1 Office of Financial Management Washington State Major Project Status Report June 8th, 2015 Agency Number: 699 Project Number: School/Campus: Renton Technical College Project Title: Automotive Complex Renovation Bill Reference(s): Contact name, phone number, Barry Baker, (425) Agency: SBCTC Project Description: The Automotive Technologies education and training programs at Renton Technical College are vital to the success of this important local industry sector. However, the existing 26-year-old Paul Greco K Complex no longer meets current programmatic needs. This project will fully renovate the existing K1, K2, and K4 buildings and provide a new K3 building replacing the existing poorly functioning K3 building. The new building to replace K3 will provide additional shop space and allow expansion of existing shop spaces in K2 and K4. The renovation will correct building deficiencies, increase energy efficiency, improve life/safety, and improve program delivery. Square feet: Renovation K1, K2, & K4: New K3 Building: Total 45,905 sf 17,645 sf 63,550 sf Scope changes: There have been no significant scope changes since the Predesign study was completed. Project Total Cost: Phase Biennium Appropriation Amount Predesign & Design $1,583,000 $1,583,000 Construction $16,915,000 $18,446,000 Other (Approp/Non Approp) $1,949,000 $2,000,000 See below* Total $20,447,000 $22,029,000 *RTC is planning on obtaining an Equipment Loan from the State Treasurer s office and will utilize 148 funds to repay the loan Budgeted MACC = $12,970,123 Bid MACC (May 28, 2015) = $14,300,000 1

2 Schedule: Budget Schedule Actual/Forecast Variance (wks) Predesign Complete October 2013 Feb 2014 Draft completed Feb Final report submitted April 2014 Start Design March 2014 March Bid Date May 2015 May 28, Notice to Proceed July 2015 July 1, 2015 (Depending 0 on end of Legislative Session date) 50% Complete May 2016 Apr wks Substantial Completion April 2017 Feb wks Final Acceptance June 2017 April weeks Project Status and discussion of Critical Path for Construction: The project was funded for Predesign and Design to be performed in the biennium. At the end of the Schematic Design phase in May 2014 the MACC scope was estimated at $14.3 mil., which was approximately 10% over the MACC budget. A Value Analysis process was performed in June, and at the end of the Design Development phase in September the MACC scope was estimated at $12.9 mil. In the Value Analysis process, the most significant cost estimate reduction was achieved by the college committing to temporarily move the automotive programs off campus to a leased facility during construction. By eliminating the need for sequencing, the anticipated construction schedule (NTP to SC) was reduced from 22 months to 13 months. After investigating potential temporary off-campus facilities, the college was unable to find a viable property to lease. During the Construction Documents phase the college decided to keep the automotive programs on campus during construction. The anticipated construction schedule (NTP to SC) was revised to 20 months, including multiple Construction Sequences to allow the programs to remain operational. However, with help from other Value Engineering measures, the CD phase MACC cost estimate was under the budgeted MACC of $12,970,000 prior to going out to bid. The project recently opened bids on May 28, There were (3) bidders, and the apparent low was Construction Enterprises & Contractors (CE&C) at $14,300,000 base bid, which is $1,330,000 over the budgeted MACC of $12,970,000. The project is currently over budget. 2

3 In order to complete the overall construction schedule within the biennium and have programs operational for Fall quarter 2015, it is necessary to perform site & utility work (Sequences 1A & 1B) within the 10-week period between July 1 Sept 14, This requires Notice to Proceed (NTP) to be issued on July 1, In order to issue NTP on July 1 st, the Department of Enterprise Services needs funding approval from the college, and the college needs a biennium capital funding commitment amount from the Legislature by June 15 th. Contract Award History A/E Agreement Construction Contract (excl. sales tax) Predesign Agreement $ 105,488 Bid Award Amount $ Predesign Amendts $ 48,811 Original Agreement $1,252,519 Bid Award Amount $ Amendments $ 474,059 Change Orders $ Pending Changes $ 140,000 Pending Changes $ Total $2,020,877 Total $ Current Design Current Construction Contingency $43,600 Contingency $ Potential for Project Cost Overruns/Claims At the end of Predesign in April 2014, the scope of the project was challenged with a total stateappropriation budget of $18,299,000, which is 4% lower than the $18,986,000 total project estimate performed in the 2007 Project Request Report seven years ago. The notification in August 2014 of an increased state-appropriation budget of $18,498,000 was good news, but is still 2.6% lower than the 2007 PRR. The project is currently facing several potential cost overruns due to construction bid market escalation, pending legislative budget cuts, and the twice-extended legislative session: Although the CD phase MACC cost estimate was under the $12,970,000 budgeted MACC, the estimate did not accurately predict the high level of escalation in the current bid market. The low base bid came in at $14,300,000, which is 10% over budget. Although the final Legislative budget has yet to be released, the preliminary Governor s, House, and Senate budgets all listed the project s allotment at a (10%) cut. Completing the construction phase within the biennium and keeping programs operational during construction require NTP to be issued on July 1, If a biennium funding amount from the Legislature is not released by June 15 th, the construction phase could be delayed. Construction start could be postponed by up to a year, due to the necessity of scheduling site mobilization/prep during Summer quarter and site/utility work during the 5-week break from mid-aug to mid-sept, in order to keep the automotive programs operational during construction. Any delay over 60 days from the 3

4 May 28 th bid opening would require the project to be re-bid, which would also likely result in further bid escalation and budget overruns. Discussion of Project Quality The buildings will be durable, easy to maintain and cost effective to operate. Finish materials (i.e., pre-finished metal siding, sealed concrete floors, etc.) will be easy to maintain, with minimal manpower, and which can withstand the level of use typical at a higher educational facility without losing their appeal. The new building and renovation of existing buildings are designed with flexibility as a goal; flexibility in its configuration with open shop bays, and flexibility in the way it will be used. New classrooms will be located for shared use by the Automotive programs, industry partners, and other programs by the College. Project Images 4

5 5

Preservation projects. Programmatic projects. Grant projects.

Preservation projects. Programmatic projects. Grant projects. A capital project is a project to construct either new facilities or make significant, long-term renewal improvements to existing facilities. A capital project using general obligation bonds usually has

More information

PROJECT CHANGE REQUEST

PROJECT CHANGE REQUEST PROJECT CHANGE REQUEST Name of Project: UAS Freshman Residence Hall, Phases 1 and 2 Project Type: New Construction Location of Project: UAS Juneau Auke Lake Campus Project Number: 2004 26 Date of Request:

More information

375 - Central Washington University Capital Project Request. 2015-17 Biennium

375 - Central Washington University Capital Project Request. 2015-17 Biennium Starting Fiscal Year: 2012 Project Class: Program Agency Priority: 3 Project Summary CWU completed a self-funded predesign on the existing vacated Samuelson Union Building (SUB) in June 2010, which was

More information

2008-2010 Biennium Date: June 8, 2007

2008-2010 Biennium Date: June 8, 2007 DPB Form CNJ March 2007 Virginia Department of Planning and Budget Project Request Justification 2008-2010 Biennium Date: June 8, 2007 A. General Information 1. Agency Name: Longwood University 2. Agency

More information

APPENDIX E GUIDELINES FOR PREPARING CAPITAL PROJECT COST ESTIMATES

APPENDIX E GUIDELINES FOR PREPARING CAPITAL PROJECT COST ESTIMATES APPENDIX E GUIDELINES FOR PREPARING CAPITAL PROJECT COST ESTIMATES The capital project cost estimate is a tool to assist agencies and institutions in creating a project construction budget. It can also

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 5c ACTION ITEM Date of Meeting April 1, 2014

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 5c ACTION ITEM Date of Meeting April 1, 2014 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 5c ACTION ITEM Date of Meeting April 1, 2014 DATE: TO: FROM: Wayne Grotheer, Director, Aviation Project Management Group David Soike, Director, Aviation

More information

Office of Budget and Financial Planning New York University. Finance Task Force April 30, 2008

Office of Budget and Financial Planning New York University. Finance Task Force April 30, 2008 Office of Budget and Financial Planning New York University Finance Task Force April 30, 2008 2 Functions of the Office of Budget and Financial Planning Prepare the annual operating and capital budgets

More information

Modified Pre-design Instructions

Modified Pre-design Instructions State of Washington Office of Financial Management 2015 Modified Pre-design Instructions November 2015 To accommodate persons with disabilities, this document is available in alternate formats by calling

More information

It is the recommendation of the administration and the Finance and Asset Management Committee that the Board of Regents:

It is the recommendation of the administration and the Finance and Asset Management Committee that the Board of Regents: F 2 UW Tacoma Urban Solutions Phase 1 RECOMMENDED ACTIONS (Board of Regents Review & Approval - Stage 2) It is the recommendation of the administration and the Finance and Asset Management Committee that

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting January 6, 2015 DATE: TO: FROM: Michael Ehl, Director Airport Operations Wayne Grotheer, Director Aviation Project Management

More information

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs.

The purpose of the policy is to establish guidelines for the administration of the School Planning and the School Construction programs. SCHOOL PLANNING/SCHOOL CONSTRUCTION PROGRAMS Effective: August 14, 2014 I. Policy Statement The Board of Education is responsible for providing safe, engaging and supportive educational and work environments

More information

TRADERS CROSS BLUFFTON, SC 29909

TRADERS CROSS BLUFFTON, SC 29909 TRADERS CROSS BLUFFTON, SC 29909 2 OFFICE BUILDINGS 44,556 sf OKATIE COMMERCE PARK PROPERTY FEATURES 108 & 110 Traders Cross Centrally located between I-95, Hilton Head, Savannah & Beaufort Prime location

More information

Targeted Group Business and Veteran-Owned Small Business Programs. March 2014

Targeted Group Business and Veteran-Owned Small Business Programs. March 2014 Targeted Group Business and Veteran-Owned Small Business Programs March 2014 1 Prepared by Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000

More information

Senate Budget & Tax Committee

Senate Budget & Tax Committee Senate Budget & Tax Committee January 15, 2014 Maryland Stadium Authority Interagency Committee on School Construction Baltimore City Public Schools Baltimore City Baltimore City Public Schools Construction

More information

Owner s project control review. 2014 Baker Tilly Virchow Krause, LLP

Owner s project control review. 2014 Baker Tilly Virchow Krause, LLP Owner s project control review 2014 Baker Tilly Virchow Krause, LLP About Baker Tilly > Established in 1931 > One of the top 20 largest accounting and advisory firms in the United States according to Accounting

More information

CONCORD UNIVERSITY BOARD OF GOVERNORS

CONCORD UNIVERSITY BOARD OF GOVERNORS CONCORD UNIVERSITY BOARD OF GOVERNORS Policy No. 12 Policy on Fixed Asset Inventory Effective Date: 05/04/2005 Section 1. GENERAL 1.1 Scope: This policy provides direction for establishing and maintaining

More information

Project Management Manual for Design and Construction Projects. (Revised August 2010)

Project Management Manual for Design and Construction Projects. (Revised August 2010) Project Management Manual for Design and Construction Projects (Revised August 2010) Table of Contents 1. Overview...5 1.1 Introduction... 6 1.2 Design and Construction Process... 7 1.3 Project Delegation

More information

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents Primary Author: Laura McCluskey 4801 N Career Ave Sioux Falls, SD

More information

Planning and Construction Management Services

Planning and Construction Management Services Planning and Construction Management Services Construction Project Management Services New construction, major renovations or improvements to building structures and systems are part of the Department's

More information

CAPITAL PLANNING, DESIGN AND CONSTRUCTION SECTION IV - FISCAL RESOURCES FOR CAMPUS DEVELOPMENT SECTIONS 9025-9040

CAPITAL PLANNING, DESIGN AND CONSTRUCTION SECTION IV - FISCAL RESOURCES FOR CAMPUS DEVELOPMENT SECTIONS 9025-9040 9025 FISCAL RESOURCES FOR CAMPUS DEVELOPMENT The following paragraphs describe the process for obtaining and encumbering funding for capital outlay. The process for obtaining support funds for new space

More information

REPORT TO THE UTAH LEGISLATURE. A Performance Audit of School Building Construction. November 2008. Number 2008-14. Audit Performed By:

REPORT TO THE UTAH LEGISLATURE. A Performance Audit of School Building Construction. November 2008. Number 2008-14. Audit Performed By: REPORT TO THE UTAH LEGISLATURE Number 2008-14 A Performance Audit of School Building Construction November 2008 Audit Performed By: Audit Manager Audit Supervisor Audit Staff Tim Osterstock Wayne Kidd

More information

Priority School Name Minuteman Technical Vocational High School

Priority School Name Minuteman Technical Vocational High School District: Minuteman Regional Vocational Technical School District School Name: Minuteman Technical Vocational High School Recommended Category: Preferred Schematic Date: July 30, 2015 Recommendation That

More information

Proposal Design Development For expansion of the Convention Center

Proposal Design Development For expansion of the Convention Center B O W AGENDA: ZIIUIUY ITEM: 6.1 THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE MEMORANDUM TO: REDEVELOPMENT AGENCY BOARD FROM: HARRY S. MAVROGENES EXECUTIVE DIRECTOR SUBJECT: SEE BELOW DATE: JANUARY

More information

SENATE FILE NO. SF0077. Sponsored by: Senator(s) Schiffer and Bebout and Representative(s) Madden A BILL. for

SENATE FILE NO. SF0077. Sponsored by: Senator(s) Schiffer and Bebout and Representative(s) Madden A BILL. for 0 STATE OF WYOMING LSO-0 SENATE FILE NO. SF00 Community college construction. Sponsored by: Senator(s) Schiffer and Bebout and Representative(s) Madden A BILL for AN ACT relating to construction of community

More information

Reasons for Change Orders

Reasons for Change Orders T E X A S D E PA R T M E N T O F T R A N S P O R TAT I O N A change order is defined in the 2004 Standard Specification Book as a written order to the Contractor detailing changes to the specified work,

More information

Capital Projects Town Hall Meeting

Capital Projects Town Hall Meeting Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CEMP-CP Regulation No. 415-1-15 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Construction CONSTRUCTION TIME EXTENSIONS FOR WEATHER ER 415-1-15 Distribution Restriction

More information

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER

PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER UNIVERSITY OF WASHINGTON OFFICE OF THE VICE PROVOST PLANNING AND BUDGETING Capital and Space Planning PROJECT REQUEST REPORT UNIVERSITY OF WASHINGTON DATA CENTER JULY 31, 2006 University of Washington

More information

Barrie Primary Care Campus

Barrie Primary Care Campus Barrie Primary Care Campus Barrie Primary Care Campus Location The Barrie Primary Care Campus will lead the market as the most advance primary health care center in Ontario. It will be a significant development

More information

TIM ANKER Commercial Properties (435) 575 5630 tanker@comre.com

TIM ANKER Commercial Properties (435) 575 5630 tanker@comre.com , UTAH OFFICE & RETAIL SPACE FOR LEASE 374,000 sf approved mixed-use PHASE I: 34,000 SF OFFICE WITH 1,800 SF DELI FILM STUDIOS TM PROPERTY FEATURES ENTERTAINMENT DEAL MAKING CENTER Park City Film Studios

More information

The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH

The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH The Commonwealth of Massachusetts AUDITOR OF THE COMMONWEALTH ONE ASHBURTON PLACE, ROOM 1819 BOSTON, MASSACHUSETTS 02108 A. JOSEPH DeNUCCI AUDITOR TEL. (617) 727-6200 NO. 2008-1461-3A INDEPENDENT STATE

More information

NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008

NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008 NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008 PROGRAM AND CONSTRUCTION MANAGER SEPTEMBER 30, 2008

More information

STATE OF MINNESOTA CAPITAL GRANTS MANUAL. A step-by-step guide that describes what grantees need to do to receive state capital grant payments

STATE OF MINNESOTA CAPITAL GRANTS MANUAL. A step-by-step guide that describes what grantees need to do to receive state capital grant payments STATE OF MINNESOTA CAPITAL GRANTS MANUAL A step-by-step guide that describes what grantees need to do to receive state capital grant payments Revised May 2014 The State of Minnesota Capital Grants Manual

More information

The University of British Columbia Board of Governors

The University of British Columbia Board of Governors The University of British Columbia Board of Governors Policy No.: 125 Approval Date: September 2009 Last Revision: September 27, 2011 Responsible Executive: Vice-President, Finance Resources, and Operations

More information

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table

More information

CONSTRUCTION MANAGEMENT REPORT NO. 2

CONSTRUCTION MANAGEMENT REPORT NO. 2 CONSTRUCTION MANAGEMENT REPORT NO. 2 Expansion and Renovation Prepared for: HOLLAND PUBLIC SCHOOLS BOARD OF EDUCATION Date: October 31, 2011 HOLLAND PUBLIC SCHOOLS HIGH SCHOOL EXPANSION AND RENOVATION

More information

Hard copies should be sent to: The Denver Waldorf School Attn: Lori Pucelik 940 Fillmore St Denver, CO 80206

Hard copies should be sent to: The Denver Waldorf School Attn: Lori Pucelik 940 Fillmore St Denver, CO 80206 April 24, 2013 RE: THE DENVER WALDORF SCHOOL SCHEMATIC DESIGN ARCHITECTURAL SERVICES REQUEST FOR PROPOSAL Dear Contact, Beecher Development Services has been retained by to provide Owners Representation

More information

Assembly Bill No. 900 CHAPTER 7

Assembly Bill No. 900 CHAPTER 7 Assembly Bill No. 900 CHAPTER 7 An act to add Chapter 3.2.1 (commencing with Section 15819.40), Chapter 3.2.2 (commencing with Section 15819.41), Chapter 3.11 (commencing with Section 15820.90), and Chapter

More information

Guidelines for Determining Architect/Engineer Fees for Public Works Building Projects (effective July 1, 2015)

Guidelines for Determining Architect/Engineer Fees for Public Works Building Projects (effective July 1, 2015) Guidelines for Determining Architect/Engineer Fees for Public Works Building Projects (effective July 1, 2015) When budgeting for state capital projects, the estimated value of the Architectural/Engineering

More information

CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2

CONTRACT FOR DESIGN SERVICES. Appendix 2 Contract Documents Design Services. PS-0748-A Page 1 5/4/2016 Appendix 2 CONTRACT FOR DESIGN SERVICES Contract Documents Design Services PS-0748-A Page 1 5/4/2016 Table of Contents Design Services Contract Contract references Attachments described below that will be provided

More information

Revised Work Scope Dated April 23 rd, 2015

Revised Work Scope Dated April 23 rd, 2015 Revised Work Scope Dated April 23 rd, 2015 2.4 SCOPE OF SERVICES The following combines the Scope of Services included in RFQ No. 671 dated March 12, 2015 and the Invitation to Interview letter dated March

More information

Request for Qualifications 2015-162

Request for Qualifications 2015-162 Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015

More information

North American Development Bank. Bid Evaluation Procedures

North American Development Bank. Bid Evaluation Procedures North American Development Bank Bid Evaluation Procedures BID EVALUATION PROCEDURES TABLE OF CONTENTS The Bidding Process Introduction Preliminary Actions and General Concerns Contract data sheet Responsible

More information

APPENDIX A. 1. Quality Control

APPENDIX A. 1. Quality Control 1. Quality Control A. Throughout the term of the contract MUNI may compare the uniforms and accessories furnished by the Contractor with the contract specifications and any samples that were submitted

More information

Discretionary Capital Expenditures. Discretionary Capital Expenditure. Presented by Byron Smith, CCIM

Discretionary Capital Expenditures. Discretionary Capital Expenditure. Presented by Byron Smith, CCIM Discretionary Capital Expenditures Discretionary Capital Expenditure Presented by Byron Smith, CCIM Discretionary Capital Expenditure Case Study Overview During the holding period of a commercial real

More information

Agencies should use the following categories when requesting capital projects:

Agencies should use the following categories when requesting capital projects: Capital Improvements State agencies maintain buildings of various agencies all over the state. Given the financial commitment the state s facilities demand, expenditure requests for capital projects are

More information

Facilities Portfolio Management Tool

Facilities Portfolio Management Tool 2016 Facilities Portfolio Management Tool Project Charter Budget- Facilities Oversight Office of Financial Management 4/10/2016 CONTENTS Overview... 2 Purpose Statement... 2 Background... 2 Goals & Objectives...

More information

Attachment A. California Community Colleges Capital Outlay Grant Application Process

Attachment A. California Community Colleges Capital Outlay Grant Application Process Attachment A California Community Colleges Capital Outlay Grant Application Process Community college districts have the responsibility to maintain, modernize, and expand the facilities at their institutions

More information

Office of Energy Resources

Office of Energy Resources Historical Summary OPERATING BUDGET FY 215 FY 215 FY 216 FY 217 FY 217 Total App Actual Approp Request Gov Rec BY FUND CATEGORY Dedicated 1,36,2 415,8 787,6 84,3 815,7 Federal 665,5 583,4 727,4 435,6 442,

More information

Prepared by David Willson, OCIO in consultation with Marc Buchalter, Procurement Please send comments to David Willson at dwillson@berkeley.

Prepared by David Willson, OCIO in consultation with Marc Buchalter, Procurement Please send comments to David Willson at dwillson@berkeley. Technology RFX Customer Guide Introduction This guide is intended for those that have identified a need to solicit bids from suppliers but may unclear on the different types of documents, the roles various

More information

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield

More information

Commissioners present: Mel Menegat, John Simpson, and Ron Farmer. Commissioners Patrick Lanning and John Brown were excused.

Commissioners present: Mel Menegat, John Simpson, and Ron Farmer. Commissioners Patrick Lanning and John Brown were excused. EUGENE WATER & ELECTRIC BOARD WORK SESSION EWEB BOARD ROOM NOVEMBER 20, 2007 5:30 P.M. Commissioners present: Mel Menegat, John Simpson, and Ron Farmer. Commissioners Patrick Lanning and John Brown were

More information

Considered: 05/24/2016

Considered: 05/24/2016 EXECUTIVE SUMMARY SANTA CLARA COUNTY CIVIC CENTER PROPOSED MASTER DEVELOPMENT AGREEMENT Revised May 2, 2016 County Team County, Office of Asset and Economic Development, Office of the County Executive

More information

Changes Affecting Purchasing and Contracting

Changes Affecting Purchasing and Contracting 2 0 0 3 L E G I S L A T I O N Changes Affecting Purchasing and Contracting By Frayda S. Bluestein The most significant legislative change in the purchasing and contracting field this session will allow

More information

SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT LAND DEVELOPMENT PROJECT. March 5, 2015

SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT LAND DEVELOPMENT PROJECT. March 5, 2015 SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT LAND DEVELOPMENT PROJECT March 5, 2015 2 WHY IS THE SJECCD BOARD OF TRUSTEES ACTING TO IMPLEMENT A SURPLUS LAND DEVELOPMENT PUBLIC/PRIVATE PARTNERSHIP? Fiscal

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES. Part I: Proposal Information REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES Part I: Proposal Information A. General Information The Berwick Area School District is soliciting proposals for construction management services

More information

CERTIFICATION OF ENROLLMENT ENGROSSED HOUSE BILL 2262. 62nd Legislature 2012 Regular Session

CERTIFICATION OF ENROLLMENT ENGROSSED HOUSE BILL 2262. 62nd Legislature 2012 Regular Session CERTIFICATION OF ENROLLMENT ENGROSSED HOUSE BILL 2262 62nd Legislature 2012 Regular Session Passed by the House March 8, 2012 Yeas 98 Nays 0 Speaker of the House of Representatives Passed by the Senate

More information

State Cashflow Management

State Cashflow Management Informational Paper 77 State Cashflow Management Wisconsin Legislative Fiscal Bureau January, 2009 State Cashflow Management Prepared by Dave Loppnow Wisconsin Legislative Fiscal Bureau One East Main,

More information

Florida Department of Transportation 1000 NW 111 th Avenue, Room 6203 Miami, Florida 33172-5800

Florida Department of Transportation 1000 NW 111 th Avenue, Room 6203 Miami, Florida 33172-5800 RICK SCOTT GOVERNOR Florida Department of Transportation 1000 NW 111 th Avenue, Room 6203 Miami, Florida 33172-5800 ADDENDUM No. 02 ISSUED ON AUGUST 1, 2012 TO THE PROJECT INVITATION TO BID DOCUMENT ADVERTISED

More information

By: Pat Derdenger, Partner Steptoe & Johnson LLP 201 East Washington Street, 16 th Floor Phoenix, Arizona 85004-2382

By: Pat Derdenger, Partner Steptoe & Johnson LLP 201 East Washington Street, 16 th Floor Phoenix, Arizona 85004-2382 ARIZONA TAX: PRECONSTRUCTION SERVICES ARE THEY TAXABLE UNDER THE PRIME CONTRACTING CLASSIFICATION OF THE ARIZONA TRANSACTION PRIVILEGE TAX OR NOT? (HOUSE BILL 2622 ANSWERS THE QUESTION) By: Pat Derdenger,

More information

WORKING DRAFT HOUSE BILL NO. Select Committee on Capital Financing and Investments A BILL. for

WORKING DRAFT HOUSE BILL NO. Select Committee on Capital Financing and Investments A BILL. for 00 STATE OF WYOMING 0LSO-0.W WORKING DRAFT HOUSE BILL NO. State building commission repeal. Sponsored by: Select Committee on Capital Financing and Investments A BILL for AN ACT relating to administration

More information

SAMPLE FINANCING AGREEMENT FOR GENERAL OBLIGATION COMMERCIAL PAPER FINANCING AGREEMENT. between TEXAS PUBLIC FINANCE AUTHORITY. and.

SAMPLE FINANCING AGREEMENT FOR GENERAL OBLIGATION COMMERCIAL PAPER FINANCING AGREEMENT. between TEXAS PUBLIC FINANCE AUTHORITY. and. SAMPLE FINANCING AGREEMENT FOR GENERAL OBLIGATION COMMERCIAL PAPER FINANCING AGREEMENT between TEXAS PUBLIC FINANCE AUTHORITY and Pertaining to Texas Public Finance Authority State of Texas Tax Exempt

More information

QUESTIONS ABOUT PAY IT FORWARD

QUESTIONS ABOUT PAY IT FORWARD QUESTIONS ABOUT PAY IT FORWARD INTRODUCTION Pay It Forward has generated a lot of excitement across the country as a way to help address pressing problems in higher education prices and student debt. As

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON : For the Meeting of ACTION ITEM APPROVAL OF PARTIAL PRELIMINARY PLANS FUNDING, LOWER SPROUL PROJECTS, BERKELEY CAMPUS CAMPUS PROJECT PROJECT

More information

County Of Sonoma Agenda Item Summary Report

County Of Sonoma Agenda Item Summary Report County Of Sonoma Agenda Item Summary Report Department: General Services Contact: Rob Kambak Phone: (707) 565-3211 Board Date: 10/27/2009 4/5 Vote Required Deadline for Board Action: AGENDA SHORT TITLE:

More information

MISSISSIPPI DEPARTMENT OF HEALTH Division of Health Planning and Resource Development May 2007. Staff Analysis

MISSISSIPPI DEPARTMENT OF HEALTH Division of Health Planning and Resource Development May 2007. Staff Analysis MISSISSIPPI DEPARTMENT OF HEALTH Division of Health Planning and Resource Development May 2007 CON Review: HG-RC-0407-007 Southwest Mississippi Regional Medical Center Capital Expenditure: $8,597,238 Location:

More information

Index. a. Personnel...2 b. Sustainability...2 c. Materials Management...3

Index. a. Personnel...2 b. Sustainability...2 c. Materials Management...3 1 Index Executive Summaries a. Personnel...2 b. Sustainability...2 c. Materials Management...3 I. Personnel a. Background...4 b. Application Process...4 c. Departmental Recruiting...6 d. The City Residency

More information

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/073

INTERNAL AUDIT DIVISION AUDIT REPORT 2013/073 INTERNAL AUDIT DIVISION AUDIT REPORT 2013/073 Audit of maintenance and building services provided by the Office of Central Support Services at Headquarters Overall results relating to the Office of Central

More information

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10)

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10) CRITICAL PATH METHOD SCHEDULE (Revised 03-24-10) The Standard Specifications are revised as follows: SECTION 108, BEGIN LINE 177, INSERT AS FOLLOWS: 108.04.1 Critical Path Method Schedule (a) General Requirements

More information

Information for Charter Schools. The following six requirements cannot be waived by a charter school:

Information for Charter Schools. The following six requirements cannot be waived by a charter school: Information for Charter Schools Site, Facility, and School Codes There are three codes associated with any school. The site code references the property on which an educational facility is located. Site

More information

SEALED BID REQUEST FOR INFORMATION

SEALED BID REQUEST FOR INFORMATION Department of Buildings and General Services Purchasing & Contract Administration 10 Baldwin St. Agency of Administration Montpelier VT 05633 [phone] 802-828-2210 [Fax] 802-828-2222 www.bgs.state.vt.us

More information

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR DB-BIM Contract No. 5890 07/14 Project No. 02-3210 AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND EVOLVE INFRASTRUCTURE SOLUTIONS, LLC, DESIGN-BUILD CONTRACTOR 1 DB-BIM Contract

More information

LOS ANGELES COMMUNITY COLLEGE DISTRICT Los Angeles Trade Technical College PROGRESS REPORT NOVEMBER 2013

LOS ANGELES COMMUNITY COLLEGE DISTRICT Los Angeles Trade Technical College PROGRESS REPORT NOVEMBER 2013 1.0 EXECUTIVE SUMMARY 1.1 Campus Program Summary There are seven (7) projects in pre-design and programming; five (5) are in design; and six (6) in construction. A summary of the Trade-Tech construction

More information

August 2006 Report No. 06-050

August 2006 Report No. 06-050 John Keel, CPA State Auditor An Audit Report on Construction Management at the Texas Tech University System Report No. 06-050 An Audit Report on Construction Management at the Texas Tech University System

More information

SUCF PROJECT COST REPORTING GUIDE

SUCF PROJECT COST REPORTING GUIDE SUCF PROJECT COST REPORTING GUIDE State University Construction Fund 353 Broadway / ALBANY, NY 12246 SUCF 900 / 11 Table of Contents Page A. Preface 1 B. Area Takeoff Methodology 1. General 2 2. Net Assignable

More information

Memo. TO: Mayor and City Council FROM: Dave Kanner, city administrator DATE: September 12, 2012 RE: Potential lease and other costs for a day center

Memo. TO: Mayor and City Council FROM: Dave Kanner, city administrator DATE: September 12, 2012 RE: Potential lease and other costs for a day center Memo TO: Mayor and City Council FROM: Dave Kanner, city administrator DATE: September 12, 2012 RE: Potential lease and other costs for a day center At its meeting of August 6, the Council asked me to investigate

More information

CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT

CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT 04-2016 CONSTRUCTION MANAGEMENT-AT-RISK AGREEMENT This Construction Management-at-Risk Agreement ( Agreement ), by and between the Lone Star College, hereinafter referred to as LSC or Owner, and, hereinafter

More information

Operating Budget Data

Operating Budget Data D25E03 Interagency Committee on School Construction Operating Budget Data ($ in Thousands) FY 15 FY 16 FY 17 FY 16-17 % Change Actual Working Allowance Change Prior Year General Fund $1,879 $1,986 $1,934

More information

In 2012 the commercial sector natural gas demand was 201 billion cubic feet (bcf) or 2.01e + 23 thousand British thermal units (kbtu).

In 2012 the commercial sector natural gas demand was 201 billion cubic feet (bcf) or 2.01e + 23 thousand British thermal units (kbtu). ENVIRONMENTAL SETTING The Southern California Gas Company (SoCalGas) provides natural gas to the City of Malibu. The City lies within the boundaries of the South Coastal distribution division. SoCalGas

More information

United States General Accounting Office GAO. High-Risk Series. February 1995. Farm Loan Programs GAO/HR-95-9

United States General Accounting Office GAO. High-Risk Series. February 1995. Farm Loan Programs GAO/HR-95-9 GAO United States General Accounting Office High-Risk Series February 1995 Farm Loan Programs GAO/HR-95-9 GAO United States General Accounting Office Washington, D.C. 20548 Comptroller General of the

More information

Comparison of California Health Coverage Expansion Proposals

Comparison of California Health Coverage Expansion Proposals Note: A comparison of the Senate Republican proposal for the special session, CalCare Plus will be available shortly. Californians to Be Covered 1 Consumers/ Individuals Treatment of Self-Employed Employers

More information

Centinela Valley Union High School District. Measure CV Program Update July 23, 2012

Centinela Valley Union High School District. Measure CV Program Update July 23, 2012 Centinela Valley Union High School District Measure CV Program Update July 23, 2012 Site Construction Progress Site Updates Hawthorne High School Lawndale High School Leuzinger High School 2 Hawthorne

More information

Among other things, completion of the project will allow expansion at the campus to include 6 th -8 th graders and serve over 1,000 students.

Among other things, completion of the project will allow expansion at the campus to include 6 th -8 th graders and serve over 1,000 students. 1003 K Street NW Suite 700 Washington, DC 20001 202.223.4505 phone 202.223.4504 fax www.kippdc.org May 2, 2014 REQUEST FOR PROPOSAL ( RFP ) FOR CONSTRUCTION MANAGEMENT SERVICES FOR AN EXPANSION PROJECT

More information

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015)

PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015) PROCEDURES FOR THE NONPUBLIC AGING SCHOOLS PROGRAM (FISCAL YEAR 2015) August 2014 These procedures are available for download at: http://www.pscp.state.md.us Applications for this program must be submitted

More information

Puget Sound Emergency Radio Network: Project Schedule and Cost Risks

Puget Sound Emergency Radio Network: Project Schedule and Cost Risks Puget Sound Emergency Radio Network: Project Schedule and Cost Risks Thomas Wood Tina Rogers November 10, 2015 Executive Summary Work to replace the aging Puget Sound Emergency Radio Network (PSERN) is

More information

Roadmap Steering Committee Meeting. Results of the 9/26/2008 Meeting

Roadmap Steering Committee Meeting. Results of the 9/26/2008 Meeting Roadmap Steering Committee Meeting Results of the 9/26/2008 Meeting 1 Agenda The plan to modernize the state s core financial systems o Are we in agreement on what is included in the scope of core financial

More information

Statement of Basis and Purpose. Rules Governing the Arkansas River Water Bank Pilot Program

Statement of Basis and Purpose. Rules Governing the Arkansas River Water Bank Pilot Program Statement of Basis and Purpose On June 5, 2001, Governor Bill Owens signed into law House Bill 01-1354 ( H.B. 1354 or the law ), as codified and found in sections 37-80.5-102, 37-80.5-104 and 37-80.5-105,

More information

OFFICE OF THE STATE COMPTROLLER Thomas P. DiNapoli, State Comptroller. New York State s Cash Flow Crunch

OFFICE OF THE STATE COMPTROLLER Thomas P. DiNapoli, State Comptroller. New York State s Cash Flow Crunch OFFICE OF THE STATE COMPTROLLER Thomas P. DiNapoli, State Comptroller New York State s Cash Flow Crunch November 2009 Summary New York State has already been forced to take extraordinary measures to meet

More information

EXHIBIT 2-2-C PROGRESS SCHEDULES

EXHIBIT 2-2-C PROGRESS SCHEDULES EXHIBIT 2-2-C PROGRESS SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The work specified in this section consists of furnishing transportation, labor, materials, equipment and incidentals necessary for preparation,

More information

Life of a Project. Phase General Activities Specific Activities Notes Expected Time Frame

Life of a Project. Phase General Activities Specific Activities Notes Expected Time Frame 1.0 Inception 1.1 Project Request from Client / User 1.2 Assignment 1.3 1.4 1.5 1.6 1.7 1.8 Preliminary Project Charter Submit Project Charter to Obtain internal project number Initial Project Authorization

More information

OFFICE OF THE SUPERINTENDENT 130 Wescott Road South Portland, Maine 04106-3442

OFFICE OF THE SUPERINTENDENT 130 Wescott Road South Portland, Maine 04106-3442 OFFICE OF THE SUPERINTENDENT 130 Wescott Road South Portland, Maine 04106-3442 Kenneth Kunin, Superintendent of Schools Kathryn Germani, Assistant Superintendent Rolfe Forland, Director of Finance, Human

More information

Professional Property Management TREC 4507

Professional Property Management TREC 4507 Professional Property Management TREC 4507 ANSWER KEY FOR FINAL EXAMINATION (With rational followed by chapter and page references) Example: (1:3 means the answer can be found in Chapter 1 on Page 3).

More information

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT

PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes

More information

Business Plan. for. Executive Sponsor Kristi Beeks, Associate Dean for Finance and Administration College of Health Professions

Business Plan. for. Executive Sponsor Kristi Beeks, Associate Dean for Finance and Administration College of Health Professions Business Plan for Asset Management System Executive Sponsor Kristi Beeks, Associate Dean for Finance and Administration College of Health Professions Customer College of Health Professions Presented by

More information

PHASE 3: PLANNING PHASE

PHASE 3: PLANNING PHASE PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning

More information

ITN for Group Term Life Insurance ITN No.: DMS 14/15-025 Response to Vendor Questions

ITN for Group Term Life Insurance ITN No.: DMS 14/15-025 Response to Vendor Questions 1 1.6 7 Timeline of Events- Why does contract start date say 3/20/15 in the timeline and not 1/1/16? 2 1.6 7 Timeline of Events- Can an extension be provided due to the amount of missing information and

More information

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL OCTOBER, 2013 TABLE OF CONTENTS 1. CHECKLIST PAGE NO. 2. CHECKLIST DETAILS A. Design Path 3 B. Property Acquisition 6 C. Outside

More information

Discussion of the 2016 STIP Fund Estimate - Draft Assumptions

Discussion of the 2016 STIP Fund Estimate - Draft Assumptions Tab 18 Discussion of the 2016 STIP Fund Estimate - Draft Assumptions Presented to the California Transportation Commission Division of Budgets March 26, 2015 Assumptions Background Discussion of Options

More information

GENERAL RETENTION SCHEDULE for WASHINGTON S COMMUNITY and TECHNICAL COLLEGE SYSTEM

GENERAL RETENTION SCHEDULE for WASHINGTON S COMMUNITY and TECHNICAL COLLEGE SYSTEM for The following records retention schedules pertain to the primary copy of a record regardless of media. Some records are given special designations disposition instructions. When indicated on the schedules

More information

Request for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition

Request for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Proposal No. RFP02658

More information