1 Pragmatic use of COBie As-Built BIM for FM Education City (EC) Infrastructure projects. Qatar Foundation / ASTAD 1

2 Table of Contents. 1. Projects Overview of Education City Infrastructure 2. Project Handover and Problems for QF FM Starting a project with the end in mind. Why handover documents in EC projects should not be done only in a traditional mode. 3. ASTAD Solutions: As-Built BIM Documents (incl. COBie) for Handover Deliverables. QF/ASTAD As-Built/COBie requirements. 4. Pragmatic integration of As-Built BIM documents (incl. COBie) for Education City Infrastructure Projects. Understanding BIM data type & flow on project lifecycle. COBie Responsibility Matrix in EC Projects Requirements adaptation by project cases. 5. Future Additional steps to be implemented. Qatar Foundation / ASTAD 2

3 About ASTAD. History: Formerly known as the QP Onshore Engineering Department Special Projects Division and in collaboration with Contract, Planning, Cost and other Support Departments within QP, have delivered high profile prominent Buildings and Facilities in Qatar since Majority of the projects were delivered to QATAR FOUNDATION (QF) which became the major client. In 2008, both entities decided to form strategic partnership and establish ASTAD PROJECT MANAGEMENT. + QP/QF JV Since the beginning of Education City 2001, ASTAD (previously QP Onshore Engineering Department) is involved in the project Management & Construction Management of the extreme majority of all EC projects. Some of ASTAD Clients SUPREME EDUCATION COUNCIL 3

4 1. Projects Overview of Education City Infrastructure EC is 1750 Hectares campus. Infrastructure Projects (North & South): North Utilities Tunnel 4.7 KM. South Utilities Tunnel 8.7 KM. People Mover System 11.6 KM tracks/ 4 Stations 20 Stops/ 1 depot. 4 Main Car Parking Buildings for 11,000 cars. Electrical Substations total connected load 800 MVA. 7 Central Plants (District Cooling & Potable Water) Roads. 4

5 2. Project Handover and Problems for QF FM Starting a project with the end in mind. Qatar Foundation as Owner, created QF FM to maintain & operate all facilities at inception of Education City in QF CPD doesn t look only at how buildings are designed, QF CPD + QF FM wants to see and plan how buildings will be Operated and Maintained. QF FM Main Objectives are; Safe operations, Sustainable & Comfortable Environment. World class FM service levels. Cost Efficiency. requires preventive maintenance Study for American Market NIST report 2004, $1 $10 $100 Design Phase Construction Phase Operating Phase 5

6 2. Project Handover and Problems for QF FM Why handover documents in EC projects should NOT be done any more ONLY in a Traditional mode. Recurring issues of handover documents that challenge QF FM Quality services: All Handover Data & Documents are poorly structured. Traditional 2D As-Built documents are very often wrong. proper QA/QC is almost impossible QF FM are using ArchiBus18.2 for CAFM, but the As-Built Data entry into ArchiBus is Time & Staff consuming. Training in time QF FM Staff in understanding their complex and extensive Buildings is difficult with 2D documents Only Operating & Maintenance Manuals - 2D AsBuilt Drawing - Close out report - Warranties. - Spare parts lists, 6

7 2. ASTAD Solutions: As-Built BIM documents (incl. COBie) for Handover Deliverables Consequences to QF FM services of inappropriate As-Built Docs and process. Time lost to find information & documents. Information reliability is still not guaranteed. Safety issues dues to the wrong information. Hidden Cost impact on cumbersome data & documents Lack of asset scheduling reliability Catastrophic chain of events due to wrong information during accident or components failure. ASTAD Solutions for Handover deliverables Well structured, Consolidated data capture for handover (Cobie2.4). Streamlining the process of data entry in CAFM platform (use of COBie*2.4 fully interoperable with ArchiBus 18.2). Accurate recoding & user friendliness of the As-Built information (As-Built BIM Models including 3D laser scanning). Offering QF FM a tools to challenge QA/QC of the contractor provided handover documents (training of QF FM Staff). QF CPD requested ASTAD to find solutions! (Sept 2011) All Handover Deliverables documents shall be one unique dataset, collected and recorded during the project lifecycle with specific standards and technologies. Images credit BIMForum *COBie: Construction Operations Building Information Exchange. 7

8 2. ASTAD Solutions: As-Built BIM documents (incl. COBie) for Handover Deliverables QF/ASTAD developed As-Built BIM (Including Cobie) requirements to be part of Handover/Closeout deliverables to assure accurate and consolidated data captured by all (AEC, specially Contractor) stakeholders during project life cycle. Critical Infrastructure projects in Education City were the 1st implementation step. COBie V2.4 The Integration of COBie in BIM Lifecycle, streamline the process of data records and assure a Consolidated & well Connected dataset. as the specification/ standard requirements for Handover deliverables information. As-Built BIM Model based (ideally) on 3D Laser Scanning as a process to record the real situation on field and to consolidate data in interactive 3D environment. Images credit EcoDomus P Situation On field 3D Laser Scan (points Cloud) Augmented /Conversion to BIM 8

9 BIM Data flow 4. Pragmatic integration of As-Built BIM documents (incl. COBie) for Education City Infrastructure projects. 4.1 Understanding BIM data type & dataflow on project lifecycle Design B/T Construction Cx/ Handover Operation BIM Requirements Overview in QF/ASTAD projects All phases Attch20 SOS Design BIM Attch23. SOW Construction (Ex) BIM Attch25. SOW As-Built BIM BIM /COBie Data type & dataflow in project lifecycle Design Construction Cx/Handover Operating AE GC GC/C Owner/FM Attributes data Sample of BIM data on component Graphical data & Geometry 9

10 BIM Data flow 4. Pragmatic integration of As-Built BIM documents (incl. COBie) for Education City Infrastructure projects. 4.2 General (theoretical/ Ideal) COBie Responsibility Matrix in Project lifecycle. Company POC Name owner O designer consultant prime contractor A E1; E2; C1, C2, Cn GC1 Owner O&M Champion FM/O&M Data Integrator sub contractor A sub contractor B SC1, SC2, Sca, SCb, commissioning Cx not used or n/a - Deliverable to Owner Design Construction Com/Hand Operating AE GC Cx Owner/FM Worksheet -> Attribute Facility Floor Space Document Type Component Spare Column 1 Name Name Name Name Name Name Name Name 2 CreatedBy CreatedBy CreatedBy CreatedBy CreatedBy CreatedBy CreatedBy CreatedBy 3 CreatedOn CreatedOn CreatedOn CreatedOn CreatedOn CreatedOn CreatedOn CreatedOn 4 Category Category Category Category Category Category TypeName Category 5 SheetName ProjectName ExtSystem FloorName ApprovalBy Description Space TypeName 6 RowName SiteName ExtObject Description Stage AssetType Description Suppliers 7 Value LinearUnits ExtIdentifier ExtSystem SheetName Manufacturer ExtSystem ExtSystem 8 Unit AreaUnits Description ExtObject RowName ModelNumber ExtObject ExtObject 9 ExtSystem VolumeUnits Elevation ExtIdentifier Directory WarrantyGuarantorParts ExtIdentifier ExtIdentifier 10 ExtIdentifier CurrencyUnit Height RoomTag File WarrantyDurationParts SerialNumber Description 11 Description AreaMeasurement UsableHeight WarrantyGuarantorLabor InstallationDate SetNumber 10

11 4. Pragmatic integration of As-Built BIM documents (incl. COBie) for Education City Infrastructure projects. 4.3 COBie Responsibility Matrix in Education City Projects (Data Collection & Responsibility) Deliverable to Owner 11

12 CASE1 CASE2 CASE3 CASE4 4. Pragmatic integration of As-Built BIM documents (incl. COBie) for Education City Infrastructure projects. 4.4 EC has several projects running in different phases. Pragmatic integration of As- Built BIM Model & COBie requirements are adapted as per Projects cases. As-Built BIM Requirements Attch25 Design B/T Construction Cx Handover Operation Attch25. Planning (preparation) period of the SOW As-Built BIM Project cases as per: SOW writing Status, Tendering Progress or Construction Progress Under Design CASE 1 10% 30% Early const CASE2 Project under Construction CASE3 Project Under Commissioning or Operation CASE 4 As-Built BIM Deliverable Requirements depending on Project cases. Del.0 Method Statement (As-Built BIM Manual) Del.1 COBie2.4 Fully Integrated in As-Build BIM and linked to deliverable data Del.2 COBie2.4 NOT Integrated in As-Build BIM Del.5 As-Built BIM model as per Execution BIM (Attch23) requirements. 3D laser Scan during construction. Del.6, 7 &8 As-Built BIM from 3D laser Scan & 2D As-Built Drawing of the existing facility. Del.9 Configuration of BIM Model & Full Integration of Handover documents (BIM/COBie Full Linkage). Del hours Training of Client (FM team) on usage of GC delivered As-Built BIM Documents. 12

13 4. Pragmatic integration of As-Built BIM documents (incl. COBie) for Education City Infrastructure projects. 4.6 few Highlights of QF/ASTAD Requirements & Policy for As-Built BIM documents Attch25. MEP Assets are the priority and key MEP items are listed. QF FM Coding Protocol are integrated to COBie in the early stage. COBie Data input (when Design BIM is required) is not requested in the design stage in QF/ASTAD projects, except Room/Spaces schedules. COBie data responsibility matrix must be clear in As-Built BIM method statement between the GC & his sub-contractors or any other 3 rd Party BIM Consultant. As-Built BIM Requirements (Few highlights). COBie Data is fully linked to As-Built BIM Model but can be also use completely separately from As-Built BIM Model. 13

14 5. Future Additional steps to be implemented. Target date of implementation of those future steps TBD. Integrating As-Built BIM/COBie in 3D CAFM platform to promote upgrade of current CAFM version (ArchiBus18.2) and assure direct link to BIM Handover deliverables. (Target dates TBD) CAFM platform linkage to other systems as, SCADA/Building Automation System (BAS), Electronic Management Systems EMS (Target dates TBD) Linking the CAFM database and As-Built BIM Models to Field BIM solution and QR bar-coding for commissioning, Operating and maintenance. (Target dates TBD) Integration of all available and future As-Built BIM data into future EC Command Control Center Dataset. (Target dates TBD) 14

15 If you do what you always did, you will get what you always got." Albert Einstein ( ) THANK YOU 15

Building the Asset Information Model

Building the Asset Information Model Building the Asset Information Model BIM: Let s Get Started Contractors Survey https://www.surveymonkey.com/s/nfbbim Hypothesis: Government as a client can derive significant improvements in cost, value

More information

(BIM) Guidelines version 1.6

(BIM) Guidelines version 1.6 Table of Contents University of Southern California Building Information Modeling (BIM) Guidelines Building Information Modeling (BIM) Guidelines version 1.6 For Design Bid Build Contracts USC Capital

More information

Cross-discipline design deliverables for BIM Phase 1 report Strategy Document

Cross-discipline design deliverables for BIM Phase 1 report Strategy Document Phase 1 report Strategy Document David Churcher, Hitherwood Consulting Mervyn Richards, MR1 Consulting Page 1 of 49 Contents 1 Introduction... 3 1.1 BIS BIM Strategy Paper... 3 1.2 Purpose of this document

More information

BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi

BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value Professor Mustafa Alshawi Improving Project Performance Current Project Portfolio 1.83 B UAED ($500M) Award Winning

More information

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 Section 1: General 1.0 Alignment with Organizational Vision In the space provided below, read

More information

Collaborative Project Management Made Simple

Collaborative Project Management Made Simple Collaborative Project Management Made Simple Construction businesses in the building, energy, and infrastructure sectors find Viewpoint For Projects to be an ideal fit. That s because all team members

More information

FR309 EMERGING APPLICATIONS OF BIM TO FACILITIES MANAGEMENT: WHAT ARCHITECTS NEED TO KNOW ABOUT CONNECTING DESIGN AND OPERATIONS

FR309 EMERGING APPLICATIONS OF BIM TO FACILITIES MANAGEMENT: WHAT ARCHITECTS NEED TO KNOW ABOUT CONNECTING DESIGN AND OPERATIONS FR309 EMERGING APPLICATIONS OF BIM TO FACILITIES MANAGEMENT: WHAT ARCHITECTS NEED TO KNOW ABOUT CONNECTING DESIGN AND OPERATIONS 5/18/2012, 4:00:00 PM 5:30:00 PM 1.50 LU HSW Program Description The application

More information

Getting to a Facility Management BIM

Getting to a Facility Management BIM Getting to a Facility Management BIM By: Duane Gleason Lake Constance 5D-Conference 2013 Constance, 28th-29th of October Introduction The evolution of building information modeling (BIM) has been very

More information

BUILDING A STRATEGY FOR BIM

BUILDING A STRATEGY FOR BIM BUILDING A STRATEGY FOR BIM A Roadmap for Clients Graham Jones Chair, Davis Langdon BIM Steering Group Building a Strategy for BIM: A roadmap for Clients Introduction Conditions for Success Why? What How?

More information

SLC Standards Leadership Council

SLC Standards Leadership Council SLC Standards Leadership Council Putting the Focus on Facilities Asset Lifecycle Grant Hartwright 2015-03-19 Copyright 2015 Noah Consulting LLC. All Rights Reserved. Page 1 Putting the Focus on Facilities

More information

Evolution of Information Management & Strategies for Tomorrow

Evolution of Information Management & Strategies for Tomorrow Houston, 2 June 2010 Evolution of Information Management & Strategies for Tomorrow Stephen Airey MBA in Project Management (Cranfield), Chartered Engineer Today s Agenda Information Management What is

More information

Energy Design Resources Commissioning Plan Outline Template

Energy Design Resources Commissioning Plan Outline Template IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

Legal, Contractual Considerations with BIM 360 Review

Legal, Contractual Considerations with BIM 360 Review PAK/902/11 February 2016 Rev02 Philip King, Hilson Moran CIBSE BIM Steering Group - 360 Review Legal, Contractual Considerations with BIM 360 Review BIM is now extensively used in the design, construction

More information

How To Design A Bim Project

How To Design A Bim Project BIM Virtual Construction & Integrated Project Delivery Randy LaNear BIM Manager Barnhart - Heery Synonyms & Related Terms Integrated Practice Integrated Project Delivery Virtual Building (Environment)

More information

Construction automation and productivity - Industry perspective

Construction automation and productivity - Industry perspective Construction automation and productivity - Industry perspective Vice President R&D, Ilkka Romo Skanska Oy 22.1.2013 1 22.1.2013 Ilkka Romo Skanska in short One of the world s leading companies in construction

More information

CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.

CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy. CPIx on Line Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: March 2013 Revision: R1 Status: Published

More information

BIM Strategy for NHSScotland

BIM Strategy for NHSScotland BIM Strategy for NHSScotland Professor Bimal Kumar and Graham Hayne GCU BIM Partnership School of Engineering and Built Environment Glasgow Caledonian University Agenda Introduction to BIM GCU BIM Partnership

More information

LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE. A presentation on the UK experience By Karen Gough, Barrister

LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE. A presentation on the UK experience By Karen Gough, Barrister LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE A presentation on the UK experience By Karen Gough, Barrister 1 1 BUILDING INFORMATION What is BIM? MODELLING essentially value

More information

UTMB Jennie Sealy Hospital Project Team The Transition from Construction to Maintenance

UTMB Jennie Sealy Hospital Project Team The Transition from Construction to Maintenance Transition from Construction to Maintenance: A Case Study of Building a Survey Ready Hospital University of Texas Medical Branch (UTMB), Galveston, Texas 30 March 2015 Project Team A Case Study of Building

More information

Createmaster Ltd, 44-48 Paul Street, London EC2A 4LB

Createmaster Ltd, 44-48 Paul Street, London EC2A 4LB Createmaster foster a relationship approach with all clients, project teams, suppliers and employees in the belief that it is people that matter and can make a difference between a successful and unsuccessful

More information

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow

More information

SURVEY. and the Digital Plan of Works. Guidance from

SURVEY. and the Digital Plan of Works. Guidance from SURVEY and the Digital Plan of Works Guidance from Survey4BIM Survey4BIM is a cross-industry group open to all organisations involved in the survey, collection, management, processing and delivery of geospatial

More information

What s New in Autodesk Revit 2014

What s New in Autodesk Revit 2014 Building Design Suite 2014 What s New in Revit 2014 * Revit 2014 software is only available as part of the Building Design Suite 2014 Premium and Ultimate Editions. New & Enhanced Features Platform & For

More information

BIMCloud: A Distributed Cloud-based Social BIM Framework for Project Collaboration

BIMCloud: A Distributed Cloud-based Social BIM Framework for Project Collaboration 41 BIMCloud: A Distributed Cloud-based Social BIM Framework for Project Collaboration Moumita Das 1, Jack C. P. Cheng 1, Srinath Shiv Kumar 1 1 Department of Civil and Environmental Engineering, The Hong

More information

BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W

BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W Insanity: doing the same thing over and over again and expecting

More information

BIM An Introduction. 16 th April 2012 Engineers Ireland

BIM An Introduction. 16 th April 2012 Engineers Ireland BIM An Introduction 16 th April 2012 Engineers Ireland Agenda Brian Lahiff - Introduction James Duggan - Civil John Casey - Structural Michael Downey - MEP BIM An Introduction Brian Lahiff Thomas Garland

More information

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan STATE OF MINNESOTA BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan January 2014 TABLE OF CONTENTS GENERAL INFORMATION BUILDING INFORMATION MODELING (BIM)... 1 PURPOSE OF

More information

Foreword. Version 1.0 27.03.2012 Parties to the COBIM project

Foreword. Version 1.0 27.03.2012 Parties to the COBIM project Series 12 author Insinööritoimisto Olof Granlund Oy: Markku Jokela, Tuomas Laine, Reijo Hänninen Foreword The publication series Common BIM 2012 is the result of a broadbased development project entitled

More information

Getting Started with BIM (Building Information Modeling)

Getting Started with BIM (Building Information Modeling) Getting Started with BIM (Building Information Modeling) Curt Egli Synergis Building Solutions Engineer Session Summary This session will walk you through issues you should consider when strategizing,

More information

Industry Solutions Construction Project Collaboration and Document Control Solutions for the Construction Sector

Industry Solutions Construction Project Collaboration and Document Control Solutions for the Construction Sector Industry Solutions Project Collaboration and Document Control Solutions for the Sector Industry Solutions McLaren Software Setting Standards New Opportunities, New Challenges Whether it be architects,

More information

OPTIONAL IMAGE OR RENDERING OF BUILDING OR SITE

OPTIONAL IMAGE OR RENDERING OF BUILDING OR SITE OPTIONAL IMAGE OR RENDERING OF BUILDING OR SITE MIT BIM Execution Plan v3.2 2 MIT Project Name MIT Project Number DEVELOPED IN COLLABORATION WITH Construction Company Architect AND Engineer MIT BIM Execution

More information

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline

Cx for Enhanced Healthcare Project Delivery. Presentation Format. Project features and timeline Cx for Enhanced Healthcare Project Delivery Rick Staley Sr. Construction Manager PH&S Joe Webb Construction Manager PH&S Richard Beam Director, Energy Management Services PH&S Todd McGuire, PE - Sr. Project

More information

Visual Asset Management: An owner s perspective on data driven. Asset Lifecycle Management

Visual Asset Management: An owner s perspective on data driven. Asset Lifecycle Management CFI, a Newmark Grubb Knight Frank company Visual Asset Management: An owner s perspective on data driven ` Asset Lifecycle Management A snapshot from NYP s journey to leverage Space and Asset Information,

More information

Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC

Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC 2013 Many building owners and facility managers lack good documentation for their automation control

More information

Incorporating BIM into Facilities Management

Incorporating BIM into Facilities Management Incorporating BIM into Facilities Management Greg Alevras, VP of Business Development, North America Sam Arabia CM-BIM, Director, Torcon Facilities Solutions Meet Our Presenter(s): Greg Alevras - ARCHIBUS

More information

Building Information Modeling Management To Facility Management

Building Information Modeling Management To Facility Management To Building Information Modeling Management To Facility Management I: INTRODUCTION - aaecs Team Thomas J. Jeff Prine, CCM, LEED AP COO Program / Facility Management Specialist Bonnie K. Gorman, Assoc.

More information

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Florian Aalami CEO ADAPT Corporation florian@adaptsoft.com What is BIM? The ability to model

More information

Fusion Procurement Implementation at Qatar Cool, Qatar

Fusion Procurement Implementation at Qatar Cool, Qatar Fusion Procurement Implementation at Qatar Cool, Qatar Qatar Cool is a leading commercial provider of district cooling services in Qatar, with a fully paid share capital of 330 million Qatari Riyals. Qatar

More information

Mobile 2D Barcode/BIM-based Facilities Maintaining Management System

Mobile 2D Barcode/BIM-based Facilities Maintaining Management System Mobile 2D Barcode/BIM-based Facilities Maintaining Management System Yu-Cheng Lin, Yu-Chih Su, Yen-Pei Chen Department of Civil Engineering, National Taipei University of Technology, No.1.Chung-Hsiao E.

More information

AVEVA NET Accesses and Manages the Digital Asset. Executive Overview... 3. Project Risk: Inaccessible, Unreliable Information... 4

AVEVA NET Accesses and Manages the Digital Asset. Executive Overview... 3. Project Risk: Inaccessible, Unreliable Information... 4 ARC WHITE PAPER By ARC Advisory Group JUNE 18, 2013 AVEVA NET Accesses and Manages the Digital Asset Executive Overview... 3 Project Risk: Inaccessible, Unreliable Information... 4 AVEVA NET Focuses on

More information

BIM for Interior Designers BIM IN PRACTICE

BIM for Interior Designers BIM IN PRACTICE 8 BIM for Interior Designers BIM IN PRACTICE 8 BIM for Interior Designers Contributors: Julia Allen, Geyer Dominik Holzer, AEC Connect Edited by Belinda Hodkinson, SKM BIM utreach 1 Educating Clients -

More information

The importance of the I in BIM

The importance of the I in BIM The importance of the I in BIM By Dr Stephen Hamil Director of Design and Innovation and Head of Building Information Modelling at NBS Building Information Modelling (BIM) is here to stay. However, which

More information

Bentley Systems Launches AssetWise Initiative for Operating and Sustaining Infrastructure Assets

Bentley Systems Launches AssetWise Initiative for Operating and Sustaining Infrastructure Assets ARC VIEW MARCH 19, 2010 Bentley Systems Launches AssetWise Initiative for Operating and Sustaining Infrastructure Assets By Tom Fiske and Russ Novak Summary As more and more owner-operators shift their

More information

McLaren FusionLive. Comprehensive SaaS Solution for Construction Document Project Collaboration

McLaren FusionLive. Comprehensive SaaS Solution for Construction Document Project Collaboration McLaren FusionLive Comprehensive SaaS Solution for Construction Document Project Collaboration Trusted Solutions From rail infrastructure to office blocks, McLaren assures construction project delivery

More information

BIM and Facilities Management

BIM and Facilities Management AUTODESK WHITEPAPER BIM and Facilities Management Building information modeling (BIM) is changing the way buildings are designed and constructed but is it changing how they re operated and maintained?

More information

CAFM Explorer. The complete facilities management software solution

CAFM Explorer. The complete facilities management software solution CAFM Explorer The complete management software solution Trusted Solutions From office blocks to hospitals, CAFM Explorer supports those responsible for maintaining facility operations with the tools to

More information

Engineering Data Lifecycle Management Overview

Engineering Data Lifecycle Management Overview Lifecycle Management Overview Ron Brennan, Chemicals and Petroleum Industry Consultant, IBM NRSC Perth 13/10/2011 Handover Overview The Handover Dilemma The Case for Smarter Management Scope of Lifecycle

More information

GRAPHISOFT ArchiCAD and COBie2. How to Prepare your ArchiCAD 17 Project for COBie2 Documentation

GRAPHISOFT ArchiCAD and COBie2. How to Prepare your ArchiCAD 17 Project for COBie2 Documentation GRAPHISOFT ArchiCAD and COBie2 How to Prepare your ArchiCAD 17 Project for COBie2 Documentation GRAPHISOFT Visit the GRAPHISOFT website at http://www.graphisoft.com for local distributor and product availability

More information

CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1.

CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1. CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects CCSFBIMS Version 1.0 Prepared by: CCSF Facilities Planning & Construction (FPC) Department

More information

d e n v e r a r t m u s e u m

d e n v e r a r t m u s e u m d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition

More information

Using BIM In HVAC Design

Using BIM In HVAC Design This article was published in ASHRAE Journal, June 2010. Copyright 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be

More information

Execution and Control

Execution and Control Project Lifecycle Proposal and Initiation Design and Appraisal Execution and Control Finalisation & Follow-up Operation Project Excellence Operational Excellence PLAN Inputs Process Outputs Feedback &

More information

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs. BIM for plumbing design The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs. BY JUNCHENG (JAMES) YANG, PE, CPD, LEED

More information

AI for Smart Cities. XIII Conference of the Italian Association for Artificial Intelligence Turin (Italy), December 4-6, 2013

AI for Smart Cities. XIII Conference of the Italian Association for Artificial Intelligence Turin (Italy), December 4-6, 2013 AI for Smart Cities XIII Conference of the Italian Association for Artificial Intelligence Turin (Italy), December 4-6, 2013 Enel Engineering and Research Sandra Scalari Enel is a global integrated energy

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

BIM Implementation Strategies

BIM Implementation Strategies BIM Implementation Strategies Howard Ashcraft Senior Partner Hanson Bridgett Dennis R. Shelden, Ph.D. Chief Technology Officer Gehry Technologies Who we are Dennis R. Shelden, Ph.D., Chief Technology Officer

More information

WHITE PAPER. From Building Information Management to Facilities Management

WHITE PAPER. From Building Information Management to Facilities Management October 2011 WHITE PAPER. Management to Facilities Management A look at the benefits to be found by fostering the links between Building Information Modelling (used by the construction industry) and Computer

More information

From 3D Laser Scanning to Revit. Processes, Products and Questions

From 3D Laser Scanning to Revit. Processes, Products and Questions From 3D Laser Scanning to Revit Processes, Products and Questions Topics Scanning Overview Recommended Processes Best Practices Up-front questions to ask Tools and Technologies, including the new Scan

More information

Civil Contractors :Interview case study Industry: Construction

Civil Contractors :Interview case study Industry: Construction BUILDING PROJECT MANAGEMENT SOLUTIONS THE WAY PROJECT MANAGERS THINK Civil Contractors :Interview case study Industry: Construction How would you describe your business? We manage the construction of earthworks,

More information

Agenda. Copyright 2012 2013 Acuity Business Solutions, LLC All Rights Reserved

Agenda. Copyright 2012 2013 Acuity Business Solutions, LLC All Rights Reserved Agenda Understand the reasons your firm purchased Vision analyzing your company s pain points What is an ERP and how is it different? Project Lifecycle Reasons why firms fail at implementation or user

More information

Laser Scanning for an Integrated BIM

Laser Scanning for an Integrated BIM Laser Scanning for an Integrated BIM By: Duane Gleason Lake Constance 5D-Conference 2013 Constance, 28th-29th of October Introduction The application of laser scanning technology has been popular in the

More information

Certificate in Building Information Modelling (BIM) - Project Management

Certificate in Building Information Modelling (BIM) - Project Management Certificate in Building Information Modelling (BIM) - Project Management Duration: 6 Months Distance Learning Programme Language: English RICS Member: 895.00 + VAT Non RICS Member 995.00 + VAT Course Summary

More information

Ramco Cloud for Connected Enterprise RACE

Ramco Cloud for Connected Enterprise RACE Ramco Cloud for Connected Enterprise RACE There is an Ecosystem around every Enterprise Dealers Sub-Dealers Retailers Franchisee Distributors Wholesalers Service Centres Channels Suppliers Manufacturing

More information

Safety Plan Reviews in 3D Christopher Santulli, PE. April 23, 2012 Times Square Marriott Marquis

Safety Plan Reviews in 3D Christopher Santulli, PE. April 23, 2012 Times Square Marriott Marquis Safety Plan Reviews in 3D Christopher Santulli, PE April 23, 2012 Times Square Marriott Marquis Safety Responsibility Building Code 3301.1 Responsibility for safety (abbr.) Nothing in this chapter shall

More information

NiceLabel Designers Version 6.1 Release Notes. Rev-1305

NiceLabel Designers Version 6.1 Release Notes. Rev-1305 NiceLabel Designers Version 6.1 Release Notes Rev-1305 Table of Contents What is New in NiceLabel Software... 3 New in NiceLabel Pro... 3 Wrap text around objects... 3 Color separation of images... 4 Ignore

More information

Office of Facilities Information - Master Plan - General. Office of. Facilities. Information

Office of Facilities Information - Master Plan - General. Office of. Facilities. Information Office of Information - Master Plan - General Facility Inventory GIS Map - Floor Plan - Parking Plan - - - Stillwater - - A&M Colleges - Coordination - Office of Information - Budget & Asset - Risk & Property

More information

2012 CASE STUDY ON QR CODE (2D) BASED ASSET INFORMATION MANAGEMENT SOLUTION (R- AIMS)

2012 CASE STUDY ON QR CODE (2D) BASED ASSET INFORMATION MANAGEMENT SOLUTION (R- AIMS) 2012 CASE STUDY ON QR CODE (2D) BASED ASSET INFORMATION MANAGEMENT SOLUTION (R- AIMS) Uma Ganesh AB Logics Private Ltd 11/15/2012 1 Executive Summary: Asset management is one of the many ways to increase

More information

McLaren CAFM Explorer. Supporting Safe, Efficient and Compliant Facilities

McLaren CAFM Explorer. Supporting Safe, Efficient and Compliant Facilities McLaren CAFM Explorer Supporting Safe, Efficient and Compliant Facilities CAFM Explorer: Applications Help Desk... 4 Work Planner... 5 Cost Control... 6 Asset Tracking... 7 Property Management... 8 Planned

More information

PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT

PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT Anoop Sattenini, Salman Azhar*, and Joseph Thuston McWhorter School of Building Science, Auburn University, Auburn, Alabama,

More information

Revit MEP. Autodesk Navisworks

Revit MEP. Autodesk Navisworks What is BIM? Autodesk BIM is an intelligent model-based process that helps owners and service providers achieve business results by enabling more accurate, accessible, and actionable insight throughout

More information

How To Get A Great Service From Swersey Electric

How To Get A Great Service From Swersey Electric Schneider Electric Datacenter Operation Services This comprehensive set of services for your datacenter infrastructure provides a customized solution. We help you maximize your investment to keep your

More information

ITS specification Handover and commissioning process (ITS-10-01)

ITS specification Handover and commissioning process (ITS-10-01) ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

Enics uses Valor MSS Quality Management to Improve Production Efficiency

Enics uses Valor MSS Quality Management to Improve Production Efficiency uses Valor MSS Quality Management to Improve Production Efficiency, in Turgi, Switzerland, estimates a 15% improvement in efficiency due to Valor MSS Quality Management. The initial application of Valor

More information

Construction layout and scanning solutions for the MEP contractor

Construction layout and scanning solutions for the MEP contractor Middle East Construction layout and scanning solutions for the MEP contractor Trimble Field Solutions Trimble Robotic Total Stations and 3D scanners allow you to both layout your MEP services as designed,

More information

CHALLENGES IN THE IMPLEMENTATION OF BIM FOR FM MANCHESTER TOWN HALL COMPLEX Arto Kiviniemi 1 and Ricardo Codinhoto 2

CHALLENGES IN THE IMPLEMENTATION OF BIM FOR FM MANCHESTER TOWN HALL COMPLEX Arto Kiviniemi 1 and Ricardo Codinhoto 2 CHALLENGES IN THE IMPLEMENTATION OF BIM FOR FM MANCHESTER TOWN HALL COMPLEX Arto Kiviniemi 1 and Ricardo Codinhoto 2 CASE 1 University of Liverpool, School of Architecture, Leverhulme Building, Abercromby

More information

Employer s Information Requirements Version 07 28.02.13. Core Content and Guidance Notes

Employer s Information Requirements Version 07 28.02.13. Core Content and Guidance Notes Employer s Information Requirements Version 07 28.02.13 Core Content and Guidance Notes Employer s Information Requirements - Guidance notes version 07: 28.02.13 Contents 1.0 Employer s Information Requirements

More information

Integrated engineering and operations to increase efficiency in the oil and gas industry

Integrated engineering and operations to increase efficiency in the oil and gas industry siemens.com/comos Integrated engineering and operations to increase efficiency in the oil and gas industry COMOS Making data work. Answers for industry. Foundations for growth Oil and gas still are the

More information

Collaboration & Data Management Overview. Ives Veelaert Technical Sales AEC NE

Collaboration & Data Management Overview. Ives Veelaert Technical Sales AEC NE Collaboration & Data Management Overview Ives Veelaert Technical Sales AEC NE Topics Autodesk Collaboration & Data Management Strategy Autodesk EDM: Solution Overview Enterprise integration with Microsoft

More information

Amazon.com, Inc. and its affiliates. All rights reserved.

Amazon.com, Inc. and its affiliates. All rights reserved. Amazon.com, Inc. and its affiliates. All rights reserved. How Enterprises Use AWS Augment On-Premises resources with cloud capacity Migrate existing apps & data to the cloud Build new apps, sites, services

More information

TRANSFORM THE DATA CENTER E-GUIDE

TRANSFORM THE DATA CENTER E-GUIDE TRANSFORM THE DATA CENTER E-GUIDE 2 Synopsis In this guide 3 For IT organizations in large businesses seeking a greater return on their enterprise storage investments, a transformed data center is a virtual

More information

Manage Deliverables - Construction Step 6. July 12, 2012

Manage Deliverables - Construction Step 6. July 12, 2012 Manage Deliverables - Construction Step 6 July 12, 2012 Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Procurement of Design Team Step 4: Design Step 5: Bid/Procurement

More information

Infor Enterprise Asset Management (EAM)

Infor Enterprise Asset Management (EAM) PROGRESSIVE Infor Enterprise Asset Management (EAM) Joined up thinking dedicated to the oil & gas industry www.progressive-tsl.com Infor Enterprise Asset Management (EAM) Infor Enterprise Asset Management

More information

A Standardized Structure for Defining and Managing BIM Project Deliverables

A Standardized Structure for Defining and Managing BIM Project Deliverables A Standardized Structure for Defining and Managing BIM Project Deliverables Dianne Davis, CSI AEC Infosystems, Inc. CSI- Co-Chair OmniClass Development National BIM Standards North American IDM Coordinator

More information

CONSTRUCTION-OPERATIONS INFORMATION EXCHANGE (COBIE)

CONSTRUCTION-OPERATIONS INFORMATION EXCHANGE (COBIE) CONSTRUCTION-OPERATIONS INFORMATION EXCHANGE (COBIE) spreadsheet demonstration January 2008 14-Jan-08 AGENDA The one thing 2 Spreadsheet design concepts Worksheet groups and data entry 14-Jan-08 AGENDA

More information

INTEGRATING BIM AND GIS FOR ASSET MANAGEMENT

INTEGRATING BIM AND GIS FOR ASSET MANAGEMENT INTEGRATING BIM AND GIS FOR ASSET MANAGEMENT Andy Chan MHKIBIM Project Manager Spatial Technology Limited Agenda Introduction of Asset Management Why GIS is not sufficient for Asset Management Data model

More information

Understand the Concepts of the Internet, Intranet, and Extranet

Understand the Concepts of the Internet, Intranet, and Extranet Understand the Concepts of the Internet, Intranet, and Extranet Lesson Overview In this lesson, you will learn about: The Internet Intranets Extranets VPN Security Zones Firewalls Anticipatory Set: 1.

More information

PROJECT MANAGEMENT INNOVATION BASED ON BUILDING INFORMATION MODELING

PROJECT MANAGEMENT INNOVATION BASED ON BUILDING INFORMATION MODELING PROJECT MANAGEMENT INNOVATION BASED ON BUILDING INFORMATION MODELING CHANGHUA LI Hefei University, Office of Science and Technology, China drch88@aliyun.com LEON PRETORIUS University of Pretoria, Department

More information

ASSET INFORMATION REQUIREMENTS

ASSET INFORMATION REQUIREMENTS ASSET INFORMATION REQUIREMENTS for SuperKTP - Development for Atarii* Developments Ltd *Atarii is the name given to the client team as represented by BIM4SME as part of the #SuperKTP Rev Description Date:

More information

WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN?

WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN? WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN? SPOF THE CONTENT THE AUDIENCE THE FRAMEWORK THE ACCESSIBILITY THE DEVELOPMENT THE UPDATES THE CONTENT Detailed Design Documentation Testing and Commissioning

More information

From COBie to Asset Management

From COBie to Asset Management BIM Prospects Conference: From COBie to Asset Management 27 th March 2015 - RIBA, London Jeff Stephens, Head of BIM jeff.stephens@vinciconstruction.co.uk 1 Experiences creating COBie data for Asset Management

More information

SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT PAGE 6 of 52 SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT Article C.1 Statement of Work This contract is designed to permit the Institutes and Centers (ICs) of NIH, the Department of Health and

More information

Portland. Reducing Software Costs While Increasing Cost Predictability and Control. Abstract. Mikko Marttinen

Portland. Reducing Software Costs While Increasing Cost Predictability and Control. Abstract. Mikko Marttinen White paper Reducing Software Costs While Increasing Cost Predictability and Control Mikko Marttinen Abstract Effective software procurement addresses contractual and overall cost of ownership through

More information

NEC Compliance Management Innovation Use of NEC Contracts and Supporting Systems for MAP Projects

NEC Compliance Management Innovation Use of NEC Contracts and Supporting Systems for MAP Projects NEC Compliance Management Innovation Use of NEC Contracts and Supporting Systems for MAP Projects Introductions James Woods James is the NEC procurement specialist for Meridian Energy and head the MaP

More information

10/06/2015. Studiedag Zee- en waterbouw in en rond Vlaanderen. Ingenieurshuis Antwerpen 4 juni 2015. BIM en SE. dr. ir. Thomas Vandenbergh

10/06/2015. Studiedag Zee- en waterbouw in en rond Vlaanderen. Ingenieurshuis Antwerpen 4 juni 2015. BIM en SE. dr. ir. Thomas Vandenbergh Studiedag Zee- en waterbouw in en rond Vlaanderen Ingenieurshuis Antwerpen 4 juni 2015 BIM en SE dr. ir. Thomas Vandenbergh WHY BIM & SE? 1 Market Evolution Project phase Traditional contracts Integrated

More information

Cloud and Mobile Services as strategic IT components for ROI increase

Cloud and Mobile Services as strategic IT components for ROI increase Cloud and Mobile Services as strategic IT components for ROI increase Dipl.-Ing. Reiner A. Meyer-Rössl ENI Sales Development, O&G Plant AutoCAD is well known 1982... but what about Autodesk? Digital Prototyping

More information

Square Mile Systems Ltd. david.cuthbertson@squaremilesystems.com www.squaremilesystems.com

Square Mile Systems Ltd. david.cuthbertson@squaremilesystems.com www.squaremilesystems.com Webinar Data Center Capacity Management David Cuthbertson, Director Square Mile Systems Ltd david.cuthbertson@squaremilesystems.com www.squaremilesystems.com Capacity Management - Why? 1. Standards have

More information

1.040 Project Management

1.040 Project Management MIT OpenCourseWare http://ocw.mit.edu 1.040 Project Management Spring 2009 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms. Fred Moavenzadeh Spring 2009

More information

Selecting Collaboration Tools from a Win-Win Perspective. Session ID Wednesday, May 2, 1:30 3:00 pm

Selecting Collaboration Tools from a Win-Win Perspective. Session ID Wednesday, May 2, 1:30 3:00 pm Selecting Collaboration Tools from a Win-Win Perspective Session ID Wednesday, May 2, 1:30 3:00 pm This presentation is protected by US and International Copyright laws. Reproduction, distribution, display

More information

Capital Project Closeout. Construction Documentation Requirements

Capital Project Closeout. Construction Documentation Requirements Capital Project Closeout Construction Documentation Requirements Guidelines for Architects, Contractors, and Project Managers For further information about this document contact: HARVARD UNIVERSITY PROPERTY

More information

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy. Senior Project Manager Job Description Reference: 102014/51 Job Title: Senior Project Manager Purpose of Role: The University is committed to providing an environment conducive to high quality teaching

More information