1 The Fall Builders Forum Part 9 Energy Efficiency and Ventilation Regulations (Effective December 19, 2014) John de Ruiter Manager, Permits & Inspections Tim Ryce Assistant Manager, Permits & Inspections Mike van der Laan Green Building Research Analyst, Permits & Inspections

2 Outline for Tonight Builders Forum Introduction (5 min) Overview of Changes (10 min) Envelope (15 min) HVAC / SWH (5 min) 9.32 Ventilation (15 min) Compliance Options (10 min) CNV Bylaw Amendments (10 min) Closing Remarks (5 Min)

3 The Builders Forum Opening Remarks

4 An Overview of the Changes

5 BCBC Energy Requirements (current to December 18, 2014)

6 BCBC Energy Requirements (as of December 19, 2014)

7 What is Section 9.36? Mid-stream amendment to the 2012 BC Building Code ~110 pages Multiple pathways to compliance Several options for specific building types Systems approach to prescriptive req s Performance-based options available

8 The Magic of Section 9.36 Treats the building as a system Enables performancebased design Removes barriers for new technologies

9 Compliance Paths Single Family Home Current to Dec. 18, 2014 Prescriptive path In-cavity Insulation Table Performance path EnerGuide model 77 As of Dec. 19, 2014 Prescriptive path Effective R-value Table Trade-off Options with / without HRV Performance path #1 EnerGuide model better than reference building Performance path #2 NECB

10 Compliance Paths Small Industrial (Automotive/Woodworking) Current to Dec. 18, 2014 Prescriptive path In-cavity Insulation Table As of Dec. 19, 2014 Performance path National Energy Code for Buildings (NECB)

11 Additional attention to detail at design stage Possible expansion of design team A whole new Code to purchase, understand, and apply Additional items in Building Permit submission A new normal What It Means For Designers / Builders

12 The Building Envelope BCBC

13 Building Envelope Scope + Application Focus is on total building performance, not just thermal insulation Heat transfer and air leakage between conditioned space and unconditioned space Windows must conform to Section 9.7 Properties of insulation, location and installation of air barriers, and vapour barriers must conform to Section 9.25

14 Effective R-Value

15 Effective R-Value Included Repetitive structural members - Studs - Joists, lintels - Sills, plates Credit for adjoining unconditioned spaces Excluded from Calculations Minor penetrations - pipes, ducts - Packaged air conditioners - Shelf angles, anchors, fasteners Major structural penetrations - Balcony slabs, beams, columns, ornamentation, Provided: insulation is tight to penetrating element - Total area of all major structural penetration is limited to max 2% of wall area

16 Effective R-Value Assembly Conventional 2x6 wood 16 o/c; R-20 batt insul; gyp bd interior; ply sheathing; wood siding Advanced 2x6 framing, 24 o/c, R-20 batt insul 2x4 wood 16 o/c; R12 batt insul; plus R-10 XPS, gyp bd interior; ply sheathing; wood siding Nominal R-value 20 (RSI 3.52) 20 (RSI 3.52) 22 (3.87) Effective R-value 17.2 (RSI 3.02) 18.2 (RSI 3.20) 22.4 (RSI 3.94) 2x6 steel 16 o/c, ; R-20 batt insul.; gyp bd interior; ply sheathing; wood siding 20 (RSI 3.52) (RSI 1.99)

17 Effective R-Value Look-up tables for common assemblies, and information on how to calculate others ( ) Calculator - Canadian Wood Council Wall Thermal Design Calculator

18 Effective R-Value

19 Continuity of Insulation

20 Continuity of Insulation Insulation must be continuous across the entire envelope but this does not mean continuous insulation across face. Another measure to reduce Thermal Bridging Applies to building components such as partitions, chimneys, fireplaces, and columns and beams along exterior walls, but not to stud framing and ends of joists (accounted for by effective R-value calculation).

21 Continuity of Insulation

22 Airtightness

23 Airtightness 9.25 currently requires an airtight building envelope 9.36 addresses construction of air barrier details because of the heat loss implications. Testing is NOT required. Air barriers must be continuous: across joints, between assemblies, and around penetrations.

24 Airtightness Joints in panel-type air barrier materials must be sealed by: Caulking, Sealants, Spray foam Gaskets Tapes

25 Airtightness Flexible sheet air barrier materials require all joints to be: lapped at least 50 mm (2 ), sealed, and structurally supported Sealants must be nonhardening

26 Airtightness

27 HVAC + Service Water Heating BCBC BCBC

28 HVAC + Service Water Heating Scope + Application Heating systems must be designed in accordance with good practice (as per 9.32 & 9.33) Systems not referenced in 9.36 must be designed in accordance with requirements of the NECB Heating and air-conditioning equipment must be located inside the conditioned space, unless it is designed to be located outside Equipment efficiency set out in Table (HVAC) and Table (Service Water Heating)

29 HVAC + Service Water Heating Continuity of Insulation All piping/ducts must be located inside the conditioned space. If located outside or within an exterior wall, the piping/ducts must be insulated to same level as required for above grade walls

30 HVAC + Service Water Heating Continuity of Air Barrier Ducts outside the heated envelope, or within an exterior assembly: All joints in the ducts must be sealed with sealant, mastic, or foil faced tape Fabric duct tape is not permitted

31 HVAC + Service Water Heating Temperature Controls Heat pumps with supplementary heaters controls should prevent operation of supplementary heater when the heat pump can supply the full heat load Heating & cooling systems with separate controls must prevent both cooling & heating to be activated simultaneously Heating systems must allow for zone controls either manually or automatically

32 HVAC + Service Water Heating Hot Water Piping The first 2 m of piping from a storage tank or heater must be insulated with pipe insulation If hot water piping system has recirculation, the entire system must be insulated. If piping is located outside the heated envelope, it must be insulated to no less than the effective R-value of exterior walls.

33 Ventilation BCBC BCBC 9.32

34 Ventilation Scope + Application Exhaust only ventilation no longer acceptable New Principal Fan Sizing Rule Ventilation air must be distributed to each bedroom and a common area 4 acceptable options Principal System must run continuously Crawlspace Ventilation Required Credit for very short bath fan exhaust ducts

35 Ventilation Principal Ventilation System Exhaust Fan Based on bedroom count & square footage Minimum exhaust fan air-flow rate in Table Minimum air flow rate, L/s Floor area m 2 Number of bedrooms >7 < >

36 Ventilation Kitchen & Bath Fans Principal exhaust fan 50 Pascals Designed to run continuously Controlled by dedicated switch Clearly marked principal Ventilation Exhaust Fan Two settings: on & off Accessible for servicing If capable of running at multiple flow rates, must have a separate switch so low rate is not less than required Sound rating not to exceed 1.0 sone

37 Ventilation Kitchen & Bath Fans Exhaust must be installed in every kitchen and bathroom Unless these are served by principal ventilation system, the Minimum flow rate is as per Table Capacity rating at 50 Pascals Room Minimum Exhaust Fan Flow Rate L/s Intermittent Continuous Kitchen 47 N/A Bathroom 23 9

38 (2) Supply with Forced Warm Air Heating Principal exhaust fan sized to Table ; continuous operation Furnace fan must run continuously Supply air drawn into furnace return; limits on supply duct

39 (3) HRV Supply with Forced Warm Air Heating

40 (4) Independently Distributed HRV System Dedicated supply ducts to each bedroom and to each floor At least one exhaust located 2 m above upper floor

41 (6) Passive Supply Only applicable to one storey dwelling (<168 m2 with no forced air heating) Passive inlets must be a min. 1.8m above floor Each bedroom must have one inlet with unobstructed vent area of 100 sq cm At least one common area must have an inlet

42 Ventilation Heated crawlspace ventilation If crawlspace is heated by ducted forced air heating, it must be connected to floor above by at least one transfer grille for each 30m2 of crawlspace area Note: Crawlspace ventilation in this section must not be confused with exterior ventilation of unheated crawlspace

43 Ventilation Ducts Exhaust ducts must discharge to outdoors Exhaust and supply ducts: Must be sized as required by manufacturer & equivalent diameter as per Table (3) Need to be air-sealed Insulated & provided with vapour barrier

44 Compliance Part 9 Building Energy Regulations in BC

45 Compliance Part 9 Building Energy Regulations in BC Effective December 19, 2014

46 Compliance Higher Energy Efficiency

47 Compliance Requirements for all Pathways Drawing Submission Design Verification Report Higher Energy Performance

48 Compliance Requirements for all Pathways Drawing Submission Design Verification Report Higher Energy Performance

49 Compliance to Prescriptive with trade-offs ( ) Design Verification Report 1.

50 Compliance Options Performance Pathway Reference house Assumes house design using all applicable prescriptive requirements Same fuel, occupancy, set-points, service hot water demand, climate data same as the Proposed house 2.5 air 50 Pascals airtightness Fenestration area and orientation to be modeled as being equally distributed on all sides fenestration to wall area ratio limited House energy target Annual energy consumption of reference house includes space conditioning and service water heating Higher Energy Performance

51 Compliance Performance Pathway House Performance Report (Pre-Construction) Design Verification Report Higher Energy Performance

52 Compliance Requirements for CNV Energy Performance Commitment House Performance Report (Pre-Construction) + (As-Built) Design Verification Report Higher Energy Performance

53 Green Building Zoning Amendments Adopted on October 27, 2014 Public Hearing Presentation

54 The Builders Forum Closing Remarks City of North Vancouver Builders Forum HPO Illustrated Guide to Energy Efficiency Requirements Canada Wood Council Effective R-Value Calculator Building Envelope Thermal Bridging Guide Pathways to High-Performance Housing in British Columbia BOABC additional training and education

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades Success with 2015 IECC Northeast & Mid-Atlantic Checklist for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED TEMPLATE 2015.1.0 PAGE 1 CHECKLIST: JOB READY 1. 2. 3. 4. 5. 6. 7. 8.

More information

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings SUCCESS WITH 2012 IECC DELAWARE Recommended Practices for Optimized Energy Savings for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED VERSION 2015.1.0 CHECKLIST: JOB READY 1. 2.

More information

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen May 2008 Wisconsin Area PO BOX 115 Lake Geneva, WI 53147 CELL (414) 550-4765 Home Performance with ENERGY STAR Evaluation Report Customer

More information

Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance

Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance Thermal Bridging of Masonry Veneer Claddings and Energy Code Compliance! Graham Finch, MASc, P.Eng Mike Wilson, MEng, P.Eng James Higgins, Dipl.T RDH Building Engineering Ltd. Vancouver, BC June 3, 2013

More information

Development Services City of Lawrence, KS

Development Services City of Lawrence, KS Development Services City of Lawrence, KS Building Planning Table R301.2 (1) Climatic & Geographic Design Criteria Building Planning The design criteria for wind speed increased from 90 MPH to 115 MPH.

More information

Proposed 2012 Vancouver Building By-law

Proposed 2012 Vancouver Building By-law Office of the Chief Building Official and The Sustainability Group Proposed 2012 Vancouver Building By-law 1 Vancouver Building By-law Building Code Development in Canada 2010 NBC BC + Variations = 2012

More information

2015 1322) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

2015 1322) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY MINNESOTA ENERGY CODE COMPLIANCE COLLABORATIVE 2015 Minnesota Residential Energy Code (MR 1322) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY (July 15, 2015 Update) Note: The following information contains

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

2009 IECC Update. Scope. Content. International Energy Conservation Code

2009 IECC Update. Scope. Content. International Energy Conservation Code 2009 IECC Update International Energy Conservation Code Scope The code applies to both residential and commercial buildings. In the code, the United States is divided into eight climate zones which are

More information

Red River College MECB 101 School of Construction and Engineering Technologies Manitoba Energy Code for Buildings 101 (MECB 101)

Red River College MECB 101 School of Construction and Engineering Technologies Manitoba Energy Code for Buildings 101 (MECB 101) Manitoba Energy Code for Buildings 101 (MECB 101) The National Research Council of Canada (NRC) has issued the National Energy Code for Buildings (NECB) in 2011. The main objective of NECB 2011 was to

More information

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance Building Energy Codes 101 October 23, 2013 Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance OVERVIEW 1. Introduction 2. Energy Code Development 3. Adoption Process 4. Elements

More information

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING

RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING BUILDING CODEACT, 1992 RULING OF THE MINISTER OF MUNICIPAL AFFAIRS AND HOUSING Pursuant to clause 29(l)(b) of the Building Code Act, 1992. as amended, the Director of the Building and Development Branch

More information

24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by

24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL. (1) The Department of Labor and Industry adopts and incorporates by 24.301.161 INCORPORATION BY REFERENCE OF INTERNATIONAL ENERGY CONSERVATION CODE (1) The Department of Labor and Industry adopts and incorporates by reference the International Code Council's International

More information

Zen House. A Case Study on Design, Construction and Cost/benefit Analysis of a High Performance Home. Presentation for Net Zero Networking & Exchange

Zen House. A Case Study on Design, Construction and Cost/benefit Analysis of a High Performance Home. Presentation for Net Zero Networking & Exchange Zen House A Case Study on Design, Construction and Cost/benefit Analysis of a High Performance Home Presentation for Net Zero Networking & Exchange CHBA Net Zero Energy Housing Council May 13, 2015 Ottawa

More information

Foundation. Foundation

Foundation. Foundation Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their

More information

Chapter 2: Foundations

Chapter 2: Foundations Chapter 2: Foundations Crawlspace [V502.1.2] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup under the floor.

More information

IECC Compliance Guide for Homes in Virginia

IECC Compliance Guide for Homes in Virginia IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,

More information

Section 9.36. Energy Efficiency

Section 9.36. Energy Efficiency January 2015 - This PDF is for information purposes only, and does not form the replacement package of the BC Building Code print product. These revisions were effective December 19, 2014 and have been

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

Heating, Ventilation and Air-Conditioning (HVAC)

Heating, Ventilation and Air-Conditioning (HVAC) Heating, Ventilation and Air-Conditioning () Energy Code Requirements The energy requirements of the building code that apply to installations (ECCCNYS Section 503) are in addition to any plumbing, mechanical,

More information

LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS

LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS SUBCHAPTER 9 LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS SECTION 150.2 ENERGY EFFICIENCY STANDARDS FOR ADDITIONS AND ALTERATIONS IN EXISTING BUILDINGS

More information

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses

research highlight Highly Energy Efficient Building Envelope Retrofits for Houses research highlight June 2012 Technical Series 12-103 Highly Energy Efficient Building Envelope Retrofits for Houses introduction In Canada approximately 30% of all energy is consumed in buildings, with

More information

Residential Duct Systems for New and Retrofit Homes

Residential Duct Systems for New and Retrofit Homes Residential Duct Systems for New and Retrofit Homes Why it is important to properly design and install high quality, efficient ducted air systems? The efficiency of air distribution systems has been found

More information

bout your apartment SOLVING ODOUR TRANSFER PROBLEMS IN YOUR APARTMENT Understanding Air Movement in Your Building

bout your apartment SOLVING ODOUR TRANSFER PROBLEMS IN YOUR APARTMENT Understanding Air Movement in Your Building A bout your apartment SOLVING ODOUR TRANSFER PROBLEMS IN YOUR APARTMENT AE 1 One of the most common problems experienced by the occupants of apartment buildings is the transfer of objectionable odours

More information

Chapter 8. Duct Design and Sealing

Chapter 8. Duct Design and Sealing Chapter 8 Duct Design and Sealing Duct Materials The three most common types of duct material used in home construction are metal, rigid fiberglass duct board, and flex-duct. Both metal and fiberglass

More information

Basement Development Construction requirements for the development of basements in residential dwellings.

Basement Development Construction requirements for the development of basements in residential dwellings. PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Basement Development Construction requirements for the development of basements in residential dwellings. June 2009 contents GENERAL INFORMATION 3 BUILDING

More information

ECHO System for Basements

ECHO System for Basements ECHO System for Basements Homeowners looking for more space are all too familiar with the cold, damp and dingy basement. Now, the Enclosure Conditioned Housing (ECHO) System TM, winner of the Ottawa-Carleton

More information

Town/City: State: Zip: Town/City: State: Zip: Phone: Cell: Phone: Cell: Signature Print Name Date

Town/City: State: Zip: Town/City: State: Zip: Phone: Cell: Phone: Cell: Signature Print Name Date New Hampshire Residential Energy Code Application for Certification of Compliance for New Construction, Additions and/or Renovations (EC-1 Form) Minimum Provisions Effective Date: April 1, 2010 Owner/Owner

More information

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses

More information

Residential Provisions of the 2012 International Energy Conservation Code July 2011

Residential Provisions of the 2012 International Energy Conservation Code July 2011 BUILDING ENERGY CODES UNIVERSITY Residential Provisions of the 2012 International Energy Conservation Code July 2011 PNNL-SA-82108 The Family of I-Codes International Building Code International Mechanical

More information

APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1

APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1 APPENDIX C FORMS 2010 FLORIDA BUILDING CODE ENERGY CONSERVATION C.1 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = The lower the Energy Performance Index, the more efficient

More information

Energy-Efficient. Home. Tips for Purchasing an. Revised 2004. Use this brochure to answer these questions:

Energy-Efficient. Home. Tips for Purchasing an. Revised 2004. Use this brochure to answer these questions: Revised 2004 Use this brochure to answer these questions: What are the Kansas energy efficiency requirements? What makes a home energy efficient? What is a home energy rating? What is the International

More information

Building Performance Solutions HVAC Design Guide, 2007

Building Performance Solutions HVAC Design Guide, 2007 Building Performance Solutions HVAC Design Guide, 2007 HVAC sizing, system design, layout, and installation shall be sized according to (Air Conditioning Contractor of America), ACCA manual J8, 8 th edition,

More information

Analysis of 2009 International Energy Conservation Code Requirements for Residential Buildings in Kansas City, Missouri

Analysis of 2009 International Energy Conservation Code Requirements for Residential Buildings in Kansas City, Missouri PNNL-20699 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Analysis of 2009 International Energy Conservation Code Requirements for Residential Buildings in Kansas City, Missouri

More information

Residential Buildings Energy Code Summary

Residential Buildings Energy Code Summary Residential Buildings Energy Code Summary Overview Iowa homebuyers appreciate the comfort and warmth of well-designed, energy-efficient houses. With the upgrade of Iowa s statewide energy code, home buyers

More information

energy-saving checklist a guide for rental property owners

energy-saving checklist a guide for rental property owners energy-saving checklist a guide for rental property owners taking responsibility As an individual, your efficient use of energy brings benefits such as lower bills, improved comfort levels in your home

More information

Home Performance with ENERGY STAR. Evaluation Report

Home Performance with ENERGY STAR. Evaluation Report Home Performance with ENERGY STAR Customer Information Evaluation Report Customer Name: Sample Report 2 Address of Building: 123 Johnson Street Mailing Address: Same City: Madison State: WI Zip: 53704

More information

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

SAVE ENERGY AT HOME INSULATE AND AIR SEAL SAVE ENERGY AT HOME INSULATE AND AIR SEAL Check the roof insulation level and add insulation to maintain minimum R-38 (6 of blown cellulose or equal). Use R-19 between frame or R-10 rigid insulation for

More information

CALCS-PLUS. 2010 Florida Building Code Energy Conservation Glitch Supplement

CALCS-PLUS. 2010 Florida Building Code Energy Conservation Glitch Supplement 2010 Florida Building Code Energy Conservation Glitch Supplement Today's Discussion Overview of Recent Changes Prescriptive or Performance Compliance Methods? Mandatory Provisions Reading the Forms Overview

More information

How To Design An Hvac Design For A Stick Built Home

How To Design An Hvac Design For A Stick Built Home LEGALETT HVAC DESIGN FEE SCHEDULE (revised April 17, 2012) Background In the past Legalett has simply supplied warm floors for comfortable living. However, 2012 Building Code changes in Ontario make it

More information

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)

More information

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates

ENERGY STAR Certified Homes, Version 3 Cost & Savings Estimates November 1, 2013 Contents ENERGY STAR Certified Homes, Version 3 Section 1: Executive Summary... 3 Section 2: Detailed Incremental Cost Estimates... 6 Section 3: Incremental Cost & Savings of the Thermal

More information

Single Family Residential Basement Finish

Single Family Residential Basement Finish How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete

More information

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional

More information

Energy Efficiency in Buildings

Energy Efficiency in Buildings Energy Efficiency in Buildings Supplemental Guide to SANS 10400-XA & SANS 204 V. 3.0 Registered to: The Drawing Studio Image: digitalart / FreeDigitalPhotos.net Report Date: 26 August 2014 Practice Name:

More information

Residential Provisions of the Utah 2012 International Energy Conservation Code

Residential Provisions of the Utah 2012 International Energy Conservation Code BUILDING ENERGY CODES UNIVERSITY Residential Provisions of the Utah 2012 International Energy Conservation Code Ken Baker PNNL-SA-82108 The Family of I-Codes International Building Code International Mechanical

More information

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained). CITY OF MILPITAS Building & Safety Department 455 E. Calaveras Blvd. Milpitas, CA 95035 408-586-3240 www.ci.milpitas.ca.gov RESIDENTIAL AIR CONDITIONING, REPLACEMENT 1. PERMIT INFORMATION: The replacement

More information

2011 Energy Efficiency Expo!

2011 Energy Efficiency Expo! Welcome to the 2011 Energy Efficiency Expo! Thank you to our session sponsors! Comparison Between the 2009 and 2012 International Energy Conservation Code What s coming when the new commercial energy code

More information

Duct Construction Standards. Code Reference: 2013 Title 24, Part 6 Standards 150.0(m)1. UL Ratings

Duct Construction Standards. Code Reference: 2013 Title 24, Part 6 Standards 150.0(m)1. UL Ratings DUCTS - CONSTRUCTION DO YOU HAVE A PHOTO OF THIS? PLEASE SEND IT TO US! installation.feedback@ energycodeace.com R-H-DS1 Duct Construction Standards All air-distribution system ducts and plenums shall

More information

Contract for Weatherization Management Address City & State

Contract for Weatherization Management Address City & State I. Parties Contract for Weatherization Management Address City & State This contract is made and entered into on and specifies the terms of the agreement between Client Name, homeowner, and Sherlock Homes

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

Enclosing Timber Frames. Panels. Frank Baker Founder, Riverbend Timber Framing and Insulspan

Enclosing Timber Frames. Panels. Frank Baker Founder, Riverbend Timber Framing and Insulspan Enclosing Timber Frames with Structural Insulated Panels Frank Baker Founder, Riverbend Timber Framing and Insulspan Outline What are SIPs? Structural advantage of SIPs for timber frames Energy performance

More information

Energy Code Compliance With SIPs. Frank Baker, PFB Corporation Don Ferrier, Ferrier Custom Homes

Energy Code Compliance With SIPs. Frank Baker, PFB Corporation Don Ferrier, Ferrier Custom Homes Energy Code Compliance With SIPs Frank Baker, PFB Corporation Don Ferrier, Ferrier Custom Homes Outline Overview of 2009 and 2012 energy codes Code compliance with SIPs Reducing air infiltration with SIP

More information

CHAPTER 4 VENTILATION

CHAPTER 4 VENTILATION CHAPTER 4 VENTILATION SECTION 401 GENERAL 401.1 Scope. This chapter, in conjunction with the building code, shall govern the ventilation of spaces within a building intended to be occupied. Mechanical

More information

New Homes EPS Modeling Frequently Asked Questions. Developed by Energy Trust of Oregon

New Homes EPS Modeling Frequently Asked Questions. Developed by Energy Trust of Oregon New Homes EPS Modeling Frequently Asked Questions Developed by Energy Trust of Oregon 1 General Questions 3 REM/Rate questions 4 -Creating custom entries 4 -Modeling Heat Pumps 5 -Modeling HRV/ERV 7 -Modeling

More information

Is Your Envelope Effective? Mark Lawton P.Eng Morrison Hershfield Limited Vancouver

Is Your Envelope Effective? Mark Lawton P.Eng Morrison Hershfield Limited Vancouver Is Your Envelope Effective? Mark Lawton P.Eng Morrison Hershfield Limited Vancouver Designing an Effective Envelope Roofs Below Grade Walls and slabs Glazing & Windows Opaque portions of walls 2 3 Energy

More information

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.

More information

CITY PLAN REVIEW AND INSPECTION. Lisa Fleming Brown, CPM

CITY PLAN REVIEW AND INSPECTION. Lisa Fleming Brown, CPM CITY PLAN REVIEW AND INSPECTION Lisa Fleming Brown, CPM Houston Commercial Energy Conservation Code (2011) A choice of 2009 IECC or ASHRAE 90.1-2007 with amendments. Effective September 2, 2011. Complete

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

Center for Energy Education Laboratory

Center for Energy Education Laboratory Paper ID #7072 Center for Energy Education Laboratory Dr. Robert Gilbert, Sinclair Community College Robert B. Gilbert, Ph.D., LEED AP, BA, is an Associate Professor of Energy Management Technology, and

More information

Idaho Energy and Cost Savings

Idaho Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Idaho Energy and Cost Savings for New Single and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC 1 2012 IECC AS COMPARED TO THE 2009 IECC Idaho Energy and Cost Savings

More information

ENERGY EFFICIENCY PLAN REVIEW CHECKLIST

ENERGY EFFICIENCY PLAN REVIEW CHECKLIST GEORGE CHAVEZ, City Building Official DAVID YELTON, Building Inspection Manager NESTOR OTAZU, Community Preservation Manager BUILDING & SAFETY DIVISION 455 North Rexford Drive, 1 st Floor Beverly Hills,

More information

Renovating Your Basement

Renovating Your Basement building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:

More information

Commercial and Residential Code Compliance Study in Florida

Commercial and Residential Code Compliance Study in Florida Where Should We Focus Efforts to Improve Building Energy Code Enforcement Rates? Results From A Research Study in Florida Charles Withers, Jr. and Robin Vieira, Florida Solar Energy Center ABSTRACT Most

More information

HVAC Code Requirements

HVAC Code Requirements one and two family dwellings? Answer: SECTION 2001: GENERAL 2001.1 Air supply. Fuel-burning equipment shall be provided with a supply of air for fuel combustion, draft hood dilution and ventilation of

More information

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers City of Duluth Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers Thank you for taking the time to join us today. We know you are busy and your time is valuable.

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

With colder weather approaching and heating costs continuing to skyrocket, ASHRAE is offering some simple ways to save energy and keep you and your

With colder weather approaching and heating costs continuing to skyrocket, ASHRAE is offering some simple ways to save energy and keep you and your Energy-Saving Tips for the Heating Season Home Energy Savings Tips for Cold Weather With colder weather approaching and heating costs continuing to skyrocket, ASHRAE is offering some simple ways to save

More information

SIGNIFICANT CHANGES to the 2015 Minnesota Residential Codes (MR 1303, 1309 and 1322)

SIGNIFICANT CHANGES to the 2015 Minnesota Residential Codes (MR 1303, 1309 and 1322) SIGNIFICANT CHANGES to the 2015 Minnesota Residential Codes (MR 1303, 1309 and 1322) The following information contains simplified explanations of significant changes to the 2015 Requirements for Radon

More information

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh Accessory Apartment Construction Guide For Single Detached Dwelling and Semi-Detached Dwellings that have been in existence for at least five (5) years Notes: Buildings that are less than five (5) years

More information

Glossary of Heating, Ventilation and Air Conditioning Terms

Glossary of Heating, Ventilation and Air Conditioning Terms Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment

More information

Comment Form on Proposed Gut Rehabilitation Alternatives

Comment Form on Proposed Gut Rehabilitation Alternatives Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line

More information

First Time Home Buyers Energy Efficiency Workshop Guide

First Time Home Buyers Energy Efficiency Workshop Guide First Time Home Buyers Energy Efficiency Workshop Guide Why is efficiency important when buying a home? Affordability: lower utility bills Environmental responsibility: reduces your carbon footprint and

More information

THE IC Y N E N E AD V A N T A G E

THE IC Y N E N E AD V A N T A G E THE IC Y N E N E AD V A N T A G E APP L I C A T I O N CA S E ST U D Y : Insulating a Metal Building for Air Sealing/ Energy Efficiency Synopsis: Twice as effective at air sealing versus conventional insulation

More information

RELEASE NOTES EG USA 3.0.0

RELEASE NOTES EG USA 3.0.0 RELEASE NOTES EG USA 3.0.0 Version 3.0 has a multitude of changes from version 2.8.05. One of the major changes is the ability to break up a home into Blocks with different HVAC systems. This includes

More information

Building Permit Application

Building Permit Application Building Permit Application CBO: Don Reed / Inspector: Scott Richardson -All applications must be filled out in full -Residential applications will be issued or denied within 10 working days -Multi-residential

More information

North Carolina State Buildings

North Carolina State Buildings North Carolina State Buildings Efficiency Conference Building Envelope Sponsored by: State Energy Office and State Construction Office NC Department of Administration Conducted by: Jeff Tiller, PE Appalachian

More information

PDmB, Inc. Definitions

PDmB, Inc. Definitions Page 1 of 11 Definitions S Satisfactory Meets industry standards for proper material and installation NP Not Present Condition or item was not present at time of inspection NI Not Inspected Condition or

More information

Table of Contents. Page ii

Table of Contents. Page ii Table of Contents Page i Table of Contents 9. Additions, Alterations and Repairs... 1 9.1 Introduction... 1 9.1.1 Additions... 2 9.1.2 Alterations... 2 9.1.3 Repairs... 3 9.2 What s New in the 2013 Standards...

More information

Energy and Cost Savings

Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Rhode Island Energy and Cost Savings for New Single- and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC 1 2012 IECC AS COMPARED TO THE 2009 IECC Rhode Island Energy

More information

Residential Building Permits

Residential Building Permits LANE COUNTY PUBLIC WORKS Residential Building Permits LAND MANAGEMENT DIVISION 3050 N. DELTA HWY, EUGENE OR 97408 i CONTACT PHONE NUMBERS: Building Program: (541) 682-4651 Inspection Requests: (888) 299-2821

More information

Indiana Energy and Cost Savings

Indiana Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Indiana Energy and Cost Savings for New Single and Multifamily Homes: 2012 IECC as Compared to the 2009 IECC 1 2012 IECC AS COMPARED TO THE 2009 IECC Indiana Energy and Cost

More information

City of St. Charles Basement Finish or Remodel

City of St. Charles Basement Finish or Remodel City of St. Charles Basement Finish or Remodel Building & Code Enforcement Division 2 East Main Street St. Charles IL 60174 630.377.4406 (Office) 630.443.4638 (Fax) http://www.stcharlesil.gov Please direct

More information

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A TechSpecs A builder s blueprint for construction technologies January 2013 The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A C B A E D H G F A. Wood Floor Framing - p. 2 B. Foundation

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

ROOFS, SNOW AND ICE DAMS

ROOFS, SNOW AND ICE DAMS ROOFS, SNOW AND ICE DAMS The Problem Ice dams are a common roof performance problem in cold climate buildings. Simply put, they are ridges of ice and icicles caused by melt water from further up the roof

More information

Analysis of Energy Consumption, Rating Score, and House Size

Analysis of Energy Consumption, Rating Score, and House Size Analysis of Energy Consumption, Rating Score, and Duncan Prahl, Registered Architect Innovation Programs Leader, Research and Development, IBACOS, Inc., Phone: + 1 412 325 1523. Fax: + 412 765 3738. E-mail:

More information

Residential HVAC Load Sizing Training October 14, 2015. David Kaiser Green Code Plan Reviewer

Residential HVAC Load Sizing Training October 14, 2015. David Kaiser Green Code Plan Reviewer Residential HVAC Load Sizing Training October 14, 2015 David Kaiser Green Code Plan Reviewer DCRA - Green Building Division Regulations of green codes including: Green Building Act Green Construction Code

More information

Introduction to Energy Codes & Green Building Programs

Introduction to Energy Codes & Green Building Programs Introduction to Energy Codes & Green Building Programs David Neiger B.S. Arch, LEED AP Homes, Certified HERS Rater Principal Populus Sustainable Design Consulting Why green homes? The Building Sector:

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

ASX7-4-IOM-7 J30-08579

ASX7-4-IOM-7 J30-08579 INSTALLATION INSTRUCTIONS 4" COMBUSTION AIR INLET KIT TUBULAR GAS FIRED DIRECT SPARK PROPELLER UNIT HEATERS UNIT CONVERSION & CATEGORY III VENTING FOR SEPARATED COMBUSTION For 30,000 to 75,000 BTU/HR SUPPLEMENT

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

Colorado Energy and Cost Savings

Colorado Energy and Cost Savings BUILDING TECHNOLOGIES PROGRAM Colorado Energy and Cost Savings for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC 1 2009 AND 2012 IECC AS COMPARED TO THE 2006 IECC Colorado

More information

Residential Inspection Guidelines

Residential Inspection Guidelines Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against

More information

Applications for building permits will not be reviewed until all of the required information has been submitted.

Applications for building permits will not be reviewed until all of the required information has been submitted. NOTICE: Applications for building permits will not be reviewed until all of the required information has been submitted. Once all items are submitted a minimum of ten (10) working days are required to

More information

Mississippi. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC

Mississippi. Energy and Cost Savings. for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC BUILDING TECHNOLOGIES PROGRAM Mississippi Energy and Cost Savings for New Single and Multifamily Homes: 2009 and 2012 IECC as Compared to the 2006 IECC 1 2009 AND 2012 IECC AS COMPARED TO THE 2006 IECC

More information