1 THE FIRST ASPHALTIC CORE DAM IN TURKEY, CETIN MAIN DAM Chr. Fredrik GRØNER Statkraft AS Oslo Norway Vahid AFSARI-RAD Veidekke Oslo Norway Introduction The Çetin Main Dam is a rock-fill dam with an asphalt-concrete core (ACRD), currently being constructed on the Botan River in Siirt Province, Turkey. The dam will be located directly downstream of the Botan and Büyük River confluence and have a height of 143 m from Talweg. The primary purpose of the dam is hydroelectric power generation. The power plant at foot of dam will house three 135 MW Francis turbine-generators and 1 Eco-flow unit. Construction works at Cetin Main began in 2012 and the power plant is planned completed in The owner is Cetin Enerji SA fully owned by Statkraft Enerji SA (Istanbul as per July 2016), a subsidiary of the Norwegian power-company Statkraft. Type: Crest elevation: Dam height: Embankment crest length: Embankment dam with central asphalt core masl m (ca.159m from foundation) m Asphalt Core width: 1,3m at bottom reduced to 0,65m in upper 1/3H Total asphalt core concrete volume: m³ Total embankment volume: approx m³ Type of impermeable curtain at foundation: grout curtain This article contains a general presentation of the project, dam type selection and the technical challenges for design and construction of one of the highest asphaltic core dams in a seismic region of Turkey. 1. General presentation The Cetin Hydro-Power-Project utilizes 175m total head within a 25 km section of Botan River being a major tributary to Tigris River. Due to challenging ground conditions it s divided in two steps comprising Cetin Main HPP (420MW and1100gwh/year) and Cetin Lower HPP (100MW and 300GWh/year). Cetin Main Dam and HPP consist of a 143m high Asphalt-concrete Core Rock-fill Dam (ACRD), gated Spillway with flip-buckets and plunge-pool, twin Diversion tunnels and Cofferdams, Intake with gates and Powertunnel/penstock towards the Powerhouse at toe of dam. The ACRD forms a reservoir of 610 mill m3 with 354 mill m3 as live storage equal to 10% of mean annual inflow. The Spillway has four radial gates with a discharge capacity of handling PMF of 5500 m3/s. There are two Diversion tunnels of 8m dia. with 800m length each, and one of the tunnels will be converted to Bottom Outlet with gates for sediment flushing and bypass for reservoir drawdown. The Powerhouse is equipped for peak power production with installed discharge capacity of 347 m3/s being 2,9 times the average flow. GRØNER_AFSARI-RAD Page 1/8

2 The Project area is located nearby the East-Anatolian-Fault-Zone (EAFZ) and defined within First Degree of Earthquake Zone. Ground conditions in the Project area consist of the geological units Bitlis Metamorphites(PzMz), Maden Complex(Tma) and Guleman Ophiolites(Jkg). The geology at site is briefly Gneiss, Schist, Limestone and some Phyllite being partly covered by slope-wash and with partly highly weathered zones. Fig. 1; Map showing Botan river and Cetin project. 2. Dam type selection The elements of Cetin Main HPP are concentrated within an area of approx. 1x1km at the conflux of Botan and Buyuk Cay thus representing a rather compact layout. Different types of main dam structures have been considered, as the original plan focused on Concrete Face Rock-fill Dam (CFRD) or Roller Compacted Concrete Dam (RCCD). Summarized pros and cons indicated that a CFRD would have lower construction costs but longer construction time than a RCCD. Additionally many other factors would count into such comparison as ex. a RCCD type choice could simplify the overall layout arrangement. However to keep the faster construction time as main advantage of an RCCD it needs to be a simple design preferably without, or at least with a minimum of, integrated objects. With the significant seismicity in the region Statkraft was encouraged to consider an ACRD as possible alternative. The ACRD type would likely fall somewhere in between the two above mentioned dam types regarding both costs and construction time, however such type as large dam had not yet been constructed in Turkey. A complete three alternatives comparison through a tender competition could have been an approach, but was not recommendable due to needed extensive resources. So to reduce the number of alternatives it was made firstly a priority-evaluation between the three dam types focusing on estimated costs and time including availability of materials in a risk assessment. This evaluation ended up with RCCD and ACRD as the two alternatives for further development. In the conclusive evaluation process ACRD ended up as the final choice. GRØNER_AFSARI-RAD Page 2/8

3 Figure 2; Cetin Main Dam and HPP layout with ACRD. 3. Technical design challenges An update of the Cetin project Seismic hazardous study gave increased load values and recommendation on control with specific historical scenarios. The seismic factors like PGAhor=0,56g (at 2475 years rec. for the SEE) implied significant challenges to the final dam design. Standard pseudo-static analysis was not sufficient to verify the dam stability, and dynamic deformation type of analysis had to be performed. To meet acceptable deformation results this implied need of decreasing planned dam-fill inclinations giving a larger dam-body volume and foot-print. Sensitivity analysis was done to secure acceptable wide ranges of rock-fill material properties expected to be found in available quarries. In order to adapt within maximum available footprint space, the dam-fill inclination design was fine-tuned with steepening the inclinations in the lower 2/3 of dam height. The four different inclinations of the dam-body surfaces are finally planned like: Up-Stream 1:1.65(v/h) on lower 2/3H, 1:1.75(v/h) on upper 1/3H Down-Stream 1:1.60(v/h) on lower 2/3H, 1:1.70/1(h/v) on upper 1/3H. Additionally there is planned a camber fill 1% of H mid dam on the crest for post-construction settlements and this will be incorporated as slightly increased inclinations in the upper 1/3H. The ACRD will need a plinth for the central asphalt-core and this will for Cetin be combined with a Grouting Gallery-system as periphery Galleries (concrete culverts). These will be used for efficient Grout-Curtain execution, possible additional grouting if needed and for leakage monitoring. Additionally some connected Galleries DS of the dam axis will serve for access, drainage and monitoring control purposes. The asphaltic core will at higher levels towards the steep abutments (max. 70 deg.) need to be flared out securing necessary watertight connections with the plinth. GRØNER_AFSARI-RAD Page 3/8

4 4. Technical construction challenges for asphalt core dams The asphalt concrete shall be produced in an asphalt batching plant with a capacity to produce a volume sufficient to lay three layers per day at any level of the dam. Aggregates, fillers and bitumen shall be weighted separately and added automatically after hot screening of the various components. The plant shall have an automatic warning or stop switch, shall any faulty operation be detected and an automatic logging and print-out device showing the composition and actual mix temperature of each batch. The bitumen weighing system shall have accuracy not less than ± 0.3% from the set point on any single test. Mixing temperatures shall not exceed 170 ºC to prevent oxidation of the bitumen (170º C is related to bitumen B (160/220). A limestone quarry at Cetin dam job site has been identified for asphalt mix aggregate. An up-to-date asphalt plant shall have: minimum 4 cold feeding bins; minimum 4 hot storage silos below the sieves; two filler silos, one for filler retrieved from aggregate and one for added filler; a bag-filter system for collecting fines to be used as filler from aggregates; a hot storage silo of minimum 50 ton of asphalt concrete. 5. Asphalt core construction progress The key piece of equipment is the core paver (see Fig. 3, 4 and 5): a custom built machine capable of heating the exposed top of the core to create a hot joint, to lay a new lift of asphalt concrete to extend the core and to place the granular material of the transitions supporting the core and allowing its immediate compaction (see Figures 7 and 8). Figure 3: Asphalt core Paver. The asphalt and transition zones shall be placed in cm layers (after compaction). GRØNER_AFSARI-RAD Page 4/8

5 Figure 4: Compaction of Asphalt Core and the Transition Zones. The transition zone is placed simultaneously with the asphalt giving this immediate lateral support. The asphalt is placed in horizontal layers, automatically controlled by laser. The asphalt layers melt together, the joint is not detectible. No tack coat is required between the layers. Figure 5: The transition zone is placed simultaneously with the asphalt giving this immediate lateral support (indicated zone-widths are an example, different from Cetin) GRØNER_AFSARI-RAD Page 5/8

6 6. Quality Assurance and Control The properties of asphalt concrete mix have to be determined and evaluated on daily basis. Quality Assurance and Control (QA/QC) are required to comply with requirements in the technical specifications. Table 2 illustrate a typical testing program at a job-site. Description Type of test No of tests Requirements Frequency 1. Asphalt delivery on dam Temperature control Each delivery 150 ºC<temp. < 170 ºC Per delivery 2.Marshall test (two specimens per test) Void content 1 Daily average results shall be less than 2.5%. No single result 3% Per 150 ton production per day 3.Sample from asphalt production Extraction analyses 1 Measurement of aggregate gradation and bitumen content Per 150 ton production per day 4.Core drilling Void content 5 drilled cores Generally < 3%; The average of all pieces < 2,5% Monthly Table 2: Quality control during asphalt core construction. A well-equipped laboratory and skilled staff is a must for every asphalt core dam job-site. Figure 6: Illustration of laboratory equipment and normal test program at a Job-site. 7. Conclusion Interest in asphalt core technology has been bolstered in recent years. It is proven that asphalt core dam is a competitive solution in respect to the speed and cost of the construction. Simple and robust construction method much simpler than CFRD construction; Asphalt concrete is a flexible and ductile material with viscoelastic-plastic properties (a forgiving material); No core erosion; therefore no strict filter criteria; Core adjusts to dam and foundation deformations; GRØNER_AFSARI-RAD Page 6/8

7 Earthquake resistant; no deterioration of properties; Self-healing (self-sealing) of any cracks; Asphalt mix may be tailored to satisfy special design requirements Can resist overtopping erosion during construction Dam will be quicker ready for impounding Which embankment type is best suited for the local conditions is also depending on safety, geotechnical condition reliability and impact on the environment. Asphalt Core for embankment Dams is still unknown technology for many clients, consultant and contractors worldwide. Involvement of consultants and contractors with sufficient previous experience in asphalt core design and construction is the key for a successful feasibility study. The most notable studies related with ACED 2-10 are indicated below. GRØNER_AFSARI-RAD Page 7/8

8 References [1] Grøner, C.F., Høva, E. and Lilleland, Ø. (2015). Cetin HPP with ACRD in Turkey. 25 th ICOLD Congress Hydropower 15 in Stavanger, Norway. [2] Höeg, K. (1993). Asphalt Concrete Core for Embankment Dams. Stikka Press, Norway, ISBN [3] Höegh, K. (2005). Earthquake Resistance of Asphalt Core Embankment Dams. Norwegian Geotechnical Institute (NGI), Report No [4] Afsari-Rad, V. (2013). Experiência em Projeto e Construção de Núcleos de Asfalto no Brasil. XXIX Seminário Nacional de Grandes Barragens, Porto de Galinhas, abril 2013 [5] Alicescu, V. and Tournier, J.P. (2012). The Environment-friendly Development of La Romaine Complex, Situated in Northern Quebec, Canada. 24 th ICOLD Congress Q.92, Kyoto, Japan. [6] Alicescu, V., Tournier, J.P., Vannobel, P., Moore, V. (2011). Design and construction of Nemiscau-1 Dam, the first ACC dam in North-America. Proceedings of the American Association on Dams, 2010 Annual Conference, San Diego, CA. [7] Wang, W. (2008). Research on the Suitability of Asphalt Concrete as Water Barrier in Dams and Dikes. PhD Thesis, Department of Geoscience, University of Oslo, AiT e-dit AS, Norway. [8] Wang, W., Zhang,Y., Zhu,Y. and Höeg, K. (2012). The Asphalt Core Embankment Dam: An Attractive Alternative. ICOLD Congress, Symposium, June [9] Wang,W., Höeg, K. and Zhang, Y. (2010). Design and Performance of the Yele Asphalt Core Rockfill Dam. Canadian Geotechnical Journal, 47:12,pp [10] Afsari-Rad, V. (2013). Compaction temperature and impermeability of asphalt core dams. HYDROPOWER & DAMS, ISSUE FOUR, The Authors C. F. GRØNER was graduated from the Norwegian University of Science and Technology (NTNU) in He has worked for both Norwegian and International consulting companies during the period 1980 to 2002 mainly with development and design of hydropower projects, oil&gas storages in rock and infrastructure projects. His roles have been as discipline lead and as engineering manager. In 2003 he joined Statkraft AS for development and construction of small hydro projects within Norway, and from 2008 also larger hydropower projects in South East Europe. He is currently Senior Project Manager in the International Hydropower business unit of Statkraft. V. AFSARI-RAD was graduated from the Norwegian University of Science and Technology (NTNU) in He began his career in 1995 as a Design Manager at Veidekke ASA, and in 2004 he joined Veidekke Industri AS as International Project Manager in respect to asphalt concrete core dam projects (ACRD) worldwide. Of the more than 130 asphalt core embankment dams that have been built worldwide since 1962, Veidekke has built 30 and Afsari-Rad has served extensively as project advisor at many of these projects around the globe. He has also participated in several research projects related to asphalt core design and construction. He is currently Director of Veidekke s International Activities. Afsari-Rad is board member of the Norwegian National Committee on large dams (NNCOLD). GRØNER_AFSARI-RAD Page 8/8

ASPHALT CORE DAMS An embankment dam with asphaltic concrete core is an appropriate dam type for the very highest future dams ICOLD Bulletin 84 (1992)

ASPHALT CORE DAMS An embankment dam with asphaltic concrete core is an appropriate dam type for the very highest future dams ICOLD Bulletin 84 (1992) ASPHALT CORE DAMS An embankment dam with asphaltic concrete core is an appropriate dam type for the very highest future dams ICOLD Bulletin 84 (1992) Asphalt Concrete Core for Embankment Dams (ACC) For

More information

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for

More information

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES August 2012 Dam Safety and Earthquakes Position Paper of International Commission on Large Dams (ICOLD) Prepared by ICOLD Committee on Seismic Aspects

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1)

Engineering Geological Asset Management for Large Dams. Yasuhito SASAKI (1) Engineering Geological Asset Management for Large Dams Yasuhito SASAKI (1) (1) Geology Research Team, Public Works Research Institute, Japan E-mail:ya-sasa@pwri.go.jp Abstract Comprehensive inspection

More information

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation

More information

Seismic Design and Performance Criteria for Large Storage Dams

Seismic Design and Performance Criteria for Large Storage Dams Seismic Design and Performance Criteria for Large Storage Dams Dr. Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design Poyry Switzerland Ltd., Zurich, Switzerland Integral Dam Safety

More information

XAYABURI HYDRO POWER PLANT, LAO PDR

XAYABURI HYDRO POWER PLANT, LAO PDR XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,

More information

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and

More information

Project Layout & Design Features of the Project

Project Layout & Design Features of the Project Project Layout & Design Features of the Project 1 PROJECT LAYOUT DRI DAM DRI DAM TOE P/H U/G POWER HOUSE COMPLEX DRI DAM TOE POWER HOUSE TANGON DAM TOE POWER HOUSE TOTAL 3070 MW 19.60 MW 7.40 MW 3097 MW

More information

Consulting Boards for Large Civil Engineering Projects

Consulting Boards for Large Civil Engineering Projects Consulting Boards for Large Civil Engineering Projects Evert Hoek and Alan S. Imrie Published in Water Power and Dam Construction, Vol. 47, No. 8, pp 33-34, August 1995. Consulting Boards for Large Civil

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

6.0 Results of Risk Analyses

6.0 Results of Risk Analyses 6. Results of Risk Analyses A risk analysis of the optimized embankment designs for the Salton Sea restoration project was conducted jointly by Kleinfelder and representatives from Reclamation. A risk

More information

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT

Federal Energy Regulatory Commission Division of Dam Safety and Inspections DRAFT RECOVERY PLAN FORMAT RECOVERY PLAN FORMAT Below is a suggested Table of Contents for an Internal Emergency Recovery (Response) Plan. This Internal Emergency Recovery Plan (IERP) is designed as a separate document which can

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS

More information

CLIFTY CREEK PLANT MADISON, INDIANA

CLIFTY CREEK PLANT MADISON, INDIANA 2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection

More information

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION

More information

Water in Africa: Hydro Pessimism or Hydro Optimism? Água em África: Hidro pessimismo ou Hidro optimismo

Water in Africa: Hydro Pessimism or Hydro Optimism? Água em África: Hidro pessimismo ou Hidro optimismo Water in Africa: Hydro Pessimism or Hydro Optimism? Água em África: Hidro pessimismo ou Hidro optimismo Centro de Estudos Africanos da Universidade do Porto Porto, Portugal, 2 3 October 2008 «WATER IN

More information

ICOLD s revised seismic design and performance criteria for large storage dams

ICOLD s revised seismic design and performance criteria for large storage dams ICOLD s revised seismic design and performance criteria for large storage dams Martin Wieland Chairman, ICOLD Committee on Seismic Aspects of Dam Design, Poyry Energy Ltd., Hardturmstrasse 161 CH-8037

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements 1.0 INTRODUCTION Colorado Springs Utilities (Utilities) is requesting proposals to provide final engineering, design, and construction management

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant

Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant Thin Air and Thick Ice Unusual Challenges at a High Elevation Hydro Plant By Ginger Gillin, John Pizzimenti, and Doug Foss, GEI Consultants, Inc., USA, and Jon Jourdonnais, PPL Montana, USA. Abstract The

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) *Reza Naghmehkhan Dahande 1 and Ahmad Taheri 2 1 Department of Civil Engineering-Water Management, Islamic Azad

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

Small Dam Hazard Assessment Inventory

Small Dam Hazard Assessment Inventory Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible

More information

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures ASPHALT INSTITUTE EXECUTIVE OFFICES AND RESEARCH CENTER Research Park Drive P.O. Box 14052 Lexington, KY 40512-4052 USA Telephone 859-288-4960 FAX No. 859-288-4999 Asphalt Institute Technical Bulletin

More information

14. ENGINEERING AND CONSTRUCTION SCHEDULES. 14.1. Preparation of Schedules ALASKA ENERGY AUTHORITY AEA11-022 ENGINEERING FEASIBILITY REPORT

14. ENGINEERING AND CONSTRUCTION SCHEDULES. 14.1. Preparation of Schedules ALASKA ENERGY AUTHORITY AEA11-022 ENGINEERING FEASIBILITY REPORT 14. ENGINEERING AND CONSTRUCTION SCHEDULES The project procurement strategy and contract strategy based on the project risk profile have not yet been formulated. For the purposes of completing the construction

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

Construction sites are dewatered for the following purposes:

Construction sites are dewatered for the following purposes: 9. DEWATERING CONTROL OF GROUNDWATER Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require

More information

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Instrumentation and Monitoring of Dams and Reservoirs - Mituaki Mizuno and Toshio Hirose

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Instrumentation and Monitoring of Dams and Reservoirs - Mituaki Mizuno and Toshio Hirose INSTRUMENTATION AND MONITORING OF DAMS AND RESERVOIRS Mituaki Mizuno Former executive director of Water Resources Development Public Corporation Japan Toshio Hirose Honorary member of the Japan Society

More information

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013 USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency

More information

Quality control: Annex-A.

Quality control: Annex-A. Quality control: Quality of the constructed work has been checked by our staff as per frequency and provision mentioned section 900 in MoRT&H and as per provision mentioned in Concession Agreement. The

More information

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes

Naue GmbH&Co.KG. Quality Control and. Quality Assurance. Manual. For Geomembranes Naue GmbH&Co.KG Quality Control and Quality Assurance Manual For Geomembranes July 2004 V.O TABLE OF CONTENTS 1. Introduction 2. Quality Assurance and Control 2.1 General 2.2 Quality management acc. to

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

UNIVERSITI PUTRA MALAYSIA

UNIVERSITI PUTRA MALAYSIA UNIVERSITI PUTRA MALAYSIA DEVELOPMENT OF THE CASCADING MODULE FOR HYDRO ENERGY DECISION SUPPORT SYSTEM (HEDSS) FOR TEMENGOR-BERSIAK-KENERING POWER PLANTS EZURIA NADZRI FSKTM 2002 9 DEVELOPMENT OF THE CASCADING

More information

Archive of SID. www.sid.ir

Archive of SID. www.sid.ir نهمین همایش صنایع دریایی یکم لغایت سوم آبانماه 1386 نور استان مازندران HEALTH, SAFETYAND ENVIRONMENTAL MANAGEMENT SYSTEM (HSE-MS) DURING HEAVY CONSTRUCTION FOR RISK AND LIABILITY REDUCTION BY INSURANCE

More information

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti

More information

Guidelines for. Permeable Pavement

Guidelines for. Permeable Pavement What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as

More information

Lecture 6. Jump as energy dissipation Control of jump.

Lecture 6. Jump as energy dissipation Control of jump. Lecture 6 Jump as energy dissipation Control of jump. Jump as energy dissipation The high energy loss that occurs in a hydraulic jump has led to its adoption as a part of high energy dissipater system

More information

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft)

Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) Outline of Guidelines for Seismic Performance Evaluation of Dams During Large Earthquakes (Draft) by Nario Yasuda 1, Kazuhito Shimamoto 2, Yoshikazu Yamaguchi 3 and Takashi Sasaki 4 ABSTRACT On March 2005,

More information

QUALITY CONTROL AND QUALITY ASSURANCE MANAGEMENT IN UPPER-KOTMALE HYDROPOWER PROJECT

QUALITY CONTROL AND QUALITY ASSURANCE MANAGEMENT IN UPPER-KOTMALE HYDROPOWER PROJECT QUALITY CONTROL AND QUALITY ASSURANCE MANAGEMENT IN UPPER-KOTMALE HYDROPOWER PROJECT Yoshimitsu NAKAJIMA MAEDA Corporation, Technical Research Institute ABSTRACT: Upper-Kotmale Hydropower Project has been

More information

Technical Approach and Methodology

Technical Approach and Methodology 1 Dam Rehabilitation & Improvement Project (DRIP), India Technical Approach and Methodology relative to Section of Design Flood Review of TOR Making an integral part of Egis Eau Tender Technical Proposal

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

California Energy Commission Agricultural Peak Load Reduction Program. For Water Agencies Administered by the Irrigation Training and Research Center

California Energy Commission Agricultural Peak Load Reduction Program. For Water Agencies Administered by the Irrigation Training and Research Center California Energy Commission Agricultural Peak Load Reduction Program For Water Agencies Administered by the Irrigation Training and Research Center Case Study Kaweah River Power Authority and Tulare ID

More information

Preliminary damage survey report on 2015 Nepal Gorkha Earthquake

Preliminary damage survey report on 2015 Nepal Gorkha Earthquake Tokyo, 13 May 2015 Preliminary damage survey report on 2015 Nepal Gorkha Earthquake Pokhrel R.M., Chiaro G., Kiyota T., Katagiri T. Institute of Industrial Science, University of Tokyo, Japan Goda K. Bristol

More information

Machine Foundation Design

Machine Foundation Design Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other

More information

FAILURE OF TETON DAM

FAILURE OF TETON DAM BACKGROUND ON FAILURE OF TETON DAM Near Rexburg, Idaho June 5, 1976 J. David Rogers, Ph.D., P.E., R.G. Karl F. Hasselmann Chair in Geological Engineering Department of Geological Sciences & Engineering

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY

PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY M. DUTZER, J.P. VERVIALLE, P. CHARTON Andra - Agence Nationale pour la Gestion des Déchets Radioactifs 1-7 rue Jean Monnet, 92298 Châtenay-Malabry

More information

Geosynthetic Mining Solutions at Copper Tailings Dams: A Review of the State of Practice in Chile.

Geosynthetic Mining Solutions at Copper Tailings Dams: A Review of the State of Practice in Chile. Geosynthetic Mining Solutions at Copper Tailings Dams: A Review of the State of Practice in Chile. Carlos Cacciuttolo, Engineering Council, Chile. Jack Caldwell, Robertson GeoConsultants, Canada. Scott

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Scour and Scour Protection

Scour and Scour Protection Design of Maritime Structures Scour and Scour Protection Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways Experiment Station 3909 Halls

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three

More information

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS

More information

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO) Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential

More information

Block and Gravel Inlet Protection (BIP)

Block and Gravel Inlet Protection (BIP) Block and Gravel Inlet Protection (BIP) Practice Description Block and gravel inlet protection is a sediment control barrier formed around a storm drain inlet by the use of standard concrete block and

More information

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water

More information

DESIGN GUIDELINES FOR EARTH RETENTION

DESIGN GUIDELINES FOR EARTH RETENTION DESIGN GUIDELINES FOR EARTH RETENTION Strata Systems, Inc. 380 Dahlonega Rd., Suite 200 Cumming, GA 30040 USA www.geogrid.com TABLE OF CONTENTS MECHANICS OF RETAINING WALLS... 3 THE STRATAWEB SOLUTION...4

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Arktis en kilde til fornybar energi?

Arktis en kilde til fornybar energi? Arktis en kilde til fornybar energi? Ånund Killingtveit 1 1 Norwegian University of Science and Technology Centre for environmental design of renewable energy - CEDREN SRREN was prepared for WG III In

More information

Queensland Dam Safety Management Guidelines. February 2002

Queensland Dam Safety Management Guidelines. February 2002 Queensland Dam Safety Management Guidelines February 2002 QNRM02013 ISBN 0 7345 2633 4 The State of Queensland (Department of Natural Resources and Mines) 2002 Copyright protects this publication. Except

More information

THE BEAR CREEK DAM, ALABAMA. Keith A. Ferguson, P.E. 1 Donald A. Bruce, PhD, C.Eng. 2 ABSTRACT

THE BEAR CREEK DAM, ALABAMA. Keith A. Ferguson, P.E. 1 Donald A. Bruce, PhD, C.Eng. 2 ABSTRACT THE BEAR CREEK DAM, ALABAMA Keith A. Ferguson, P.E. 1 Donald A. Bruce, PhD, C.Eng. 2 ABSTRACT In July of 2007, the Tennessee Valley Authority (TVA) selected the authors to serve on a two member senior

More information

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE Author: Audrey G. Beaulac, P.E., CPSWQ Company: (Hoyle, Tanner), Manchester, New Hampshire INTRODUCTION In early July 2013, 2 inches of rain fell

More information

Integrated Water and Sediment Management of Yellow River

Integrated Water and Sediment Management of Yellow River Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey Outline: I. Yellow River Characteristic

More information

Potential Impacts of Hydrofracturing on Dam & Levee Safety

Potential Impacts of Hydrofracturing on Dam & Levee Safety Potential Impacts of Hydrofracturing on Dam & Levee Safety Anita Branch, P.E. Senior Geotechnical Engineer Dam Fort Safety Worth Production District Center, Tulsa SAGEEP, 29 March 2012 29 January 2013

More information

TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station)

TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station) Twelfth International Water Technology Conference, IWTC12 2008 Alexandria, Egypt 1 TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station) N. M. Abdelsalam 1, M. M. Abdelaziz 2, A. F. Zobaa 3 and M. S. Aziz

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

Steel mill tumble belt shot blast machines

Steel mill tumble belt shot blast machines Steel mill tumble belt shot blast machines Blast machines Second-hand machines Conveyor systems Service and spare parts Steel mill tumble belt shot blast machines are used for deburring, descaling, sand

More information

Rutting Based Evaluation of Asphalt Mixes

Rutting Based Evaluation of Asphalt Mixes Pak. J. Engg. & Appl. Sci. Vol., July, 22 (p. 6-65) Rutting Based Evaluation of Asphalt Mixes Kamran Muzaffar Khan, Mumtaz Ahmed Kamal 2. Associate Professor, Civil Engg. Department, University of Engg.

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information

rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr HUESKER HUESKER HUESKER HUESKERHUES Product- Portfolio HUESKER Engineering with Geosynthetics

rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr HUESKER HUESKER HUESKER HUESKERHUES Product- Portfolio HUESKER Engineering with Geosynthetics HUESKER Engineering with Geosynthetics rhuesker HUESKER Product- HUESKER HUESKER HUESKER HUESKERr SKER HUESKER Portfolio HUESKER HUESKER HUESKER HUESKERHUES Engineering with Geosynthetics HUESKER Synthetic

More information

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

HYDROPOWER POTENTIAL OF NEUQUÉN PROVINCE

HYDROPOWER POTENTIAL OF NEUQUÉN PROVINCE HYDROPOWER POTENTIAL OF NEUQUÉN PROVINCE Hydropower potential of Neuquén province Existing structures Hydroelectric power plant Installed Power (MW) Annual Mean Energy (GWh/a) Alicurá 1.050 2.360 Piedra

More information

Overview of Tekeze hydroelectric power plant General

Overview of Tekeze hydroelectric power plant General Overview of Tekeze hydroelectric power plant General The Ethiopian Electric power corporation constructed the Tekeze hydro electric power plant as part of the Country s general development plan with the

More information

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town MEETING NOTES April 16, 2015 6:00 8:00 PM VERI Project Overview With funding from the US Economic Development Administration

More information

Best Management Practices for Coal Ash Storage Facilities

Best Management Practices for Coal Ash Storage Facilities 2009 World of Coal Ash (WOCA) Conference - May 4-7, 2009 in Lexington, KY, USA http://www.flyash.info/ Best Management Practices for Coal Ash Storage Facilities Presented by: Christopher D. Hardin, PE

More information

RESUME Lee A. Knuppel, P.E.

RESUME Lee A. Knuppel, P.E. RESUME Lee A. Knuppel, P.E. OFFICE: EDUCATION: LEE A. KNUPPEL AND ASSOCIATES, Inc. 7770 Cooper Road, Suite 7 Montgomery, Ohio 45242 (513) 793-4222 Graduate: UCLA, Los Angeles, CA M.S. in Civil Engineering,

More information

Guide to Safety Edge Systems

Guide to Safety Edge Systems Guide to Safety Edge Systems Tel: 0845 054 5070 asosafety@egduk.com Guide to Safety Edges All new automatic gate & door systems installed in the UK should comply to BS-EN13241-1 & EN-138491-1 harmonised

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine

The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine Author: Nattapon Pinitchan, Kanyarat Tankong, EGAT (Bangpakong Power Plant), Thailand 1 of 10 ABSTRACT EGAT's

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

Cost base for small-scale hydropower plants (< 10 000 kw)

Cost base for small-scale hydropower plants (< 10 000 kw) Cost base for small-scale hydropower plants (< 10 000 kw) 2 2012 V E I L E D E R COST BASE FOR SMALL-SCALE HYDROPOWER PLANTS (With a generating capacity of up to 10 000 kw) Price level 1 January 2010 Norwegian

More information

High Capacity Hot Air Dryer

High Capacity Hot Air Dryer High Capacity Hot Air Dryer MADE IN AUSTRIA autumn 2015 www.zimmer-austria.com page 1 Hot air dryer type: Compact HC The modular construction of the high efficiency and powerful hot air nozzle dryer is

More information

Introduction to Architecture. Lesson 13: Hoover Dam

Introduction to Architecture. Lesson 13: Hoover Dam Introduction to Architecture Lesson 13: Hoover Dam Back in 2010, my family and I flew to California and then drove to the Grand Canyon via the Hoover Dam. Named after President Herbert Hoover, the Hoover

More information