1 WAM FOAM ASPHALT PRODUCTION AT LOWER OPERATING TEMPERATURES AS AN ENVIRONMENTAL FRIENDLY ALTERNATIVE TO HMA O.R. Larsen 1, Ø. Moen 1, C. Robertus 2, B.G. Koenders 3 1 KOLO VEIDEKKE a.s., Central laboratory, Langbakken 16, P.O. Box 55, N-1431, Ås, Norway 2 Shell International Petroleum Company Limited, Shell Centre, London SE1 7NA, United Kingdom 3 Shell Global Solutions (France) S.A.S., Route Départementale 3, B.P. 97, Petit Couronne, France ABSTRACT A co-operation between Kolo Veidekke and Shell initiated work on Warm Asphalt Mixtures (WAM*) with laboratory experiments back in The work resulted in the WAM Foam process which was presented for the first time at the Eurasphalt&Eurobitume congress in WAM Foam is a new process for producing asphalt of hot mix quality, at lower operating temperatures ( C) in a conventional asphalt plant with only minor modifications to the equipment. Asphalt production and quality have been further investigated by several field trials, full-scale applications (about tonnes of dense asphalt concrete have been laid) and extensive laboratory testing during the last four years. The road sections have been monitored closely and appear to be as durable as those made with hot mix technology. Lower production temperatures result in energy savings of approximately 30% and in an equivalent reduction of CO 2 emissions. Simultaneously, reductions in other emissions and in fume exposure have been observed, resulting in an improved work environment for both plant operators and asphalt workers. Several plant emission measurements have been performed by an external expert agency and the reductions have been confirmed for the WAM Foam process. In light of the increased focus on the environment in the asphalt industry, the WAM Foam process could play an important role in reducing the industry s greenhouse gas emissions. Keywords: Energy saving, Environment, Foam, Fumes, Workability 1. INTRODUCTION The growing health, safety and environmental awareness of the general public and within the industry as a whole has resulted in significant efforts to save non-renewable fossil fuels, conserve energy and reduce emissions and exposures. In the asphalt industry there is considerable interest in exploring the possibilities of producing and paving asphalt mixtures at intermediate temperatures ( C). Advances in technology, coupled with growing environmental concerns, have led to research into more environmentally friendly asphalt production processes. The driving force for the interest is to combine the benefits of the lower operating temperatures with asphalt mixture quality and durability on the road that are equal to the properties that can be obtained Book I - 641

2 with hot mixtures. At intermediate temperatures, the range of C is of particular interest. At lower temperatures, e.g C, the binder will already have a certain level of stiffness and therefore not give enough workability and compactability. Above 120 C energy savings are obviously less, but it should be remembered that lower operating temperatures are still beneficial for fume and smell reductions. The benefits from lower operating temperatures are significant. But lower operating temperatures are difficult to put in practice since requirements on coating, workability, compaction and final asphalt performance have to be fulfilled. In 1995, Kolo Veidekke and Shell initiated a joint development programme to develop a process for manufacturing asphalt at lower temperatures that has equivalent properties to traditional hot mixed asphalt. A number of approaches that we have investigated have been discussed previously [1-3]. In this paper the emphasis is on the use of foamed bitumen in the warm asphalt mixture process (WAM Foam). This WAM Foam is a process in which a soft bitumen grade and a foamed hard bitumen grade are combined in the asphalt production process in order to achieve a reduction in operating temperatures. Work in our laboratories and in external laboratories has shown that good coating and good compaction can be achieved [3-5]. Once the volumetric properties are similar, the mechnical properties of the warm mixtures are equal to those of the hot mixtures. In the past four years the WAM Foam technique has progressed from a development trial stage into a production stage. Many sections have been paved in Norway, Sweden and the UK. At the time of submission of this paper approximately tonnes of WAM Foam asphalt had been produced. Dayto-day production and laying experience has been obtained in both batch-mixing plants and in drummixing plants. Investigations in the use of recycled asphalt have also been carried out. * WAM is a Shell trademark 2. WARM ASPHALT MIXTURE PROCESS In the warm asphalt mixture process using foam (WAM Foam) two different bitumen grades are used. The viscosity of the soft component is chosen such that at a temperature of 100 C it can coat the mineral aggregates. The hard component is added in the form of foam. Depending on the pavement requirement, the hard component has a penetration at 25 C between 10 and 100 dmm. Standard penetration grades such as 10/20, 20/30, 35/50, 40/60 and 70/100 are suitable hard components. The required penetration level of the final binder determines the blend ratio of soft and hard binder components. This ratio is easily determined from penetration measurements of blends of the initial components. If required, an adhesion improver can be used in the binders, as for hot mixtures, to reduce water sensitivity. A WAM Foam modified asphalt plant mixes the soft bitumen first with the mineral aggregate inorder to achieve a pre-coating. In the second step the foamed bitumen is introduced. Foamed bitumen is produced by injection of a small amount of tap water into hot bitumen. The fine droplets of water come into contact with the hot bitumen (typically 160 C to 170 C). After the nozzle (pressure reduction) the rapid evaporation of water produces a very large volume of foam: theoretically 1 liter of water forms about 1200 liters of steam. The steam expands until a film of bitumen holds the steam and air in bubbles. The foam is usually characterised in terms of its expansion ratio and its halflife. Book I - 642

3 An important factor in foaming is the nozzle design and the injection pressure in order to obtain a good water droplet spray in contact with the hot bitumen. The foaming characteristics of a specific bitumen are further influenced by numerous factors: Temperature of the bitumen. For most bitumens the foaming characteristics are improved with higher temperature. The expansion ratio increases with an increase in the amount of water added, whilst the half-life decreases. The water helps in creating the foam, but the foam can collapse rather fast due to rapidly escaping steam. It is known that e.g. silicone compounds can be effective anti-foaming agents. On the other hand, compounds have also been identified that can increase the expansion ratio and the half-life of the foam from seconds to minutes. 3. WAM FOAM PROCESS IN THE ASPHALT PLANTS The lower temperature operation of the dryer combined with the moisture from the foam raise a number of potential issues regarding the operations in the ashalt plant. Generally, dryers are designed to be most efficient when heating and drying aggregates at a given moisture content. If the moisture content is higher, the rate at which the aggregates are fed to the dryer must be reduced. Asphalt cannot be produced any faster than the aggregate can be dried and heated. For efficient dryer operation, the air combined with fuel for combustion must be in balance with the amount of fuel being fed into the burner. With fuel oil, lack of sufficient air or excess flow of fuel oil can lead to incomplete combustion of the fuel. With gas operated plants this situation is different. The WAM Foam modified asphalt plants in Norway operate the dryer at a temperature of about C without any problems with burner instabilities or in the dust collection system. At these temperatures less dust is collected and there is a lower loading of the filter installation. No moisture was found in the aggregates and no problems were experienced in the screening units and in the hot bins. In order to compensate for the pressure build-up in the mixer while foaming it was found that a good air extraction system is needed. In a batch-mixing plant the foamed bitumen is produced by injecting the tap water into the bitumen pipe (in a special nozzle system) just before the bitumen enters the mixer. In such a plant the foam is produced in a discontinuous way. An airgun has been installed to blow the foaming chamber and pipes clean after each foam injection. In a drum-mixing plant the foam can be produced in a continuous way. This has some operational advantages, which makes the WAM Foam process most suitable for a drum-mixer. Insulation of pipes and the cleaning is not necessary to the same degree as for the discontinuous process in the batch-mixer. The production capacity was maintained for all types of mixtures. When recycled asphalt pavement (RAP) was used at a level of 15% to 25% in the production of wearing course asphalt in a drum-mixing plant, the amount of water coming from RAP was about three times higher than the amount of water that was coming from the foam. When RAP was added to the mixture the temperature of the dryer was raised a little to compensate for the extra drying capacity, as would have been done for hot mixture production. Book I - 643

4 4. FROM ROAD TRIALS TO LARGE SCALE COMMERCIAL PRODUCTIONS The first WAM Foam field trial was carried out in May 1999 using a Midland MixPaver (modified for foaming) on the road close to the Hobøl asphalt plant of Kolo Veidekke in Norway. The MixPaver was used because foam equipment had not yet been installed in the asphalt plant. In the MixPaver equipment, bitumen foam was produced on the paver, mixed with the aggregate that was precoated with the soft binder in the batch plant, and subsequently laid on the road. Even though this trial was carried out under extremely adverse weather conditions (even some snowfall), the whole paving operation was carried out with satisfactory results. For the second WAM Foam trial in May 2000 the asphalt mixture was produced in a batch asphalt mixing plant. Foam equipment built into the asphalt plant enables foamed bitumen to be introduced directly into the pug mill. The first larger scale road trial (one lift wearing course) was carried out in September 2000 on the main road RV120, see Figure 1. A reference hot mix section was also laid. The mixture was a dense asphalt concrete Ab11 with a 85 pen (final) binder. The asphalt concrete was produced in a batch plant (3300 kg/batch). On the road the Demag DF 110P paver and the Bomag 164 (roller) and 8 tonnes vibratory roller were used. In Tables 1 and 2 the voids contents as measured with the Seaman (nuclear density meter) are given. The Asphalt Technological Institute (ATI) has monitored the development of (average) rutting, longitudinal smoothness and surface texture two times per year (spring and fall). The rutting performance is shown in Figure 2. The first set of data for 5 September 2000 was the condition of the road before the paving of the new one-lift wearing course. The large increase after the first winter period is due to studded tyres that wear off the mortar on the surface. This is typically observed on all Norwegian roads where the percentage of studded tyres on cars in the winter period is close to 60%. The road has now gone through three winters. In the UK in April 2001, a trial was held: a WAM Foam 20 mm Dense Road Basecourse (DRB) material with an equivalent of 40/60 pen bitumen and a conventional hot 20 mm DRB with 40/60 pen were manufactured and paved [6]. The WAM Foam mixture was paved and compacted with conventional paving and compaction equipment. The texture of the asphalt mixture is identical to that of a conventional hot 20 mm DRB mixture. Specimens for testing were cored only a few days after the material had been compacted and the mechanical properties were measured. Test specimens were also cored from the conventional hot 20 mm DRB pavement for comparative data. The densities and air voids of the WAM Foam mixture are very similar to those of the conventional hot mixture. The stiffness modulus at 20 C of the WAM Foam 20 mm DRB was identical to that of the conventional hot mixture. Fatigue measurements were carried out in the Nottingham Asphalt Tester (NAT). The graph of the applied strain (microstrain) versus cycles to failure shows that statistically the fatigue properties are the same. In 2001 productions of WAM Foam in a batch mixing plant and a continuous drum mixing plant were started in Norway for normal (commercial) paving works. Compared to the few hours of production during the field trials, the day-to-day production provided more information on the plant operational issues which might arise when operating at lower temperatures. Because of the positive results obtained in these field trials the project moved into the large scale commercial production stage, in particular in Norway. An overview of a number of commercial paving jobs Book I - 644

5 done so far in Norway is presented in Table 3. In total about tonnes of asphalt produced according to WAM Foam process was paved from 2000 to The examples show that different types of mixtures were produced (dense graded mixtures Agb, Ab and stone mastic asphalt, Ska) with different final binder pen grades and various combinations of hard bitumen and soft bitumen components. They also include different applications: paving of road sections, hand laying and rut filling. The FV82 road gives another example of a wearing course for which it is possible to show the behaviour of the road after a number of years. A section was laid on this road with a dense asphalt concrete WAgb11 with 180 pen (final) binder (160/220 grade). The asphalt concrete mixture was produced in a batch plant (3300 kg/batch). On the road, the Demag DF 90P paver and the rollers, Bomag 151 oscillations and HAM 3 wheels static roller (9 ton) were used. Some details about the production are presented in Table 4: tonnes produced, fuel consumption, filter temperature and moisture in aggregate. The moisture content in aggregate is that of the stones before entering the drying drum. No problems were found with the filters during production. The fuel consumption was reduced by 31.5%. In Table 5 the results of the voids content measurements for both the warm mixture and the hot mixture section are shown. Rut depth measurements were carried out on the WAM Foam section and on the reference hot mix section. The average rut depth is obtained by first scanning a cross section (initial profile) of the road using an ultrasonic device and then carrying out a continuous measurement along the road section. The average value for every 20 m is calculated and stored as a datapoint. The outcome of these measurements, displayed in Figure 3, covers a period from October 2000 to June The results associated with 16 October 2000 were obtained before laying the new layers. The results for 1 September 2001 were obtained after laying of a levelling course (mixture prepared with cold recycling foam technique, 100% RAP). The results obtained on 22 October 2001 are those after paving with the WAM Foam mixture (WAgb11) and the hot mixture (Agb11). The measurements carried out later were done to monitor the development of the rut depths. The longitudinal smoothness (International Roughness Index, IRI) is displayed in Figure 4 for both the WAM Foam mixture (WAgb11) and the hot mixture (Agb11). In Figure 5 the mean profile depth is shown. The measurements are carried out with a laser and the average value for every 25 cm is a datapoint and the results are a measure for the surface texture on the road. The results shown in Figure 5 were obtained after one winter period and they are within the range of mm which is considered the range for good skid resistance. The benefits of lower asphalt operating temperatures are savings in fuel consumption, reductions in overall emissions of associated green house gases and a reduction of fumes generated from the hot materials during application on the road. Measurements on fume emissions in the plant during a trial in 2000 were described previously [2,3]. More recently fuel consumption and gas/dust emissions were measured during large scale asphalt mix production in a drum-mixing plant in Skarnes, Norway. During this production 15% recycled asphalt was used in the mixture. Veritas (DNV in Norway) carried out the measurements and the results are presented in Table 6. Reductions in fuel consumption above 30% were found and, in addition, dust emission was reduced by about 50%. Book I - 645

6 7. CONCLUDING REMARKS WAM Foam production temperatures between 100 C-120 C result in fuel/energy savings of approximately 30% and an equivalent reduction of CO2 emissions. At the same time lower potential fume exposure, no smell for the workers and a reduction in plant emissions are observed resulting in an improved environment for both plant operators and asphalt workers. Comparison of the WAM Foam process with the traditional hot mix process based on these environmental measures clearly demonstrates the important role that WAM Foam could play in the future of the asphalt industry. The WAM Foam process can be used on both continuous drum plants and in batch mixing plants. By adjusting the ratio of soft binder and hard binder, equivalent (final) binders have been produced from a 40/60 pen grade up to a 330/430 pen grade. As for hot mixtures the temperature during the paving and compaction operations must be adjusted according to the type of bitumen grade used. The WAM Foam process is suitable for basecourse and wearing course mixtures. The traffic intensity on the paved roads ranges from 1500 vehicles per day to vehicles per day. WAM Foam mixtures can be paved and compacted with standard paving and compaction equipment. Best practice protocols should be used to achieve optimal results, e.g. compaction should take place directly behind the paver. Cores can be taken as soon as the pavement has reached ambient temperature. The average volumetric composition of the WAM Foam mixture is very similar to the composition of a hot mixture using the same materials when proper paving techniques are applied. Consequently, in those cases the mechanical properties of the WAM Foam mixtures are equal to those of the hot mixtures. On the road, the behaviour of the WAM Foam sections and the reference hot mixture sections is equal in terms of (average) rut depth, longitudinal smoothness and surface texture. REFERENCES [1] B.G. Koenders, D.A. Stoker, C. Bowen, P. de Groot, O. Larsen, D. Hardy, K.P. Wilms, Innovative process in asphalt production and application to obtain lower operating temperatures, 2 nd Eurasphalt&Eurobitume congress, Barcelona, September 2000, Book 2, session 3, pp [2] P.C. de Groot, C. Bowen, B.G. Koenders, D.A. Stoker, O. Larsen, J. Johansen, A comparison of emissions from hot mixture and warm asphalt mixture production, Proceedings IRF congress, Paris, June 2001, paper O022. [3] B.G. Koenders, D.A. Stoker, C. Robertus, O. Larsen and J. Johansen, WAM Foam, asphalt production at lower operating temperatures, 9 th International Conference on Asphalt Pavements, ISAP 2002, Copenhagen. [4] K.J. Jenkins, A.A.A. Molenaar, J.L.A. de Groot, M.F.C. van de Ven, Foamed asphalt produced using warmed aggregates, Association of Asphalt Paving technologists (AAPT), Colorado, March [5] Workshop foamed bitumen (schuimbitumen: recente ontwikkelingen), 11 June 2003, Road and Hydraulic Engineering Division, Delft and Delft University of Technology, Faculty of Civil Engineering, The Netherlands. [6] D. Strickland, Development of WAM Foam technology, paper presented at 2 nd International Conference: Addressing Government sustainability and recycling targets for contruction and related industries, John Moores University, Liverpool, February 2003, UK. Book I - 646

7 Figure 1: WAM Foam mixture and hot mixture paving and compaction on RV120 in Norway Distance, m Density, kg/cm 3 Voids content, %v/v 50 2,420 6, ,508 3, ,511 2, ,486 3, ,497 3,4 Specs 3-4,5 Average 3,9 Table 1: Voids content as measured with the Seaman on the road for WAM Foam Distance, m Density, kg/cm 3 Voids content, %v/v 350 2,522 2, ,448 5,3 Specs 3-4,5 Average 3,9 Table 2: Voids content as measured with the nuclear density meter on the road for the hot mixture Book I - 647

8 25 RV 120 Hobøl Rutting [mm] Lane 1 Lane 2 Lane 1 Lane 2 WAM Foam HMA Figure 2: Comparison of rutting performance for WAM Foam mixture and hot mixture for a period of 3 years Year Type of mixture Binders Final pen Mixer Road 2000 WAb 11 50/70, V /100 batch RV 120 Hobøl 2001 WAgb 11R15 50/70, V2000 drum RV WAgb 11 50/70, V /220 batch FV WAgb 11 70/100, V /220 batch RV 120 Kirkebygda 2002 WAgb 11, WSka 11 10/20, V /60, 50/70 batch Grandeveien, Drøbak 2002 WAgb 11 30/50, V /100 batch FV33 Siggerud-Oslo grense 2002 WSka 11 50/70, V /100 batch Exit/entrance ramp Highway Korsegården 2002 WSka 11 (trackpaver) 50/70, V /100 batch E6 Asurthern-Oslo grense 2002 WAb 11 50/70, V /100 batch RV 120 Elvestad 2002 WAgb 11 R15 50/70, V /220 drum Seljesvingen 2003 WAb 11 50/70, V /100 batch E18 Østfold grense 2003 WSka 11 (trackpaver) 50/70, V /100 batch E18 Vinterbro 2003 WSka 11 (trackpaver) 50/70, V /100 batch RV 152 Kolbotn 2003 WSka 11 (trackpaver) 50/70, V /100 batch RV 152 Drøbak 2003 WSka 11 (trackpaver) 50/70, V /100 batch FV 76 Ottarsrud 2003 WAb 11 (trackpaver) 50/70, V /100 batch RV 115 Østfold 2003 WSka 11 50/70, V /100 batch RV 152 Kolbotn centre 2003 WAb 11 50/70, V /100 batch RV 155 Krokhol 2003 WAb 11 50/70, V /100 batch RV 22 Trøgstad Table 3: Large scale productions in Norway with asphalt produced according to WAM Foam Book I - 648

9 2003 WAb 11 50/70, V /100 batch RV 155 Krokhol 2003 WAb 11 50/70, V /100 3batch rd Eurasphalt & RV Eurobitume 22 Trøgstad Congress Vienna 2004 Paper 137 Table 3: Large scale productions in Norway with asphalt produced according to WAM Foam WAgb 11 and WAb 11 are dense grade mixtures with 0/11 mm aggregate WSka 11 is stone mastic asphalt with 0/11 mm aggregate R15 has 15% RAP in the mixture For the soft grade as an example: V2000 is a soft binder with a dynamic viscosity of 2000 mpa.s at 60 C WAgb 11 and WAb 11 are dense grade mixtures with 0/11 mm aggregate WSka 11 is stone mastic asphalt with 0/11 mm aggregate R15 has 15% RAP in the mixture For the soft grade as an example: V2000 is a soft binder with a dynamic viscosity of 2000 mpa.s at 60 C Produced, Fuel consumption, Filter temperature, Moisture in Asphalt Date tonnes l/ton C aggregate, % 3/ , ,9 WAgb 11 5/ , ,8 (WAM) 6/ , ,0 Average 6, ,3 10/ , ,3 11/ , ,4 Agb 11 (HMA) 12/ , ,4 13/ , ,6 14/ , Average 8, ,4 Table 4: Production data data for for comparison between between WAM WAM Foam Foam and Hot and Mix Hot Asphalt Mix Asphalt Type of mixture Device Number of measurements Voids range Average Std. deviation Specifications Norway WAgb11 Seaman C ,0 5,4 % 4,1 ± 0,9 % 2,0 7,0 % WAgb11 Core 12 3,0 5,6 % 4,5 ± 1,1 % 2,0 7,0 % Agb 11 hot mix Core 7 2,9 4,5 % 3,6 ± 0,5 % 2,0 7,0 % Table Voids content on the road and of cores on the Agb11 warm asphalt mix section and hot mix section Table 5: Voids content on the road and of cores on the Agb11 warm asphalt mix section and hot mix section 14,0 12,0 10,0 FV 82 Frogn Average rut depth [mm] ,0 6,0 4,0 2,0 0,0 Lane 1 Lane 2 Lane 1 Lane 2 WAM Foam HMA Figure 3: Rut depth measurements on the FV82 from October 2000 to June 2003 for the WAM Foam WAgb11 and hot mixture Agb11 Book I - 649

10 3,0 FV 82 Frogn IRI , ,0 1,5 1,0 0,5 0,0 Lane 1 Lane 2 Lane 1 Lane 2 WAM Foam Figure 4: Longitudinal smoothness (IRI) of the road up to two years after laying HMA 1,20 FV 82 MPD (Mean Profile Depth) [mm] 1, , ,60 0,40 0,20 0,00 Lane 1 Lane 2 Lane 1 Lane 2 WAM Foam HMA Figure 5: Mean profile depths for warm asphalt mixture and hot mixture after winter period Asphalt type Diesel consumption CO 2 CO NO x [litre/ton] [kg/hour] [kg/hour] [kg/hour] Agb 11R15 ca. 4, ,5 WAgb 11R15 ca. 2,7 (-40%) 1980 (-31,4%) 35 (-28,5%) 0,3 (-61,5%) Table 6: Comparison of fuel consumption, gas and dust emissions in drum mixing plant between hot mix and WAM Foam productions at identical production rates Book I - 650

The use of Warm Mix Asphalt EAPA Position Paper

The use of Warm Mix Asphalt EAPA Position Paper The use of Warm Mix Asphalt EAPA Position Paper 1 European Asphalt Pavement Association Rue du Commerce 77 1040 Brussels, Belgium www.eapa.org info@eapa.org January 2010 2 Summary Since the mid 1990s a

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS

More information

Bitumen and foaming properties. October 15, NABin 2013, Grand Hotel Oslo, Helene Odelius, Nynas AB

Bitumen and foaming properties. October 15, NABin 2013, Grand Hotel Oslo, Helene Odelius, Nynas AB Bitumen and foaming properties October 15, NABin 2013, Grand Hotel Oslo, Helene Odelius, Nynas AB Content Bitumen foaming; why, when and how? Foaming characterisation of binders Laboratory asphalt evaluation

More information

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015 LADOTD Balanced Mixture Design Samuel Cooper III, Ph.D., P.E. Southeastern Asphalt User Producer Group November 6 9, 25 Williamsburg, Va. Acknowledgements LTRC Asphalt Research Group Jeremy Icenogle, Patrick

More information

High-Speed Nondestructive Testing and Intelligent Construction Systems

High-Speed Nondestructive Testing and Intelligent Construction Systems High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form (NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* HMA Paving Inspector* Soils & Aggregate Inspector* Soils & Aggregate Lab Technician*

More information

Cliquez pour modifier les styles du texte du masque. Application of 14000-tonnes of Warm Mix Asphalt on a New Highway Near Strasbourg, France

Cliquez pour modifier les styles du texte du masque. Application of 14000-tonnes of Warm Mix Asphalt on a New Highway Near Strasbourg, France Cliquez pour modifier les styles du texte du masque Application of 14000-tonnes of Warm Mix Asphalt on a New Highway Near Strasbourg, France Eurovia Range Cliquez Historicpour modifier les styles du texte

More information

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING TNZ P/23 NOTES: 2005 FOR HOTMIX ASPHALT WEARING COURSE SURFACING 1. BACKGROUND 1.1 Specification Use The specification is to be used where the Engineer requires a dense graded, open graded (permeable)

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE

More information

PENETRATION OF BITUMINOUS MATERIALS

PENETRATION OF BITUMINOUS MATERIALS NANYANG TECHNOLOGICAL UNIVERSITY School of Civil and Structural Engineering LABORATORY - PAVEMENT MATERIALS PENETRATION OF BITUMINOUS MATERIALS OBJECTIVES To examine the consistency of a sample of bitumen

More information

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation A View From The Bureau of Materials & Physical Research IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation HMA Issues HMA Issues HMA Issues HMA Issues a Technical Opinion Cautious HMA

More information

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance

Testing and appraisal of Lucobit polymer effect as an additive on asphalt mixture performance Abstract Testing and appraisal of polymer effect as an additive on asphalt mixture performance Hamid Sabbagh mollahosseini*,golazin Yadollahi**, Ershad Amoosoltani*** *, ***Executive of Engineering and

More information

Thoughts on Warm Mix Asphalt production (..among other things!)

Thoughts on Warm Mix Asphalt production (..among other things!) Thoughts on Warm Mix Asphalt production (..among other things!) Even K. Sund Senior Principal Engineer Roads and Traffic Department, Road Directorate Contents of presentation Brief status for road maintenance

More information

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E.

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. Louisiana Case Study: Implementation of CRM Binder in PG specification. AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. My Story Background Approach Phase I Evaluation:

More information

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Introduction Objective: to estimate the CO2 emissions produced by road surface construction

More information

asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service

asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of

More information

Otta Seal BACKGROUND GENERAL DESCRIPTION DESIGN ASPECTS. Category : Technical Information/On-carriageway/

Otta Seal BACKGROUND GENERAL DESCRIPTION DESIGN ASPECTS. Category : Technical Information/On-carriageway/ Otta Seal Category : Technical Information/On-carriageway/ BACKGROUND An Otta seal is a thin bituminous seal comprising graded gravel or crushed aggregate containing all sizes and either a cut-back or

More information

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti

More information

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be:

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be: Asphalt Emulsions 101 Introduction Chris Lubbers Technical Sales and Marketing Mgr Kraton Polymers, LLC 50 TH Annual Idaho Asphalt Conference Moscow, ID October 28, 2010 Semi Solid Liquid Asphalt Binder

More information

PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS

PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS A. Vanelstraete, W. Teugels, Belgian Road Research Centre, Belgium, Nynas Bitumen, Belgium Abstract Understanding the behaviour and performance of bituminous

More information

STUDY OF THE BEHAVIOUR OF BITUMINOUS MIXTURES RESISTANT TO FUEL

STUDY OF THE BEHAVIOUR OF BITUMINOUS MIXTURES RESISTANT TO FUEL STUDY OF THE BEHAVIOUR OF BITUMINOUS MIXTURES RESISTANT TO FUEL INTRODUCTION Evaluation of the performance of asphalt mixtures applied on wearing courses of road and airport pavements when subjected to

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

Rutting Based Evaluation of Asphalt Mixes

Rutting Based Evaluation of Asphalt Mixes Pak. J. Engg. & Appl. Sci. Vol., July, 22 (p. 6-65) Rutting Based Evaluation of Asphalt Mixes Kamran Muzaffar Khan, Mumtaz Ahmed Kamal 2. Associate Professor, Civil Engg. Department, University of Engg.

More information

Construction of Quality Hot Mix Asphalt Pavements

Construction of Quality Hot Mix Asphalt Pavements 59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed

More information

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

GRADATION OF AGGREGATE FOR CONCRETE BLOCK GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published

More information

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.org History Performance Graded Binders MDOT Local Agency Guide NAPA Guide Outline Other Considerations For each there are: Right

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

Determination of Thermal Conductivity of Coarse and Fine Sand Soils

Determination of Thermal Conductivity of Coarse and Fine Sand Soils Proceedings World Geothermal Congress Bali, Indonesia, - April Determination of Thermal Conductivity of Coarse and Fine Sand Soils Indra Noer Hamdhan 1 and Barry G. Clarke 2 1 Bandung National of Institute

More information

Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5

Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5 Cl Sfb (27-9) Rn7 M2 December 2004 Built-up roofing solutions with rigid insulation boards on concrete decks for new-build and refurbishment E-a5 Fesco, Fesco S, Retrofit, Retrofit S, Fesco Fillet, PF,

More information

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way. Contractor Quality Control Oh No, We Got an Airport Job! John Savastio Quality Control Manager Highway Materials, Inc. We ve Come A Long Way. Investment in Staff, Labs and Equipment Acceptance based on

More information

Field Test Protocol NANOTAC

Field Test Protocol NANOTAC Field Test Protocol NANOTAC Chemically bonded Waterproofing Tack coat April 2, 2013 Version 1.0 APR, 2, 2013 LTP-RD-NT-001-01 Auth: RP Chkd: AR Page 1 of 6 Contents 1 Introduction... 3 2 Nanotac tack coat

More information

Methodology and rules for design and rehabilitation of road pavement using new hot and cold recycled asphalt mixtures

Methodology and rules for design and rehabilitation of road pavement using new hot and cold recycled asphalt mixtures Deliverable 8 Methodology and rules for design and rehabilitation of road pavement using new hot and cold recycled asphalt mixtures CONTRACT N : G1RD-CT2000-00374 PROJECT N : GRD1-2000-25168 ACRONYM: PARAMIX

More information

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING

INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Interim Advice Note 96/07 INTERIM ADVICE NOTE 96 /07 Revision 1 GUIDANCE ON IMPLEMENTING RESULTS OF RESEARCH ON BRIDGE DECK WATERPROOFING Summary This interim advice note provides guidance on improving

More information

AGREGADOS RECICLADOS MITOS Y REALIDADES

AGREGADOS RECICLADOS MITOS Y REALIDADES The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material

More information

Section 300 Base Courses

Section 300 Base Courses Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA

More information

Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands

Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands Monitoring of primary road network Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands The Netherlands Mainport to EU 41.526 km² area 17 million

More information

DRAFT ENRICHMENT DESIGN MANUAL. Pavements Engineering No. 1988-45M. R D Leach SENIOR RESEARCH OFFICER. MAIN ROADS Western Australia R:1988-45M

DRAFT ENRICHMENT DESIGN MANUAL. Pavements Engineering No. 1988-45M. R D Leach SENIOR RESEARCH OFFICER. MAIN ROADS Western Australia R:1988-45M DRAFT ENRICHMENT DESIGN MANUAL Pavements Engineering No. 1988-45M R D Leach SENIOR RESEARCH OFFICER ABSTRACT This report takes the form of a draft surface enrichment design manual. It describes the design

More information

Greening our Roads. Approach

Greening our Roads. Approach Greening our Roads Approach To create a Sustainable Future for the world, by achieving Resource Extension economically, by reducing usage of limiting resources and extending life cycle Ensuring Green Roads

More information

South Dakota QC/QA Asphalt Concrete Training Manual January 2015

South Dakota QC/QA Asphalt Concrete Training Manual January 2015 South Dakota QC/QA Asphalt Concrete Training Manual January 2015 January 2015 QC/QA ASPHALT CONCRETE TRAINING MANUAL prepared by South Dakota Department of Transportation Division of Planning/Engineering

More information

Stone crusher dust as a fine aggregate in Concrete for paving blocks

Stone crusher dust as a fine aggregate in Concrete for paving blocks Stone crusher dust as a fine aggregate in Concrete for paving blocks Radhikesh P. Nanda 1, Amiya K. Das 2, Moharana.N.C 3 1 Associate Professor, Department of Civil Engineering, NIT Durgapur, Durgapur

More information

Quality control: Annex-A.

Quality control: Annex-A. Quality control: Quality of the constructed work has been checked by our staff as per frequency and provision mentioned section 900 in MoRT&H and as per provision mentioned in Concession Agreement. The

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR666 Specification for Low Temperature Asphalt Mixtures J C Nicholls (TRL), H K Bailey (TRL), N Ghazireh (Lafarge

More information

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS

SPECIFICATION FOR CONSTRUCTION OF UNBOUND GRANULAR PAVEMENT LAYERS TNZ B/02:2005 SPECIFICATION FOR CONSTRUCTION OF UNBOUND 1. SCOPE This specification shall apply to the construction of unbound granular pavement layers. The term pavement layer shall apply to any layer

More information

CHAPTER 8 ROAD SURFACE PROPERTIES

CHAPTER 8 ROAD SURFACE PROPERTIES CHAPTER 8 ROAD SURFACE PROPERTIES 230 8.1 Introduction: The road user desires a road surface where he can drive safe and comfortable. This requires a pavement structure with enough stiffness, a fast run-off

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Florida s Experience with Crumb Rubber

Florida s Experience with Crumb Rubber Florida s Experience with Crumb Rubber Jim Warren Executive Director Asphalt Contractors Association of Florida, Inc. www.floridaridesonus.org Slides Courtesy of FDOT State Materials Office Background

More information

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. September 1, 2003 CONCRETE MANUAL 5-694.300 MIX DESIGN 5-694.300 NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. 5-694.301

More information

Construction Materials Testing. Classes of Test

Construction Materials Testing. Classes of Test Construction Materials Testing Classes of Test February 2014 Copyright National Association of Testing Authorities, Australia 2014 This publication is protected by copyright under the Commonwealth of Australia

More information

6 QUALITY CONTROL PROCEDURES

6 QUALITY CONTROL PROCEDURES 6 QUALITY CONTROL PROCEDURES Producer Personnel Management Representative Certified Asphalt Technicians Qualified Technicians Reference Publications Field Laboratory Test Equipment Calibration Diary Materials

More information

Benefits of Preventative Maintenance Pavement Sealers

Benefits of Preventative Maintenance Pavement Sealers Pavement Coatings Technology Council WWW.PAVEMENTCOUNCIL.ORG Benefits of Preventative Maintenance Pavement Sealers Introduction Pavement Sealers have been used successfully for around 60 years. Recently,

More information

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures ASPHALT INSTITUTE EXECUTIVE OFFICES AND RESEARCH CENTER Research Park Drive P.O. Box 14052 Lexington, KY 40512-4052 USA Telephone 859-288-4960 FAX No. 859-288-4999 Asphalt Institute Technical Bulletin

More information

asphalt applications Construction and surfacing of parking areas including private drives mpa asphalt Asphalt Information Service

asphalt applications Construction and surfacing of parking areas including private drives mpa asphalt Asphalt Information Service asphalt applications 1 Construction and surfacing of parking areas including private drives Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction Nearly all roads

More information

Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA

Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA October 30, 2003 T3S - Superpave for Low Volume Roads - R. Horan 1 What is Asphalt? October 30, 2003 T3S - Superpave

More information

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract

More information

Recycling with CRM. John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com

Recycling with CRM. John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com Recycling with CRM John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com Tire Rubber Crumb Rubber Modifier There are several different processes used to with CRM.

More information

STENCA HT PIPE. Quality Insulation made of calcium silicate. www.stenca.com

STENCA HT PIPE. Quality Insulation made of calcium silicate. www.stenca.com STENA HT PIPE Quality Insulation made of calcium silicate LD Heat Fire INsulation WELME T STENA TRADING - Global focus with local service Stenca Trading offers optimal solutions for the offshore, marine,

More information

APPENDIX B. I. Background Information

APPENDIX B. I. Background Information APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement

More information

Proposed Revision to Bridge Design & Drafting Manual

Proposed Revision to Bridge Design & Drafting Manual INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:

More information

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.) Gyproc Plasters The cracks in cement sand plaster are an inherent feature which cannot be completely prevented but can only be controlled and

More information

What you measure is what you get? a novel approach for specifying and controlling acoustic quality of road surfaces

What you measure is what you get? a novel approach for specifying and controlling acoustic quality of road surfaces What you measure is what you get? a novel approach for specifying and controlling acoustic quality of road surfaces Ard Kuijpers & Wout Schwanen M+P consulting engineers, Vught, the Netherlands. Jan van

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1). Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State

More information

Test report P 7013-E. InoPaz H2O. Pazkar LTD. Alon Tavor Industrial Zone AFULA 18000 / Israel. J. Magner Dipl.-Ing. N. Machill.

Test report P 7013-E. InoPaz H2O. Pazkar LTD. Alon Tavor Industrial Zone AFULA 18000 / Israel. J. Magner Dipl.-Ing. N. Machill. Kiwa Polymer Institut GmbH Quellenstraße 3 65439 Flörsheim-Wicker Tel. +49 (0)61 45-5 97 10 Fax +49 (0)61 45-5 97 19 www.kiwa.de Test report P 7013-E Testing order: Test of the waterproofing system based

More information

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY BS 40 M6 MuCis mono SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY LE CE LE type: "expansive binder which allows the production of extremely fluid concrete

More information

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf

More information

Pace s plant had minimal problems producing warm-mix asphalt for the paving project.

Pace s plant had minimal problems producing warm-mix asphalt for the paving project. Pace s plant had minimal problems producing warm-mix asphalt for the paving project. 22 Hot Mix Asphalt Technology SEPTEMBER/OCTOBER 2006 By Chuck MacDonald Tractor-trailer trucks crawled along an open

More information

EQUIPEMENTS DE MAINTENANCE. Road maintenance

EQUIPEMENTS DE MAINTENANCE. Road maintenance EQUIPEMENTS DE MAINTENANCE Road maintenance There are many road maintenance techniques. The treatment of cracks and potholes, the creation of joints are all different works needing specific equipment.

More information

ITEM 330 LIMESTONE ROCK ASPHALT PAVEMENT

ITEM 330 LIMESTONE ROCK ASPHALT PAVEMENT ITEM 330 LIMESTONE ROCK ASPHALT PAVEMENT 330.1. Description. Construct a base course, a surface course, a level-up course, or any combination of these courses of the types and grades shown on the plans

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

Construction Practices and Techniques

Construction Practices and Techniques Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE Presentation Topics: KMA plant characteristics; Foamed bitumen; Technology fail criteria; Jobsite presentation: Rod. dos Bandeirantes

More information

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document NRMCA Quality Certification Ready Mixed Concrete Quality Management System Certification Criteria Document Version 1 February 2014 NRMCA Quality Certification Ready Mixed Concrete Quality Management System

More information

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Best Practices for RAP Management 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Outline Current RAP usage and practices Motivations for using

More information

Bailey Tool for Gradation Control in Superpave Mix Design

Bailey Tool for Gradation Control in Superpave Mix Design What is the Bailey Method? Bailey Tool for Gradation Control in Superpave Mix Design 48 th Annual Idaho Asphalt Conference The Bailey Method will Evaluate individual s Determine what is Coarse and Fine

More information

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION 1. SCOPE The maximum dry density and optimum moisture content, as defined below,

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.

More information

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Uniclass L6129 EPIC F122 CI/SfB Yp3 Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Introduction... 2 Product... 2 Sustainability... 2 Physical Properties of Lightweight Aggregate...

More information

CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE

CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE NCAT Report No. 97-5 CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE by Prithvi S. Kandhal Larry Lockett September 1997 CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE

More information

Aquifer Thermal Energy Storage Application in Greenhouse Climatization

Aquifer Thermal Energy Storage Application in Greenhouse Climatization Aquifer Thermal Energy Storage Application in Greenhouse Climatization Bekir TURGUT, Halime PAKSOY, Şaziye BOZDAĞ, Hunay EVLİYA, Kazım ABAK, H. Yildiz DASGAN Çukurova University 01130 Balcalı Adana-Turkey

More information

Summary of FHWA In-Place Recycling Activities

Summary of FHWA In-Place Recycling Activities Summary of FHWA In-Place Recycling Activities 2014 International and 7 th Western States In- Place Recycling Conference Lee Gallivan FHWA Asphalt Materials Engineer Office of Asset Management, Pavement,

More information

High Capacity Hot Air Dryer

High Capacity Hot Air Dryer High Capacity Hot Air Dryer MADE IN AUSTRIA autumn 2015 www.zimmer-austria.com page 1 Hot air dryer type: Compact HC The modular construction of the high efficiency and powerful hot air nozzle dryer is

More information

asphalt applications Resurfacing of roads and other paved areas using asphalt mpa asphalt Asphalt Information Service Mineral Products Association

asphalt applications Resurfacing of roads and other paved areas using asphalt mpa asphalt Asphalt Information Service Mineral Products Association asphalt applications 3 Resurfacing of roads and other paved areas using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction Resurfacing of a road pavement

More information

Asphalt in Railway Tracks

Asphalt in Railway Tracks Airfield uses of asphalt Asphalt in Railway Tracks Ref: (3)2-03-00.015 European Asphalt Pavement Association P.O. Box 175 3620 AD Breukelen, The Netherlands www.eapa.org info@eapa.org October 2003 2 Contents

More information

A Case for Reducing and Laydown Temp

A Case for Reducing and Laydown Temp A Case for Reducing and Laydown Temp Acommon response to difficulties obtaining in-place density is to increase mix production temperature, because it is easier to control than other factors that may affect

More information

Improving Energy Efficiency through Biomass Drying

Improving Energy Efficiency through Biomass Drying Improving Energy Efficiency through Biomass Drying Gilbert McCoy, Senior Energy Systems Engineer Northwest CHP Technical Assistance Partnership International District Energy Association Woody Biomass CHP

More information

Comparison of Results of SHRP and Conventional Binder Tests on Paving Asphalts

Comparison of Results of SHRP and Conventional Binder Tests on Paving Asphalts International Journal of Applied Science and Engineering 2004. 2, 3: 245-256 Comparison of Results of SHRP and Conventional Binder Tests on Paving Asphalts Ming-Gin Lee a, Chui-Te Chiu b, Yu-Cheng Kan

More information

asphalt applications Choosing a surfacing contractor mpa asphalt Asphalt Information Service Mineral Products Association

asphalt applications Choosing a surfacing contractor mpa asphalt Asphalt Information Service Mineral Products Association asphalt applications 5 Choosing a surfacing contractor Service mpa asphalt November 2009 Mineral Products Association Introduction Property owners with existing asphalt* or as more commonly known macadam

More information

SECTION 3.3 - PAVEMENT DESIGN

SECTION 3.3 - PAVEMENT DESIGN SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

research report Investigation of Proposed AASHTO Rut Test Procedure Using the Asphalt Pavement Analyzer Virginia Transportation Research Council

research report Investigation of Proposed AASHTO Rut Test Procedure Using the Asphalt Pavement Analyzer Virginia Transportation Research Council Final Report VTRC 07-R11 Virginia Transportation Research Council research report Investigation of Proposed AASHTO Rut Test Procedure Using the Asphalt Pavement Analyzer http:/www.virginiadot.org/vtrc/main/online_reports/pdf/07-r11.pdf

More information

On Bituminous Mix Design

On Bituminous Mix Design On Bituminous Mix Design Animesh Das 1 Abstract: Bituminous mix design is a delicate balancing act among the proportions of various aggregate sizes and bitumen content. For a given aggregate gradation,

More information

The soot and scale problems

The soot and scale problems Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

74 Chapter 5. 5.5 CO 2 Cleaning

74 Chapter 5. 5.5 CO 2 Cleaning 74 Chapter 5 5.5 CO 2 Cleaning The CO 2 method involves spraying CO 2 snow against the optical surface. Snow is made using a specialized nozzle (Fig. 5.7) that expands the gas or liquid through an orifice.

More information

Pellet Process - Uses and Exposures

Pellet Process - Uses and Exposures Pellet Process - Uses and Exposures 1 PROCESS - MANUFACTURING & USES 1 1.1 Manufacturing of pellets 2 Pellets are formed from the raw materials fine ores and additives of < 0.05 mm - into 9-16 mm spheres

More information

Concrete Resurfacing. System Guide. by Parchem Construction Supplies

Concrete Resurfacing. System Guide. by Parchem Construction Supplies Concrete Resurfacing System Guide by Parchem Construction Supplies Resurfacing Spray-on resurfacing is a 2-3mm topping applied to structurally sound concrete surfaces that are at least 28 days old. Resurfacing

More information

Clinic Washer-Disinfectors. Washer-Disinfector Line

Clinic Washer-Disinfectors. Washer-Disinfector Line Clinic Washer-Disinfectors Washer-Disinfector Line Easy-to-Use Washer-Disinfectors for Clinics The Clinic Range of Washer Disinfectors provides superior cleaning and disinfection combined with innovative

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

Example Specification for Concrete using Current Building Code Requirements

Example Specification for Concrete using Current Building Code Requirements Example Specification for Concrete using Current Building Code Requirements DISCLAIMER: This specification is an example that accompanies a seminar titled The P2P Initiative: Performance-based Specs for

More information

and Fuel Use/GHG Emissions: Model

and Fuel Use/GHG Emissions: Model Life Cycle Assessment of Pavement and Fuel Use/GHG Emissions: Model and Initial Results Ting Wang, In-Sung Lee, Chang-Mo Kim, EB Lee, Alissa Kendall, John Harvey FHWA Pavement Performance Prediction Symposium

More information