Successfully Planning and Executing Large-Scale Workload Migration Projects
|
|
|
- Jeffrey Eaton
- 9 years ago
- Views:
Transcription
1 White Paper PlateSpin Transformation Manager PlateSpin Migrate Successfully Planning and Executing Large-Scale Workload Migration Projects Updated for PlateSpin Transformation Manager 1.0 and PlateSpin Migrate 12.1
2 Table of Contents Introduction... 1 Who Is This White Paper For?... 1 Understanding Workloads and Workload Migrations... 2 Introduction to PlateSpin Migrate... 3 Introduction to PlateSpin Transformation Manager... 5 Planning Large-Scale Workload Migration Projects Architecting a Migration Infrastructure for Scale Execution Dynamics of Large-Scale Workload Migration Projects Becoming a Certified PlateSpin Migration Specialist page
3 Introduction In today s dynamic world, the need for cost reduction and the desire to increase operational efficiency have a constant impact on the organization of IT resources. Enterprises are relentlessly looking for better ways to manage infrastructure, systems and applications, and this often leads to the execution of projects where large numbers of workloads are moved from one platform or data center to another. Typical examples include the migration of physical servers onto a virtual platform, the migration of virtual machines from one virtual platform to another, the migration of on-premise workloads into a public or managed cloud, and traditional data center consolidations. Who Is this White Paper For? This white paper is specifically written for project managers and project architects who are leading large-scale workload migration projects using NetIQ PlateSpin tools like PlateSpin Transformation Manager and PlateSpin Migrate. When used together, PlateSpin Transformation Manager and PlateSpin Migrate will help them to execute data center transformation projects up to 50% more efficiently, with near-zero application downtime, elimination of risk, flexible testing, less human error, and a dramatic reduction of overall project execution time. 1
4 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects PlateSpin performs up to 50% better, allowing you to migrate more workloads, in less time, with better results. Fig. 1 PlateSpin performs up to 50% better, allowing you to migrate more workloads, in less time, with better results. Understanding Workloads and Workload Migrations In this white paper, we ll use the term workload as the aggregate term for an operating system with all the applications installed on it, all the patches and configuration settings, and also all the data files or blocks that reside on its data volumes. 2
5 Using PlateSpin Migrate ensures that the new workload is created rapidly and automatically, and that it is functionally identical to the original workload. Workload migrations are an important element in many, if not all, of today s data center transformation projects. In the context of data center transformation projects, rebuilding a workload from scratch on a new platform is rarely a desired migration methodology. This is because rebuilding is a manual, slow and error-prone process that requires a vast amount of expensive testing to ensure that the new workload is built in exactly the same way as the original workload. A true workload migration, as performed by PlateSpin Migrate, streams the blocks or files of the original workload into a replica on the new (or target ) platform. Using PlateSpin Migrate ensures that the new workload is created rapidly and automatically, and that it is functionally identical to the original workload. Workload migrations are an important element in many, if not all, of today s data center transformation projects. Introduction to PlateSpin Migrate PlateSpin Migrate is a powerful workload portability solution that automates the process of moving workloads over the network between physical servers, virtual hosts and the cloud. PlateSpin Migrate remotely decouples workloads from the underlying server hardware and streams them to and from physical or virtual hosts all from a single point of control. It provides enterprises and service providers with a mature, proven solution for testing, migrating and rebalancing workloads across infrastructure boundaries, with a strong focus on data centers. PlateSpin Migrate supports the following main types of workload migration: Physical to Physical (P2P), e.g., moving a workload from an outdated physical server to a newer model Physical to Virtual (P2V) and vice versa, e.g., virtualizing a workload that s currently running on a physical server Virtual to Virtual (V2V), e.g., migrations from VMware to Hyper-V or vice versa Physical or Virtual to the Cloud (X2C) and vice versa PlateSpin Migrate does not perform any of the following: Application-level migrations Unix to Linux conversions Operating System upgrades 3
6 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects Some of the key features in PlateSpin Migrate include: Anywhere to anywhere workload migration capabilities (including most leading hypervisor platforms, and Microsoft Azure) Support for most enterprise versions of Windows and Linux workloads Multiple automated incremental replications and test points before the final cutover of the source workload to the target workload. Cutover is the point in time where users are moved from the old server (source workload) to the new server (target workload). Typically this involves shutting down or decommissioning the source workload. Ability to scale up to 40 concurrent migrations per PlateSpin Migrate server Industry-leading automation, including post-migration hooks and a command line interface (CLI) A typical workload migration with PlateSpin Migrate involves two kinds of replications: a full replication and one or more incremental replications. Incremental replications are also called synchronizations. The first replication of the workload is almost always a full replication: all blocks or files of the source workload are transferred to the target workload. After this first full replication, the target workload is typically tested. While tests are happening, changes occur on the source workload, which thus needs to be synchronized at least once, before the final cutover. The synchronization of these changes is done with an incremental replication. If testing takes a long time, multiple incremental replications are usually applied. Finally, the cutover of the workload is performed, in combination with one final incremental replication to make sure all changes are captured. During this whole process, the source workload is online and fully accessible to its business users. It s only during the very last synchronization and cutover that services need to be briefly shut down, before they come up again on the target workload. In order to keep this service downtime to an absolute minimum, PlateSpin aims to minimize the time needed for a synchronization. For this purpose, PlateSpin has developed an optional block-based transfer (BBT) driver. This driver can be installed in the source workload, where it tracks blocks that are modified in between replications. When the synchronization window starts, the driver immediately identifies dirty blocks and sends them to the target. Migrations can be performed with or without the driver, but using the driver reduces the time needed for a synchronization. One PlateSpin Migrate server can typically administer a couple of hundred migrations, forty of which can be actively running and replicating in parallel. For large projects, PlateSpin recommends spreading the total number of migrations over multiple horizontally scaled PlateSpin Migrate servers. PlateSpin Migrate uses Microsoft SQL Server as its database back end. Multiple PlateSpin Migrate servers can share the same SQL Server instance. This makes it easier to scale migration servers horizontally. One PlateSpin Migrate server can typically administer a 4
7 Because all information is centrally managed in the PlateSpin Transformation Manager database, the status of the project can be consulted at any point in time, visualized in a dashboard, which can optionally be exposed to the end customer. couple of hundred migrations, forty of which can be actively running and replicating in parallel. For optimal performance, PlateSpin recommends spreading the total number of migrations over multiple horizontally scaled PlateSpin Migrate servers, centrally managed by a PlateSpin Transformation Manager server. Introduction to PlateSpin Transformation Manager PlateSpin Transformation Manager is designed from the ground up to properly plan, track and streamline the execution of data center transformation projects and is typically used in combination with a workload migration tool like PlateSpin Migrate. It features a client-server based architecture, and allows multiple people with different roles to access and update project data at the same time safely, via a web browser. It can handle multiple projects for multiple end customers, with built-in multi-tenancy to ensure that all customer data is properly contained and cannot be accessed by other customers. Information about source workloads can be easily imported into a project via a spreadsheet or via the PlateSpin Transformation Manger API, or can be automatically discovered in real-time by PlateSpin Transformation Manager itself. This information can be continuously updated, to make sure that it keeps reflecting the potentially changing reality in the source environment, while the project is being executed. Once all workload information is imported, the project can be planned. Project managers can assign different people to different projects, and split up large projects in smaller chunks (called waves and batches) to organize the execution of the project via more manageable pieces. For each workload, the final state and destination can be described long before the actual migration takes place. Once the workload s final state is sufficiently described, it can be submitted for execution, which means it s available for a migration specialist to work on in the planned time frame. Because all information is centrally managed in the PlateSpin Transformation Manager database, the status of the project can be consulted at any point in time visualized in a dashboard, which can optionally be exposed to the end customer. 5
8 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects PlateSpin Transformation Manager core roles: Administrator Project Manager Project Architect Migration Specialist Dashboard Viewer Fig. 2 PlateSpin Transformation Manager allows multiple people with different roles to access and update the same data at the same time safely, via a web browser. PlateSpin Transformation Manager features the following core roles: Administrator. The person who installs the product. The administrator can be the first project manager and/or can create other project managers. Project Manager. Typically creates new projects, and creates projects architects and migration specialists. The project manager has all rights on a project. Project Architect. Has all rights on projects to which he has been assigned, but cannot create new projects. The project architect can also create migration specialists. Migration Specialist. This role has no planning privileges. The migration specialist can only execute tasks in the context of planned workload migrations. Dashboard Viewer. Can only see the project dashboard. 6
9 To avoid unnecessary delays, PlateSpin recommends starting the certification process as soon as possible in the project. Planning Large-Scale Workload Migration Projects Planning Resources for PlateSpin Servers and Microsoft SQL Servers PlateSpin recommends to run all PlateSpin servers as virtual machines. This allows you to easily allocate more or less resources to these servers later on in the project. Example resource configurations can be found in the documentation for the respective products. Typically, plan on provisioning one virtual server for each of these: The PlateSpin Transformation Manager server One PlateSpin Migrate server for each 200 workload migrations that are concurrently managed, 40 of which can be actively replicating at the same time One Microsoft SQL Server (Standard or Enterprise Edition), to host the data for the PlateSpin Migrate servers. (See PlateSpin Migrate documentation for supported versions.) As a note: PlateSpin Transformation Manager comes as a downloadable appliance of about 1 GB in size. Planning BBT Driver Certification and Maintenance Windows for BBT Driver Installations The installation of the BBT driver (which yields faster synchronizations) requires a reboot for source workloads that are based on the Microsoft Windows operating system. To minimize the impact of this, a standalone installer for the driver is available. This installer can be run on the source workload at any time, and will simply register the driver for installation at the next reboot of the source workload. The source workload can then be rebooted at any time prior to its migration. Since maintenance windows can be sparse, planning these reboots is an important step in the project planning. In some environments, the use of a new driver will require certification of this driver. To avoid unnecessary delays, PlateSpin recommends starting the certification process as soon as possible in the project. 7
10 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects Installing, Configuring and Initializing PlateSpin Transformation Manager (Software) PlateSpin Transformation Manager comes as a downloadable Linux-based appliance, and only requires attaching an additional data disk (typically 40 GB) before launching it. At first boot, the appliance will ask a couple of simple configuration questions. After this initial configuration the project manager will use a web browser to log in, discover source workloads, target environ ments and PlateSpin Migrate servers, and then create the project plan. Installing PlateSpin Migrate Servers (Software) PlateSpin recommends installing PlateSpin Migrate on a dedicated Microsoft Windows 2012 R2 operating system. No other applications should be installed on this system. A full description of the installation process can be found in the product documentation. One PlateSpin Migrate server can handle approximately 200 concurrently discovered source workloads, 40 of which can be replicating at the same time. If installing multiple PlateSpin Migrate servers is needed for the scale of the project, then consider installing a centralized Microsoft SQL Server instance to manage all migration related data (Microsoft SQL Server Standard or Enterprise Edition is required). PlateSpin recommends installing PlateSpin Migrate on a Microsoft Windows 2012 R2 operating system. A full description of the installation process can be found in the product documentation. Creating Effective Execution Teams PlateSpin recommends that all team members who operate PlateSpin Migrate attend the PlateSpin Migrate Administration training. At least one team member should be a Certified PlateSpin Migration Specialist. More information about the certification is provided at the end of this white paper. Besides PlateSpin Migrate administration skills, PlateSpin recommends the following skills, which can be spread over the team members: If Linux workloads need to be migrated: basic Linux administration skills. For certain versions of Linux, a custom BBT driver may need to be compiled. This process is not difficult and is welldocumented, but requires Linux command-line interface administration skills. Check the product documentation for an overview of Linux versions for which a pre-compiled BBT driver already exists. If Windows workloads need to be migrated: basic Windows administration skills. PlateSpin highly recommends a good understanding of the target platforms to which workloads need to be migrated. Each target platform will have its own intricacies, and especially during problem resolution at least intermediate knowledge about the target platform is required. For migrations to VMware target platforms, it s highly advised to have at least one team member be VMware certified. For migrations to other target platforms, it s advised to investigate if any certification about the platform exists, and to subsequently have at least one team member obtain the certification. 8
11 As a best practice, PlateSpin recommends to verify the integrity of every source workload s file system before starting any replication. Network-related issues are the number one cause of migration challenges, wether they have to do with bandwidth constraints, firewalls, or network architectures which prevent certain communication paths. A good understanding of the networks involved in the project is critical for project success. Furthermore, PlateSpin recommends to have at least one team member be certified in standard TCP/IP networking, especially in the context of bandwidth calculations. Collecting Information About Source Workloads PlateSpin Transformation Manager features a flexible data import mechanism that s based on Microsoft Excel spreadsheets. On the main workload overview tab in the UI, a widget can be launched to import information about source workloads into the project. The widget has a download link that allows for an easy download of an example spreadsheet to a desktop system. The next step is populating this spreadsheet with data about the source workloads. Alternatively, information about source workloads can be added into PlateSpin Transformation Manager via a REST-based API. As the planning phase moves on, more data about source workloads can become available. PlateSpin Transformation Manager allows for subsequent imports of information about systems that were previously imported. The fully qualified domain name (FQDN) is used as the key to find and update, or complete the existing information. At any point in time, imported data can be complemented with real-time discovery of source workload information. This optional discovery is performed by PlateSpin Transformation Manager in combination with at least one PlateSpin Migrate server. Thanks to this additional real-time discovery, the data requirements for the initial import via spreadsheets or API are very minimal. It s important to know that PlateSpin Migrate imposes two requirements on the source workload regarding free disk space: 100 MB of free disk space is required for the installation of the PlateSpin Migrate controller. This controller is typically automatically installed in the migration preparation phase. For Windows workloads, 10% of free space per volume is needed. This is because PlateSpin Migrate creates VSS snapshots during replication, to ensure data consistent replication. The 10% of free space is required to accommodate the snapshot. For Linux workloads, the same requirement exists, but at the level of the volume group, and only if LVM is used. Also, as a best practice, PlateSpin recommends to verify the integrity of every source workload s file system before starting any replication. Data corruption may prevent the target workload from booting correctly, as the corruptions may be copied from the source to the target. This is 9
12 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects especially true for block-based replications. For Windows workloads, the Check Disk (chkdsk) utility can be used for integrity checking. Planning Your Project in PlateSpin Transformation Manager A single data center transformation project can contain up to tens of thousands of workloads, but even a thousand workloads can be a daunting number to tackle without the ability to categorize and group workloads in more manageable chunks. PlateSpin Transformation Manager features three levels of grouping: PlateSpin Transformation Manager grouping levels: Batch Wave Project Batch. A batch contains one or more workloads. Typically these workloads will belong to one or more applications, and will need to be cut over in the same time frame. Wave. A wave contains one or more batches. Project. A project contains one or more waves. While planning the project, workloads can be easily grouped into waves and batches with the advanced search and bulk edit tools, as illustrated in the following figure. Fig. 3 Groups of workloads can easily be identified via the advanced search form. 10
13 Based on experience, PlateSpin recommends to not perform more than 10 concurrent replications into a VMware cluster. Architecting a Migration Infrastructure for Scale A determining factor for project success is the architecture of the PlateSpin migration infrastructure. Several scalability limits determine what kind of architecture is needed. 1. PlateSpin Migrate Scalability Limits One PlateSpin Migrate server can handle up to 40 concurrent replications, and about 200 concurrently discovered and/or configured workloads. Both of these are moving windows : if a replication is finished, another one can be started, as long as the upper limit of 40 concurrent replications is not surpassed. Similarly, if a workload has been successfully migrated, then its information can be deleted from the PlateSpin Migrate server, to free up a new slot for a new workload. When PlateSpin Transformation Manager is used, workload migrations are automatically load-balanced across the available PlateSpin Migrate servers. Furthermore, up to 30 individual target platforms can be discovered and managed per PlateSpin Migrate server. When discovering a VMware cluster, the individual ESX(i) hosts become target platforms. So as an example, one PlateSpin Migrate server can handle 2 VMware clusters of 15 hosts each, or 3 clusters of 10 hosts each. 2. Target Platform Scalability Limits Replicating workloads into a target platform generates network and storage related stress on the target platform. If the platform features shared resources, as is the case for hypervisors, then this stress may negatively impact other workloads that are running on the target platform while migrations are happening. If this needs to be avoided, a two-stage approach is recommended, where workloads are migrated into a stage target platform where no production workloads are running, and are then moved to their final production destination. An additional consideration is the speed at which the target platform can handle the incoming replications. Based on experience, PlateSpin recommends to not perform more than 10 concurrent replications into a VMware cluster. 11
14 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects 3. Source Platform Scalability Limits Replicating workloads also generates network stress on the source platform. CPU, RAM and storage related stress is not important here, as the data only needs to be read, not written. One important factor to take into consideration is the network bandwidth of the network card (NIC virtual or physical) that links the source platform to the networking infrastructure: no matter the speed of the networking infrastructure, any migration will not be able to consume more bandwidth than offered by the connecting NIC. This is even more important in virtualized environments, where a physical NIC can be shared by multiple workloads: if that NIC is 1Gbps, and if multiple workloads are being replicated at the same time, then all replications will have to share the 1Gbps link, which will lead to poor migration times, even on a 10Gbps or better networking infrastructure. PlateSpin recommends to not have more than three people share the same PlateSpin Migrate server. 4. Human error PlateSpin Migrate is a multi-user migration tool, where multiple users can work on migrating workloads at the same time. However, to avoid human error most often in the form of losing track who s working on what workload, or in the form of one administrator accidentally performing an operation on another administrator s workload PlateSpin recommends to not have more than three administrators share the same PlateSpin Migrate server. One person can work on multiple PlateSpin Migrate servers, but one server should not be manned by more than three different people. Each team should be given a set of applications to migrate, and should use one and the same PlateSpin Migrate server to migrate all workloads belonging to these applications. When PlateSpin Transformation Manager is used, the risk of this kind of human error is as good as eliminated. 12
15 PlateSpin highly recommends to measure all available bandwidth for all source to target platform network paths before the start of the actual migrations. Fig. 4 Visualization of some of the most important constraints (example for VMware target infrastructure). 5. Networking infrastructure Measuring Bandwidth Even when fast theoretical (e.g., 10 Gbps) network speeds are available, calculations need to be made to ensure that the available bandwidth is sufficient for the amount of data that needs to be moved simultaneously. As early as possible in the project, the real available bandwidth should be determined between the source workload and the target platform, as this bandwidth will have a significant impact on the real migration speed. A good way to measure the actual available bandwidth is by using the iperf tool. iperf is a client-server based tool, where the server should be run on the target platform. For a VMware based target, this can be done in a small, dedicated virtual machine. The client part can then be downloaded and launched on the source workload, after which the bandwidth between source and target can be measured. PlateSpin highly recommends to measure all available bandwidth for all source to target platform network paths before the start of the actual migrations. 13
16 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects Tuning the Network Depending on network latency, the TCP/IP receive window between source and target can be tuned to achieve greater throughput during replications. Consult the PlateSpin Migrate documentation for detailed steps on how to do this. Furthermore, every networking infrastructure has a characteristic size of messages that may be transmitted, called the maximum transmission unit (MTU). PlateSpin Migrate allows administrators to set the MTU for any given replication, to avoid packet fragmentation and related loss of throughput performance. Consult the PlateSpin Migrate documentation for detailed steps on how to do this. PlateSpin Migrate allows administrators to set the MTU for any given replication, to avoid packet fragmentation and related loss of throughput performance. Compression For very slow links such as WAN links, PlateSpin Migrate allows compression to be used to compress the data before it s being sent over the network. Depending on the type of the data, compression of up to 70% can be obtained, leading to much faster replication times. However, since the CPU on the source workload is used to compress the data, an additional CPU overhead of about 5% has to be taken into account. Required Communication Paths For a complete overview of all communication paths, including what ports may need to be opened up in firewalls, consult the PlateSpin Migrate technical documentation, where this information is readily available. The most important requirements are: Connectivity between the PlateSpin Migrate server and the source workload Connectivity between the PlateSpin Migrate server and the Linux Ram Disk (LRD) helper ISO image during replication. During any replication, the target workload is always booted from this helper image. This connectivity can use a dedicated network, if desired, which can be selected during the migration configuration. Connectivity between the source workload and that same LRD helper ISO image, during replications. This network path is the path that will be used for the replication traffic, so it needs the most scrutiny regarding required bandwidth. Connectivity between the PlateSpin Migrate server and the target platform (e.g., the VMware ESX server) to which the workload is being migrated. Connectivity between the PlateSpin Migrate server and the target workload in its final format, i.e., when the production IP address has been assigned to it. This requirement also exists when the workload is being tested, after the test IP address has been assigned to it. The reason for these requirements is the final configuration process of the target workload: this is done via a configuration service that s injected into the target workload prior to its first boot. At boot time, this configuration service will do the final workload customization, and then remove itself. However, to know what it needs to configure, this configuration service needs network access to the PlateSpin Migrate server to download that information. 14
17 When PlateSpin Migrate is replicating a workload, the target workload is always booted from a Linux RAM Disk (LRD) ISO helper image. IP Address Management When PlateSpin Migrate is replicating a workload (i.e., during any full or incremental replication), the target workload is always booted from a Linux RAM Disk (LRD) ISO helper image. This helper image needs an IP address, so that it can communicate over the network with the source workload and the PlateSpin Migrate server. You configure this IP address as part of the workload migration configuration in PlateSpin Migrate. The means that there are potentially four different IP addresses in play during the complete migration process: IP address of the source workload (usually this is fixed, at least when it s a live migration) IP address of the PlateSpin Migrate server (this is fixed) IP address of the target workload in its final configuration. This IP address may be the same as the source workload (assuming the source will be shut down after cutover), or it can be different. IP address of the LRD ISO helper image during replications. If the IP address of the target workload in its final configuration is going to be different than the IP address of the source workload, then usually that same target workload IP address can be used, as it will not conflict with the source s IP address. However, if the IP address of the source will be transferred as is to the target workload in its final configuration, then a dedicated IP address needs to be planned for the replication. The IP address of the target workload cannot be used in this case, as it will conflict with the (same) IP address of the source workload. Note that if DHCP is used in the environment where the target workload will reside, IP address assignment will mostly be handled automatically by the DHCP service. Execution Dynamics of Large-Scale Workload Migration Projects Project Progress Tracking with PlateSpin Transformation Manager As workloads are being migrated, the information in the PlateSpin Transformation Manager database is constantly kept up to date to reflect the latest state of the project. If workload transformation deadlines are missed, a warning is displayed to indicate that the attention of the project architect or project manager is needed. They can then choose to add that workload to a future batch, create a new batch for it, or take other necessary actions. 15
18 White Paper Successfully Planning and Executing Large-Scale Workload Migration Projects PlateSpin Transformation Manager features the following workload migration states: Imported. The project manager or project architect has imported the workload into a project (via a spreadsheet or the API) but no modifications have been made to it yet. Needs Additional Information. Some planning has been done for the workload by the project manager or the project architect, but more planning is needed for a proper execution of the migration itself. Ready to Submit. All information for a migration execution has been provided, and the workload is ready to be handed off for migration at a later point in time, according to the project planning. Submitted. The workload has been formally handed off by the project manager or project architect for migration In Progress. The workload migration is happening. PlateSpin Transformation Manager workload transformation states: Imported Needs Additional Information Ready to Submit Submitted In Progress Completed Completed. The workload migration had been completed The most important project information can at any time be consulted by all roles that have rights to the project, in the project dashboard. Optionally, this dashboard can be exposed to any third party via a dashboard viewer role, which only has view-only rights. Fig. 5 The project dashboard shows the most important project information at a glance. 16
19 With PlateSpin Migrate, testing the target workload can be done while the source workload is still online, in production. Cutting Over Your Workloads: Test Early, Test Often Before cutting over to the new server, a certain amount of testing is almost always required. With PlateSpin Migrate, testing the target workload can be done in a sandboxed environment, while the source workload is still online in production. There is no limit on the duration of a test, or on the number of tests performed before cutover. Once testing is completed, an incremental replication is automatically performed to synchronize the source and the target workload, so that the target workload contains the latest updates for the next test. This process of testing and synchronizing can be repeated any number of times. Once the test teams sign off on the target workload, a final synchronization between source and target is performed, after which the cutover takes place. To ensure 100 percent data consistency between the source and the target, it s considered a best practice to shut down the business services on the source workload during the final synchronization. Shutting down the services ensures that no data changes are being made while the final deltas are transferred from the source to the target workload. PlateSpin Migrate features a widget that allows for easy selection of services that need to be brought down before the final synchronization. Because business services are down during cutover, it s paramount to make sure that the cutover is done as fast as possible. Multiple synchronizations (typically interleaved with testing as described earlier) will ensure that the overall services downtime during the final synchronization and cutover is kept to an absolute minimum (usually a couple of minutes) and, equally important, that the downtime of the services is predictable: the final synchronization should not take longer than any of the previous automated synchronizations. 17
20 Fig. 6 Scheduling a workload for replication is easy and wizard-driven in the PlateSpin Migrate web UI. Becoming a Certified PlateSpin Migration Specialist Migration specialists who want to become experts in the use of PlateSpin Migrate can register for the PlateSpin Migrate Administration course. The course covers all aspects of working with PlateSpin Migrate, including product installation, understanding mass migration dynamics, understanding licensing, use of the command line interface, driver management, and troubleshooting. Upon course completion, the student can register for the Certified PlateSpin Migration Specialist exam, which consists of a set of multiple-choice questions to test the student s knowledge on all relevant topics. Consult the PlateSpin Migrate website on netiq. com for more information on training options and certification ( products/migrate). Worldwide Headquarters 515 Post Oak Blvd., Suite 1200 Houston, Texas USA [email protected] For a complete list of our offices in North America, Europe, the Middle East, Africa, Asia-Pacific and Latin America, please visit: Q 05/ NetIQ Corporation and its affiliates. All rights reserved. NetIQ, the NetIQ logo, and PlateSpin are trademarks or registered trademarks of NetIQ Corporation in the USA. All other company and product names may be trademarks of their respective companies.
Executing Large-Scale Data Center Transformation Projects with PlateSpin Migrate 12
Executing Large-Scale Data Center Transformation Projects with PlateSpin Migrate 12 WHITE PAPER Table of Contents What are Data Center Transformation Projects?... 1 Introduction to PlateSpin Migrate...
VMware vsphere Data Protection 6.1
VMware vsphere Data Protection 6.1 Technical Overview Revised August 10, 2015 Contents Introduction... 3 Architecture... 3 Deployment and Configuration... 5 Backup... 6 Application Backup... 6 Backup Data
CAS8491 Data Center Transformation as Service
CAS8491 Data Center Transformation as Service Gary Ardito Chief Architect Cloud Service Provider Solutions Pradeep Chaturvedi Product Management Agenda Workload Migration Challenges PlateSpin Recon PlateSpin
Optimizing Business Continuity Management with NetIQ PlateSpin Protect and AppManager. Best Practices and Reference Architecture
Optimizing Business Continuity Management with NetIQ PlateSpin Protect and AppManager Best Practices and Reference Architecture WHITE PAPER Table of Contents Introduction.... 1 Why monitor PlateSpin Protect
CA ARCserve Family r15
CA ARCserve Family r15 Rami Nasser EMEA Principal Consultant, Technical Sales [email protected] The ARCserve Family More than Backup The only solution that: Gives customers control over their changing
SILVER PEAK ACCELERATION WITH EMC VSPEX PRIVATE CLOUD WITH RECOVERPOINT FOR VMWARE VSPHERE
VSPEX IMPLEMENTATION GUIDE SILVER PEAK ACCELERATION WITH EMC VSPEX PRIVATE CLOUD WITH RECOVERPOINT FOR VMWARE VSPHERE Silver Peak Abstract This Implementation Guide describes the deployment of Silver Peak
An Oracle White Paper July 2011. Oracle Primavera Contract Management, Business Intelligence Publisher Edition-Sizing Guide
Oracle Primavera Contract Management, Business Intelligence Publisher Edition-Sizing Guide An Oracle White Paper July 2011 1 Disclaimer The following is intended to outline our general product direction.
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module June, 2015 WHITE PAPER Contents Advantages of IBM SoftLayer and RackWare Together... 4 Relationship between
What s new in v6. Veeam Backup & Replication. Enterprise scalability. To learn more, visit: www.veeam.com 1
Veeam Backup & Replication What s new in v6 GOLD AWARD NEW TECHNOLOGY Veeam Backup & Replication v6 won Best New Technology at VMworld 2011. This is the second year in a row Veeam Backup was selected as
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module June, 2015 WHITE PAPER Contents Advantages of IBM SoftLayer and RackWare Together... 4 Relationship between
CA ARCserve Replication and High Availability Deployment Options for Hyper-V
Solution Brief: CA ARCserve R16.5 Complexity ate my budget CA ARCserve Replication and High Availability Deployment Options for Hyper-V Adding value to your Hyper-V environment Overview Server virtualization
Silver Peak Virtual Appliances
Silver Peak Virtual Appliances Frequently Asked Questions (FAQ) VX Installation This section addresses questions or problems you may encounter during Silver Peak VX installation. 1. I need to increase
Double-Take Cloud Migration Center (CMC) Tech Brief
Double-Take Cloud Migration Center (CMC) Tech Brief Overview Double-Take Cloud Migration Center is an online service that enables migrations from VMware vsphere and Amazon Web Services EC2 to Microsoft
VMware vsphere Replication Administration
VMware vsphere Replication Administration vsphere Replication 6.1 This document supports the version of each product listed and supports all subsequent versions until the document is replaced by a new
Esri ArcGIS Server 10 for VMware Infrastructure
Esri ArcGIS Server 10 for VMware Infrastructure October 2011 DEPLOYMENT AND TECHNICAL CONSIDERATIONS GUIDE Table of Contents Introduction... 3 Esri ArcGIS Server 10 Overview.... 3 VMware Infrastructure
Simplify Data Management and Reduce Storage Costs with File Virtualization
What s Inside: 2 Freedom from File Storage Constraints 2 Simplifying File Access with File Virtualization 3 Simplifying Data Management with Automated Management Policies 4 True Heterogeneity 5 Data Protection
Office 365 Migration Performance & Server Requirements
Solutions for the Modern Workforce Office 365 Migration Performance & Server Requirements Understanding Migration Performance There are many factors that can affect performance when migrating to Office
WanVelocity. WAN Optimization & Acceleration
WanVelocity D A T A S H E E T WAN Optimization & Acceleration WanVelocity significantly accelerates applications while reducing bandwidth costs using a combination of application acceleration, network
Hybrid Cloud Backup and Recovery Software. Virtualization Support Real Backups of Virtual Environments
Hybrid Cloud Backup and Recovery Software Virtualization Support Asigra Inc. 1120 Finch Avenue West, Suite 400 Toronto, ON Canada M3J 3H7 tel: 416-736-8111 fax: 416-736-7120 email: [email protected] www.recoveryourcool.com
vsphere Upgrade Update 1 ESXi 6.0 vcenter Server 6.0 EN-001804-02
Update 1 ESXi 6.0 vcenter Server 6.0 This document supports the version of each product listed and supports all subsequent versions until the document is replaced by a new edition. To check for more recent
What s New in VMware vsphere 4.1 VMware vcenter. VMware vsphere 4.1
What s New in VMware vsphere 4.1 VMware vcenter VMware vsphere 4.1 W H I T E P A P E R VMware vsphere 4.1 ( vsphere ) continues to improve on its industry-leading virtualization platform, continuing the
Paragon Protect & Restore
Paragon Protect & Restore ver. 3 Centralized and Disaster Recovery for virtual and physical environments Tight Integration with hypervisors for agentless backups, VM replication and seamless restores Paragon
PlateSpin Migrate 11.1 User Guide
PlateSpin Migrate 11.1 User Guide September 22, 2014 www.netiq.com/documentation Legal Notice THIS DOCUMENT AND THE SOFTWARE DESCRIBED IN THIS DOCUMENT ARE FURNISHED UNDER AND ARE SUBJECT TO THE TERMS
Real-time Protection for Hyper-V
1-888-674-9495 www.doubletake.com Real-time Protection for Hyper-V Real-Time Protection for Hyper-V Computer virtualization has come a long way in a very short time, triggered primarily by the rapid rate
Dell AppAssure Universal Recovery
Technology spotlight Dell AppAssure Universal Recovery The key to unlimited cross-platform restoration flexibility Universal Recovery is a built-in Dell AppAssure tool for recovering whole physical machines,
7.x Upgrade Instructions. 2015 Software Pursuits, Inc.
7.x Upgrade Instructions 2015 Table of Contents INTRODUCTION...2 SYSTEM REQUIREMENTS FOR SURESYNC 7...2 CONSIDERATIONS BEFORE UPGRADING...3 TERMINOLOGY CHANGES... 4 Relation Renamed to Job... 4 SPIAgent
Deployment Options for Microsoft Hyper-V Server
CA ARCserve Replication and CA ARCserve High Availability r16 CA ARCserve Replication and CA ARCserve High Availability Deployment Options for Microsoft Hyper-V Server TYPICALLY, IT COST REDUCTION INITIATIVES
This document describes how the Meraki Cloud Controller system enables the construction of large-scale, cost-effective wireless networks.
This document describes how the Meraki Cloud Controller system enables the construction of large-scale, cost-effective wireless networks. Copyright 2009 Meraki, Inc. All rights reserved. Trademarks Meraki
VMware vsphere Data Protection 5.8 TECHNICAL OVERVIEW REVISED AUGUST 2014
VMware vsphere Data Protection 5.8 TECHNICAL OVERVIEW REVISED AUGUST 2014 Table of Contents Introduction.... 3 Features and Benefits of vsphere Data Protection... 3 Additional Features and Benefits of
QuickStart Guide vcenter Server Heartbeat 5.5 Update 2
vcenter Server Heartbeat 5.5 Update 2 This document supports the version of each product listed and supports all subsequent versions until the document is replaced by a new edition. To check for more recent
Enterprise Storage Solution for Hyper-V Private Cloud and VDI Deployments using Sanbolic s Melio Cloud Software Suite April 2011
Enterprise Storage Solution for Hyper-V Private Cloud and VDI Deployments using Sanbolic s Melio Cloud Software Suite April 2011 Executive Summary Large enterprise Hyper-V deployments with a large number
Advanced Server Virtualization: Vmware and Microsoft Platforms in the Virtual Data Center
Advanced Server Virtualization: Vmware and Microsoft Platforms in the Virtual Data Center Marshall, David ISBN-13: 9780849339318 Table of Contents BASIC CONCEPTS Introduction to Server Virtualization Overview
Veritas Backup Exec 15: Protecting Microsoft SQL
Veritas Backup Exec 15: Protecting Microsoft SQL Who should read this paper Technical White Papers are designed to introduce IT professionals to key technologies and technical concepts that are associated
Running VirtualCenter in a Virtual Machine
VMWARE TECHNICAL NOTE VirtualCenter 2.x Running VirtualCenter in a Virtual Machine Running VirtualCenter in a virtual machine is fully supported by VMware to the same degree as if it were installed on
VMware vsphere Data Protection Evaluation Guide REVISED APRIL 2015
VMware vsphere Data Protection REVISED APRIL 2015 Table of Contents Introduction.... 3 Features and Benefits of vsphere Data Protection... 3 Requirements.... 4 Evaluation Workflow... 5 Overview.... 5 Evaluation
Access to easy-to-use tools that reduce management time with Arcserve Backup
Access to easy-to-use tools that reduce management time with Arcserve Backup In business, evolution is constant. Staff grows. New offices spring up. New applications are being implemented, and typically,
Virtualization Support - Real Backups of Virtual Environments
Virtualization Support Real Backups of Virtual Environments Contents Virtualization Challenges 3 The Benefits of Agentless Backup 4 Backup and Recovery Built for Virtualized Environments 4 Agentless in
Setup Cisco Call Manager on VMware
created by: Rainer Bemsel Version 1.0 Dated: July/09/2011 The purpose of this document is to provide the necessary steps to setup a Cisco Call Manager to run on VMware. I ve been researching for a while
VMware vsphere Data Protection 6.0
VMware vsphere Data Protection 6.0 TECHNICAL OVERVIEW REVISED FEBRUARY 2015 Table of Contents Introduction.... 3 Architectural Overview... 4 Deployment and Configuration.... 5 Backup.... 6 Application
NetScaler VPX FAQ. Table of Contents
NetScaler VPX FAQ Table of Contents Feature and Functionality Frequently Asked Questions... 2 Pricing and Packaging Frequently Asked Questions... 4 NetScaler VPX Express Frequently Asked Questions... 5
What s New in VMware vcenter 5.0
What s New in VMware vcenter 5.0 Effective Virtualization Management TECHNICAL MARKETING DOCUMENTATION v 1.0/Updated April 2011 Table of Contents Introduction.... 3 vsphere Web Client.... 4 Web Client
A virtual SAN for distributed multi-site environments
Data sheet A virtual SAN for distributed multi-site environments What is StorMagic SvSAN? StorMagic SvSAN is a software storage solution that enables enterprises to eliminate downtime of business critical
Veritas Backup Exec 15: Deduplication Option
Veritas Backup Exec 15: Deduplication Option Who should read this paper Technical White Papers are designed to introduce IT professionals to key technologies and technical concepts that are associated
PlateSpin Migrate12.0 User Guide. July 2015
PlateSpin Migrate12.0 User Guide July 2015 Legal Notice THIS DOCUMENT AND THE SOFTWARE DESCRIBED IN THIS DOCUMENT ARE FURNISHED UNDER AND ARE SUBJECT TO THE TERMS OF A LICENSE AGREEMENT OR A NON-DISCLOSURE
PARALLELS CLOUD STORAGE
PARALLELS CLOUD STORAGE Performance Benchmark Results 1 Table of Contents Executive Summary... Error! Bookmark not defined. Architecture Overview... 3 Key Features... 5 No Special Hardware Requirements...
Veritas Storage Foundation High Availability for Windows by Symantec
Veritas Storage Foundation High Availability for Windows by Symantec Simple-to-use solution for high availability and disaster recovery of businesscritical Windows applications Data Sheet: High Availability
Cloud Optimize Your IT
Cloud Optimize Your IT Windows Server 2012 The information contained in this presentation relates to a pre-release product which may be substantially modified before it is commercially released. This pre-release
Symantec Virtual Machine Management 7.1 User Guide
Symantec Virtual Machine Management 7.1 User Guide Symantec Virtual Machine Management 7.1 User Guide The software described in this book is furnished under a license agreement and may be used only in
Backup and Recovery Best Practices With CommVault Simpana Software
TECHNICAL WHITE PAPER Backup and Recovery Best Practices With CommVault Simpana Software www.tintri.com Contents Intended Audience....1 Introduction....1 Consolidated list of practices...............................
About Parallels Desktop 10 for Mac
About Parallels Desktop 10 for Mac Parallels Desktop 10 for Mac is a major upgrade to Parallels award-winning software for running Windows on a Mac. About this Update This update for Parallels Desktop
CMB 207 1I Citrix XenApp and XenDesktop Fast Track
CMB 207 1I Citrix XenApp and XenDesktop Fast Track This fast paced course provides the foundation necessary for students to effectively centralize and manage desktops and applications in the datacenter
Monitoring Databases on VMware
Monitoring Databases on VMware Ensure Optimum Performance with the Correct Metrics By Dean Richards, Manager, Sales Engineering Confio Software 4772 Walnut Street, Suite 100 Boulder, CO 80301 www.confio.com
Protecting Microsoft Hyper-V 3.0 Environments with CA ARCserve
Solution Brief: CA ARCserve R16.5 Complexity ate my budget Protecting Microsoft Hyper-V 3.0 Environments with CA ARCserve Customer Challenges Today, you face demanding service level agreements (SLAs) while
Veeam 74-409 Study Webinar Server Virtualization with Windows Server Hyper-V and System Center. Orin Thomas @orinthomas
Veeam 74-409 Study Webinar Server Virtualization with Windows Server Hyper-V and System Center Orin Thomas @orinthomas http://hyperv.veeam.com/ study-guide-microsoft-certification-exam-74-409-server-virtualization-windows-server-hyper-v-system-center-4202/
VIDEO SURVEILLANCE WITH SURVEILLUS VMS AND EMC ISILON STORAGE ARRAYS
VIDEO SURVEILLANCE WITH SURVEILLUS VMS AND EMC ISILON STORAGE ARRAYS Successfully configure all solution components Use VMS at the required bandwidth for NAS storage Meet the bandwidth demands of a 2,200
Consulting Solutions WHITE PAPER Citrix XenDesktop Citrix Personal vdisk Technology Planning Guide
Consulting Solutions WHITE PAPER Citrix XenDesktop Citrix Personal vdisk Technology Planning Guide www.citrix.com Overview XenDesktop offers IT administrators many options in order to implement virtual
WHITE PAPER. Acronis Backup & Recovery 10 Overview
Acronis Backup & Recovery 10 Overview Copyright Acronis, Inc., 2000 2009 Table of contents Executive Summary... 3 The Next Generation Backup and Recovery Solution from Acronis... 4 New! Scaleable Architecture
VEEAM CLOUD CONNECT REPLICATION
VEEAM CLOUD CONNECT REPLICATION DRaaS that is extremely powerful and extremely easy Luca Dell Oca vexpert, VCAP-DCD, CISSP Contents Veeam Cloud Connect Replication, easy disaster recovery for everyone...3
Getting Started with ESXi Embedded
ESXi 4.1 Embedded vcenter Server 4.1 This document supports the version of each product listed and supports all subsequent versions until the document is replaced by a new edition. To check for more recent
Veeam Cloud Connect. Version 8.0. Administrator Guide
Veeam Cloud Connect Version 8.0 Administrator Guide April, 2015 2015 Veeam Software. All rights reserved. All trademarks are the property of their respective owners. No part of this publication may be
HP Matrix Operating Environment Co-Existence with Microsoft Hyper-V Replica
Technical white paper HP Matrix Operating Environment Co-Existence with Microsoft Hyper-V Replica HP Insight Management 7.4 Update 1 Table of contents Hyper-V Replica high-level overview... 3 What happens
http://support.oracle.com/
Oracle Primavera Contract Management 14.0 Sizing Guide October 2012 Legal Notices Oracle Primavera Oracle Primavera Contract Management 14.0 Sizing Guide Copyright 1997, 2012, Oracle and/or its affiliates.
PARALLELS SERVER BARE METAL 5.0 README
PARALLELS SERVER BARE METAL 5.0 README 1999-2011 Parallels Holdings, Ltd. and its affiliates. All rights reserved. This document provides the first-priority information on the Parallels Server Bare Metal
Contents Introduction... 5 Deployment Considerations... 9 Deployment Architectures... 11
Oracle Primavera Contract Management 14.1 Sizing Guide July 2014 Contents Introduction... 5 Contract Management Database Server... 5 Requirements of the Contract Management Web and Application Servers...
Cloud Server. Parallels. An Introduction to Operating System Virtualization and Parallels Cloud Server. White Paper. www.parallels.
Parallels Cloud Server White Paper An Introduction to Operating System Virtualization and Parallels Cloud Server www.parallels.com Table of Contents Introduction... 3 Hardware Virtualization... 3 Operating
Parallels Virtuozzo Containers
Parallels Virtuozzo Containers White Paper Top Ten Considerations For Choosing A Server Virtualization Technology www.parallels.com Version 1.0 Table of Contents Introduction... 3 Technology Overview...
Veeam ONE What s New in v9?
Veeam ONE What s New in v9? Veeam ONE is a powerful monitoring, reporting and capacity planning tool for the Veeam backup infrastructure, VMware vsphere and Microsoft Hyper-V. It helps enable Availability
Managing Microsoft Hyper-V Server 2008 R2 with HP Insight Management
Managing Microsoft Hyper-V Server 2008 R2 with HP Insight Management Integration note, 4th Edition Introduction... 2 Overview... 2 Comparing Insight Management software Hyper-V R2 and VMware ESX management...
vsphere Upgrade vsphere 6.0 EN-001721-03
vsphere 6.0 This document supports the version of each product listed and supports all subsequent versions until the document is replaced by a new edition. To check for more recent editions of this document,
Dell Compellent Storage Center
Dell Compellent Storage Center How to Setup a Microsoft Windows Server 2012 Failover Cluster Reference Guide Dell Compellent Technical Solutions Group January 2013 THIS BEST PRACTICES GUIDE IS FOR INFORMATIONAL
VMware Server 2.0 Essentials. Virtualization Deployment and Management
VMware Server 2.0 Essentials Virtualization Deployment and Management . This PDF is provided for personal use only. Unauthorized use, reproduction and/or distribution strictly prohibited. All rights reserved.
Migration and Disaster Recovery Underground in the NEC / Iron Mountain National Data Center with the RackWare Management Module
Migration and Disaster Recovery Underground in the NEC / Iron Mountain National Data Center with the RackWare Management Module WHITE PAPER May 2015 Contents Advantages of NEC / Iron Mountain National
Product Brief SysTrack VMP
for VMware View Product Brief SysTrack VMP Benefits Optimize VMware View desktop and server virtualization and terminal server projects Anticipate and handle problems in the planning stage instead of postimplementation
Isilon OneFS. Version 7.2. OneFS Migration Tools Guide
Isilon OneFS Version 7.2 OneFS Migration Tools Guide Copyright 2014 EMC Corporation. All rights reserved. Published in USA. Published November, 2014 EMC believes the information in this publication is
EMC Virtual Infrastructure for Microsoft Applications Data Center Solution
EMC Virtual Infrastructure for Microsoft Applications Data Center Solution Enabled by EMC Symmetrix V-Max and Reference Architecture EMC Global Solutions Copyright and Trademark Information Copyright 2009
How To Protect Your Data From Being Damaged On Vsphere Vdp Vdpa Vdpo Vdprod (Vmware) Vsphera Vdpower Vdpl (Vmos) Vdper (Vmom
VMware vsphere Data Protection 6.0 Maciej Kot Senior Systems Engineer VMware Overview vsphere Data Protection Overview Data protection for VMs and applications Agent-less VM backup and restore Agents for
Neverfail for Windows Applications June 2010
Neverfail for Windows Applications June 2010 Neverfail, from Neverfail Ltd. (www.neverfailgroup.com), ensures continuity of user services provided by Microsoft Windows applications via data replication
Evaluation of Enterprise Data Protection using SEP Software
Test Validation Test Validation - SEP sesam Enterprise Backup Software Evaluation of Enterprise Data Protection using SEP Software Author:... Enabling you to make the best technology decisions Backup &
Planning the Migration of Enterprise Applications to the Cloud
Planning the Migration of Enterprise Applications to the Cloud A Guide to Your Migration Options: Private and Public Clouds, Application Evaluation Criteria, and Application Migration Best Practices Introduction
PHD Virtual Backup for Hyper-V
PHD Virtual Backup for Hyper-V version 7.0 Installation & Getting Started Guide Document Release Date: December 18, 2013 www.phdvirtual.com PHDVB v7 for Hyper-V Legal Notices PHD Virtual Backup for Hyper-V
Cloud Computing. Chapter 1 Introducing Cloud Computing
Cloud Computing Chapter 1 Introducing Cloud Computing Learning Objectives Understand the abstract nature of cloud computing. Describe evolutionary factors of computing that led to the cloud. Describe virtualization
Virtualization 101: Technologies, Benefits, and Challenges. A White Paper by Andi Mann, EMA Senior Analyst August 2006
Virtualization 101: Technologies, Benefits, and Challenges A White Paper by Andi Mann, EMA Senior Analyst August 2006 Table of Contents Introduction...1 What is Virtualization?...1 The Different Types
Business Value of Microsoft System Center 2012 Configuration Manager
Business Value of Microsoft System Center 2012 Configuration Manager Sponsored by: Microsoft Corporation Publish date: February 2013 Abstract: Microsoft System Center 2012 Configuration Manager ( Configuration
Virtual Appliance Setup Guide
Virtual Appliance Setup Guide 2015 Bomgar Corporation. All rights reserved worldwide. BOMGAR and the BOMGAR logo are trademarks of Bomgar Corporation; other trademarks shown are the property of their respective
vsphere Replication for Disaster Recovery to Cloud
vsphere Replication for Disaster Recovery to Cloud vsphere Replication 6.0 This document supports the version of each product listed and supports all subsequent versions until the document is replaced
Backup Exec 15: Protecting Microsoft SQL
TECHNICAL BRIEF: BACKUP EXEC 15: PROTECTING MICROSOFT SQL........................................ Backup Exec 15: Protecting Microsoft SQL Who should read this paper Technical White Papers are designed
Backup Exec 2014: Deduplication Option
TECHNICAL BRIEF: BACKUP EXEC 2014: DEDUPLICATION OPTION........................................ Backup Exec 2014: Deduplication Option Who should read this paper Technical White Papers are designed to
Backup Exec 15: Deduplication Option
TECHNICAL BRIEF: BACKUP EXEC 15: DEDUPLICATION OPTION........................................ Backup Exec 15: Deduplication Option Who should read this paper Technical White Papers are designed to introduce
StarWind Virtual SAN Installation and Configuration of Hyper-Converged 2 Nodes with Hyper-V Cluster
#1 HyperConverged Appliance for SMB and ROBO StarWind Virtual SAN Installation and Configuration of Hyper-Converged 2 Nodes with MARCH 2015 TECHNICAL PAPER Trademarks StarWind, StarWind Software and the
Drobo How-To Guide. Cloud Storage Using Amazon Storage Gateway with Drobo iscsi SAN
The Amazon Web Services (AWS) Storage Gateway uses an on-premises virtual appliance to replicate a portion of your local Drobo iscsi SAN (Drobo B1200i, left below, and Drobo B800i, right below) to cloudbased
Asigra Cloud Backup V13.0 Provides Comprehensive Virtual Machine Data Protection Including Replication
Datasheet Asigra Cloud Backup V.0 Provides Comprehensive Virtual Machine Data Protection Including Replication Virtual Machines (VMs) have become a staple of the modern enterprise data center, but as the
EMC Virtual Infrastructure for Microsoft Applications Data Center Solution
EMC Virtual Infrastructure for Microsoft Applications Data Center Solution Enabled by EMC Symmetrix V-Max and Reference Architecture EMC Global Solutions Copyright and Trademark Information Copyright 2009
Mayur Dewaikar Sr. Product Manager Information Management Group Symantec Corporation
Next Generation Data Protection with Symantec NetBackup 7 Mayur Dewaikar Sr. Product Manager Information Management Group Symantec Corporation White Paper: Next Generation Data Protection with NetBackup