Section Two: Stanford Perimeter Trail

Size: px
Start display at page:

Download "Section Two: Stanford Perimeter Trail"

Transcription

1 IMAGE SOURCE: JONAS FLAKEN, FLICKR (CREATIVE COMMONS) IMAGE SOURCE: DONJD2, FLICKR (CREATIVE COMMONS) Section Two: Stanford Perimeter Trail

2 ~ 22 ~

3 2 Sta nford Perimeter Trail 2.1 Project Description The core of the Stanford University campus is bounded by Sand Hill Road to the north, El Camino Real on the east, Stanford Avenue to the south and Junipero Serra Boulevard forming the western edge. In several locations these streets are the interface between the campus and surrounding communities including Menlo Park and Palo Alto, and are within several blocks of Los Altos, Los Altos Hills and Portola Valley. The Stanford Perimeter Trail (SPT) will provide both an easily-accessible recreational amenity that will directly serve Stanford campus residents and facility users, and an important connection to local parks and schools, and regional recreational destinations. This linkage will provide several important connections along three of the four 1 major streets surrounding the Stanford University campus core, including: Junipero Serra Boulevard from Page Mill Road to Stanford Avenue (A) Stanford Avenue from Junipero Serra Boulevard to El Camino Real (B) El Camino Real from Stanford Avenue to Quarry Road (C) The linkage also includes trail-related improvements to several associated intersections. Intersections will be improved to better support the multi-use trail system and will include, but are not limited to: Wide curb ramps to improve accessibility Detectable warning surfaces to comply with ADA Pedestrian signals for protected street crossings Island modifications to provide safe refuge for users Target design guidelines are shown in Exhibit E. 2.2 Project Purpose The SPT will provide connectivity, Stanford University campus access, recreational use, amenities, regional network build out, and improved safety along 3.4 miles of multi-use trails. Recreational Opportunities The SPT will provide a recreational resource for Stanford students, faculty, and staff as well as the residents and visitors of the adjacent communities who use campus recreational facilities. The trail will offer: Walking, running, and bicycling opportunities for individuals and groups. Opportunities for social interaction along the trail. 1 Stanford studied a potential trail that would encircle the perimeter of the core campus. However, substantial feasibility issues were identified on Junipero Serra Boulevard from Stanford Avenue to Sand Hill Road, and on Sand Hill Road. Accordingly, the Stanford University portion of this grant application is limited to the three segments identified above, and no other perimeter trail improvements are proposed. The SPT will Supplement the regional trail network in Santa Clara County. Enhance the Bay-To-Ridge Trail (Program T25) connection via Stanford Avenue and the Junipero Serra Boulevard link to Page Mill Road. Complete a part of the Santa Clara County County-Wide Trails Master Plan along Junipero Serra Boulevard and Stanford Avenue. Connectivity New connections will be made between communities and trails, and between major destinations: The SPT will link neighborhoods together and also link the Dish Route and S1 Trail, as well as the future C2 Trail to Arastradero Preserve. Neighborhood children and teens will have the ability to easily access Nixon Elementary School, Escondido School, and Palo Alto High School by foot or on a bicycle. The SPT will provide connections to Stanford Stadium, Town and Country Village, Palo Alto Medical Foundation, and Stanford Shopping Center. Route Dish A Junipero Serra Old Page Mill Rd to S1 Trail Junipero Serra Blvd Peter Coutts Rd d B C Page Mill Rd Serra St Serra St Quarry Rd Palm Dr El Camino Real Stanford Avenue }þ 82 to Linkage 2 ~ 23 ~

4 The SPT will also link to recreational and transportation facilities at El Camino Park including the Palo Alto Transit Center and the possible new TheatreWorks. Function The Class I SPT will separate and buffer recreational users from vehicular traffic: Creating a much safer and more enjoyable experience. Correcting the serious safety problem that exists on Stanford Avenue near Junipero Serra Boulevard. Providing safer routes for children to ride their bicycles to Nixon Elementary School, Escondido School, and Palo Alto High School. In addition to the trail itself, the SPT will include improvements at key locations. These amenities will create a trail that is more functional and beautiful, providing value-added to all of the associated communities: 2.3 Linkage Components Junipero Serra Boulevard (Segment A) Page Mill Road to Stanford Avenue This is a new trail segment where none exists today. This segment of Junipero Serra Boulevard is very important as a link between the County S1 Trail and Stanford Avenue. This route is part of the City of Palo Alto Bay-to-Ridge Trail Network. This new segment of the SPT will be located on Stanford University property, adjacent to the Dish area on the west. The proposed trail will be built to the target 12 foot width, and the existing fence on Junipero Serra Boulevard will be relocated to provide the required space for the trail. Both existing Class II bike lanes will remain on the street. The intersection crossing on this side of Junipero Serra Boulevard at Page Mill Road will be improved to meet current ADA standards. Bike racks strategically located at key places where users enter/exit the trail. Landscape plantings to either repair a disturbed area or to supplement an area with trees and native plantings. Way-finding signage located along the entire trail to provide directions or to inform the users about destination points. ~ 24 ~ No continuous trail exists on Junipero Serra Boulevard between Stanford Avenue and Page Mill Road. The SPT will provide a Class I trail to connect the S1 Trail to the Dish Route and to Palo Alto via the Stanford Avenue Bay-To-Ridge Trail.

5 Foothill Expy Jun ipero Ser ~ 25 ~ The Stanford and Palo Alto Trails Program: Connecting the Bay to the Ridge Junipero Serra Blvd Page Mill Road Intersection access upgrades. Proposed trail connects directly to existing S-1 Trail, additional bicycling route (Old Page Mill Road) toward Arastradero Preserve Page Mill Rd Junipero Serra Serra Blvd Blvd Stanford Ave Stanford Avenue Connection to the Palo Alto Bay-to-Ridge Trail (Linkage 1, Segment B) Stanford Dish Recreational a Route Access to popular hiking ing network at Stanford Avenue e Existing Class II bicycle lanes will remain on both sides of roadway Class 1 Multi-Use Path Design Standard 12 wide accessible path with soft shoulders for joggers and hikers; adjacent landscaping S1 Trail I Feet Dish Route (hiking only) Stanford and Palo Alto Trails Program Linkage #1 - Stanford Perimeter Trail: Segment A. Junipero Serra Boulevard Proposed Linkage (Grant Application Project) Existing Class 1 Multi-Use Trail (except where noted) Existing Class II Bicycle Lane!

6 2.3.2 Stanford Avenue (Segment B) This segment of the SPT would provide a complete trail along Stanford Avenue from Junipero Serra Boulevard to El Camino Real. Currently, there is not a complete trail in this location. There is a substantial gap between Junipero Serra Boulevard and Raimundo Way and other areas are substandard. Sidewalk exists along portions of Stanford Avenue. The approach to this street segment is to supplement existing conditions, provide a continuous trail, and to provide Class II bike lanes. Stanford Avenue Intersection Improvements The Stanford Avenue intersection at Junipero Serra Boulevard is a particularly critical area because it is the location of the Stanford Dish Recreational Route Gate. Currently, trail users parallel park along both sides of Stanford Avenue from Raimundo Way to Junipero Serra Boulevard. This parking, coupled with the fact that no trail exists on the north side of Stanford Avenue, creates a safety problem where pedestrians must walk in the street. New ramps and a new pedestrian signal (in addition to the trail) will significantly change these two blocks and provide a safer and more convenient configuration for pedestrians and bicyclists. This segment of Stanford Avenue near Junipero Serra Boulevard is abutted by a drainage channel. Adequate space exists to improve this edge. A Class I multi-use trail and enhanced Class II bike lane will be added along this segment of Stanford Avenue. ~ 26 ~

7 Junipero Serra Blvd to Raimundo Way Intersection access improvements at Junipero Serra Blvd; installation of Class I trail adjacent to roadway, improved bike lane, and back-in angled parking on south side of Stanford Avenue Bowdoin Street Intersection access improvements Escondido School Work with Palo Alto Unified School District to widen sidewalk with a 5 decomposed granite path and additional Existing 10 wide concrete and decomposed granite path will remain, which well serves pedestrians, joggers, and slower speed bicyclists landscaping; replace existing sidewalk where necessary Escondido do Elementary School Stanford Ave Linkage 1C: El Camino Real to Linkage 2: Park Blvd Junipero Serra Blvd Linkage 1A: Junipero Serra Blvd Raimundo Way Nixon Elementary School Peter Coutts Rd Rd Amigos de Palo Alto (preschool) Bowdoin St St Werry Park Weissharr Park Hanover St St College Ave California Ave Cameron Park Mayfield Park College Terrace Library El Camino Real Raimundo Way to Bowdoin oin Street Improve existing walking path, widen with soft shoulders wherever possible. Consider new parking pull-outs and access improvements to Nixon School on Stanford Avenue Stanford and Palo Alto Trails Program Linkage #1 - Stanford Perimeter Trail: Segment B. Stanford Avenue Proposed Linkage (Grant Application Project) Existing Dish Recreational Route (hiking only) Existing Stanford University Pathway Existing Class II Bicycle Lane Existing Class III Shared Roadway! I Existing Park Amenities Feet Picnic Area Playground Tennis Court ~ 27 ~

8 Junipero Serra Boulevard to Raimundo Way A new Class I trail will be constructed on the north side of the street, and will connect the pedestrian crossing on Junipero Serra Boulevard to Raimundo Way. The existing on-street parallel parking will be removed from both sides of the street and will be replaced with back-in angled parking on the south side of the street. Currently, parking in this location is unmarked, disorganized, and unsafe. If this existing street segment were striped to meet current County standards, the street would accommodate a total of 55 striped, parallel parking spaces. The proposed parking configuration would have no parking on the north side and would provide a total of 40 striped, angled, back-in parking spaces on the south side. Raimundo Way to Bowdoin Street This street segment is adjacent to residential neighborhoods, along which a scenic creek runs in a channel several feet below the street grade. A six-foot-wide asphalt trail meanders along the creek, following the up and down grade between large trees, crossing the creek in several places. The creek is undergrounded near Peter Coutts Road, but the trail continues northward within a more open area, nearer to street grade. The existing six-foot-wide path will be realigned in limited locations, and a two-foot-wide shoulder will be added on at least one side. Shoulders may be placed on both sides, where possible, which will result in a trail that is eight to ten feet wide in the segment. A culvert with a bridge crossing exists south of the small, stone dam. The south end of the culvert was constructed above the creek flow line and at an angle to it. As a result, the existing path on top of the culvert rises in grade to cross the culvert and subsequently drops down on the opposite side, creating slopes that are not ADA compliant. Plan View of Stanford Avenue between Junipero Serra Boulevard and Raimundo Way (Proposed Linkage) Section of Stanford Avenue between Mears Court and Raimundo Way (Proposed) ~ 28 ~

9 The path alignment has a sharp turn, which also constricts an existing Redwood tree. Lowering the culvert and realigning it will achieve the following four objectives: 1. Improve ADA compliance, making the trail accessibe to more people 2. Remove a kink in the path alignment for improved bicycle/pedestrian safety Existing parallel parking pockets will be formalized along the north side of the street in areas between existing trees. There will be no net change to parking. Bowdoin Street to Escondido Road A five-foot concrete sidewalk exists along this segment, similar to the sidewalk between Escondido Road and El Camino Real. A five-foot-wide decomposed granite path will be added along the inside edge of the sidewalk and the parkway will be planted, so that it is continuous with the El Camino Real to Escondido Road block. If agreeable to the Palo Alto Unified School District, the Escondido School fence may be relocated to allow for ornamental plantings in front of the fence. A 5-foot-wide concrete sidewalk currently exists on Stanford Avenue between Escondido Road and Bowdoin Street. The existing 6-foot-wide asphalt trail near Bowdoin Street will be widened by adding a 2-foot wide shoulder to both sides to better accommodate runners. The existing 6-foot asphalt trail adjacent to Stanford Avenue near Bowdoin Street will be widened by adding a 2-foot shoulder, where feasible, to each side to better accommodate joggers. The existing sidewalk will be expanded to 10 feet wide, similar to the block to the north, which will accommodate pedestrians, runners and recreational bicyclists. ~ 29 ~

10 Escondido Road to El Camino Real As part of the new housing development, a ten-foot-wide trail was recently constructed in this segment approximately five feet from the back of curb, consisting of a five-foot-wide concrete sidewalk and a five-foot-wide decomposed granite path. Attractive plantings are located in the planting area behind the curb. No work is required in this segment. Stanford Avenue between Escondido Road and El Camino Real. This stretch of the Stanford Perimeter Trail was completed in 2011 as part of a new faculty housing project. The remainder of the trail will be expanded to match this 10-foot cross section. ~ 30 ~

11 2.3.3 El Camino Real (Segment C) This segment is a new, continuous trail from Stanford Avenue to Quarry Road. El Camino Real is a California State Highway under the jurisdiction of Caltrans. In addition to being a busy state thoroughfare, the multi-jurisdictional Grand Boulevard Initiative establishes clear designation for the corridor as a Transit Priority Street and, as a result, on-street bicycle lanes and routes are not prioritized for the area adjacent to Stanford campus. For pedestrians, currently there are only limited areas of public sidewalk and limited sections of paved trails along the El Camino real frontage. Where no such facilities exist, unpaved informal paths are visible where pedestrians have walked behind the existing Stanford fence. The new trail will provide a safe, continuous route for pedestrians and bicyclists. Stanford Avenue to Serra Street No trail or sidewalk exists in this segment. The Stanford fence is located approximately eight feet behind the curb and a lawn transitions into a drainage swale beyond the fence along Escondido Village. The fence will be relocated so that a new, wide paved pathway can be constructed along El Camino Real. Landscaping will be added, consistent with the Grand Boulevard Initiative recommendations. Serra Street to Galvez Street This street segment is adjacent to the Stanford Athletic Fields, where considerable open space exists. An eight- to ten-foot-wide asphalt trail follows behind the existing fence along this segment and there are no physical limitations to expanding the trail. Therefore, the trail will be expanded to meet the target 12 foot width. No paved sidewalk currently exists on El Camino Real at Escondido Village. Galvez Street to Palm Drive This segment is adjacent to the Stanford Stadium, located in an open area. A trail less than 12 feet wide exists behind the existing fence along the western part of the segment and there is no paved trail on the eastern portion of this section. A trail meeting the target 12 foot width will be constructed along this segment behind the fence and will weave through the existing trees as necessary to protect them. The Stanford Perimeter Trail will provide an 8-foot-wide paved path behind the street curb that can accommodate pedestrians and bicyclists. ~ 31 ~

12 "b The Stanford and Palo Alto Trails Program: Connecting the Bay to the Ridge b"b "b Picnic Area Playground ~ 32 ~ City of Menlo Park El Camino Park Palo Alto Transit Center Town & Country Village Palo Alto High School Stanford Shopping Center * * * Peers Park Stanford Ave El Camino Park Connection from the Stanford Perimeter Trail to the Palo Alto Transit Center and the C1 Trail at Palo Alto/Menlo Park Palm Drive Reconstruct median islands and curb ramps to improve access; widen existing approach facilities to meet Class I multi-use trail target standard Galvez Street/ Embarcadero Road Intersection crossing and trail access improvements * Cameron Park Alma St Park Blvd Embarcadero Rd University Avenue Palo Alto Ave El Camino Real Stanford University Move existing fence back to provide a generous 12 paved path and 4 planting strip. Facility will accommodate pedestrians, joggers, and bicyclists and is consistent with Grand Boulevard Initiative recommendations for El Camino Real. Existing drainage to be protected. Palm Dr Quarry Road Existing Trail Gap Intersection access improvements; coordinated wayfinding with Stanford Medical Center expansion mitigation improvements Install new 12 Class I trail between Palo Alto Medical Foundation and Embarcadero Road/ Galvez Street Connection to existing Stanford recreational facilities Serra Street Intersection crossing and trail access improvements Proposed Linkage 2 Stanford Faculty Housing Proposed Linkage (Grant Application Project) Existing Class I Multi-Use Path / Barrier Crossing Existing Stanford University Pathway Existing Park Amenities Existing Class II Bicycle Lane Feet Stanford and Palo Alto Trails Program Linkage #1 - Stanford Perimeter Trail: Segment C. El Camino Real Stanford Child Care Facilities Public Restroom Soccer Field I Baseball/Softball Diamond Existing Class III Shared Roadway! Existing Bicycle Boulevard

13 Palm Drive to Quarry Road An existing trail is located in the Stanford Arboretum along this street segment, behind the existing fence. However, it does not meet the target trail width and it will therefore be improved to meet that standard. Because of the open nature of the area, expanding the trail to 12 foot width will not negatively impact the existing trees, as there is ample room to meander the trail as necessary. El Camino Real Intersection Improvements Intersections will be improved along El Camino Real to better support the trail system. Intersection improvements are proposed along El Camino Real at the following streets: Quarry Road new detectable warning surfaces and minor signal modifications Palm Drive new curb ramps and island modifications Galvez Street new curb ramps and minor signal modifications Serra Street new curb ramps and signal modifications Stanford Avenue no improvements required A Caltrans permit will be required for work at all intersections along El Camino Real. Standard Multi-Use Trail Section The areas along El Camino Real with no trail will be improved with a new Class I trail located behind the existing fence. ~ 33 ~

14 2.4 Cost Estimate & Timeline The Stanford Perimeter Trail is estimated to cost $4.5 million. The cost estimate includes over $2.75 million for trail improvements, $690,000 for intersection improvements, and $1 million in soft costs including engineering (20%) and contingencies (10%). 4Q 2012 Project Agreement Stanford Perimeter Trail Estimated Project Schedule Q 2Q 3Q Q Engineering CEQA - GUP Checklist Permitting Stanford anticipates that it can complete detailed design work for the SPT by October 1, The design work will include site surveys, siting of improvements to avoid trees and other sensitive resources wherever feasible, and creation of a set of construction-level plans and drawings for agency review. Once design work has proceeded to the level at which project-specific information about environmental conditions can be determined, Stanford will prepare the GUP Checklist that it submits for all projects on the Stanford campus within unincorporated Santa Clara County. The GUP Checklist includes documentation of any project-specific effects on protected trees, oak woodlands, wetland areas, and sensitive wildlife species as well as other environmental topics addressed by the Environmental Impact Report for the Stanford Community Plan and GUP. For most campus construction projects, the County relies upon the GUP EIR, and applies the GUP EIR s mitigation measures to avoid or substantially reduce the project s environmental effects. Stanford estimates that it will be prepared to submit applications for County and other agency approval by October, The permitting process likely will take approximately six months. Section 2.5, following, lists the permits that may be required for the SPT. If it has obtained the necessary permits by the end of March 2014, Stanford estimates that it will be able to construct the SPT by the close of This is a realistic schedule based upon Stanford s recent experience constructing trails projects in unincorporated Santa Clara County and Portola Valley. 2Q Construction 3Q Permits The regulatory permits for the Stanford Perimeter Trail likely would include the following: U.S. Army Corps of Engineers: Construction work to realign the culvert that is located along Stanford Avenue between Bowdoin Street and Raimundo Way likely would require a federal permit from the U.S. Army Corps of Engineers under Section 404 of the Clean Water Act. It is anticipated that one or more of the Corps Nationwide Permits would be used to authorize the work and simplify the permit process. The requirement for a federal permit also would trigger the need for a Water Quality Certification from the San Francisco Regional Water Quality Control Board. Given the limited nature of the work and the anticipated use of the Corps streamlined Nationwide Permit process, permitting is expected to take approximately six months. California Department of Fish & Game: The realignment of the culvert could trigger the requirement for a Streambed Alteration Agreement under Section 1602 of the California Fish & Game Code. Note that Section 1602 provides that DFG may determine that no Streambed Alteration Agreement is necessary upon a finding that the activity would not have a substantial adverse effect on any fish or wildlife resource. The DFG approval process under Section 1602 is expected to take up to six months. California Department of Transportation: An encroachment permit from Caltrans would be needed for work at the El Camino Real intersections and in any state-controlled right of way. The permit process is expected to take up to six months. State Water Resources Control Board, General Storm Water Construction Permit: Construction work would require compliance with the SWRCB s General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities. Coverage under the General Permit would be obtained by filing a Notice of Intent, Storm Water Pollution Prevention Plan, and other required documentation. City of Palo Alto: An encroachment permit/street opening permit would be required for work within City right-of-way on El Camino Real between Serra Street and Stanford Avenue, and possibly within the City s right-of-way for Stanford Avenue between Escondido Road and Bowdoin Street. Review of project elements within the City of Palo Alto will be performed by the City s Architectural Review Board and Planning & Transportation Commission to ensure conformance with local design and transportation policy. Project segments within the County of Santa Clara will be coordinated with the County. Depending on the final project design details, a grading permit also could be required. The City approval process is expected to take up to six months. Santa Clara County: An encroachment permit would be required for work within County rightof-way on Stanford Avenue and Junipero Serra Boulevard. Architectural & Site Approval also would be required for work within the County s jurisdictional boundary. Depending on the final project design details, a grading permit also could be required. ~ 34 ~

The Stanford and Palo Alto Trails Program: Connecting the Bay to the Ridge ~ 2 ~

The Stanford and Palo Alto Trails Program: Connecting the Bay to the Ridge ~ 2 ~ " b off tyy o City C k Park o Park lo nlo Men M n The Stanford and Palo Alto Trails Program: C1 Connecting the Bay to the Ridge Sand H ill Rd " b Stan St Stanford ta tan an nffor fo ord Univ University

More information

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016 Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Street Audit Tool: Web 2.0 Tools

Street Audit Tool: Web 2.0 Tools Name: Email: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards APPENDIX G California Coastal Commission & Conservancy Accessibility Standards STANDARDS AND RECOMMENDATIONS FOR ACCESSWAY LOCATION AND DEVELOPMENT These standards provide guidelines for the location,

More information

DESIGN ASSISTANCE APPLICATION

DESIGN ASSISTANCE APPLICATION DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015

More information

LETTER OF INTENT Measure A is the ten-year half-cent general sales tax approved by the voters in November 2012. Measure A funds projects that:

LETTER OF INTENT Measure A is the ten-year half-cent general sales tax approved by the voters in November 2012. Measure A funds projects that: LETTER OF INTENT Measure A is the ten-year half-cent general sales tax approved by the voters in November 2012. Measure A funds projects that: Are consistent with the needs identified in the text for Measure

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with

More information

CONDITIONS OF APPROVAL

CONDITIONS OF APPROVAL Stanford University General Use Permit CONDITIONS OF APPROVAL The following conditions have been established for the Stanford University General Use Permit (GUP). The conditions describe the distribution

More information

Harlem River Bridges Access Plan

Harlem River Bridges Access Plan Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa

More information

APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS

APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS APPENDIX B: TRAIL DEVELOPMENT AND MANAGEMENT STANDARDS This section provides guidance on a variety of trail issues for planners and developers of the Ice Age NST across the state. It also provides introductory

More information

Residential Driveway Installation Requirements. Table of Contents

Residential Driveway Installation Requirements. Table of Contents Residential Driveway Installation Requirements Table of Contents Residential Driveway Requirements Sidewalk Construction Specifications for Residential Properties Hold Harmless Agreement for Residential

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

Description Quantity Cost Total Cost

Description Quantity Cost Total Cost APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000

More information

Update on Previous Related Transportation Enhancement Grants

Update on Previous Related Transportation Enhancement Grants ROUND 16 ROUND 16 Update on Previous Related Transportation Enhancement Grants Pima County and City of Tucson staff are implementing the Pima County-Tucson Safe Routes to Schools Pilot Program. This program

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations. Amount Requested

2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations. Amount Requested 2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations Name Overlay s Applicant Amount Requested Recommended Funding Amount Coupeville, Langley $411,661

More information

Executive Director s Recommendation Commission Meeting: July 11, 2013

Executive Director s Recommendation Commission Meeting: July 11, 2013 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United

More information

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS Triple Bottom Line Analysis Map (TBLAM) Project or Decision: College Ave Corridor for FC Moves long range transportation plan for College Ave., for redevelopment

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456

More information

Summary. Run By the Sea 226 Jeter Street Santa Cruz, CA 95060 Phone: 831 272 4627 Email: whatisron@gmail.com Web: www.runbythesea.

Summary. Run By the Sea 226 Jeter Street Santa Cruz, CA 95060 Phone: 831 272 4627 Email: whatisron@gmail.com Web: www.runbythesea. Run By the Sea 226 Jeter Street Santa Cruz, CA 95060 Phone: 831 272 4627 Email: whatisron@gmail.com Web: www.runbythesea.org Ohlone Rail Trail Proposal We propose opening a section of north coast farm

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts

More information

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

Is Encouraging More Bike Ridership On El Camino Real A Good Idea? Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning

More information

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)

Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any

More information

Assessing Paved Trails for Compliance with Standards and Best Practices

Assessing Paved Trails for Compliance with Standards and Best Practices Assessing Paved Trails for Compliance with Standards and Best Practices Session Presenters: Kristin Maravilla, Planner/Designer Masters in Landscape Architecture (UC Berkeley) Masters in City and Regional

More information

In 2005, the City of Pasadena, CA, USA, with the support of consultants,

In 2005, the City of Pasadena, CA, USA, with the support of consultants, Creating a Citywide Safe Routes to School Program: Pasadena, CA, USA s Step-by-Step Approach In 2005, the City of Pasadena, CA, USA, initiated development of a comprehensive Safe Routes to School Program.

More information

GOALS, OBJECTIVES, AND EVALUATION MEASURES

GOALS, OBJECTIVES, AND EVALUATION MEASURES GOALS, OBJECTIVES, AND EVALUATION MEASURES The Tallahassee-Leon County MPO is developing its first Bicycle and Pedestrian Master Plan, a 20- year plan that provides guidance for the development of facilities

More information

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Executive Summary. Transportation Needs CHAPTER. Existing Conditions CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in

More information

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the

More information

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations? Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview Purpose of Subdivision/ Land Development Ordinances (SALDO) Municipalities Planning Code Process Design

More information

Northern Nevada Water Planning Commission

Northern Nevada Water Planning Commission 12-07-11: NNWPC Agenda Item 6 Northern Nevada Water Planning Commission DATE: November 29, 2011 STAFF REPORT TO: FROM: SUBJECT: Chairman and Members, Northern Nevada Water Planning Commission Jim Smitherman,

More information

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division

Designing Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division Keith et P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

The Transect Zones

The Transect Zones T1 TABLE 1. TRANSECT ZONE DESCRIPTIONS TABLE 1: Transect Zone Descriptions. The following are general descriptions of the character of each Transect Zone. They may be interpreted as a constituent part

More information

EPA Technical Assistance for Sustainable Communities Building Blocks

EPA Technical Assistance for Sustainable Communities Building Blocks EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET

TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET TOWN OF FORT MYERS BEACH CAPITAL IMPROVEMENT PLAN DRAFT BUDGET FISCAL YEAR 2005/2006 TRANSPORTATION SOURCE OF FUNDS: Beginning fund balance and anticipated revenue. Over the course of the past fiscal years

More information

Evaluation of the Shared-Use Arrow

Evaluation of the Shared-Use Arrow Evaluation of the Shared-Use Arrow Table of Contents Page Evaluation of the Shared-Use ARROW Background... 1 ARROW Design... 1 ARROW Placement... 2 Wayne E. Pein William W. Hunter J. Richard Stewart Report

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

Clean, Green, Fun! Cady Way. Trail

Clean, Green, Fun! Cady Way. Trail Clean, Green, Fun! Cady Way Trail Seminole County Burkett Osceola 426 Mizell Sylvan 426 Ward Memorial Cady Way 436 426 551 Nan Waunatta Martha Mira Pearl George Virginia Berry Irma Winter Pines Golf Course

More information

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN

PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF)

THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS HIGHWAY DEPARTMENT PROJECT INITIATION FORM (PIF) To: From: Contact Information: Roland Bartl, Planning, Town of Acton, 472 Main St. Acton MA 01440; 978-264-9639;

More information

Collingwood Trails Network Management Guidelines. Parks, Recreation & Culture Department

Collingwood Trails Network Management Guidelines. Parks, Recreation & Culture Department Collingwood Trails Network Management Guidelines 2012 Parks, Recreation & Culture Department 1 SECTION 1: INTRODUCTION IN December 1998 the Town of Collingwood Parks, Recreation and Culture Department

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

The Snelling Community Park and Playground Renovation Project

The Snelling Community Park and Playground Renovation Project The Snelling Community Park and Playground Renovation Project The Shelburne Community School is currently undergoing a renovation and redesign of The Snelling Community Park which serves as the school

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

D3 April 8, 2015 Public Hearing

D3 April 8, 2015 Public Hearing D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

For more information, visit: rethinkingstreets.com

For more information, visit: rethinkingstreets.com For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,

More information

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment SR 89/Fanny Bridge Community Revitalization Project Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment 2015 Meeting Purpose Provide a summary description of alternatives

More information

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES

CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES CENTRAL BUSINESS DISTRICT STREETSCAPE AND IMPROVEMENT GUIDELINES I. INTRODUCTION In May 1990, the Town Council accepted a report from the Commercial Plan Committee that included a recommendation to develop

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

Task 1 Project Management and Project Organization Work Plan

Task 1 Project Management and Project Organization Work Plan City of Palmdale Active Transportation Program Plan Scope of Work At their January 22, 2015 meeting, the California Transportation Commission (CTC) allocated funding for the above-referenced project as

More information

Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop

Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Mission Reach Self-Guided Tour Mission Concepción Portal Loop and Mission Reach Phase II Embayment Loop Welcome to the Mission Reach! The Mission Reach Ecosystem Restoration and Recreation Project is transforming

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY

APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer

More information

Iowa Department of Transportation Concurrent NEPA / 404 Process

Iowa Department of Transportation Concurrent NEPA / 404 Process Iowa Department of Transportation Concurrent NEPA / 404 Process Project Name: County: Dallas County Project No.: HDP-8260(629) 71-25 Concurrence Point 2: PIN: N/A Public Land Survey System: Sections 16,21,22,23,26,27,28

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Architectural Services

Architectural Services Architectural Services for New PW Facility S EA (Sco Edwards Architects Contract $130,000 Expenses $10,000 Contract Total $140,000 Original conceptual layout by HSR/Waterleaf 1 Working with reduced funding

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014. John Cock, Principal/Planner Alta Planning + Design

BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014. John Cock, Principal/Planner Alta Planning + Design BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014 John Cock, Principal/Planner Alta Planning + Design Alta Planning + Design Creating active communities where bicycling and walking are safe, healthy,

More information

South Greeley Highway Corridor: Main Street of South Cheyenne

South Greeley Highway Corridor: Main Street of South Cheyenne South Greeley Highway Corridor: Main Street of South Cheyenne South Cheyenne Community Development Association Adopted by the Laramie County Board of Commissioners, June 18, 2013 The South Cheyenne Community

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

FINAL REPORT STANFORD UNIVERSITY TRAFFIC MONITORING REPORT 2000 GUP BASELINE. Santa Clara County Department of Planning Development.

FINAL REPORT STANFORD UNIVERSITY TRAFFIC MONITORING REPORT 2000 GUP BASELINE. Santa Clara County Department of Planning Development. FINAL REPORT STANFORD UNIVERSITY TRAFFIC MONITORING REPORT 2000 GUP BASELINE Prepared for: Santa Clara County Department of Planning Development July 2002 Prepared by: 1570 The Alameda, Suite 222 San Jose,

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning

More information