Offshore Legal Framework
|
|
|
- Alberta Thornton
- 10 years ago
- Views:
Transcription
1 Offshore Legal Framework Introduction Saskia Jaarsma 1
2 Background Legal framework: Offshore Code + Connection agreements Connection agreements for construction and operational phase Offshore Codes: technical requirements Prior to STROOM / Upon start of 1 st subsidy tender STROOM in force Offshore Connection Agreements (models) Completed draft Offshore Code requirements Aim: Preliminary Offshore Code approved by ACM; acceptable models for Connection Agreements Offshore Code Offshore Connection Agreements Existing legal procedures are being used for development of the Offshore Legal Framework 2
3 Offshore Legal Framework Technical Code amendments Offshore Code provisions regarding offshore grid connections Public law based general applicable rules regarding connections to the offshore transmission system o elaboration based on European Network Code Requirements for Generators o technical conditions for connecting to the platform (system specifics) o technical requirements for installations of connected parties (OWFs) o Starting point: RfG chapters for Offshore Power Park Modules (preliminary) implemented in Dutch national Codes as of start subsidy tender SDE+ o RfG specifies the required capability (value or boundary) of PPM o For some requirement parameters TSO can define the range or value Model Offshore Connection Agreements 3
4 Status RfG EU Comitology April - First formal meeting Q Vote Q2/ Approval by EU Parliament and European Council NC RfG enters into force as EU Regulation National implementation Within 2 years after entry into force (art. 7.14) New installations (art. 3) Existing installations (art. 4) Code change National process 4 4
5 Existing Code change process Two existing procedures Uniforme Openbare Voorbereidingsprocedure (UOV, appr. 6 months) Verkorte procedure (VP, appr. 3 months) Main difference: UOV takes more time as ACM considers it necessary to consult the market more extensively ACM indicated they would be willing to apply the Verkorte Procedure for the Offshore Code
6 Overview existing Code change process Verkorte procedure according to ACM 1. Overleg marktpartijen 2. Voorstel wijzigen codes 3. Publicatie voorstel 4. Beoordelen wijzigingsvoorstel 5. Definitief besluit 6. Bezwaar en beroep 6
7 Overview existing Code change process Verkorte procedure according to ACM 1. Market Consultation Netbeheer Nederland consults representatives of connected parties regarding the proposed Code change 2. Proposed Code change 3. Publication of proposal 4. Assessment of proposal 5. Formal decision 6. Objection and appeal 7
8 Overview existing Code change process Verkorte procedure according to ACM 1. Overleg marktpartijen 2. Proposed Code change 3. Netbeheer Nederland submits Code change proposal to ACM The proposal must explain the results of market consultation The proposal must explain the background of and reasoning behind the proposed Code change. ACM decides if the Code change procedure will be started. Publication of proposal 4. Assessment of proposal 5. Formal decision 6. Objection and appeal 8
9 Overview existing Code change process Verkorte procedure according to ACM 1. Overleg marktpartijen 2. Proposed Code change 3. Publication of proposal If ACM decides to start the Code change procedure, the Code change proposal is published. A consultation period of four weeks is started for stakeholders to submit their response. 4. Assessment of proposal 5. Formal decision 6. Objection and appeal 9
10 Overview existing Code change process Verkorte procedure according to ACM 1. Overleg marktpartijen 2. Proposed Code change 3. Publication of proposal 4. Assessment of proposal ACM assesses if the Code change proposal complies with legal requirements ACM may request additional information ACM may request adjustments if the proposal is non-compliant. 5. Formal decision 6. Objection and appeal 10
11 Overview existing Code change process Verkorte procedure according to ACM 1. Overleg marktpartijen 2. Proposed Code change 3. Publication of proposal 4. Assessment of proposal 5. Formal decision Based on the proposal and consultation response, ACM formally decides ACM publishes the approved Code changes 6. Objection and appeal 11
12 Overview existing Code change process Verkorte procedure according to ACM 1. Overleg marktpartijen 2. Proposed Code change 3. Publication of proposal 4. Assessment of proposal 5. Formal decision 6. Objection and appeal Stakeholders may object within 6 weeks ACM decides and publishes their beslissing op bezwaar. Stakeholders can object against ACM ruling within 6 weeks with College van Beroep voor het bedrijfsleven (CBb). 12
13 Timeline existing Code change process Verkorte procedure according to ACM 1. Overleg marktpartijen Expert meeting: March, April, May Netbeheer Nederland: May GEN: June 2. Voorstel wijzigen codes Early July 3. Publication of proposal July August By ACM 4. Assessment of proposal August By ACM 5. Formal decision September By ACM 6. Objection and appeal October 13
14 Conclusions/recommendations Regarding the Offshore Code It is in our common interest to establish the Offshore Code timely Verkorte procedure for Code changes is highly desirable ACM will apply verkorte procedure if the proposed Code change is supported by GEN You are represented in GEN via existing members (Representative Bodies) TenneT uses these Expert Meetings to consult the draft Offshore Code and create a proposal for the Offshore Code Provide your written feedback regarding the draft Offshore Code Align with your representatives in GEN to assure smooth decision making 14
15 Offshore Legal Framework Technical Code amendments Model Offshore Connection Agreements Agreement for connection and power transmission Civil law based agreement, establishing enduring obligations between system operator at sea and connected party o Legal general conditions for the exploitation phase of the OWF o Maximum available capacity and contracted transport capacity o Applicability of connection, transport and metering tariffs o Mandatory compensation in case of interruption of power transmission o Control centre arrangements (bedrijfsvoeringsafspraken) Agreement for realisation of the offshore connection Civil law based agreement, regarding the construction of the connection, also for future constructional changes; temporal character, entered into before operational phase o Legal general conditions regarding the realisation phase o o o o Access to the platform for connecting the inter-array cables Terms of delivery for the connection Mandatory compensation in case of exceeding the time of delivery Basic design of the connection 15
16 Principles for regulation TenneT is obliged to use conditions and charge tariffs that are objective, transparent and non-discriminatory It evolves from TenneT s mandatory tasks as a transmission system operator to deal with system operational challenges in an early stage of development TenneT is obliged to perform (cost) efficient grid management: o o o o Careful consideration of investments on the platform for ancillary services versus the alternative: ancillary services provided by generators Efficient measures should be future-proof, taking into account that from time to time grid load will be fully dependent on wind It is not feasible to extend the platform investment after the design phase Offshore flow to land grid must be stable, peak transport capacity must be guaranteed TenneT and generators recognize their mutual interdependencies Due to the discrimination prohibition, TenneT may only distinguish between connected parties on land and at sea, as long as there is a justification to treat such parties different The legal framework should be applicable one-on-one to the other Dutch offshore projects 16
17 Procedure to approved model Offshore Connection Agreements Draft models Offshore Connection Agreements Models drafted by TenneT Technical + legal track consultation Q2/Q Negotiation Multilateral negotiations between TenneT and designated representative bodies for negotiation Q2/ Approved models Connection Agreements Formal legal acceptability check by ACM in September/October Published on TenneT s website November
18 Conclusions/recommendations Regarding the Offshore Connection Agreements It is in our common interest to establish the Offshore Connection Agreement Models timely TenneT uses these Expert Meetings to consult the draft Offshore Connection Agreement Models After ACM has verified legal acceptability, the Offshore Connection Agreements and their General Terms and Conditions are fixed and public Provide your written feedback regarding the draft Offshore Connection Agreements 18
19 Overview: how are technical topics reflected in the OLFW Table of topics Legal Framework Topic Offshore Code Offshore REA Offshore REA General terms Offshore CTA Offshore CTA General Terms Technical issue Technical issue concluded Legal - conform onshore conditions Legal - to be discussed Table topics Legal Framework.xlsx 19
20 Offshore Legal Framework Way to consult stakeholders to the offshore grid Use of template consultation sheet: 1. Presentation by topic (today s presentation) 2. Input on each topic (conform ppt) provided by all stakeholders (deadline) 3. TenneT gathers input and formulates (initial) reactions 4. Consultation results taken into account with in formal procedures: a. Technical Code changes (Offshore Code): to GEN and ACM b. Draft models connection agreements: to designated representative bodies for negotiation Template consultation sheet.docx 20
21 Offshore Legal Framework Way of consultation Template Consultation Sheet: PUBLIC CONSULTATION OFFSHORE CONNECTION AGREEMENTS CONSULTATION SHEET Subject: Offshore Connection and Transmission Agreement (CTA) [Name and contact details responding party] [Article CTA + content (see ppt) f.i.:] Article 3 Feed-in: OWF entitled to a transmission capacity equal to the Feed-in Transmission Capacity (3.1.1 Grid Code) Obligation TenneT to keep the Installation connected to the Offshore Transmission System in a way that allows OWF to feed in for the Installation at the (primary) Connection Point a quantity of electrical energy corresponding Feed-in Transmission Capacity If overplanting is decided: addition of a flexible provision that for overplanting purposes allows an additional feed-in of no more than 10% of the system s Feed-in Transmission Capacity, if technically feasible. Consumption: obligation TenneT (after connecting Installation to Offshore Transmission System) to keep Installation connected in a way that allows OWF to take up for the Installation at the (primary) Connection Point a quantity of electrical energy that corresponds with the Contracted Transmission Capacity [Feedback / input / consulted party] [space left blank] [Initial reaction TenneT] [space left blank] 21
22 Thank you Stakeholder consultation website
23 NC RfG April Bart van Hulst
24 Offshore code requirements Starting point: Network code Requirements for Generators RfG has separate chapter for Offshore Power Park Modules (PPM) RfG specifies the required capability (value or boundary) of PPM, by - a written requirement, or - specific parameter value, or - parameter value within a defined range, or - an envelop of an operating area. For some requirement parameters TSO can define the range or value April NC RfG
25 RfG: Title II - Chapter IV Requirements for Offshore Power Park Modules Article 23: General provisions Article 24: Frequency stability requirements Article 25: Voltage stability requirements Article 26: Robustness Article 27: System restoration Article 28: General system management These articles refer back to articles of conventional power plants. April NC RfG
26 Article 23: General provisions Main topics: Definition of Offshore PPM Connection point Offshore grid connection system April NC RfG
27 Article 24: Frequency stability Reference to Article 13 Frequency range (table 2) Time periods for which PPM shall be capable of operating on frequencies deviating from nominal value while staying connected to the network Synchronous area Frequency range Time period for operation 47.5 Hz 48.5 Hz 30 minutes Continental Europe 48.5 Hz 49.0 Hz 30 minutes 49.0 Hz 51.0 Hz Unlimited 51.0 Hz 51.5 Hz 30 minutes April NC RfG
28 Article 25(1) Voltage stability Table 10: Voltage base for 1 pu < 300 kv (at connection point) Time periods for which PPM shall be capable of operating for voltage ranges deviating from nominal value while staying connected Synchronous area Voltage range Time period for operation 0.85 pu 0.90 pu 60 minutes Continental Europe 0.9 pu pu Unlimited pu 1.15 pu 30 minutes April NC RfG
29 Article 25(3) Voltage stability Fast fault current injection in case of symmetrical faults Voltage stability at and below maximum capacity. April NC RfG
30 Article 25(3) Voltage stability Reactive power capability at maximum capacity April NC RfG
31 Article 25(3) Voltage stability Reactive power capability below maximum capacity April NC RfG
32 Article 26 Robustness PPM shall retain steady state operation in case of power oscillations PPM shall be capable of remaining connected and operate without power reduction as long as voltage and frequency remains within the limits PPM shall be capable of remaining connected to the network during auto-reclosures on network line Fault-ride-through capability April NC RfG
33 Article 26 Robustness Fault-ride-through profile (table 3.2) - band width April NC RfG
34 Article 27 System restoration Article 14 reconnection Reconnection after an incidental disconnection caused by network disturbance Automatic reconnection Article 15 system restoration Black start Island operation Quick re-synchronisation April NC RfG
35 Article 28 General system management Article 14 Control schemes and settings Protection schemes and settings Information exchange Article 15 Loss of angular stability Instrumentation Simulation models Article 16 Synchronisation April NC RfG
36 Thank you Stakeholder consultation website
37 Public Consultation Offshore Legal Framework Model Agreements Offshore Connection & Transmission Agreement Fokke Elskamp 37
38 Offshore Connection & Transmission Agreement (CTA) Agreement establishing an enduring relationship between the offshore system operator and the connected party (OWF), regarding mandatory connection and power transmission obligations Summary of the content Main body of Agreement: Maximum available capacity and contracted transport capacity Applicability of connection, transport and metering tariffs Metering Entry into force Station operation engagements (bedrijfsvoeringsafspraken) Legal general conditions Annexes: OWF operations and contact details Description and technical specifications of the Connection unit, including drawings Technical terms and conditions for connection to offshore platforms Technical requirements applicable to the connected Installation (unless provided for in applicable Offshore Code) Arrangements for Installation operations and exchange of information List of tariffs 38
39 Offshore Connection & Transmission Agreement (CTA) The following is drawn from currently existing onshore applicable connection and transmission agreements ( ATO ) The content of this presentation is for information and discussion purposes only. In no way does it constitute rights for (potential) connected parties, or bind TenneT legally 39
40 Offshore Connection & Transmission Agreement (CTA) MAIN BODY OF THE CONNECTION & TRANSMISSION AGREEMENT 40
41 Offshore Connection & Transmission Agreement (CTA) Article 1: Definitions and general provisions (1) Definitions - Capitalized words have the meanings assigned to them in: Article 1 of the Act (STROOM bill) The Glossary accompanying the technical codes within the meaning of Article 9.1 of the Act (Begrippenlijst) The Tariff Code (Article 9.2 of the Act) and the technical codes (Art. 9.1 of the Act) Or otherwise as defined: Act: Electricity and Gas Act (= STROOM bill) Agreement: this Connection and Transmission Agreement, consisting of the Main (body of the) Agreement, General Terms and Conditions, and the Annexes General Terms and Conditions: TenneT General Terms and Conditions for the Connection and Transmission of Offshore Electricity 2015 Basic Design: basic design included in Annex 2 Glossary (Begrippenlijst): The Glossary as referred to in the technical codes Annexes: All annexes to the CTA, which form an integral part thereof Codes: Electricity Grid Code (Netcode Elektriciteit), Electricity System Code (Systeemcode Elektriciteit), Electricity Metering Code (Meetcode Elektriciteit), Electricity Tariff Code (Tarievencode Elektriciteit), and the Electricity and Gas Information Code (Informatiecode Elektriciteit en Gas) European Act: Regulation (EC) 714/2009 and forthcoming Network Codes and guidelines Contracted Transmission Capacity: contracted transmission of Tariff Code Main (body of the) Agreement: part of the Agreement other than the General Terms and Conditions and the Annexes Installation: Equipment (electrical or otherwise) and power lines that: a. are permanently connected to each other; b. are intended for the consumption, storage, transfer or production of electricity; c. are used or managed by a consumer or producer; and: d. are located behind a system s security facilities (= STROOM definition) 41
42 Offshore Connection & Transmission Agreement (CTA) Article 1: Definitions and general provisions (2) Offshore Transmission System: One or more connections including any associated auxiliary equipment for the transmission of electricity connecting one or more offshore wind farms to an electricity transmission system (= STROOM definition) Feed-in Transmission Capacity: Transmission capacity contracted and made available on the connection within the meaning of Grid Code that OWF will be allowed to feed into the grid Metering Device: device referred to in article [8] CTA that comprises all the components, software, etc. that are necessary for recording exchanged electrical energy and, if applicable, reactive energy Tariff Decision: Public law based decision of ACM (Art STROOM) that establish tariffs for TenneT List of Tariffs: List that states, in accordance with the ACM Tariff Decision, the tariffs that are payable by OWF to TenneT under the CTA 42
43 Offshore Connection & Transmission Agreement (CTA) Article 1: Definitions and general provisions (3) General provisions Agreement subject to the General Terms and Conditions Explicit exclusion of applicability of General Terms and Conditions of the connected party Order of precedence in case of conflicts between the documents that are part of the Agreement: Main body of the Agreement - Annexes - General Terms and Conditions Language of the CTA: Dutch or English (communication language control centre: Dutch) 43
44 Offshore Connection & Transmission Agreement (CTA) Article 2: (Contact) details & specifics updates Technical details of the Connection (specs) > Annex 1 Information duties: possible or planned changes to the details of Annex 1 to be noticed in writing Guarantee accuracy and completeness of provided details (verifiably) 44
45 Offshore Connection & Transmission Agreement (CTA) Article 3: Transmission right; contracted power transmission capacity Feed-in: OWF entitled to a transmission capacity equal to the Feed-in Transmission Capacity (3.1.1 Grid Code) Obligation TenneT to keep the Installation connected to the Offshore Transmission System in a way that allows OWF to feed in for the Installation at the (primary) Connection Point a quantity of electrical energy corresponding Feed-in Transmission Capacity If overplanting is decided: provision and conditions regarding additional feed-in of no more than 10% of the system s Feed-in Transmission Capacity, if technically feasible Consumption: obligation TenneT (after connecting Installation to Offshore Transmission System) to keep Installation connected in a way that allows OWF to take up for the Installation at the (primary) Connection Point a quantity of electrical energy that corresponds with the (Contracted) Transmission Capacity (kwmax + kwgecontracteerd) 45
46 Offshore Connection & Transmission Agreement (CTA) Article 4: The Connection Basic Design: technical description and diagrammatic representation of the Connection on TenneT s connecting platform, added as Annex 2 Information duty TenneT regarding possible or planned changes to the details of the Basic Design (Annex 2) Arrangements for (partly) disconnection for the purpose of modifications or maintenance 46
47 Offshore Connection & Transmission Agreement (CTA) Article 5: Connected Installation (OWF) OWF ensures to satisfy the requirements applicable to the connected Installation in Annex 4, after taking in operation and continuously during the term of the CTA TenneT informs OWF in writing as soon as possible of any proposed changes to the Installation requirements 47
48 Offshore Connection & Transmission Agreement (CTA) Article 6: Tariffs Mandatory Tariffs, if applicable, will be charged (List of Tariffs in Annex 6, accordance with yearly updated ACM Tariff Decision) Transporttarief not applicable for feed-in of OWFs On request of TenneT, OWF provides the details necessary for determining the tariffs owed. TenneT informs OWF of the tariffs that apply All amounts owed by OWF increased by taxes, surcharges and duties that TenneT is required or authorized to charge under a government decision. ACM Tariff Decision prevails in event of conflicts between the Tariff Decision and the List of Tariffs 48
49 Offshore Connection & Transmission Agreement (CTA) Article 7: Metering devices and metering TenneT maintains, replaces, relocates and/or removes the primary component of the Metering Device Metering in accordance with Metering Code (might be necessary to amend for metering at sea) Metering at (primary) Connection Point (defined in Annex 1, diagrammatic representation in Annex 2), performed by an Acknowledged Metering Responsible Party, to be designated by TenneT Metering tasks to be charged to OWF at mandatory tariffs 49
50 Offshore Connection & Transmission Agreement (CTA) Article 8: Transparency requirements OWF to provide in good time information to TenneT regarding Art. 14 (generation forecast) and Art. 16 (actual generation) of Regulation (EU) No 543/2013 (transparency) 50
51 Offshore Connection & Transmission Agreement (CTA) Article 9: Testing and Simulation Requirements TenneT will be entitled to require from OWF during the Installation s lifecycle the performance of the compliance tests and simulations pursuant to the TenneT compliance testing requirements (in accordance with Offshore Realisation Agreement) Requirement OWF of performance of compliance tests and simulations pursuant Annex 5 Reference to TenneT s testing compliancy documents in Annex 4 Compliance activities with regard to Connection Requirements for System Operations related to Wind Farms, Version V3.0, January 2014 (SO-SOC ) to be updated according RfG and tailor made for offshore 51
52 Offshore Connection & Transmission Agreement (CTA) Article 10: Commencement and Term of Agreement CTA takes effect on the day after the Connection has been taken into operation CTA remains in force [for an indefinite term or until relevant date] OWF and TenneT may each cancel the CTA subject to the cancellation provisions of the General Terms and Conditions 52
53 Offshore Connection & Transmission Agreement (CTA) Article 11: Applicable Law CTA governed by the Laws of The Netherlands 53
54 Offshore Connection & Transmission Agreement (CTA) Article 12: Amendment of Main body Agreement and Annexes Amendments and additions agreed by the Parties in writing, in effect from the agreed time Changes to Annexes: ensure effective date, new Annex replaces the old Annex; amended Annex to be signed by both Parties Parties consult with each other how to deal with void or non-binding provisions Parties consult with each other about changing the CTA if current legislation is amended in a way that precludes unamended continuation of the Main body of the Agreement in its existing form 54
55 Offshore Connection & Transmission Agreement (CTA) Article 13: Operational arrangements and exchange of information Arrangements on operational matters and exchange of information on operations to be included in Annex 5 55
56 Offshore Connection & Transmission Agreement (CTA) GENERAL TERMS TO THE CONNECTION & TRANSMISSION AGREEMENT 56
57 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 1 Definitions Capitalized words have the meanings assigned to them in: Glossary (Begrippenlijst), technical codes Electricity and Gas Act or the CTA or otherwise: ACM: Authority for Consumers & Markets Party / Parties: party / parties to the CTA, i.e. TenneT or OWF Property: any movable or immovable property (or part or combination thereof) for which a Connection was or will be realized or transmission of electrical energy occurs or will occur Representative Body (Representatieve Organisatie): a legal entity within the meaning of Article 9.5 of the Act 57
58 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 2 Maintenance, inspection, replacement, relocation and removal of a Connection Connection unit to be maintained, tested, replaced, relocated, or removed exclusively by and at the expense of TenneT, in consultation with OWF Modifications to the Connection at the expense of OWF, if: modification on request of OWF result from an act or omission on part OWF (unless credibly established circumstances that cannot reasonably be attributed to OWF 58
59 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 3 Facilities for the Connection Connection shall be located entirely on TenneT s platform; provision shall contain arrangements concerning access for OWF to the platform OWF provides required cooperation free of charge in the performance of work on the Connection Equipment that forms part of or is used for the Connection is and remains the property of TenneT If CTA is terminated, TenneT entitled to use the equipment that forms part of or is used for OWF s Connection for the purpose of its operations 59
60 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 4 Rights and obligations Arrangements for cable crossings As and when necessary, OWF and TenneT shall fairly and reasonably consult with each other to install cables realize Connections and create branches from pre-existing Connections, and to operate, maintain, enlarge, modify or remove such lines on behalf of OWF or third parties To the extent reasonably within its power, each Party ensures that no acts occur that are capable of preventing or obstructing TenneT s or third Party s (esp. neighboring OWF s) operations, or jeopardize the safe presence, maintenance or repair of cables, Connections or branches or that pose a hazard to people or property Shared use on behalf of a third party only with the OWF s consent (not withheld on unreasonable grounds, adverse consequences for OWF s operations in any event considered as a reasonable ground for withholding consent) 60
61 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 5 Transfer of rights and obligations OWF may not assign rights and obligations under the CTA to a third party without TenneT s prior permission (TenneT shall not withhold permission without reasonable grounds) If successor to TenneT is named under the Act to manage the offshore grid (or part thereof), OWF may decline to consent to the successor taking TenneT s legal position under the CTA only if the successor fails to adopt unconditionally all rights and obligations of TenneT under the CTA. 61
62 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 6 Restriction or interruption of transmission TenneT is allowed to restrict or interrupt transmission (shortest time possible) if reasonably necessary in the interests of an effective public electricity supply, on following conditions: consultation between TenneT and OWF about the scheduled restriction or interruption. In consultation with OWF, TenneT determines time and duration of its work in connection with the scheduled restriction or interruption, except (only) if performance of TenneT s statutory duties preclude such action. If this is the case, TenneT shall perform the work with the fullest possible allowance for the operations of the Connected Party. No liability TenneT for damages or disadvantage resulting from scheduled restriction or interruption Unscheduled restrictions or interruptions, TenneT informs OWF however: compensation based on Article 5.27 STROOM bill Provision applies mutatis mutandis to work on the primary part of the Metering Device, except for mandatory compensation rules 62
63 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 7 Invoicing and payment Monthly itemized invoicing in euro ( ) for all amounts owed by OWF under the CTA (transmission tariff not applicable for feed-in) Payment term 30 days after date of the invoice; statutory interest over the outstanding amount from the due date In all instances undisputed part of an invoice to be paid on time; Parties consult with each other on any disputed part of the invoice Set-offs under Article 6:127 et seq of the Netherlands Civil Code (verrekening) of debts against debts owed by the other Party not be allowed, except in the case of a set-off in bankruptcy or suspension of payments (Art. 53 / Art. 234 Bankruptcy Act) 63
64 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 8 Security deposit TenneT shall have the right to require OWF to provide collateral against amounts owed by OWF under the CTA if: OWF fails or in previous three months has failed to meet payment obligations (in full or on time), and reasonable grounds for TenneT assuming that OWF will be unable or unwilling to fulfil Collateral cancelled as soon as the Connected Party has met its payment obligations in full and on time for a consecutive period of six months 64
65 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 9 Other obligations General obligation TenneT to execute the CTA as a conscientious Transmission System Operator, taking all measures reasonably necessary to prevent OWF from being inconvenienced or unnecessarily harmed OWF ensures to have concluded agreement(s) to assume Balance Responsibility (programmaverantwoordelijkheid) or to commission an Acknowledged BRP ( Erkende programmaverantwoordelijke partij ) on its behalf. Required cooperation between Parties in applying and implementing these provisions, in particular by: informing each other Party about all details, incidents and changed circumstances that may be relevant to performance of the CTA informing the other Party in good time of changes of address and changes of names or trading names Access OWF to the platform in case of emergencies Access TenneT to the installation in case of necessity for fulfilment of obligations imposed by the authorities Parties may choose to be represented by third parties for the purposes of fulfilling their obligations and exercising their rights 65
66 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 10 Right to compensation OWF (Art STROOM bill) OWF shall be entitled to damage compensation payable by TenneT if the volume of electricity that cannot be transmitted across the offshore transmission system during a calendar year exceeds the volume of electricity that cannot be transmitted as a result of maintenance that on average is reasonably required for the system, and the Connected Party cannot have all or part of its electricity transmitted as a result. Compensation comprises consequential damage and damage resulting from lost or deferred income for the OWF, subject to the relevant provisions in or pursuant to the Act (STROOM bill) OWF shall endeavor to reduce the damage as far as possible. 66
67 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 11 Liability (1) Liability towards each another only for direct damage that one Party causes the other Party, subject to a maximum of [to be discussed] euro per incident No liability for any damage other than direct damage, including loss of profit/income and immaterial damage TenneT shall not be liable for damage arising due to: deficiencies in transmission: unscheduled interruptions and/or restrictions of transmission and voltage management disruptions (such as voltage dips and transients) scheduled and agreed interruptions or restrictions of transmission (curtailment) Exception for damages arising through deliberate act or gross negligence by TenneT, its employees or its subordinates, maximum of 10,000,000 (ten million) euro per incident and per calendar year In case more connected parties damaged by deliberate act or gross negligence and total damage exceeds maximum, amount divided proportionally to connection capacity (no individual compensation higher than actual damage) 67
68 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 11 Liability (2) Claims due to a deliberate act or gross negligence by TenneT to be submitted within one year of occurrence of the deficiency, otherwise right cease to exist If total damage from deficiency in transmission due to deliberate act or gross negligence by TenneT is expected to exceed maximum TenneT pays within reasonable time after end of aforementioned year, but not later than six months after that No liability for both Parties towards each other for damage arising from acts or omissions by third parties Liability provisions extend to transmission system owner, OWF owner, OWF operator the employees or subordinates of the Parties 68
69 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 12 Termination Termination (dissolution) of the CTA by mutual consent, not unilaterally, except in case: TenneT s TSO-at-sea designation ceases Upon granting suspension of payments (unless sufficient security furnished within reasonable time) Bankruptcy declared or filed (unless sufficient security furnished within reasonable time) OWF may terminate by written notice of cancelling of at least two months TenneT may cancel the CTA because of pressing interests ( zwaarwichtige belangen ), with due observance of the OWF s reasonable interests upon written notice giving reasons for the cancellation and a reasonable period of time During notice period, Parties give each other opportunity to perform activities necessary for termination of the CTA; Parties remain bound to the CTA 69
70 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions TenneT may dissolve the CTA with immediate effect after: notice of default affording a reasonable time for redress, OWF fails to fulfil any of its obligations (except payment obligations under the CTA, and seriousness justifies dissolution in view of safety of people and property or the safety and reliability of the public electricity supply notice of default affording a reasonable time for redress, OWF fails to fulfil its payment obligations the BRP (programma-verantwoordelijke partij) for the Connection has lost its status and the OWF fails to remedy this situation within two working days after occurrence After dissolution of the CTA, TenneT has the right to deactivate the Connection at the OWF s expense with effect from the day of effectiveness of the dissolution Parties have the right to suspend fulfilment of their obligations under the CTA in cases provided for by the Dutch Civil Code (Burgerlijk Wetboek), if reason for suspension is justifiable, for instance because of safety of persons and property or the safety and reliability of the public electricity supply, taking into account the reasonable interests of the OWF TenneT may interrupt or restrict transmission to execute suspension The CTA shall remain fully in force on occurrence of a situation of necessary restriction or interruption of power transmission or justified suspension by TenneT 70
71 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 13 Loss of status of Balance Responsible Party (BRP) (Programma-Verantwoordelijke Partij) The following applies if the Balance Responsibility Party loses its status. OWF rectifies the situation as soon as possible and in all instances within two working days of its occurrence During the rectification period the OWF limits as far as reasonably possible the feed-in and/or uptake of electricity over the Connection TenneT charges OWF an imbalance price in accordance with the imbalance system as if a zero programme had been submitted for electricity exchanged over the Connection during the period of loss of status of the BRP Supplementary to this charge, the OWF owes 10% of the imbalance price Parties inform each other without delay of the loss of status BRP and inform each other as soon as possible of the measures to rectify the situation 71
72 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 14 Deviations from the General Terms and Conditions Departures from and additions to the General Terms and Conditions only binding if agreed by Parties in writing as an integral part of the Main body of the Agreement or Annexes 72
73 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 15 Amendments of the General Terms and Conditions (1) Amendment of General Terms and Conditions by TenneT if and after agreement on the amendment with Representative Bodies (Representatieve Organisaties) of Connected Parties. If no agreement reached, TenneT may make the amendment subject to a ruling by the independent third party referred to below Amendments also apply to pre-existing agreements with OWFs that are subject to these General Terms and Conditions Term for effectiveness of amendment to the General Terms and Conditions not earlier than 14 days after the postmarked date of dispatch of the written notice informing OWF of the amendment Representative Bodies of Connected Parties are informed written notice with explanatory notes about amendments of these General Terms and Conditions. Consultation starts within six weeks of dispatch, purpose: endeavor to reach agreement on the proposed amendment 73
74 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 15 Amendments of the General Terms and Conditions (2) In case of objections from Representative Bodies (Representatieve Organisaties), and no solution within four months, each has the right to request an independent third party designated jointly by them to give a ruling that makes allowance for the interests of TenneT on the one hand and the interests represented by the Representative Bodies on the other. Incase parties do not agree on designation, the designation could be requested to be made by the presiding judge of the Arnhem District Court TenneT and the Representative Bodies involved in the consultations may depart from the procedure described above subject to consultation with each other. The parties shall consult reasonably with each other about such a departure if one of the parties submits a written and articulated request to the other parties to that effect. TenneT may amend this article only if and after it has reached agreement on the amendment with Representative Bodies of Connected Parties. 74
75 Offshore Connection & Transmission Agreement (CTA) General Terms and Conditions Article 16 Applicable law CTA to be governed by the laws of the Netherlands Article 17 Disputes Parties endeavor to resolve disputes amicably Choice of forum: competent court in Arnhem (the Netherlands), if unable to resolve disputes amicably In particular cases, Parties choose to agree a different way of ispute dissolution If immediate provisional measures required: free to apply to a preliminary injunctions court for summary proceedings Always intact the right to submit a dispute to ACM (Art STROOM bill) Article 18 Final provisions Citation clause: TenneT General Terms and Conditions for the Connection and Transmission of Offshore Electricity
76 Offshore Connection & Transmission Agreement (CTA) ANNEXES TO THE CONNECTION & TRANSMISSION AGREEMENT 76
77 Offshore Connection & Transmission Agreement (CTA) Annex 1 Details of OWF General details EAN code of connection / EAN code(s) of power line(s) / Producer / Correspondence address + contact person / Chamber of Commerce registration number / Commencement date / Invoice address / Order number / reference for invoicing purposes Transmission details Feed-in Transmission Capacity / Initially contracted Transmission Capacity (usage) / Transmission tariff category (producers exempted) / kw max category of operating time Connection details Connection capacity / Physically connected to / Primary Connection Point / Secondary Connection Point / Tertiary Connection Point Details of metering device Location of metering device / Voltage level of metering device / Owner of metering device / Correction factor for cable losses / Correction factor for transformer losses / assigned Balance-responsible party / Assigned party with metering responsibility 77
78 Offshore Connection & Transmission Agreement (CTA) Annex 2 Description and technical specifications of the Connection, including drawings Platform specifications: Line diagram of connection 33/66 kv maximum number of inter array cable connections (location of) metering device security operation Capacity curtailment conditions party responsible for operating the circuit breakers 78
79 Offshore Connection & Transmission Agreement (CTA) Annex 3 Technical terms and conditions for offshore connection platforms Technical specifications for the platform relevant OWF s Measures to ensure that producers the same platform do not negatively affect each other 79
80 Offshore Connection & Transmission Agreement (CTA) Annex 4 Technical requirements applicable to the connected Installation (OWF) All that is not arranged on Technical Code level, to be added in Annex 4 Description of compliance test requirements: prescribe relevant compliancy tests, according to TenneT Requirements (to be updated and tailor made for connected parties to grid at sea) 80
81 Offshore Connection & Transmission Agreement (CTA) Annex 5 Operational arrangements and exchange of information (1) Scope of the Annex Describes operational arrangements agreed by and between OWF and TenneT Control Centre. Details specified: contact persons of the both Parties / content of the operational arrangements / procedure for resolving failures / exchange of information Contact details for operational matters Operations at TenneT performed by National Control Centre (LBC) Arnhem for voltages of 380/220 kv Contact details for planning the availability of the TenneT transmission grid Planned Unavailability On working days, OWF s contact person for matters concerning Planned Unavailability Specification of availability of the offshore connection in case of maintenance (Planned Unavailability), and Unplanned Unavailability Changes to contact details TenneT Customer Relationship Manager responsible for changing the contact details e.a. (correspondence address TenneT TSO B.V.) 81
82 Offshore Connection & Transmission Agreement (CTA) Annex 5 Operational arrangements and exchange of information (2) Content of arrangements: Control work In conformity with NEN-EN 50110, under the operational decision-making authority of the operational managers of either Party. Basic principle: each Party controls its own component, in accordance with the arrangements agreed for the Interchange Point (see Annex 2). Any exceptions to be stated in the table Switching procedures Supplemental to NEN-EN 50110: specific switching procedure Parties must follow to assure safety, continuity, etc. If this situation occurs, to be detailed in table Resolution of failures Failure in this Annex defined as an unscheduled interruption or restriction of electricity transmission, including but not confined to a voltage management disruption (such as voltage dips and transients). Duty to provide information on failures As failure occurs: Parties inform each other comprehensively and quickly to allow to act effectively. The information includes volume of switched-off capacity and the estimated resolution time of the failure. On request: Parties provide information about (probable) cause of the problem, and state actions to resolve the failure as well as measures to prevent recurrence 82
83 Offshore Connection & Transmission Agreement (CTA) Annex 5 Operational arrangements and exchange of information (3) Major incidents and protection and restoration plan TenneT coordinates the response to a major incident affecting the energy supply. For this purpose, TenneT may instruct OWFs to switch-off. OWF shall ensure that the requested load is switched off in conformity. The National Control Centre shall issue this instruction by telephone to the contact person named above. On request, OWF receives written confirmation of the oral instruction In order to control the incident or to prevent damage to the managed Installation, the connection, or the grid, the OWF may request TenneT to switch off all or part of the Connection if it is affected by a major incident. TenneT shall meet such a request unless it cannot reasonably be expected to do so Crisis centre In the event of a major incident, option for OWF to let a crisis centre handle communications. OWF indicates when the crisis centre is to take over handling of communications. The details of OWF s crisis centre stated in Annex 5 OWF s crisis team OWF designates crisis team to handle major incidents, contact details of the team stated in Annex 5 Exchange of information Parties provide each other with the information that by reasonable standards may be relevant to the operation of TenneT s grid and the operation of the Installation of OWF 83
84 Offshore Connection & Transmission Agreement (CTA) Annex 6 List of tariffs Example: currently onshore used Tarievenblad 2015 See next slide. 84
85
86 Public Consultation Offshore Legal Framework Connection Agreements Offshore Realisation Agreement Fokke Elskamp 86
87 Connection Agreements: realisation TenneT builds, owns and manages the offshore connection units as part of the offshore transmission system and connects the OWF within an agreed period Agreement on: Planning of the realisation of the connection Time setting for operational readiness Commitment to compliance on technical requirements Legal general conditions Annexes: Annex 1: Basic Design for the Connection Annex 2: Planning schedule Annex 3: Insurance sheet [to be decided] Annex 4: Compliance testing documentation 87
88 Offshore Realisation Agreement (REA) The following is drawn from currently existing onshore applicable realisation agreements ( REA ) The content of this presentation is for information and discussion purposes only. In no way does it constitute rights for (potential) connected parties, or bind TenneT legally 88
89 Offshore Realisation Agreement (REA) MAIN BODY OF THE OFFSHORE REALISATION AGREEMENT 89
90 Offshore Realisation Agreement (REA) Article 1: Definitions and general provisions (1) Definitions - Capitalized words shall have the meanings assigned to them in: Article 1 of the Act The Glossary accompanying the technical codes within the meaning of Article 9.1 of the Act (Begrippenlijst) The Tariff Code (Article 9.2 of the Act) and the technical codes (Art. 9.1 of the Act) Or otherwise as defined: Act: Electricity and Gas Act (= STROOM proposal) Agreement: agreement including all Annexes General Terms and Conditions: TenneT General Terms and Conditions for the Realisation of Offshore Connections 2015, as appended to this Agreement Basic Design: The basic design as described under A of the preamble and included in Annex 1 Glossary (Begrippenlijst): The Glossary as referred to in the technical codes Annexes: All annexes to this Agreement, which form an integral part thereof Codes: The Electricity Grid Code, the Electricity System Code, the Electricity Metering Code, the Electricity Tariff Code, and the Electricity and Gas Information Code Recognised Party with Metering Responsibility (Erkende Meetverantwoordelijke): A Recognised Party with Metering Responsibility within the meaning of the Electricity Metering Code Person Responsible for the Installation: The person who, in the context of the company s working conditions policy pursuant to the Working Conditions Act, is responsible for ensuring and maintaining the safety of the electrical installation and its operation and who has been appointed for that purpose by his/her employer in writing in accordance with the NEN-EN standard 90
91 Offshore Realisation Agreement (REA) Article 1: Definitions and general provisions (2) Connection Point: The interface point at which the Power Generating Module is connected to an offshore Transmission System, as identified in the Connection Agreement (= RfG definition) (i.e. the physical point agreed by the Parties where a separation may be made between the ownership and operation of the offshore grid Connection on the one hand, and the connected party s Installation on the other, see Begrippenlijst) Work: All work required to realise the Connection Planning: The planning within the meaning of Art.7 that has been appended to this Agreement as Annex 2 and that contains the target dates pertaining to the Work The Agreement will be subject to the General Terms and Conditions. The applicability of the General Terms and Conditions of the connected party will be explicitly excluded. Order of precedence in case of conflicts between the documents that are part of the Agreement: Agreement - Annexes 1 and 2 - General Terms and Conditions 91
92 Offshore Realisation Agreement (REA) Article 2: Realization of the connection The actual realisation regards connecting the OWF installation to TenneT s platform, in accordance with the planning for the realisation of the platform and the scheduled start-up date, and depending on the test and simulation results as well as the requirements of designating a: Person Responsible for the Installation Supplier Balance Responsible Party (BRP) (Programma-Verantwoordelijke Partij) Metering Responsible Party Concluding a Connection and Transmission Agreement (CTA) TenneT performs the realisation in accordance with the provisions of the Act, the Codes and Agreement TenneT shall perform the realisation in accordance with the conditions, guidelines and principles as laid down in the Basic Design and Offshore REA 92
93 Offshore Realisation Agreement (REA) Article 4: Connection points (ownership and management) Diagrammatic representation of the primary and secondary Connection Points for the Connection operated by TenneT in Annex 1 (also specified in Connection and Transmission Agreement) The Connection entirely owned by TenneT in accordance with the relevant provisions of the applicable laws and regulations See: Position Paper regarding common point of connection 93
94 Offshore Realisation Agreement (REA) Article 5: Testing and simulation requirements Requirement OWF of performance of compliance tests and simulations pursuant Annex 4 These tests and simulations shall be performed before the Connection is taken into operation Reference to TenneT s testing compliancy documents attached as Annex 4: Compliance activities with regard to Connection Requirements for System Operations related to Wind Farms, Version V3.0, January 2014 (SO-SOC ) ) to be updated according to RfG and tailor made for offshore 94
95 Offshore Realisation Agreement (REA) Article 6: Start-up and commissioning of the connection Conditions before taking Connection into operation: OWF concluded supply agreement at least one month before use of the Connection, and informs TenneT of the supplier s name on request OWF agreed with TenneT that TenneT shall appoint a Recognised Party with Metering Responsibility, and shall have an effective and reliable metering device at its disposal OWF informed TenneT of the name of the Person Responsible for the Installation OWF informed TenneT of the name of the Balance Responsible Party (BRP) Before OWF starts using the Connection: OWF satisfies the conditions in Annex 4 to the Connection and Transmission Agreement (technical installation requirements for OWF) TenneT receives a Connection and Transmission Agreement for the Connection signed by OWF OWF satisfies the provisions below on this slide: Before the Connection is commissioned, TenneT informed by OWF or Supplier, the Balance Responsible Party (BRP) (Programma-Verantwoordelijke Partij) or Person Responsible for the Installation of all relevant details using the relevant procedures in accordance with the relevant Code provisions 95
96 Offshore Realisation Agreement (REA) Article 7: Planning Setting the target date for commissioning of the Connection; in accordance with the scenario of the Minister of Economic Affairs TenneT shall do everything that may be reasonably expected (best effort) to complete the Work in accordance with the Planning; if in spite of this the Planning turns out not to be feasible, Parties will consult with each other in order to arrive at a mutually acceptable solution TenneT shall keep OWF informed of the progress of the Work [to be discussed: way and terms of reporting] If the required permits for the construction of the Connection are not issued, Parties shall consult with each other about possible alternatives 96
97 Offshore Realisation Agreement (REA) Article 8: Insurance [To be decided if relevant offshore] TenneT takes out a CAR (Construction All Risk) insurance in connection with the performance of the Work, including the connection to the Offshore Wind Farm (OWF) at the interface A copy of a summary of TenneT s current insurance policy has been provided to OWF and is also included as Annex 3 to this Agreement. 97
98 Offshore Realisation Agreement (REA) Article 9: Termination After the REA has entered into effect, OWF may cancel the REA without stating any reasons [To be decided if relevant offshore:] If REA is terminated pursuant any reason attributable to OWF, actual costs specifically made for connected party owed to TenneT 98
99 Offshore Realisation Agreement (REA) GENERAL TERMS AND CONDITIONS TO THE OFFSHORE REALISATION AGREEMENT 99
100 Offshore Realisation Agreement (REA) General Terms and Conditions Article 1 Definitions Capitalized words have the meanings assigned to them in: Glossary (Begrippenlijst) accompanying the technical codes the REA, or otherwise: General Terms and Conditions: TenneT General Terms and Conditions for the Realization of Offshore Connections 2015 concerning the construction of offshore Connections. In these General Terms and Conditions, realization of a Connection shall be understood to include the modification, extension or removal of an existing Connection Party / Parties: TenneT or OWF OWF: the party with which TenneT enters into an Agreement Work site: the site (offshore platform) where the Connection will be realized 100
101 Offshore Realisation Agreement (REA) General Terms and Conditions Article 2 The Agreement REA ends by operation of law after both Parties have fulfilled all of their obligations arising from the Agreement Without the OWF s consent, TenneT shall have the right to engage third parties for the fulfilment of its obligations towards the OWF, under TenneT s full responsibility for the performance of these third parties OWF is responsible for the timely provision (also in connection with planning) and the accuracy of the information, data and decisions submitted to TenneT by it or on its behalf that are required for the proper realization of the Connection. Departures from and/or additions to the REA only apply if agreed by Parties in writing. 101
102 Offshore Realisation Agreement (REA) General Terms and Conditions Article 3 General Terms and Conditions Citation clause: TenneT General Terms and Conditions for the Realization of Offshore Connections 2015 Departures from and/or additions to these General Terms and Conditions only apply if agreed by Parties in writing Any General Terms and Conditions of the OWF do not apply to the Agreement 102
103 Offshore Realisation Agreement (REA) General Terms and Conditions Article 4 Permits Unless Parties agree otherwise in the REA, TenneT shall apply for any permits required for the Work at the platform Article 5 Construction work [To be discussed: standard arrangements for cable crossings] (As far as necessary) OWF cooperates in the realisation of the Connection free of charge, unless explicitly agreed otherwise 103
104 Offshore Realisation Agreement (REA) General Terms and Conditions Article 6 Access to the platform [To be discussed: arrangements for access to platform for connection activities] 104
105 Offshore Realisation Agreement (REA) General Terms and Conditions Article 7 Intellectual property rights All drawings, designs, models etc. created by TenneT for the realisation of the Connection (platform) and made available by TenneT in connection with the Work, as well as all associated intellectual and industrial property rights remain the exclusive property of TenneT TenneT shall also be considered to be the creator and author of those drawings, designs, models etc. Without TenneT s prior written permission, OWF shall not make any documents, information and/or advisory reports from TenneT available to third parties 105
106 Offshore Realisation Agreement (REA) General Terms and Conditions Article 8 Right to compensation OWF (Art STROOM bill) OWF is entitled to damage compensation payable by TenneT if TenneT partly or completely fails to deliver the part of the Offshore Transmission System required to connect the OWF within the timeframe stipulated in the scenario within the meaning of Article 5.6, subsection 1 of the Act (STROOM bill), and if the OWF cannot have all or some of its electricity transmitted as a result The damage compensation covers consequential damage and damage resulting from lost or deferred income for the OWF, subject to the relevant provisions in or pursuant to the Act (STROOM bill) OWF endeavours to limit the damage referred to in this article as far as possible 106
107 Offshore Realisation Agreement (REA) General Terms and Conditions Article 9 Liability If during or after the performance of the Work shows that the performance does not meet the requirements that may be reasonably imposed on it, TenneT will correct any errors and rectify any deficiencies If OWF suffers damage due to attributable failure to TenneT in fulfilling its obligations connected to the realisation of the Connection, TenneT will only be liable for damage covered by its Construction All Risk (CAR) insurance policy or that TenneT can recover from third parties [To be decided whether CAR insurance will also be applicable offshore] 107
108 Offshore Realisation Agreement (REA) General Terms and Conditions Article 10 Taxes and levies Prices stated in the REA are exclusive of Value-Added Tax (VAT) and other levies, duties or other costs resulting from the performance of the Work, wherever it may be carried out Costs for the account of OWF and charged separately Financial consequences of any changes to regulations, rules, legislation etc. during the term of the REA for the account of OWF; TenneT notifies OWF in writing as soon as possible about any such changes and the consequences thereof 108
109 Offshore Realisation Agreement (REA) General Terms and Conditions Article 11 Default If OWF has not paid an invoice within the applicable term and in requested manner, it shall be in default without any notice, barring any part of the invoice rightly disputed by the OWF From the moment of default until the day on which full payment has been made, the OWF shall owe statutory interest, without prejudice to TenneT s right to full compensation All expenses incurred in collecting amounts owed by OWF as well as (extra)judicial costs for the account of the OWF 109
110 Offshore Realisation Agreement (REA) General Terms and Conditions Article 12 Early termination of Agreement If the OWF: files for bankruptcy, is declared bankrupt, cedes its property to credits, submits a request for suspension of payment decides to discontinue its business activities or a significant part thereof including its stake in a company that already exists or is to be established or decides to change its business objectives or to dissolve or wind up its business TenneT has, without compensation obligation and without prejudice to its rights and without notice of default or recourse to the courts, the right to: I. dissolve the REA (whole or in partly) by submitting a written notification to that effect to the OWF II. claim any amount owed by the OWF to TenneT immediately and entirely III. suspend execution of the REA 110
111 Offshore Realisation Agreement (REA) General Terms and Conditions Article 13 Confidentiality Without prejudice to Article 5.22 of the Act (STROOM bill) (confidentiality provisions for system operators), each Party shall treat as confidential any information it receives from the other Party in connection with the REA or the performance of the Work, except insofar as it concerns information that is generally known or accessible TenneT has the right to provide third parties it has engaged for the performance of the Work with any information about or supplied by the OWF that is reasonably necessary for the performance of the Work Without prior written permission from TenneT, the OWF may not publicly disclose any documents, information or advisory reports drawn up by TenneT in connection with the performance of the REA The confidentiality duty remains in force after the REA has ended 111
112 Offshore Realisation Agreement (REA) General Terms and Conditions Article 14 Disputes Parties shall endeavour to resolve disputes amicably Any disputes arising from the REA including its existence and validity submitted to the competent court in Arnhem, the Netherlands, if Parties are unable to resolve the disputes amicably In particular cases, Parties may choose to agree a different way of resolving a dispute If a dispute requires an immediate provisional ruling, Parties shall be free to apply to a preliminary injunctions court for summary proceedings The provisions of this article shall leave intact the right to submit a dispute to the Authority for Consumers & Markets (ACM) under Article of the Act (STROOM bill) 112
113 Offshore Realisation Agreement (REA) ANNEXES TO THE OFFSHORE REALISATION AGREEMENT 113
114 Offshore Realisation Agreement (REA) Annexes Annex 1: Basic Design for the Connection Connection specifications that are relevant for the interconnection of cables (Basic Design), also in Annex 2 CTA Annex 2: Planning schedule Annex 3: Insurance sheet [to be decided] Annex 4: Compliance testing documentation: Compliance activities with regard to Connection Requirements for System Operations related to Wind Farms, Version V3.0, January 2014 (SO-SOC ) ) to be updated according to RfG and tailor made for offshore 114
115 Thank you Stakeholder consultation website
116 Disclaimer Liability and copyright of TenneT This PowerPoint presentation is offered to you by TenneT TSO B.V. ('TenneT'). The content of the presentation including all texts, images and audio fragments is protected by copyright laws. No part of the content of the PowerPoint presentation may be copied, unless TenneT has expressly offered possibilities to do so, and no changes whatsoever may be made to the content. TenneT endeavours to ensure the provision of correct and up-to-date information, but makes no representations regarding correctness, accuracy or completeness. TenneT declines any and all liability for any (alleged) damage arising from this PowerPoint presentation and for any consequences of activities undertaken on the strength of data or information contained therein.
117 TenneT is Europe s first cross-border grid operator for electricity. With about 21,000 kilometres of (extra) high-voltage lines and 36 million end-users in the Netherlands and Germany, we rank among the top five grid operators in Europe. Our focus is to develop a North-west European energy market and to integrate renewable energy. Taking power further 117
Connection and Transmission Agreement
PAGE 1 of 13 Disclaimer: the content of this draft is disclosed for information and discussion purposes only. In no way does this draft constitute rights for (potential) connected parties, or bind TenneT
Realisation Agreement
PAGE 1 of 11 Disclaimer: the content of this draft is disclosed for information and discussion purposes only. In no way does this draft constitute rights for (potential) connected parties, or bind TenneT
Terms & Conditions Verder B.V. (02031806) Filed at the Chamber of Commerce on 29-01-2015
Terms & Conditions Verder B.V. (02031806) Filed at the Chamber of Commerce on 29-01-2015 1. General 1.1 These terms and conditions use the following terms and definitions: Product: items, as well as services
TERMS OF ELECTRICITY SALES 2010. as recommended by Finnish Energy Industries
TERMS OF ELECTRICITY SALES 2010 as recommended by Finnish Energy Industries Content: A. General, concluding an electricity sale contract, the prerequisites for electricity sales, commencement of electricity
Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer
Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland
Kingdom of the Netherlands
Kingdom of the Netherlands GENERAL GOVERNMENT PURCHASING CONDITIONS 2014 (ARIV 2014) Adopted by order of the Prime Minister, Minister of General Affairs, of 26 March 2014, no. 3132081 I General Article
GENERAL PURCHASING TERMS AND CONDITIONS
GENERAL PURCHASING TERMS AND CONDITIONS Handelsmaatschappij van Hijfte BV with its registered office in Willemsweg 89, 4515 RG IJzendijke (the Netherlands) as well as its legal successors and affiliated
ENTSO-E Network Code on Emergency and Restoration
ENTSO-E Network Code on Emergency and Restoration Notice 25 March 2015 This Network Code represents ENTSO-E s final proposals in line with the ACER Framework Guidelines on Electricity System Operation
GENERAL TERMS AND CONDITIONS (version 3.0)
GENERAL TERMS AND CONDITIONS (version 3.0) OF: The private company with limited liability Global Data Collection Company BV, with its registered office in Rotterdam, and having its principal place of business
ELECTRICITY SUPPLY/ TRADE LICENSE KORLEA INVEST A.S
Hamdi Mramori Street, No 1 Prishtina 10000 Kosovo Tel: +381 (0) 38 247 615 ext. 103 Fax: +381 (0) 38 247 620 e-mail: [email protected] www.ero-ks.org ELECTRICITY SUPPLY/ TRADE LICENSE GRANTED TO: KORLEA
General Terms and Conditions of ICTRecht
General Terms and Conditions of ICTRecht Version dated 1 September 2012 These General Terms and Conditions (the General Conditions ) govern each Contract with, and performance of work by, ICTRecht. Any
GENERAL PURCHASING TERMS AND CONDITIONS Olympic Fruit B.V. with its registered office in Barendrecht, Handelscentrum ZHZ 40A as well as its legal successors and affiliated companies, hereinafter to be
General Terms and Conditions of Supply 2014 Gas Eneco Zakelijk B.V.
General Terms and Conditions of Supply 2014 Gas Eneco Zakelijk B.V. Entering into effect on 1 april 2014 The original Dutch version of these General Terms and Conditions, the Algemene Leveringsvoorwaarden
GENERAL TERMS AND CONDITIONS
GENERAL TERMS AND CONDITIONS OF: Europe Retail Packing BV ABC Westland 315 2685 DD Poeldijk hereinafter to be referred to as: ERP Article 1 Definitions 1. In the present general terms and conditions, the
General Terms and Conditions of Peak Payroll Services B.V. In these General Terms and Conditions:
General Terms and Conditions of Peak Payroll Services B.V. Article 1 General In these General Terms and Conditions: 1. The Client refers to the party issuing the assignment, and 2. Peak refers to the company
ENTSO-E Working Draft Network Code on Emergency and Restoration
ENTSO-E Working Draft Network Code on Emergency and Restoration DRAFT FOR THE FOURTH PUBLIC WORKSHOP Notice 22 January 2015 This document reflects the status of the work of Transmission System Operator
Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010
Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL 28 rue
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only
Statutes in translation Please note that this translations are not official translations. The translation is furnished for information purposes only and the documents are not legal documents. The texts
General Terms and Conditions. Horatio Assurance Group B.V. Horatio Accountants B.V. Horatio Schade-Auditors B.V.
General Terms and Conditions Horatio Assurance Group B.V. Horatio Accountants B.V. Horatio Schade-Auditors B.V. A. General In these General Terms and Conditions the terms listed below have the following
Standard conditions of electricity supply licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of electricity supply licence SECTION A: STANDARD CONDITIONS FOR ALL SUPPLIERS Standard conditions 1 to 6: General arrangements
General terms and conditions of the VVV
General terms and conditions of the VVV 1. Definitions In these general terms and conditions the following terms have the following meanings, unless explicitly indicated otherwise: 1.1 The VVV: Netherlands-based
GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY SENSUS
Article 1 Applicability GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY SENSUS 1.1 These terms and conditions are used by Sensus B.V., as well as by its affiliated companies, hereinafter referred to
General conditions for the food and luxury business, determined by the Stichting Centraal orgaan voor de Voedings- en Genotmiddelenbranche (COVEG).
General conditions for the food and luxury business, determined by the Stichting Centraal orgaan voor de Voedings- en Genotmiddelenbranche (COVEG). Registered at the registry of the district court in Amsterdam,
Listed in the trade register of the Chamber of Commerce in Den Haag under file number 27266792 d.d. 23-08-2005 -------------------------------------
General terms and conditions of delivery and payment of: Multi Air B.V. Het Ambacht 13-B 3155 AK MAASLAND The Netherlands Listed in the trade register of the Chamber of Commerce in Den Haag under file
ELECTRICITY MARKET ACT
1 NB: Unofficial translation Ministry of Trade and Industry, Finland ELECTRICITY MARKET ACT (386/1995; amendments up to 1172/2004 included) In accordance with a decision by Parliament, the following is
Dutch Association of Sport Product Manufacturers and Wholesalers
General terms and conditions of Sale and Delivery Of the Vereniging van Fabrikanten en Groothandelaren in Sportbenodigdheden (F.G.H.S.) [Dutch Association of Sport Product Manufacturers and Wholesalers]
General Terms of Purchase. of HAN University of Applied Sciences
General Terms of Purchase of HAN University of Applied Sciences HAN-Terms of Purchase; Page 1 of 6 Versie14 september 2010 Content Article 1 Definitions Article 2 Quotation; Creation Article 3 Applicability
General Terms and Conditions of the Association of Dutch Designers (BNO) January 2005
General Terms and Conditions of the Association of Dutch Designers (BNO) January 2005 1 Agreement, offers and confirmation 1.1 These General Terms and Conditions apply to the exclusion of any purchase
Article 2. Offers and quotations
1 Article 1. General 1. These terms and conditions apply to all offers, quotations and agreements between Smets Food Trading B.V., with registered offices in (6131 GR) Sittard, at Odasingel 473, hereinafter
ENSA TERMS AND CONDITIONS
ENSA TERMS AND CONDITIONS 1. Contract Terms Under the contract agreement both The Customer and The Service Provider hereby agree to the following terms and conditions. 2. Commencement of the Agreement
Standard Terms and Conditions
Standard Terms and Conditions Amendend version, Amersfoort juli 2011 Standard Terms and Conditions for Temporary Worker Postings and Job Placement Services of the Nederlandse Bond van Bemiddelings- en
GENERAL SALES CONDITIONS POS SERVICE HOLLAND BV (Pty Ltd, Dutch Company Status)
GENERAL SALES CONDITIONS POS SERVICE HOLLAND BV (Pty Ltd, Dutch Company Status) 1. Definitions 1.1 In these general conditions it is understood under: Supplier: Customer: Pos Service Holland BV (Pty Ltd,
Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH
Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 21 December 2012 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20
TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut
General Terms and Conditions of Plus Subscriptions & Services Version of December 2013
General Terms and Conditions of Plus Subscriptions & Services Version of December 2013 These General Terms and Conditions are applicable to the Services offered to the Customer by The New Motion. By activating
General Terms and Conditions of the Association of Dutch Designers (BNO) February 2013
General Terms and Conditions of the Association of Dutch Designers (BNO) February 2013 1 Agreement, offer and confirmation 1.1 These General Terms and Conditions ( General Terms and Conditions ) govern
ANVR B2B Terms and Conditions
ANVR B2B Terms and Conditions Article 1 Applicability 1.1 These General Terms and Conditions will govern the legal relationship between the travel company on the one hand and its customers on the other
The Installation, Maintenance and Removal of Data Logging Equipment on Scottish Water s Water Revenue Meters. Terms and Conditions
The Installation, Maintenance and Removal of Data Logging Equipment on Scottish Water s Water Revenue Meters Terms and Conditions Terms and Conditions Data Logging Activities This document sets out the
GENERAL CONDITIONS FOR SALE OF ELECTRICITY TO DOMESTIC CONSUMERS
27 February 2015 1 (9) GENERAL CONDITIONS FOR SALE OF ELECTRICITY TO DOMESTIC CONSUMERS GENERAL CONDITIONS prepared by Svensk Energi following agreement with the Swedish Consumer Agency. 1. Introductory
Energy Act 2013 CHAPTER 32. Explanatory Notes have been produced to assist in the understanding of this Act and are available separately
Energy Act 2013 CHAPTER 32 Explanatory Notes have been produced to assist in the understanding of this Act and are available separately Energy Act 2013 CHAPTER 32 CONTENTS PART 1 DECARBONISATION 1 Decarbonisation
THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18
TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut
STATUTORY INSTRUMENTS. S.I. No. 281 of 2010 EUROPEAN COMMUNITIES (CONSUMER CREDIT AGREEMENTS) REGULATIONS 2010
STATUTORY INSTRUMENTS. S.I. No. 281 of 2010 EUROPEAN COMMUNITIES (CONSUMER CREDIT AGREEMENTS) REGULATIONS 2010 (Prn. A10/0843) 2 [281] S.I. No. 281 of 2010 EUROPEAN COMMUNITIES (CONSUMER CREDIT AGREEMENTS)
General Conditions Latest update: February 12, 2016
General Conditions Latest update: February 12, 2016 Herein you will find the General Conditions of AttachingIT. These are applicable in case you receive a service from AttachingIT. We advise you to read
1.1 These General Terms and Conditions are applicable to all offers, quotations and/or contracts of Life After Football (hereinafter: LAF ).
General Terms and Conditions 1. General Provisions Applicability 1.1 These General Terms and Conditions are applicable to all offers, quotations and/or contracts of Life After Football (hereinafter: LAF
Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)
Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) This Agreement for Net Metering and Interconnection Services ( Agreement ) is made and entered into this day of
GENERAL TERMS AND CONDITIONS
1 DEFINITIONS 1.1 Account: the customer name used by the Customer to access the System of VEVIDA Services BV. 1.2 Email Address: an address code set up in the Customer s name for exchanging electronic
General Terms of Delivery
General Terms of Delivery Article 1 APPLICABILITY 1. These Terms apply to all negotiations, offers, agreements and any resulting obligations between Kompak Nederland B.V., referred to hereinafter as Kompak
General Contractual Terms and Conditions of KRÁLOVOPOLSKÁ SLÉVÁRNA, s.r.o.
General Contractual Terms and Conditions of KRÁLOVOPOLSKÁ SLÉVÁRNA, s.r.o. 1. General provisions 1.1. These terms and conditions (TC) govern the sale of products and services (hereinafter as goods ) of
General Government Terms and Conditions for Public Service Contracts 2011 (ARVODI 2011)
General Government Terms and Conditions for Public Service Contracts 2011 (ARVODI 2011) Adopted by order of the Prime Minister, Minister of General Affairs, of 7 June 2011, no. 3104145 (Government Gazette
2. Our Conditions 2.1 When They Apply 2.2 Deposit 2.3 Your Account and On Line Sign Up 2.4 Minimum Period of Service 2.
Simply Broadband Terms Terms and Conditions for Simply Broadband 1. Definitions Wherever these words and expressions appear in these terms and conditions of Service (each a Condition and collectively,
MASTER ADVERTISING AGREEMENT
MASTER ADVERTISING AGREEMENT THE UNDERSIGNED: 1. [ ] B.V., registered in the trade register with the number [ ], having its registered office in Voorburg, legally represented in this matter by Mr. R. Van
GETTING CONNECTED WITH
GETTING CONNECTED WITH Table of Contents INTRODUCTION... 1 01 BEING A MEMBER... 1 Becoming a member... 1 Meters, reading your meter and meter testing... 2 Accessing your property... 2 Vegetation management...
Energy Act 2011 CHAPTER 1 CONTENTS PART 1 ENERGY EFFICIENCY GREEN DEAL
Energy Act 2011 CHAPTER 16 CONTENTS PART 1 ENERGY EFFICIENCY CHAPTER 1 GREEN DEAL Introductory 1 Green deal plans 2 Green deal plans: supplementary 3 Framework regulations Green deal plan 4 Assessment
Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY 11249 1-877- 208-7636 www.kiwienergy.us
Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY 11249 1-877- 208-7636 www.kiwienergy.us Natural Gas / Electricity SALES AGREEMENT Customer Disclosure Statement Page 1 Price: Variable rate per
GENERAL CONDITIONS OF SALE AND DELIVERY LAURA METAAL HOLDING BV LAURA METAAL EYGELSHOVEN BV LAURA STAALCENTER MAASTRICHT BV
GENERAL CONDITIONS OF SALE AND DELIVERY OF LAURA METAAL HOLDING BV LAURA METAAL EYGELSHOVEN BV LAURA STAALCENTER MAASTRICHT BV Clause 1 - Applicability 1.1. These General Conditions of Sale and Delivery
INTERNAL REGULATIONS
COUNCIL OF BUREAUX CONSEIL DES BUREAUX INTERNAL REGULATIONS Preamble (1) Whereas in 1949 the Working Party on Road Transport of the Inland Transport Committee of the Economic Commission for Europe of the
GENERAL PURCHASING TERMS AND CONDITIONS for products and services BOSKALIS A. GENERAL PROVISIONS
GENERAL PURCHASING TERMS AND CONDITIONS for products and services of BOSKALIS A. GENERAL PROVISIONS Article 1. Definitions In these General Terms and Conditions, the following terms will be understood
RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS
RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS Our Contact Information Type of Plan Term of Agreement Rate Renewal Early Termination Fee Rescission Nature of Sale Delivery Notification
General Terms and Conditions, Waterland Trading, 2009
General Terms and Conditions, Waterland Trading, 2009 Article 1: Definitions 1.1 In these terms and conditions Waterland Trading means Waterland Trading B.V., having its registered office in (1446 WZ)
EXCHANGE RULES, SECTION XII. Conditions for Admission of Collective Investment Securities to Trading on the Regulated Market of the Exchange
EXCHANGE RULES, SECTION XII. Conditions for Admission of Collective Investment Securities to Trading on the Regulated Market of the Exchange PART I. GENERAL Article 1 Subject Matter and Definitions (1)
DATED TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES
DATED TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES GEM SOLUTIONS LTD 1 ST GEORGES PLACE BATH BA1 3AA TEL: 01225 690069 The customer s attention is particularly drawn to the provisions of clause 6. 1.
CLSA SECURITIES (THAILAND) LIMITED - FUTURES/OPTIONS TRADING SERVICES ANNEX
CLSA SECURITIES (THAILAND) LIMITED - FUTURES/OPTIONS TRADING SERVICES ANNEX 1. Definitions and Interpretation 1.1 Subject to Clauses 1.2 and 1.3 below, in this CLSA Securities (Thailand) Limited Futures/Options
Terms & Conditions For Electricity Supply
Terms & Conditions For Electricity Supply your energy solution Introduction 1 Our contract with you In these terms and conditions, we or us is used to mean Prime Energy Limited, and you is used to mean
TERMS AND CONDITIONS OF PAYMENT CARD ACQUIRING SERVICES AGREEMENT Valid from 16.02.2015
TERMS AND CONDITIONS OF PAYMENT CARD ACQUIRING SERVICES AGREEMENT Valid from 16.02.2015 1. DEFINITIONS 1.1 Settlement Day a day on which the Bank is open for general banking operations. Generally, the
General Conditions pertaining to assignments granted to a tax adviser registered with the Register Belastingadviseurs (Dutch Register of Tax Advisers)
General Conditions pertaining to assignments granted to a tax adviser registered with the Register Belastingadviseurs (Dutch Register of Tax Advisers) Article 1 - General 1.1 The following definitions
These Terms & Conditions may only be used by members of Koninklijke Metaalunie.
METAALUNIE CONDITIONS General delivery and payment conditions of Koninklijke Metaalunie (the Dutch organisation for small and medium-sized enterprises in the metal industry), referred to as the METAALUNIE
GENERAL TERMS AND CONDITIONS BDO Accountants & Belastingadviseurs B.V.
GENERAL TERMS AND CONDITIONS BDO Accountants & Belastingadviseurs B.V. GENERAL TERMS AND CONDITIONS BDO Accountants & Belastingadviseurs B.V. 2 BDO Accountants & Belastingadviseurs B.V. also acts under
Most household services provide you with a fixed monthly bill: Broadband Internet service
Predict-a-Bill Natural Gas Most household services provide you with a fixed monthly bill: Cell phone service Broadband Internet service And now... your natural gas supply! Predict-a-Bill advantage: Developed
Appendix A. Call-off Terms and Conditions for the Provision of Services
Appendix A Call-off Terms and Conditions for the Provision of Services Where an Order Form is issued by the Authority that refers to the Framework Agreement, the Contract is made between the Authority
Physical Distribution Conditions
Physical Distribution Conditions 1st September 2000 Physical Distribution Conditions Filed with the District Court in Amsterdam on September 1, 2000 Registered under number 177/2000 Filed with the District
Terms & Conditions Operational Leasing BYD Europe b.v.
Terms & Conditions Operational Leasing BYD Europe b.v. Version 1.1 Date of Release: March 25, 2014 1. Relevance 1.1. These General Conditions apply to all operational leases of BYD Europe b.v. (hereinafter
Bluewater TV Cable GENERAL TARIFF CRTC 21680 Original Page 10
Original Page 10 General Rights and Obligations 1. General This Item sets out the basic rights and obligations (hereinafter referred to as the Terms ) of both Bluewater TV Cable and Telecommunications
Government of the Netherlands
Government of the Netherlands General Government Terms and Conditions for Public Service Contracts 2014 (ARVODI 2014), adopted by order of the Prime Minister, Minister of General Affairs, of 26 march 2014,
LONDON STOCK EXCHANGE HIGH GROWTH SEGMENT RULEBOOK 27 March 2013
LONDON STOCK EXCHANGE HIGH GROWTH SEGMENT RULEBOOK 27 March 2013 Contents INTRODUCTION... 2 SECTION A ADMISSION... 3 A1: Eligibility for admission... 3 A2: Procedure for admission... 4 SECTION B CONTINUING
Asset Protection Agreement Templates - Customer Explanatory Notes. Explanatory Notes on Asset Protection Agreement
Asset Protection Agreement Templates - Customer Explanatory Notes Explanatory Notes on Asset Protection Agreement Clause Heading Background The Asset Protection Agreement is intended for use where the
b) General Sales Conditions: these general sales and delivery conditions;
GENERAL SALES AND DELIVERY CONDITIONS OF LABORI INTERNATIONAL B.V. 1. DEFINITIONS 1.1 In these general sales and delivery conditions the following terms have the following meaning: a) Buyer: the person
Specific amendments to the Capacity Allocation and Congestion Management Network Code
Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several
JRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business.
JRI S STANDARD TERMS OF PURCHASE 1. INTERPRETATION 1.1 Definitions. In these Conditions, the following definitions apply: Business Day: a day (other than a Saturday, Sunday or public holiday) when banks
General Terms and Conditions for the Sale and Delivery of Organizational and Programming Services and Permission to Use Software Products
General Terms and Conditions for the Sale and Delivery of Organizational and Programming Services and Permission to Use Software Products 2004 Professional Association of Management Consultants AND INFORMATION
Building Work Contractors Act 1995
Version: 21.11.2015 South Australia Building Work Contractors Act 1995 An Act to regulate building work contractors and the supervision of building work; and for other purposes. Contents Part 1 Preliminary
Electronic Data Interchange (EDI) Trading Partner Agreement
Electronic Data Interchange (EDI) Trading Partner Agreement THIS ELECTRONIC DATA INTERCHANGE TRADING PARTNER AGREEMENT (the Agreement ) is made as of (date) by and between Ameren Services Company, for
CLOUD SERVICES SERVICE LEVEL AGREEMENT. Cloud Services
Article 1: Definitions CLOUD SERVICES SERVICE LEVEL AGREEMENT Support for all Customers on all Problems with the exception of 1 st line Help desk those which initial investigation shows are directly related
AGANANG LOCAL MUNICIPALITY. Credit Control and Debt Collection Policy. Credit control and debt collection policy
AGANANG LOCAL MUNICIPALITY Credit Control and Debt Collection Policy 1 1. PREAMBLE Whereas Section 96(a) of the Local Government: Municipal Systems Act, No 32 of 2000 (hereinafter referred to as the Systems
GENERAL TERMS AND CONDITIONS OF DELIVERY AND PAYMENT MITSUBISHI ELECTRIC EUROPE (BENELUX)
Definitions GENERAL TERMS AND CONDITIONS OF DELIVERY AND PAYMENT MITSUBISHI ELECTRIC EUROPE (BENELUX) Where these terms and conditions refer to Mitsubishi, this shall be understood to mean MITSUBISHI ELECTRIC
Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy
Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial
GENERAL TERMS AND CONDITIONS FOR PROCUREMENT OF GOODS AND SERVICES IN RAIFFEISEN BANK KOSOVO J.S.C. (further as GTCs)
GENERAL TERMS AND CONDITIONS FOR PROCUREMENT OF GOODS AND SERVICES IN RAIFFEISEN BANK KOSOVO J.S.C. (further as GTCs) 1. DEFINITIONS Contract means the respective agreement in writing for the sale of Goods
Terms of Service of Data and Internet Service Providers. Rabi I, 1429H March 2008. Note: This is only a rough translation, Arabic is prevails 1
Terms of Service of Data and Internet Service Providers Rabi I, 1429H March 2008 Note: This is only a rough translation, Arabic is prevails 1 Contents Article One: Definitions... 3 Article Two: General
BROADBAND INTERNET ACCESS TRANSMISSION SERVICE WHOLESALE SERVICE GUIDE AND WHOLESALE RATES GENERAL
GENERAL 1.1 General Regulations ( Cooperative ) is an Incumbent Local Exchange Carrier (ILEC). The service provided under these terms and conditions is the transport component of wireline broadband Internet
2. Offers or quotations made by WorldStream B.V. are valid for 14 days unless specified otherwise.
General Terms and Conditions of WorldStream B.V. 1. Definitions 1. Client: the natural or legal entity with whom the agreement to supply products and services from WorldStream B.V. is concluded. 2. Services
Listing and Admission to Trading Rules for. Short Term Paper. Release 2
Listing and Admission to Trading Rules for Short Term Paper Release 2 14 April 2014 Scope These Listing and Admission to Trading Rules ( Rules ) relate to the Listing and admission to trading on the Main
