Multi-layer Insulation Blanket for Roofs, Walls & Floors
|
|
- Pierce O’Connor’
- 7 years ago
- Views:
Transcription
1 Multilayer Insulation Blanket for Roofs, Walls & Floors Thermal Insulation in a 40mm thin, flexible, multilayer membrane Thermally the best performing multifoil on the market by far.
2 Thermally the best performing multifoil on the market by far. Unique Technology Our unique patented technology allows the material to expand where necesary, increasing overall thermal performance. Roof Application (See page 9) 19 Layers Thermally the best performing 19 layers of material including Reflective Foil, Expanded Polyethylene & Polyester Wadding. Thermally the best performing multifoil on the market by far. Wall Application (See Page 23) Floor Application (See Page 31)
3 contents ROOF APPLICATIONS 04 / GENERAL FIXING INSTRUCTIONS 05 / UNDER RAFTER Pitched Roof Application 06 / OVER RAFTER Pitched Roof Application 07 / TWO LAYER Pitched Roof Application 0809 / UNDER RAFTER Flat Roof Application 10 / OVER RAFTER Flat Roof Application 11 / TWO LAYER Flat Roof Application 12 / RECESSED DETAILS 13 / PURLINS DETAILS 1415 / DETAILING 1728 WALL APPLICATIONS 18 / GENERAL FIXING INSTRUCTIONS 19 / TIMBER FRAME & DORMER CHEEKS 20 / CAVITY WALL 21 / DRY LINING 22 / DWARF WALL 23 / EXTERNAL RENDER 2529 FLOOR APPLICATIONS 26 / GENERAL FIXING INSTRUCTIONS 27 / SUSPENDED TIMBER FLOOR 28 / FLOATING TIMBER FLOOR 29 / CRAWL SPACE FLOOR
4
5 Roof Applications.
6 Insulation for use in Roofs Benefits General Fixing Instructions NHBC Acceptance Meets requirements of L1A and L1B 2010 addition In accordance with BR443 Fully certificated Thermally tested in accordance with EN16012 High thermal resistance of 2.50m²K/W Effective solar overheating barrier Effective in summer and winter Lightweight, thin & flexible Fast and simple installation Tear Resistant For pitched roofs between 20 O and 70 O is a very flexible, easy to fit, multilayer insulation thermally tested in accordance with EN16012 achieving a high thermal resistance of 2.50m²K/W for accompanied by a 25mm air cavity either side of the material. Installation of for pitched roof applications and additional insulation products should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. must be installed with a 50mm overlap with all joints taped with YBS 75mm foil tape. can be cut with a YBS cutter, craft knife or a sharp pair of scissors. can be easily fixed with staples at regular intervals. Minimum 14mm stainless steel or galvanised staples are recommended. is most effective with a minimum 25mm air gap on either side. Battens can be used to create this gap. No protective clothing/handling required. How does Work? Due to the special composition of multilayers of insulation, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). works most effectively by reflecting infrared radiation. This means that not only is effective in winter by reflecting heat back into the building and cold out, but also in summer, is a very effective barrier to solar overheating which reduces the need for artificial cooling systems as it prevents the accumulation of heat within the building. 4
7 Under Rafter Pitch Roof Fixing Instructions Installation of for under rafter applications and additional insulation products should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.18 Outside Surface Slate/Tile Breather Membrane Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using YBS Foil Tape. Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. Rafter Cavity Rafter Cavity Fix 25mm by 38mm battens at right angel to rafters. Battens must always be fixed around the perimeter of windows The plasterboard is fixed over the and onto the battens in the usual manner. Total Resistance When installed below rafters will perform as a vapour barrier. Outside Surface Slate/Tile Breather Membrane Rafter Cavity Rafter Cavity See installation video at UValue table All calculations are based on 50mm rafters and include the effect of cold bridging. For individual calculation please contact the technical team on Description (rafters at 400mm centres) and 75mm (0.022 W/mk) and 130mm Glasswool (0.040 W/mK) and 110mm (0.022 W/mk) and 140mm (0.022 W/mK) Description (rafters at 600mm centres) and 70mm (0.022 W/mk) and 120mm Glasswool (0.040 W/mK) and 95mm (0.022 W/mk) and 125mm (0.022 W/mK) UValue 0.13 W/m 2 k UValue 0.13 W/m 2 k 5
8 Over Rafter Pitch Roof Fixing Instructions Installation of for over rafter applications and additional insulation products should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the rafter height, pulled tight and stapled onto the rafters at minimum 300mm centres. should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using YBS Foil Tape. Additionally, at the eaves is cut around the rafters and sealed to the Cavity wall insulation or wall plate. UValue Combined Method (W/m 2 K) 0.18 Outside Surface Slate/Tile Breather Membrane Rafter Cavity Rafter Cavity Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Parallel battens, recommended 38mm by 50mm are fixed to the rafters. Battens must always be fixed around the perimeter of windows. Vapour Control A breather membrane is fitted in accordance with the manufacturers fixing details above the battens before tile battens and tiles. A vapour control layer should be fitted behind plasterboard to prevent any risk of interstitial condensation. Total Resistance Outside Surface Slate/Tile Rafter Cavity Breather Membrane Rafter Cavity Vapour Control Calculated to include timber bridging UValue table All calculations are based on 50mm rafters and include the effect of cold bridging. For individual calculation please contact the technical team on Description (rafters at 400mm centres) and 80mm (0.022 W/mk) and 135mm Glasswool (0.040 W/mK) and 115mm (0.022 W/mk) and 145mm (0.022 W/mk) Description (rafters at 600mm centres) and 70mm (0.022 W/mk) and 125mm Glasswool (0.040 W/mK) and 100mm (0.022 W/mk) and 130mm (0.022 W/mk) UValue 0.13 W/m 2 k UValue 0.13 W/m 2 k 6
9 Two Layer Pitch Roof Fixing Instructions Installation of for under rafter applications and additional insulation products should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. UValue Combined Method (W/m 2 K) 0.18 Outside Surface Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) For recessed installation please see page 12. For under rafter installation please see page 3 fixing instructions. When installing two layers of a 38mm air space should be maintained between layers at all times. Slate/Tile Roofing Membrane Rafter Cavity Rafter Cavity Phenolic See installation video at Total Resistance Roof Covering Slate/Tiling Batten Roofing Membrane Rafters Outside Surface Slate/Tile Roofing Membrane Rafter Cavity Rafter Cavity Batten or Staple Insulated Perpendicular batten Insulated Calculated to include timber bridging UValue table All calculations are based on 50mm rafters and include the effect of cold bridging. For individual calculation please contact the technical team on Description (rafters at 400mm centres) (2 Layers) with 40mm insulated (XPS) (1.070 m 2 K/W) (2 Layers) and 50mm (0.022 W/mK) (2 Layers) and 57.5mm Insulated () (2.2 m 2 K/W) (2 Layers) and 80mm (0.022 W/mK) Description (rafters at 600mm centres) (2 Layers) with 40mm insulated (XPS) (1.070 m 2 K/W) (2 Layers) and 45mm (0.022 W/mK) (2 Layers) and 57.5mm Insulated () (2.2 m 2 K/W) (2 Layers) and 70mm (0.022 W/mK) UValue 0.13 W/m 2 k UValue 0.13 W/m 2 k 7
10 Under Joist Flat Roof Fixing Instructions Installation of for under joist flat roof applications and additional insulation products should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. should be overlapped at each joint by approx. 50mm and stapled onto the joists, the joints should be sealed using YBS Foil Tape. When is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. should be cut equal to the width of the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the joists, after which it is fixed using staples, nails or YBS saddle clips. should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. UValue Combined Method (W/m 2 K) 0.18 EPDM Ply decking Cavity (ventilated) Total Resistance EPDM Ply decking Cavity (ventilated) Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) When installed below joists will perform as a vapour barrier. UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on Description (rafters at 400mm centres) and 160mm Mineral Wool (0.040 W/mk) and 140mm Mineral Wool (0.033 W/mk) and 180mm Mineral Wool (0.033 W/mk) and 100mm (0.022 W/mk) and 135mm (0.022 W/mk) and 165mm (0.022 W/mk) Description (rafters at 600mm centres) and 150mm Mineral Wool (0.040 W/mk) and 125mm Mineral Wool (0.033 W/mk) and 170mm Mineral Wool (0.033 W/mk) and 90mm (0.022 W/mk) and 120mm (0.022 W/mk) and 145mm (0.022 W/mk) UValue 0.13 W/m 2 k UValue 0.13 W/m 2 k 8
11 Under Joist Flat Roof Fixing Instructions Installation of for under joist flat roof applications and additional insulation products should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. should be overlapped at each joint by approx. 50mm and stapled onto the joists, the joints should be sealed using YBS Foil Tape. When is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. should be cut equal to the width of the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the rafters, after which it is fixed using staples, nails or YBS saddle clips. should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. When installed below joists will perform as a vapour barrier. UValue Combined Method (W/m 2 K) 0.18 EPDM Ply decking Cavity (ventilated) Cavity (nonventilated) Total Resistance EPDM Ply decking Cavity ventilated NonVentilated Cavity Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on Description (rafters at 400mm centres) and 140mm Mineral Wool (0.040 W/mk) and 120mm Mineral Wool (0.033 W/mk) and 170mm Mineral Wool (0.033 W/mk) and 90mm (0.022 W/mk) and 120mm (0.022 W/mk) and 150mm (0.022 W/mk) Description (rafters at 600mm centres) and 130mm Mineral Wool (0.040 W/mk) and 110mm Mineral Wool (0.033 W/mk) and 150mm Mineral Wool (0.033 W/mk) and 80mm (0.022 W/mk) and 110mm (0.022 W/mk) and 135mm (0.022 W/mk) UValue 0.13 W/m 2 k UValue 0.13 W/m 2 k 9
12 Over Joist Flat Roof Fixing Instructions Installation of for over joist flat roof applications and additional insulation products should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. should be overlapped at each joint by approx. 50mm and stapled onto the joists, the joints should be sealed using YBS Foil Tape. When is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. should be cut equal to the width if the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the rafters, after which it is fixed using staples or nails or with saddle clips. should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. UValue Combined Method (W/m 2 K) 0.18 EPDM Ply decking NonVentilated Cavity NonVentilated Cavity Total Resistance EPDM Ply decking NonVentilated Cavity Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) Additional insulation should be installed above the. When installed below rafters will perform as a vapour barrier. NonVentilated Cavity UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on Description (rafters at 400mm centres) and 65mm (0.022 W/mk) and 90mm (0.022 W/mk) and 105mm (0.022 W/mk) and 85mm XPS (0.029 W/mk) and 120mm XPS (0.029 W/mk) and 140mm XPS (0.029 W/mk) Description (rafters at 600mm centres) and 65mm (0.022 W/mk) and 90mm (0.022 W/mk) and 105mm (0.022 W/mk) and 85mm XPS (0.029 W/mk) and 120mm XPS (0.029 W/mk) and 135mm XPS (0.029 W/mk) UValue 0.13 W/m 2 k 0.13 W/m 2 k UValue 0.13 W/m 2 k 10
13 Two Layer Flat Roof Fixing Instructions Installation of for over and under rafter flat roof applications with additional insulation should be in accordance with the manufacturers certificate, fixing instructions and current good building practice. UValue Combined Method (W/m 2 K) 0.18 EPDM Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) should be overlapped at each joint by approx. 50mm and stapled onto the rafters, the joints should be sealed using YBS Foil Tape. When is cut to fit around openings or connections, gaps must be minimized and any exposed cut edges should be sealed with YBS Foil Tape to prevent condensation. Ply decking NonVentilated Cavity NonVentilated Cavity should be cut equal to the width of the roof section plus 100mm. Installation should start from the external wall with being unrolled perpendicular to the joists, after which it is fixed using staples, nails or YBS saddle clips. Total Resistance should be held in place using timber battens or by other means as shown, in such a way that there is a nominal 25mm air cavity above the product (if applicable) and a nominal 25mm air cavity below. To minimize the effect of thermal bridging cross battening is advised. EPDM Ply decking NonVentilated Cavity When installed below joists will perform as a vapour barrier. NonVentilated Cavity UValue table All calculations are based on 50mm joists and include the effect of cold bridging. For individual calculation please contact the technical team on Description (rafters at 400mm centres) and 50mm Mineral Wool (0.040 W/mk) and 100mm Mineral Wool (0.040 W/mk) and 40mm Mineral Wool (0.033 W/mk) and 30mm (0.022 W/mk) and 65mm (0.022 W/mk) and 75mm (0.022 W/mk) Description (rafters at 600mm centres) and 50mm Mineral Wool (0.040 W/mk) and 90mm Mineral Wool (0.040 W/mk) and 40mm Mineral Wool (0.033 W/mk) and 25mm (0.022 W/mk) and 55mm (0.022 W/mk) and 65mm (0.022 W/mk) UValue 0.13 W/m 2 k UValue 0.13 W/m 2 k 11
14 Recessed Detail Over Rafter Application Under Rafter Application Where roof height is critical can be recessed between the rafters. 1. is stapled to the top of the first rafter. 2. is recessed into the rafter void and fixed with staples or with battens. 3. The material is then fixed to opposite rafter as per instruction is then wrapped around the rafter and the procedure starts again. Once all the is fitted, all joints should be taped using YBS Foil Tape. A breather membrane is then fitted in accordance with the manufacturers fitting instructions. Ensure that there is an airspace above the at all times. 1. is stapled to the underside of the first rafter. 2. is recessed into the rafter void and fixed with staples or with battens. 3. The material is then fixed to opposite rafter as per instruction is then wrapped around the rafter and the procedure starts again. Once all the is fitted, all joints should be taped using YBS Foil tape. can then be fixed directly to the underside of the rafters below the. Tile batten and tiles can then be fitted. Over Rafter Under Rafter Roof Covering Slate/Tiling Batten Batten or Staple Roofing Felt on Rafters Roof Covering Slate/Tiling Batten Batten or Staple Roofing Felt on Rafters & Finish & Finish Insulation joints YBS Foil Taped Insulation joints YBS Foil Taped To see an easy way to recess, please see our installation video (Superquilt Double Layer) at 12
15 Purlin Details Between Purlins Application Around Purlins Application is fixed horizontally or vertically and stapled to the underside of the the rafters. At the purlins the is turned up and stapled in place. Perpendicular Battens are fixed through the into the rafters, at the purlins the battens are fixed into the rafters crushing the tightly against the purlins. can then be fixed to the battens. is fixed horizontally or vertically and stapled to the underside of the the rafters. At the purlins the is cut and pushed behind the purlins then taped to the next piece at the opposite side of the purlin. Perpendicular Battens are fixed through the into the rafters. can then be fixed to the battens. Between Purlins Around Purlins Roofing Covering Slate/Tile Roofing Covering Slate/Tile Slate/Tiling Batten Slate/Tiling Batten Breather Membrane Roofing Felt Between Rafters Rafters Between Rafters Rafters Insulation joints YBS Foil Taped Insulation joints YBS Foil Taped & Finish & Finish Perpendicular 25mm battens Perpendicular 25mm battens Purlin Purlin 13
16 Detailing Vents / Light Pipes Fixing Instructions Collar/Flashing Tiles/Slate Tiles/Slate Batten Counter Batten Breather Membrane is fixed above rafters as per fixing details and turned up at the vent/wall/rooflight and sealed with YBS Foil Tape. Battens are placed on the rafters above the Super Quilt. A breather membrane is fixed above the battens and finished by turning up at the vent/wall/rooflight and sealing to the vent/wall/rooflight. Tile battens are fixed in place. The flashing/collar for the vent/wall/rooflight is fitted above the tile battens and then tiles. Rafter Flashing Flashing Tiles/Slate Tiles/Slate Batten Counter Batten Breather Membrane Rafter Rooflight Rooflight Frame Flashing Tiles/Slate Tiles/Slate Batten Counter Batten Breather Membrane Rafter 14
17 Over Rafter Fixing Details Eaves is stapled to the rafters. At the eaves the is cut and taken down between the rafters to the cavity wall insulation or the wall plate. The needs to be sealed with staples and taped to the rafters and the cavity wall insulation or wall plate to create an airtight envelope. Under Rafter Fixing Details Tiles Battens Counter Battens Foil Taped Joints Breather Membrane Rafter Timber Wallplate is stapled to the underside of the rafters. At the eaves the is cut and taken down between the joists to the cavity wall insulation or the wall plate. The material needs to be fixed to the rafters with minimum 14mm staples and taped to the joists and cavity wall insulation or wall plate so that an airtight envelope is created. Foil taped joins Valleys Tiles Tile Battens Felt Membrane Counter Battens should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joints should be sealed using YBS 75mm Foil Tape. Lead Gutter Mortar Pointing Rafters Vapour control layer When all joints are sealed using foil tape also works as a vapour control layer. knife available YBS Foil joining tape available Downlighters YBS recommend fire hoods are used with all recessed lighting. Perpendicular Battens A circular hole is cut in the to create a minimum 25mm clearance from the downlighter. The cut edge must be completely sealed using YBS Foil Tape. 15
18
19 Wall Applications.
20 Insulation for use in Walls Benefits General Fixing Instructions Meets requirements of L1A, L1B 2010 Fully certificated Thermally tested in accordance with EN High thermal resistance of up to 3.00m²K/W Ideal for New build & Refurbishment Effective solar overheating barrier Lightweight, thin & flexible Fast and simple installation Vapour control layer is a very flexible, easy to fit, multilayer insulation thermally tested in accordance with EN achieving a high thermal resistance of up to 3.00m²K/W for accompanied by a 25mm air cavity either side of the material. How does Work? Due to the special composition of multilayers of insulation, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). works most effectively by reflecting infrared radiation. This means that not only is effective in winter by reflecting heat back into the building and cold out, but also in summer is a very effective barrier to solar overheating which reduces the need for artificial cooling systems as it prevents the accumulation of heat within the building. Installation of for Timber Frame and Masonry Wall Applications and additional insulation products should be in accordance with the Certificate, YBS fixing instructions and current good building practice. When the is cut to fit around openings, care should be taken to minimise gaps. can be cut easily using sharp scissors or a knife. The surfaces of the masonry wall should be sound and free from loose material; large projections should be removed and holes filled and levelled. A survey of the wall may be required to establish the extent of any packing that may be required to ensure a uniform plane for the materials to be fixed. Bearing surfaces for timber battens should comply with BS 8212 : The depth of timber battens will determine the air space achieved on either side of the, YBS recommend 25mm battens. All joints and perforations in the products must be securely sealed with YBS Foil Tape Services may be accommodated within the void created by the dry lining system. If the wall you are refurbishing has a damp or mould issue, this needs to/must be rectified before any insulation is installed. RD
21 Timber Frame & Dormer Cheeks Fixing Instructions Installation of for Timber Frame wall applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.24 Outside Surface Brick, External Cavity BreatherFoil FR Sheathing Board Stud Cavity Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the materials and onto the battens in the usual manner. Outside Surface Brick, External Cavity BreatherFoil FR Sheathing Board Stud Cavity UValue table *For custom calculations please send request to technical@ybsinsulation.com Description 25mm Batten 38mm Batten and YBS BreatherFoil FR 0.25 W/m 2 k 0.24 W/m 2 k, YBS BreatherFoil FR and 50mm Glasswool W/m 2 k 0.20 W/m 2 k, YBS BreatherFoil FR and 100mm Glasswool W/m 2 k 0.16 W/m 2 k, YBS BreatherFoil FR and 25mm W/m 2 k 0.20 W/m 2 k, YBS BreatherFoil FR and 50mm W/m 2 k, YBS BreatherFoil FR and 100mm W/m 2 k 0.14 W/m 2 k, YBS BreatherFoil FR and 140mm W/m 2 k 0.12 W/m 2 k, YBS BreatherFoil and 0.17 W/m 2 k 0.17 W/m 2 k, Standard Breather Membrane 0.30 W/m 2 k 0.28 W/m 2 k, Standard Breather Membrane and 50mm Glasswool W/m 2 k 0.22 W/m 2 k, Standard Breather Membrane and 100mm Glasswool W/m 2 k, Standard Breather Membrane and 25mm W/m 2 k 0.23 W/m 2 k, Standard Breather Membrane and 50mm W/m 2 k 0.20 W/m 2 k, Standard Breather Membrane and 100mm W/m 2 k, Standard Breather Membrane and 140mm W/m 2 k 0.13 W/m 2 k, Standard Breather Membrane and 0.19 W/m 2 k 19
22 Cavity Wall Fixing Instructions A spider clip is fitted on to the wall tie against the inner leaf and this creates the minimum cavity between the product and the blockwork. The initial run of is positioned over the wall ties, ensuring that it is kept taut but with sufficient drop to below floor insulation. can be cut with a sharp blade to fit onto wall ties. The top edge of the material should be a minimum of 75mm over the top row of the wall ties giving a weathered lap joint. When a full run is in position, the retaining clip is fixed to the wall tie to keep the central to the cavity. The second leaf is built up to the topmost line of the wall ties, (or two courses below) and the second run of installed ensuring a minimum lap of 75mm. Vertical joints in the should always be on a line of wall ties, ensuring a 100mm lap (ie 50mm either side of the wall tie) and sealed using YBS Foil Tape At internal and external corners a recommended air space of 25mm must be maintained. UValue Combined Method (W/m 2 K) 0.24 Outside Surface Brick, External Cavity Cavity Thermal Block Plaster Dabs Outside Surface Brick, External Cavity Cavity Thermal Block s Plaster Dabs Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) UValue table *For custom calculations please send request to technical@ybsinsulation.com Description 100mm Cavity 110mm Cavity and 100mm Dense Block W/m 2 k 0.29 W/m 2 k and 100mm Medium Block W/m 2 k 0.28 W/m 2 k and 100mm Lightweight Block W/m 2 k 0.27 W/m 2 k and 100mm Thermal Block W/m 2 k 0.24 W/m 2 k and 100mm Thermal Block Thin Mortar 0.25 W/m 2 k 0.24 W/m 2 k and 140mm Dense Block W/m 2 k 0.29 W/m 2 k and 140mm Medium Block W/m 2 k 0.27 W/m 2 k and 140mm Lightweight Block W/m 2 k 0.26 W/m 2 k and 140mm Thermal Block W/m 2 k 0.23 W/m 2 k and 140mm Thermal Block Thin Mortar 0.23 W/m 2 k 0.22 W/m 2 k 20
23 Dry Lining Fixing Instructions Vertical counter battens, minimum 25mm by 38mm battens are fixed to the wall at 400mm centres. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the battens at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.28 Outside Surface Brick, External Cavity Block Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. Insulated Counter battens are fixed to the wall battens through the material at 600mm centres. The plasterboard is fixed over the and onto the battens in the usual manner. If there is a concern regarding condensation because of the installation of an insulating vapour barrier, please supply full build up information on fax or to our technical team and they can carry out a condensation risk analysis for you. Outside Surface Brick, External Insulated s UValue table *For custom calculations please send request to technical@ybsinsulation.com Description 25mm Batten 38mm Batten and Solid Wall 0.34 W/m 2 k 0.29 W/m 2 k, Solid Wall and 30mm Insulated EPS 0.29 W/m 2 k 0.26 W/m 2 k, Solid Wall and 40mm Insulated EPS 0.27 W/m 2 k 0.24 W/m 2 k, Solid Wall and 0.22 W/m 2 k 0.19 W/m 2 k and Cavity Wall uninsulated 0.33 W/m 2 k 0.28 W/m 2 k, Cavity Wall uninsulated & 30mm Ins. EPS 0.28 W/m 2 k 0.25 W/m 2 k, Cavity Wall uninsulated & 40mm Ins. EPS 0.26 W/m 2 k 0.23 W/m 2 k, Cavity Wall uninsulated & 0.22 W/m 2 k and Cavity Wall Insulated 0.25 W/m 2 k 0.22 W/m 2 k, Cavity Wall Insulated & 30mm Ins. EPS 0.23 W/m 2 k 0.21 W/m 2 k, Cavity Wall Insulated & 40mm Ins. EPS 0.22 W/m 2 k 0.20 W/m 2 k, Cavity Wall Insulated & 0.16 W/m 2 k 21
24 Dwarf Wall Fixing Instructions Installation of for dwarf wall applications with additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.19 Outside Surface Loft Void (Between Studs) Stud cavity Thickness (mm) Conductivity (W/mK) 0.22 Resistance (m 2 K/W) should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the products and onto the battens in the usual manner. Outside Surface Loft Void Stud Cavity Accessories s knife available YBS Foil joining tape available UValue table *For custom calculations please send request to technical@ybsinsulation.com Description 25mm Batten 38mm Batten and 50mm Glasswool W/m 2 k 0.22 W/m 2 k and 100mm Glasswool W/m 2 k and 25mm W/m 2 k 0.23 W/m 2 k and 50mm W/m 2 k 0.19 W/m 2 k and 75mm W/m 2 k and 100mm W/m 2 k Two Layer 0.21 W/m 2 k 0.19 W/m 2 k 22
25 External Wall Insulation Fixing Instructions UValue Combined Method (W/m 2 K) 0.30 Thickness (mm) Conductivity (W/mK) Resistance (m 2 K/W) All timber exposed to the outer cavity, except naturally durable species should be treated. Outside Surface Render is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber battens at minimum 300 mm centres. Render Board Batten (Ventilated Cavity) should be overlapped at each joint by approximately 50 mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. Vertical battens, recommended 25 mm by 38 mm are fixed to the vertical battens; battens should always be placed at the top and bottom of the wall and around the perimeter of doors and windows. Brickwork Drylining plaster dabs The carrier board is fixed over the product and onto the battens, the external rendered finishing should comply with BS EN Decorative Render Render Board (Ventilated Cavity) Brickwork businessgreen leaders awards 2012 winner Multilayer Insulation Blanket for Floors WWF Green GameChangers Innovation of the Year Knowsley Housing Trust B Y A architects UValue table *For custom calculations please send request to technical@ybsinsulation.com Solid Wall 25mm Batten 38mm Batten and Cladding 0.30 W/m 2 k 0.26 W/m 2 k and Render Board (Ventilated Cavity) 0.33 W/m 2 k 0.30 W/m 2 k Cavity Wall 25mm Batten 38mm Batten and Cladding 0.30 W/m 2 k 0.27 W/m 2 k and Render Board (Ventilated Cavity) 0.33 W/m 2 k 0.31 W/m 2 k 23
26
27 Floor Applications.
28 Insulation for use in Floors Benefits General Fixing Instructions Fully certificated Fast and simple installation High core thermal resistance of 1.52m²K/W Tear Resistant Effective in summer and winter For suspended & floating floors Lightweight, thin & flexible is a very flexible, easy to fit, multilayer insulation thermally tested in accordance with EN12667 achieving a high core thermal resistance of 1.38m²K/W for. Installation of for floor applications should be in accordance with the certificate, YBS fixing instructions and current good building practice. must be installed with a 50mm overlap. can be cut with a YBS cutter, craft knife or a sharp pair of scissors. can be easily fixed with staples at regular intervals. Minimum 14mm stainless steel or galvanised staples are recommended. No protective clothing/handling required. How does Work? Due to the special composition of multilayers of insulation, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). works most effectively by reflecting infrared radiation. This means that not only is effective in winter by reflecting heat back into the building and cold out, but also in summer, is a very effective barrier to solar overheating which reduces the need for artificial cooling systems as it prevents the accumulation of heat within the building. P/A Ratio The heat loss in a floor is greater at the exposed perimeter edge of the floor. To calculate the Uvalue, the exposed perimter edge to area ratio needs to be worked out e.g. a 100m 2 area, semidetached house with 3 external walls of 10m each has a perimeter to area ratio 0.3 (i.e. 30m : 100m 2 = 0.3). RD
29 Suspended Timber Floor Fixing Instructions is rolled out over the joists, then stapled in place to create required airspace or nailed in place through the YBS saddle clips to maintain the required 50mm airspace (4 saddle clips per m 2 ). The horizontal joints are tightly overlapped and left open to allow any moisture accumulation to dissipate. should be sealed around the perimeter or brought up above the floor deck. The decking is then fixed at 200mm centres with screws 37mm into the joists. can be used in conjunction with Superfloor Clips to provide a channel for underfloor heating pipework; please visit and look under Superfloor for more information. (Please note that thermal outputs for underfloor heating have not been tested with ) Construction Chipboard Deck Joist Cavity Joist Cavity Ventilated Void Ground Thickness (mm) UValue table P/A Ratio UValue (with 50mm Cavity above) UValue (with 100mm Cavity above) W/m 2 k 0.12 W/m 2 k W/m 2 k W/m 2 k W/m 2 k 0.20 W/m 2 k W/m 2 k 0.20 W/m 2 k W/m 2 k 0.21 W/m 2 k W/m 2 k 0.22 W/m 2 k W/m 2 k 0.22 W/m 2 k W/m 2 k 0.23 W/m 2 k W/m 2 k 0.23 W/m 2 k 27
30 Floating Timber Floor Fixing Instructions is rolled out onto the concrete floor leaving enough edge overlap to protrude above the floor deck. Timber joists/battens are then laid on top of the, spaced at centres to suit the particular flooring. The deck is then fixed at 200mm centres with screws 37mm into the joists/battens. Construction Chipboard Deck Joist Cavity Concrete Slab Ground Thickness (mm) UValue table P/A Ratio UValue (with 50mm Cavity above) UValue (with 100mm Cavity above) W/m 2 k 0.12 W/m 2 k W/m 2 k 0.17 W/m 2 k W/m 2 k 0.20 W/m 2 k W/m 2 k 0.22 W/m 2 k W/m 2 k 0.23 W/m 2 k W/m 2 k 0.24 W/m 2 k W/m 2 k 0.25 W/m 2 k W/m 2 k 0.26 W/m 2 k W/m 2 k 0.27 W/m 2 k W/m 2 k 0.27 W/m 2 k 28
31 Crawl Space & Cellars Fixing Instructions Accessories is rolled out under the floor joists than stapled in place. Access is gained using the under floor crawl space. The horizontal joints are tightly overlapped and left open to allow any moisture accumulation to dissipate. should be sealed around the perimeter or brought up above the floor deck. knife available YBS Foil joining tape available Construction Tongue & Groove Floorboards Joist Cavity Ventilated Void Ground Thickness (mm) UValue table P/A Ratio UValue (with 150mm Cavity above) UValue (with 200mm Cavity above) W/m 2 k 0.11 W/m 2 k W/m 2 k 0.14 W/m 2 k W/m 2 k W/m 2 k 0.16 W/m 2 k W/m 2 k W/m 2 k W/m 2 k W/m 2 k W/m 2 k W/m 2 k 0.19 W/m 2 k 29
32 BDA Agrément Nr. BAR 12454/01 CAD Drawings Can now be downloaded from Technical Properties Product Description 19 Components Thickness 40mm approx. Weight 800g/m 2 Mechanical Properties Value Reference Standard Thermal performance Core 1.52m 2 K/W BS EN Roof 2.50m 2 K/W BS EN 6946 Wall 3.00m 2 K/W BS EN 6946 Floor 4.45m 2 K/W BS EN 6946 Flammability Class E BS EN Water vapour resistance 1569MNs/g BS EN Emission coefficients of surfaces 0.02 BS EN Tensile strength 142KPA BS EN 1608 Packaging 15m 2 7.5m 2 Width 1.5m 1.5m Length 10m 5m Weight 12.5Kg 6.25Kg Yorkshire Building Services (Whitwell) Ltd Crags Industrial Park, Morven Street, Creswell, Derbyshire, S80 4AJ Tel: Fax: sales@ybsinsulation.com Web: Yorkshire Building Services (Whitwell) Ltd. YBS V4 10/2015
Multi-layer Insulation Blanket for Roofs
Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof
More informationCERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
More informationRockwool Flexi Insulation Application Guide
Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed
More informationSection 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining
Section Timber Frame Walls Single layer between studs Product: Earthwool FrameTherm Rolls and Slabs Tf01 Single layer between studs with service void Product: Earthwool FrameTherm Rolls and Slabs Tf02
More informationBuilding Regulations for the Conservation of Fuel and Power
Insulation CI/SfB Rn7 M2 First Issue April 2014 Building Regulations for the Conservation of Fuel and Power ENGLAND EXISTING DWELLINGS 2013 EDITION Low Energy Low Carbon Buildings Contents Page Introduction
More informationContents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37
Contents Pages Full fill cavity walls 2-13 Partial fill cavity walls 14-25 Solid externally insulated walls 26-37 Appendix (BRE confirmation of Ψ and y-values) 38-40 Page 1 of 40 APA Construction Details
More informationThe Pocket Guide To Insulation August 2013
The Pocket Guide To Insulation August 2013 Introduction Knauf Insulation is the UK s leading manufacturer of insulation products, including: Earthwool glass and rock mineral wool Polyfoam ECO extruded
More informationSection 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.
Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice
More informationBUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.
Building Control Charnwood Borough Council Southfield Road Loughborough LE11 2TN BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS. Last updated 16/11/2010 Page 1 of 6 PURPOSE: This Guidance
More informationIncluding. Rubershield-Pro. Breather Membrane
Including RubershieldPro Breather Membrane 2 Ruberoid produces a wide range of underslating membranes, primarily to be installed below tiles, slates or metal roofing providing a secondary barrier against
More informationEnergy Company Obligation (ECO): Technical Monitoring Questions
Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified
More informationGood Craftsmanship Guide. Carpentry and Joinery- Carcassing
Good Craftsmanship Guide Carpentry and Joinery- Carcassing Introduction This Good Craftsmanship Guide highlights key problems with the major elements of Carpentry and Joinery - Carcassing, and gives guidance
More informationIntroduction & Principles Issued in support of Junction Details, Parts 1 to 5
Accredited Construction Details (Scotland) 2010 For the limitation of thermal bridging and air infiltration in low and medium rise domestic buildings Introduction & Principles Issued in support of Junction
More informationModule 3.7. Thermal bridging
Module 3.7 Thermal bridging Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2 Introduction to thermal
More informationNRG 75 CRF NRG GREENBOARD WALL SYSTEM
NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark
More informationTimber Frame Walls Rethinking Construction
Insulation Fifth Issue November 2007 Timber Frame Walls Rethinking Construction INSULATION BEST PRACTICE FOR THE 21ST CENTURY Summary 9 mm OSB sheathing 3 mm skim coated 15 mm plasterboard Rock or glass
More informationCavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
More informationRev 1-12.2013. Code of Practice. SIP Technology. www.uksips.org
Rev 1-12.2013 Code of Practice SIP Technology www.uksips.org What are Structural Insulated Panels (SIPS)? SIPS are prefabricated, high performance, lightweight, building panels that can be used in floors,
More information!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035
Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí
More informationSteel-framed Walls. Insulation
Insulation A4/8 SF AW1192 Issue 4 Nov 2012 Steel-framed Walls Insulation guide Helps achieve a 6-star house energy rating Rigid and flexible Kingspan AIR-CELL solutions available Vapour barrier or vapourpermeable
More informationResidential Refurbishment. September 2012. ThermoShell Internal Wall Insulation System Design Guide
Residential Refurbishment September 2012 ThermoShell Internal Wall Insulation System Design Guide The importance of wall insulation in houses Buildings account for 40% of our energy consumption and in
More informationSection 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with
Section Separating Floors Timber frame floor with I-Beams Product: Earthwool Acoustic Roll and Floorfoam Easy Edge Strip Timber frame floor with solid timber joists Product: Earthwool Acoustic Roll and
More informationProviding protection in construction
Providing protection in construction VOLUME 2: WALLS AND FLOORS Contact Information UK office address: DuPont Tyvek Hither Green Trading Estate Clevedon, North Somerset BS21 6XU Tel: 01275 879770 Fax (sales):
More informationRoofers Guide to Underslating Membranes
Roofers Guide to Underslating Membranes IKO is a worldwide enterprise, with more than 3000 employees, and manufacturing plants in Canada, the United States, United Kingdom, Belgium, Holland, France and
More informationGUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.
GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS. This leaflet provides guidance on how to attain compliance with The Building (Amendment) Regulations (Northern Ireland) 2006, Part
More informationCHESTERFLEX ROOF WATERPROOFING MEMBRANES
CI/SfB (47) Ln2 Chesterfelt Ltd CHESTERFLEX ROOF WATERPROOFING MEMBRANES Certificate No 94/3062 DETAIL SHEET 2 Product THIS DETAIL SHEET RELATES TO CHESTERFLEX ROOF WATERPROOFING MEMBRANES, POLYESTER REINFORCED
More informationInterior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM
P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 2 below and above ground V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V The flexible, fast and cost-effective answer
More informationInnovation - High performance roof, wall and floor insulation board. delivering better performance
2010 VERSION 1 IRL High performance roof, wall and floor insulation board Innovation - delivering better performance PRODUCT SPECIFICATION INSTALLATION GUIDE I ve worked with Xtratherm for years, they
More informationEnvelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit
R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed
More informationMulti-Foil reflective insulation SPACE SAVING U-VALUE AS LOW AS 0.16W/m 2 K LIGHTWEIGHT EASY TO FIX
Multi-Foil reflective insulation SPACE SAVING U-VALUE AS LOW AS 0.16W/m 2 K LIGHTWEIGHT EASY TO FIX TECHNICAL CHARACTERISTICS Multi-Foil Reflective Insulation Xfoil Range of insulation is designed to achieve
More informationBuilding Control Guidance Note
Elements Renovation / Replacement. Issued 25/01/13 Rev a Page 1 of 9 (Applies to both Domestic and Non-Domestic Premises) Works relating to thermal elements can arise in building an extension, a material
More informationUbiflex. Non-lead flashing system
Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof
More informationINTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal
More informationSTRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
More informationINSULATED PITCHED ROOFING
DOW CONSTRUCTION PRODUCTS (a division of the Dow Chemical Company Ltd) INSULATED PITCHED ROOFING Welcome to this RIBA approved CPD self tutorial. First some information about the Dow Chemical Company itself:
More informationCI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd
CI SfB (4-) Nn2 Onduline Mini Profile Onduline Garden Roof Range Onduline Building Products Ltd Onduline Garden Roof Range Onduline Mini Profile The new Onduline Mini Profile sheets have been designed
More informationBER Assessors Dwellings Technical Bulletin
BER Assessors Dwellings Technical Bulletin Issue No. 2/12 April 2012 Contents: 1. SUPPLEMENTARY ELECTRIC WATER HEATING IN SUMMER... 2 2. PITCHED ROOF U-VALUE CALCULATIONS... 8 2.1. PITCHED ROOF, INSULATED
More informationConventions for U-value calculations
Conventions for U-value calculations 2006 edition Brian Anderson BRE Scotland BRE is committed to providing impartial and authoritative information on all aspects of the built environment for clients,
More informationH-Stud Area Separation Wall System
12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic
More informationThe Kingspan Insulation Price List 1 st January 2013
Insulation The Kingspan Insulation Price List 1 st January 2013 FOR BUILDING FABRIC INSULATION, CAVITY CLOSERS AND MEMBRANES Visit our website: www.kingspaninsulation.co.uk Low Energy - Low Carbon Buildings
More informationAsphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
More informationPROVIDING PROTECTION IN CONSTRUCTION Technical guide: roofs. www.tyvek.co.uk www.construction.tyvek.com
PROVIDING PROTECTION IN CONSTRUCTION Technical guide: roofs www.tyvek.co.uk www.construction.tyvek.com DuPont TM membranes Providing protection Contents Page Introduction............................................................................................................................
More informationSANS 1 0 1 7 7-9. www.spunchem.com FIRE PERFORMANCE SANS 428 ENERGY SAVER REFLECTIVE TIASA A MEMBER OF 2009/366 2009/367 2009/369 2008/341
REFLECTIVE ENERGY SAVER FIRE PERFORMANCE SANS 428 SANS 1 0 1 7 7-9 SANS 10177-10 SANS 10177-11 www.spunchem.com A MEMBER OF TIASA Thermal Insulation Association of Southern Africa 2009/66 2009/67 2009/69
More informationTunnels & Arches OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM
P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 5 Tunnels & Arches V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V Create dry usable space with the original X pattern
More informationEcoTouch Insulation with PureFiber Technology
PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.
More information- Version 2 Total R-value calculations for typical building applications
- Version 2 Total R-value calculations for typical building applications - Version 2 Total R-value calculations for typical building applications Acknowledgements Version Date Description 1 Nov 2010 Initial
More informationLinea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1
Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.
More informationMineral fibreglass insulation
Isover MULTIMAX 30 Specification code: MW - EN 13162 - T5 - MU1 - WS - WL(P) - AF r 5 TeChNICaL SPeCIFICaTION Insulating slabs made of Isover fibreglass wool. The production method is based on the fibering
More informationsound reduction systems for commercial, educational and industrial environments
sound reduction systems for commercial, educational and industrial environments Tel: +44 ()14 3874 Fax: +44 ()14 38957 E-mail: info@soundreduction.co.uk Web: www.soundreduction.co.uk soundblocker Acoustic
More informationENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.
APR 1200 Acoustic Partition Roll CI/Sfb Ref: APR002 Glass mineral wool roll designed to provide high levels of sound insulation in walls and floors to meet Part E (England & Wales) and Section 5 (Scotland)
More informationAfter reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
More informationFire 2This Technical Bulletin has been commissioned by the UK SIP Association in
REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory
More informationSection 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01
Section Built-up Metal Roofs Rail and bracket system Product: Earthwool FactoryClad range Bu01 Standing seam system Product: Earthwool FactoryClad range and Earthwool Universal Slab Bu02 Built-up Metal
More informationInstallation Window Building In Details
Installation Window Building In Details INSTALLATION Photo courtesy of Rowe Aluminium DATE: NOVEMBER 2009 REPLACES: AUGUST 2003 INSTALLATION Installation Replaces: Scale: NOT TO SCALE Vantage snap-on couplers
More informationIRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION
IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION Bill Robinson BSc. C. Eng. M. I. Struct. E. Timber Design Services 1 IS440 Timber frame
More informationplumbing products guide
plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly
More informationCITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
More informationSchlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing
Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight
More informationRockwool Cladding Roll
Rockwool Cladding Roll High performance industrial insulation has been specifically developed for use in lightweight cladding applications to commercial or industrial framed buildings. Cladding Roll U/F
More informationSOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS
NOISE TECHNICAL FACT SHEET FACT SHEET 5 SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS The sound insulation of exterior walls and roof-ceiling systems refers to their ability to reduce external
More informationPRESTRESSED CONCRETE FLOORING BEAMS
PRESTRESSED CONCRETE FLOORING BEAMS TRIED & TRUSTED Introduction Established in 2001 TT Concrete Products Limited has become a prominent manufacturer of prestressed concrete flooring beams throughout the
More informationFIRE RATED GLAZING System Guide
SYSTEM GUIDE Issue date: 05-05-2015 Expiry date: 31-12-2016 System Guide Introduction Pyropanel Developments are specialists in fire rated glazing solutions, and our systems are designed for easy installation
More information1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability
1/9/13 By Brett T. Fagan, P.E. Presented by Marie Horan, P.E. Building Diagnostics, Inc. Building Diagnostics Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability
More informationKnauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap
Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet
More informationA COMPREHENSIVE GUIDE TO THIN MULTIFOIL INSULATION
2011 Edition ACTIS THIN MULTIFOIL INSULATION A COMPREHENSIVE GUIDE TO THIN MULTIFOIL INSULATION Product Catalogue ROOFS ATTICS FLOORS WALLS EUROPEAN TECHNICAL APPROVAL IN PROCESS Registration N 12.01/12
More informationNCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
More informationGuide to the safe installation of downlighters in dwellings
Guide to the safe installation of downlighters in dwellings Technical guidance for designers and installers 01 Guide to the safe installation of downlighters in dwellings Technical guidance for designers
More informationFire Barrier Duct Wrap 15A
3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies
More informationSTEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.
STEP-BY-STEP construction guide Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. Welcome to our CONSERVATORY AND SUNROOM CONSTRUCTION GUIDE What is the specification
More informationKINGSPAN INSULATION KINGSPAN KOOLTHERM K12 FRAMING BOARD INSULATION
Kingspan Insulation Limited Pembridge Leominster Herefordshire HR6 9LA Tel: 01544 388601 Fax: 01544 388888 e-mail: general.enquiries@kil.kingspan.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL
More informationMemtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems
Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology Modern Efficient Performance Cost Effective Flat Roofing Systems Introduction A complete range of Memtec Roofing and Waterproofing Single
More informationTGD L 2011. Limiting Thermal Bridging and Air Infiltration. Acceptable Construction Details. Introduction
TGD L 2011 Limiting Thermal Bridging and Air Infiltration Acceptable Construction Details Introduction Government of Ireland 2015 1 INTRODUCTION This guide to Acceptable Construction Details (ACDs) is
More informationTimber Frame Construction
Timber Frame Construction Introduction Design and Detailing What is timber? Failure modes History of timber frame construction Forms of timber frame construction Live and dead loads Wind loads Roof construction
More informationIntroduction. 1. Heat Transfer. In Townsville s climate it is essential to choose building materials that perform well in our local conditions.
In Townsville s climate it is essential to choose building materials that perform well in our local conditions. Choosing the correct materials and insulation will improve the overall thermal performance
More informationHow To Certify The Scottsdale Construction System
BRE CERTIFICATION LIMITED PRODUCT SCOTTSDALE CONSTRUCTION SYSTEM CERTIFICATE NUMBER 129/07 DATE OF ISSUE December 2007 SUPPLIED BY Scottsdale Construction System Ltd SUMMARY The Scottsdale Construction
More informationRochdale Building Control Guide. Approved Document C. Site preparation and resistance to contaminants and moisture
Rochdale Building Control Guide Approved Document C Site preparation and resistance to contaminants and moisture Dampness is often misdiagnosed within buildings, the approved document deals with prevention
More informationDEFAULT HEAT LOSS COEFFICIENTS
DEFAULT HEAT LOSS COEFFICIENTS SECTION A101 GENERAL REQUIREMENTS A101.1 Scope. The following defaults shall apply to Chapter 4 of both the (RE) and (CE) sections of the IECC. This chapter includes tables
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationSika Membran System For Sealing and Waterproofing Construction Gaps in Building Façades
Construction Sika For Sealing and Waterproofing Construction Gaps in Building Façades Waterproof and Airtight Flexible Seal Controlled Vapour Diffusion Bonds to any Building Substrate Prevents Interstitial
More informationFinal inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
More informationImproving thermal insulation of concrete sandwich panel buildings
Improving thermal insulation of concrete sandwich panel buildings Jørgen Munch-Andersen Danish Building Research Institute, Aalborg University LCUBE conference, Vienna 17-18 April 2007 Outline A general
More informationHOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY
HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard
More informationROOFERS CHOICE BREATHER MEMBRANES FOR USE IN COLD NON-VENTILATED ROOFS
Mercury Building Products Ltd 114 Eckington Road Coal Aston Dronfield Sheffield S18 3AY Tel: 01246 292816 Fax: 01246 292867 e-mail: sales@vaprfree.co.uk danny@vaprfree.co.uk website: www.mercurybuildingproducts.com
More informationI n s u l a t i o n. Low Energy Low Carbon Buildings
I n s u l a t i o n CI/Sfb (47) Ln6 Sixth Issue March 2011 BREATHABLE MEMBRANE FOR UNVENTILATED PITCHED ROOFS AND TIMBER FRAME WALLS Waterproof can be used as a temporary roof covering Non tenting Airtight
More informationTechnology at its best. Benefits
Protecting what s under your roof from the elements is simplicity itself with Ruberoid Roofing Shingles. Roofing Shingles make ideal roofing; they are attractive, easy to install and are perfect for use
More information0845 0098 980 www.nicholsonsts.com
0845 0098 980 www.nicholsonsts.com ROOFTRAK The IFP is revolutionising the way we fix things to roofs. Technical Director of a leading UK roofing system manufacturer The ROOFTRAK-IFP A revolutionary solution
More informationGYPSUM AREA SEPARATION FIREWALLS GA-620-2011
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein
More informationfoot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
More informationNEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
More informationROOFS, SNOW AND ICE DAMS
ROOFS, SNOW AND ICE DAMS The Problem Ice dams are a common roof performance problem in cold climate buildings. Simply put, they are ridges of ice and icicles caused by melt water from further up the roof
More informationUnbeatable energy efficient glass curtain wall system
Unbeatable energy efficient glass curtain wall system CONTENT Introduction 1 System 2 World Class Engineering 4 Unit Selection 5 Energy Efficiency & Comfort 10 Maximised Installation Efficiency 12 Aesthetics
More informationInstallation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
More informationThe formation of roof waterproofing details calls for
3.5 BUILT-UP ROOFING DETAIL DESIGN INTRODUCTION The formation of roof details calls for a combination of the skills of the designer and the roofer. There are many different approaches to detail design
More informationBuilding Control Guidance Note
Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you
More informationAND MEMBRANES ROOFING UNDERLAYS. www.fakro.com
AND MEMBRANES 010 ROOFING UNDERLAYS 1 HO DOES YOUR ROOF BREATHe? MEMBRANES THE WAY to A WARM AND DRY ROOF HO HO HO HO HO HO WATERTIGHTNESS The FAKRO Company offers a wide range of membranes and underlays
More informationShingle Installation Guide
Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of
More informationCI/SfB (31.9) BETTER BY DESIGN PRODUCT GUIDE COMPLETE GUIDE TO THE IG PRODUCT RANGE. www.iglintels.com
CI/SfB (31.9) Hh2 BETTER BY DESIGN PRODUCT GUIDE COMPLETE GUIDE TO THE IG PRODUCT RANGE www.iglintels.com BETTER BY DESIGN IG produce the UK s largest range of steel lintels backed by industry leading
More informationSection 2.3. Flat Roofs. Warm deck single ply membrane. Warm deck single ply membrane. Warm deck built-up felt/ mastic asphalt. Protected membrane
Section Flat Roofs Warm deck single ply membrane Product: Rocksilk Krimpact Flat Roof Slab Fl01 Warm deck single ply membrane Product: Polyfoam ECO Roofboard Fl02 Warm deck built-up felt/ mastic asphalt
More information