Installation Instruction Manual

Size: px
Start display at page:

Download "Installation Instruction Manual"

Transcription

1 Installation Instruction Manual (Residential Products) G.James Glass & Aluminium Phone: Address: 1084 Kingsford Smith Drive Eagle Farm QLD 4009 Australia

2 Introduction The purpose of this manual is to provide a detailed and comprehensive set of installation instructions for our residential window and door products. Non-compliance Builders and installers who choose not to follow these instructions will take full responsibility for their installation methods in relation to, but not limited to, the following: the ability of the installation to resist all weather elements the long-term weather performance of the installation the ability of the installation to cope with building movement, both structural and material the compatibility of different construction materials including sealants the long term durability and integrity of external seals (degradation of seals can occur after lengthy exposure to the elements and UV rays) Please Note Fixing centres have not been included as these should be engineered on a site-by-site basis and fall within the builder's scope of works. All frame depths have been rounded up to the nearest whole mm, ie. 47.5mm to 48mm and 101.5mm to 102mm.

3 RECOMMENDED WINDOW PAGE 1 BRICK VENEER CONSTRUCTIONS - 48mm FRAMED PRODUCTS BRICKWORK 10mm CLEARANCE MILD STEEL LINTEL 18mm TIMBER REVEAL HEAD FLASHING (BY OTHERS) GOES OVER JAMB FLASHINGS AND WINDOW HEAD SECTION HEAD DETAIL SILL DETAIL MANDATORY 10mm CLEARANCE FRAME SIZE OPENING SIZE = FRAME SIZE + 50mm INSIDE 18mm TIMBER REVEAL SILL BRICK PACKER AS REQUIRED SARKING JAMB STUD OPENING SIZE = FRAME SIZE + 50mm PACKER AS REQUIRED FRAME SIZE SARKING 18mm TIMBER REVEAL 27 INSIDE JAMB FLASHING (BY DOOR SUPPLIER) 48 JAMB DETAIL BRICKWORK

4 RECOMMENDED WINDOW PAGE 2 BRICK VENEER CONSTRUCTIONS - 48mm FRAMED PRODUCTS SQUARE SET WINDOW FRAME HEAD FLASHING (BY OTHERS) GOES OVER JAMB FLASHINGS AND WINDOW HEAD SECTION 10mm CLEARANCE MILD STEEL LINTEL 18mm TIMBER REVEAL HEAD DETAIL CAULKING (BY OTHERS) PLASTERBOARD SET OVER INSIDE SILL DETAIL STOPPING ANGLE ABUTS WINDOW FRAME CORNER BEAD SILL BRICK PACKER AS REQUIRED 18mm TIMBER REVEAL SARKING SET OVER CORNER BEAD PLASTERBOARD JAMB DETAIL PACKER AS REQUIRED STOPPING ANGLE ABUTS WINDOW FRAME SARKING 18mm TIMBER REVEAL CAULKING (BY OTHERS) INSIDE

5 RECOMMENDED WINDOW BRICK VENEER CONSTRUCTIONS - 48mm FRAMED PRODUCTS TYPICAL HEAD SARKING & FLASHING FIXING PAGE 3 BRICKWORK SARKING FIXED TO LINTEL (BY OTHERS) BRICKWORK FLASHING FIXED TO LINTEL (BY OTHERS) TIMBER LINTEL BRICKWORK 10mm CLEARANCE MILD STEEL LINTEL 18mm TIMBER REVEAL HEAD FLASHING (BY OTHERS) GOES OVER JAMB FLASHINGS AND WINDOW HEAD SECTION

6

7 RECOMMENDED WINDOW INSTALLATION DETAILS CLAD SHEET CONSTRUCTIONS - 48mm FRAMED PRODUCTS HEAD / JAMB SEALING DETAIL PAGE 5 CLADDING JAMB FLASHING 18mm TIMBER REVEAL Issue B

8 RECOMMENDED WINDOW PAGE 6 CONCRETE BLOCK CONSTRUCTIONS - 48mm FRAMED PRODUCTS HEAD DETAIL SEALANT (BOTH INSIDE AND ) ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING WINDOW (BY OTHERS) 33 INSIDE FRAME SIZE 48 FIXING SET IN SEALANT AND SEALED OVER HEAD OF FIXING ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING WINDOW (BY OTHERS) X SEALANT AND BACKING ROD (AS REQUIRED) 45 FILL FIXING HOLE WITH SEALANT PRIOR TO INSERTING FIXING. SEALANT MUST OVERFLOW SUFFICIENTLY TO REINSTATE MEMBRANE ENSURE MINIMUM 3mm GAP AT FRONT OF SILL TO ALLOW WINDOW TO VENT AND DRAIN SILL DETAIL FRAME SIZE 27 INSIDE JAMB DETAIL 48 SEALANT (BOTH INSIDE AND ) ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING WINDOW (BY OTHERS)

9 RECOMMENDED WINDOW FORMED CONCRETE CONSTRUCTIONS - 48mm FRAMED PRODUCTS 450Pa. 131 SERIES SILL INSTALLATION PAGE 7 SEAL BETWEEN ANGLE & FRAME APPLIED EXTERNAL FINISH OVER PAINTABLE MEMBRANE TO FINISH AT FRONT EDGE OF SILL. ENSURE THIS AREA IS NOT BLOCKED TO ALLOW FOR WATER RUN-OFF x25x1.6mm FIXING ANGLE SET IN SEALANT & POINTED OFF POP RIVET MUST BE SEALED FIXING SET IN SIKA & THEN SEAL OVER HEAD OF FIXING BED OF SEALANT OPENING TANKED WITH A PAINTABLE MEMBRANE (BY OTHERS) TYPICAL CONCRETE FORMED WINDOW SILL

10

11

12

13

14

15

16 PAGE 14 BRICK VENEER CONSTRUCTIONS - 102mm FRAMED PRODUCTS BRICKWORK 10mm CLEARANCE MILD STEEL LINTEL 18mm TIMBER REVEAL HEAD FLASHING (BY OTHERS) GOES OVER JAMB FLASHINGS AND DOOR HEAD SECTION HEAD DETAIL FILL FIXING HOLE WITH SEALANT PRIOR TO INSERTING FIXING. SEALANT MUST OVERFLOW SUFFICIENTLY TO REINSTATE MEMBRANE 102 SEALANT OVER HEAD OF FIXING 45 FRAME SIZE OPENING SIZE = FRAME SIZE + 30mm SILL DETAIL 45 FLOOR TILE OPENING SIZE = FRAME SIZE + 50mm 30 FRAME SIZE INSIDE PACKER AS REQUIRED SARKING 18mm TIMBER REVEAL 102 JAMB DETAIL JAMB FLASHING (BY DOOR SUPPLIER) BRICKWORK

17

18 INSTALLATION DETAILS CLAD SHEET CONSTRUCTIONS - 102mm FRAMED PRODUCTS HEAD / JAMB SEALING DETAIL PAGE 16 CLADDING SIKAFLEX SEAL BETWEEN TOP OF PROCESSED JAMB SECTION AND HEAD FLASHING. SHEET IS NOTCHED AROUND FLASHING AND FILLET SEALED. FIN CORNER PATCH (SHOWN IN HIDDEN DETAIL BEHIND OUTER CLADDING) ATTACHED WITH SILICONE AND JOINTS FILLET SEALED (BY DOOR MANUFACTURER) JAMB FLASHING 18mm TIMBER REVEAL Issue B

19 PAGE 17 CONCRETE BLOCK CONSTRUCTIONS - 102mm FRAMED PRODUCTS SEALANT (BOTH HEAD DETAIL 45 ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING DOOR (BY OTHERS) FRAME SIZE 102 SEALANT OVER HEAD OF FIXING INSIDE GROUT OR SEALANT AND BACKING ROD ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING DOOR (BY OTHERS) SILL DETAIL 45 FLOOR TILE REBATED CONCRETE SLAB FILL FIXING HOLE WITH SEALANT PRIOR TO INSERTING FIXING. SEALANT MUST OVERFLOW SUFFICIENTLY TO REINSTATE MEMBRANE 30 FRAME SIZE SEALANT OVER HEAD OF FIXING INSIDE VOID MUST BE BETWEEN 3-12mm WIDE GROUT OR SEALANT (BY OTHERS) FLOOR TILE ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING DOOR (BY OTHERS) 45 SEALANT AND BACKING ROD 102 JAMB DETAIL REBATED CONCRETE SLAB WITH WATERPROOF MEMBRANE APPLIE SILL DETAIL FLUSH FLOOR REBATE OPTION SEALANT (BOTH INSIDE AND )

20

21 INSTALLATION DETAILS FIBRE CEMENT CONSTRUCTIONS - 102mm FRAMED PRODUCTS HEAD / JAMB SEALING DETAIL PAGE 19 CLADDING SIKAFLEX SEAL BETWEEN TOP OF PROCESSED JAMB SECTION AND HEAD FLASHING FIN CORNER PATCH ATTACHED WITH SIKAFLEX AND JOINTS FILLET SEALED (BY DOOR MANUFACTURER) JAMB FLASHING 18mm TIMBER REVEAL Issue B

22

23 INSTALLATION DETAILS WEATHER BOARD CLAD WALL CONSTRUCTIONS - 102mm FRAMED PRODUCTS HEAD / JAMB SEALING DETAIL PAGE 21 CLADDING SIKAFLEX SEAL BETWEEN TOP OF PROCESSED JAMB SECTION AND HEAD FLASHING FIN CORNER PATCH ATTACHED WITH SIKAFLEX AND JOINTS FILLET SEALED JAMB FLASHING 18mm TIMBER REVEAL Issue B

24 PAGE 22 CAVITY BRICK CONSTRUCTIONS - 102mm FRAMED PRODUCTS BRICKWORK MILD STEEL LINTEL HEAD FLASHING (BY OTHERS) GOES OVER JAMB FLASHINGS AND DOOR HEAD SECTION MILD STEEL LINTEL SEALANT OPTION TO FIT ANGLE IF BRICK WIRE IS NOT USED HEAD DETAIL FILL FIXING HOLE WITH SEALANT PRIOR TO INSERTING FIXING. SEALANT MUST OVERFLOW SUFFICIENTLY TO REINSTATE MEMBRANE SILL DETAIL FRAME SIZE INSIDE FLOOR TILE BRICKWORK FLASHING BY OTHERS (MANDATORY) FRAME SIZE 30 INSIDE BUILDING-IN TIE JAMB FLASHING (BY OTHERS) BRICKWORK 102 JAMB DETAIL BUILDING-IN TIE

25 PAGE 23 BRICK VENEER CONSTRUCTIONS SERIES 5 TRACK SARKING FIXED TO LINTEL (BY OTHERS) BRICKWORK FLASHING FIXED TO LINTEL (BY OTHERS) HEAD FLASHING (BY OTHERS) GOES OVER JAMB FLASHINGS AND DOOR HEAD SECTION 10mm CLEARANCE INTERNAL LINING ARCHITRAVE MILD STEEL LINTEL HEAD DETAIL 168 SEALANT OVER HEAD OF FIXING 45 FRAME SIZE OPENING SIZE = FRAME SIZE + 30mm INSIDE SILL DETAIL 45 FLOOR TILE TILE FILL FIXING HOLE WITH SEALANT PRIOR TO INSERTING FIXING. SEALANT MUST OVERFLOW SUFFICIENTLY TO REINSTATE MEMBRANE BRICKWORK

26 PAGE 24 PPLICATIONS BRICK VENEER CONSTRUCTIONS SERIES 5 TRACK ARCHITRAVE INSIDE LINING OPENING SIZE = FRAME SIZE + 50mm 30 FRAME SIZE STUD FRAME PACKER AS REQUIRED INSIDE SARKING 18mm TIMBER REVEAL JAMB FLASHING (BY DOOR SUPPLIER) 168 JAMB DETAIL BRICKWORK

27 PAGE 25 CONCRETE BLOCK CONSTRUCTIONS SERIES 5 TRACK ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING DOOR SEALANT (BOTH INSIDE AND ) 45 HEAD DETAIL 168 FRAME SIZE SILL DETAIL SEALANT OVER HEAD OF FIXING 45 FLOOR TILE REBATED CONCRETE SLAB GROUT OR SEALANT AND BACKING ROD

28 PAGE 26 CONCRETE BLOCK CONSTRUCTIONS SERIES 5 TRACK SEALANT OVER HEAD OF FIXING VOID MUST BE BETWEEN 3-12mm WIDE FLOOR TILE 30 FRAME SIZE INSIDE ACRYLIC OR URETHANE BASED WATERPROOF MEMBRANE (TANKING) APPLIED TO OPENING BEFORE FIXING DOOR (BY OTHERS) JAMB DETAIL REBATED CONCRETE SLAB GROUT OR SEALANT AND BACKING ROD SILL DETAIL FLUSH FLOOR REBATE OPTION PACKING AS REQIURED SEALANT (BOTH INSIDE AND )

29 PAGE 27 CLAD SHEET CONSTRUCTIONS SERIES 5 TRACK HEAD FLASHING MINIMUM 75mm HIGH SARKING CLADDING 10mm CLEARANCE 18mm TIMBER REVEAL INTERNAL LINING ARCHITRAVE HEAD DETAIL 168 SEALANT OVER HEAD OF FIXING 45 FRAME SIZE OPENING SIZE = FRAME SIZE + 30mm SILL DETAIL 45 TIMBER DECKING FLOOR TILE

30 PAGE 28 CLAD SHEET CONSTRUCTIONS SERIES 5 TRACK ARCHITRAVE INSIDE LINING OPENING SIZE = FRAME SIZE + 50mm FRAME SIZE 30 INSIDE 18mm TIMBER REVEAL STUD FRAME SARKING PACKER AS REQUIRED CLADDING JAMB FLASHING (BY DOOR SUPPLIER) EXTERNAL SEAL 168 JAMB DETAIL

31 INSTALLATION DETAILS CLAD SHEET CONSTRUCTIONS SERIES 5 TRACK HEAD / JAMB SEALING DETAIL PAGE 29 CLADDING FOLDED METAL FLASHING JAMB FLASHING SARKING

32 PAGE 30 FIBRE CEMENT CONSTRUCTIONS SERIES 5 TRACK SARKING HEAD FLASHING MINIMUM 75mm HIGH HEAD SECTION. (MIN. 100mm WIDER THAN DOOR WIDTH). REFER TO PAGE 32 FOR FLASHING-TO-JAMB SEALING CLADDING 10mm CLEARANCE INTERNAL LINING ARCHITRAVE 168 SEALANT OVER HEAD OF FIXING 45 HEAD DETAIL 45 FRAME SIZE OPENING SIZE = FRAME SIZE + 30mm SILL DETAIL TIMBER DECKING FLOOR TILE

33 PAGE 31 FIBRE CEMENT CONSTRUCTIONS SERIES 5 TRACK APPLICATIONS ARCHITRAVE INSIDE LINING OPENING SIZE = FRAME SIZE + 50mm FRAME SIZE 30 INSIDE STUD FRAME SARKING PACKER AS REQUIRED 18mm TIMBER REVEAL JAMB FLASHING (BY DOOR SUPPLIER) CLADDING DECORATIVE POLYSTYRENE MOULDING (OR SIMILAR) 168 JAMB DETAIL

34 INSTALLATION DETAILS FIBRE CEMENT CONSTRUCTIONS SERIES 5 TRACK HEAD / JAMB SEALING DETAIL PAGE 32 CLADDING SARKING SARKING FOLDED METAL FLASHING JAMB FLASHING

35 PAGE 33 WEATHER BOARD CLAD WALL CONSTRUCTIONS SERIES 5 TRACK CLADDING HEAD FLASHING MINIMUM 75mm HIGH HEAD DETAIL SARKING 10mm CLEARANCE INTERNAL LINING ARCHITRAVE 18mm TIMBER REVEAL 168 SEALANT OVER HEAD OF FIXING 45 FRAME SIZE OPENING SIZE = FRAME SIZE + 30mm SILL DETAIL 45 TIMBER DECKING 19mm FINISHED TIMBER FLOOR 19mm PARTICLE BOARD STRUCTURAL FLOOR SARKING JOIST TYPICAL

36 PAGE 34 WEATHER BOARD CLAD WALL CONSTRUCTIONS SERIES 5 TRACK APPLICATIONS ARCHITRAVE INSIDE LINING OPENING SIZE = FRAME SIZE + 50mm FRAME SIZE 30 INSIDE 18mm TIMBER REVEAL STUD FRAME SARKING PACKER AS REQUIRED JAMB FLASHING (BY DOOR SUPPLIER) 168 JAMB DETAIL

37

38 PAGE 36 CAVITY BRICK CONSTRUCTIONS SERIES 5 TRACK BRICKWORK BRICKWORK HEAD FLASHING (BY OTHERS) GOES OVER JAMB FLASHINGS AND DOOR HEAD SECTION MILD STEEL LINTEL MILD STEEL LINTEL SEALANT SEAL OPTION TO FIT ANGLE IF BRICK WIRE IS NOT USED HEAD DETAIL 168 SEALANT OVER HEAD OF FIXING FRAME SIZE INSIDE SILL DETAIL FLOOR TILE BRICKWORK

39 PAGE 37 CAVITY BRICK CONSTRUCTIONS SERIES 5 TRACK 30 FRAME SIZE INSIDE BUILDING-IN TIE JAMB FLASHING (BY OTHERS) BRICKWORK BUILDING-IN TIE 168 JAMB DETAIL BRICKWORK BRICKWORK

40 FORMED CONCRETE CONSTRUCTIONS - 102mm FRAMED PRODUCTS 245 SERIES SILL WITH SUB-SILL INSTALLATION PAGE 38 SEALANT INTERNAL TILING SEAL OVER HEAD OF FIXING CONCRETE HOB (BY OTHERS). FILLED OVER TO HEIGHT OF TOP HAT CONCRETE SLAB MINIMUM 3mm GAP SLOPE ON TILES TILING WATERPROOFING (BY OTHERS) TOP HAT ( ) 5mm PACKER SILL DETAIL

41 FORMED CONCRETE CONSTRUCTIONS SERIES 5 TRACK 245 SERIES SILL WITH SUB-SILL INSTALLATION PAGE 39 SEALANT INTERNAL TILING CONCRETE HOB (BY OTHERS). FILLED OVER TO HEIGHT OF TOP HAT MINIMUM 3mm GAP SLOPE ON TILES CONCRETE SLAB TILING WATERPROOFING (BY OTHERS) TOP HAT ( ) 8mm PACKER SILL DETAIL

42 FORMED CONCRETE CONSTRUCTIONS - 65mm FRAMED PRODUCTS 165 SERIES SILL WITH SUB-SILL INSTALLATION PAGE 40 SEALANT SEAL OVER HEAD OF FIXING SEAL GAP BETWEEN SUB-SILL AND SLAB mm MINIMUM CLEARANCE WATERPROOFING (BY OTHERS) ROCK COAT TO FINISH SURFACE MUST BE LEFT OPEN FOR VENTILATION CONCRETE SLAB SILL DETAIL

43 FORMED CONCRETE CONSTRUCTIONS - 102mm FRAMED PRODUCTS 477 SERIES INSWING BI-FOLD SILL WITH SUB-SILL INSTALLATION PAGE 41 SEAL OVER HEAD OF FIXING SEALANT INTERNAL TILING CONCRETE HOB (BY OTHERS). FILLED OVER TO HEIGHT OF TOP HAT CONCRETE SLAB MINIMUM 3mm GAP SLOPE ON TILES TILING WATERPROOFING (BY OTHERS) TOP HAT ( ) 5mm PACKER SILL DETAIL

44 FORMED CONCRETE CONSTRUCTIONS - 102mm FRAMED PRODUCTS 477 SERIES OUTSWING BI-FOLD SILL WITH SUB-SILL INSTALLATION PAGE 42 SEALANT SEAL OVER HEAD OF FIXING INTERNAL TILING CONCRETE HOB (BY OTHERS). FILLED OVER TO HEIGHT OF TOP HAT CONCRETE SLAB MINIMUM 3mm GAP SLOPE ON TILES TILING WATERPROOFING (BY OTHERS) TOP HAT ( ) 5mm PACKER SILL DETAIL

Installation Window Building In Details

Installation Window Building In Details Installation Window Building In Details INSTALLATION Photo courtesy of Rowe Aluminium DATE: NOVEMBER 2009 REPLACES: AUGUST 2003 INSTALLATION Installation Replaces: Scale: NOT TO SCALE Vantage snap-on couplers

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step

More information

TECHNICAL MANUAL. airlite.com.au

TECHNICAL MANUAL. airlite.com.au PAGE Awning Windows 1 Casement Windows 7 Double Hung Windows 14 Sliding Windows 21 Sliding Doors 28 Bi-fold Doors 38 Hinged Doors 45 Stacking Doors 54 airlite.com.au AWNING WINDOWS Building In brick veneer

More information

Installation An Industry Guide to the Correct Installation of Windows and Doors

Installation An Industry Guide to the Correct Installation of Windows and Doors An Industry Guide to the Correct of Windows and Doors Background Foreword The Australian Window Association is pleased to produce this Industry Guide for the of Windows and Doors as part of its commitment

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

Residential Inspection Guidelines

Residential Inspection Guidelines Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against

More information

Melbourne balcony Assessments

Melbourne balcony Assessments Balcony Assessment Melbourne balcony Assessments Address: SAMPLE Date: Assessor: Luke O Neill Registered Builder DBL-C 31305 Assessment Guidelines This is an assessment of balcony and elements as presented

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

0331 Brick and block construction

0331 Brick and block construction 0331 BRICK AND BLOCK CONSTRUCTION This worksection has been written for Class 1 and 10a buildings that fully conform to the scope of AS 4773.1. If the works include isolated structures, (totally separate

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated) (Fixed Lite Window Illustrated) SINGLE LEAF CLADDING / CORRUGATED STEEL (Awning Window Illustrated) SINGLE LEAF CLADDING / FOAM BOARD (Casement Window Illustrated) BRICK VENEER CONSTRUCTION (Horizontal

More information

Barewood Octagon and Elongated Windows Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and

More information

Wet Area Construction. Carpentry - Residential Construction. Product Code: 5603

Wet Area Construction. Carpentry - Residential Construction. Product Code: 5603 E PL SA M Wet Area Construction Carpentry - Residential Construction Product Code: 5603 Publishing details: Second Edition 2012 TAFE NSW Training and Education Support, Industry Skills Unit Orange and

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES Building and Construction Industry A joint industry initiative produced by BSA Supershow logo.indd 1 30/01/2008 9:43:29 AM EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES FAILING WATERPROOFING

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation Scope of works Name Job# TBA -1 Address Date Suburb P. code Phone H BH 0 Mobile E-mail Project: Bathroom Renovation.01 Demolition Strip out and remove from site: All existing fixtures, fittings and cabinets

More information

How-To-build guide timber windows

How-To-build guide timber windows How-To-build guide timber windows What you can build using this guide This guide shows you how to install a factory-made timber casement window into a house with a weatherboard cladding. Casement windows

More information

Series 456 Commercial Awning Window

Series 456 Commercial Awning Window Commercial Awning Window COMMERCIAL SERIES Photo courtesy of Hanlon Windows Australia DATE: MAY 2013 REPLACES: MARCH 2008 COMMERCIAL SERIES KEY FEATURES/PERFORMANCE CHARACTERISTICS Scale: not to scale

More information

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection PB301 July 2009 Lightweight Building Solutions Bushfire Protection www.boral.com.au/bushfireprotection Attached or adjacent within 6m roofed structures such as garages, carports, verandas and the like,

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 2mm MIN GAP IN SHEATHING STEP 1 PLACE 100mm X 100mm PIECE OF P&S IN CORNER SO THAT IT IS 38mm INTO THE OPENING EACH WAY

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11

More information

Sports Buildings: budget costs for the Flood Relief Fund

Sports Buildings: budget costs for the Flood Relief Fund Sports Buildings: budget costs for the Flood Relief Fund The list below provides typical costs for flood insurance works, typically required by sports clubs or facilities. The list is not exhaustive but

More information

How to build a Pizza Oven in 4 days

How to build a Pizza Oven in 4 days How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY

More information

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri Determination 2009/103 The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri 1. The matters to be determined 1.1 This is a determination under Part 3 Subpart 1 of the

More information

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP CONTENTS WHAT IS RISING DAMP STEP 1 SURVEY STEP 2 METER READINGS STEP 3 CONCLUSION STEP 4 PREPARATION FOR TREATMENT STEP 5 TYPE OF TREATMENT STEP 6

More information

ISSUE 2. Installation Guide

ISSUE 2. Installation Guide ISSUE 2 Installation Guide Here at Slide and Fold, we LOVE our Bi-Fold Plus range of folding-sliding doors. We want to ensure that your customers love them too. So we have created a new, detailed installation

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

Technical data sheet PVC Bi-fold doors

Technical data sheet PVC Bi-fold doors Standard Specifications White internally beaded, Deceuninck 3000 series profile 28mm Low-e toughened sealed units with argon gas Open in doors with white handles and hinges Tracks are fitted to the top

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

A GUIDE TO WINDOW AND DOOR SELECTION

A GUIDE TO WINDOW AND DOOR SELECTION Australian window association guide series A GUIDE TO WINDOW AND DOOR SELECTION An industry guide to the selection and certification of windows and doors Background Foreword As part of its commitment to

More information

rationel WINDOWS WITH VISION

rationel WINDOWS WITH VISION Brick / Blockwork 340mm Cavity Wall Interface Detail Cill BW-001A 5 x 50mm Woodscrews (Staggered) By Installer 20 x 90mm Standard Timber Packer With Upstand Bedded To Frame In Silicone By Installer Aluminium

More information

Leaky Homes Financial Assistance Package (FAP) Repair plan example

Leaky Homes Financial Assistance Package (FAP) Repair plan example LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 1 Leaky Homes Financial Assistance Package (FAP) Repair plan example Introduction This repair plan example is intended

More information

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013] FLASHMAN WINDOW AND DOOR FLASHING SYSTEM This Appraisal replaces BRANZ Appraisal No. 573 (2007). Amended 05 February 2016. BRANZ Appraisals Technical Assessments of products for building and construction.

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS NOISE TECHNICAL FACT SHEET FACT SHEET 5 SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS The sound insulation of exterior walls and roof-ceiling systems refers to their ability to reduce external

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

FC:533 CONSTRUCTAFLOOR WET AREA FLOORING CEMINTEL RESIDENTIAL INTERNAL WET AREA FLOORING SYSTEM

FC:533 CONSTRUCTAFLOOR WET AREA FLOORING CEMINTEL RESIDENTIAL INTERNAL WET AREA FLOORING SYSTEM CEMINTEL CONSTRUCTAFLOOR WET AREA FLOORING FC:533 RESIDENTIAL INTERNAL WET AREA FLOORING SYSTEM MARCH 2015 Constructafloor Wet Area flooring is an advanced, lightweight, fibre cement flooring that offers

More information

Ver. 2. Guide to. Inspecting Residential Brick Veneer

Ver. 2. Guide to. Inspecting Residential Brick Veneer Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

WINDOW INSTALLATION GUIDE

WINDOW INSTALLATION GUIDE WINDOW INSTALLATION GUIDE is not responsible for or liable for any use or misuse of the information contained in this window installation guide. Window Installation Guide This guide provides basic information

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.

More information

Rockwool Flexi Insulation Application Guide

Rockwool Flexi Insulation Application Guide Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed

More information

FC:121 EXTERNAL CLADDING & EAVES LINING CSR CEMINTEL

FC:121 EXTERNAL CLADDING & EAVES LINING CSR CEMINTEL CSR CEMINTEL EXTERNAL CLADDING & EAVES LINING EXTERIOR CLADDING SYSTEM A fast, simple, durable and attractive external cladding system for residential walls, ceilings and eaves. FC:121 SEPTEMBER 2013 2

More information

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls. Improving the flood resistance of your home Advice sheet 4: Flood-resilient walls. This sheet provides guidance on identifying different types of wall, and reducing the flow of floodwater through them

More information

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.

More information

Ubiflex. Non-lead flashing system

Ubiflex. Non-lead flashing system Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Finegan Inspection Services, Inc.

Finegan Inspection Services, Inc. Finegan Inspection Services, Inc. Report Prepared For: Phone 513-683-0733 Fa 513-697-0163 Owners Property Address City, State, ZIP Phone FAX Owners Realtor Realty Company Phone FAX OWNER INFORMATION PROPERTY

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

Information Technology Solutions

Information Technology Solutions Information Technology Solutions Aluminum Sliding Door Assembly Instructions Shield Doors & Windows Bi-fold Door Assembly Instructions For Support Please Call 03 8339 2252 Aluminum Sliding Door Assembly

More information

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST 0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL

More information

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING 6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry

More information

LINE OF EXISTING ADJACENT STRUCTURE 6" MIN. PROTECTION COURSE (NOT REQUIRED WHERE THERE IS NO ADJACENT BLDG. MOISTURE RESISTIVE MEMBRANE AT EXIST. AND NEW BLDG. AS OCCURS WATER STOP SLAB-ON-GRADE TERMINATION

More information

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special)

Tested to BS 6375: Part 1: 1989 and achieved a weathertightness classification of 2000 Pa (Special) THE B6 GLAZING SYSTEM GLAZING SYSTEMS FOR SEPTEMBER 2013 THE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM Page 1 DESCRIPTION The B6 Heel Bead Seal Security Glazing System is suitable for installing all types

More information

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME) Cost Guide < 1 > MARKET SUMMARY OVERVIEW Low interest rates and competitive construction pricing makes now a great time to renovate or build a new home. Interest rates are at historic lows and can be fixed

More information

GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS

GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS CONTENTS Introduction 2 Applications 3 Advantages 3 Components 3 6 Design Considerations 7 8 System Features 10 Typical installation Sequence

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry WELCOME Recommended Window 1.5 credits Minnesota Department of Labor and Industry In accordance with the Department of Labor and Industry s statute 326.0981, Subd. 11, This educational offering is recognized

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes

More information

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE SITEWORKS FOUNDATIONS & SURFACE BED Site to be cleared and leveled. Builder s rubble to be carted away. As per Engineer s design, with USB green waterproofing.

More information

residential concrete detailing and specification guide

residential concrete detailing and specification guide residential concrete detailing and specification guide residential concrete detailing and specification guide preface This technical manual is published by the Cement & Concrete Association of New Zealand

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

FIRE RATED GLAZING System Guide

FIRE RATED GLAZING System Guide SYSTEM GUIDE Issue date: 05-05-2015 Expiry date: 31-12-2016 System Guide Introduction Pyropanel Developments are specialists in fire rated glazing solutions, and our systems are designed for easy installation

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

Contents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37

Contents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37 Contents Pages Full fill cavity walls 2-13 Partial fill cavity walls 14-25 Solid externally insulated walls 26-37 Appendix (BRE confirmation of Ψ and y-values) 38-40 Page 1 of 40 APA Construction Details

More information

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs The better way to build TM Installation Manual EXTERIOR WALL SIPs July 2015 EXTERIOR WALL SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................

More information

Basic Requirements for Residential Plan Review _

Basic Requirements for Residential Plan Review _ Basic Requirements for Residential Plan Review _ Below you will find the basic requirements for your plan submittal. General: Drawn to scale Plan Size minimum: 9 x 12 Designer, Engineer, or Architect name,

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

EXAMPLE BILL OF MATERIALS

EXAMPLE BILL OF MATERIALS EXAMPLE BILL OF MATERIALS COMPONENTS 00.001 YELLOW ENVELOPE PACK 0 1 - LABELLED "ATTENTION BUILDER". [CONSISTS OF :- A3 & A4 PLANS, PLANS CONSTRUCTION MANUAL, BILL-OF-MATERIALS, VARIOUS DETAILS.] 00.002

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES CERTIFICATE OF APPROVAL No CF 5055 This is to certify that, in accordance with TS00 General Requirements for Certification of Fire Protection Products The undermentioned products of 1 st Industrial Area,

More information

Installation Instructions

Installation Instructions Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate

More information

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP for Pretend Customer at: Pretend Customer Site address: Monday, 23 November 2015 Dear Pretend Customer, Subject: Thank you for your valued enquiry and instructions to quote for the above project. We are

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure A M E R I C A N A R C H I T E C T U R A L AAMA 2400-10 Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure M A N U F A C T U

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

IMPORTANT INFORMATION

IMPORTANT INFORMATION Curved Quadrant Instruction Manual CQ IMPORTANT INFORMATION Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according to our guidelines.

More information

Building Regulations for the Conservation of Fuel and Power

Building Regulations for the Conservation of Fuel and Power Insulation CI/SfB Rn7 M2 First Issue April 2014 Building Regulations for the Conservation of Fuel and Power ENGLAND EXISTING DWELLINGS 2013 EDITION Low Energy Low Carbon Buildings Contents Page Introduction

More information

HfHMD uses LP SmartSide siding and trim.

HfHMD uses LP SmartSide siding and trim. HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.

More information

If stepping is required, step at 180mm as seen in this picture.

If stepping is required, step at 180mm as seen in this picture. Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

Installation Instructions

Installation Instructions Installation Instructions One-Piece Deep Wall Sleeve For Use with Packaged Terminal Units Please read these instructions completely before attempting installation. NOTE: Ensure that the unit is only installed

More information

Management Consultancy Training. Asbestos Materials. Residential Guide

Management Consultancy Training. Asbestos Materials. Residential Guide Asbestos Materials Residential Guide This guide highlights some of the more common asbestos containing materials (ACMs) in low occupancy residential buildings, their uses and likely locations. The guide

More information