Process D1 : Establish the team
|
|
|
- Marian Grant
- 9 years ago
- Views:
Transcription
1 Process D1 : Establish the team Objective : To determine the best possible team to solve the problem & to specify the team rules No. Input Process Output 1 Decide to use the 8D method to solve the problem Organise a small group of people as a team. These people should have process and/or product know-how. Step "D1" of the 8D report completed : names and roles of the team members : The team members must have the time, authority and ability in the technical disciplines to solve the problem and to implement corrective actions. The group must have a designated champion and a team leader. The group begins the teambuilding process. - Champion - Team leader - Each team member If possible the team should have 4 to 10 members (not too big a team). The make-up of the team can vary during the process, depending on requirements. Enter the team members in the 8D report, ensuring traceability i.e., first names and surnames, telephone numbers and addresses. Use the "assessment questions" to determine whether step "D1" is complete. 2 Champion As champion Champion is appointed you are responsible for the system or process having the problem to be solved (the problem owner). you have the authority to make resources available to the team. you support team decisions. you ask the right questions in order to drive the progress of the team. you are not actually a member of the team but nevertheless you take part in team meetings as necessary. you are the interface between the team and the rest of the company. you can eliminate organisational hindrances. you ensure the right environment and the empowerment of the team. VDA-Volume 4: 8D Method, Long Version 1
2 3 Team leader As team leader Team leader you are the business manager of the team and responsible for progress in the technical sphere. you must have the technical expertise and necessary leadership quality. you should have mastered the 8D method and lead your team accordingly. you ensure the ordered, organisational running of the team meeting. you draw up the agenda and papers for the team meeting. you are the spokesman for the team and the interface to the champion. you work with the team in setting out targets and tasks. you request a summary of the contributions made by the team members. you focus on the reason for the meeting. you provide information to the team. you lead the decision-making process....you summarize the decisions. you quit the role of leader when you take part in the discussion. 6 Team member As team member you provide technical input. Activities / behaviour as team member you carry out tasks allotted to you. you offer information and ideas. you provide feedback and clarify queries. 2 VDA-Volume 4: 8D Method, Long Version
3 Reference data : Assessment questions (Appendix); Forms : 8D report Elementary aids : VDA Volume 4 Rules for decision-making : Activities / behaviour within the team : Many teams have a problem with decision-making because there is always the question of taking responsibility. At the beginning of operations, specify how you wish to come to decisions. If you are the team leader you can set out briefly the various methods for making decisions. If you have decided on a method for decisionmaking you should also decide how you wish to document the decisions and, if appropriate, how you arrive at them. Within the team, consider whether and when exceptions can be permitted. Specify who is responsible for carrying out the decision-making process. (in this connection see also D5) Specify team roles quickly. Ensure that team meetings start and finish on time. Define clear objectives for your work, both shortterm and long-term. Agree within the team on the "rules of the game" under which you wish all team tasks to be carried out in future. Set out these rules in writing. Set out clearly in writing what you consider to be acceptable and unacceptable behaviour within the team. All team members should be clear that each individual person is responsible for the progress of the entire team. Comments : The explanations are very comprehensive because the team process and the way team members work together are crucial in achieving a constructive solution. VDA-Volume 4: 8D Method, Long Version 3
4 Process D2 : Describe the problem Objective : Describe the internal / external problem by identifying "What is wrong with what" and detail the problem in quantifiable terms. No. Input Process Output 1 Symptom (measurable) Define the problem Definition of the problem Positive result of the check on the pre-requisites for using the 8D method. Available documents regarding similar problems, such as 8D reports, FMEAs, process flow plans, control plans, layouts, drawings ) Collect all the information regarding the problem. Determine as precisely as possible, based on facts, what defective product or process is involved : What item shows the defect / failure? Arrive at a clear statement of what the defect / failure is. What is the defect / failure? Look behind the symptom by posing the question : Who noticed what first? Ask the first person who noticed the symptom to describe exactly what he/she observed. Collect all available documents on similar problems (8D reports, FMEAs, process flow plans, control plans, ) Statement regarding the defective product or process. Statement regarding what the defect / failure is. 4 VDA-Volume 4: 8D Method, Long Version
5 2 Definition of the problem Statement regarding the defective product or process. Statement regarding what the defect / failure is. Develop a definition of the description of the problem (Problem statement). A problem definition - is a simple, precise statement of the item and the defect, the cause of which is not known. In the case of complex symptoms, consider breaking down the problem into sections for individual treatment. Draw up a list of "IS / IS NOT" facts. Describe the occurrence in terms of : - What? - Where? - When? - How many (how often; how significant? Do not draw any conclusions (don't ask why)!!! The form used for assembling the IS/IS NOT facts contains precisely those questions necessary in order to collect comprehensive data : - What is the item revealing the defect? - What is the defect / failure? - Where on the item can the defect be seen? - Where was the defect first observed? - Where has the defect been seen since? - How many items are affected? - How much of the item is affected? - How many defects per item can be seen? - Does the occurrence of the defect follow a trend? Use the "IS NOT" column to answer what, where, when, how many) the defect has not occurred. Does the quality department have data providing important information : line diagrams, diagrams showing a pattern, Pareto charts, etc.? Draw up a "To Do" list. Evaluate all the aids available, such as SPC data, machine log books, production measurement data, Check the make-up of the team. Document all decisions and changes to the problem or process. Agree the results of the collection of "IS/IS NOT" facts with the customer. Check whether the collected data show clearly a difference between specification actual performance, or whether the product/process was never good. Complete step "D2" of the 8D report. Description of the problem Completed "IS / IS NOT FACTS" form (what, where, when, how many) Up-dated 8D report D2 Up-dated To Do List List of actions with items outstanding ("To Do" list). Character of the defect. Brief statement of what the defect is. VDA-Volume 4: 8D Method, Long Version 5
6 Reference data : Assessment questions (Appendix); Elementary aids : VDA Volume 4 Comments : Forms : 8D report Collection of "IS / IS NOT" facts (Appendix) Tools & techniques : In D2 the objective is to describe the problem to be processed, clearly and as comprehensively as possible, based on the facts available. Collecting data and facts in D2 often appears to demand a lot of time and effort and it requires trust in the system to cause this amount of work within the team. However, once it is seen how much more quickly and effectively all the later stages can be handled, the team members are happy to bring all the facts together. Be careful not to draw any conclusions. The subconscious mind will always look for reasons in order to answer a problem as quickly as possible. Too many open questions cause stress. Brainstorming (creative methods, ) 8D reports covering similar failures Customers' reports Reports of experience Dealers' reports Quality studies Rework and repair reports Process, product and system audits 6 VDA-Volume 4: 8D Method, Long Version
7 Process D3 : Immediate containment action(s) Objective : To define, verify and implement the immediate containment action(s) (ICA) to isolate the effects of the problems from any internal / external customer until permanent corrective actions (PCA) are implemented and are effective. Validate the effectiveness of the ICA. No. Input Process Output 1 8D report D2 with a current description of the problem Current "To Do" list from D2 Define actions which will provide 100% protection for the customer. Use the quality tools (see elementary aids, VDA Volume 4) to evaluate which action protects the customer best. Buy time for the analysis of cause(s). Protect the customer from the effects of the problem. Restrict the problem in terms of costs, quality and time. Check whether a service action is necessary (by the vehicle maker). Defined ICA which provide 100% protection for the customer (the customer no longer sees the symptom) Service action if necessary 2 Defined ICA which provide 100% protection for the customer (the customer no longer sees the symptom) Up-dated 8D report (up to "D3" without verification) Verification of ICA : Before implementation, demonstrate that the action - achieves what is intended (by comparing data before and after) and - no new problem occurs. Verification activities may include : - Tests and demonstrations - comparison of the new action with similar, proven improvements - review of newly developed documents before approval/release : All documents (procedures, drawings, specifications, etc.) must be checked for accuracy before they are released. Verification is a process which evaluates that the intended change is made without causing a new problem. Verification can, for example, be carried out by a crossdepartmental team which assesses the change and its effect, including any effects on the organisation. If possible a pilot introduction should be carried out in order to demonstrate the effects of the change. There should be team consensus on the decision. Implement the ICA. Verification results, in 8D report (D3) Approved/released documents. ICA implemented. VDA-Volume 4: 8D Method, Long Version 7
8 3 Verification results in the 8D report (D3) Approved/released documents. ICA implemented. Validate the ICA. - Demonstrate continuously that the action has the intended effect without causing a new problem. - Although the customer is the last testing point for validation, validation by the customer is not the right way to carry out validation. Validation before release to the customer - Demonstrate continuously the expected effect of the actions before introducing the change to the customer. - The activities may include tests, inspection, observations and other quality tests. Validation by the customer - Demonstrate continuously the expected effect of the actions after introducing the change to the customer. Proof of effectiveness is achieved when improvements are seen at the same indicators which indicated the symptom. The improvements can be observed and demonstrated with a flow diagram. Up-dated 8D report with : Verification and validation data for the ICA. Reasons (if applicable) why an ICA is not necessary. Reasons for the selected ICA (decision and criteria method). Action plan for coordinating the ICA ("to do" list) Action plan for the next steps ("to do" list) Reference data : Assessment questions (Appendix); Elementary aids : VDA Volume 4 Comments : Forms : 8D report Decision criteria method (Appendix) Characteristics of an immediate containment action (ICA) Temporary elimination of the effect / symptom. An action which prevents symptoms arising from one or more problems from having any effects on personnel, organisations or specific vehicle drivers. An ICA makes use of the data collected at the D2 stage. An immediate action attacks the symptom. is verified for effectiveness before implementation. is observed for its effect. is not merely a quick solution which is then forgotten. is replaced by the selected permanent corrective action (D6) - not to be forgotten! generates costs. 8 VDA-Volume 4: 8D Method, Long Version
9 Process D4 : Root cause(s) Objective : to determine all possible causes, decide on and demonstrate the main (root) cause, indicate the point where the fault slipped through (the "escape point". No. Input Process Output 1 8D report completed up to and including D3 : Verification and validation data for the ICA. Reasons (if applicable) why an ICA is not necessary. D4 is the actual analysis of the cause(s). It must be carried out with care and without allocating blame. Facts are all that count no deductions or subjective assessments. Make sure that the problem has been caused by a change here, "change" means sudden and continuous and not a problem which occurred on the first day. Reasons for the selected ICA (decision and criteria method). Action plan for coordinating the ICA (decision-making work-sheet) Action plan for the next steps (if involved in the management review) ("to do" list). e.g., current problem description, process sequence, FMEA, work instructions, maintenance records, SPC, Measurements are carried out, which show that the specified requirements are not met. Determine all the differences between what "IS" and what "IS NOT". Allocate all the differences to the relevant changes and date these changes. Within the team, develop all possible theories regarding potential causes. Use the experience and creativity of the team members. Each theory which might explain how the problem could have occurred is identified as a possible cause. Isolate the root cause by testing all the theories of causes against ALL the facts from the "IST / IS NOT" exercise. Isolate the "escape point" the point in the process where some-one could have recognized the problem and prevent its effects but did not do so. Use the cause & effect diagram, the process flow chart and problem-solving sheets: Work-sheet : IS / IS NOT differences / changes. Write down all the differences: Ask what is unusual, strange, striking or unique about the "IS" data. Consider the influence of personnel, methods, materials, machines, measurements and the environment (revise the cause & effect diagram). Completed work-sheet : IS / IS NOT differences / changes - cause & effect diagram - action plan Ask what has changed with regard to the differences. Keep asking Why? as you work toward the root cause (the "why" staircase) until there is no longer a clear answer to the question. VDA-Volume 4: 8D Method, Long Version 9
10 Use the work-sheet : Testing the theories for causes 2 - cause & effect diagram - action plan - 8D report Verify the cause Verification of the most probable cause can take place only in the real world, where the problem occurs. Verification of the cause is the confirmation that the cause has actually caused the problem. Verification should be carried out in two stages : - passive verification - active verification Passive verification is carried out by observation. With passive verification a check is made as to whether the cause is present. If it cannot be demonstrated that the cause is present, there is every chance that the "most probable cause is not the real cause. - Verified cause - Up-dated 8D report Active verification is a process, in which the effect of the cause can be switched on and off VDA-Volume 4: 8D Method, Long Version
11 Reference data : Assessment questions (Appendix); Elementary aids : VDA Volume 4 Comments : Terminology regarding causes Forms : 8D report, IS / IS NOT data collection (appendix) IS / IS NOT DIFFERENCES / CHANGES (Appendix) Problem caused by a change Possible cause" Each failure which was identified often (in a cause & effect diagram), which describes how an effect could occur Most likely cause" A theory which, after assessing the data, best explains the description of the problem. "Root cause" A verified cause which explains the occurrence of the problems and has been verified both passively and actively. Quality Expected Time continuous Expected Actual Terminology regarding the "escape point" (the point at which the problem slipped through) sudden "Control system" A system which is established in order to observe the product and/or process. It ensures that the quality requirements are met. It covers responsibilities, procedures and resources. The system has one or more control points, at which the product / process is checked. Quality Time Actual "Control point" A point in the control system at which the product / process is checked for compliance with defined quality requirements. "Escape point" The earliest point in the process at which the problem could have been detected but was not detected. VDA-Volume 4: 8D Method, Long Version 11
12 Tools & techniques : Robust design Environmental tests and analyses Measurement system analysis Benchmarking First-day deviation (The actual figure never achieves the required level) Expected First-day deviation Quality Actual Time Process D5 : Planned permanent corrective action(s) Objective : Select the best permanent corrective action in order to eliminate the cause of the problem No. Input Process Output 1 - Cause & effect diagram - Verified cause - Action plan - Up-dated 8D report Select the best corrective action to eliminate the cause of the problem. Select the best corrective action to prevent the problem from slipping through at the "escape point". Verify that both these decisions are effective, once they have been introduced Ensure that no new causes of problems have been introduced as a result of the corrective action. Eliminate the cause of the problem. Verify this in D5 and validate it in D6. Criteria for the permanent corrective action : Solve the problem at the level of the cause. Do not generate any new problems. Verify the effectiveness of the action. - Action plan - Up-dated 8D report 12 VDA-Volume 4: 8D Method, Long Version
13 2 - Verified cause - Action plan Use the attached work-sheet : DECIDE ON THE CRITERIA METHOD - Up-dated 8D report Essential criteria : What Essential criteria are objectively measurable, non-negotiable, realistic features regarding the decision. They often involve money, completion dates, company regulations and legislation. Why Essential criteria are minimum criteria. This means that some decisions are filtered out. How Essential criteria must be objectively measurable and realistic. Desirable criteria : Was Desirable criteria are features which are desirable in decision-making. They are subjectively / objectively measurable. Why Desirable criteria enable you to determine which of the remaining decisions should be preferred. How Desirable criteria generate the criteria required to make the ideal decision, taking resources into account, in order to reach the necessary end-result. Criteria entered in the worksheet : DECISION ON THE CRITERIA METHOD. 3 Criteria entered in the work-sheet : DECISION ON THE CRITERIA METHOD Decide on the relative importance of the desirable criteria : What Desirable criteria have a relative importance to each other in terms of the end-result. Why The relative importance enables the effect of each available option to be evaluated in order to determine the relative advantages. How Some desirable criteria are more desirable than others. Award 10 points to the most important criteria, compare the other criteria to it and award them points accordingly (scoring (1-10). Criteria and importance entered in the work-sheet : DECISION ON THE CRITERIA METHOD VDA-Volume 4: 8D Method, Long Version 13
14 4 Work-sheet : DECISION ON THE CRITERIA METHOD with criteria and importance 5 Work-sheet : DECISION ON THE CRITERIA METHOD with criteria and importance Select a decision : What Generate a list of the alternatives. Why The "band-width" gives you a high-value selection. How Some of the alternatives may have already been suggested for example, by the manager. Others may already have been considered on the basis of the personal experience of other people. Some examples may have been taken from technical magazines, literature, etc. Bear in mind that this process may require several team meetings, if data need to be collected from outside the team. Compare the choice against the decision-making criteria : What A comparison enables you to determine how well the possible decision fulfils the decision-making criteria. Why You carry out the comparison so that you can select the best solution from all the possible solutions. How 1. Compare the essential criteria, checking the solutions (variants) to see if they are appropriate (yes or no). 2. Then check the solutions against the desirable criteria. Award the best solution 10 points and evaluate the other solutions in relation to this, with scores of 1 to Multiply these "how good" values with the importance of each desirable criterion. Enter the result of this multiplication in the Points column. 4. Produce total figures for each variant (solution). Work-sheet : DECISION ON THE CRITERIA METHOD with criteria and importance Work-sheet : DECISION ON THE CRITERIA METHOD with criteria, importance and totals for the individual variants. Consider the following : Write down objective information 14 VDA-Volume 4: 8D Method, Long Version
15 6 Work-sheet : DECISION ON THE CRITERIA METHOD with criteria, importance and totals for the individual variants. Work-sheet : DECISION ON THE CRITERIA METHOD with criteria, importance and totals for the individual variants. Completed risk analysis work-sheet. regarding the desirable criteria and not merely yes, no, good or bad. Try to use the entire points band-width, from 1 to 10. Analyse the risk What In the risk assessment, consider what can "go wrong". Why It is essential to consider the risk. Often solutions will bring not only advantages but also negative side-effects (the "network" theory). How Draw up a statement of risk : If an event occurs, it will have the following consequences ("FMEA thinking ) Examine the probability of occurrence and the severity of the possible effects. Relate the results of these considerations to the essential and desirable criteria. Is the solution really a solution? Or does it also contain a possible new problem? Come to a fully-weighed decision. What A fully-weighed decision is based on all the information and the conclusions which have been drawn. Why You make the fully-weighed decision in order to make the best possible decision. How When weighing up the advantages and disadvantages you may find that the solution initially proposed is no longer the optimum solution. Work-sheet : DECISION ON THE CRITERIA METHOD with criteria, importance and totals for the individual variants. Decision 7 Decision Verification, feasibility test Justification of the final VDA-Volume 4: 8D Method, Long Version 15
16 Check to make sure that the solution works in practice. Examples : experiments, trial runs, tests. decision Verification data for the permanent corrective action(s). Risk analysis, FMEA 8 - Action plan - Up-dated 8D report Describe the result of the decision : What the result is a brief statement containing the desired end-result of the decision. Why the end-result must be known in order to determine the range, or scope of the decision and also to focus thinking and further action on this. How you describe the end-result by defining the actions and the item(s) involved. Action plan for the next steps. Up-dated 8D report Brief description of the decision, including the range, the actions and the item(s) involved. Up-dated 8D report Reference data : Assessment questions (Appendix); Elementary aids : VDA Volume 4 Tools & techniques Forms : 8D report, Work-sheet : decision criteria method Summary FMEA Process capability methods Process flow diagram Design of experiments (DOE) Creativity techniques TRIZ Benchmarking Organisation charts Process control checks Weibull analysis Important factors in D5 are : Take the right decision Weigh the advantages and risks No hasty introduction Verify that the selected action will be successful 16 VDA-Volume 4: 8D Method, Long Version
17 Process D6 : Implement and validate permanent corrective actions (PCAs) Objective : Plan and implement the chosen permanent corrective actions (PCA) and stop the immediate containment actions (ICA). Validate the PCA. Observe the long-term results. No. Input Process Output 1 Brief description of the decision, including the range, the actions and the item(s) involved. Up-dated 8D report Plan and implement the selected permanent corrective action (PCA). The team proceeds on the principles of : Plan Do Check - Act 1. Describe the objective. 2. Set out the standards and conditions which must be met. 3. Specify the stages of the action. Preventing problems regarding the planned PCA 4. Specify the main stages. 5. Identify barriers. 6. Identify preventive actions. 7. Identify safety/security actions. 8. Look for key words covering safety/ security actions. 9. Specify who is responsible for what action. - Permanent corrective action - Plan Do Check Act list - Implementation plan 2 - Permanent corrective action - Plan Do Check Act list - Implementation plan 3 - Final permanent corrective action - Plan Do Check Act list - Implementation plan Final plan 10. Check, revise and communicate the final plan. Validation The validation is successful if it is demonstrated that the problem no longer occurs. Proof can be provided using a performance chart (failure statistics over a long period). - Final permanent corrective action - Plan Do Check Act list - Implementation plan - Confirmation that the validation is successful. - Up-dated 8D report 4 - Confirmation that the validation is successful. - Up-dated 8D report Stop the immediate containment action (ICA) Part of "D6" is to conclude and stop the immediate containment action (ICA) which was intended to protect the customer. The ICA is no longer required because the permanent action (PCA) has eliminated the cause of the problem. ICA are stopped. Up-dated 8D report VDA-Volume 4: 8D Method, Long Version 17
18 Continuing the ICA would use important resources (causing unnecessary costs). The ICA would also hinder the validation Tools & techniques : Forms / information : Action plan Process flow chart FMEA Initial sample inspection report (ISIR) (Production Part Approval Process, PPAP) Process descriptions Work descriptions SPC Flow charts Process capability checks 8D report Elementary aids : VDA Volume 4 Summary : If you cannot prove that the problem is solved, it is not solved! Process D7 : 18 Objective : Prevent the recurrence of the failure VDA-Volume 4: 8D Method, Long Version
19 Prevent recurrence which has been eliminated in the system. Give recommendations for improvements, also covering other systems in which the problem might occur. No. Input Process Output 1 - Confirmation that the validation is successful. - Up-dated 8D report. - Other information sources : - FMEA - ISO and VDA documents - Process flow charts - Timing plans - Control plans - Report of experience from the teams (lessons learned) - Provisional solutions Prevent recurrence This is an action to prevent the occurrence of current problems, similar problems and systemic problems. The current problem is the problem covered by the present 8D process. In "D7" the team examines the same problem from the systemic perspective. Similar problems are problems of a similar nature to the problem covered by the present 8D process. The team leader for the current 8D process initiates the necessary actions if appropriate. Show what practices and procedures in the system allowed the problem to occur and to slip through without being detected. Identify possible practices and procedures for preventing the problem in the current system. 2 Possible improvements to practices, procedures, etc. 3 Recommendations for systemic improvements, procedures, etc. Identify possible practices and procedures for preventing similar problems in other systems. Modify the necessary systems prevent current or similar problems from occurring. Preventive actions fall within the area of responsibility of the current team leader! As a team, give recommendations for systemic improvements if necessary / possible. It may be necessary to appoint a different team champion in the case of systemic problems. Possible reaction to improvement proposals from the teams : "D7" results are the area of responsibility of the current team champion. 1. The champion authorizes the current 8D team to implement appropriate action; or 2. The champion authorizes others to Possible improvements to practices, procedures, etc. Up-dated FMEA, control plan, process flow chart (if appropriate) and layout. Recommendations for systemic improvements, procedures, etc. Action (1 to 5) by the team champion, depending on his decision. VDA-Volume 4: 8D Method, Long Version 19
20 implement appropriate action; or 3. The champion calls for further investigations; or 4. The champion rejects the team's recommendations; or 5. The champion forwards the recommendations (escalation). Reference data : Assessment questions (Appendix); Elementary aids : VDA Volume 4 Tools & techniques : Forms : 8D report Summary : 5 x "why"? Process flow chart FMEA SWOT QFD Interviews with experts Behind all causes there are systemic errors which must be eliminated. The objective is to modify the system in such a way that the problem cannot occur. "D7" prevents similar problems from occurring. The team also has the opportunity to propose fundamental improvements to the system. 20 VDA-Volume 4: 8D Method, Long Version
21 Process D8 : Congratulate your team Objective : Recognize the team and individual contributions to what has been achieved. Close the project. No. Input Process Output 1 Completed 8D report, stages D1 D7. Recognition and praise within the team and for individual contributions. Performance within the team can be recognized. This does not mean that there is no recognition outside the team. Effective recognition must be targeted in a measured manner and at the right time. Recognition increases self-esteem and motivates people to work in future 8D teams. Recognition and praise should be tangible. Responsible : Team champion Recognize the team and individual contributions. 2 Recognize the team and individual contributions. Complete any actions and documents not yet brought to a conclusion. This includes : Completion and archiving of documentation. Recognition and evaluation of the experiences in the team process. Presentation of results to the team champion. Feedback to team members on their efforts (praise and criticism). Responsible : Team champion Closure of the 8D method. Documentation of the process Revised list of 8D experience for all solved problems. Complete 8D report. Reference data : Assessment questions (Appendix); Elementary aids : VDA Volume 4 Forms : 8D report Tools & techniques : Summary : It is important that... individual contributions are recognized as well as the team's performance. incomplete work and documents are brought to a conclusion before the team is disbanded. success is appreciated. - Optional Prepare to clarify the problem / Objective : Immediate interim containment action (IICA) if necessary. Decide on the use of the 8D method. VDA-Volume 4: 8D Method, Long Version 21
22 immediate interim containment action / prepare the 8D method No. Input Process Output 1 The problem or symptom is reported by an internal or external customer or by the person affected. Ask the first person who noticed the symptom to describe exactly what he/she observed. Check whether an immediate interim containment action (IICA) is necessary. Determine whether other internal or external customers might be affected by this or a similar problem and implement appropriate actions. Check for a reasonable possibility of making up for a possible loss of production. - Proof that an IICA is necessary (2a) - Reason for the IICA (for example, a decision-making worksheet) - Action plan to coordinate the IICA - Proof that an IICA is not necessary (2b) (for example, a decisionmaking worksheet) 2a - Proof that an IICA is necessary - Action plan to coordinate the IICA Define and initiate an immediate interim containment action (IICA) if necessary. Inform the customer if appropriate. Immediate interim containment action; information to the customer if appropriate Check the way in which the IICA will operate and ensure that no undesirable side-effects occur. 2b Immediate interim containment action; information to the customer if appropriate As a reaction to a symptom of a problem, check whether it makes sense to employ the 8D method (a team solution is necessary). Check the pre-requisites for using the 8D method : Decision : Result of a check on the pre-requisites for using the 8D method 1. The symptom is defined and quantified e.g. : - what has been observed? - what parts or products are affected? 2. You know the customer where the symptom has occurred and those affected. 3. The cause is not known. If the 8D method is not to be used (3a) If the 8D method is to be used (3b) 4. Management provides the resources required to eliminate the root cause of the problem and for preventive actions. 5. The complexity of the symptom cannot be handled by one person alone that is, a solution by a team is required. Decide whether or not to use the 8D method. 3a Decision : Use a different method and justify your 22 VDA-Volume 4: 8D Method, Long Version
23 Do not use the 8D method reasons 3b Decision : Use the 8D method Start the 8D method. Document all decisions and also each and every change to the problem or process. Reference data : Assessment questions (Appendix) Tools & techniques : Elementary aids : VDA Volume 4 Comments : Symptom : An event or effect which has occurred with a customer which is quantifiable and indicates that one or more problems exist. The symptom is an effect of the problem, which is detected at the customer's premises or in-house. Problem : A quality deficiency, a deviation from an expected result (specified value), special causes within specification limits if the limits are set too wide, or other unexpected effects. Immediate interim containment action : An action which immediately protects the internal and/or external customer in the short term for example : - out-sorting defective parts - stop production - stop shipments VDA-Volume 4: 8D Method, Long Version 23
8D :: Problem Solving Worksheet
Tracking Number: Customer Number: Response Due Date: 8D :: Problem Solving Worksheet 8-D is a quality management tool and is a vehicle for a cross-functional team to articulate thoughts and provides scientific
Supplier Training 8D Problem Solving Approach. 2013 Brooks Automation, Inc.
Supplier Training 8D Problem Solving Approach What is the 8D method? 8D stands for the 8 disciplines or the 8 critical steps for solving problems. It is a highly disciplined and effective scientific approach
Training As a Root Cause
Corrective Action Preventative Action Defining Alternatives to Training As a Root Cause Presentation Sponsors Corporate Quality Director at MME Group Inc ISO 9001:2008 & ISO 13485-:2003 Certified Customer
Effective Root Cause Analysis For Corrective and Preventive Action
Effective Root Cause Analysis For Corrective and Preventive Action Manuel Marco Understanding Key Principles Requirement need or expectation that is stated, generally implied, or obligatory Generally implied
Supplier quality guideline. VOSS Automotive Group Issue 02.06.2014 Rev00
Supplier quality guideline VOSS Automotive Group Issue 02.06.2014 Rev00 Table of Contents 1. General requirements 1.1 Scope of application 1.2 Quality objectives 1.3 Quality management system 1.4 Supplier
Six Sigma aims to maximise customer satisfaction and minimise defects.
Six Sigma aims to maximise customer satisfaction and minimise defects. WHAT IS SIX SIGMA? In statistical terms, the purpose of Six Sigma is to reduce process variation so that virtually all the products
Internal Quality Assurance Arrangements
National Commission for Academic Accreditation & Assessment Handbook for Quality Assurance and Accreditation in Saudi Arabia PART 2 Internal Quality Assurance Arrangements Version 2.0 Internal Quality
Design Verification. Introduction
Design verification is an essential step in the development of any product. Also referred to as qualification testing, design verification ensures that the product as designed is the same as the product
Team Dynamics in Process Simplification. Introduction to Process Improvement Slide 1
Team Dynamics in Process Simplification Understanding the Basics of Team Development Slide 1 Teams are all around us Slide 2 Each team should: Define their principles in alignment with organizational vision
SQM-H. This Handbook is a summary of the processes and documents of the supplier quality management 1/13
SQM-H Supplier Quality Management Handbook MAHLE Behr - global This Handbook is a summary of the processes and documents of the supplier quality management 1/13 Scope of Application The Supplier Quality
Supplier Quality Requirements
Key Elements Procedures # 2 Supplier Quality Requirements Section List of content Page 1.0 Foreword 2 2.0 Definitions and acronyms 2 3.0 Basic Quality Requirements 3 4.0 Part Specific Quality Requirements
An Introduction to. Metrics. used during. Software Development
An Introduction to Metrics used during Software Development Life Cycle www.softwaretestinggenius.com Page 1 of 10 Define the Metric Objectives You can t control what you can t measure. This is a quote
CAPA Essentials Root Cause Analysis Tools and Techniques
CAPA Essentials Root Cause Analysis Tools and Techniques Presented by Edna R. Falkenberg 21/10/2014 Slide 1 in numbers: Growing from strength to strength 1 One-stop technical solution provider 150 years
Writing Reports BJECTIVES ONTENTS. By the end of this section you should be able to :
Writing Reports By the end of this section you should be able to : O BJECTIVES Understand the purposes of a report Plan a report Understand the structure of a report Collect information for your report
GUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu [email protected]
GUIDELINES FOR PILOT INTERVENTIONS www.ewaproject.eu [email protected] Project Lead: GENCAT CONTENTS A Introduction 2 1 Purpose of the Document 2 2 Background and Context 2 3 Overview of the Pilot Interventions
An Introduction to PRINCE2
Project Management Methodologies An Introduction to PRINCE2 Why use a Project Methodology and What Does PRINCE2 Enable? PRINCE - PRojects IN Controlled Environments - is a project management method covering
7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers
Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4
Relationship Manager (Banking) Assessment Plan
Relationship Manager (Banking) Assessment Plan ST0184/AP03 1. Introduction and Overview The Relationship Manager (Banking) is an apprenticeship that takes 3-4 years to complete and is at a Level 6. It
Lean Six Sigma Training The DMAIC Story. Unit 6: Glossary Page 6-1
Unit 6: Glossary Page 6-1 Glossary of Terms Unit 6: Glossary Page 6-2 Action Plan A technique that documents everything that must be done to ensure effective implementation of a countermeasure or improvement
1. What is PRINCE2? Projects In a Controlled Environment. Structured project management method. Generic based on proven principles
1. What is PRINCE2? Projects In a Controlled Environment Structured project management method Generic based on proven principles Isolates the management from the specialist 2 1.1. What is a Project? Change
Team Building. HR can provide you with support for building effective team work.
Team Building HR can provide you with support for building effective team work. Developing Effective Teams Model Typically we work with the leader or a smaller working group to determine what they would
The University of Adelaide Business School
The University of Adelaide Business School MBA Projects Introduction There are TWO types of project which may be undertaken by an individual student OR a team of up to 5 students. This outline presents
Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)
1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like
Monte Carlo analysis used for Contingency estimating.
Monte Carlo analysis used for Contingency estimating. Author s identification number: Date of authorship: July 24, 2007 Page: 1 of 15 TABLE OF CONTENTS: LIST OF TABLES:...3 LIST OF FIGURES:...3 ABSTRACT:...4
Maintaining employees focus and motivation is essential if they are to make a full contribution to your business.
Maintaining employees focus and motivation is essential if they are to make a full contribution to your business. appraisals actively involve employees in understanding what is expected of them. By setting
Corrective and Preventive Action Background & Examples Presented by:
Corrective and Preventive Action Background & Examples Presented by: Kimberly Lewandowski-Walker Food and Drug Administration Division of Domestic Field Investigations Office of Regulatory Affairs Overview
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
Using the AT Decision-Making Guide
Using the AT Decision-Making Guide When the members of the team who have been assigned to gather information have completed their tasks, the team is ready to come together for the next step. The information
AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?
1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme
ENGR 1181 Lab 2: Quality and Productivity Lab
ENGR 1181 Lab 2: Quality and Productivity Lab - Preparation Material - - Report Guidelines Preparation Material 1. Overview of Quality and Productivity Lab The Quality and Productivity lab introduces various
Risk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
Design Verification The Case for Verification, Not Validation
Overview: The FDA requires medical device companies to verify that all the design outputs meet the design inputs. The FDA also requires that the final medical device must be validated to the user needs.
Training Pack. Kaizen PDCA ( Plan / Do / Check / Act )
Training Pack Kaizen PDCA ( Plan / Do / Check / Act ) Introductions Name Department Current knowledge of Plan Do Check Act Aims & Objectives Target Audience : All! Purpose of Module : To train the delegates
Complaints Policy. Complaints Policy. Page 1
Complaints Policy Page 1 Complaints Policy Policy ref no: CCG 006/14 Author (inc job Kat Tucker Complaints & FOI Manager title) Date Approved 25 November 2014 Approved by CCG Governing Body Date of next
The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1
The Thinking Approach LEAN CONCEPTS All rights reserved 1 Basic Thinking to Manage the Journey MANAGEMENT TACTICS OF A LEAN TRANSFORMATION All rights reserved 2 LEAN MANAGEMENT Two key questions What is
Section 2 - Key Account Management - Core Skills - Critical Success Factors in the Transition to KAM
Section 2 - Key Account Management - Core Skills - Critical Success Factors in the Transition to KAM 1. This presentation looks at the Core skills required in Key Account Management and the Critical Success
www.transition-support.com
Can we include all products and services in the QMS but limit the scope of registration? According to ISO/TC 176/SC 2/N 524, organizations are not obliged to include all the products that it provides within
ILM Level 3 Certificate in Using Active Operations Management in the Workplace (QCF)
PAGE 1 ILM Level 3 Certificate in Using Active Operations Management in the Workplace (QCF) CONTENTS Qualification Overview: ILM Level 5 Award, Certificate and Diploma in Management APPENDICES Appendix
PRINCE2:2009 Glossary of Terms (English)
accept (risk response) acceptance acceptance criteria activity agile methods approval approver assumption assurance A risk response to a threat where a conscious and deliberate decision is taken to retain
Module 15: Nonconformance And Corrective And Preventive Action
Module 15: Nonconformance And Corrective And Preventive Action Guidance...15-2 Figure 15-1: Root Cause Diagram...15-3 Tools and Forms...15-6 Tool 15-1: Corrective & Preventive Action Worksheet...15-6 Tool
DECISION-MAKING 6-1 DECISION-MAKING
DECISION-MAKING 6-1 DECISION-MAKING OBJECTIVES To successfully complete this assignment, you must study the text and master the following objectives: Describe the six strategies used to make decisions.
Potential Interview Questions
Potential Interview Questions Listed below are some questions commonly asked by employers during interviews along with some hints about how to best answer each question. Outline or write out your responses
[14:37 2007/2/22 Ch03-H8325.tex] ISBN: 0750683252 YULL: BTEC First ICT Practitioners Curriculum Support Pack Page: 42 41 58
Unit 3 ICT project The activities provided to support this unit have been designed to give students an insight into some of the tools and techniques required to embark on effective project management.
Level: 3 Credit value: 5 GLH: 28 Relationship to NOS:
Unit 341 Implement UAN: Level: 3 Credit value: 5 GLH: 28 Relationship to NOS: Assessment requirements specified by a sector or regulatory body: Aim: T/506/1929 Management & Leadership (2012) National Occupational
Audit Readiness Lessons Learned
Audit Readiness Lessons Learned Four Tips for Achieving a Smooth Audit It seems obvious: Prepare well and prepare ahead of time and the year-end audit does not have to be the painful experience most organizations
Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) 7917134922 E-Mail: [email protected].
Edwin Lindsay Principal Consultant, Tel: + 44 (0) 7917134922 E-Mail: [email protected] Corrective and Preventative Action (CAPA) is a system of quality procedures required to eliminate the causes
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1
FMEA and HACCP: A comparison. Steve Murphy Marc Schaeffers
FMEA and HACCP: A comparison Steve Murphy Marc Schaeffers FMEA and HACCP: A comparison Introduction FMEA and Control planning is being used more and more in industry. In the food industry companies use
Content Sheet 16-1: Introduction to Documents & Records
Content Sheet 16-1: Introduction to Documents & Records Role in quality management system The management of documents and records is one of the 12 essential elements of the quality system. The management
Quality Assurance Agreement (QAA)
Quality Assurance Agreement (QAA) History and Release Notes: Version Date Acronym 0.1 15.04.2010 AB Draft 0.2 10.06.2010 AB Revision in the core team 1.0 28.03.2011 AB,RK, RH Release Status of revision;
Five High Order Thinking Skills
Five High Order Introduction The high technology like computers and calculators has profoundly changed the world of mathematics education. It is not only what aspects of mathematics are essential for learning,
QUIZ MODULE 1: BASIC CONCEPTS IN QUALITY AND TQM
QUIZ MODULE 1: BASIC CONCEPTS IN QUALITY AND TQM These questions cover Sessions 1, 2, 5, 6, 7. The correct answer is shown in bold A fundamental attribute of TQM is Drawing control charts Having team meetings
Planning and conducting a dissertation research project
Student Learning Development Planning and conducting a dissertation research project This guide addresses the task of planning and conducting a small research project, such as an undergraduate or masters
Certified Quality Improvement Associate
Certified Quality Improvement Associate Quality excellence to enhance your career and boost your organization s bottom line asq.org/certification The Global Voice of Quality TM Certification from ASQ is
Human Resources Training. Performance Management Training Module 2: Managing Employee Performance
Human Resources Training Performance Management Training Module 2: Managing Employee Performance Table of Contents Learning Objectives...1 Expectations Of You As A Leader...3 Setting and Communicating
Supporting effective teamwork
Supporting effective teamwork A checklist for evaluating team performance CHAPTER 26 : HATCHED Margaret Kilvington and Will Allen Summary Teams can be instruments for achieving changes in culture and practice
Accident Investigation
Accident Investigation ACCIDENT INVESTIGATION/adentcvr.cdr/1-95 ThisdiscussionistakenfromtheU.S.Department oflabor,minesafetyandhealthadministration Safety Manual No. 10, Accident Investigation, Revised
Workflow and Process Analysis for CCC
Section 3.6 Design Workflow and Process Analysis for CCC This tool introduces the importance of workflow and process improvement in a community-based care coordination (CCC) program, describes the value
An introduction to impact measurement
An introduction to impact measurement Contents 1 Introduction 2 Some definitions 3 Impact measurement at BIG 4 Setting impact measures for programmes APPENDICES A External Resources (separate document)
Performance Element: Compare stocks, bonds, and commodities to determine advantages.
PATHWAY: Financial & Investment Planning Pathway Topic: Product Knowledge Pathway KS Statement: Examine characteristics to distinguish between stocks, bonds, and commodities. Performance Element: Compare
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
FAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS
FAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS Presented By Clay Anselmo, R.A.C. President and C.O.O. Reglera L.L.C. Denver, CO Learning Objectives Understand the Definitions of Failure Investigation and
ASSESSMENT, RECORDING AND REPORTING(ARR) POLICY.
ASSESSMENT, RECORDING AND REPORTING(ARR) POLICY. Introduction The ARR Policy is closely linked to other key school policies (in particular: Teaching and Learning and Gifted and Talented) to ensure whole
How to conduct an investigation
July 2005 How to conduct an investigation Advice for local authorities on investigating allegations of misconduct About this guide This guide provides an introduction to the practice of investigation and
SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM
Fuji Autotech USA, LLC Walton, KY 41094 DATE: SUPPLIER QUALITY SELF AUDIT & QUESTIONNAIRE FORM DUNS# Supplier Name Complete Mailing Address Complete Shipping Address (if different then mailing address)
Workbook 4 Noticing unhelpful thinking. Dr. Chris Williams. Overcoming Depression A Five Areas Approach
Workbook 4 Noticing unhelpful thinking Dr. Chris Williams Overcoming Depression A Five Areas Approach 2 Section 1: Introduction This is the first of two workbooks that will help you find out about and
Lean Six Sigma Black Belt Certification Recommendation. Name (as it will appear on the certificate) Address. City State, Zip
Lean Six Sigma Black Belt Certification Recommendation Name (as it will appear on the certificate) IQF Member Number Address City State, Zip Country We the undersigned, on behalf of the Sponsoring Organization,
High Schools That Work: How Improving High Schools Can Use Data to Guide Their Progress
High Schools That Work: How Improving High Schools Can Use Data to Guide Their Progress In our book, The Power of Focus, we encourage all governmental, nonprofit, and for-profit groups that are working
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
Getting the best from your 360 degree feedback
1 Contents Getting the best from your 360 degree feedback... 3 What it is.... 3 And isn t.... 4 Using the system... 5 Choosing your respondents... 5 Choosing your competencies... 5 Compiling your questionnaire...
Measuring the Impact of Volunteering
Measuring the Impact of Volunteering Why is measuring the impact of volunteering important? It is increasingly important for organisations or groups to describe the difference that volunteering makes to,
Measuring ROI in Leadership Development
15 CHAPTER Measuring ROI in Leadership Development Linear Network Systems This program represents a comprehensive leadership development initiative for first-level managers in a technical environment.
POLICE OFFICER (EMPLOYEE) EVALUATION
CHESWOLD POLICE Department of Public Safety POLICE OFFICER (EMPLOYEE) EVALUATION Effective Date: Directive Number: April 15, 2013 10-1-7 Special Instructions: NONE Distribution: All Sworn & Last Re-Evaluation
AS9100 B to C Revision
AS9100 B to C Revision Key: Additions Deletions Clarifications 1.2 Application AS9100C Key Additions This standard is intended for use by organizations that design, develop and/or produce aviation, space
FURTHER QUALIFICATION FOR TOURIST GUIDES 2011
Requirements for a competence-based qualification FURTHER QUALIFICATION FOR TOURIST GUIDES 2011 Regulation 12/011/2011 Publications 2013:11 Finnish National Board of Education and authors Publications
Requirements & Guidelines for the Preparation of the New Mexico Online Portfolio for Alternative Licensure
Requirements & Guidelines for the Preparation of the New Mexico Online Portfolio for Alternative Licensure Prepared for the New Mexico Public Education Department Educator Quality Division http://www.ped.state.nm.us/
GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page
7/11/12 Supplier Quality 1 of 18 7/11/12 Supplier Quality 2 of 18 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management
INTRODUCTION TO COACHING TEACHING SKILLS TEACHING/LEARNING. September 2007 Page 1
TEACHING SKILLS September 2007 Page 1 TEACHING SKILLS Being a teacher is one of the main roles a coach fulfils for their players. The ability to teach effectively, especially the technical skills of ice
BODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT
BODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT The topics in this Body of Knowledge include additional detail in the form of subtext explanations and the cognitive level at which test questions will
Chapter 2 ISO 9001:2008 QMS
Chapter 2 ISO 9001:2008 QMS For internal use of BSNL only Page 1 ISO 9001:2008 QMS Introduction Everyone wants to achieve profits. Profits can come by more sales with some profit margin and also by cutting
Applications and Benefits of Ethnographic Research
Hitachi Review Vol. 62 (2013), No. 6 317 Applications and Benefits of Ethnographic Research Case Study of Management System Upgrade for Power Plant Construction Site Takafumi Kawasaki Masaki Takano Kazuaki
What we mean by competence is an appropriate skill, aptitude or ability that you have demonstrated
Page 1 of 7 Tips for Completing Competence-based Application Forms What we mean by competence is an appropriate skill, aptitude or ability that you have demonstrated Q - How do you demonstrate a competence
NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008
WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,
ITIL CSI 2011 Vernon Lloyd
ITIL CSI 2011 Vernon Lloyd 12 th December 2011 Implementing or Improving? Vernon Lloyd International Client Director Fox IT Without change there is no innovation, creativity, or incentive for improvement
Mgmt 301 Managers as Decision Makers. Exploring Management. [Nathan Neale]
Mgmt 301 Managers as Decision Makers Exploring Management [Nathan Neale] Slide # 1 Slide Title: WSU Online Title Slide [piano introduction] Slide #2 Slide Title: Chapter 4 Managers as Decisions Makers
Root Cause Analysis Concepts and Best Practices for IT Problem Managers
Root Cause Analysis Concepts and Best Practices for IT Problem Managers By Mark Hall, Apollo RCA Instructor & Investigator A version of this article was featured in the April 2010 issue of Industrial Engineer
Quality Management in Purchasing
Saimaa University of Applied Sciences Faculty of Business Administration, Lappeenranta Degree Programme in International Business Olga Anisimova Quality Management in Purchasing Thesis 2014 Abstract Olga
QUALITY RISK MANAGEMENT (QRM): A REVIEW
Lotlikar et al Journal of Drug Delivery & Therapeutics; 2013, 3(2), 149-154 149 Available online at http://jddtonline.info REVIEW ARTICLE QUALITY RISK MANAGEMENT (QRM): A REVIEW Lotlikar MV Head Corporate
University of Alberta Business Alumni Association Alumni Mentorship Program 2015-2016
University of Alberta Business Alumni Association Alumni Mentorship Program 2015-2016 Program Guidelines This document is designed to be a reference guide, containing information that you will need throughout
Hertsmere Borough Council. Data Quality Strategy. December 2009 1
Hertsmere Borough Council Data Quality Strategy December 2009 1 INTRODUCTION Public services need reliable, accurate and timely information with which to manage services, inform users and account for performance.
CONDUCTING EFFECTIVE MEETINGS WORKBOOK A BASIC BUSINESS VICTORY GUIDE
CONDUCTING EFFECTIVE MEETINGS WORKBOOK A BASIC BUSINESS VICTORY GUIDE This book was developed by James H. Saylor Copyright 2006. All rights reserved. Printed in the United States of America. Except as
Table of Contents. Chapter 3: ESTABLISH A COMMUNICATION PLAN... 39 3.1 Discussion Questions... 40 3.2 Documenting the Communication Element...
Table of Contents Chapter 1: LAY THE GROUNDWORK... 1 1.1 Obtain Management Commitment... 1 1.2 Choose a Champion... 9 1.3 Form an EMS Team... 12 1.4 Build Support and Involve Employees... 14 1.5 Conduct
Time needed. Before the lesson Assessment task:
Formative Assessment Lesson Materials Alpha Version Beads Under the Cloud Mathematical goals This lesson unit is intended to help you assess how well students are able to identify patterns (both linear
SC21 Manufacturing Excellence. Process Overview
SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management
THE PROJECT MANAGEMENT PROCESS FROM A QUALITY MANAGEMENT PROFESSIONAL S PERSPECTIVE:
THE PROJECT MANAGEMENT PROCESS FROM A QUALITY MANAGEMENT PROFESSIONAL S PERSPECTIVE: More Than Just the Project Quality Management Knowledge Area for Successful Project Management ASQ BLUE RIDGE SECTION
Course Overview Lean Six Sigma Green Belt
Course Overview Lean Six Sigma Green Belt Summary and Objectives This Six Sigma Green Belt course is comprised of 11 separate sessions. Each session is a collection of related lessons and includes an interactive
How the Ministry of Education managed the 2008 national school bus transport tender process. Report to the Ministry of Education October 2009
How the Ministry of Education managed the 2008 national school bus transport tender process Report to the Ministry of Education October 2009 Contents 1: Introduction... 3 What is school transport?... 3
BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL
130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical
