Office 1 Office 2 Office 3 Office 4 Retail Industrial / warehouse EPC rating Baseline E G F E D F Market refurb D F F E 3 C B Additional capital cost extra over market standard refurbishment 4 (%) E 0.3% 1.0% D 1.7% 1.9% 1.0% C 0.8% 14.6% 12.6% 12.8% B 14.1% 37.3% 44.7% 45.7% 2.6% A 40.0% % Headline findings are: a. As expected, offices have become more energy efficient since the early 1990s because building regulations have driven a reduction in CO 2 emissions. Non-air-conditioned offices also perform better in terms of their EPC rating compared to air-conditioned offices. b. A market standard refurbishment can improve the EPC rating by at least one grade for most buildings. The improvement is substantial for the industrial/warehouse building (i.e. rating improves from an F to a B). c. All offices can be improved by an extra grade for an additional cost of up to 1% of the refurbishment budget which is potentially viable for most projects. d. Air-conditioned offices built over 10 years ago (Offices 2 and 3) represent the most cost effective opportunity because EPC ratings can be improved by two EPC grades for a total extra spend of circa 2%. e. The EPC rating of the retail building can be improved to a B for an additional capital sum of 2.6% above the standard refurbishment cost and, therefore, this is attractive in terms of future-proofing the asset. f. It is unviable to achieve an A-rated EPC for all buildings (including the industrial/warehouse, which can achieve a B rating through refurbishing to a market standard). 3 A market refurbishment would not be carried out to a building which is less than 10 years old hence no improvement in the EPC rating. 4 All costs are cumulative.
14 8 Costing Energy Efficiency Improvements in Existing Commercial Buildings 4. Key findings It is also anticipated that the EPC rating for the office built after 2006 (Office 4) will drop from an E to an F following the next revision to Part L based on a comparison between the 2006 and 2010 versions of the regulations. The proposed minimum energy efficiency standards for buildings let by landlords to be introduced by 2018 will mean that even offices built to recent standards will be affected by this forthcoming legislation. This will also apply to retail and industrial/warehouse buildings. The increased energy efficiency standards under the Building Regulations will undoubtedly result in the industrial/warehouse building being rated as a G by 2018 and it is likely that the retail building would be rated as F or G and thus be affected by the minimum standards. An EPC is valid for 10 years and, therefore, a currently certified building might be temporarily shielded from the impact of the 2018 standard but any refurbishment work or request from a prospective buyer or tenant for an updated EPC might expose the landlord to the new rules. 4.2 Energy efficiency quick wins The update study has demonstrated that there are common energy efficiency quick wins across a range of commercial building types that are low cost to implement and can improve EPC ratings by either one or two grades. These quick wins are: Boilers (95% efficiency); Daylight controls; Improving air tightness; Variable speed heating and cooling pumps; Heating controls; Power factor correction (>0.95); High-efficiency chillers; T5 lighting; Heat recovery; and DC drive fan coil units. These quick wins can either form part of a general refurbishment during a period of vacant possession or be one-off improvements when the building is wholly or partly occupied. This is an important consideration when a planned refurbishment is some years away and one or more leases are due to expire. The introduction of EPCs has made tenants acutely aware of how buildings perform in terms of their energy performance and the issue is likely to be prevalent during lease negotiations. If a landlord carries out a few quick wins to improve the rating of a building, these could assist a lease renewal, reduce void periods and potentially affect the rental level achieved. Replacing lighting and fan coil units poses particular challenges, especially for retail buildings, but can still be implemented out of hours, over an extended period of time. The premium to undertake these works out of hours would typically be no more than 7% because the extra cost of labour is offset by not having to pay main contractor s preliminaries, overheads and profit.
15 9 4. Key findings Individual improvements to office buildings Table 4.2 identifies the energy efficiency improvements that need to be implemented to improve the EPC ratings above market standard for each office and the additional cost of specifying these measures compared to the cost of a market standard refurbishment. All costs are cumulative. The research found that there were often alternative strategies that were more cost effective to meet particular EPC ratings rather than a strategy based on market standard cost only. It is recommended that a full options appraisal with financial cost-benefit analysis is undertaken prior to any refurbishment works to determine the most cost-effective way of cutting CO 2 and securing improved EPC ratings. Table 4.2: Office EPC improvement strategies Additional Capital Cost (%) EPC Rating Office 1 Office 2 Office 3 Office 4 Cost Improvements Cost Improvements Cost Improvements Cost Improvements E 0.3% Daylight controls VS pumps D 1.7% Power factor Chiller Air tightness Boiler 95% Heat recovery 1.0% Power factor VS pumps Chiller 1.9% Specific fan power Daylight controls 1.0% VS pumps Chiller Daylight controls C 0.8% Daylight controls Air tightness VS pumps Heating controls Power factor 14.6% Heating controls Specific fan power PIR controls LED lighting Passive chilled beams 12.6% Boiler 95% External shading 12.8% Boiler 95% Specific fan power External shading B 14.1% Air source heat pumps PV 375m2 37.3% PV 375m 2 External shading 44.7% LED Lighting Heating controls Passive chilled beams 45.7% Heat recovery LED lighting Passive chilled beams A 40.0% LED lighting PIR controls Double glazing Key: PV = photovoltaic panels; PIR = passive infra-red; VS = variable speed; LED = light-emitting diode The foregoing results indicate that EPC ratings for all offices can be improved by an extra grade for an additional cost of up to 1% of the refurbishment budget. This is a relatively minor amount to spend when undertaking a refurbishment project to secure a better EPC rating. Air-conditioned offices built over 10 years ago (Offices 2 and 3) represent the most cost effective opportunity to further enhance EPC ratings and cut CO 2. For a total extra spend of circa 2%, the EPC can be improved by two ratings above a market standard refurbishment (i.e. F to D for both Offices 2 and 3). Improving the EPC to a C rating becomes significantly more expensive and requires additional expenditure of 12% or more.
16 10 Costing Energy Efficiency Improvements in Existing Commercial Buildings 4. Key findings For Offices 1 and 4, improving EPC ratings by two grades is less cost effective compared to the other offices, as an additional total investment of around 12% to 15% is required. It is possible to improve the EPC ratings to either a C or B for air-conditioned offices but it is expensive to do so. An A-rated EPC was not practically achievable based on the improvements considered although it might be possible if a more detailed analysis was undertaken and further options explored. The naturally ventilated office could achieve an A rating but the cost would be prohibitive as refurbishment costs would need to increase by a staggering 40%. The quick wins shown in Table 4.2 can either form part of a general refurbishment during a period of vacant possession or as one-off improvements when the building is wholly or partly occupied. The work will be done predominantly out of hours. However, significant items of work in an occupied office will take considerably more time to undertake. This includes lighting and fan coils units. It might be favourable to refrain from undertaking these types of improvements until the next planned refurbishment if it is in the short to medium term. Chilled beams and fabric enhancement measures (with the exception of external shading) would not be undertaken when a building is occupied due to the level of disruption such works would cause Individual improvements to retail buildings Table 4.3 identifies the energy efficiency improvements that need to be implemented to improve the EPC rating for the retail building and the additional cost of specifying these measures compared to the cost of a market standard refurbishment. All costs are cumulative. Table 4.3: Retail EPC improvement strategy EPC Rating Additional Capital Cost (%) Cost Improvements B 2.6% Power factor correction Variable speed pumps DC drive fan coils Air tightness Heat recovery Boiler 95% Chiller A - - The results indicate that a B-rated EPC can be achieved by spending an additional 2.6% over and above the cost of a market standard refurbishment project. Further improvements become significantly more expensive and, in practice, it would be difficult to achieve an A rating based on the improvements considered (which included several low- and zero-carbon energy sources). The quick wins shown in Table 4.3 can either form part of a general refurbishment during a period of vacant possession or as one-off improvements when the building is wholly or partly occupied. However, due to the high hours of use of retail buildings compared to offices, improvements to lighting and fan coil units out of hours are not likely to be feasible without a high risk of disrupting trading activities. It is advisable, therefore, to refrain from undertaking these types of improvements until the next planned refurbishment.
17 11 4. Key findings Individual improvements to industrial/warehouse buildings Table 4.4 identifies the energy efficiency improvements that need to be implemented to improve the EPC rating for the industrial/warehouse building and the additional cost of specifying these measures compared to the cost of a market standard refurbishment. All costs are cumulative. Table 4.4: Industrial/warehouse EPC improvement strategy EPC Rating Additional Capital Cost (%) Cost Improvements A 20.7% Power factor correction Variable speed pumps Boiler 95% External wall insulation Heat control Warm air blowers Wind turbine (20kWp) Photovoltaics (750m²) The results indicate that an A-rated EPC can be achieved by spending an additional 20% over and above the cost of a market standard refurbishment. This would be a significant increase to the base refurbishment cost and not feasible in most cases. A large photovoltaic array and a wind turbine would also be needed to achieve an A rating, which will not be feasible for some buildings. Most improvements considered for the refurbishment scenario are potentially viable as one-offs when the industrial/warehouse building is occupied. However, replacing the full lighting system would require more time to complete if undertaken at weekends.
18 12 Costing Energy Efficiency Improvements in Existing Commercial Buildings 5. Conclusion The current research demonstrates that a business case remains for taking action to improve energy performance in existing commercial buildings. The Energy Performance Certificate (EPC) rating for an office, retail building or industrial/warehouse building can be improved cost effectively by either specifying more energy efficient building services when undertaking a refurbishment project or through ad hoc improvements when the building is wholly or partly occupied. Implementing measures recommended in this report can significantly reduce the exposure to landlords of the planned minimum energy performance standards scheduled to be introduced by 2018 and also satisfy increasing demand for low energy commercial buildings. It is imperative, therefore, that landlords review their portfolios to identify those assets that are at risk and prepare a strategy (with timescales and cost benefit analysis) to improve energy performance accordingly. The split incentive to invest in energy efficiency improvements between landlords and tenants is often cited as the main cause for the lack of action being taken. However, better available data on the costs and efficiency savings from implementing a range of improvement options, as detailed in the full report, is a critical first step in enabling landlords and tenants to negotiate more effectively lease terms to support more sustainable property occupation and management.
19 13
20 Investment Property Forum New Broad Street House 35 New Broad Street London EC2M 1NH Telephone: Fax: Web: Printed on recycled paper
Green investment an asset value? Miles Keeping Director
Green investment an asset value? Miles Keeping Director Downloadable from www.greenleases-uk.com Agenda Making office buildings greener: How is it an issue? Why is it an issue? What are the effects of
Energy Performance Certificate
Energy Performance Certificate 0 Raleigh Drive CULLOMPTON EX15 1FZ Dwelling type: Date of assessment: Date of certificate: Reference number: Type of assessment: Total floor area: Semi detached house 09
Passive & Active Design
Passive & Active Design CIBSE Building Simulations Group Peter A. Brown CEng, MBA October 2010 Introduction Passive & Active Design Introduction What are the interactions between passive and active design?
BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust
BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched
What can we learn from the commercial sector and building modelling
What can we learn from the commercial sector and building modelling Chris Twinn FRSA HonFRIBA FCIBSE MEI CEng BSc(Hons) Founder & CEO of Buildings that do not cost the Earth 2 This is how energy efficient
CTBUH Copyright. What every tenant wants. Chairman, Jones Lang LaSalle. Dan Probst
What every tenant wants Dan Probst Chairman, Jones Lang LaSalle Chicago, USA Industry drivers Converging forces Mass acceptance of global warming, climate change Rising energy prices Widely accepted green
(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)
Energy Performance Certificate Georgia House Stud Bradley Road Burrough Green NEWMARKET CB8 9NH Dwelling type: Detached house Date of assessment: 17 August 2011 Date of certificate: 17 August 2011 Reference
Domestic energy consumption in Barnet has reduced but remains higher than the British average:
HOME ENERGY EFFICIENCY ACT (HECA) RETURN LB BARNET 31ST MARCH 2013 The following report sets out the energy conservation actions being or proposed to be taken by London Borough of Barnet that it considers
Low Carbon Domestic Refurbishment
www.breeam.com Briefing Paper Low Carbon Domestic Refurbishment Kiruthiga Balson, Gavin Summerson and Steven Stenlund 2 BRE Global Ltd 2014 Permission is granted for this report to be distributed only
Introduction to the London Energy Efficiency Fund (LEEF)
Executive Summary Introduction to the London Energy Efficiency Fund (LEEF) 1. The London Green Fund (LGF) is a 100m Fund comprising of 50m from the London 2007-13 European Regional Development Fund (ERDF)
Big Yellow Group PLC Basis of Reporting 1st April 2012 31st March 2014 Corporate Social Responsibility
Big Yellow Group PLC Basis of Reporting 1st April 2012 31st March 2014 Corporate Social Responsibility Deloitte LLP provides independent and limited assurance of selected subject matters in our annual
Energy Efficiency Insurance. Product overview
Energy Efficiency Insurance Product overview High energy prices combined with a desire to reduce CO2 emissions have seen increasing investment in green energy initiatives. With around 40%* of all the energy
Sustainable Schools 2009. Renewable Energy Technologies. Andrew Lyle RD Energy Solutions
Sustainable Schools 2009 Renewable Energy Technologies Andrew Lyle RD Energy Solutions RD Energy Solutions Energy efficiency and renewable energy consultancy Project management of installations Maintenance
Land East of Clitheroe Road Renewable Energy Statement
Land East of Clitheroe Road Renewable Energy Statement Commercial Estates Group 6th December 2010 WSP Document Reference Renewable Energy Assessment QM Issue/revision Issue 1 Revision 1 Revision 2 Revision
HEATING, VENTILATION & AIR CONDITIONING
HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating
Case Study: Low carbon refurbishment of Westborough Primary School
Case Study: Low carbon refurbishment of Westborough Primary School Summary The buildings at Westborough Primary had evolved through a fragmented and piecemeal series of building additions and adaptations
Solar for social housing
Solar for social housing The solar opportunity for social housing Energy costs are going up across the board. Average households are now spending over 5% of their income on energy. The Office of National
THE POWER TO BUILD YOUR BUSINESS
THE POWER TO BUILD YOUR BUSINESS FIND out how our products and services can power your business to success the power behind your business who we are NICEIC and ELECSA are leading voluntary regulatory bodies
GREEN DEAL Saving money by understanding the Energy Agenda. Dave Princep BSc LLB MCIEH
GREEN DEAL Saving money by understanding the Energy Agenda Dave Princep BSc LLB MCIEH Energy Efficiency Energy Efficiency What a difference a years makes! Energy Efficiency 2010 Energy Efficiency 2011
Energy Performance Certificates (EPCs) and renting homes: A landlord s guide
Energy Performance Certificates (EPCs) and renting homes: A landlord s guide From 1 October 2008 landlords are required to provide an Energy Performance Certificate when they rent out a home. An Energy
Energy Performance Certificate
Energy Performance Certificate Flat 307 Windsor House Cumberland Market LONDON NW1 4DE Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Mid-floor flat 8361-6824-6900-7049-8026
Solar Power Frequently Asked Questions
General information about solar power 1. How do I get solar power? Solar Power Frequently Asked Questions Many companies install solar power systems including some electricity retailers. It is worth comparing
Technical Management Design Energy Sustainability
Technical Management Design Energy Sustainability Technical Management Technical Management FHP ESS is an experienced Mechanical, Electrical and Public Health engineering consultancy. We provide support
ENERGY SAVINGS ACTION PLAN 2014 2018
Environment Unit ENERGY SAVINGS ACTION PLAN 2014 2018 LISA MILLER ENVIRONMENT MANAGER JOHN HAZELTON ENERGY & WATER SUSTAINABILITY PROJECTS ENGINEER FACILITIES MANAGEMENT DIVISION MAY 2014 APPROVED BY:
Energy Performance Certificate
Energy Performance Certificate Flat 2 Bagshot House Redhill Street LONDON NW1 4BY Dwelling type: Date of assessment: Date of certificate: Reference number: Total floor area: Ground-floor flat 09 April
1 Jones Lang LaSalle A tale of two buildings 2012. Are EPCs a true indicator of energy efficiency?
1 Jones Lang LaSalle A tale of two buildings 2012 Are EPCs a true indicator of energy efficiency? 2 Jones Lang LaSalle A tale of two buildings 2012 Working to make buildings better The objective of this
ZERO CARBON HOMES AND NEARLY ZERO ENERGY BUILDINGS. UK Building Regulations and EU Directives
ZERO CARBON HOMES AND NEARLY ZERO ENERGY BUILDINGS UK Building Regulations and EU Directives This leaflet summarises the UK s proposed Zero Carbon Standard for Homes, and the EU s new Nearly Zero- Buildings
Carbon Management Plan
E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open
Commercial Building Energy Initiative Tenant Business Case
Commercial Building Energy Initiative Tenant Business Case April 2010 An initiative of the Greater Toronto CivicAction Alliance The business case for GTA tenants Why to invest in energy efficiency programs
ENERGY STATEMENT for a proposed new residential care home at Great North Road, Doncaster, South Yorkshire, DN6 7EJ
ENERGY STATEMENT for a proposed new residential care home at Great North Road, Doncaster, South Yorkshire, DN6 7EJ Ref. No: 12/02870/FULM Contents 1. General... 2 2. Planning Condition... 2 3. Development...
tap into opportunities to develop your business
Find out more about the Green Deal, ECO and renewable energy markets and how your business can benefit tap into opportunities to develop your business Background and overview Over recent years, the UK
Feed in Tariffs for Microgeneration. Jos Mister Energy Saving Trust
Feed in Tariffs for Microgeneration Jos Mister Energy Saving Trust Funding and Finance Feed in Tariffs Clean Energy Cashback April 2010 Renewable Heat Incentive April 2011 Business support Enhanced Capital
HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY
HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing
Introduction to DEAP for Professionals DWELLING ENERGY ASSESSMENT PROCEDURE (DEAP)
Introduction to DEAP for Professionals Introduction to DEAP for Professionals 1 DWELLING ENERGY ASSESSMENT PROCEDURE (DEAP) 2 Introduction to DEAP for Professionals Introduction to DEAP for Professionals
NATURAL GAS IN COMMERCIAL BUILDINGS
OCTOBER 2012 TECHNOLOGY NATURAL GAS IN COMMERCIAL BUILDINGS Discussion Questions: 1. If natural gas promises lower operating costs, lower emissions, and greater efficiency over utility grid delivered electricity,
THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power
THE EUROPEAN GREEN BUILDING PROGRAMME Technical Module on Combined Heat and Power Contents Foreword...1 1. Introduction...2 2. Inventory of the CHP system...3 3. Assessment of technical energy saving measures...5
Heating, ventilation and air conditioning equipment. A guide to equipment eligible for Enhanced Capital Allowances
Heating, ventilation and air conditioning equipment A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Introduction 03 Background 03 Setting the scene 03 Benefits of purchasing ETL
How To Boost Your Cash Flow With The Enhanced Capital Allowance Scheme
ECA272 The Enhanced Capital Allowance scheme for energy-saving technologies The Enhanced Capital Allowance scheme Boost your cash flow Enhanced Capital Allowances (ECAs) are a straightforward way for a
Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?
Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green
FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE
FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE CFAA 2010 Canadian Rental Housing Conference June 14, 2010 Presented by Robert Greenwald, PEng., MBA President, Prism Engineering
Sustainability and Environmental Review. Introduction
Sustainability and Environmental Review Introduction Edmundson Electrical Ltd is a long established privately owned company with an unrivalled reputation in the marketplace and with a unique culture that
Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)
Drives and motors A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) The power behind the data Private and public businesses, from banks to
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
Shifting sands the UK market for low carbon B2B offerings may never be the same again
Shifting sands the UK market for low carbon B2B offerings may never be the same again White Paper June 2015 Contact: Michael Brown [email protected] +44 131 466 5544 Dina Darshini [email protected]
EXAMPLES OF SUCCESSFUL POLICY TOOLS FOR EMISSION REDUCTION
Submission of the United Nations Environment Programme (UNEP) Sustainable Building Initiative (SBCI) to the Ad Hoc Working Group on Long-Term Cooperative Action under the Convention (AWG-LCA) 24 April
Directorate for the Built Environment Building Standards Division
Directorate for the Built Environment Building Standards Division Energy Management Solutions Ltd Investigation of measures to improve the energy performance of a existing building: Retail JUNE 2009 Report
EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency
TM EnergySTEP (Sustainability Tiered Efficiency Program) Our Approach to Energy Efficiency Agenda Our Vision and Mission EnergySTEP, Our approach to Energy Efficiency Capabilities Case Study Incentives
UNDERSTANDING ENERGY BILLS & TARRIFS
UNDERSTANDING ENERGY BILLS & TARRIFS as part of the Energy Efficiency Information Grants Program Reading and understanding your energy and gas bills is a good first step to help you to identify where you
Introduction to Energy Codes & Green Building Programs
Introduction to Energy Codes & Green Building Programs David Neiger B.S. Arch, LEED AP Homes, Certified HERS Rater Principal Populus Sustainable Design Consulting Why green homes? The Building Sector:
ECA272. The Enhanced Capital Allowance scheme for energy-saving technologies
ECA272 The Enhanced Capital Allowance scheme for energy-saving technologies The Enhanced Capital Allowance scheme Boost your cash flow Enhanced Capital Allowances (ECAs) are a straightforward way for a
Photo Kirklees IS SOLAR ENERGY FOR ME? A guide to going solar
Photo Kirklees IS SOLAR ENERGY FOR ME? A guide to going solar WHY SOLAR? Economics Solar energy can reduce bills, earn you money and protect you from rising energy prices. Solar is a free source of energy
HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget
A PRIMER Educational HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget Contents: Introduction: The best HVAC system is durable, reliable
SP Energy Networks 2015 2023 Business Plan
SP Energy Networks 2015 2023 Business Plan Updated March 2014 Annex Heat pump and energy efficiency scenarios Frontier Economics 41 January 2014 1 Frontier Economics January 2014 Confidential Heat pump
Energy usage in households with Solar PV installations
Energy usage in households with Solar PV installations Background The National Energy Efficiency Data-Framework (NEED) is produced and published by DECC to provide detailed information on annual electricity
The Enhanced Capital Allowance Scheme for energy saving plant and machinery
CIBSE Briefing The Enhanced Capital Allowance Scheme for energy saving plant and machinery An cash incentive for your clients to invest in energy and tax efficiency What are Capital Allowances? Capital
RENEWABLE ENERGY INVESTMENTS
RENEWABLE ENERGY INVESTMENTS FREQUENTLY ASKED QUESTIONS SOLAR PV What are photovoltaics (PV)? First used in about 1890, the word photovoltaic has two parts; photo derived from the Greek for light, and
Reducing energy costs and improving business...
Reducing energy costs and improving business... Energy Procurement Energy Legislation Carbon Reduction Renewable Energy Water Services www.energyteam.co.uk Working in partnership with energyteam we have
Case Study. Commercial Building Energy Efficiency Retrofit 4 Mort Street, Canberra. Results. Background PEOPLE PRACTICES SYSTEMS
Case Study PEOPLE PRACTICES SYSTEMS Commercial Building Energy Efficiency Retrofit 4 Mort Street, Canberra In 2010, 4 Mort St, Canberra (Figure 1) was upgraded to significantly improve its energy performance.
Rules of Thumb Energy Efficiency in Buildings
Energy Efficiency in Buildings Energy Savings Cost Savings Increased Productivity Economic Development Other Standard lighting retrofits: $0.90-$1.20 per square foot. High-efficiency packaged and split
Deep Energy Savings in Existing Buildings
Case Study Deep Energy Savings in Existing Buildings Overview Site Details Owner: Alliance for Sustainable Colorado Location: Denver, CO Building Type: Office Project Description: Major Renovation Size
APPENDIX B - PL1 Homes that meet people s needs and aspirations
APPENDIX B - PL1 Homes that meet people s needs and aspirations Decent and accessible homes are vital to all. Our focus on providing affordable homes is being progressed primarily through the Affordable
Air-to-water heat pumps: Making the most of renewables. Richard Pickford, Daikin UK
Air-to-water heat pumps: Making the most of renewables Richard Pickford, Daikin UK 1 Overview 1. ASHPs potential 2. Heat pump system design 3. Installation best practice 4. Renewable Heat Incentive 5.
Climate Change (Scotland) Act 2009: Section 63 Form of Regulations for non-domestic buildings Consultation Questions
Climate Change (Scotland) Act 2009: Section 63 Form of Regulations for nondomestic buildings Consultation Questions Consultees are encouraged to submit their views in electronic format. Please feel free
effective energy management guide
effective energy management guide going low-carbon is the only option for a profitable, future-proof business Environment Agency published on www.oursouthwest.com the South West in partnership with the
Annex 1 Tool for the demonstration and assessment of additionality
page 1 Tool for the demonstration and assessment of additionality 1. This document provides for a step-wise approach to demonstrate and assess additionality. These steps include: Identification of alternatives
Sustainability: Green hotels
Sustainability: Green hotels 10 October 2013 How green is your hotel? Azita Dezfouli and Adam Mactavish of Sweett Group look at the practical steps for reducing the environmental impact of hotels during
BUILDING COST UPDATE: Q1 2014 COMMERCIAL FIT-OUT AND REFURBISHMENT
BUILDING COST UPDATE: Q1 2014 COMMERCIAL FIT-OUT AND REFURBISHMENT UK BUILDING CONSULTANCY COST CONSULTANCY 2014 EDITION A A 2 BUILDING COST UPDATE INTRODUCTION The construction industry is reporting activity
Assessment Methods. 15 th November 2010 Huw Jenkins Simon Lannon
Assessment Methods 15 th November 2010 Huw Jenkins Simon Lannon Assessment Methods Program Country Year Program Country Year 1 R-2000 Canada 1982 12 LEED US 2000 2 P-mark Sweden 1989 13 ECO-Quantum Netherlands
Direct Fresh Air Free Cooling of Data Centres
White Paper Introduction There have been many different cooling systems deployed in Data Centres in the past to maintain an acceptable environment for the equipment and for Data Centre operatives. The
AN APPLICATION MANUAL FOR BUILDING ENERGY AND ENVIRONMENTAL MODELLING
AN APPLICATION MANUAL FOR BUILDING ENERGY AND ENVIRONMENTAL MODELLING D. Bartholomew *, J. Hand #, S. Irving &, K. Lomas %, L. McElroy # F. Parand $, D. Robinson $ and P. Strachan # * DBA, # University
A guide to energy performance certificates for the Construction, sale and let of non-dwellings
A guide to energy performance certificates for the Construction, sale and let of non-dwellings Preface This document is intended to give a simplified overview of Commercial Property Energy Certification.
The Enhanced Capital Allowance scheme for energy-saving technologies. A guide to equipment eligible for Enhanced Capital Allowances
The Enhanced Capital Allowance scheme for energy-saving technologies A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Boost your cash flow 03 1. Check it s on the Energy Technology
Cushman & Wakefield. Business appetite for sustainable property is on the rise
Cushman & Wakefield Sustainability BRIEFING Business appetite for sustainable property is on the rise Business appetite for sustainable property is on the rise Before the downturn, sustainability was an
Energy Management Strategy
Energy Management Strategy Gloucester s Energy Management Strategy sets out the way for the organisation to measure and manage all the energy and water resources it uses. The main areas it looks at are
Energy saving technology to deliver the fastest returns. Top 10 energy saving options
Energy saving technology to deliver the fastest returns Top 10 energy saving options How can you increase efficiency, reduce costs and cut your carbon emissions? Unstable energy prices, increased costs,
PERTH AND KINROSS COUNCIL. Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY
PERTH AND KINROSS COUNCIL 10 11/465 Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY Report by Depute Director (Environment) This report seeks
Heating, ventilation and air conditioning zone controls
Technology information leaflet ECA762 Heating, ventilation and air conditioning zone controls A guide to equipment eligible for Enhanced Capital Allowances Contents Introduction 01 Background 01 Setting
ENERGY EFFICIENCY AND RENEWABLE ENERGY ESCOs INNOVATIVE FINANCING SOLUTIONS. Helping you to cut the cost of your energy and secure its supply
ENERGY EFFICIENCY AND RENEWABLE ENERGY ESCOs INNOVATIVE FINANCING SOLUTIONS Helping you to cut the cost of your energy and secure its supply THE PROBLEM A challenging energy landscape THE SOLUTION BDO
Roadmap for Enhancing Energy Efficiency in New Buildings
Roadmap for Enhancing Energy Efficiency in New Buildings Shabnam Bassi Bureau of Energy Efficiency Government of India Page 1 of 33 ENERGY CONSERVATION ACT, 2001 Energy Conservation Act, enacted in October