STEP BY STEP INSTALLATION GUIDE

Size: px
Start display at page:

Download "STEP BY STEP INSTALLATION GUIDE"

Transcription

1 STEP BY STEP INSTALLATION GUIDE

2 Step 1: Remove the old kitchen cabinets (If this project is a new home, then skip to Step 4) Clear everything out of your old cabinets. Shut off all the water supply lines and electricity to the kitchen. Remove all appliances and if possible move them to another room for adequate space and ease of installation. If you plan to reuse your existing sink and taps, remove them carefully using the proper tools and store them safely away from the work area. Remove the old cabinets and countertops, in addition to any mouldings and baseboards that may interfere with the new cabinets. When removing upper cabinets rom the wall, be sure to have someone to support the cabinet s weight while removing the last few screws or nails to prevent the cabinet from falling causing unnecessary injury and damage. Repair any damage to the wall surfaces resulting from the removal of the old kitchen. Step 2: Prepare to install your new kitchen Start by determining the highest point in the floor along the walls where the cabinets are being installed. To determine this point, check the floor with a level. Tip: Tape a level to the edge of a longer straight edge such as a toe kick moulding to check a larger area. Once you find the highest point, measure up 34 ½ and use a straight edge to draw a level line on the wall where the new base cabinets will be installed. This line determines the base cabinet height. From the base cabinet line, measure up 50 ⅛ and draw a parallel line on the wall where the new wall cabinets will be installed. This line determines the wall cabinet height. Tip: If you are installing a pantry then draw the upper cabinet line from top of pantry once it is installed.

3 Step 3: Preparing your kitchen for installation Mark the location of all of the studs on the walls that will support the new cabinets using either a magnetic stud finder or a hammer and small finishing nail. It is very important to ensure the cabinets are attached to wall studs to provide the required support. Remove all the packaging, doors, drawers, false fronts, and removable shelving from the new set of cabinets prior to installation. Use a pen and pieces of tape to number the parts and the corresponding cabinet they came from. This helps to reduce the weight and prevent injury or damage from swinging doors, sliding drawers, and falling shelves during installation. The cabinets are equipped with fully adjustable clip hinges which allows the doors to be removed easily. At the end of the hinge facing the inside of the cabinet, there is a clip. Tip: To help visualize the location of the new cabinets, draw an outline on the walls where they will be attached by measuring the width of the cabinets and transferring the measurement to the proper location. Tip: Some people find it useful to attach a piece of wood to the wall to mark the level line and offer support when hanging wall cabinets.

4 Step 4: Install the base cabinets Always start with the corner cabinet. If there is no corner cabinet, start from one end. Step 4-A Shim base cabinets up to line on wall. Then level cabinets from front to back and place shims at stud and floor locations if there is a gap. Follow the 34 ½ line and attach the cabinet through the cabinet back to all available studs behind the cabinet using the 2 ½ screws. Tip: measure from inside of cabinet gable to center of wall stud then transfer measurement inside cabinet for screw location. Step 4-B Begin by moving the base cabinet into the proper location. Using wood shims, shim the cabinet up to the 34 ½ line and check the top with a level and shim accordingly. The toe kick moulding installed after will hide the shims. If your base corner cabinet is round, secure it to the adjacent cabinets before you level and position it. Step 3-C If there is not an adjacent cabinet to the round cabinet, leave it detached until the countertops are installed. Secure it to the underside of the countertop to keep it in position. Tip: To break off the excess shim, score the shim with a utility knife and break the extra section off. Make sure the shims do not stick out past the cabinet s sides.

5 Step 4-D Move the next cabinet into position so the side sits flush and precisely against the side of the installed corner cabinet. Clamp the two cabinets together using C-clamps or quick grip clamps and shim under the cabinet if necessary. Align front edges as well as the top and bottom. Check to make sure the cabinet is level. Use the 1 ⅛ screws included in the installation kit to attach the cabinets together. To prevent splitting or cracking, you can pre-drill these holes beforehand with a countersink bit. Use four screws to attach the cabinets together. Finish installing the remainder of the base cabinets using the same procedure. Tip: Every time you install a new wall or base cabinet, position your level across the top of it and the last cabinet you installed to make sure they are lined up with each other perfectly. Tip: Always pre-fit the cabinets before securing them permanently to avoid unwanted screw holes inside your new cabinets.

6 Step 5: Install the wall cabinets The procedure for installing wall cabinets is similar to installing the base cabinets. Always start with the corner cabinet and if there isn t one, start at one end. Position the cabinet so the top is flush with the pre-drawn 84 ⅝ level line. Check to ensure the cabinet is level and in the precise location. Secure the cabinet to the studs through the back of the cabinet at the top and bottom using the 2 ½ screws included in the installation kit. It is recommended that at least two screws at the top and two at the bottom are used to support each cabinet. Tip: leave screws loose to help align and fasten adjacent cabinets. Once they are all connected, shim gaps at walls if needed and tighten screws. Similar to the installation procedure for base cabinets, move the next cabinet into place and align front edges use c-clamps or quick grip clamps to clamp the two cabinets together. Shim behind the cabinet if necessary and ensure the cabinet is level. Screw the cabinets together using 1 ⅛ screws and then secure it to the studs using the 2 ½ screws. Finish installing the remainder of the wall cabinets using the same procedure. Tip: It may be helpful to make a simple cabinet support to hold the cabinet in place during installation.

7 Step 6: Install fillers The sides of the cabinets must sit flush to the walls for a truly built-in look. Because modular cabinets are built in standard sizes and walls can be uneven, it is sometimes necessary to install fillers to conceal the extra space. For small gaps, caulking can also be used. Fillers are straight pieces that are cut to fill the gaps between a cabinet and wall. To cut a filler, cover the surface with masking tape and mark the line you need to cut right on the tape. Use a jigsaw or table saw to make your cut. The tape helps prevent tear-out from the saw blade and protects the finish. Slide the filler into position, and attach it to the cabinet using the 1 ⅛ screws included in your installation kit or 1 brad nails. Be sure the filler width is wide enough to clear the door trim so the drawers open fully without hitting. Tip: While determining the location of the fillers during the planning stage, it is best to place them at the end of the cabinet run because they can usually be installed after the cabinets have been installed. If they are placed between cabinets, it is important to install them in the correct location during the installation of the cabinets. Tip: When cutting melamine covered wood, use masking tape under your pencil line before you cut to prevent chipping or flaking from the saw blade.

8 Step 7: Install the countertops Lift the new countertop into place. Check that it is level from end to end and front to back at multiple points along its length. Insert wood shims where necessary or to fill any gaps between the cabinet tops and underside of the counter. If the gaps are large, set a drawing compass to the span of the largest gap between the backsplash and the wall. Set the compass point next to the wall and the marker on the backsplash and pull the compass along the wall to mark what will need to be removed on the backsplash. Remove the countertop and clamp it in place on sawhorses. Use a belt sander to sand the backsplash to the line drawn with the compass. Place the countertop on the cabinet to ensure the backsplash is flush against the wall. If Countertop needs to be joined such as a corner then, glue them together with some wood glue and press the edges together. Ensure the entire surface is flush at the seam along the front edge of the counter. Tighten the nearest mitre clamp and wipe away any excess glue. Stand behind the countertop and push it down as needed to make the seam flush along the back of the counter. Tighten the mitre clamp closest to the backsplash. If one side of the same is higher than the other, protect the surface with a piece of wood and tap the countertop with a hammer. When seam is level, tighten the remaining mitre clamps. Check the length of every screw carefully so you don t penetrate the counter surface. Fasten the countertop by screwing up through the bottom of the cabinet top into the countertop using 1 ⅛ screws. If you are reusing your original sink, measure and mark the location, then trace the paper hole pattern onto the countertop in the proper place. Use a jigsaw to cut the sink hole in the countertop. To prevent chipping the surface, cover with masking tape and drill a pilot hole for the jigsaw blade. Install the sink and reconnect the water and drain lines. Apply a bead of caulking where the countertop or its backsplash meets the wall.

9 Step 8: Align the drawers and doors Re-install the drawers, false fronts, and shelving that were removed prior to installation. Install the cabinet doors and make adjustments using the diagram below. Drawer fronts can be also adjusted using the procedure illustrated below. Tip: The swing direction of some styles of cabinet doors can be reversed by moving the hinges to the other side of the cabinet, flipping the door and clipping it into position. Be sure to change the swing before drilling any handle holes.

10 Step 9: Handles and pulls Once the doors are properly installed and adjusted, install the handles or knobs. Cardboard Template Scrap Block Step 10: Mouldings and trim Lastly, cut the toe kicks to fit and attach with brad nails or adhesive. For corner cabinets, cut the front piece long enough to cover the cut end of the side piece. Most moulding mitre joints are at a 90 angle and consist of two pieces of moulding cut at opposing 45 angles. When fitted together they should form a tight right angle. For tight mitre joints, nail and glue at joint. Step 11: Pat yourself on the back! Toe Kick Moulding Crown Moulding You have now successfully installed your kitchen cabinets. Congratulations on your beautiful new kitchen! Long-term Care & Maintenance: Our finishes are made of the highest quality and will maintain their beauty with simple maintenance. Use warm water, a soft cloth, and mild, non-abrasive soap for cleaning all surfaces. Never use thinners, scrapers, or abrasive cleaners on finishes. For any questions, please contact cindy@cupboardbrothers.com

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN HOW TO INSTALL A BEAUTIFUL NEW KITCHEN Easy to follow step-by-step kitchen cabinet installation TOOL AND MATERIAL LIST Hammer Pry bar Screwdriver Phillips Flathead Level Tape measure Pencil Straight edge

More information

DIY CABINET REFACING INSTALLATION GUIDE

DIY CABINET REFACING INSTALLATION GUIDE DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products

More information

KITCHEN INSTALLATION GUIDE

KITCHEN INSTALLATION GUIDE KITCHEN INSTALLATION GUIDE The step-by-step guide to installing your new kitchen right The materials and tools you ll need This brochure is your guide to preparing and installing your new kitchen. Inside

More information

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where

More information

Installing Window and Door Mouldings

Installing Window and Door Mouldings Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces

More information

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets... tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or

More information

Cabinetry Installation

Cabinetry Installation Cabinetry Installation INTALLATION EQUIPMENT #8 x 2 1 2 screws #8 x 2 1 2 washer head screws Variable speed drill, electric or cordless Extension cord Countersink drill bit Drill bits, 3/16 and 1/4 Assorted

More information

Congratulations on your new IKEA Kitchen, and on the money you saved!

Congratulations on your new IKEA Kitchen, and on the money you saved! Congratulations on your new IKEA Kitchen, and on the money you saved! INSTALLATION GUIDE FOR YOUR AKURUM KITCHEN Seven steps to a brand new kitchen It s time to discover another major advantage of investing

More information

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical

More information

www.cornholesupplies.com

www.cornholesupplies.com www.cornholesupplies.com How To Build Regulation Cornhole Boards Home of the Original Cornhole Bags and Boards Supply List: 1-4' X 8' Piece of Plywood (pre sanded) 4-2" X 4" X 8' Studs (2 by 4s make sure

More information

Assembly GUIDE. display wine cellar kits. Required. Suggested. Questions? 888.373.6057. or visit wineracksamerica.com

Assembly GUIDE. display wine cellar kits. Required. Suggested. Questions? 888.373.6057. or visit wineracksamerica.com Page 1 Middle Ladder End Ladder Display Tray Screwless Connector Package Contents * All models follow the same assembly procedure varying only in the number of middle ladders your rack will require. Depending

More information

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS BATH SINKS INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Caution: All installation types need to allow room for faucet installation. Ensure adequate clearance behind the basin for your faucet and

More information

How to Build a Poker Table

How to Build a Poker Table How to Build a Poker Table www.pokertablematerials.com 10-Person Poker Table- 96 x 48 These are step by step instructions for building a poker table. The table will measure 48" x 96" and have a 4" wide

More information

How to Build Your Own CornHole Game

How to Build Your Own CornHole Game How to Build Your Own CornHole Game DIMENSIONS Here is a diagram with the basic measurements for the Cornhole board game. SUPPLIES 1/2 thick sheet of plywood one 4 x4 or two 2 x4 s 8 long 2 4 s (4) 4 1/2

More information

Composite Stone Veneer

Composite Stone Veneer Composite Stone Veneer Installation Guide Ver 1 Jun 2015 www.compstone.com Composite Stone Veneer Installation Guide Contents Introduction & Overview 3 Required Tools 4 Optional Tools 4 Attachment Guidelines:

More information

Ladder Shelf Plans Final dimensions: 25 L x 21 W x 72 H

Ladder Shelf Plans Final dimensions: 25 L x 21 W x 72 H Ladder Shelf Plans Final dimensions: 25 L x 21 W x 72 H Copyright 2011. MLCS Woodworking. Page 1 Router bits and supplies needed: 3/8 Rabbeting bit (#10691) 1 Bottom Cleaning bit (#7941) Top and Bottom

More information

COMPLIMENTARY WOODWORKING PLAN

COMPLIMENTARY WOODWORKING PLAN COMPLIMENTARY WOODWORKING PLAN Adirondack Chair This downloadable plan is copyrighted. Please do not share or redistribute this plan in any way. It has been created for Wilton Tools, a division of WMH

More information

Stainless Steel Sink Work Center With Portable Sink, Colander and Cutting Board

Stainless Steel Sink Work Center With Portable Sink, Colander and Cutting Board SKU: 463780 / QK09 Owner s Manual Stainless Steel Sink Work Center With Portable Sink, Colander and Cutting Board THANK YOU for selecting American Standard the benchmark of fine quality for over 00 years.

More information

Do it yourself guide to installing your kitchen

Do it yourself guide to installing your kitchen Do it yourself guide to installing your kitchen Design and Quality IKEA of Sweden In most kitchens, it s easiest to install the wall cabinets first. This way there won t be any base cabinets to work around

More information

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

The JIG is UP Or A couple hours up front pays in the long run.

The JIG is UP Or A couple hours up front pays in the long run. Ed Simon Page 1 of 5 The JIG is UP Or A couple hours up front pays in the long run. A large part of the fun of beekeeping is the construction and assembly of the equipment. Since it is a hobby, I decided

More information

Stair Parts Installation. Tricks

Stair Parts Installation. Tricks Stair Parts Installation Tips & Tricks Introduction Your DIY staircase guide Welcome to the Stairpart home installation guide. Your stairway is both a functional and focal point in your home, so keeping

More information

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts.

These instructions will show you how to install an internal door into a non-loadbearing partition wall. The instructions are split into three parts. No 8 in the series of 'How to' brochures produced by PlaceMakers, New Zealand How to Frame and Hang a Door These instructions will show you how to install an internal door into a non-loadbearing partition

More information

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling. i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in

More information

Premier & Deluxe 3-Season Room Sliding Glass Door

Premier & Deluxe 3-Season Room Sliding Glass Door DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen

More information

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS TheRTAStore.com STEP 1: CLEAR A WORK SPACE Place your RTA cabinet panels on a smooth, scratch resistant surface in a large, open area. (Some people like to

More information

Router Table Plans. www.bobsplans.com

Router Table Plans. www.bobsplans.com www.bobsplans.com Router Table Plans Increase the capabilities of your router with this weekend project. Features a sliding fence with EZ-Mount clamps. These clamps are simple to make and grip tightly

More information

STAIR TREAD & RISER INSTALLATION GUIDELINES

STAIR TREAD & RISER INSTALLATION GUIDELINES STAIR TREAD & RISER INSTALLATION GUIDELINES ARTISTIC FINISHES DOES NOT WARRANTY THE COMPLETENESS OR ACCURACY OF ANY INSTALLATION. THE INSTALLATION CONTRACTER MUST HAVE THE EXPERIENCE AND KNOWLEDGE TO COMPLETE

More information

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast

More information

Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU #298-017).

Total Quantity: IMPORTANT: Plans are to be used with 3 x6 Plexiglass (SKU #298-017). # Materials: Quantity Each: 4x4x8 3 2x4x8 2 2x8x8 1 4x8x3/4 plywood 1 3 x6 corkboard (can be 18 of the 1 x1 pieces) 1 3 x6 plexiglass 1 8 door casing 3 Primer 1 qt. Total Quantity: TIPS FOR SUCCESSFUL

More information

Easy Six Cube Bookshelf. Copyrighted Material. Page 1

Easy Six Cube Bookshelf. Copyrighted Material. Page 1 Compare to: Land of Nod Cube Collection, 6 Cube Bookshelf Skill Level: Beginner Easy Six Cube Bookshelf I love the storage cubes in kids rooms because they give you an opportunity to have your children

More information

Bathroom Installation Guide

Bathroom Installation Guide Bathroom Installation Guide Step-by-step installation of your cabinets We do a lot of groundwork to make it as simple as possible for you to assemble and install your new bathroom furniture yourself. We

More information

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure

IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure IN00419 (rev A) Aqua 6 Glide Quadrant and Off-set Quadrant Enclosure Instruction suitable for both Quadrant & Off-set Quadrant variations. Instruction suitable for both Right and Left Hand fixing variations

More information

How To Install Your Frameless Shower Enclosure

How To Install Your Frameless Shower Enclosure How To Install Your Frameless Shower Enclosure a) Installing Single Frameless Door Side Mounted Wall Hinges b) Installing Frameless Door with In-Line Panel c) Installing Frameless Door Between In-Line

More information

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Viewed from the exterior. IMPORTANT: Please read before you begin installation. TABLE OF CONTENTS AND TOOL / MATERIAL

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

FRONT WINDSHIELD SEAL INSTALLATION

FRONT WINDSHIELD SEAL INSTALLATION FRONT WINDSHIELD SEAL INSTALLATION Tech Article From Newsletter 16.1-1st Quarter of 2010 Replacing your Front Windshield Seal ISN T AS HARD AS YOU MAY THINK! Recently, we retooled our front window seal

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

MGB Chrome Bumper Conversion

MGB Chrome Bumper Conversion MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different

More information

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting. 1. TEKA Soft Loc Installation Guide Thank you for having chosen TEKA Parquet. To guarantee a constant quality product TEKA engineered hardwood flooring is made out of selected wood species and runs only

More information

GARDEN WINDOW GLAZING AND DE-GLAZING INSTRUCTIONS

GARDEN WINDOW GLAZING AND DE-GLAZING INSTRUCTIONS GARDEN WINDOW GLAZING AND DE-GLAZING INSTRUCTIONS DE-GLAZING 1.) If there is any PVC cement covering the joints where external glazing bead strips meet, cut through the cement with a utility knife. 2.)

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

Basic Spring Motor Roller Shades

Basic Spring Motor Roller Shades Comprehensive Roller Shade Installation Guide Basic Spring Motor Roller Shades ATTENTION!!! READ CAREFULLY! This shade has a reliable long-lasting Spring Motor. The Spring Motor must have proper tension

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL.  SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 Black Wolf TM POCKET BILLIARD TABLE INSTALLATION MANUAL www.brunswickbilliards.com SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 51-905710-000 SEPTEMBER 2010 NOTE: Please use the instructions in this

More information

2&3 SECTION LOFT LADDER

2&3 SECTION LOFT LADDER TWIST CATCH ASSEMBLY A4 A2 A1 A3 A7 A6 A5 2&3 SECTION LOFT LADDER Images feature the 3 section loft ladder, but the same instructions apply to both 2 & 3 section ladders Installation and Operating Instructions

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Base Cabinet with Self-storing Folding Doors and Floor

Base Cabinet with Self-storing Folding Doors and Floor Usable Kitchens When designing a kitchen for use by persons with mobility impairments, especially those who use wheelchairs, careful layout of the kitchen is crucial to maintaining accessibility. People

More information

Customer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Customer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips reflect your style TM Customer Service 800.780.8889 or visit us online at smithnoble.com Wood Shutters Step by Step Installation Troubleshooting Tips Easy Care Instructions STEP 1 Your New Shutter Thank

More information

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base

majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base These Instructions are for a left and right handed unit. The diagrams show a left

More information

Installing Shutters using Fasteners

Installing Shutters using Fasteners Installing Shutters using Fasteners Electric drill, ¼" drill bit, 3 8" drill bit, hammer, and shutter fasteners. (¼" carbide drill bit is required for stucco, hardboard, fiber cement, brick or masonry.)

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

DETAILED INSTALLATION GUIDE

DETAILED INSTALLATION GUIDE DETAILED INSTALLATION GUIDE Warning: Risk of Electrical Shock, Fire or Personal Injury Once Installed and your wiring is run through your SMARTWALL system there is risk of electrical shock, fire or personal

More information

Sliding Door Hardware Installation Instructions

Sliding Door Hardware Installation Instructions Sliding Door Hardware Installation Instructions Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview ff All Krown Lab sliding

More information

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview

More information

HfHMD uses LP SmartSide siding and trim.

HfHMD uses LP SmartSide siding and trim. HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.

More information

Building an Off-Center Fixture for Turning Pendants

Building an Off-Center Fixture for Turning Pendants Building an Off-Center Fixture for Turning Pendants Turning a pendant off-center with most available metal pendant chucks means that you will have a significant amount of mass off center, which will limit

More information

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY

HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard

More information

WARNING: Important: Keep these instructions for future reference. Gate Instructions (1) Assembly and Installation Instructions

WARNING: Important: Keep these instructions for future reference. Gate Instructions (1) Assembly and Installation Instructions Assembly and Installation Instructions Please read these instructions carefully. Please follow these instructions carefully to ensure that your gate extension is properly installed. Improper installation

More information

How to Install UnderDeck The Original.

How to Install UnderDeck The Original. How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter

More information

AZEK Rail Install Guide

AZEK Rail Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with CableRail by Feeney... 1 Installing CableRail by Feeney for AZEK Rail... 7 Installing AZEK Rail Stairs with CableRail

More information

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

1 Door Tall Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children. Page 1 of 9 ASSEMBLY GUIDE 1 Door Tall Unit IMPORTANT Before Commencing Assembly: Read all instructions COMPLETELY Ensure all listed parts are present If any parts are missing from Parts List 1, please

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance

More information

PROJECT PLAN. Stackable shelves

PROJECT PLAN. Stackable shelves PROJECT PLAN Stackable shelves This article originally appeared in The Family Handyman magazine. For subscription information, visit www.familyhandyman.com Please note that pages that appeared in the magazine

More information

IN00378 (rev A) Corner Entry

IN00378 (rev A) Corner Entry IN00378 (rev A) Corner Entry Before You Start Check that the tray has been installed correctly and that it is level (Fig. A), tiled down onto and sealed to the manufacturer s guidelines. Please Note: All

More information

Gate Leg Drop Leaf Table Plans

Gate Leg Drop Leaf Table Plans Preparing the table top blanks: Cut and glue enough 3/4 stock to make three panels 40 long by 24 wide (they will be cut to final size at a later time). While the glue dries we will work on the legs. Preparing

More information

Step-by-step installation of your brand new kitchen

Step-by-step installation of your brand new kitchen Step-by-step installation of your brand new kitchen The Do it Yourself Guide you have in your hand will give you tips and ideas about how to assemble and install your new kitchen step by step. Before you

More information

Kitchen Cabinets. Installing

Kitchen Cabinets. Installing Installing Kitchen Cabinets Careful planning and knowing exactly where the framing is help factory-made cabinets go in quickly and easily for a custom look with no nasty surprises BY KEVIN LUDDY THE STARTING

More information

How to Install GoBoard:

How to Install GoBoard: How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel

More information

Sash Replacement Guide

Sash Replacement Guide for Andersen 200/400 Series Awning Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete this procedure, call Andersen at 1-888-888-7020

More information

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would Picnic Table Plans Made out of a single sheet of plywood, it s also portable! By Kevin Ayer Materials One 4- by 8-foot sheet of 3 4-inch AC plywood Twelve 11 4-inch wood screws Primer and exterior paint

More information

TOLL FREE: (866) 591-7792. E-Mail: techmail@vigoindustries.com. www.vigoindustries.com VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09042K1

TOLL FREE: (866) 591-7792. E-Mail: techmail@vigoindustries.com. www.vigoindustries.com VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09042K1 VANITY SPECIFICATIONS VANITY COMPONENTS Model VG09042K1 MODEL VG09042K1 FEATURES Freestanding cabinet Soft closing sliding cabinet drawer hardware White, single hole ceramic sink Cabinet ships assembled

More information

1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS By Denny Williams Photos by Denny Williams 1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS Denny Williams - Technical Writer Denny is first and foremost a dyed-in-thewool

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

Here is your set of Detailed Plans from Copyright 2004 All Rights Reserved

Here is your set of Detailed Plans from Copyright 2004 All Rights Reserved Here is your set of Detailed Plans from Copyright 2004 All Rights Reserved Materials for the House Here is the list of materials you will need to construct the basic house then to cover it with roofing

More information

Extra Tall Wide Span Gate

Extra Tall Wide Span Gate Extra Tall Wide Span Gate MODEL NO: 1154 Owner s Manual 11/19/2013_BL READ ALL INSTRUCTIONS BEFORE ASSEMBLY AND USE OF GATE. KEEP INSTRUCTIONS FOR FUTURE USE. www.regalo-baby.com... Regalo International,

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE

More information

Beadboard Wall Bookcase

Beadboard Wall Bookcase Beadboard Wall Bookcase Note: The maximum load for each shelf is 30lbs.This hanging system is meant for drywall/wood stud mounting only. If walls are concrete, brick or plaster, please consult your local

More information

Hive Top Ventilation Shims

Hive Top Ventilation Shims Hive Top Ventilation Shims When preparing your bee hives for the winter, it is very important to provide for ventilation at the top of the hive. Through out the winter, the bees are expelling a lot of

More information

Cabinet Installation Guide

Cabinet Installation Guide These instructions should only be printed using Adobe Acrobat and should not be faxed or reproduced on a digital copier. American Woodmark Corporation provides these instructions on an AS IS basis and

More information

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions

More information

3. Choose between an easy table (24 inches wide) and a hard table (20 inches wide).

3. Choose between an easy table (24 inches wide) and a hard table (20 inches wide). Ultra Carpetball Plans Version 2.0 The Best (And Only) Free Carpetball Plans On The Web By Matthew Campbell Instructions: 1. Read these instructions all the way through and look at all the diagrams before

More information

Laminate Flooring T-Lock Angle-Drop Installation Instructions

Laminate Flooring T-Lock Angle-Drop Installation Instructions TECHNICAL SERVICE Laminate Flooring T-Lock Angle-Drop Installation Instructions March 23, 2012 Read all instructions carefully before beginning installation. Make sure that the instructions are the most

More information

Installation Guide for Andersen Architectural Wood Inswing Entry Doors

Installation Guide for Andersen Architectural Wood Inswing Entry Doors Installation Guide for Andersen Architectural Wood Inswing Entry Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are

More information

All-Season Sunroom Sliding Glass Door Installation Instructions

All-Season Sunroom Sliding Glass Door Installation Instructions ASRESGD-08 All-Season Sunroom Sliding Glass Door Installation Instructions Panel Frame Door Frame Left Side Foam Insulator IE241 H Bar Assembly Door Frame Top Track Panel Frame Door Frame Right Side Stationary

More information

FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?

FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base? 1. Where is the serial number of my tub located? 2. What can I use to clean my tub or shower? 3. What is an Above Floor Rough-in? 4. Can I replace my towel bar? 5. What are grommets? 6. Why do some bathing

More information

AZEK Rail Install Guide

AZEK Rail Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with Glass Infill... 2 Installing AZEk Rail Stairs with Glass Infill... 9 Notes...14 Please read all instructions completely

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.

More information

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you

More information

Above-Counter Bathroom Sink

Above-Counter Bathroom Sink P72060 P72061 P72064 P72065 P72066 P72067 1 of 5 THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to KALLISTA quality products. Please take a moment to review this manual before you install

More information

Tools Required. Recommended Adhesives Vinyl Bonding: - Christy s White Hot Vinyl Cement

Tools Required. Recommended Adhesives Vinyl Bonding: - Christy s White Hot Vinyl Cement Assembly Instructions STEP-BY-STEP HANDRAIL INSTALLATION for 1-1/2" vinyl handrail component system Rise in inches Run in inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40

More information

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls

Installation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls Installation Manual Toilet Partitions, Dressing Compartments & Shower Stalls Metpar Corp 95 State Street, Westbury, New York, USA, 11590 Tel: 516-333-2600 Fax: 516-333-2618 Internet: http://www.metpar.com

More information