1 The Fort Edmonton Footbridge Project

2 The Fort Edmonton Footbridge is a signature pedestrian suspension bridge located in SW Edmonton.

3 The Fort Edmonton Footbridge project provides a river crossing and approach trails that further develop the Edmonton s River Valley. Tender Closing July 9, 2008 Construction Sept 6, 2008 to November 10, 2010 Construction Cost - $ 23 M

4 Bridge Details The bridge has three spans, including two 54 m side spans and the 138 m main span. Two continuous main cables support the precast concrete deck panels over the length of the bridge. The cables are anchored in abutments at both ends of the bridge, and are clamped into saddles at the tops of two towers.

5 Project Management Team The City of Edmonton Alberco Ch2MHill

6 Construction Team Erection Engineering & Construction Engineering Support Dialog Caissons AGRA Foundations Soil Anchors Beck Drilling Cast-in-place Concrete Alberco Reinforcing Steel A & H Rebar Bearings & Tower Saddles LCL Bridge Products Steel Tower Legs WF Welding & Overhead Crane Post Tensioning & Cable Anchorage Dywidag Systems International Steel Cable System Bridon International, UK Precast Panels Lafarge North America

7 Project Scope of Work Environmental management. River berm installation and removal. Concrete abutments with post-tensioned soil anchor foundations. Concrete/ Steel Towers with concrete belvederes. Suspension cable & support system. Precast deck panels. Post-tensioning Architectural steel components. Trail construction and landscaping. Environmental compensation.

8 Getting Started

9 Access Roads & Berm Construction - River berms constructed from both sides of river to access both Tower locations

10 Environmental Management - Aqua-Barrier water filled dams & floating silt curtains.

11 Berm footprints were minimized to provide less environmental impact. Berm elevations were approved at the 1:5 year water levels. Rock Rip Rap, concrete topping, and geotextile liner.

12 Tower Construction

13 Tower Foundations - Two belled caissons 2.4m diameter. 12.5m deep with 3.6m bell. Temporary steel casings used for water control.

14 Tower Foundations Caisson Installation

15 Tower Base - Solider pile & lagging shoring for tower base.

16 Tower Base Concrete Formwork & Shoring

17 Tower Columns 1.220m dia. steel pipe with tower head reinforcing cage.

18 Tower Columns - Survey control during erection using laser targets to achieve installation within 10mm tolerance at tower tops.

19 Tower Columns A-symmetrical concrete filled steel tower columns. - Horizontal & diagonal struts to control column positions.

20 Tower Head 53 m3 of cast-in-place post-tensioned concrete elevated 30m from river elevation.

21 Belvedere Construction Concrete Slab, post-tensioned, 100m3 each, elevated 12m.

22 Belvedere Construction Steel Shoring System: beams, H-Pile columns, steel scaffolding.

23 Belvedere Slab Transverse post-tensioning and post-tensioning ducts with anchorage for precast panel system.

24 Abutment Construction concrete raft slab with post-tensioned soil anchors.

25 Abutment Construction Soil Anchors, 60 per abutment, 16-22m depth.

26 Abutment Construction Anchors for suspension cable.

27 Abutment Construction Abutment chamber - 1.3m raft slab, 1.1m thick walls, 0.3m thick roof slab.

28 Abutment Construction Concrete Chamber

29 Abutment Construction Concrete Chamber

30 Suspension Cable - Socket anchor casting by ESCO foundry.

31 Suspension Cable Main cable anchors.

32 Suspension Cable - Tower Saddle radius plate with machined cable groove & matching clamping plate.

33 Suspension Cable Installation Installation of suspended walkway system to allow for winching cable across the river into position.

34 Walkway Installation Fall arrest mock drill

35 Suspension Cable Installation

36 Walkway for Cable Installation

37 Cable Spool & Socket - 255m long, 113mm diameter.

38 Suspension Cable Installation - Winching of Cables on suspended walkways

39 Suspension Cable Installation Winching of cables across tower head.

40 Suspension Cable Installation Winching of Cables on suspended walkways

41 Suspension Cable Installation Winching of Cables on suspended walkways

42 Suspension Cable Installation Cable clamps and hangers installed for precast panel installation.

43 Temporary High Line Precast installation using pulleys & tirfors.

44 Precast Panel Installation Erection sequence & engineering analysis.

45 Precast Panel Installation Remove walkways & install end spans with conventional cranes.

46 Precast Panel Installation Install center span panels with trolley system.

47 Precast Panel Installation Trolley wagon & cable system.

48 Precast Panel Installation Test lift of precast panels using hydraulic tirfors.

49 Precast Panel Installation Load panel on trolley cart, winch cart into position, attach hydraulic tirfors to temporary cables, jack panel into position.

50 Precast Panel Installation Trolley system using highline.

51 Precast Panel Installation Lower high line and hardware onto precast panels

52 Precast Panel Installation Install temporary wind bracing and grout panels

53 Post-Tension Panel System strands in precast panel curbs. Anchored at abutment & belvederes.

54 Damper System 4 vibration dampers (2 per abutment) to control deck movements.

55 Environmental Compensation Installation of 4 rock groynes, downstream of bridge.

56 Aerial View - panels erected.

57 Aerial View Berms removed.

58 Bridge completed!

59 2 years & 2 months to complete. Approx. 513 work days on site. Approx. 57,881 man hours workers during construction peak ( 40 Alberco, Sub-trades)

60 BRIDGE FEATURES Deck elevation looking East. Tower canopy, handrails, LED lighting.

61 BRIDGE FEATURES River Elevation - Looking East

62 BRIDGE FEATURES Belvedere seating area with canopy.

63 BRIDGE FEATURES Belvedere View from river elevation.

64 BRIDGE FEATURES Tower and deck view from river elevation. Looking West.

65 BRIDGE FEATURES Night View Bridge LED Lighting.

66 Project Awards ACI 2011 Awards of Excellence

67 Questions?

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

San Francisco Oakland Bay Bridge East Span Seismic Safety Project

San Francisco Oakland Bay Bridge East Span Seismic Safety Project San Francisco Oakland Bay Bridge East Span Seismic Safety Project Presented To: Society of American Military Engineers May 16, 2013 Brian Maroney, P.E. Dr. Engr. Karen Wang, P.E. Pier E9 Following the

More information

ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT

ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT Edmund Ho, P.Eng. MMM Group Limited, Canada Monty Knaus, P.Eng. MMM Group Limited, Canada Paper prepared

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

Chaudière Crossing Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation

More information

Cable-Stayed Bridge Uses New Post-Tensioning System

Cable-Stayed Bridge Uses New Post-Tensioning System Stretching over the Ohio River Cable-Stayed Bridge Uses New Post-Tensioning System By William B. Caroland, PE, and Jorge M. Suarez, PE Located approximately 2.8 miles downstream from the suspension bridge

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009. Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing

More information

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials COMPETENCY ANALYSIS PROFILE Rodworker 452A (All unshaded skill sets must be demonstrated/ completed) PROTECT SELF AND OTHERS Wear personal protective (PPE) Lift and Apply housekeeping rules Interpret warning

More information

Söderströmtunnel: immersion in downtown Stockholm, Sweden

Söderströmtunnel: immersion in downtown Stockholm, Sweden Söderströmtunnel: immersion in downtown Stockholm, Sweden J. Glückert Dipl.-Ing, Züblin Ground Engineering, Stuttgart, Germany N.H.J. Vink MSe, M. Reijm BSc, P.T. van Westendorp BSc Strukton Immersion

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL Prepared for: Public Works and Government Services Canada Parliamentary Precinct Branch Prepared by: Halsall Associates 210 Gladstone

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

1.2 Advantages and Types of Prestressing

1.2 Advantages and Types of Prestressing 1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly

More information

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER Professional Experience: Pride and Passion in the Art of Structural Engineering since 1979. Professional Registration: Professional

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

Norwegian Public Roads Administration. Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH

Norwegian Public Roads Administration. Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH Norwegian Public Roads Administration Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH Golden Gate 1937 - Norwegian parliament 2006 It s 1937: The longest suspension bridge in the world, the Golden

More information

Cable-Stayed Bridge as an Alternative for Medium and Short Span Bridges

Cable-Stayed Bridge as an Alternative for Medium and Short Span Bridges Cable-Stayed Bridge as an Alternative for Medium and Short Span Bridges Azita Azarnejad, CH2M HILL Ken McWhinnie, CH2M HILL Gamil Tadros, Speco Engineering Jiri Strasky, Jiri Strasky Consulting Engineer

More information

Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project

Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project U.S. Department of Labor Occupational Safety and Health Administration Directorate of

More information

CITY OF TRAIL MEMORANDUM

CITY OF TRAIL MEMORANDUM 0 C CITY OF TRAIL MEMORANDUM DATE: TO: FROM: SUBJECT: March 24, 2011 FILE NO. 5400-02 DAVID PEREHJJDOFF, CHIEF ADM1NTSTRATIVE OFFICER WARREN PROULX, ENGINEERING TECHMCIAN OLD TRAIL BRIDGE With the interest

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and

More information

Scope of EN 1090-1 Clarification Document

Scope of EN 1090-1 Clarification Document Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical

More information

Scaffolding. The University of Tennessee Office of Environmental Health & Safety

Scaffolding. The University of Tennessee Office of Environmental Health & Safety Scaffolding The University of Tennessee Office of Environmental Health & Safety Do employees working on supported scaffolds need to be trained? Scaffolding: Three Main Groups: Suspended Supported Aerial

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. Drilling since 1916 2215 Belknap Place Phone (210) 824-3800 San Antonio, TX 78212-1904 Fax (210) 824-9525 www.duderstadtfoundation.com ABOUT THE COVER: Drilled

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell) Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

Value Engineering vs. Alternate Designs in Bridge Bidding

Value Engineering vs. Alternate Designs in Bridge Bidding Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.

More information

Chapter 3: Fall Protection/ Scaffolding Safety

Chapter 3: Fall Protection/ Scaffolding Safety Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing

More information

Technical Assignment 2 TABLE OF CONTENTS

Technical Assignment 2 TABLE OF CONTENTS 2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17

More information

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage University of Missouri Hospitals and Clinics Structural Repair and Protection of Post-tensioned Parking Garage 1 University of Missouri Project The University of Missouri Health Care Patient and Visitor

More information

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis DNA project managers planners architects engineers David Nairne + Associates Ltd Suite 250 171 W Esplanade North Vancouver British Columbia Canada V7M 3J9 T 604 984 3503 F 604 984 0627 E dna@ davidnairne.com

More information

9.3 Two-way Slabs (Part I)

9.3 Two-way Slabs (Part I) 9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are

More information

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can

More information

Hunter College school of Social Work Thesis Proposal

Hunter College school of Social Work Thesis Proposal Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing

More information

Quality Control and Quality Assurance Guide

Quality Control and Quality Assurance Guide Quality Control and Quality Assurance Guide Bridge Division, Design Section October 2013 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants...

More information

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form 3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO

More information

Optimum proportions for the design of suspension bridge

Optimum proportions for the design of suspension bridge Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering

More information

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE Multi-storey Precast Concrete Framed Structures Kim S. Elliott BTech, PhD, CEng, MICE Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE WI LEY Blackwell Contents Preface Notation Precast Concepts, History

More information

DESIGNING STRUCTURES IN EXPANSIVE CLAY

DESIGNING STRUCTURES IN EXPANSIVE CLAY DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers

More information

Virginia Approach Spans

Virginia Approach Spans Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT

INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT VISCMA 412/August 2014 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT August 2014 Developed originally by the Vibration Isolation and Seismic Control Manufacturers Association under a cooperative

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections. Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

Transmission Foundations Case History : Helical piles Hydro One Networks Inc.

Transmission Foundations Case History : Helical piles Hydro One Networks Inc. Transmission Foundations Case History : Helical piles Hydro One Networks Inc. www.hubbellpowersystems.com Late in 2008, an aerial patrol discovered three 500kV towers with partially-collapsed foundations

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Pro-Lift Steel Pile Foundation Repair

Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the

More information

Truss. are both simple and A Matsuo Example continuous trusses. The

Truss. are both simple and A Matsuo Example continuous trusses. The Girder Bridge A girder bridge is perhaps the most common and most basic bridge. A log across a creek is an example of a girder bridge in its simplest form. In modern steel girder bridges, the two most

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an

More information

DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS

DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS 8601 North Black Canyon Highway Suite 103 Phoenix, AZ 8501 For Professionals Engaged in Post-Tensioning Design Issue 14 December 004 DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS by James D. Rogers 1 1.0

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

Stay Cable Replacement of the Luling Bridge

Stay Cable Replacement of the Luling Bridge Stay Cable Replacement of the Luling Bridge Armin Mehrabi, Bridge Engineering Solutions, PC 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge, LA Lower Anchorage Upper

More information

San Francisco Oakland Bay Bridge SELF-ANCHORED SUSPENSION (SAS) SPAN

San Francisco Oakland Bay Bridge SELF-ANCHORED SUSPENSION (SAS) SPAN San Francisco Oakland Bay Bridge SELF-ANCHORED SUSPENSION (SAS) SPAN San Francisco Oakland Bay Bridge SELF-ANCHORED SUSPENSION (SAS) SPAN 2 Project Overview Conventional Vs SAS Bridge SFOBB SAS Features

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA 1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:

More information

Robert B. Bittner, P.E., President, Ben C. Gerwick, Inc. San Francisco, CA, USA

Robert B. Bittner, P.E., President, Ben C. Gerwick, Inc. San Francisco, CA, USA FLOAT-IN COFFERDAMS Robert B. Bittner, P.E., President, Ben C. Gerwick, Inc. San Francisco, CA, USA Large diameter piles (2 to 3-m diameter, both driven and drilled) are being used more frequently by designers

More information

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon 3D view of intake - looking upstream from the west bank New intake access track forming upstream bund The intake is located at grid ref 204791,888654. The intake screen arrangement is a drop bar type screen

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

CONSTRUCTION OF THE HOOVER DAM BYPASS BRIDGE Updated 29 May 2009

CONSTRUCTION OF THE HOOVER DAM BYPASS BRIDGE Updated 29 May 2009 CONSTRUCTION OF THE HOOVER DAM BYPASS BRIDGE Updated 29 May 2009 www.maximumreach.com 1,600 FT. SOUTH OF THE DAM 900 FT. ABOVE WATER 2000 FT. LONG COMPLETION DATE: November 2010 Artists conception of the

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

WORK SCOPE. Domains in which we work:

WORK SCOPE. Domains in which we work: WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial

More information

Guide to the Jamey Stillings Photographs of the Mike O Callaghan-Pat Tillman Memorial Bridge and the Hoover Dam

Guide to the Jamey Stillings Photographs of the Mike O Callaghan-Pat Tillman Memorial Bridge and the Hoover Dam Guide to the Jamey Stillings Photographs of the Mike O Callaghan-Pat Tillman Memorial Bridge and the Hoover Dam This finding aid was produced using ArchivesSpace on November 17, 2015. English 2015 The

More information

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab, DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared

More information

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified:

Beginning on Friday, Jan 22, and on subsequent investigations, the following issues were identified: Date: 2/15/2016 Project: To: Middleton Public Library Roof Repair Pamela K. Westby Library Director Middleton Public Library 7425 Hubbard Avenue Middleton WI 53562 Pamela, Strategic Structural Design,

More information

Professional Engineers Providing Structural Engineering Services In Buildings

Professional Engineers Providing Structural Engineering Services In Buildings GUIDELINE Professional Engineers Providing Structural Engineering Services In Buildings 1995 Published by Association of Professional Engineers of Ontario Revised 12/11/98 CONTENTS INTRODUCTION...3 PART

More information

Infrastructure Cost Data

Infrastructure Cost Data Hewitt Estimating Consultants a Division of International Project Estimating Limited Infrastructure Cost Data www.infrastructurecost.com The Chief Estimator Software 150 Couling Crescent, Guelph Ontario,

More information

Steel and composite bridges in Germany State of the Art

Steel and composite bridges in Germany State of the Art Steel and composite bridges in Germany State of the Art Univ.-Prof. Dr.-Ing. G. Hanswille Institute for Steel and Composite Structures University of Wuppertal Germany Univ.-Prof. em. Dr.-Ing. Dr. h.c.

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASE 2 AS OF JULY 31, 2015 SEPTEMBER 2015 Phase 2 Cost Summary July Expenditures $ 19.2 Million Total Expenditures $ 508.7 Million

More information

U.S. Department of Labor Occupational Safety and Health Administration Directorate of Construction. April 2015

U.S. Department of Labor Occupational Safety and Health Administration Directorate of Construction. April 2015 Investigation of the November 13 and 14, 2014 collapses of two pedestrian bridges under construction at Wake Technical Community College Campus, Raleigh, NC U.S. Department of Labor Occupational Safety

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information