Traffic at OSL in 2005

Size: px
Start display at page:

Download "Traffic at OSL in 2005"

Transcription

1 Annual report 2005 Oslo Lufthavn AS (OSL) experienced another year of strong passenger growth in 2005 with almost 16 million passengers passing through the airport during the year. This strong growth was a consequence of increased competition at the airport, with a number of new destinations for passengers to choose from. One important event for the airport was the opening of the duty free shop in arrivals after new rules allowing this came into force on 1 July Sales at OSL started on the same date and the great interest shown in this service led to the company building a new shop during the autumn, which was ready in time for Christmas. Despite the fact that it is at a lower level than before, OSL still ranks near the top in Europe with respect to punctuality. OSL was ranked fifth in 2005 by the Association of European Airlines was otherwise characterised by preparations for the new security requirements that apply from 1 January The new security requirements will have little impact on passengers; instead they are primarily directed at the control of access to the airport by personnel and vehicles. The company s operating result (before financial items) was NOK million, which is NOK million better than in The result after tax was NOK million. Traffic at OSL in 2005 Passengers Passengers Change in % Scheduled domestic 7,398,264 7,698, % Charter domestic 16,960 17, % Scheduled international 6,257,800 6,956, % Charter international 1,192,436 1,222, % Total 14,865,460 15,896, % 15,896,148 passengers passed through OSL in This is 1,030,688 more than last year. This is the highest passenger figure recorded for a single year in OSL s history. The most popular routes in 2005 were: Bergen 1,426,600 passengers Trondheim 1,400,826 passengers Copenhagen 1,263,326 passengers Stavanger 1,110,549 passengers The largest growth on international routes was traffic to Munich, which saw 60,000 more passengers. Other international routes that grew sharply were Stockholm, with 57,000, and Prague, with 45,000 more passengers in 2005 than in The biggest increase for charter was to Turkey, with 20,000, and to the Canary Islands with 18,000 more passengers in 2005 than the year before. For domestic traffic, the biggest increase was on the routes to Stavanger (78,000), Bergen (74,000) and northern Norway (110,000 to Bodø, Harstad / Narvik, Tromsø, Alta and Kirkenes). Eight airlines opened a total of 18 new international routes in 2005: 13 year-round routes and 5 seasonal routes. In 2005, OSL had routes to 71 international airports and 24 domestic airports. Annual Report Oslo Lufthavn AS Page 1 of 9

2 The SAS Group is the biggest customer, carrying 59.5% of passengers in Norwegian had 16.1% of the passengers. Viewed in relation to comparable airports in neighbouring countries, OSL s increase of 6.9% means it experienced greater growth in 2005 than Arlanda (5.2%) and Copenhagen (5.0%). The main reason for this is the strong growth in international traffic at OSL. Air transport movements Air transport movements Change in % Scheduled domestic 93,111 94, % Scheduled international 81,046 84,816, 4.7% Charter 7,160 7, % Cargo 5,464 4, % Other (GA, military, etc) 9,574 10, % Total 196, , % A greater increase in the number of passengers than in the number of air transport movements means an increase in the cabin factor, and for 2005 this was 68% compared with 65% in Cargo and mail The total number of tonnes of cargo and mail to/from OSL was 84,270 tonnes in This is an increase of 6,242 tonnes or 8%. The increase in volume is largely due to larger cargo aeroplanes than before, and this is to a great degree related to the transport of salmon. Comparison with the other major airports in the Nordic Region Airport Passengers (1000) Growth International % Punctuality Oslo 15, % 51% 84% Copenhagen 19, % 92% 84% Stockholm 17, % 66% 83% Helsinki 15, % 63% 85% Source: Airports websites and statistics from the Association of European Airlines Turnover In 2005, OSL s turnover totalled NOK 2,535.7 million, which is an increase of NOK million in relation to OSL s revenues come from two sources: 49% of its revenues come directly from airline traffic passing through the airport, and these revenues are invoiced based on the number of departing passengers and takeoffs from the airport. These revenues increased by NOK million from 2004 to The rest of the revenues come from derived activities such as the leasing of floor space to retail businesses, servicing, parking and other use of the building and site related infrastructure. The proportion of revenue from derived activities increased in The primary reason for this was the opening of the duty free shop in arrivals on 1 July Revenues from such derived activities are heavily dependent on traffic trends, especially international traffic. Annual Report Oslo Lufthavn AS Page 2 of 9

3 Expansion Project Central Hall 2005 started up at the beginning of August The aim of the project is to modernise and expand retailing and food services for passengers in the passenger terminal. A new section of the duty free shop opened at the beginning of 2005, while operation of the shops was transferred to a new contract partner. New places to eat were opened in May and August A new bookshop opened at the end of June, and at the end of August a large cosmetics retail outlet opened for domestic flights, charging the same prices as the duty free outlet for international flights. Just before Christmas 2005, a new 650 m² duty free shop opened in arrivals. A three-stage plan has been developed for upgrading the baggage handling system to ensure operating stability and increase the system s capacity. The first phase of the expansion was carried out during autumn 2004, and comprised establishing more robust solutions for dealing with system stoppages. Phase two started up in 2005 and consists of establishing a new area for manual checks and the replacement of x-ray machines in the facility. This will provide us with more robust solutions in the event of operational halts in the facility. This phase will be completed in spring Phase three consists of replacing the remaining x-ray machines; this will start in autumn 2006 and be completed in the beginning of The EU2 Security Project is a consequence of stricter security requirements from the EU. Planning for this started in the middle of May when the ground rules for it became available and implementation started in Q Most of the measures were completed for 1 January 2006, and by 1 March 2006 all of the work will be finished. All employees must now undergo security checks prior to gaining access to security restricted areas. Going concern assumption The annual accounts and report have prepared on the basis of the going concern assumption. This assumption is based on the result forecasts for 2006 and long-term prognoses for subsequent years. The company s equity is low, but the company is nonetheless in a healthy economic and financial position since the company has a subordinated loan of NOK 2,371.3 million, which has priority over other debt. Result, investment, financing and liquidity The result for 2005 was a profit of NOK million before tax and NOK million after tax. The equivalent figures for 2004 were NOK million and NOK 89.1 million. The company s balance sheet total on 31 December 2005 was NOK 10,761.0 million. Our assets consist primarily of airport investment in the form of runway systems and buildings. Our equity and liabilities consist primarily of NOK million in equity, NOK 2,371.3 million in a subordinated loan from Avinor AS, and a long-term loan from the Ministry of Transport and Communications of NOK 6,415.5 million. In connection with the establishment of the parent company as a limited company as of 1 January 2003, OSL was granted an interest-only period for three years on the government loan. Due to good cash flow, principal repayments were resumed in December 2004, and the company thus repaid NOK million in principal on this loan in The company s overall investment in fixed assets in 2005 totalled NOK million. During the year the company received a NOK million refund of VAT relating to construction costs. The company has no distributable equity as per 31 December The company s financial standing is satisfactory, and as of 31 December 2005 it is able to repay short-term liabilities and Annual Report Oslo Lufthavn AS Page 3 of 9

4 make principal repayments on long-term liabilities by means of its liquid assets. The subordinated loan from Avinor AS is prioritised after all other liabilities. Within this result OSL paid NOK 218 million in ground rent and NOK 87 million in interest on the subordinated loan from its parent company, Avinor AS. Financial risks Market risk The company is exposed to changes in long-term interest rates since a substantial portion of the company s financing (the government loan) is tied to long-term government bond yields. The company is marginally exposed to currency fluctuations. Credit risk Up until today, OSL and its parent company Avinor AS have experienced low losses on receivables from our primary customers, the airlines. Some of them, however, have for some time been struggling to achieve satisfactory profitability. In light of this, the company considers there to be a moderate risk that customers will be unable to meet their obligations. Liquidity risk The company considers the liquidity in the company to be satisfactory. Safety OSL s management and control system has developed into an integrated system for ensuring improved quality, including safety, security, health, the environment and employee safety. In 2005, the main focus was on: Training and information linked to the use of OSL s management and control system. Risk assessments and risk analyses, and following up of risk reduction measures. Safety levels and acceptance criteria. Following up the European Action Plan for the Prevention of Runway Incursions (runway collision risk). An increased focus on routines for the incorporation of statutory requirements in the chain of authority, as well as intensified internal control and audit/inspection activities. OSL s safety work has in recent years developed from being a traditional incident based system to also including elements of risk management. The solely incident-based system involved basing training and improvements on instances of non-compliance and incidents that had already occurred. The risk-based portion of the system now includes management principles and tools for catching potential incidents and instances of non-compliance before they occur. The implemented risk-based elements include the utilisation of risk analyses in the event of changes and the selection of inspections and audits on the basis of risk. In 2005, seven aviation-related incidents were registered in OSL s area of responsibility on runways/taxiways and in air space, compared with nine in In the wake of these incidents, several actions and follow-up measures were instituted focusing on safety-related improvements and on improving operational systems. Four of the incidents were reported to the Accident Investigation Board - Norway (AIBN) for civil aviation and railways. Annual Report Oslo Lufthavn AS Page 4 of 9

5 The company has developed a new non-compliance system, which is integrated into the company s system for management, operation and maintenance. The non-compliance system will also be used to follow up instances of non-compliance from inspections, recommendations, and risk reducing measures relating to serious instances of non-compliance/unwanted incidents. AIBN issued a report on the implementation of aviation safety in Norwegian air space during restructuring processes. In cooperation with union representatives and the management, OSL has drawn up an action plan to follow up on the report s recommendations that are of particular relevance to the company. In 2005, OSL focused on planning, constructing and implementing new statutory requirements, which includes the new requirements regarding the security control service. The statutory requirements implement EU Directive 1138/2004, which officially came into force in Norway on 1 January The main challenge has been to plan the construction with regard to optimum operation of the airport for all players while complying with the statutory requirements. OSL conducted several minor crisis management drills. Audits and supervision In accordance with the company s areas of focus, internal reviews, in the form of audits and inspections, focused on safety issues. In the course of 2005, 21 audits and inspections were conducted in relation to quality, safety, security and HSE. Civil Aviation Authority - Norway (CAA) conducted an intermediate inspection of the ground services, aerial navigation and flight weather service in The inspection confirmed that OSL s services within these areas comply with CAA s requirements. Employees and working environment OSL had an average of 486 employees in 2005, compared with 481 in At the close of 2005, Oslo Lufthavn AS had 425 permanent employees, down from 416 at the close of the previous year. The difference between the total number of employees and permanent employees is mainly due to extra workers being employed temporarily during the winter season. The company attaches great importance to a good working environment for its employees and complies with all the relevant requirements. A Working Environment Committee has been appointed, which has held regular meetings. The company s personnel turnover is low: 2.3% in 2005, compared with 3.2% the previous year. A Cooperation Forum has been established in the company, in which regular meetings are held between the management and union representatives. The collaborative climate is considered to be good. The average age in the company is 44 unchanged from The rate of absences due to illness fell from 5.6% in 2004 to 5.3%. Long-term absence due to illness still constitutes the largest proportion of total absences due to illness. Follow-up plans are prepared for all people who are on long-term sick leave. OSL previously entered into a collaborative agreement for a more inclusive workplace (MIW). The object of MIW is for the workplace to function as the main arena for preventing unnecessary absences due to illness and exclusion from working life. Seen in relation to when the company implemented the systematic follow-up of absences due to illness, absences have been reduced by more than 35%. Annual Report Oslo Lufthavn AS Page 5 of 9

6 In 2005, nine injuries to personnel resulting in absence from work, totalling 189 days, were recorded. The equivalent figure for each of the three preceding years was seven. The company plays an active role in relation to health, safety and the environment and works systematically to prevent absences due to illness and occupational injuries in those who work at the airport. Everyone with access to the airport must undergo an HSE exam, fire protection training and a separate security training course. To discharge its principal enterprise responsibility pursuant to the Working Environment Act, Oslo Lufthavn AS has established an overarching HSE (Heath, Safety and Environment) structure at the airport. Regular HSE inspections are made of the airport s communal areas under the leadership of OSL and with the participation of the management and chief safety deputies of the companies in question. In addition, regular safety inspections are undertaken within the company. OSL has established a co-worker support scheme in a separate care plan as part of Emergency Planning. This scheme was primarily established to assist employees of OSL who experience critical and serious events at work. Gender equality 24% of the company s personnel are women, an increase from 22% the previous year. The percentage of women in management positions is 8%. Of newly recruited employees in 2005, 63% were women, compared with 36% the year before. The average salary levels of women in management positions are 95% of the average for men, compared with 94% in Proportionately more women than men take further and continued education courses. Men and women have the same working hours arrangements. 6% of the women work part-time compared with 0.6% of the men. 40% of the shareholder elected members of the Board of Directors are women. It is OSL s goal to achieve gender balance, especially in senior positions. The enterprise has focused on and will continue to focus on developing female managers through the group s manager development programme, and in the case of otherwise equal qualifications, women shall receive preference. External environment In 2002, a lawsuit was filed against OSL pursuant to the provisions of the Neighbouring Properties Act regarding noise from the airport. Of the original 639 plaintiffs who filed a complaint with the conciliation board, 223 elected to bring the case before the Eidsvoll District Court. Due to the large number of plaintiffs, it was agreed that initially the court should deal with a representative sample of 26 cases. Judgment in the District Court was rendered at the beginning of There the court found for three of the 26 sample plaintiffs, and OSL was ordered to pay compensation and litigation costs. OSL was awarded litigation costs from 18 of the 23 plaintiffs who lost their cases. The District Court s judgment was appealed to the Court of Appeal, which handed down its judgment on 26 November In this OSL was ordered to pay a total of NOK 3,525,000 in damages to all the plaintiffs, and to pay the plaintiffs litigation costs in the amount of NOK 5,915,147. The judgment has been appealed in its entirety to the Supreme Court, and the case will be heard in March Annual Report Oslo Lufthavn AS Page 6 of 9

7 2005 saw the start of the construction of Europe s first infrared de-icing facility at OSL. The facility will be operated by Scandinavian Ground Services AS. The facility will start operations in the winter of 2006 and OSL will monitor its operation carefully with regard to operational stability and environmental benefits. Two minor breaches of the discharge permit for groundwater were confirmed during the de-icing season in The collection rate for aircraft de-icing fluid was 82%. OSL initiated an extensive project that aims to establish long-term critical loads for de-icing chemicals in soil and groundwater. The project will be continued in Air quality at the airport is affected by many factors, both local and regional emissions, as well as long-range pollution. A local monitoring facility has in recent years been located in a residential area in the vicinity of the fire drill area. The results from this show that the levels of particulate matter (PM 10 ) and nitrogen oxides (NO x ) are well below the threshold values in the Pollution Control Regulations. For a more comprehensive review of the environmental conditions in and around the airport, the Board would refer you to OSL s Environmental Report Future trends and challenges The aviation sector has undergone major changes in recent years. The established airlines have undergone major costs reduction programmes and new players have entered the market, and because of this the competition situation has become significantly tougher. There are now many more players at the airport than there were a few years ago, and we expect this trend to continue. Overall the Board of Directors expects this trend to result in an increase in traffic in the years ahead. For OSL s part this situation is generating increased demands for flexibility in the form of infrastructure adaptations, and lower prices for our services. We expect to reduce our prices in the years ahead as well. The results presented by OSL s largest customers show that they have taken a big step towards achieving satisfactory profitability. Should this trend be sustained, it will mean that the airlines will have a better basis for both maintaining current routes and expanding their operations. The company is also taking the initiative with regard to improving revenues from ancillary activities. In 2006, the company will for the first time experience the full-year effect of duty free sales in arrivals. The company is in the process of planning the expansion of parking facilities at the airport and at the same time its wholly owned property company, Oslo Lufthavn Eiendom AS, is in the process of expanding the hotel. These developments are important with respect to meeting the increasing demand within these areas. Airport Plan ( ) The Airport Plan, which focuses particularly on the need for and possibility of a future third runway, was submitted to the Ministry of Transport and Communications in April The Ministry of Transport and Communications is currently examining aspects of the Airport Plan. The Akershus County Administration has started work on a regional county plan for Gardermoen. Ullensaker Municipality intends to draw up a municipal plan with a special emphasis on land use and growth patterns for the area around the airport, but is awaiting reports from the Ministry of Transport and Communications. Resolutions that prevent developments from hemming in the airport are essential. Studies show that there will be a need for a third runway around Annual Report Oslo Lufthavn AS Page 7 of 9

8 Ownership The company is wholly owned by Avinor AS. Avinor has invested a total of NOK 1,070.1 million in equity in OSL: NOK 250 million in share capital, NOK 660 million in a share premium account, and NOK million in group contributions (after tax). Part of the share premium account has been used to cover previous years losses. At 31 December 2005, the called-up and fully paid share capital entered in the balance sheet consists of NOK 250 million in share capital, NOK 46.9 million in the share premium account, and NOK million in group contributions, a total of NOK million. Oslo Lufthavn Eiendom AS OSL has a wholly owned subsidiary, Oslo Lufthavn Eiendom AS (OSLE), which has been assigned responsibility for developing and building commercial buildings in the airport s central area. The company owns the hotel adjacent to the terminal, which is operated by the Radisson SAS chain, the OSL Flyporten office and service building, and a parking garage for employees. The company s profit before tax in 2005 was NOK 47.2 million. Oslo Lufthavn Tele og Data AS Oslo Lufthavn Tele og Data AS (OLTD) is owned 50/50 by Telenor Business Solutions AS and OSL. The company is the total supplier of telecommunications, IT services, IT systems and IT products to airlines, service companies, retail businesses, government agencies, and the general public at Oslo Airport Gardermoen. In 2005, the company recorded sales revenues of NOK 31.7 million and posted a pre-tax profit of NOK 2.4 million. The Board of Directors At the ordinary general meeting the Deputy Chairman of the Board of Directors, Lasse Bardal, and board members Ola M. Rinnan and Jon Sjølander were re-elected for new terms. The Chairman of the Board, Randi R.S. Flesland and board member Linda B. Silseth had already been elected for the period and continued as members of the board on this basis. In connection with Randi R.S. Flesland resigning her position as the Managing Director of Avinor AS, an extraordinary general meeting was held on 31 January Lasse Bardal was elected as the new Chairman of the Board, and Jon Sjølander was elected as the Deputy Chairman. Margrethe Snekkerbakken was elected as a new permanent board member, and Randi R.S. Flesland left the Board of Directors. These changes will apply until the ordinary general meeting in Of the board members elected by the shareholders, three members are from Avinor and two are external. The Employee representatives on the board are Ole Hansen, Jan Fagernes and Geir Larsen. Annual Report Oslo Lufthavn AS Page 8 of 9

9 Application of the profit for the year The board proposes that the company s profit for the year of NOK 302,714,643 be transferred to other reserves. Gardermoen, 7 March 2006 Lasse Bardal Jon Sjølander Linda B. Silseth Chairman of the Board Deputy Chairman Ole Hansen Margrethe Snekkerbakken Ola M. Rinnan Jan Fagernes Geir Larsen Nic. Nilsen Managing Director Annual Report Oslo Lufthavn AS Page 9 of 9

Passengers 2005 2006 Change in % Scheduled domestic 7,698,723 8,324,610 8.1% Charter domestic 17,833 55,128 209.1% Scheduled international

Passengers 2005 2006 Change in % Scheduled domestic 7,698,723 8,324,610 8.1% Charter domestic 17,833 55,128 209.1% Scheduled international Annual Report Rapid growth in traffic put its mark on Oslo Airport (OSL) in 2006. Fuelled by several new routes and an extensive array of low fares, the number of passengers grew by 11.2%, pushing OSL

More information

INTERIM FINANCIAL REPORT Q3 2013

INTERIM FINANCIAL REPORT Q3 2013 INTERIM FINANCIAL REPORT Q3 2013 3 AVINOR Group main figures 4 Board of directors report 5 Balance sheet 10 Income statement 11 Statement of comprehensive income 12 Statement of changes in equity 13 Statement

More information

ARTICLES OF ASSOCIATION FOR SPAREBANK 1 NORD-NORGE

ARTICLES OF ASSOCIATION FOR SPAREBANK 1 NORD-NORGE ARTICLES OF ASSOCIATION FOR SPAREBANK 1 NORD-NORGE 2 June 2014 CHAPTER 1 CORPORATE NAME, REGISTERED HEAD OFFICE, OBJECTS Article 1-1 Corporate name, registered head office, objects SpareBank 1 Nord-Norge

More information

The list below gives references to where the points required by section 3-3b of the Norwegian Accounting Act may be found.

The list below gives references to where the points required by section 3-3b of the Norwegian Accounting Act may be found. Corporate governance Corporate governance at the Moelven Group is based on the current Norwegian recommendation for corporate governance of October 2014. The recommendation has not been changed in 2015,

More information

Aegean Airlines Nine Month 2008 Results. Analysts Conference Call November 12, 2008

Aegean Airlines Nine Month 2008 Results. Analysts Conference Call November 12, 2008 Aegean Airlines Nine Month 2008 Results Analysts Conference Call November 12, 2008 Key Highlights Turnover increased 26% to 468.2m from 370.5m Total passengers served reached 4.6m, +13% above 2007 (+23%

More information

Annual report / Profit and loss accounting / Balance / Cash flow statement / Notes. Annual report 2010

Annual report / Profit and loss accounting / Balance / Cash flow statement / Notes. Annual report 2010 Annual report 2010 The extension of the Duty Free area in arrivals has been completed and now provides a total retail area of 1,500m 2. Content 3 Introduction 4 Annual Report 4 Oslo Lufthavn AS 6 Traffic

More information

A-CDM from an airport perspective Oslo Airport

A-CDM from an airport perspective Oslo Airport A-CDM from an airport perspective Oslo Airport Gro Jære Content Facts about Oslo Airport (OSL) A-CDM at OSL Implementation Experiences Future plans Q&A Summary of air traffic 2014 Oslo Airport 24,3 million

More information

Corporate Governance Guidelines

Corporate Governance Guidelines Corporate Governance Guidelines 1. Introduction Entra ASA ( Entra ), and together with its subsidiaries, ( the group ) will be subject to the reporting requirements on corporate governance set out in 3

More information

-9% Interim report Q22013. Norwegian Air Shuttle ASA second quarter and first half. Unit cost: Unit cost NOK 0.42

-9% Interim report Q22013. Norwegian Air Shuttle ASA second quarter and first half. Unit cost: Unit cost NOK 0.42 Interim report Norwegian Air Shuttle ASA second quarter and first half Unit cost: -9% Unit cost NOK 0.42 Pre-tax profit of MNOK 277 and margin improvement of 3 p.p. International expansion contributes

More information

Annual report / Profit and loss accounting / Balance / Cash flow statement / Notes. Annual report 2011

Annual report / Profit and loss accounting / Balance / Cash flow statement / Notes. Annual report 2011 Annual report 2011 Content 3 Introduction 4 Annual Report 4 Oslo Lufthavn AS 6 Traffic at Oslo Airport in 2011 8 Safety, audits and inspections 9 The external environment 10 Employees and working environment

More information

Bjørn Kjos (CEO) Oslo, 27. April 2006 Norwegian Air Shuttle ASA

Bjørn Kjos (CEO) Oslo, 27. April 2006 Norwegian Air Shuttle ASA Norwegian (NAS) Q1 2006 Bjørn Kjos (CEO) Oslo, 27. April 2006 Norwegian Air Shuttle ASA Strong revenue growth in Q1 539 MNOK in revenue in Q1 2006 Revenue growth of 69 % since Q1 2005 Revenue MNOK 600

More information

NORWEGIAN AIR SHUTTLE ASA

NORWEGIAN AIR SHUTTLE ASA NORWEGIAN AIR SHUTTLE ASA FIRST QUARTER REPORT 2013 HIGHLIGHTS First quarter revenue up by 23% to MNOK 2,904 (2,360). RASK up 2% to 0.39, where yield was up 4% to 0.51 and load factor was down 1% to 76%.

More information

Tariff Regulations at Torp Sandefjord Airport

Tariff Regulations at Torp Sandefjord Airport Tariff Regulations at Torp Sandefjord Airport Valid from 1 January 2016 Sandefjord Lufthavn AS Torpveien 130 N-3241 Sandefjord Translation only The Norwegian text shall prevail. Tel.: +47 33 42 70 00 E-Mail:

More information

Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers. Valid since 01.11.2010. Lennart Meri Tallinn Airport

Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers. Valid since 01.11.2010. Lennart Meri Tallinn Airport Authorised with the 01 October 2010 Directive of the Chairman of the Management Board no 48 Tallinn Airport Ltd. Conditions of infrastructure use for ground handling service providers Valid since 01.11.2010

More information

INTERIM FINANCIAL REPORT. 1st quarter 2016

INTERIM FINANCIAL REPORT. 1st quarter 2016 INTERIM FINANCIAL REPORT 1st quarter 2016 2 AVINOR AS Content Group main figures 3 Board of directors report 4 Income statement 8 Statement of comprehensive income 9 Balance sheet 10 Statement of changes

More information

The Local Government Act Page 1 of 61

The Local Government Act Page 1 of 61 The Local Government Act Page 1 of 61 UNOFFICIAL TRANSLATION Act No. 107 of 25 September 1992: Act relating to municipalities and county authorities (the Local Government Act). DATE: Act No. 107 of 25

More information

Avinor AS Debt Investor Presentation SEB SEMINAR September 2015

Avinor AS Debt Investor Presentation SEB SEMINAR September 2015 Avinor AS Debt Investor Presentation SEB SEMINAR September 2015 Hilde Vedum, Finanssjef Agenda 1. Avinor in brief 2. Group performance overview 3. Business segments 4. Financial review and strategy Appendix

More information

Annual Report / Income statement / Balance / Statement of cash flows / Notes. Annual Report 2012

Annual Report / Income statement / Balance / Statement of cash flows / Notes. Annual Report 2012 Annual Report 2012 Content 3 Introduction 4 Annual Report 4 Oslo Lufthavn AS 6 Traffic at Oslo Airport in 2012 8 Safety, quality, audits and inspections 9 External environment 10 Employees and working

More information

Act on the Supervision of Financial Institutions etc. (Financial Supervision Act)

Act on the Supervision of Financial Institutions etc. (Financial Supervision Act) FINANSTILSYNET Norway Translation update January 2013 This translation is for information purposes only. Legal authenticity remains with the official Norwegian version as published in Norsk Lovtidend.

More information

2 AVINOR ANNUAL REPORT

2 AVINOR ANNUAL REPORT annual report 2011 2 AVINOR ANNUAL REPORT A good year for Avinor Dag Falk-Petersen, CEO Avinor AS 2011 has been a good year for Avinor. Passenger traffic increased by 10 per cent to over 44 million travellers

More information

NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT THIRD QUARTER 2005 [This document is a translation from the original Norwegian version]

NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT THIRD QUARTER 2005 [This document is a translation from the original Norwegian version] NORWEGIAN AIR SHUTTLE ASA QUARTERLY REPORT THIRD QUARTER 2005 THIRD QUARTER IN BRIEF The operating revenue has increased by 78 % to MNOK 589,9 compared to MNOK 331,7 in the same period last year. The total

More information

INTERIM FINANCIAL REPORT Q4 2015

INTERIM FINANCIAL REPORT Q4 2015 INTERIM FINANCIAL REPORT Q4 2015 4 Group main figures 4 Board of directors report 5 Income statement 12 Statement of comprehensive income 13 Balance sheet 14 Statement of changes in equity 15 Statement

More information

Announcement of Financial Results 1999. for. Den Danske Bank Group

Announcement of Financial Results 1999. for. Den Danske Bank Group Announcement of Financial Results 1999 for Den Danske Bank Group 2 Den Danske Bank Group Highlights Core earnings and net profit for the year (DKr million) 1999 1998 1997 1996 1995 Net interest income,

More information

Norwegian Air Shuttle ASA

Norwegian Air Shuttle ASA Norwegian Air Shuttle ASA Q3 2010 Presentation October 21st 2010 Double digit revenue growth in Q3 Group revenues of MNOK 2,828 in Q3 2010, 24 % growth since last year Domestic revenue: MNOK 992 (+27 %)

More information

SAS Q4 2013/2014 December, 2014

SAS Q4 2013/2014 December, 2014 SAS Q4 2013/20 December, 20 SAS delivers in line with guidance and introduces further efficiency measures Q4 EBT Full year EBT SEK 789* million SEK 347** million SAS EBT* SEK millions +188 789 Commercial

More information

Carnegie Investment Bank AB (publ) Year-end report

Carnegie Investment Bank AB (publ) Year-end report Carnegie Investment Bank AB (publ) (Corp. reg. no. 516406-0138) Year-end report 1 January 31 December 2009 Carnegie Investment Bank AB (publ) is a leading independent investment bank with Nordic focus.

More information

The list below gives references to where the points required by section 3-3b of the Norwegian Accounting Act may be found.

The list below gives references to where the points required by section 3-3b of the Norwegian Accounting Act may be found. Corporate governance Corporate governance at Moelven is based on the Norwegian recommendations for corporate governance of October 2014. The recommendations are available on www.nues.no The list below

More information

INTERIM FINANCIAL REPORT Q3 2015

INTERIM FINANCIAL REPORT Q3 2015 INTERIM FINANCIAL REPORT Q3 2015 3 TABLE OF CONTENTS Group main figures 4 Board of directors report 5 Income statement 14 Statement of comprehensive income 15 Balance sheet 16 Statement of changes in equity

More information

Norwegian (NAS) Q2 2007. Bjørn Kjos (CEO) Oslo, 19. July 2007

Norwegian (NAS) Q2 2007. Bjørn Kjos (CEO) Oslo, 19. July 2007 Norwegian (NAS) Q2 2007 Bjørn Kjos (CEO) Oslo, 19. July 2007 Strong revenue growth continues in Q2 07 1,019 MNOK in total revenue, 33 % growth since last year MNOK revenue 1 000 800 600 400 200 0 Q2 04

More information

SAS Q3 2014/2015 TELECONFERENCE 08.09.2015

SAS Q3 2014/2015 TELECONFERENCE 08.09.2015 SAS Q3 2014/2015 TELECONFERENCE 08.09.2015 Q3 brief summary Q3 update Commercial initiatives paying off EuroBonus members up 15% - now 4 million Summer program with 47 seasonal routes well received by

More information

Norwegian Air Shuttle ASA (NAS) Q4 2003 and FY 2003. 24-26 February 2004

Norwegian Air Shuttle ASA (NAS) Q4 2003 and FY 2003. 24-26 February 2004 Norwegian Air Shuttle ASA (NAS) Q4 2003 and FY 2003 24-26 February 2004 Agenda Introduction Financials Q4 2003 and FY 2003 Norwegian low-fare operation Going forward 2004 2 Agenda Introduction Financials

More information

Interim report January 1 March 31, 2014

Interim report January 1 March 31, 2014 Odd Molly International AB (publ) Stockholm, Sweden, April 29, 2014 Interim report January 1 March 31, 2014 More stores and new sales organization January 1 March 31, 2014 Net sales amounted to SEK 82.8

More information

Oslo Børs Holding ASA First quarter 2003

Oslo Børs Holding ASA First quarter 2003 Oslo Børs Holding ASA First quarter 23 First quarter highlights: Some reduction in revenues on trading and financial market data sales Continued reduction in other operating expenses Profit: NOK 1.3m (13.1m)

More information

CHARGES REGULATIONS APPLYING TO COPENHAGEN AIRPORT IN FORCE DURING THE PERIOD 1 APRIL 2015 TO 31 MARCH 2019

CHARGES REGULATIONS APPLYING TO COPENHAGEN AIRPORT IN FORCE DURING THE PERIOD 1 APRIL 2015 TO 31 MARCH 2019 CHARGES REGULATIONS APPLYING TO COPENHAGEN AIRPORT IN FORCE DURING THE PERIOD 1 APRIL 2015 TO 31 MARCH 2019 CONTENTS 1. INTRODUCTORY PROVISIONS... 2 2. PASSENGER RELATED CHARGES... 2 2.1 GENERAL... 2 2.2

More information

INTERTANKO FINANCIAL REPORT AND ACCOUNTS FOR 2014

INTERTANKO FINANCIAL REPORT AND ACCOUNTS FOR 2014 INTERTANKO FINANCIAL REPORT AND ACCOUNTS FOR 2014 Management Committee s Financial Report 2014 The International Association of Independent Tanker Owners (INTERTANKO) is a non-profit organisation whose

More information

ANNUAL REPORT 2007. Page 1

ANNUAL REPORT 2007. Page 1 ANNUAL REPORT 2007 BP Norge AS carries out exploration and production of oil and gas from the Norwegian Continental Shelf. The company's head office is in Stavanger. Profit The petroleum revenues for 2007

More information

Table of GRI indicators

Table of GRI indicators 2013 Sustainability Report > Table of GRI indicators Table of GRI indicators The following table of GRI-G3.1 indicators includes a brief description of each, reference to the page in the 2013 Sustainability

More information

ANNUAL REPORT 2008. The Draugen field that is operated by Norske Shell started production in 1991 and is operated from Kristiansund.

ANNUAL REPORT 2008. The Draugen field that is operated by Norske Shell started production in 1991 and is operated from Kristiansund. ANNUAL REPORT 2008 BP Norge AS (BPN) is owned by BP Global Investments Ltd and Amoco Norway Oil Company. Both are part of the BP Group which itself is one of the largest integrated Oil & Gas Companies

More information

Finnair Q1 result info

Finnair Q1 result info Finnair Q1 result info 7 May 2014 CEO Pekka Vauramo CFO Erno Hildén 1 Updated mission and strategic targets 2 Our Mission Offer the smoothest connections in the northern hemisphere via Helsinki, and the

More information

NORWEGIAN AIR SHUTTLE ASA

NORWEGIAN AIR SHUTTLE ASA NORWEGIAN AIR SHUTTLE ASA SECOND QUARTER AND FIRST HALF REPORT 2009 HIGHLIGHTS First half revenue up by 24.5% to MNOK 3,287.8, quarterly revenue up by 22.5 % to MNOK 1,900.5 (1,551.2). Earnings before

More information

Danisco A/S. Corporate Governance Policy

Danisco A/S. Corporate Governance Policy Danisco A/S Corporate Governance Policy Introduction and conclusion Below is a detailed review of Danisco s compliance with the Committee on Corporate Governance s recommendations for corporate governance

More information

Presentation of results. Kirsten Idebøen, CEO

Presentation of results. Kirsten Idebøen, CEO Q2 1st half-year and 2nd quarter 2012 Presentation of results from SpareBank 1 Gruppen Kirsten Idebøen, CEO 9 August 2012 Year-to-date profit in line with last year Pre-tax profit Group quarterly (MNOK)

More information

GATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015

GATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015 GATWICK AIRPORT* RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2015 * Consolidated results for Ivy Holdco Limited, the parent of Gatwick Airport Limited, representing the performance of the Gatwick Airport

More information

Regulations Relating to Charges at Avinor AS's Airports

Regulations Relating to Charges at Avinor AS's Airports Regulations Relating to Charges at Avinor AS's Airports Unofficial translation the Norwegian text shall prevail. Authority: Laid down by the Ministry of Transport and Communications on 15 November 2010

More information

Service Quality Performance Report 2013

Service Quality Performance Report 2013 NSB GJØVIKBANEN AS Service Quality Performance Report 2013 Passenger Rights Regulation 1371/2007 1. NSB Gjøvikbanen AS NSB Gjøvikbanen AS is a subsidiary in the NSB Group. The company is 100 % owned by

More information

3. regulations issued on the basis of provisions included under 1 or 2,

3. regulations issued on the basis of provisions included under 1 or 2, 1(53) Aviation Act (2010:500) PART ONE Civil Aviation Chapter 1 Introductory provisions Scope of the Act Section 1. Aviation within Swedish territory may only be carried out in accordance with this act

More information

EDB Business Partner ASA FOURTH QUARTER 2003 INTERIM REPORT

EDB Business Partner ASA FOURTH QUARTER 2003 INTERIM REPORT - 1 - EDB Business Partner ASA FOURTH QUARTER 2003 INTERIM REPORT Summary The EDB group reports its best quarterly earnings since the fourth quarter of 2001 All business areas report improved operating

More information

Interim financial report for the first quarter of 2011

Interim financial report for the first quarter of 2011 Interim financial report for the first quarter of 2011 Improved results between years in spite of high fuel prices Total turnover was ISK 16.0 billion, down by 2% between years EBITDA was negative by ISK

More information

Words from the President and CEO 3 Financial highlights 4 Highlights 5 Export lending 5 Local government lending 6 Funding 6 Results 6 Balance sheet

Words from the President and CEO 3 Financial highlights 4 Highlights 5 Export lending 5 Local government lending 6 Funding 6 Results 6 Balance sheet Words from the President and CEO 3 Financial highlights 4 Highlights 5 Export lending 5 Local government lending 6 Funding 6 Results 6 Balance sheet 7 Events after the balance sheet date 8 Income statement

More information

Chief Financial Officer s report

Chief Financial Officer s report 12 / British Airways 2008/09 Annual Report and Accounts Chief Financial Officer s report Last year we said that record profitability had put us in a good position to weather economic slowdown. That has

More information

Interim report ICA AB. January 1 June 30, 2009

Interim report ICA AB. January 1 June 30, 2009 Interim report ICA AB January 1 June 30, 2009 Interim report Stockholm, Sweden, August 19, 2009 Increased sales and improved operating income excluding capital gains and impairments Second quarter Net

More information

Description of Airport Charges. Swedavia AB 2015. Appendix 3 to Conditions of Services, Swedavia AB

Description of Airport Charges. Swedavia AB 2015. Appendix 3 to Conditions of Services, Swedavia AB Description of Airport Charges Swedavia AB 2015 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission

More information

iomart Group plc Interim Report 6 months ended 30 June 2001

iomart Group plc Interim Report 6 months ended 30 June 2001 iomart Group plc Interim Report 6 months ended 30 June 2001 Interim Report 6 months ended 30 June 2001 iomart Group plc ("iomart"), the Glasgow based internet services business, presents its consolidated

More information

N Brown Group plc Interim Report 2013

N Brown Group plc Interim Report 2013 N Brown Group plc Interim Report 2013 2013 4CUSTOMER CENTRIC SEGMENTS FINANCIAL SUMMARY Financial Highlights 2013 2012 Revenue 409.6m 379.3m Operating profit 48.4m 45.7m Adjusted profit before taxation*

More information

Annual and CSR Report 2015

Annual and CSR Report 2015 Annual and CSR Report 2015 We unite Norway and Norway with the world 2 THE YEAR 50 000 000 PASSENGERS 724 000 DEPARTURES AND LANDINGS 3 157 EMPLOYEES ANNUAL AND CSR REPORT 2015 3 300 000 PATIENT FLIGHTS

More information

TABLE OF CONTENTS. Norwegian Hotel Industry Overview Pg. 2

TABLE OF CONTENTS. Norwegian Hotel Industry Overview Pg. 2 Norwegian Hotel Industry Hotelia s mid-year report 2015 TABLE OF CONTENTS 1. Introduction 4 2. Hotel Industry Performance in the Major Cities.. 5 Norway Oslo Bergen Trondheim Gardermoen (Ullensaker) Stavanger

More information

HIGHLIGHTS FIRST QUARTER 2016

HIGHLIGHTS FIRST QUARTER 2016 Q1-16 EUROPRIS ASA 2 CONTENTS / HIGHLIGHTS FIRST QUARTER 2016 HIGHLIGHTS FIRST QUARTER 2016 (Figures for the corresponding period of last year in brackets. The figures are unaudited.) Group revenues increased

More information

OPENING UP OF THE AIR TRANSPORT MARKET IN GREECE UNDER LIBERALIZATION. (Submitted by Greece)

OPENING UP OF THE AIR TRANSPORT MARKET IN GREECE UNDER LIBERALIZATION. (Submitted by Greece) February 2003 English and French only OPENING UP OF THE AIR TRANSPORT MARKET IN GREECE UNDER LIBERALIZATION (Submitted by Greece) 1. INTRODUCTION 1.1 Until 1991, Greek air transport had developed within

More information

years in the community

years in the community Montréal-Trudeau, from the 70 past to the future years in the community The airport s beginnings Montréal Pierre Elliott Trudeau International Airport is 70 years old! It was on September 1, 1941, that

More information

Quarterly Report 1/2004

Quarterly Report 1/2004 Quarterly Report 1/2004 Operating revenues increased in 1 th quarter to NOK 1407.0 mill. Operating profit decreased to NOK 5.4 mill. The operations of the Moelven Timber Group have been affected by the

More information

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016)

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) Dnro 7202/804/2008 Unofficial translation Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) 1 The starting points and grounds for the agreement

More information

THE ARTICLES OF ASSOCIATION OF SPAREBANK 1 SR-BANK ASA

THE ARTICLES OF ASSOCIATION OF SPAREBANK 1 SR-BANK ASA THE ARTICLES OF ASSOCIATION OF SPAREBANK 1 SR-BANK ASA (Adopted by the General Meeting, 28 April 2015 and approved by the Financial Supervisory Authority, 12 May 2015) CHAPTER 1 COMPANY. REGISTERED OFFICE.

More information

Quarterly Report 3/2003

Quarterly Report 3/2003 Quarterly Report 3/2003 Residential repair and maintenence demand close to normal level. Slower construction market in Norway and Sweden. Revenues and profit after nine months on same level as last year.

More information

INTERIM REPORT Q3 2015

INTERIM REPORT Q3 2015 INTERIM REPORT Q3 2015 Key figures FIGURES IN NOK 000s INCOME STATEMENT Profit/loss after taxation 75 343 85 221 112 243 Net interest margin 1,37 % 1,68 % 1,64 % Profit/loss after tax as a % of average

More information

Planning requirements for heliports and helicopter landing sites

Planning requirements for heliports and helicopter landing sites Practice Note 75 December 2012 Planning requirements for heliports and helicopter landing sites The purpose of this practice note is to: 1. Explain how helicopter activity is regulated by the planning

More information

4th Quarter 2010. Risk management. General information

4th Quarter 2010. Risk management. General information 4th Quarter 2010 Sør Boligkreditt AS 2 4th Quarter 2010 General information Sør Boligkreditt AS was established in the autumn of 2008 and is a wholly owned subsidiary of Sparebanken Sør. The company is

More information

INTERIM REPORT for the period January 1 March 31, 2007

INTERIM REPORT for the period January 1 March 31, 2007 Interim report for ICA AB January 1 - March 31, 2007 INTERIM REPORT for the period January 1 March 31, 2007 Stockholm, May 15, 2007 Strong sales growth but lower operating income during first quarter Net

More information

Norwegian employment law

Norwegian employment law Norwegian employment law Tron Dalheim Partner TOPICS Purpose of today s session is to give an overview of Norwegian employment law with case studies and examples Introduction: Characteristics of Norwegian

More information

Interim report for the 3rd quarter of 2008. Glitnir Bank ASA

Interim report for the 3rd quarter of 2008. Glitnir Bank ASA Interim report for the 3rd quarter of 2008 Glitnir Bank ASA contents Report of the Directors...3 Consolidated Income Statement...5 Consolidated Balance Sheet...6 Consolidated Statement of Changes in Equity...7

More information

INTERIM REPORT 1 Jan - 30 Jun 2002. Second quarter operational result better than last year

INTERIM REPORT 1 Jan - 30 Jun 2002. Second quarter operational result better than last year FINNAIR - GROUP INTERIM REPORT 1 Jan - 30 Jun 2002 Second quarter operational result better than last year Summary of second quarter key figures Turnover 421.1 million euros (Q2/2001: 440.2 million) Profit

More information

INTERIM REPORT. Q1 2015 (unaudited)

INTERIM REPORT. Q1 2015 (unaudited) INTERIM REPORT Q1 2015 (unaudited) Key figures FIGURES IN NOK 000s INCOME STATEMENT Profit/loss after taxation 29 446 32 079 112 243 Net interest margin 1,53 % 1,81 % 1,64 % Profit/loss after tax as a

More information

Double digit revenue growth in Q4

Double digit revenue growth in Q4 Double digit revenue growth in Q4 Group revenues of MNOK 2,145 in Q4 2010, 23 % growth since last year Domestic revenue: MNOK 848 (+5%) International revenue: MNOK 1,297 (+37%) Revenues 1,145 1,615 1,750

More information

Control of Development in Airport Public Safety Zones

Control of Development in Airport Public Safety Zones Control of Development in Airport Public Safety Zones December 2007 Control of Development in Airport Public Safety Zones This document contains the Government s general policy advice on Public Safety

More information

Quarter 2011. Presentation of results from SpareBank 1 Gruppen. Kirsten Idebøen, CEO

Quarter 2011. Presentation of results from SpareBank 1 Gruppen. Kirsten Idebøen, CEO 3rd Q Quarter Presentation of results from SpareBank 1 Gruppen Kirsten Idebøen, CEO 28 October Profits down due to market turmoil and high claims ratio Q1 Q2 Group pre-tax profit* (MNOK), quarterly 374

More information

Price list Swedavia s Conditions of Use and Airport Charges. Valid for aircraft with an authorised MTOW exceeding 5,700 kg.

Price list Swedavia s Conditions of Use and Airport Charges. Valid for aircraft with an authorised MTOW exceeding 5,700 kg. Price list Swedavia s Conditions of Use and Airport Charges. Valid for aircraft with an authorised MTOW exceeding 5,700 kg. Valid from April 1, 2012 Contents 1 General... 4 1.1 Validity... 4 1.2 Charges...

More information

Environmental report 2010

Environmental report 2010 Environmental report 21 Contents 3 Environmental status 4 Environmental management 5 Aircraft noise 6 Water and soil 7 Energy 8 Waste 9 Climate 1 Air quality 11 Key figures Environmental Status Oslo Airport

More information

Preliminary Accounts 2012

Preliminary Accounts 2012 Q4 Preliminary Accounts Presentation of results from SpareBank 1 Gruppen Kirsten Idebøen, CEO 14 February 2013 The pre-tax profit for was more than doubled compared with 2011 Pre-tax profit Group (MNOK)

More information

Corporate Social Responsibility (CSR)

Corporate Social Responsibility (CSR) Corporate Social Responsibility (CSR) CSR in Atlantic Airways 2014 At Atlantic Airways, we are committed to conducting our business in a responsible and transparent manner, striving to serve the Faroese

More information

Norwegian Air Shuttle ASA

Norwegian Air Shuttle ASA Norwegian Air Shuttle ASA Q1 2011 presentation April 28th 2011 Double digit revenue growth in Q1 Group revenues of MNOK 1,895 in Q1 2011, 19 % growth since last year Domestic revenue: MNOK 780 (+10%) International

More information

NOTICE FOR ANNUAL GENERAL MEETING OF SHAREHOLDERS in Reinhold Europe AB (publ), 556706-3713

NOTICE FOR ANNUAL GENERAL MEETING OF SHAREHOLDERS in Reinhold Europe AB (publ), 556706-3713 NOTICE FOR ANNUAL GENERAL MEETING OF SHAREHOLDERS in Reinhold Europe AB (publ), 556706-3713 The shareholders of Reinhold Europe AB ( publ), 556706-3713, are hereby invited to attend an Annual General Meeting

More information

Airport Charges. Airport Charges for Swedavia AB

Airport Charges. Airport Charges for Swedavia AB Charges Charges for Swedavia AB Valid for aircraft with an authorised MTOW exceeding 5,700 kg from 1 April 2016. Revised 19 May. Appendix 1 to Conditions of Services, Swedavia AB. Contents 1 General...

More information

Kvartalsrapport. Quarterly Report

Kvartalsrapport. Quarterly Report Kvartalsrapport Quarterly Report Fourth Quarter 2015 1 Summary The Group s operating revenues developed positively in 2015. Nominal growth was 2.7 % compared with 2014. Adjusted for acquisitions, currency

More information

Interim report ICA AB. January 1 March 31, 2009

Interim report ICA AB. January 1 March 31, 2009 Interim report ICA AB January 1 March 31, 2009 Interim report Stockholm, May 6, 2009 Increased net sales and improved operating income for the ICA Group during the first quarter First quarter Net sales

More information

Interim report 1st quarter 2016

Interim report 1st quarter 2016 Interim report 1st quarter 2016 About Komplett Bank ASA Komplett Bank ASA started banking operations on 21 March 2014 when the company received its banking licence from the Norwegian authorities. Komplett

More information

MEDIA RELEASE SIKA WITH STRONG GROWTH IN EMERGING MARKETS

MEDIA RELEASE SIKA WITH STRONG GROWTH IN EMERGING MARKETS DATUM 1 / 6 Zugerstrasse 50 6341 Baar, Switzerland www.sika.com CONTACT TELEPHONE E MAIL Dominik Slappnig Corporate Communications & Investor Relations +41 58 436 68 21 slappnig.dominik@ch.sika.com SIKA

More information

Pandox acquires Hotellus International AB

Pandox acquires Hotellus International AB PRESS RELEASE Stockholm February 7, 2000 Pandox acquires Hotellus International AB The acquisition creates a large and pure hotel property company with wellknown brands and operations in northern Europe.

More information

Risk management and sensitivities

Risk management and sensitivities 8% Russia DISTRIBUTION OF OPERATING REVENUES 58% North Sea 34% Gulf of Mexico Risk management and sensitivities Prosafe operates on several continents and in various 11% unsecured debt segments of the

More information

Norsk Naturskadepool www.naturskade.no

Norsk Naturskadepool www.naturskade.no Norsk Naturskadepool www.naturskade.no World Forum Meeting Iceland 25/25 Norwegian Natural Perils Pool 1 Norway Land area: 307 766 km2 Mainland coastline 21 112 km Population: 4.7 mill. KABELVÅG ANDENES

More information

BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. AUDIT COMMITTEE CHARTER

BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. AUDIT COMMITTEE CHARTER BAHRAIN TELECOMMUNICATIONS COMPANY B.S.C. AUDIT COMMITTEE CHARTER Contents I. Audit Committee... 1 1. Purpose and Mission... 1 2. Authority... 1 3. Membership... 2 4. Secretary... 3 5. Quorum... 3 6. Decisions...

More information

book 4: financials The Law Foundation Of Ontario

book 4: financials The Law Foundation Of Ontario book 4: financials The Law Foundation Of Ontario audited financial statements To The Trustees of The Law Foundation of Ontario We have audited the accompanying financial statements of The Law Foundation

More information

FRC Risk Reporting Requirements Working Party Case Study (Hospitality Industry)

FRC Risk Reporting Requirements Working Party Case Study (Hospitality Industry) FRC Risk Reporting Requirements Working Party Case Study (Hospitality Industry) Table of Contents Executive Summary... 2 Background and Scope... 3 Company Background and Highlights... 3 Sample Risk Register

More information

how to finance the business

how to finance the business A DV I C E B O O K L E T how to finance the business HOW TO FINANCE THE BUSINESS Getting enough of the right funding is one of the more difficult tasks that you will face as a new entrepreneur. Typically,

More information

FLUGHAFEN WIEN AG. Q1/2015 Results

FLUGHAFEN WIEN AG. Q1/2015 Results FLUGHAFEN WIEN AG Q1/2015 Results Q1/2015: Earnings improvement despite weak traffic results Good business development of the company in Q1/2015: clearly improved net profit 1) of 14.1 million (+15.4%)

More information

Act on the Supervision of Credit Institutions, Insurance Companies and Securities Trading etc. (Financial Supervision Act)

Act on the Supervision of Credit Institutions, Insurance Companies and Securities Trading etc. (Financial Supervision Act) KREDITTILSYNET Norway Translation updated August 2003 Translated by Government Authorised Translator Peter Thomas This translation is for information purposes only. Legal authenticity remains with the

More information

Airport Charges. Airport Charges for Swedavia AB.

Airport Charges. Airport Charges for Swedavia AB. Charges Charges for Swedavia AB. Valid for aircraft with an authorised MTOW exceeding 5,700 kg. Valid from April 1, 2015 (Revised August 15). Appendix 1 to Conditions of Services, Swedavia AB Contents

More information

Interim report Q1 2013 KLP Banken AS Group

Interim report Q1 2013 KLP Banken AS Group Interim report Q1 2013 KLP Banken AS Group Contents Interim financial statement 1/2013 3-4 Income statement 5 Financial position statement 6 Statement of owners equity 7 Statement of cash flows 8 Notes

More information

THE PRICE LIST OF HANDLING SERVICES Bydgoszcz Airport. The terms used in this Schedule of Charges have the following meanings:

THE PRICE LIST OF HANDLING SERVICES Bydgoszcz Airport. The terms used in this Schedule of Charges have the following meanings: THE PRICE LIST OF HANDLING SERVICES Bydgoszcz Airport BYDGOSZCZ-SZWEDEROWO AIRPORT SCHEDULE OF CHARGES 1. DEFINITIONS The terms used in this Schedule of Charges have the following meanings: DDM nr 2014/01/00472

More information

INDUSTRIAL-ALLIANCE LIFE INSURANCE COMPANY. FIRST QUARTER 2000 Consolidated Financial Statements (Non audited)

INDUSTRIAL-ALLIANCE LIFE INSURANCE COMPANY. FIRST QUARTER 2000 Consolidated Financial Statements (Non audited) INDUSTRIAL-ALLIANCE LIFE INSURANCE COMPANY FIRST QUARTER 2000 Consolidated Financial Statements (Non audited) March 31,2000 TABLE OF CONTENTS CONSOLIDATED INCOME 2 CONSOLIDATED CONTINUITY OF EQUITY 3 CONSOLIDATED

More information

Process towards the final NTP 2018-2029

Process towards the final NTP 2018-2029 NTP 2018-2029 Planning basis from Avinor, the Norwegian National Rail Administration, the Norwegian Coastal Administration, and the Norwegian Public Roads Administration 1 Process towards the final NTP

More information