1 Glass Cullet Utilization Study Civil Engineering Applications Nebraska State Re cy cl i n g As so c i a t i on June 1997 HDR Engineering, Inc.

2 GLASS CULLET UTILIZATION IN CIVIL ENGINEERING APPLICATIONS PREPARED FOR: NEBRASKA STATE RECYCLING ASSOCIATION 1941 SOUTH 42ND STREET, SUITE 512 OMAHA, NEBRASKA PREPARED BY: HDR ENGINEERING, INC. JUNE 1997

3

4

5 SECTION 1.0 INTRODUCTION 1.1 Purpose The purpose of this report is to review available literature, data, and field applications of glass cullet and identify possible uses of glass cullet in civil engineering applications in the State of Nebraska. This project provides the information on glass cullet properties and processing so that engineers could specify the use of cullet as a construction aggregate. 1.2 Background The background research included review of literature and case history information for applicability to civil engineering applications. Much of this information was based on the Glass Feedstock Evaluation project conducted by the Clean Washington Center, a division of the Washington State Department of Trade and Economic Development. Glass cullet utilized as an aggregate can incorporate mixed glass that have been crushed and screened to remove debris and oversized particles. This system provides a use for glass materials not currently recycled, or difficult to market (2). This report is divided into the following sections: Processing and Properties of Glass Cullet - presents glass processing (crushing) technologies and the physical properties of glass cullet. Applications - describes glass cullet applications and presents some case histories. Specifications - presents recommended specifications and applicability to State of Nebraska. Economic Considerations - discusses the processing and marketing issues of glass cullet. Conclusions - presents conclusions and discusses implementation issues. A preliminary range of design parameters, e.g., friction angles, compaction, hydraulic conductivity, specific gravity is presented. This report includes sample economic models (1 1) which can be modified to fit a particular situation. Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cullet.doc - 1- HDR Engineering, Inc. June 1997

6 SECTION 2.0 PROCESSING AND PROPERTIES OF GLASS CULLET 2.1 Cullet Processing; Methods This section presents an overview of the processing methods used to produce marketable glass cullet for use in civil engineering applications (9). Processing methods can vary, depending on the anticipated end use. The following discussion is limited to the typical process necessary to produce glass cullet for reuse as a construction aggregate. This category of use includes: general backfill, roadways, utilities, and drainage applications, and miscellaneous applications such as landfill leachate collection or gas venting layers. Glass crushing equipment has been derived from the rock crushing industry. Several types of equipment can produce cullet which may be used as construction aggregate. Typically, glass crushers will be smaller than rock crushers (glass production capacities of 1 to 20 tons per hour) and designed to handle the abrasive nature of glass cullet. The basic glass crushing system consists of a crusher (crushing mechanism), a feed hopper, and a discharge chute. The types of crushing mechanisms commonly available are: hammermill, rotating disk and breaker bar, rotating drum and breaker plate, rotating breaker bar, impactor, and helical fluted roller. Optional components to aide in production of glass cullet include infeed and outlet conveyors and a screening mechanism. With this system, glass bottles are loaded into the feed hopper either manually or by a front-end loader, conveyed to the crusher, processed and screened, and conveyed to a bin or the floor. The screening mechanism will likely be necessary to produce aggregate-quality cullet by removing the oversize particles and most of the debris. Glass crushing may be possible in mills designed for crushing rock; however, several factors need to be considered for crushing glass based on Dames & Moore s observations of glass crushers (9). Cullet is more abrasive than natural aggregate which will result in greater wearing of surfaces and subsequently more frequent maintenance. Cullet is also less dense than natural aggregate which may cause difficulties in existing crushed rock gravity feed systems. The rock crushing equipment is designed to crush rock to a desired gradation (grain size distribution). The gradation of cullet from this same piece of equipment may be significantly different. Glass cullet may be handled, spread and compacted with conventional construction equipment. Civil engineering applications of glass cullet include the substitution of cullet or cullet-aggregate mixtures for conventional aggregate materials in backfills, roadway base course, subbase or embankments, utility trench bedding and backfill, drainage fills, and landfills.

7 Further processing to pulverized or ground glass will require additional equipment and cost. Pulverizing makes glass into particles the size of sand. Civil engineering applications and products of pulverized glass can include glasphalt, concrete additive, building materials, filter media, drainage and erosion control, and reclamation of beaches. 2.2 Physical Properties The technical feasibility of substituting glass cullet or cullet blends for a given soil/aggregate component should be based on demonstrating the equivalency of the cullet performance to that of the conventional aggregate component. The use of conventional aggregate materials in civil engineering construction applications is based on an evaluation of classification and engineering properties (7). Classification properties are those properties which help identify a material and engineering properties are those used for engineering design. The following summarize a review of the literature on the physical characteristics and properties of glass cullet and their implications for use as construction aggregate components. Project specific testing should be conducted for each glass cullet source to establish adequate physical properties and performance. Existing American Society for Testing and Materials (ASTM) test methods for soils and aggregates are suitable for glass cullet materials. The pulverized glass is not considered, since it has a higher production cost and broader level of reuse in products Appearance The amount of debris in glass cullet can affect its engineering properties. Depending upon the glass collection and sorting procedures, glass cullet may contain the following types of debris (8): paper, foil and plastic labels, plastic and metal caps, cork, paper bags, wood debris, food residue, and grass. Specifications should place a limit on the percentage of debris allowed in the cullet. Generally, debris levels should not exceed a maximum of 10 percent and in many applications 5 percent. Glass cullet sizes analyzed by Dames & Moore (7, 8, 10) were the 3/4-inch minus (coarse) and %-inch minus (fine) size ranges which relate to standard classifications for fine gravely and sandy soils used for most construction aggregate. The glass cullet particles are mostly angular with a small percentage flat or platy shape. The angular shape indicates a potential to cut or puncture a synthetic liner (geomembrane) or similar material if placed against this material. Applications should avoid this direct contact Specific Gravity and Relative Density Specific gravity is a measure of a material s density. This determines the amount of voids in the aggregate. Specific gravity values for crushed natural aggregate range from 2.60 to Based on test results (10), the specific gravities for coarse glass cullet range from 1.96 to 2.41 and for fine cullet range from 2.49 to 2.52.

8 ASTM D 653 (1) defines relative density as, "... the ratio of the difference between the void ratio of a cohesionless soil in the loosest state and any given void ratio, to the difference between the void ratios in the loosest and in the densest states. In other words, relative density is a measure of a soil s mass density relative to its possible range of density. Test data shows that the maximum relative densities for 100 percent cullet range from 90.9 to pounds per cubic foot. With cullet-aggregate blends, the relative density increases with decreasing cullet content. The specific gravity and relative density of glass cullet are important baseline properties. They relate directly to engineering properties such as compaction and shear strength Gradation ASTM D 653 (1) defines gradation (grain-size distribution) as the...proportions by mass of a soil or fragmented rock distributed in specified particle-size ranges. Gradation is a primary criterion for roadway and engineering fill. It can affect engineering properties such as compaction, permeability, filtration, and shear strength. The gradation of glass cullet is generally similar to crushed rock and gravely sand and is controlled by the cullet processing method. Gradation is obtained by sieve analysis. Specifications will dictate the gradation required for each application. Gradation test results from Dames & Moore (10) indicate that significant gradation change occurs when 100 percent cullet is subjected to heavy impact compaction. Therefore, fill applications that use this type of compaction such as fluctuating or heavy stationary loads should not use 100 percent cullet Durability and Workability Durability of a material is based on hardness and toughness. Durability was evaluated by Dames & Moore (1 0) from the Los Angeles (L.A.) abrasion tests using standard method ASTM C Durability is a material classification property that affects its suitability for roadway base course and fill under fluctuating loads. Glass cullet s resistance to abrasion is lower than that of natural aggregate. The L.A. abrasion test indicated that the percentage wear of glass cullet was 30 percent for 1/4-inch minus size and 42 percent of 3/4-inch minus size (10). This is almost two times greater than that of natural aggregate. The Nebraska Department of Roads (NDOR) specifies limiting values for mineral aggregate used in roadway base courses and foundation courses at 40 percent, and crushed rock used in base courses at 45 percent. Workability is the ease with which an aggregate is handled and compacted. Glass cullet is generally angular in shape, compared to crush rock (subangular) and gravely sand Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cuilet.doc -4- HDR Engineering, Inc. June 1997

9

10 The R-value relates indirectly to the strength of the material. The value is commonly used to specify base or sub-base aggregate. The resilient modulus is a measure of a material s stiffness used in pavement design. The resilient modulus of natural aggregate is typically about 30 ksi at a bulk stress of 25 psi. Modulus for cullet does not appreciable change with repeated loading (e.g., repeated traffic loads). Shear strength is a major design consideration for construction with glass cullet in embankments, roadway base courses, and engineering fill under foundations (7). Test results indicate that the strength of cullet is about the same as natural aggregate (1 0). However, for specific applications such as fills under fluctuating loads and roadways, only cullet mixes up to 30 percent are recommended by Dames & Moore Compaction ASTM D 653 (1) defines compaction as the...densification of a soil by means of mechanical manipulation. Compaction is a design consideration that effects density control. Compaction characteristics include relationship of density and moisture content, effect of compaction method on density and potential gradation change, and sensitivity of material to weather conditions. Cullet and cullet-aggregate mixtures have favorable compaction characteristics. Glass cullet-aggregate mixtures generally do not experience appreciable gradation changes with compaction. The maximum density values obtained from the Modified Proctor compaction and vibratory compaction tests are about equivalent for cullet-added fill materials. Density slightly increases with decreasing cullet content. However, heavy field compaction equipment can significantly effect density values for 100 percent cullet fills because of the gradation changes, The compacted density of cullet is not sensitive to the moisture content (1 0), which means that cullet material can be placed and compacted during wet weather. As a result, construction downtime may be kept to a minimum Permeability ASTM D 653 (1) defines permeability as,...the capacity of a rock to conduct liquid or gas. Permeability is a design consideration in civil drainage applications such as foundations drainage, drainage blankets, and french drains, and in leachate collection and gas venting layers. For drainage fill material, high permeability is usually more beneficial than low. Typical granular soils (washed gravel, sand or sand-gravel mixtures) have permeabilities ranging from 0.01 to cm/sec. The permeability of a granular material depends on its gradation and density. Data reported on permeability tests of 100 percent glass cullet have permeabilities ranging from 0.04 to 0.06 cm/sec for fine cullet and 0.18 to 0.26 cm/sec for coarse cullet (1 0). The cullet-aggregate mixtures have Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cullet.doc -6- HDR Engineering, Inc. June 1997

11 permeabilities between 100 percent cullet and granular soils. In general, permeability will increase with increasing cullet content, cullet size, and debris level but will decrease with increasing compaction. This is comparable to natural sand and gravel. Therefore, drainage applications can use 100 percent glass cullet for fill material. Cullet also appears to have favorable characteristics for use as filtration media in such applications as septic fields, leachate treatment and water purification. However, further study of the filtration capacity is warranted Thermal Conductivity Thermal conductivity represents the ability of the material to conduct or resist heat flow. Thermal conductivity is a design consideration that effects bedding and backfill for conduits or other heat sources. Test data results (1 0) indicate that glass cullet and cullet-aggregate mixtures have slightly lower thermal conductivities than natural aggregate. In other words, cullet conducts heat more slowly. This slight difference still allows cullet materials to be feasible for utility trench backfill Filtration ASTM D 653 (1) defines a filter as, "... a layer or combination of layers of pervious materials designed and installed in such a manner as to provide drainage, yet prevent the movement of soil particles due to flowing water. Filtration is a design consideration that effects clogging and plugging between adjacent layers. The American Water Works Association Standard B 100 was applied to cullet properties (gradation, specific gravity, shape, and hardness) to determine suitability as a filtering media (7). Typical filtering media such as silica sand have required effective sizes ranging from 0.35 mm to 0.65 mm. The gradation of fine glass cullet (%-inch minus) tested by Dames & Moore (10) ranged from 0.5 mm to 6.5 mm. With additional sieving, the fine cullet appears to be feasible as an intermediate filtering media. Coarse cullet provides high permeability, but is not effective as a graded filter. Dames & Moore recommended further direct measurement and study of cullet filtration capacity. Filtration is a major design consideration for all drainage type applications in direct contact with adjacent soil layers. Filter fabrics may be used to provide the filtration function and prevent plugging and clogging of the cullet layer. Thick non-woven geotextiles also offer puncture resistance Leachability Glass is a relatively inert material; however, common contaminants from collection methods can influence the chemical characteristics of glass feedstock. Only Glass Cullet Utilization in Civil Engineering Application -7- HDR Engineering, Inc. n:\waste\nsra\cullet.doc June 1997

12 limited chemical test data is available for recycled glass feedstocks. Toxicity Characteristic Leaching Procedure (TCLP) testing for metals, based on analytical data provided by the Clean Washington Center (7) indicates,...all metals, except lead, occurred at concentrations below the regulatory limit. The lead levels in some samples may be associated with the lead foil wrappers on wine bottles in various cullet feedstocks. TCLP organic compounds were not detected, suggesting that organic compounds in cullet have a low leachability potential. The semi-volatile organic analysis indicated the presence of phthalate compounds, a biodegradation product of plastics. The variability in presence and concentration of lead and phthalates in cullet samples can be attributed to whether cullet is screened for debris, the color of the cullet, and the sorting and collection procedure for each cullet source. Laboratory test results have been conducted for total lead and leachable lead by BFI using EPA Method 3010/6010 and EPA Method 13 11/6010 (8). The test results for all samples showed that total lead concentrations were undetectable or at low concentrations similar to levels in natural aggregate. Most cullet source samples showed TCLP lead results below the federal regulatory limit of 5 mg/l or undetected. Additional laboratory leaching tests were conducted by Dames & Moore (8) in accordance with ASTM D 4793 to assess the chemical characteristics and the potential for contaminant leaching over time. The test protocol involved shaking a known weight of sample with water and separating the aqueous phase ten times over a ten-day period. In general, metal concentrations in glass cullet were at or below the metal concentrations typically found in background levels of natural aggregate. Contaminant levels of the cullet samples decreased in concentration over time and a at concentrations of concern. Leachability is a design consideration for glass cullet applications in contact with ground water or subject to infiltration into ground water. 2.3 Safety and Handling Safety concerns in handling glass cullet during production and construction include: exposure to respirable particles and potential for skin irritations, cuts, or lacerations. Glass is primarily composed of amorphous silica. Amorphous silica is not considered to be a significant health hazard. Crystalline silica, a health hazard known to cause fibrogenic lung disease (7), is not likely to be found, except in very low amounts, in the post-consumer glass stream used for cullet. Test results conducted-by Dames & Moore (9) indicated that cullet samples contained less than one percent crystalline silica which puts glass cullet dust in the nuisance dust category under OSHA. Skin irritations and cuts can be avoided through the use of protective clothing similar to that worn when working with natural aggregates. This includes heavy gloves, long-sleeve shirts, pants, heavy boots, hard hats, hearing protection and eye protection. Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cuilet.doc -8- HDR Engineering, Inc. June 1997

13

14

15 Conventional backfill materials typically consist of granular soils. Design considerations include gradation, compaction, shear strength, and leachability. In 1992, the Town of Portage La Prairei, Manitoba used crushed glass as an underlayment for cement sidewalks (1 2). Glass cullet processed in the City of Vancouver is used as aggregate or construction fill by several local companies. 3.3 Roadway Construction Potential glass cullet uses in roadway construction include base course, subbase, subgrade, and embankments. When cullet is mixed with natural aggregate, the resulting mixture will most likely have acceptable strength and resistance to abrasion and traffic loads. Conventional subbase and base course material are granular soils. Design considerations for conventional materials include shear strength, abrasion, R-value, resilient modulus and filtration. The use of glass cullet would add considerations of compaction and leachability. Imtiaz Ahmed of Purdue University (1 2) concluded that glass cullet is suitable for roadway construction as either an unbound aggregate base layer if it meets gradation standards or as fill material for embankments, if crushed to the appropriate size. The Western Research Institute in Laramie, Wyoming came to similar conclusions. Glass cullet has been used in several roadway construction projects by the following counties and communities (1 2): Ocean City, Maryland; City of Regina, Saskatchewan; Town of Dryden, Ontario; Orange County, New York; Pierce County, Wisconsin; Portage County, Wisconsin; Palm Beach County, Florida; and Warner, New Hampshire. Many of these projects use glass cullet as 10 percent of the road base material. Orange County, New York used 70 pounds of crushed glass per square yard mixed in with reclaimed roadbed aggregate. These projects found that glass cullet can be beneficial for roadbed construction where poor quality gravel exists. In fact, the addition of glass cullet (especially 1/4- inch minus) may enhance the engineering performance of coarse natural aggregate and may even help some of the borderline aggregates meet State s gradation requirements. Several state departments of transportation have approved and written specifications for the use of glass cullet in road base and subbase applications. These states include California, New Hampshire, New York, Minnesota, and Washington. Glass Cullet Utilization in Civil Engineering Application -11- HDR Engineering, Inc. n:\waste\nsra\cullet. doc June 1997

16 Others such as South Carolina, Pennsylvania, and Wisconsin have experimented and tested cullet-aggregate mixtures against their specifications. Specifications may then be developed for using glass cullet in unbound base courses, subbase, and/or embankments. In 1994, the State of Wisconsin had already issued a draft exemption for the use of recycled glass in asphalt, roadbed aggregate and drain tile material. In 1994, the Washington Department of Transportation amended its specifications to allow the use of 3/4-inch minus glass cullet in aggregate applications such as backfill, sand drainage and bedding materials (1 5). 3.4 Utility Construction Glass cullet can be used for utility trench bedding and backfill. Cullet content up to 100 percent can be used for backfill up to the last two feet below the final grade. Depending on the loading conditions on the backfill area, the last two feet of the backfill may have cullet contents varying from 15 percent to 100 percent. Conventional materials include granular soils. Design considerations for these conventional materials and glass cullet include compaction, permeability, thermal conductivity, and filtration. In New London, New Hampshire (12), glass cullet of 1/2-inch minus is being used for fill around sewer connections from homes to the city s line, as fill for electrical conduit, as backfill and drainage aggregate along walls, and as frost-heave protection fill under pathways and parking lots. The State of Hawaii, by law, also requires the use of glass cullet as cushioning backfill of underground utilities. Other usage requirements include drainage backfill behind retaining walls, surrounding leachlines and perforated drains, and similar uses. The 1991 National Standard Plumbing Code allows the use of glass crushed to 3/4- inch as aggregate in storm drains, which are used to drain water away from the parts of the buildings that are below ground. 3.5 Drainage Glass cullet can be used for construction of drainage facilities such as drainage blankets, french drains, foundation drains, and behind retaining walls. Conventional materials include granular soils and geosynthetics (geotextiles and geonets). Design considerations include compaction, permeability, filtration and puncture resistance. Drainage backfill behind retaining walls will also have considerations of lateral earth pressure coefficient, settlement of underlying soils, Poisson s ratio, and unit weight. In drainage applications, a geotextile filter should be used to separate glass cullet from the surrounding soil and to prevent clogging of the drain, similar to conventional aggregate filtration requirements. Glass Cullet Utilization in Civil Engineering Application -12- HDR Engineering, Inc. n:\waste\nsra\cullet.doc June 1997

17 Glass cullet was used in french drains and trench drains by the Town of Dryden, Ontario in parkland and residential subdivision work and by Palm Beach County, Florida at its landfill (1 2). The City of Seattle, Washington used glass cullet for filtration purposes in a storm water treatment project (7). Glass cullet was used in the trenches along with a mineral aggregate and geotextile. Performance of this system is being monitored by the City. The City also used glass cullet as drainage aggregate at its landfill. 3.6 Landfill Construction Potential glass cullet uses in landfill construction include the leachate collection layer, gas venting layer, and landfill cover Leachate Collection Layer The purpose of a leachate collection layer is to provide positive control and discharge of landfill leachate. These layers are typically located directly above the geomembrane component of the composite liner system. Conventional materials used in leachate collection layers include granular soils and geosynthetics (geotextiles and geonets). Design considerations for these conventional leachate collection materials include shear strength (side slopes), permeability, filtration and puncture resistance. The use of glass cullet would add a consideration of compaction and durability. Glass cullet of 3/8-inch minus was tested in the laboratory and field as a landfill leachate layer by the Ohio Environmental Protection Agency (13). This glass cullet was found to be feasible for a 12-inch thick leachate collection layer, compacted using standard equipment. The non-carbonate nature of glass made it preferable to natural aggregates that are highly carbonate. A non-woven geotextile provided cushioning between the glass and the geomembrane. Vancouver, British Columbia, a Connecticut landfill, and a private firm in San Jose, California (1 2) have all used glass cullet as a filter media between soil and coarse aggregate or some other component of the leachate collection system. Section B 1 of the Nebraska Department of Environmental Quality (NDEQ) Title 132 states that leachate collection systems shall be designed and constructed to maintain less than a 30 cm depth of leachate over the liner. The permeability required to meet this criterion, whether granular soil, a geosynthetic, or glass cullet, is a function of the slope and drainage path length of the leachate collection layer. Glass cullet permeability is comparable to sands and fine gravels Gas Venting Layer The purpose of a gas venting layer is to provide control and discharge of landfill gas under active or passive extraction. These layers typically are located directly beneath the infiltration layer in the closure cap. Conventional materials used in these layers Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cullet.doc -I 3- HDR Engineering, Inc. June 1997

18 include granular soils and geosynthetics (geotextiles and geonets). Design considerations for these conventional materials include shear strength (on side slopes), permeability, and filtration. The use of glass cullet would add considerations of puncture resistance (against a synthetic liner) and leachability. Glass cullet has been used or approved for several projects in the construction of gas venting systems at landfills in the State of New York (14). The cullet passed New York s Department of Environmental Conservation regulations for gas venting layers without further processing as delivered from the material recovery facility. A geotextile should be placed on top of the glass cullet layer to prevent cuts or puncture of the flexible membrane liner Landfill Cover The purpose of daily and intermediate cover is to control disease, fires, odors, blowing litter, scavenging, and minimize infiltration and leachate generation. Intermediate cover also serves to support vegetative growth. Conventional materials used in these layers are soils and synthetic materials. The higher permeability of glass cullet can be a limitation for this application, since this may limit the glass cullet layers effectiveness in controlling disease vectors, odors, and infiltration. However, several landfills have used glass cullet as daily landfill cover (1 2): NDEQ Title 132 allows for the use of alternative materials of an alternative thickness for daily cover if it can be demonstrated to perform all the functions of a daily cover without presenting a threat to human health and the environment. 3.7 Summary Glass cullet may be used in numerous civil engineering applications, many of which are mentioned in Section 3.1. Conventional soils and aggregate laboratory test results and design analyses can address the major design considerations identified in Section 2 and further establish the feasibility of using glass cullet in the civil engineering applications described in this Section 3. The key to utilizing glass cullet is identifying and matching the minimum performance requirements for each application. Glass Cullet Utilization in Civil Engineering Application -14- HDR Engineering, Inc. n:\waste\nsra\cuilet.doc June 1997

19 SECTION 4.0 SPECIFICATIONS 4.1 Introduction The data collected by Dames & Moore for the Glass Feedstock Evaluation (7, 8, 9, 10, 1 1) can be used to evaluate engineering performance of glass cullet for a variety of aggregate applications. However, not all glass sources will be suitable for all civil engineering applications that utilize aggregate. For each application proposed, the suitability of a particular glass source for aggregate-quality cullet should be reviewed. Glass can be processed into construction-grade cullet using any convenient mechanical method described in Section 2.1. For cullet-aggregate blends, glass cullet can be blended with natural aggregates by any convenient mechanical method. Normal precautions should be followed to prevent segregation. Physical properties and performance of aggregate materials are presented in the State of Nebraska Department of Roads (NDOR) Standard Specifications for Highway Construction, 1985, and supplemental specifications, Some of the civil engineering applications identified in this report for glass cullet as an aggregate may be governed under other state regulations. Typical aggregates in Nebraska for construction include sands, gravels, crushed rock and recycled concrete. The glass cullet and culletaggregate blends should be compared with these standard specifications for each specific application. The intent of this report is to encourage NDOR and other regulatory departments within the State of Nebraska to amend specifications to allow glass cullet and cullet-aggregate blends as an alternative to conventional aggregate in numerous applications. Several states, including the Washington State Department of Transportation (6), have already included specifications for glass aggregate. 4.2 Application Specifications Dames & Moore developed model specifications for using cullet in aggregate applications. These specifications include recommendations on threshold values for cullet content, debris level, and compaction level which are summarized in Table 4-1 for the various applications. The cullet contents for utility and drainage application listed in this table would apply to backfill which is not subjected to surcharge loading such as from a roadway. If the utility trench backfill or drainage fill are subject to surcharge loads, then the specifications for general backfill or roadway applications would apply, as appropriate. I Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cuilet.doc HDR Engineering, Inc. June 1997

20 Landfill Leachate Collection Layer Landfill Gas Venting Layer Landfill Cover Data Source: Dames & Moore Inc., Glass Feedstock Evaluation Project, Task 5 - Evaluation of Cullet as a Construction Aggregate, Clean Washington Center, June Notes: 1 Percent by weight. 2 Percent using the AGI visual method. 3 Percentage of maximum dry density. Use ASTM D1557 (Modified Proctor) for cullet - aggregate mixtures or ASTM D698 (Standard Proctor) for 100% cullet fills. 4 Based on case histories from references (13) and (14) and data from Dames & Moore, Inc. Cullet gradation specifications are provided for structural fill (backfill, roadway and utility applications) and drainage fill in Table 4-2. Both the 3/4-inch minus or 1/4-inch minus gradations should perform well. However, Dames & Moore found that the 1/4-inch minus cullet appeared to be more durable and complimented the gradation of natural aggregates better. Glass Cullet Utilization in Civil Engineering Application n \waste\nsra\cullct doc HDR Engineering, Inc. June 1997

21

22 4.3.1 Debris Level Debris is any material which can negatively impact the performance of the engineered fill and includes all non-ceramic components of the glass cullet. No hazardous materials should be allowed in the glass cullet. The percentage of debris in glass cullet can be quantified visually in the field by using the Comparison Chart for Estimating Percentage Composition, by the American Geological Institute, 1982 (AGI Data Sheets 15.1 and 15.2). Dames & Moore (1 1) recommends a sample size of approximately 200 grams of processed glass cullet, avoiding segregation of debris from the glass. The debris level determined by the AGI method should not exceed the values given in Table 4-1 or as allowed by the State of Nebraska Laboratory Testing Laboratory testing should be conducted to establish values for the appropriate physical properties used in the design (Table 2-2). Existing ASTM test methods for soils and aggregates are suitable for cullet and cullet-aggregate mixtures. A minimum suite of index tests should include: Maximum dry density of cullet-aggregate mixtures determined by Modified Proctor Test in accordance with ASTM Dl557 test procedure. Maximum dry density of 100 percent cullet determined by standard proctor test in accordance with ASTM D 698 test procedure. Gradation test of cullet or cullet-aggregate in accordance with ASTM D422. In addition, environmental testing for total lead may also be required. For example, the Washington State Department of Transportation requires five random samples to be tested quarterly for total lead by the product supplier (6). The sample collection should be conducted in accordance with ASTM D 75. The mean of these tests should not exceed 80 ppm. Total lead content testing should be conducted according to EPA 3010/ Field Placement and Compaction Prior to field placement, surfaces and adjacent areas should be protected in accordance with specified conventional construction techniques. Field placement and compaction should include the following requirements (1 1): 1. Lifts shall not exceed 8 inches in loose thickness. 2. Place each layer of glass cullet or cullet-aggregate blends over full width of section. Use conventional equipment, as needed, to obtain a uniform layer thickness. 3. Cullet and cullet-aggregate blends shall be well mixed.

23 4. Compact each lift to specified minimum dry density. 5. Compacted fill shall be tested by engineer using the method described subsequently prior to approval. With fills containing cullet, some consideration should be made regarding the exposure to the general public. Depending on the application, landscaping soil and vegetation, asphalt pavement, or reinforced concrete could be used to cover the cullet fills. Some applications may place glass cullet directly against a synthetic liner. Glass cullet may puncture a synthetic liner. Current practice suggests using a heavy geotextile between the glass cullet and a synthetic liner Field Quality Control Field quality control should include the following tests (1 1): 1. Minimum of one density test per 1000 square feet of fill, but not less than one test per lift. 2. Field density testing: a) Sand replacement method, ASTM D 1556, or b) Nuclear densometer method, ASTM D The nuclear method shall be field-verified by the engineer prior to its use as a means of compaction control. Quality assurance should include the following procedures: Obtain samples from on-site stockpiles in accordance with ASTM D75. Conduct gradation tests in accordance with ASTM D 422. Sample and test at a frequency of 1 test per 500 tons. Glass Cullet Utilization in Civil Engineering Application -19- HDR Engineering, Inc. n:\waste\nsra\cullet.doc June 1997

24 SECTION 5.0 ECONOMIC CONSIDERATIONS 5.1 Introduction In 1995, Nebraskans recycled 4,663 tons of glass as compiled by the Nebraska State Recycling Association (NSRA). This was estimated to be approximately six percent of the total glass generated in the State. The majority of this was recorded as mixed glass. Low prices, high transportation costs, and more stringent specifications make it difficult to sell post-consumer glass back to distant packaging manufacturers. In addition to municipal recycling programs, manufacturers and industrial generators also need more and better outlets for their waste glass. Currently, there are no viable markets for waste industrial glass anywhere in the midwest region. The Nebraska Business Development Center had identified about 50 manufacturers of glass products (i.e. bottlers, flat glass, bottles, glass/lock structural, glass products made from purchased glass, and surgical and medical instruments) and another 275 firms for glass, auto plate and window. These firms will be targeted for a more in-depth survey to be conducted by NSRA in The economics of glass recycling are very case and geography specific. The competitiveness of glass cullet to the natural aggregates will primarily depend on the glass collection and processing costs, conventional aggregate costs, and local market demand. The sections below discusses these considerations in more detail. 5.2 Glass Collection and Processing Collection of glass in many communities may depend upon the price and market for glass. Some may collect all three colors of glass (clear, green, brown), while others may only collect clear glass. The cost of collection will vary between curbside collection and drop-off centers. After collection, glass is either processed locally or shipped to distant processors or markets. A community or county may want to consider a glass crushing system to process glass locally. Before selecting a glass crushing system, the purchasing objectives should be determined. These may include capital costs, operational and maintenance costs, minimum production capacity, system configuration and size, portability, power requirements, operational factors (e.g. noise and dust levels), desired product characteristics, etc. Suggested purchasing guidelines and recommendations by Dames & Moore (9) include the following: Equipment relatively easy to operate and maintain; Screening system to control particle size and debris level; Adjustable crushing mechanism to adjust the gradation of the cullet to specific applications; Wearing surfaces constructed of abrasion-resistant materials;

25

26 5.4 Economic Model Dames & Moore (11) developed an economic model that helps identify the criteria and parameters important to the economic viability of glass aggregate production. The key to usage is production of glass cullet that is comparable to rock aggregate for a variety of applications. Economics become more favorable if there are many applications and a stable demand for glass aggregate production. Local conditions and operations can be entered into the model to evaluate the economic tradeoffs. (See Appendix B). A further analysis would compare the three available options for glass: landfill disposal, the bottle market, and the aggregate market. A sample spreadsheet by Dames & Moore (1 1) which evaluates these options is provided in Appendix C. The cost inputs for landfill disposal, collection, labor, shipping, and glass processing can vary from region to region. The cost of rock aggregate can also vary significantly depending on the location of the aggregate supply and project application. The spreadsheet could be modified to reflect these local conditions. Glass Cullet Utilization in Civil Engineering Application -22- HDR Engineering, Inc. n:\waste\nsra\cuilet.doc June 1997

27 SECTION 6.0 CONCLUSIONS 6.1 Summary A review of the literature on glass cullet utilization in civil engineering applications indicated that glass cullet usage is viable as an aggregate or blended with conventional aggregate. The findings are as follows: Glass cullet and cullet-aggregate blends have been used in numerous civil engineering applications as an alternative to conventional granular materials. Glass cullet has physical properties similar to granular materials. The computational methods and tests to demonstrate glass cullet performance essentially are the same methods and tests used for granular materials. Several states have amended specifications or approved the usage of glass cullet in unbound construction aggregate applications. Cullet content is dependent upon the application and allowable percentages by the state. 6.2 Implementation Issues The acceptance of glass cullet as an aggregate relies on the technical equivalency compared to conventional granular materials. As noted in the previous sections, the physical properties fall within the ranges for conventional granular materials. Analytical methods, combined with laboratory test results, are available to demonstrate the technical equivalency of glass cullet. Implementation issues which may impact the acceptance of glass cullet for unbound aggregate applications include: Current physical tests on glass cullet have been conducted using ASTM methods for soils or aggregate. ASTM had established a committee in 1993 to evaluate the use of recycled material, including glass cullet, for highway construction. The water quality issue could be a concern for applications where the glass cullet is in contact with ground water or infiltration. However, the only material in glass recycling programs that is of potential environmental concern is lead foil, which is typically used for wine bottle wrappers. Specifications can address this issue by requiring random samples for total lead of the glass cullet supply. Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cullet.doc -23- HDR Engineering, Inc. June 1997

28 Cost savings for a specific glass cullet application will depend on local materials costs, glass cullet processing costs, and additional design features, i.e., geotextiles between a glass cullet layer and synthetic liner. 6.3 Potential Benefits The utilization of glass cullet in civil engineering applications is an emerging market, subject to variability in costs of materials and contractors perceptions of risk associated with glass cullet construction. However, the viable applications for glass cullet utilization offer many benefits which may include: Creation of a product market for mixed glass; Diversion of recyclable glass from disposal in a landfill; Reduction in need for natural mineral resources; Improving the performance of poor quality gravel in cullet-aggregate mixtures; and Glass Cullet Utilization in Civil Engineering Application -24- HDR Engineering, Inc. n:\waste\nsra\cullet.doc June 1997

29 REFERENCES ASTM, Standard Technology Relating to Soil, Rock and Contained Fluids, Annual Book of ASTM Standards, Vol , No. D , American Society for Testing and Materials, Philadelphia, PA., Broughton, A.C., Glass Recyclers Seek Quality, Alternatives, Recycling Today, December 1992, pps Clean Washington Center, Washington State Department of Trade and Economic Development, Glass Markets Information System Application Summary Reports, December Clean Washington Center, Washington State Department of Trade and Economic Development, Recycling Burden Turned Into Local Resource Fact Sheet, September Clean Washington Center, Washington State Department of Trade and Economic Development, Respiratory Health Aspects of Ground Glass vs. Ground Silica Fact Sheet, September Clean Washington Center, Washington State Department of Trade and Economic Development, Washington State Department of Transportation Specifications for Glass Aggregate Fact Sheet, September Dames & Moore Inc., Glass Feedstock Evaluation Project, Task 1 - Testing Program Design, Clean Washington Center, March Dames & Moore Inc., Glass Feedstock Evaluation Project, Task 2 - Environmental Suitability Evaluation, Clean Washington Center, June Dames & Moore Inc., Glass Feedstock Evaluation Project, Task 3 - Equipment Evaluation, Clean Washington Center, June Dames & Moore Inc., Glass Feedstock Evaluation Project, Task 4 - Engineering Suitability Evaluation, Clean Washington Center, June Dames & Moore Inc., Glass Feedstock Evaluation Project, Task 5 - Evaluation of Cullet as a Construction Aggregate, Clean Washington Center, June Reindl, J., Reuse/Recycling of Glass Cullet For Non-Container Uses, Dane County Department of Public Works, State of Wisconsin, May 20, Schmucker, Bruce O., and Buffalini, Rick J., Pulverized Glass and Landfill Liner Systems, Waste Age, April 1995, pps Glass Cullet Utilization in Civil Engineering Application -25- HDR Engineering, Inc. n:\waste\nsra\cullet.doc June 1997

30 (14) Swyka, Mark A., Alternative Construction Materials in Waste Containment Applications, Waste Age, March 1996, pps (1 5) Washington State Department of Transportation, Amendment to 1994 Standard Specifications Section , Standard Specifications for Road, Bridge, and Municipal Construction, Glass Cullet Utilization in Civil Engineering Application n:\waste\nsra\cullet.doc -26- HDR Engineering, Inc. June 1997

31 APPENDIX A GLASS PROCESSING COST PER TON ANALYSIS

32

33 APPENDIX B GLASS FEEDSTOCK ECONOMIC MODEL

34

35

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

AGREGADOS RECICLADOS MITOS Y REALIDADES

AGREGADOS RECICLADOS MITOS Y REALIDADES The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material

More information

The Most Advanced Name in Drainage Systems. Geotextile Products

The Most Advanced Name in Drainage Systems. Geotextile Products The Most Advanced Name in Drainage Systems Geotextile Products ADS MEETs YOUR Geotextile NEEDS Advanced Drainage Systems, Inc. (ADS) single wall and N12 dual wall pipe have become the industry standard

More information

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission. SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for

More information

Aggregates for Path Construction

Aggregates for Path Construction Aggregates for Path Construction Technical Information Note No. 7 October 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling

More information

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills 1. INTRODUCTION: 2011 World of Coal Ash (WOCA) Conference May 9-12,

More information

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL 11 Featuring Highland Stone anchorwall.com TABLE OF CONTENTS 2 TABLE OF CONTENTS BEFORE YOU BEGIN............................

More information

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

GRADATION OF AGGREGATE FOR CONCRETE BLOCK GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. September 1, 2003 CONCRETE MANUAL 5-694.300 MIX DESIGN 5-694.300 NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. 5-694.301

More information

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete

More information

SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT Note: This guide specification is intended for use in the U.S. It describes construction of permeable interlocking concrete pavers on a permeable,

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information

SUDAS Revision Submittal Form

SUDAS Revision Submittal Form SUDAS Revision Submittal Form Status Date: As of 3/13/15 Topic: Permeable interlocking pavers Manual: Design & Specs Manual Location: Design Section 5L-1; Spec Section 7080 Requested Revision: Reason for

More information

the French experience

the French experience VLLW disposal and management of large volume of slightly contaminated materials the French experience Nicolas Solente Very Low Level Waste disposal in France The CIRES facility in Morvilliers VLLW waste

More information

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT A. The requirements for construction of permeable interlocking concrete pavement: 1. Install the interlocking

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)

More information

BMP 6.4.6: Dry Well / Seepage Pit

BMP 6.4.6: Dry Well / Seepage Pit BMP 6.4.6: Dry Well / Seepage Pit A Dry Well, or Seepage Pit, is a variation on an Infiltration system that is designed to temporarily store and infiltrate rooftop runoff. Key Design Elements Fllow Infiltration

More information

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE

USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE USE OF GEOSYNTHETICS FOR FILTRATION AND DRAINAGE Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Functions of a Filter Retain particles of the base

More information

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction California Groundwater Association An NGWA Affiliate State PO Box 14369 Santa Rosa CA 95402 707-578-4408 fax: 707-546-4906 email: cga@groundh2o.org website: www.groundh2o.org CGA Standard Practices Series

More information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s) Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone

More information

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com

Secondary Containment: Regulations & BMPs. Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Secondary Containment: Regulations & BMPs Beth Powell Vice-President and General Manager New Pig Energy bethp@newpigenergy.com Federal Secondary Containment Safeguarding method in addition to the primary

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Full-Scale Laboratory Testing of a Toe Drain with a Geotextile Sock DSO-99-14. Materials Engineering and Research Laboratory

Full-Scale Laboratory Testing of a Toe Drain with a Geotextile Sock DSO-99-14. Materials Engineering and Research Laboratory Full-Scale Laboratory Testing of a Toe Drain with a Geotextile Sock DSO-99-14 Materials Engineering and Research Laboratory April 1999 Full-Scale Laboratory Testing of a Toe Drain with a Geotextile Sock

More information

Porous Pavement Alternatives Cost Analysis

Porous Pavement Alternatives Cost Analysis Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

PART 3 DEFINITION OF ROCKFILL VERSUS EARTHFILL MATERIAL

PART 3 DEFINITION OF ROCKFILL VERSUS EARTHFILL MATERIAL PART 3 DEFINITION OF ROCKFILL VERSUS EARTHFILL MATERIAL Allan J. Breitenbach, P.E. AB Engineering Inc. Littleton, Colorado, USA Telephone: 1/720-981-5244 Telefax: 1/720-981-5245 Email: ajbreitenbach@hotmail.com

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN Research & Development Division RD/GN/012 August 1990 HIGHWAYS DEPARTMENT GUIDANCE NOTES (RD/GN/012) SOIL TEST FOR PAVEMENT DESIGN Prepared

More information

APPENDIX G SETTLEMENT

APPENDIX G SETTLEMENT APPENDIX G SETTLEMENT TABLE OF CONTENTS G.1 IN T R O D U C T IO N... 1 G.2 MATERIAL PLACEMENT AND COMPACTION... 1 G.2.1 Incom pressible M aterials... 1 G.2.2 Compressible Materials... 2 G.2.3 Soil P lacem

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information

Part 7 GEOTEXTILE FILTER FABRICS

Part 7 GEOTEXTILE FILTER FABRICS Part 7 GEOTEXTILE FILTER FABRICS Well Screens Slotted casings are normally employed as well screens within the aquifers being taped by water wells. The width of the slots should allow 50 to 60% of the

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

PVC PIPE PERFORMANCE FACTORS

PVC PIPE PERFORMANCE FACTORS PVC PIPE PERFORMANCE FACTORS PVC pipe, like all flexible pipe products, is very dependent on the surrounding soil for its structural capacity, in addition, the pipe material must have sufficient inherent

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

1.34 WASTE CONTAINMENT AND SITE REMEDIATION TECHNOLOGY TAKE-HOME FINAL EXAM DUE FRIDAY MAY 7, 2004 AT 9:30 AM

1.34 WASTE CONTAINMENT AND SITE REMEDIATION TECHNOLOGY TAKE-HOME FINAL EXAM DUE FRIDAY MAY 7, 2004 AT 9:30 AM 1.34 WASTE CONTAINMENT AND SITE REMEDIATION TECHNOLOGY TAKE-HOME FINAL EXAM DUE FRIDAY MAY 7, 2004 AT 9:30 AM This is an open-book exam, but the work should be yours alone. Please do not work with others

More information

Use of Marginal Materials & Fly ash in Road Works

Use of Marginal Materials & Fly ash in Road Works Use of Marginal Materials & Fly ash in Road Works U.K.Guru Vittal Sr. Principal Scientist Central Road Research Institute New Delhi 110 025 vittal.crri@gmail.com Introduction Issue Development Vs. Environment

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate

Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Uniclass L6129 EPIC F122 CI/SfB Yp3 Technical Manual - Section 1 Introduction to Lytag lightweight aggregate Introduction... 2 Product... 2 Sustainability... 2 Physical Properties of Lightweight Aggregate...

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Soils and Aggregates Division

Soils and Aggregates Division Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled

More information

Solid Waste Treatment Facility Solid Waste Permit Application

Solid Waste Treatment Facility Solid Waste Permit Application Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.

More information

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS

DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION MATERIALS CONSTRUCTION REQUIREMENTS 304.06 DIVISION 300 BASES SECTION 304 AGGREGATE BASE COURSE DESCRIPTION 304.01 This work consists of furnishing and placing one or more courses of aggregate and additives, if required, on a prepared subgrade.

More information

Lesson 3. Portland Cement and Concrete

Lesson 3. Portland Cement and Concrete Portland Cement and Concrete This lesson focuses on the most consumed construction material, Portland cement based concrete. It s consumed for pavement, dams, bridges, floors, walls, columns, and even

More information

Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5

Minnesota Department of Transportation Best Management Practices (BMP) for Concrete Washout May 2009, v5 Best Management Practices (BMP) for Concrete Washout The NPDES permit requires that concrete washout be managed on all construction projects. This document is Mn/DOT s interpretation of MPCA s guidance

More information

SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS

SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS Pervious interlocking pavers.doc Note: This guide specification for U.S. applications describes construction of permeable interlocking ceramic pavers

More information

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems www.stma.org Drainage A Crucial Component for Athletic Field Performance Part Three: Sub-Surface Installed Drainage Systems Water is applied to maintained turfgrass areas by irrigation or precipitation.

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM Anchor [coarse-split products] SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes 1. Concrete segmental retaining wall units 2. Geosynthetic reinforcement

More information

Stabilenka HUESKER. and Separation. Engineering with Geosynthetics SKER HUESKER HUESKER HUESKER HUESKERHUES

Stabilenka HUESKER. and Separation. Engineering with Geosynthetics SKER HUESKER HUESKER HUESKER HUESKERHUES HUESKER Engineering with Geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr rhuesker HUESKER Woven HUESKER HUESKER Fabrics HUESKER HUESKERr SKER HUESKER HUESKER HUESKER HUESKERHUES rhuesker

More information

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures. BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming

More information

AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers

AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers F.P.O. Need SF-Rima THE TREMRON GROUP Permeable Paver Guide AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers MIAMI 11321 NW 112th Court Medley, FL 33178 800.567.1480 or 305.825.9000 Fax 305.823.6614

More information

Material and methods. Värmeforsk report 1212 2012 Niklas Hansson DIANAS utilization of waste inciniration bottom ash in bound construction materials

Material and methods. Värmeforsk report 1212 2012 Niklas Hansson DIANAS utilization of waste inciniration bottom ash in bound construction materials Värmeforsk report 1212 2012 Niklas Hansson DIANAS utilization of waste inciniration bottom ash in bound construction materials Executive Summary Introduction In an international perspective waste incineration

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

ROAD CONSTRUCTION. Pavement Base Reinforcement Subgrade Stabilization

ROAD CONSTRUCTION. Pavement Base Reinforcement Subgrade Stabilization ROAD CONSTRUCTION Pavement Base Reinforcement Subgrade Stabilization TM Road Construction applications have specific needs and objectives. No one understands that better than Road construction applications

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM SECTION 32 14 13.19 AquaPave Permeable Interlocking Concrete Pavement Note: This guide specification is for the

More information

BMP #: Dry Wells / French Drains

BMP #: Dry Wells / French Drains Structural BMP Criteria BMP #: Dry Wells / French Drains A Dry Well, or French Drain, is a variation on an Infiltration Trench that is designed to temporarily stores and infiltrate rooftop runoff. Key

More information

GEOTEXTILES IN ROAD CON- STRUCTION, MAINTENANCE AND EROSION CONTROL

GEOTEXTILES IN ROAD CON- STRUCTION, MAINTENANCE AND EROSION CONTROL GEOTEXTILES IN ROAD CON- STRUCTION, MAINTENANCE AND EROSION CONTROL Textiles were first applied to roadways in the days of the Pharaohs Even they struggled with unstable soils which rutted or washed away

More information

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the

More information

APPENDIX B. I. Background Information

APPENDIX B. I. Background Information APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement

More information

geotextile filter design, application, and product selection guide

geotextile filter design, application, and product selection guide geotextile filter design, application, and product selection guide Marine & Transportation Engineering TC Mirafi MIRAFI GEOTEXTILE FILTER DESIGN, APPLICATION, AND PRODUCT SELECTION GUIDE Drainage and Erosion

More information

Part 9 SUBDRAIN DESIGN AND LAYOUT

Part 9 SUBDRAIN DESIGN AND LAYOUT Part 9 SUBDRAIN DESIGN AND LAYOUT Early subdrainage often consisted of placing free-draining material, mostly gravel and rock, in the axis of filled swales, as sketched above. These began to be employed

More information

Liner system design for tailings impoundments and heap leach pads

Liner system design for tailings impoundments and heap leach pads Liner system design for tailings impoundments and heap leach pads John F. Lupo, Ph.D., P.E. AMEC E&E TAILINGS & MINE WASTE 08, VAIL Liner Systems Liner systems Environmental containment of process solutions

More information

1. ASTM C 140 - Sampling and Testing Concrete Masonry Units 2. ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units

1. ASTM C 140 - Sampling and Testing Concrete Masonry Units 2. ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units SPECIFICATION FOR SEGMENTAL RETAINING WALL SYSTEMS PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing materials, labor, equipment and supervision to install a segmental retaining wall

More information

PERMEABLE INTERLOCKING CONCRETE PAVEMENT

PERMEABLE INTERLOCKING CONCRETE PAVEMENT [NOTE TO SPECIFICATION WRITER: This guide specification for the use of permeable interlocking concrete pavers for pedestrian and vehicular traffic application was developed based on the use of an open-graded

More information

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1). Página 1 de 12 AASHO Road Test The AASHO Road Test, a $27 million (1960 dollars) investment and the largest road experiment of its time, was conceived and sponsored by the American Association of State

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS

GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS STATE OF CONNECTICUT August 2007 DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 Elm Street, Hartford, CT 06106-5127

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

CLASS II BASE COURSE - Section 302

CLASS II BASE COURSE - Section 302 CLASS II BASE COURSE - Section 302 Class II Base Courses are similar to Class I Base Courses, with the exception that placement on a subgrade layer built in accordance with Specification Section 305 is

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT GREEN ROOFS A green roof is a system consisting of waterproofing material, growing medium, and vegetation, and is used

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia Roller-Compacted Concrete Pavement: Design and Construction Pavement Thickness esign and RCC-Pave Software Gregory E. Halsted, P.E. Pavements Engineer Portland Cement Association October 24, 2006 Atlanta,

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Trench Rescue by Buddy Martinette

Trench Rescue by Buddy Martinette Trench Rescue by Buddy Martinette SOIL TYPE AND TESTING It is imperative that rescue personnel understand soil types and testing procedures if the want to be competent at trench rescue operations. Determining

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM Section 32 32 23 Concrete Segmental Retaining Wall Page 1 of 12 PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM A. Concrete segmental retaining wall units.

More information

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.

SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals. SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in

More information

Building Your Interlocking Concrete Pavement to Last a Lifetime

Building Your Interlocking Concrete Pavement to Last a Lifetime Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

CHAPTER 13 LAND DISPOSAL

CHAPTER 13 LAND DISPOSAL CHAPTER 13 LAND DISPOSAL Supplemental Questions: Which of Shakespeare's plays is the source of the opening quote? The Tempest [1611-1612],Act: I, Scene: i, Line: 70. 13-1. Cite four reasons landfills remain

More information

Guidelines of Best Management Practices for the Operation of Post Consumer (Tear 0ff) Asphalt Shingle Recycling Facilities

Guidelines of Best Management Practices for the Operation of Post Consumer (Tear 0ff) Asphalt Shingle Recycling Facilities Guidelines of Best Management Practices for the Operation of Post Consumer (Tear 0ff) Asphalt Shingle Recycling Facilities The purpose of this document is to provide potential recyclers/processors with

More information