1 Collaborative Development, A Better Way to Deliver Software! An introduction, Collaborative Lifecycle Management Surf the CLM web! Douglas Gulledge IBM Certified Consulting IT Specialist Rational Software Specialty Architect dgulledge@us.ibm.com (314)
2 Agenda 1 Collaborative Lifecycle Management Introduced Historical View Solutions Today The Art of What s Possible! Illustration, In Practice Collaborative Lifecycle Management 5 Appendix OSLC Companies Participating and Implementing 2
3 What is Application Lifecycle Management (ALM)? The coordination of development life-cycle activities, including requirements, modeling, development, build, and testing, through: Process Automation - Enforcement of processes that span these activities. Traceability - Management of relationships between development artifacts used or produced by these activities. Reporting - Reporting on progress of the development effort as a whole. The Changing Face of Application Life-cycle Management Forrester Research, Inc. 3
4 ALM, What does it Mean? The coordination of development life-cycle activities, including requirements, ALM is a discipline, modeling, but is not discipline development, specific build, and testing, through: ALM is manifest in the information produced by leveraging the integrations between practitioner tools Process Automation - Enforcement of processes that span these activities. ALM leverages information produced to automate process handoffs Executable process that can be automated ensures process compliance Traceability - Management of relationships between development artifacts used or produced by these activities. The process establishes relevant traceability between the information Coordination of development life-cycle activities is achieved by correlating the information Compliance requirements make traceability a necessity Reporting - Reporting on progress of the development effort as a whole. Reporting based on objective data, not subjective testimony, is the only real progress measure Improve your process by extracting useful measures to apply as input to the process The Changing Face of Application Life-cycle Management Forrester Research, Inc. 4
5 ALM, Top 3 Reasons Fails to Deliver Promise 1. Distracted by day-to-day delivery pressures 78% What are the expectations? Software is a competitive differentiator, therefore the software delivery process is a critical business process How are you going to improve that business process? Technology Innovation? Smaller contribution considering ever increasing commonality and emerging parity Process Improvement? Larger contribution, but requires investment in change which is difficult and at odds with #1 2. Tools don t integrate properly 62% The activities of an individual practitioner or small group of practitioners are fairly well served Challenge lies with coordinating end-to-end software activities Eliciting end-user requests, translated by analyst in requirements, designed and developed, validated by quality professionals, ultimately coordinating deployment into newer products delivered or Data Centers 3. Lack the necessary internal expertise 56% Need to fully and seamlessly integrate the work of testers, business analysts, and developers Inconsistency among products user interface, underlying logic, storage Brittle Integrations, Proprietary repository API s, Source: Forrester study commissioned by Wipro, 2008 Source: Martin Nally - IBM Rational CTO, IBM Fellow, and VP at Innovate
6 ALM, How Do We Make Successful? ALM challenges #1, #2 (previous slide) translate to a need to Improve personal collaboration and process Integrate information end-to-end Improve your process by extracting useful measures to apply as input to the process ALM is an information-centric discipline The methods we use to control the process are based on the artifacts produced, e.g. requirements, defects, architectural modules, test cases, etc. ALM tools can help with the challenge of process change Easy to adopt, open standards based, iteratively deployed, supporting scenario based adoption Teach, support, and enact the process Historical approach: Tool-Process support largely based on brining guidance to the right point in the tool Modern approach: Tool understands Process being followed and provides active process guidance Seamless integration across tools in support of multiple practitioner roles Automatic gathering of statistics and generation of reports Historical approach: Stage-gate processes relying on manual gathering of quality metrics Modern approach: A users daily work produces the fundamental data used as measures The measures become a behavior modifier. If clear guidance is provided, and a way to measure ones progress against goals, then people are willing to embrace change. What is generally lacking is the guidance. Source: Martin Nally - IBM Rational CTO, IBM Fellow, and VP at Innovate
7 What is Collaborative Lifecycle Management? Collaborative Lifecycle Management coordinates people, processes, and information in iterative software and systems delivery IBM Software Group IBM Software Group What is Application Lifecycle Management? The coordination of development life-cycle activities, What is including Collaborative Lifecycle Management? requirements, modeling, development, build, Collaborative and testing, through: Lifecycle Management coordinates people, processes, and Process Automation - Enforcement of processes that span these activities. information in iterative software and systems delivery Traceability - Management of relationships between development artifacts used or produced by these activities. Meets domain-specific needs while enabling Reporting - Reporting on progress of the development a real-time effort flow as of information a whole. and ideas IBM Software Group Lotus Improves software collaboration across teams and The Changing Face of Application Life-cycle Management geographies Forrester Research, Inc. by providing consistent access to team process, workflow and artifacts Helps meet compliance requirements through asset traceability and approval workflows Provides the foundation for continuous capability improvement through flexible, rules-based process enforcement, real-time reporting and integrated best practices Watch the 5 minute video: Watch the 5 minute video: Reduces total cost ownership through streamlined and enterprise-ready deployment, security and administration. 3 5 CLM for Scenario 7
8 Agenda 1 Collaborative Lifecycle Management Introduced Historical View Solutions Today The Art of What s Possible! Illustration, In Practice Collaborative Lifecycle Management 5 Appendix OSLC Companies Participating and Implementing 8
9 What was State-of-the-Art 20 years ago? IBM s AD/Cycle businesses are are also also faced with with the the high high costs of of maintaining existing inventories of of applications and and a a shortage of of experienced programming skills.. Vision: Central Repository, Data Governance, Data Linking A Arecent survey of of over over 1000 businesses indicated that that the the backlog for for applications is is approximately four four years requirements and and specifications are are passed on on paper from from product planners to to designers and and from from designers to to coders proliferation of of unrelated tools, methodologies, and and manual data data transformations Challenges: Closed Market Data Duplication (Import) for foreign tools Source: Presentation on IBM s AD/Cycle, circa 1990! 9
10 What was State-of-the-Art 10 years ago The Rational Software Development Platform Analyst Architect Developer Tester Pervasive and Embedded Model, simulate and monitor Visually construct, program, IBM business Software Group and Lotus software execute processes Model applications and data generate code Design, create, and tests DB2 Lotus Tivoli WebSphere IBM and 3 rd Party Servers Project Manager Follow a common process Track project status Manage requirements Manage change and assets Manage quality Partners Microsoft Open Standards IBM Services 10
11 What was State-of-the-Art 10 years ago The Rational Software Development Platform Environment Requirements Business component test code Modeling Project Mgmt. Project Dashboard/ Metrics Process Mgmt Report Publishing Tool mentors Generate documentation Requirements Mgmt Design & Development Collect & publish metrics Generate test inputs and Link Use Case elements (models & text) Version Rose controlled units Configuration Mgmt Analysis & Design Functional Testing Testing / Implementation Automate run-time testing Developer Unit Testing Create & execute test scripts Create test inputs from requirements Test Mgmt Submit defects Link requirements to change requests Change Mgmt Submit defects Link code changes to activities (Unified Change Management) Configuration & Change Management 11
12 Agenda 1 Collaborative Lifecycle Management Introduced Historical View Solutions Today The Art of What s Possible! Illustration, In Practice Collaborative Lifecycle Management 5 Appendix OSLC Companies Participating and Implementing 12
13 Collaborative Lifecycle Management, Architectural Aspects The evolution of software delivery Surf the CLM web Jazz Integration Architecture Open Services for Lifecycle Collaboration Architecture Proven architecture principles derived from the WWW Presentation / Semantic Split Open, Extensible and On-Demand Linked Open Data, data representations linked with URL s IBM Software Open Group Approach Lotus to define the software Data model Data Collaborate openly on common resource definitions Standardized data protocols enable linking Supported by WWW protocols CLM scenario s public on Jazz.net & open-services.net Workflow Outside-In scenarios Real-World End-to-end lifecycle Role-based, task-based user experiences 13
14 The Jazz project People working together to deliver great software Jazz is a project and platform for transforming how people work together to deliver greater value and performance from their software investments A major investment by IBM to create a scalable, extensible team collaboration platform IBM s vision for the future of software delivery supporting a workforce that is increasingly organizationally and globally distributed, fluid and dynamic A community at Jazz.net the online venue for open commercial development of select Jazzbased products A community at open-services.net an open invitation to collaborate on a common integration architecture for software delivery 14
15 Open Services for Lifecycle Collaboration Aimed at simplifying collaboration across the software delivery lifecycle Open Services for Lifecycle Collaboration Open interfaces. Open possibilities. An industry initiative for making it easier to use software delivery tools in combination. 300 registered community members, from 30+ companies The Open Services initiative is Building a community of vendors, open source projects, integrators and IT teams, at open-services.net Creating public specifications of resources and services, like change requests, test cases, defects, requirements and user stories Delivering loosely coupled resource formats and services with just enough standardization 15
16 Jazz Integration Patterns Check List is available 16
17 User Interface Pattern & Style Guide for Jazz Web Applications 17
18 Jazz, OSLC, and Collaborative Lifecycle Management Adding value to existing investments and delivering new innovative capabilities c Existing IBM Offerings New IBM Offerings Business Partner Offerings offering offering offering offering offering offering IBM Software Best Group Practice Processes Lotus software offering Search and Query Dashboards Team awareness Events notification In context collaboration Security Client Integrations Eclipse Web 2.0 Visual Studio JAZZ technology platform Open Lifecycle Service Integrations Powered by Server Integrations Existing IBM offerings Business Partner offerings Open source offerings 18
19 Resources IBM Software Group Jazz.net: Open-Services.net: InfoQ.com 19
20 IBM Software Group Jazz Million Seat March.momentum is building Join the March to transform software delivery by enabling organizations to be more collaborative and transparent, leveraging our open standards-based Jazz platform... We re so convinced of the power of this platform that we re offering it free to teams of up to 10 developers What Analysts are saying: Liz Barnett, Ez-Insight: "With the Jazz project, Rational has developed breakthrough technology and is poised to set the standard for collaborative ALM... 50,000+ members active on Jazz.net 300,000+ seats in market Julie Craig, EMA: "Rational s differentiators are difficult for competitors to equal, and the new Jazz platform foundation may well turn out to be one of the best investments the Rational team has made. Join the movement and try Jazz today or 20
21 Agenda 1 Collaborative Lifecycle Management Introduced Historical View Solutions Today The Art of What s Possible! Illustration, In Practice Collaborative Lifecycle Management 5 Appendix OSLC Companies Participating and Implementing 21
22 Collaborative Lifecycle Management, Illustration in Practice Rational Requirements Composer Business expert collaboration Elicit, capture, elaborate, discuss and review requirements Rational Team Concert Core team collaboration "Think and work" in unison and provide real-time project heath Rational Quality Manager Quality team collaboration Coordinate quality assurance plans, processes and resources Analyst Tester Architect Developer 22 22
23 Collaborative Lifecycle Management, Illustration in Practice - I m Bob the Product Owner. - I m Scott the Scrum Master. Marco, Deb Dev Lead. Developer - I m Tanuj, a Tester on the team. I am responsible producing, prioritizing and accepting user stories I coach the team, manage change, and track health and quality by team collaboration We re developers who embrace agile practices and continuous integrations. I practice concurrent testing Rational Requirements Composer Elicit stories Rational Team Concert Manage Collection Elaborate stories Prioritize Backlog Team Plans Iteration Detail sprint plans Source/fix developed, tested, delivered Triage defects / change requests Sprint Review Rational Quality Manager Plan & Align Test Effort Detail test plans Test. Submit/ Confirm Plan Sprint Deliver 23
24 Collaborative Lifecycle Management, Illustration in Practice Requirements Composer users can: Create/Link Requirement Collections to Quality Manager Test Plans Create/Link Requirements to Quality Manager Test Cases Create/Link Requirements to Team Concert Plan Work Items CLM Mash-up Dashboards containing viewlets from Team Concert, from Quality Manager,... Team Concert users can: Create/Link Plan Work Items to Requirements Composer Requirements Create/Link Plan Work Items to Quality Manager Test Cases CLM Queries: Defects blocking Test CLM Mash-up Dashboards containing viewlets from Requirements Composer, Quality Manager,... Quality Manager users can: Create/Link Test Plans to Requirements Composer Requirement Collections Create/Link Test Cases to Requirements Composer Requirements Create/Link Test Cases to Team Concert Plan Work Items Create/Link to Team Concert Defects for Failed Test Execution Results CLM Queries: Tests blocked by Defects CLM Mash-up Dashboards containing viewlets from Requirements Composer, from Team Concert,... 24
25 Collaborative Lifecycle Management, Illustration in Practice Cross discipline query viewlets 25
26 Collaborative Lifecycle Management, Illustration in Practice Cross discipline query viewlets 26
27 Rational software Collaborative Lifecycle Management, Illustration in Practice Cross discipline query viewlets 21
28 Collaborative Lifecycle Management, Illustration in Practice Rich hovers provide insight without having to traverse the link 28
29 OSLC, Companies participating in creation of OSLC specifications and implementing Who What Description Siemens Teamcenter & Rational Team Concert Forge.mil & Rational Requirements Composer Oracle jdeveloper & Rational Team Concert Eclipse Mylyn, Tasktop Pro & Rational Team Concert. & Rational ClearQuest Coordinate product (PLM) and software (ALM) change management. Siemens is integrating change management processes for mechanical, electrical and software systems by creating and linking Rational Team Concert and Siemens Teamcenter change requests. Enable project teams with different tools & processes to link and share ALM resources. As a proof of technology, U.S. DISA has linked work items between project teams who are working in Rational Requirements Composer and Forge.mil (DISA s deployment of CollabNet TeamForge). Oracle developers boost productivity with ALM integration. Oracle s Team Productivity Center provides a task-oriented interface for developers by connecting with ALM products like Rational Team Concert, bringing work items into the JDeveloper IDE. Task-focused collaboration for Eclipse developers through ALM integration. Tasktop Pro and Eclipse Mylyn provide developers with a revolutionary task-focused interface that supports one-click multitasking, workspace focusing, and time tracking for Rational Team Concert work items and ClearQuest change requests. HP Quality Center & Rational Team Concert PLM/ALM traceability scenarios Improve collaboration between development and test teams. BSD Group is connecting development and test processes by linking Rational Team Concert work items with HP Quality Center test requirements and plans. Break down barriers between PLM and ALM. General Motors is driving integration scenarios to achieve better performance and traceability across the product and software lifecycles. Microsoft Project & Rational Team Concert itko LISA & Rational Team Concert, Rational ClearQuest dbmaestro Teamwork & Rational Team Concert Rally & ClearQuest Better collaboration between product managers and agile teams. Ascendant s Atech Team Connector synchronizes Microsoft project plans with Rational Team Concert release and iteration plans. Reduce time to defect resolution. itko LISA creates Rational Team Concert work items or ClearQuest defects that include detailed, multi-tier trace information from any test executed with LISA Pathfinder. Manage change to your database system. dbmaestro TeamWork enables teams to manage database and schema evolution by utilizing Rational Team Concert change management -- linking dbmaestro database change sets with Team Concert work items. Connect agile teams with enterprise processes and change management. Rally is enhancing the bidirectional synchronization between change requests in ClearQuest and artifacts in Rally, providing visibility into the total lifecycle in both systems. 29
30 900 business partners worldwide jazzed about CLM 30
31 Ready-for-Rational certified partners extend value of your CLM solution Collaborate with Microsoft SharePoint and Lotus Quickr libraries Analyze project data and automate tasklevel work breakdown structures Reserve, deploy and manage an inventory of virtual test resources Synchronize defect and change workflows with HP Quality Center Execute tests for SAP Enable TMAP process support Simulate requirements to reduce project risk Enable bidirectional JIRA change IBM Software management Group integration Lotus software Deliver automated governance to insure compliance and minimize business risk Find and manage open source approvals Execute mobile handset tests. Accelerates test cycles with virtual machine management and execution Visually validate business requirements Integration between Rational Quality Manager and Borland CaliberRM to enable traceability between requirements and test artifacts Execute data tests. Integrate with Mylyn task focused interface Tools for validation of SAP business objects Execute LISA tests from RQM Allows users to define RQM test cases according to product line features 31
32 32 32
33 Agenda 1 Collaborative Lifecycle Management Introduced Historical View Solutions Today The Art of What s Possible! Illustration, In Practice Collaborative Lifecycle Management 5 Appendix OSLC Companies Participating and Implementing 33
34 OSLC, Companies participating in creation of OSLC specifications and implementing Siemens Coordinate product (PLM) and software (ALM) change management Siemens is integrating change management processes for mechanical, electrical and software systems by creating and linking Rational Team Concert and Siemens Teamcenter change requests Learn more: ALM-1633B, An Open Services Approach to ALM and PLM Integration for Systems Development SIEMENS TEAMCENTER 34
35 OSLC, Companies participating in creation of OSLC specifications and implementing U.S. DISA Enable teams using different tools & processes to link & share ALM resources As a proof of technology, U.S. DISA has linked work items between project teams who are working in Rational Requirements Composer and Forge.mil (DISA s deployment of CollabNet TeamForge). Learn more: 35
36 OSLC, Companies participating in creation of OSLC specifications and implementing Oracle Oracle developers boost productivity with ALM integration Oracle s Team Productivity Center provides a task-oriented interface for developers by connecting with ALM products like Rational Team Concert, bringing work items into the JDeveloper IDE Learn more: OSLC Change Management workgroup: CmHome topic on open-services.net wiki Oracle Team Productivity Center: Oracle Team Productivity Center 36
37 OSLC, Companies participating in creation of OSLC specifications and implementing Eclipse Mylyn Task-focused collaboration for Eclipse developers through ALM integration Tasktop Pro and Eclipse Mylyn provide developers with a revolutionary task-focused interface that supports one-click multitasking, workspace focusing, and time tracking for Rational Team Concert work items and Rational ClearQuest change requests Learn more: ALM-1894B - Eclipse Mylyn: Redefining the "I" of the IDE 37
38 OSLC, Companies participating in creation of OSLC specifications and implementing BSD Group Improve collaboration between development and test teams BSD Group is connecting development and test processes by linking Rational Team Concert work items with HP Quality Center test requirements and plans Learn more: CCM-1653: Integrating IBM Rational Team Concert with HP Quality Center 38
39 OSLC, Companies participating in creation of OSLC specifications and implementing General Motors Break down barriers between PLM and ALM General Motors is driving integration scenarios to achieve better performance and traceability across the product and software lifecycles Learn more: OSLC-PLM workgroup: topic PlmHome at open-services.net wiki 39
40 OSLC, Companies participating in creation of OSLC specifications and implementing Ascendant Technology Better collaboration between product managers and agile teams Ascendant s Atech Team Connector synchronizes Microsoft project plans with Rational Team Concert release and iteration plans Learn more: Ascendant Technology home: IBM Global Solutions Directory: Atech Team Connector 40
41 OSLC, Companies participating in creation of OSLC specifications and implementing itko Reduce time to defect resolution itko LISA creates Rational Team Concert work items or ClearQuest defects that include detailed, multi-tier trace information from any test executed with LISA Pathfinder Learn more: itko home: IBM Global Solutions Directory: LISA/RTC, LISA/ CQ < Alt-Click! > LISA 41
42 OSLC, Companies participating in creation of OSLC specifications and implementing dbmaestro Manage change to your database system dbmaestro TeamWork enables teams to manage database and schema evolution by utilizing Rational Team Concert change management and linking dbmaestro database change sets with Rational Team Concert work items Learn more: dbmaestro home: IBM Global Solutions Directory: dbmaestro TeamWork 42
43 OSLC, Companies participating in creation of OSLC specifications and implementing Rally Software Connect agile teams with enterprise processes and change management Rally is enhancing the bi-directional synchronization between change requests in ClearQuest and artifacts in Rally, providing visibility into the total lifecycle in both systems Learn more: OSLC Change Management workgroup: CmHome topic on open-services.net wiki Rally integrations: Rally Connector for ClearQuest 43
Agile Development with Jazz and Rational Team Concert
Agile Development with Jazz and Rational Team Concert Mayank Parikh mayank.parikh.@in.ibm.com Acknowledgements: Thanks to Khurram Nizami for some of the slides in this presentation Agile Values: A Foundation
More informationRequirements Management im Kontext von DevOps
IBM Software Group Rational software Requirements Management im Kontext von DevOps DI Steindl Wolfgang https://www.xing.com/profiles/wolfgang_steindl Senior IT Specialist wolfgang.steindl@at.ibm.com http://lnkd.in/tpzrug
More informationCollaborating for Quality in Agile Application Development From Beginning to End
Collaborating for Quality in Agile Application Development From Beginning to End + 1 Agenda Application Development Challenges Meeting the Challenge in the Enterprise End-to-End HP/CollabNet Solution Agile
More informationHP Application Lifecycle Management
HP Application Lifecycle Management Overview HP Application Lifecycle Management is a software solution expressly designed to allow your team to take control of the application lifecycle while investing
More informationHP Agile Manager What we do
HP Agile Manager What we do Release planning Sprint planning Sprint execution Visibility and insight Structure release Define teams Define release scope Manage team capacity Define team backlog Manage
More informationAgile Software Development & Application Life Cycle Management
IBM Software Group Rational software Agile Software Development & Application Life Cycle Management Steindl Wolfgang & Burucu Osmann Wolfgang.steindl@at.ibm.com Osman.Burucu@at.ibm.com 2010 IBM Corporation
More informationHow do you manage the growing complexity of software development? Is your software development organization as responsive to your business needs as
How do you manage the growing complexity of software development? Is your software development organization as responsive to your business needs as it could be? Borland Core SDP enables your IT organization
More informationHarnessing the power of software-driven innovation. Martin Nally IBM Rational CTO IBM Fellow and VP
Harnessing the power of software-driven innovation Martin Nally IBM Rational CTO IBM Fellow and VP We have entered a new wave of innovation Innovation The Industrial Revolution Age of Steam and Railways
More informationDevelop enterprise mobile applications with IBM Rational software
Develop enterprise mobile applications with IBM software Providing comprehensive mobile application development and lifecycle management solutions Highlights Helps streamline and optimize the software
More informationProduct Stack and Corporate Overview
Product Stack and Corporate Overview October 2010 Laszlo Szalvay VP of the Worldwide Scrum Business CollabNet s Scrum Business Line is dedicated to Scrum and extreme programming (XP) as a means to an end
More informationChallenges and Approaches in Global Development and Delivery
Challenges and Approaches in Global Development and Delivery Mats Göthe - mats.gothe@se.ibm.com Kathryn Fryer - fryerk@ca.ibm.com Solution Architects, Rational Green Thread Team IBM Rational Software Development
More informationThe Worksoft Suite. Automated Business Process Discovery & Validation ENSURING THE SUCCESS OF DIGITAL BUSINESS. Worksoft Differentiators
Automated Business Process Discovery & Validation The Worksoft Suite Worksoft Differentiators The industry s only platform for automated business process discovery & validation A track record of success,
More informationIBM Rational DOORS Next Generation
Silvio Ronchi, Technical Sales & Solutions IBM Software, Rational 26/06/2014 IBM Rational DOORS Next Generation Software and Systems Engineering Rational Agenda 1 Why DOORS Next Generation? 2 Collaborative
More informationImproving IT Agility with Rational Collaborative Lifecycle Management
IBM Software Group Improving IT Agility with Rational Collaborative Lifecycle Management Transforming software delivery through Collaborative Lifecycle Management Innovation for a smarter planet 2009 IBM
More informationAbout the Speakers: Rainer Ersch, Research Engineer, Siemens Corporate Research and Technologies. Pascal Vera, Product Manager Siemens TEAMCENTERT
An Open Services (OSLC) Approach to ALM and PLM Integration for Systems Development Rainer Ersch Senior Research Engineer, Siemens rainer.ersch@siemens.com Pascal Vera Lead Teamcenter/ALM integration,
More informationenterprise IBM Rational Team Concert 2 Essentials
IBM Rational Team Concert 2 Essentials Improve team productivity with Integrated Processes, Planning, and Collaboration using Team Concert Enterprise Edition Suresh Krishna TC Fenstermaker [ '; v.v- ;
More informationIBM Rational Asset Manager
Providing business intelligence for your software assets IBM Rational Asset Manager Highlights A collaborative software development asset management solution, IBM Enabling effective asset management Rational
More informationIBM Rational ClearCase, Version 8.0
IBM Rational ClearCase, Version 8.0 Improve software and systems delivery with automated software configuration management solutions Highlights Improve software delivery and software development life cycle
More informationSoftware Lifecycle Integration. A Quality Management Discipline
Table of Contents Overview Defects aren t the only shared artifact Methods of sharing artifacts among systems Using Tasktop Sync The Quality Management System as a Dashboard 1 2 2 3 4 Overview The testing
More informationUnleash Competitive Advantage through Software Lifecycle Integration
Unleash Competitive Advantage through Software Lifecycle Integration In partnership with Introduction Software has become a key competitive differentiator in nearly every industry. This is why many companies
More informationApplication Test Management and Quality Assurance
SAP Brief Extensions SAP Quality Center by HP Objectives Application Test Management and Quality Assurance Deliver new software with confidence Deliver new software with confidence Testing is critical
More informationSoftware development for the on demand enterprise. Building your business with the IBM Software Development Platform
Software development for the on demand enterprise Building your business with the IBM Software Development Platform An on demand business is an enterprise whose business processes integrated end-to-end
More information2015 IBM Continuous Engineering Open Labs Target to better LEARNING
2015 IBM Continuous Engineering Open Labs Target to better LEARNING (NO COST - not a substitute for full training courses) Choose from one or more of these Self-Paced, Hands-On Labs: DMT 3722 - Learn to
More informationIKAN ALM and Collabnet TeamForge
IKAN ALM and Collabnet TeamForge Where Development, Testing and Operations meet Table of contents Executive summary...3 Problem statement...4 Solution Description...4 TeamForge and IKAN ALM...5 Versioning...5
More informationSimplifying development through activity-based change management
IBM Rational ClearCase and IBM Rational ClearQuest October 2004 Simplifying development through activity-based change management Allan Tate Product Manager IBM Software Group Karen Wade SCM Product Marketing
More informationGeneral Introduction to IBM (R) Rational (R) Asset Manager
General Introduction to IBM (R) Rational (R) Asset Manager Peter Smith Certified IT Specialist, IBM 2007 IBM Corporation Objectives! Background: Issues and Challenges!Asset Management and SOA! Define Asset
More informationOpen source, commercial software or a coexistence strategy?
Application lifecycle management White paper December 2009 Open source, commercial software or a coexistence strategy? Deciding what s right for your needs Jean Louis Vignaud, senior manager, Rational
More informationIBM BPM Solutions Addressing the Enterprise Business Process Management
IBM BPM Solutions Addressing the Enterprise Business Process Management Cristina Morariu, IBM Agenda Business Process Management IBM Featured products for BPM IBM Business Process Manager IBM Case Manager
More informationIBM Rational Software
IBM Rational Software Development Conference 2008 Collaborative Software Development An Introduction to Rational Team Concert Erich Gamma Distinguished Engineer, Jazz Technical Lead IBM Rational Zurich
More informationHP ALM11 & MS VS/TFS2010
Comparison Test Management Tools HP ALM11 & MS VS/TFS2010 22 mei 2012 voordracht georganiseerd door Discussiegroep Software Testing met de steun van Ingenieurshuis, Antwerpen 24/05/2012 HP ALM 11 Microsoft
More informationEnhancing The ALM Experience
Enhancing The ALM Experience Tools to Accelerate Delivery of Secure, Reliable Modern Applications Brent Dorenkamp Solutions Architect Agenda Application Modernization and the Instant-On Enterprise Building
More informationDriving Your Business Forward with Application Life-cycle Management (ALM)
Driving Your Business Forward with Application Life-cycle Management (ALM) Published: August 2007 Executive Summary Business and technology executives, including CTOs, CIOs, and IT managers, are being
More informationRally Integration with BMC Remedy through Kovair Omnibus Kovair Software, Inc.
Rally Integration with BMC Remedy through Kovair Omnibus Kovair Software, Inc. 2410 Camino Ramon, STE 230, San Ramon, CA 94583 www.kovair.com sales@kovair.com Document Version History Release Date Reason
More informationWhat s new in the HP Functional Testing 11.5 suite Ronit Soen, product marketing John Jeremiah, product marketing
What s new in the HP Functional Testing 11.5 suite Ronit Soen, product marketing John Jeremiah, product marketing Today s agenda A new world order for applications impact on QA HP s response announcement
More informationSolutions for Quality Management in a Agile and Mobile World
Solutions for Quality Management in a Agile and Mobile World with IBM Rational Quality Management Solutions Realities can stall software-driven innovation Complexities in software delivery compounded by
More informationIBM 2010 校 园 蓝 色 加 油 站 之. 商 业 流 程 分 析 与 优 化 - Business Process Management and Optimization. Please input BU name. Hua Cheng chenghua@cn.ibm.
Please input BU name IBM 2010 校 园 蓝 色 加 油 站 之 商 业 流 程 分 析 与 优 化 - Business Process Management and Optimization Hua Cheng chenghua@cn.ibm.com Agenda Why BPM What is BPM What is BAM How BAM helps optimization
More informationBusiness Process Management Tampereen Teknillinen Yliopisto
Business Process Management Tampereen Teknillinen Yliopisto 31.10.2007 Kimmo Kaskikallio IT Architect IBM Software Group IBM SOA 25.10.2007 Kimmo Kaskikallio IT Architect IBM Software Group Service Oriented
More informationEnhance visibility into and control over software projects IBM Rational change and release management software
Enhance visibility into and control over software projects IBM Rational change and release management software Accelerating the software delivery lifecycle Faster delivery of high-quality software Software
More informationThe 7 Attributes of a Good Software Configuration Management System
Software Development Best Practices The 7 Attributes of a Good Software Configuration Management System Robert Kennedy IBM Rational software Benefits of Business Driven Development GOVERNANCE DASHBOARD
More informationIBM Cognos Performance Management Solutions for Oracle
IBM Cognos Performance Management Solutions for Oracle Gain more value from your Oracle technology investments Highlights Deliver the power of predictive analytics across the organization Address diverse
More informationA Better Solution, Inc. Sr. Rational Tools Consultant. Drexel University, Philadelphia Master of Business Administration March, 2001
Sr. Rational Tools Consultant Objective: Education: Rational Certifications: Other Certifications: Related Skills: Over 13+ years of software system development and integration projects through all phases
More information<Insert Picture Here> Application Testing Suite Overview
Application Testing Suite Overview Agenda Ats Overview OpenScript Functional Testing OpenScript Load Testing Forms/Siebel Modules Installation of Ats Oracle Load Tester Oracle Test
More informationCollaborative DevOps Learn the magic of Continuous Delivery. Saurabh Agarwal Product Engineering, DevOps Solutions agarwasa@us.ibm.
Collaborative DevOps Learn the magic of Continuous Delivery Saurabh Agarwal Product Engineering, DevOps Solutions agarwasa@us.ibm.com Please note IBM s statements regarding its plans, directions, and intent
More informationOSLC ALM-PLM Interoperability Proof of Concept. Mike Loeffler Systems Engineering IT Specialist General Motors Company michael.loeffler@gm.
OSLC ALM-PLM Interoperability Proof of Concept Mike Loeffler Systems Engineering IT Specialist General Motors Company michael.loeffler@gm.com Disclaimers and Fine Print No information contained herein
More informationSoftware Engineering. Session 3 Main Theme Requirements Definition & Management Processes and Tools Dr. Jean-Claude Franchitti
Software Engineering Session 3 Main Theme Requirements Definition & Management Processes and Tools Dr. Jean-Claude Franchitti New York University Computer Science Department Courant Institute of Mathematical
More informationSuccessfully managing geographically distributed development
IBM Rational SCM solutions for distributed development August 2004 Successfully managing geographically distributed development Karen Wade SCM Product Marketing Manager IBM Software Group Page 2 Contents
More informationSimplified Management With Hitachi Command Suite. By Hitachi Data Systems
Simplified Management With Hitachi Command Suite By Hitachi Data Systems April 2015 Contents Executive Summary... 2 Introduction... 3 Hitachi Command Suite v8: Key Highlights... 4 Global Storage Virtualization
More informationBest Practices for Building Mobile Web
Best Practices for Building Mobile Web and Hybrid Applications Mobile is the NEXT dominant phase of computing Mobile is different: Transformational business models Faster lifecycles More iterative Mobile/Wireless/Cloud
More informationDocument Management. Document Management for the Agile Enterprise. AuraTech Pte Ltd
Document Management Document Management for the Agile Enterprise AuraTech Pte Ltd 30 Robinson Road, #04-01B Robinson Towers, Singapore 048546 http://www.consultaura.com PH: 6224 9238 Try it! Call AuraTech
More informationTRANSFORMING TO NEXT-GEN APP DELIVERY FOR COMPETITIVE DIFFERENTIATION
www.wipro.com TRANSFORMING TO NEXT-GEN APP DELIVERY FOR COMPETITIVE DIFFERENTIATION Renaissance Delivery Experience Ecosystem Sabir Ahmad Senior Architect ... Table of Content Introduction 3 Driving Transformational
More informationFlexible Business Process Management enabled by SOA Full support of BPM life cycle Closing the gap between Business & IT
Flexible Business Process Management enabled by SOA Full support of BPM life cycle Closing the gap between Business & IT Collaborative Development IT Clean hand-off to IT with Business Models, Metrics
More informationRealizing business flexibility through integrated SOA policy management.
SOA policy management White paper April 2009 Realizing business flexibility through integrated How integrated management supports business flexibility, consistency and accountability John Falkl, distinguished
More informationMaximizing Cross-Platform Application Availability
June 2005 Maximizing Cross-Platform Application Availability Robert Kennedy, SCM Product Manager Karen Wade, SCM Product Marketing Manager Page 2 Contents 2 The challenges of change in complex computing
More informationHow To Understand The Tools Your Organization Uses To Manage An Agile Process
Agile Tooling Survey The Agile Manifesto states Individuals and Interactions over Process and Tools. This survey is seeking to identify the Process Lifecycle Management Tools teams and organizations depend
More informationBusiness Process Management Enabled by SOA
Business Process Management Enabled by SOA Jyväskylä 8.5.2007 Kimmo Kaskikallio IT Architect IBM Software Brands Five middleware product lines designed to work together Service-Oriented Architecture (SOA)
More informationHow to Ensure IT Compliance Without Compromising Innovation. Nik Teshima, IBM Phil Odence, Black Duck
How to Ensure IT Compliance Without Compromising Innovation Nik Teshima, IBM Phil Odence, Black Duck Black Duck 2013 Speakers Phil Odence VP of Business Development Black Duck Software Nik Teshima Senior
More informationManager Domain Experts. Delivery Team. C h ic a g o
Outsourc es erv ice Engagement Domain Experts Vendor Account er d i ov Pr Finance Executive Sponsor Bo sto n C h ic a g o Project Empowering Agile with PPM Digite, Inc. 21060 Homestead Rd, Suite 220, Cupertino,
More informationRequirements Definition and Management Processes
Software Engineering G22.2440-001 Session 1 Sub-Topic 1 Requirements Definition & Management Processes and Tools Dr. Jean-Claude Franchitti New York University Computer Science Department Courant Institute
More informationRealtests.M2140-648.67 questions M2140-648. IBM Rational IT Sales Mastery Test v2
Realtests.M2140-648.67 questions Number: M2140-648 Passing Score: 800 Time Limit: 120 min File Version: 5.0 M2140-648 IBM Rational IT Sales Mastery Test v2 I'm sure glad that I used it. Even though I knew
More informationIBM Enterprise Content Management Product Strategy
White Paper July 2007 IBM Information Management software IBM Enterprise Content Management Product Strategy 2 IBM Innovation Enterprise Content Management (ECM) IBM Investment in ECM IBM ECM Vision Contents
More informationAn Enterprise Cloud Development (ECD) Blueprint with TeamForge. An Implementation Checklist
An Enterprise Cloud Development (ECD) Blueprint with TeamForge An Implementation Checklist Table of Contents Overview... 3 Step 1 Embrace Cloud... 4 Step 2 Implement Community Architecture... 6 Step 3
More informationImplement a unified approach to service quality management.
Service quality management solutions To support your business objectives Implement a unified approach to service quality management. Highlights Deliver high-quality software applications that meet functional
More informationLiving Architectures - from eclipse to jazz
Living Architectures - from eclipse to jazz Erich Gamma IBM distinguished engineer IBM rational zurich research lab (please contact me if you are interested in a Praktikum or full time position) 2010 IBM
More informationSAP IT Infrastructure Management
SAP IT Infrastructure Management Legal Disclaimer This presentation is not subject to your license agreement or any other agreement with SAP. SAP has no obligation to pursue any course of business outlined
More informationDevOps Best Practices for Mobile Apps. Sanjeev Sharma IBM Software Group
DevOps Best Practices for Mobile Apps Sanjeev Sharma IBM Software Group Me 18 year in the software industry 15+ years he has been a solution architect with IBM Areas of work: o DevOps o Enterprise Architecture
More informationA new approach to automotive electric/electronic engineering life-cycle management
IBM Software Automotive A new approach to automotive electric/electronic engineering life-cycle management Managing engineering data and processes using a single source of truth 2 A new approach to automotive
More informationTools to support Requirements-Based Testing
Requisite Pro RMT/RFT/RPT/Robot Rational Test Manager ClearQuest 26 IBM Rational Test Manager Test Manager runs as a schema on top of ClearQuest Version 7 Integrates with other IBM products, such as ClearCase,
More informationhttp://blogs.msdn.com/clemmend/
http://blogs.msdn.com/clemmend/ Forrester defines ALM as: The coordination of development life-cycle activities, including requirements, modeling, development, build, and testing, through: 1. enforcement
More informationA Software Development Platform for SOA
A Software Development Platform for SOA Peter Eeles Executive IT Architect Rational Brand Architect for UK, Ireland and South Africa peter.eeles@uk.ibm.com 2004 IBM Corporation Agenda IBM Software Group
More informationBusiness Partner Program Guide
Business Partner Program Guide Business Challenges Require New Solutions A Comprehensive Approach to Partnering for Success. Panduit introduces an exciting program designed to help you become a better
More informationCognizant Accelerates Enterprise Application Development Cycle-time by 10 Percent
Microsoft Visual Studio Customer Solution Case Study Cognizant Accelerates Enterprise Application Development Cycle-time by 10 Percent Overview Country or Region: India Industry: IT Consulting and Technology
More informationHP SOA Systinet software
HP SOA Systinet software Govern the Lifecycle of SOA-based Applications Complete Lifecycle Governance: Accelerate application modernization and gain IT agility through more rapid and consistent SOA adoption
More informationHow Application Lifecycle Management can address elearning Software Challenges
Karen Lee How Application Lifecycle Management can address elearning Software Challenges Borland solutions for fast and flexible software delivery A Borland ASEAN White Paper August 2004 Karen Lee Borland
More informationRational Team Concert. Scrum Project Management Tutorial
Rational Team Concert Scrum Project Management Tutorial 1 Contents Contents... 2 1. Introduction... 3 2. Terminology... 4 3. Project Area Preparation... 4 3.1 Adding Users and specifying Roles... 5 3.2
More informationAgile extreme Development & Project Management Strategy Mentored/Component-based Workshop Series
Overview This is a 15-day live facilitator-led or virtual workshop is designed to prompt your entire team to work efficiently with Microsoft s Application Lifecycle Management solution based around Visual
More informationCollaborative software development using IBM Rational Team Concert
IBM Software An IBM Proof of Technology Collaborative software development using IBM Rational Team Concert Presentations PoT.Rational.07.2.038.03 Copyright International Business Machines Corporation,
More informationModernizing enterprise application development with integrated change, build and release management.
Change and release management in cross-platform application modernization White paper December 2007 Modernizing enterprise application development with integrated change, build and release management.
More informationCompeting and Integrating with Open Source Technologies
IBM Software Group Competing and Integrating with Open Source Technologies Khurram Nizami (knizami@us.ibm.com) Gary Cernosek (gcernosek@us.ibm.com) Rational Enablement Friday March 1, 2013 Hosted by: Sam
More informationIBM WebSphere Operational Decision Management Improve business outcomes with real-time, intelligent decision automation
Solution Brief IBM WebSphere Operational Decision Management Improve business outcomes with real-time, intelligent decision automation Highlights Simplify decision governance and visibility with a unified
More informationData Center Solutions
Data Center Solutions New Data Center Challenges Require New Solutions Data Center Architecture. Inside and Out. Data centers are mission-critical facilities. A silo-based approach to designing, deploying
More informationModule 6 Essentials of Enterprise Architecture Tools
Process-Centric Service-Oriented Module 6 Essentials of Enterprise Architecture Tools Capability-Driven Understand the need and necessity for a EA Tool IASA Global - India Chapter Webinar by Vinu Jade
More informationBest Practices in Release and Deployment Management
WHITEPAPER Best Practices in Release and Deployment Management Mark Levy Through 2016, a lack of effective release management will contribute up to 80% of production incidents in large organizations with
More informationPervasive Software + NetSuite = Seamless Cloud Business Processes
Pervasive Software + NetSuite = Seamless Cloud Business Processes Successful integration solution between cloudbased ERP and on-premise applications leveraging Pervasive integration software. Prepared
More informationIBM Customer Experience Suite and Electronic Forms
Introduction It s more important than ever to have a set of capabilities that allow you to create dynamic, self service options for your customers that leverage existing processes and infrastructure. Your
More informationHow To Create A Help Desk For A System Center System Manager
System Center Service Manager Vision and Planned Capabilities Microsoft Corporation Published: April 2008 Executive Summary The Service Desk function is the primary point of contact between end users and
More informationApplication Lifecycle Management: Marriage of Business Management with Software Engineering
Application Lifecycle Management: Marriage of Business Management with Software Engineering Lovelesh Chawla, Robert F. Roggio School of Computing University of North Florida Jacksonville, FL Lovelesh.chawla@gmail.com
More informationMicrosoft Office SharePoint Server 2007
Microsoft Office SharePoint Server 2007 Vir Bhargava Solution Specialist Microsoft Corporation April 2008 Agenda Introductions A New World of Work The SharePoint Story and MOSS 2007 SharePoint in a Real-World
More informationALM/Quality Center. Software
HP ALM/Quality Center Software Datasheet Page 1 of 8 HP Application Lifecycle Management software In today s rapidly changing business world, business agility depends on IT agility. And predictable, high
More informationA brief introduction on SharePoint
A brief introduction on SharePoint Raizel Consulting 11/09/2007 SharePoint is an enterprise information portal, from Microsoft, that can be configured to run Intranet, Extranet and Internet sites. SharePoint
More informationzenterprise The Ideal Platform For Smarter Computing Developing Hybrid Applications For zenterprise
zenterprise The Ideal Platform For Smarter Computing Developing Hybrid Applications For zenterprise Smarter Computing Is Redefining The Data Center Consolidate Infrastructure Optimize to data center Eliminate
More informationContents. Introduction... 1
Managed SQL Server 2005 Deployments with CA ERwin Data Modeler and Microsoft Visual Studio Team Edition for Database Professionals Helping to Develop, Model, and Maintain Complex Database Architectures
More informationAsset Based Development
IBM Software Group Asset Based Development Grant Larsen gjlarsen@us.ibm.com November 2003 Agenda Introduction Asset-based Development Process Standards Tooling Assets Getting Started Agenda Introduction
More informationOrchestrated. Release Management. Gain insight and control, eliminate ineffective handoffs, and automate application deployments
Orchestrated Release Management Gain insight and control, eliminate ineffective handoffs, and automate application deployments Solution Brief Challenges Release management processes have been characterized
More informationImproved SOA Portfolio Management with Enterprise Architecture and webmethods
Improved SOA Portfolio Management with Enterprise Architecture and webmethods Patrick Buech Product Management, Enterprise Architecture Management Sumeet Bhatia Senior Director, Enterprise Architecture
More informationwith Managing RSA the Lifecycle of Key Manager RSA Streamlining Security Operations Data Loss Prevention Solutions RSA Solution Brief
RSA Solution Brief Streamlining Security Operations with Managing RSA the Lifecycle of Data Loss Prevention and Encryption RSA envision Keys with Solutions RSA Key Manager RSA Solution Brief 1 Who is asking
More informationProject Management through
Project Management through Unified Project and Portfolio Fluent User Interface Management Built on SharePoint Server 2010 Time Reporting Enhancements Project Initiation & Business Case Exchange Server
More informationMicrosoft SOA Roadmap
Microsoft SOA Roadmap Application Platform for SOA and BPM Thomas Reimer Enterprise Technology Strategist, SOA and BPM Microsoft Corporation (EMEA) Trends and Roadmap THE FUTURE OF DYNAMIC IT Market Trends
More informationIBM WebSphere ILOG Rules for.net
Automate business decisions and accelerate time-to-market IBM WebSphere ILOG Rules for.net Business rule management for Microsoft.NET and SOA environments Highlights Complete BRMS for.net Integration with
More informationRequirement Management with the Rational Unified Process RUP practices to support Business Analyst s activities and links with BABoK
IBM Software Group Requirement Management with the Rational Unified Process RUP practices to support Business Analyst s activities and links with BABoK Jean-Louis Maréchaux Software IT Specialist IBM Rational
More informationTesting Tools using Visual Studio. Randy Pagels Sr. Developer Technology Specialist Microsoft Corporation
Testing Tools using Visual Studio Randy Pagels Sr. Developer Technology Specialist Microsoft Corporation Plan REQUIREMENTS BACKLOG Monitor + Learn Development Collaboration Production Develop + Test Release
More information