1 Masonry party wall with Lion House Retained boundary wall with chesterfield house Masonry party wall with Lion House : Install temporary lateral support to party wall and boundary wall Historic listed boundary wall Historic listed boundary wall : Install temporary steel frame to retained front facade Existing underpin : Conduct site investigation along party wall and Chesterfield house boundary wall to determine the depth and extent of existing underpinning : Install temporary hoarding and scaffold to Red Lion Yard (subject to agreement) Existing basement retaining wall STAGE Temporary column fixed to the internal face of existing underpin : Install temporary ground beams and supporting piled foundation STAGE : Install temporary steel frame to retained front facade : Install temporary hoarding and scaffold oversailing Red Lion Yard (subject to agreement) : Install temporary ground beam and supporting piled foundation : Install temporary crane base and supporting piles COLUMN CONNECTION DETAIL STAGE A STAGE A A A) the above bar should be 00mm or 0mm A SHEET OF.0.0 SLS P SLS P / A. T: F:
2 A A) : Install folding jib crane (optional) the above bar should be 00mm or 0mm A Hoarding and to Red Lion Yard 7: Existing building demolished 8: Remvove internal face of existing underpins and protruding toes (Optional) Backfill Basement once work to underpins is complete 9: Install 0 diameter piles at 00 crs. Installed at high level 7: Existing building demolished Choice of piling rig subject to site constraints 9: Existing basement retaining wall to be grubbed out prior to piling.0.0 SLS P SLS P.0.0 STAGE STAGE SHEET OF 07 / 7. T: F:
3 A A) the above bar should be 00mm or 0mm A Temporary slab to be dowelled into side of piles 0: Install temporary props to party wall 0: Reduce level of excavation down to underside of props : Excavate to : Once level has been reduced Install low level piles : Install temporary steel props : Install temporary steel props to support piled retaining wall : Construct temporary working platform (optional) Where pile centres are greater than 700mm, the liner wall is to be cast in.0m deep sections throughout the excavation.0.0 SLS P SLS P.0.0 : Temporary piles and ground beams to be braced using steelwork connected to temporary props or piled retaining wall STAGE : Temporary piles to be braced using steelwork connected to temporary props STAGE SHEET OF 07 / 7. T: F:
4 A A) 8: Install props at the above bar should be 00mm or 0mm A 7: Install dowels between piles and slab 7: Install sump pits 7: Install high level slab at basement B level 7: Cast lift pit STAGE 8 9: Excavate swimming pool area, cut to of tension piles : Install secondary props to new RC liner wall 0: Install dowels between piles and slab and cast slab and walls to underside of primary prop Crane support legs may be cast into slab and cut off after construction is complete STAGE 9 : Remove prop Once RC slab has been constructed : Construct RC slab below prop : Construct RC liner wall to underside of proposed slab level : Construct internal RC walls and columns to underside of proposed slab level.0.0 SLS P SLS P.0.0 STAGE 7 : Remove prop at : Excavate to : Piling rig to install new tension piles : Install below ground drainage STAGE 0 SHEET OF 07 / 7. T: F:
5 A A) the above bar should be 00mm or 0mm A Crane voids to be infilled (Optional) 8: Complete superstructure 7: Remove temporary props as slabs are cast : Construct slabs up to ground floor and remove top props to piled retaining wall.0.0 SLS P SLS SHEET OF STAGE STAGE 07 / 7. T: F:
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
More informationKing Post Wall Information
King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-
More informationARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationDUDERSTADT FOUNDATION & CONSTRUCTION, LLC.
DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. Drilling since 1916 2215 Belknap Place Phone (210) 824-3800 San Antonio, TX 78212-1904 Fax (210) 824-9525 www.duderstadtfoundation.com ABOUT THE COVER: Drilled
More informationGEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER
GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER Professional Experience: Pride and Passion in the Art of Structural Engineering since 1979. Professional Registration: Professional
More informationCONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL
CONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL A FULL POLICY WORDING IS AVAILABLE ON REQUEST PLEASE COMPLETE IN CAPITAL LETTERS USING AN INK PEN AND TICK BOXES AS APPROPRIATE Where requested,
More informationAsset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification
Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Contents Introduction... 3 Asset Details... 3 Description... 3 Asset Tagging... 3 Attributes... 4 Data
More informationSECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS
SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS SITE C SHOPPING CENTRE, KHAYELITSHA PROJECT NO 2369 Project Specification Refer all queries to: John Meiring Tel: +27 21 425 0065 REVISION P01 E-mail:
More informationEXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...
More informationFLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad
More informationBuildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
More informationNational Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
More informationU.S. ARMY CORPS OF ENGINEERS MIDDLE EAST DISTRICT WINCHESTER, VIRGINIA DESIGN CHECKLIST
U.S. ARMY CORPS OF ENGINEERS MIDDLE EAST DISTRICT WINCHESTER, VIRGINIA DESIGN CHECKLIST 1. The checklist is intended to serve as a convenient guide in design development as well as the final checking of
More informationInstruction Manual 19/9/01. Flat Roof Carport
Flat Roof Carport Thank you for choosing this quality carport. We strongly recommend that you read these instructions thoroughly. The carport you are building may vary from a carport previously bought
More informationCHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
More informationSupplier ID: 26421. Local Office: GLASGOW 69 Buchanan Street Glasgow G1 3HL
M D & FOUNDATIONS MIDLANDS Supplier ID: 26421 MINI PILING PILING REINFORCED CONCRETE UNDERPINNING DRILLING & GROUTING SITE INVESTIGATION & PILE TESTING NATIONWIDE SPECIALIST PILING & FOUNDATION SERVICES
More informationQuantity Take-off. Quantity Take-off
Quantity Take-off Required Information for Cost Estimate Detailed drawings Specifications Available site data Available resource data (labor, material & equipment) Government regulations Applicable owner
More informationBernie Nimer, Dave Seton Mayfair Hotel Development Corporation
SITE INVESTIGATION REPORT NO. S1r1 PROJECT: The Mayfair Hotel PROJECT NO: 140565 ATTN: Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation PREPARED BY: Cory Zurell, PhD, P.Eng. DATE: 13 April
More informationUp-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
More informationIf stepping is required, step at 180mm as seen in this picture.
Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping
More informationConceptual design and design examples for multi-storey buildings
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Conceptual design and design examples for multi-storey buildings Dr.-Ing. Christian Müller Dipl.-Ing. Matthias Oppe RWTH Aachen Overview
More informationBasement & Foundation Damage
Basement & Foundation Damage Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case
More informationSisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E)
Revision: issue 1 Date: 11 June 2014 Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) 24 th May 2014 Structural Inspection Report Observations
More informationBasement Moisture Problems
Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design
More informationChapter 5.4. Waterproofing of basements and other below ground structures
Chapter Waterproofing of basements and other below ground structures Waterproofing of basements and other below ground structures CONTENTS SCOPE DESIGN Clause Page D1 Design standards D1 2 D2 Statutory
More informationLowering Basement Floors (Underpinning, Benching)
Copyright K.H. Davis Engineering Consultants 2011. All rights reserved Page 1 Lowering Basement Floors (Underpinning, Benching) One way of obtaining additional living space in a home is to renovate a basement
More informationCurrent Status of Seismic Retrofitting Technology
CONTENTS Current Status of Seismic Retrofitting Technology Damages of Past Earthquakes Seismic Diagnosis Method Building Control Section Urban Building Division Bureau of Urban Development, TMG Seismic
More informationWORK SCOPE. Domains in which we work:
WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial
More informationGeotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
More informationThe Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
More informationOSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION Table of Contents Executive Summary... 1 Introduction... 1 Installing
More informationWI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE
Multi-storey Precast Concrete Framed Structures Kim S. Elliott BTech, PhD, CEng, MICE Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE WI LEY Blackwell Contents Preface Notation Precast Concepts, History
More informationBuilding Foundation and Structure
Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original
More informationASHULIA APPARELS LTD. Client Summary Report
Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary
More informationDesigned and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
More informationENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE
ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can
More informationMILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014
MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationResidential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
More informationSlavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
More informationCase studies. Patrick Isaacs BSc(Hons) CEng MICE ACILA National Engineering Manager Cunningham Lindsey
Case studies Patrick Isaacs BSc(Hons) CEng MICE ACILA National Engineering Manager Cunningham Lindsey Process Inspection Investigation Diagnosis Mitigation Repair Case study 1 Clay shrinkage Visit 21/07/11
More informationStandard Designs & Details - Drawings. Drawing Number Rev Title Click Click
Drawing Number Rev Title Click Click NR/CIV/SD/101 A rickwork and masonry repairs Specification for the Works NR/CIV/SD/102 A rickwork and masonry repairs Standard brickwork bonds NR/CIV/SD/103 A rickwork
More informationDemolition & Construction Management Plan
Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview
More informationSECTION 7 Engineered Buildings Field Investigation
SECTION 7 Engineered Buildings Field Investigation Types of Data to Be Collected and Recorded A field investigator looking at engineered buildings is expected to assess the type of damage to buildings.
More informationMaterials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
More informationCONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
More informationBeijing National Swimming Centre, China American Institute of Architects Building Information Model (BIM) Awards Competition 2004 (TAP) Knowledge
Beijing National Swimming Centre, China American Institute of Architects Building Information Model (BIM) Awards Competition 2004 (TAP) Knowledge Community Beijing National Swimming Centre The National
More informationBUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
More informationCity of Fort Smith Building Permit Process Frequently Asked Questions
Question: W ho must obtain a building permit? City of Fort Smith Building Permit Process Frequently Asked Questions Answer: This answer is the same for residential or commercial building. Any owner or
More informationEXCAVATION and BASEMENT CONSTRUCTION. Introduction
EXCAVATION and BASEMENT CONSTRUCTION Introduction In general, excavation means to loosen and.take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used
More informationCODE OF PRACTICE FOR DEMOLITION OF BUILDINGS
CODE OF PRACTICE FOR DEMOLITION OF BUILDINGS 2004 FOREWORD The Draft Code of Practice for Demolition of Buildings was first issued in February 1998 to provide guidance on safe and good practices for demolition
More informationHow To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
More information90 Brighton Road, Surbiton, Surrey
90 Brighton Road, Surbiton, Surrey Civil and Structural Engineering Basement Feasibility Report Mixed Use Scheme 108802-REP-002 March 2015 Contents 1. Executive Summary... 3 2. Site Description and Constraints...
More informationDESIGNING STRUCTURES IN EXPANSIVE CLAY
DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers
More informationEXAMPLES OF SEISMIC RETROFITTING IN JAPAN
09-031 The 2005 World Sustainable Building Conference, EXAMPLES OF SEISMIC RETROFITTING IN JAPAN Hiroshi YAMAMOTO 1 Yasuhiro TSUNEKI 2 Toshihiko KOHNO 3 1 Senior Structural Engineer, Structural Engineering
More informationChaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
More informationSIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO
SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO SIKA SYSTEMS FROM BASEMENT TO ROOF BASEMENT TO ROOF SOLUTIONS FOR ELEPHANT HOUSE AT ZURICH ZOO PROJECT DESCRIPTION The Kaeng Krachan Elephant
More informationEngineered Wood Foundations
Engineered Wood Foundations Emeraldfoundations.com 1 EWF Planning and Installation manual This manual will serve as a guide to planning and installing an Emerald Foundation system. This system is comprised
More informationBUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
More informationDiscussion on Products under the Scope of EN 1090-1 and proposed CEN/TR to clarify the scope
CEN/TC 135 N 686 European Committee for Standardization Comité Européen de Normalisation Europäisches Komitee für Normung CEN/TC 135 Execution of steel structures and aluminium structures N 686 Secretariat:
More information201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
More informationMUNICODE SERVICES LTD.
The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved
More informationUnderpinning Systems 14.1 FOUNDATION REPAIR. Helical Piles
Helical Piles Howard A. Perko Copyright 0 2009 by John Wiley & Sons, Inc. All rights reserved. C h a p t e r 14 Underpinning Systems There has been tremendous growth in the use of helical piles for underpinning
More informationImportant Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage
3.3. Evaluation of Building Foundation Damage Basic Terminology: Damage: Destruction, deformation, inclination and settlement of a building foundation caused by an earthquake. Damage grade: Degree of danger
More informationHanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
More informationConnex. Mortarless Masonry Block System
Connex Mortarless Masonry Block System Connex Mortarless block wall system from Boral The Boral Connex mortarless system comprises three modular components which key together eliminating the need for mortared
More informationRESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS
RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use
More informationImproving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
More informationCavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
More informationBUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
More informationDESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
More informationRe: Damages to Alaska Building from Legislative Information Office Construction
510 L Street Suite 200 Anchorage, AK 99501-1949 (907) 274-22362236 Phone (907) 274-25202520 Fax www.bbfm.com July 22, 2015 Jim Gottstein Alaska Building 406 G Street, Suite 206 Anchorage, AK 99501 Re:
More informationExtra. Technical. November 2014 Issue 16 NHBC STANDARDS GUIDANCE AND GOOD PRACTICE. In this issue:
Technical Extra November 2014 Issue 16 In this issue: NHBC STANDARDS Introducing Chapter 5.4 Waterproofing of basements and other below ground structures page 3 GUIDANCE AND GOOD PRACTICE The basement
More informationPROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY
PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the
More informationKing s Cross Construction News Winter/Spring 2010
King s Cross Construction News Winter/Spring 2010 www.constructionatkingscross.com Helpline 0800 328 8840 Issue 07 Network Rail s new concourse for King s Cross Station, being constructed by Taylor Woodrow,
More informationCast iron swing grate in cast iron frame. 300x300 ID concrete chamber. Available chamber depths 400mm or 600mm deep. K&C Roadway SITE PLAN
Cast iron swing grate in cast iron frame Nominal 90 mm inlet SECTION x ID concrete chamber. vailable chamber depths 400mm or 600mm deep CHMBER PLN Stormwater pipe House Chamber location in vehicle cutdown
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
More informationSince it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span
formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and
More informationOctober 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.
117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This
More informationMandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated
More informationNo allowance will be made for classification of different types of material encountered.
PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More informationCardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
More informationTEMPORARY AND PERMANENT SUPPORT OF HYDRO OTTAWA DUCT BANKS WHEN UNDERCUT BY AN EXCAVATION
TITLE: Engineering Specification RECOMMENDED: C. Proulx APPROVED: C. Malone REV. DATE: 2002-09-12 NO: UDS0013 1 OF 5 REV: 0 TEMPORARY AND PERMANENT SUPPORT OF HYDRO OTTAWA DUCT BANKS WHEN UNDERCUT BY AN
More informationCOPYRIGHT. Dincel Construction System Pty Ltd
WATERPROOF WALLS Dincel Construction System Pty Ltd 101 Quarry Road Erskine Park NSW 2759 PO Box 104, St Clair NSW 2759 Phone: (612) 9670 1633 Fax: (612) 9670 6744 Email: construction@dincel.com.au COPYRIGHT
More informationFUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
More informationChapter 9 Remedial Measures
[This is an annotated version of a chapter from the US Army Corps of Engineers book, Foundations in Expansive Soils. This book is in the public domain. This document is consists of an abbreviated and annotated
More informationHIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL
HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL Prepared for: Public Works and Government Services Canada Parliamentary Precinct Branch Prepared by: Halsall Associates 210 Gladstone
More informationTYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an
More informationSeismic Isolation Retrofitting of Japanese Wooden Buildings
Seismic Isolation Retrofitting of Japanese Wooden Buildings Summary Junko Suga Building Design Department Takenaka Corporation, Osaka Main Office Osaka, Japan Hiroyuki Ueda Building Design Department Takenaka
More informationFLAT ROOF BOX SPAN CARPORTS
AGS/NC/03 FLAT ROOF BOX SPAN CARPORTS Thank you for choosing this quality product. We strongly recommend that you read these instructions thoroughly. Please take your time and do not rush the erection
More informationBrom 31 pton Square SW3
Brompton 31 Square SW3 31 Brompton Square KNIGHTSBRIDGE SW3 A discreet family house, with one of the largest private gardens in Knightsbridge, perfectly positioned in the crescent overlooking the communal
More informationPing An: Insurance and Tall Buildings
Ping An: Insurance and Tall Buildings Wai Ming (Thomas) Tsang, CEO, Ping An Financial Centre Yongmin (Stephen) Yuan, General Manager Risk Management Department, Ping An Life Insurance Company of China
More informationTypes of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically
Foundation Engineering Lecture #23 Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically stabilized) - Slurry
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationHow to secure your property after a disaster
How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,
More informationInvestigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps
Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure
More information