Slip-Joint Folder Designing By: Steve Culver

Size: px
Start display at page:

Download "Slip-Joint Folder Designing By: Steve Culver"

Transcription

1 Slip-Joint Folder Designing By: Steve Culver This tutorial shows how to design the joint mechanism of a single blade slip-joint folder, with a half stop. This method of designing a folding knife joint, is based on the size relationship between the height of the blade at the ricasso, the height of the blade tang and the height of the portion of the spring that functions against the blade's tang. This portion of the spring is called the "blade walk". The thickness of the blade and spring material do not change these dimensional relationships. It doesn't matter if the blade stock is 1/16 inch, or 1/4 inch thick. The dimensional relationships of the parts do not change. Designing a folding knife can begin with one of two available starting points. You can begin by designing the handle shape first and then make a blade that will fit inside it. Or, design the blade and make a handle to fit around it. Once your design work has reached the point of finding the height of the blade at the back of the ricasso, you have the information needed to design the knife s joint. This design principle applies to a single blade knife, as well as multi blade knives. All of the blades in a multi blade knife will have the same tang to blade-walk relationship, with the pivot pin location in the center of the tang. This designing method also works as a starting point for designing a folder that does not have a half stop, by simply changing the end of the tang to be rounded. A lock-back folder can be created from this tutorial, by adding a locking notch to the tang and locking tab to the blade-walk area of the back-spring. Also included in this tutorial are the steps taken to fit the blade and spring into the handle.

2 The size relationship between the blade, tang and spring: The illustration below is of a blade that is 1/2 inch (.500) in height. The combined height of the tang and the blade-walk, match the height of the blade at the back of the ricasso. The tang takes up two thirds of this measurement and the blade walk one third. This makes the blade walk one half the height of the blade tang. A tang that is 2/3 the height of the riccasso will give sufficient support to the blade. Note that the size of the tang also affects the lift on the backspring. The larger the tang, the greater the distance from the pivot pin to the corners of the tang. A larger tang will reduce the height and strength of the spring as well as increase the lift on the spring. Taken to extremes, a very large tang could lift the shortened height blade walk above the back of the knife. During the designing and first phases of building the knife, the tang is perfectly square. The bottom of the tang is level with the blade edge. The kick extends below the edge and the tang. The pivot pin is in the exact center of the square tang. This helps to ensure that the lift on the spring is the nearly the same amount as the blade is rotated and the spring goes over the corners of the tang.

3 Locating the pivot in the exact forward/aft center of the tang is very important. If the pivot is located closer to the rear of the tang, the entire blade will move towards the handle as the knife is opened. This will cause the end of the blade walk to extend past the tang, in the half-stop and closed positions. The lift on the spring will also be reduced. This knife can be made to function, but may necessitate lengthening the handle to accommodate the blade being positioned further into the handle in the closed position. The blade walk extending over the tang on the half-stop and closed positions is not esthetically pleasing and collectors will find it objectionable.

4 Locating the pivot closer to the front of the tang causes even more serious problems. In this situation, the blade walk will not reach past the tang and the bottom corner of the blade walk will tend to dig into the end of the tang. A large radius could be ground on the corner of the tang to move contact point behind the end of the blade walk. Rounding off the square corners of the tang actually will be done during the final fitting of the knife. However, creating a large radius on the corners of the tang will affect the knife's "walk and talk" and the blade will feel sluggish. More on the correct rounding of the tang corners in the fitting in section of this tutorial.

5 Building the Slip-joint Folder: Begin construction of a folder by cutting and grinding the blade, spring and liners to rough shape. Leave a little extra material on the top of the three parts for final fitting. The pivot hole in the blade and the three pin holes in the spring are drilled. The blade and spring are then heat-treated. Only drill the pivot hole and the hole for the top rear pin in the liners. The other pin holes will be drilled in the liners when the spring position is being set for pre-load.

6 The first step in fitting in the folder is to do the rough fit-up of the parts. Begin by sanding and finishing the spring notch (also called the run-up, or back square) in the blade as you want it in the finished knife. Also finish the bottom of the blade walk, where it contacts the tang and the kick. These two areas establish the position of the spring in the knife's open position. These two areas should not be sanded or changed later in any way. Assemble the blade, spring and one liner, using assembly pins. The tip of the blade walk section of the spring is now ground to bring the blade to the correct position with the knife open. Leave the point of the blade a little lower than you will want it to be in the finished knife. This is because the spring will flex when it is loaded and sometimes the tip of the blade will be slightly higher in the assembled and finished knife.

7 When grinding the end of the spring to position the blade, it is often possible to leave a small clearance area between the bottom of the spring and the spring notch in the blade. This clearance area is to allow a place for a small amount of dirt to accumulate. If this clearance cannot be made during the fitting of the blade, material could be removed from the top of the tang, at the front of the spring notch. Or, a small amount of material could be ground away from under the tip of the blade walk. There should be two contact points between the blade and blade walk; at the rear of the tang and also at the top of the spring notch, near the blade spine. Allow sufficient contact between the tip of the blade walk and the front of the spring notch to prevent the two parts from mushrooming. The next step is to fit the blade into the handle, in the closed position. The kick will be ground to let the blade into the handle. During this operation, the lower corner of the tang is also ground to lower the spring into the handle to match its position at close, to its position at open. Since the blade is not rotated a full 90 degrees from the open to closed positions, the square tang will not allow the spring to be lowered to the same level in the closed position as it is in the open position. Removing this material at the bottom of the tang will reduce the lift on the spring slightly during the rotation from half stop to the closed position. This is beneficial to the functioning of the knife, as it slightly reduces the amount of force necessary to open the knife from closed to half stop and also reduces the risk of the blade slamming closed forcefully enough to cause the blade's edge to hit the back-spacer portion of the spring.

8 The approximate amount of the kick that will removed to let the blade tip into the handle, can be seen in the sketch below. Grinding either the kick, or the lower corner of the tang, affects both the position of the blade tip and also the position of the spring. As the kick is ground to let the tip of the blade into the handle, the rotation of the tang will lower the spring into the handle. Grinding the lower corner of the tang will cause the blade tip to rise out of the handle and the spring to also lower into the handle. So it s a balancing act, grinding both the kick and the lower corner of the tang to position both the blade tip and the spring. Leave the spring a little high at the back of the knife. This provides some extra material for final fit-up. Next, the end of the tang will be ground to lower the spring to near the level it is at in the open position. As when adjusting the spring position at close, leave the spring a little high, providing some extra material for final fit-up.

9 After rough fittings of the parts, it is time to drill the pin holes in the liners for final assembly. Assemble the knife, using assembly pins through the blade pivot and the single hole through the spring and one of the liners. With the knife in the open position, mark the location of the bottom of the spring, near the tip. Remove the pin from the pivot hole and remove the blade. Lower the tip of the spring to provide spring loading and drill the remaining pin holes in the liners.

10 Assemble the knife. If the knife is too stiff in operation and it is necessary to lighten the action, you will grind to remove material from the spring between the blade kick and the center pin. A folder is usually stiffer in operation after final assembly, so lighten the spring a little more than you will want it to be in the finished knife.

11 When the knife is assembled, the loaded spring will be flexed from the pressure against the tang. This will probably change all of the positions of the blade compared to where they were during the rough fitting in. The tip of the blade may be higher than what it was after rough fitting. There isn't anything that you can do about that now.. The flexed spring can cause the blade to be more open than it should be at half-stop. To correct this, the lower corner of the tang is ground to let the blade rotate to a more closed position. In grinding the lower corner of the tang back, it may increase the unequal distance between the pivot pin and corners of the tang slightly.

12 As the tang is being ground to adjust the position of the blade at half-stop, the end of the tang should be ground to create two contact points. Having two contact points prevents the blade from rocking at half-stop. At this time, the corners of the tang should be slightly radiused. Rounding of the corners is done to remove the sharp square corners of the tang. It also moves the tang contact point back from the tip of the spring. Rounding the corners of the tang should done very carefully. The square corners of the tang must only be rounded slightly. In the sketch below, the rounding of the corners is exaggerated for illustration purposes. If the corners are rounded over too much, the blade feels sluggish when opening and closing the blade. As the user is turning the blade, the blade walk is sliding over the rounded corner with no change being made to the spring lift. The user must manually rotate the blade during the time that the blade walk is sliding over the rounded corner. With no change being made to the spring lift, the spring is not assisting with the movement of the blade and the user gets no feedback from the spring's affecting the movement of the blade. The larger the rounded corner, the longer the dwell time that the blade walk is sliding over the corner and the more degrees of blade rotation that the user has to do manually.

13 As the position of the blade at half-stop is being adjusted, the position of the spring is also being finalized to match its position when the knife is open. Final fitting of the blade into the handle in the closed position is adjusted next. Due to flexing of the spring, the blade tip will likely need to be set back into the handle again. The kick is ground to let the blade in and the lower corner of the tang is ground to position the spring the same as at open and half-stop. Again, it is best to create two contact point against the spring. The tang can be radiused along the bottom to provide the two points.

14 The drawings below show what the blade to spring fit-up should look like when the knife is finished.

Pole Lathe and Shave Horse Design

Pole Lathe and Shave Horse Design Pole Lathe and Shave Horse Design These pictures and accompanying words are Copyright Michael Hughes February 2002. They are not to be re-produced, in part or whole, without permission from the author.

More information

General Allowances for Insulation & Cladding

General Allowances for Insulation & Cladding TRADE OF Industrial Insulation PHASE 2 Module 1 Sheet Metal and Insulation Fundamentals UNIT: 4 General Allowances for Insulation & Cladding Produced by In cooperation with subject matter expert: Michael

More information

Gate Leg Drop Leaf Table Plans

Gate Leg Drop Leaf Table Plans Preparing the table top blanks: Cut and glue enough 3/4 stock to make three panels 40 long by 24 wide (they will be cut to final size at a later time). While the glue dries we will work on the legs. Preparing

More information

COMPLIMENTARY WOODWORKING PLAN

COMPLIMENTARY WOODWORKING PLAN COMPLIMENTARY WOODWORKING PLAN Adirondack Chair This downloadable plan is copyrighted. Please do not share or redistribute this plan in any way. It has been created for Wilton Tools, a division of WMH

More information

How To Make A Spiral Fluted And Wire Wrapped Dagger Handle

How To Make A Spiral Fluted And Wire Wrapped Dagger Handle Making A Spiral Fluted and Wire Wrapped Dagger Handle By: Steve Culver, MS Part 1 Making A Spiral Fluted and Wire Wrapped Dagger Handle By: Steve Culver, MS After the rough handle material is drilled through

More information

SAFETY & OPERATING INSTRUCTIONS

SAFETY & OPERATING INSTRUCTIONS SAFETY & OPERATING INSTRUCTIONS EDLUND TOMATO LASER, Models ETL -316, -140 & -380 READ AND UNDERSTAND THIS MANUAL AND ALL INSTRUCTIONS BEFORE OPERATING THIS SLICER. 159 Industrial Parkway, Burlington,

More information

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL

CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL SAVE THESE INSTRUCTIONS DEALER/INSTALLER: GIVE TO HOMEOWNER CONFER ABOVE GROUND CURVE STEP / ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL Model CCX-AG Note: 40 lbs. of sand required!

More information

How to Build Your Own CornHole Game

How to Build Your Own CornHole Game How to Build Your Own CornHole Game DIMENSIONS Here is a diagram with the basic measurements for the Cornhole board game. SUPPLIES 1/2 thick sheet of plywood one 4 x4 or two 2 x4 s 8 long 2 4 s (4) 4 1/2

More information

www.cornholesupplies.com

www.cornholesupplies.com www.cornholesupplies.com How To Build Regulation Cornhole Boards Home of the Original Cornhole Bags and Boards Supply List: 1-4' X 8' Piece of Plywood (pre sanded) 4-2" X 4" X 8' Studs (2 by 4s make sure

More information

HONING LATHE DUPLICATOR CUTTERS

HONING LATHE DUPLICATOR CUTTERS Lay the flat face of the cutter or bit on the flat top surface of the hone with the rest of the cutter overhanging the edge. Rub the cutter or bit up and down the hone (Figure 24-44). Be sure to hold the

More information

BEACH VOLLEYBALL TRAINING PROGRAM

BEACH VOLLEYBALL TRAINING PROGRAM 2008 ELITE PERFORMANCE ATHLETE CONDITIONING BEACH VOLLEYBALL TRAINING PROGRAM Team BC 2008 Steve Van Schubert, CAT(C), CSCS Training Schedule General Outline Phase 1 2 Weeks Phase 2 3 Weeks Phase 3 3 Weeks

More information

BUILD A TABLETOP LOOM

BUILD A TABLETOP LOOM BUILD A TABLETOP LOOM From 1" x 2" stock (actual 3/4" x 1"1/2) cut: 4 pieces 15" long 4 pieces 5"1/2 long Use the above to make 2 frames for the front and back of the loom. From 1" x 4" stock (actual 3/4"

More information

Balance Shoe and Balance Replacement

Balance Shoe and Balance Replacement and Replacement for E-Series Double-Hung and Single-Hung Windows Thank you for choosing Andersen. For questions call 1-888-888-7020. For more information and/or guides visit www.eaglewindow.com Please

More information

No. 57 Receiver Sight No. 57 SML Receiver Sight No. 66 Receiver Sight

No. 57 Receiver Sight No. 57 SML Receiver Sight No. 66 Receiver Sight No. 57 Receiver Sight No. 57 SML Receiver Sight No. 66 Receiver Sight MOUNTING AND ADJUSTING MOUNTING LYMAN NO 57 RECEIVER SIGHT The No. 57 Sight is designed primarily for rifles with round receivers.

More information

A Short Course on Wheel Alignment

A Short Course on Wheel Alignment A Short Course on Wheel Alignment In its most basic form, a wheel alignment consists of adjusting the angles of the wheels so that they are perpendicular to the ground and parallel to each other. The purpose

More information

The tablesaw may be your shop s most valuable cutting. Crosscut Sleds. Foolproof. Innovative approach guarantees perfect results

The tablesaw may be your shop s most valuable cutting. Crosscut Sleds. Foolproof. Innovative approach guarantees perfect results Foolproof Crosscut Sleds Innovative approach guarantees perfect results B Y A L A N T U R N E R The tablesaw may be your shop s most valuable cutting tool, but for precise, repeatable crosscuts it needs

More information

DO NOT OPERATE LANCELOT OR SQUIRE WITHOUT FIRST ADJUSTING THE SAFETY GUARD. ( See Below)

DO NOT OPERATE LANCELOT OR SQUIRE WITHOUT FIRST ADJUSTING THE SAFETY GUARD. ( See Below) Assembly Instructions - Lancelot and Squire King Arthur s Tools (KAT) is pleased to present the first tandem mounted saw chain accessories whereby differing combinations of Lancelot and Squire may be paired

More information

SHOP NOTES METAL SHAPER FOR YOUR SHOP

SHOP NOTES METAL SHAPER FOR YOUR SHOP SHOP NOTES METAL SHAPER FOR YOUR SHOP A METAL SHAPER is indispensable for certain machining operations where flat surfaces must be produced within very close limits, such as machining flats on castings,

More information

Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow

Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow This press can be built from readily available metal. Materials and dimensions need not be exactly what is shown here. Much of the material

More information

Roll-Up Door Maintenance Guide

Roll-Up Door Maintenance Guide R Roll-Up Door Maintenance Guide Cable Replacement on Two Spring Type Balancer Page 1 Panel Replacement - Removable Roller Cover Type Bottom Panel Page 1 Panel Replacement - Removable Roller Cover Type

More information

HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate

HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate 1 Swing Plate Assembly-RM1-0043 1 Swing Plate Kit-5851-2766 (RM1-0043 plus RM1-1091 gear) CAUTION: Fuser may be hot. Turn off printer, unplug it and allow

More information

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS TheRTAStore.com STEP 1: CLEAR A WORK SPACE Place your RTA cabinet panels on a smooth, scratch resistant surface in a large, open area. (Some people like to

More information

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT

More information

Making Wooden Hinges

Making Wooden Hinges Making Wooden Hinges By Alex Reid - www.mokkou.jp Materials and tools used - 3.2mm straight router bit - 1/8 round-over router bit - Flush-cut straight bit (with bearing on bottom) - Finger-joint jig -

More information

How to become an Operation Christmas Child Shoe Box Character

How to become an Operation Christmas Child Shoe Box Character How to become an Operation Christmas Child Shoe Box Character SUPPLIES A large rectangular box (to look like a shoe box) Cardboard or foam strips, 2 wide, for the lid Large printed Boy or Girl shoe box

More information

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions

LIFT-505. BMF Lift Kit. Yamaha Drive Gas or Electric. Installation Instructions LIFT-505 BMF Lift Kit Yamaha Drive Gas or Electric Installation Instructions Contents of LIFT-505 Yamaha Drive BMF Lift Kit: a (1 ea.) BMF A-Arm Assembly b (1 ea.) Driver Side Shock Tower c (1 ea.) Passenger

More information

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk This guide explains how to correctly install our chain link fencing and post system. The guide provides details of the

More information

Speed-Mat Rectangle Cutter

Speed-Mat Rectangle Cutter Speed-Mat Rectangle Cutter 1 Honeycomb baseboard. 2 Left hold down. 14 3 Bottom hold down. 4 4 Left / right rule. 8 5 8 5 Left / right rule pointer. 1 6 Top / bottom rule. 7 Top / bottom rule pointer.

More information

Ford F-Series Column Shift Repairs

Ford F-Series Column Shift Repairs Ford F-Series Column Shift Repairs I ve had it on my list to tighten up the linkage on my 52 s column shift setup for a long time. I tried to get it apart when I had all the front end sheet metal off,

More information

Router Table Plans. www.bobsplans.com

Router Table Plans. www.bobsplans.com www.bobsplans.com Router Table Plans Increase the capabilities of your router with this weekend project. Features a sliding fence with EZ-Mount clamps. These clamps are simple to make and grip tightly

More information

Modular Locomotive System Instruction Manual for HBK8 George Body Kit

Modular Locomotive System Instruction Manual for HBK8 George Body Kit Modular Locomotive System Instruction Manual for HBK8 George Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302

More information

MODEL T10023 ACCESSORY KIT #1 FOR T10010/T10097 WET GRINDER

MODEL T10023 ACCESSORY KIT #1 FOR T10010/T10097 WET GRINDER MODEL T0023 ACCESSORY KIT # FOR T000/T0097 WET GRINDER INSTRUCTION SHEET Introduction The Model T0023 Accessory Kit # for the Model T000/T0097 Wet Grinder includes fixtures for sharpening small knives,

More information

Hive Top Ventilation Shims

Hive Top Ventilation Shims Hive Top Ventilation Shims When preparing your bee hives for the winter, it is very important to provide for ventilation at the top of the hive. Through out the winter, the bees are expelling a lot of

More information

Building an Off-Center Fixture for Turning Pendants

Building an Off-Center Fixture for Turning Pendants Building an Off-Center Fixture for Turning Pendants Turning a pendant off-center with most available metal pendant chucks means that you will have a significant amount of mass off center, which will limit

More information

Cedar Cottage Doghouse Plans

Cedar Cottage Doghouse Plans Overlapping cedar shingles add an element of charm to this medium size doghouse. The walls, floor, and trim are constructed of solid cedar, making it naturally weather resistant and provides excellent

More information

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool H Craft Print Project No. 272 ERE'S a metal bender that will enable you to bend

More information

2&3 SECTION LOFT LADDER

2&3 SECTION LOFT LADDER TWIST CATCH ASSEMBLY A4 A2 A1 A3 A7 A6 A5 2&3 SECTION LOFT LADDER Images feature the 3 section loft ladder, but the same instructions apply to both 2 & 3 section ladders Installation and Operating Instructions

More information

ROTOPOD PERISCOPE LIGHTING KIT (for MCWHLR & Daniel D/Xeno Periscopes)

ROTOPOD PERISCOPE LIGHTING KIT (for MCWHLR & Daniel D/Xeno Periscopes) ROTOPOD PERISCOPE LIGHTING KIT (for MCWHLR & Daniel D/Xeno Periscopes) 14-APR-2012_rev 1.2 I designed the Periscope Lighting Kit to be as flexible as possible. Every LED is individually controllable. I

More information

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would

Picnic Table Plans. Made out of a single sheet of plywood, it s also portable! By Kevin Ayer. This children's picnic table would Picnic Table Plans Made out of a single sheet of plywood, it s also portable! By Kevin Ayer Materials One 4- by 8-foot sheet of 3 4-inch AC plywood Twelve 11 4-inch wood screws Primer and exterior paint

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

Complete Dovetail Jig Instructions

Complete Dovetail Jig Instructions Complete Dovetail Jig Instructions 18 15 1 12 13 8 (22818) 19 17 16 4 3 6 14 5 9 9 11 10 2 PARTS LIST - COMPLETE DOVETAIL JIG Introduction Your new dovetail jig will cut Full Through Dovetails and three

More information

Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit

Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit Modular Locomotive System Instruction Manual for HBK5 Billy Body Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302

More information

Lathe Milling Attachment

Lathe Milling Attachment Lathe Milling Attachment By L C. MASON BY CLEVERLY stacking cold-rolled flat stock together, T-slots and slide for this lathe milling attachment are made without costly machinery. In fact, only two tools,

More information

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast

More information

Children s Furniture Projects

Children s Furniture Projects This is an excerpt from the book Children s Furniture Projects by Jeff Miller Copyright 2002 by The Taunton Press www.taunton.com CHILD S ROCKER KIDS ARE ALWAYS IN MOTION. It s not easy to get them even

More information

All-Season Sunroom Sliding Glass Door Installation Instructions

All-Season Sunroom Sliding Glass Door Installation Instructions ASRESGD-08 All-Season Sunroom Sliding Glass Door Installation Instructions Panel Frame Door Frame Left Side Foam Insulator IE241 H Bar Assembly Door Frame Top Track Panel Frame Door Frame Right Side Stationary

More information

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1: IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Thank you for purchasing your new replacement windows from Great Lakes Window. The following instructions will help remove the old windows

More information

FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER

FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware

More information

Sheet Metal Shearing & Bending

Sheet Metal Shearing & Bending Training Objective After watching the program and reviewing this printed material, the viewer will gain a knowledge and understanding of the principles and machine methods of shearing and bending sheetmetal

More information

Valley fold 1/4 at the left side, again creasing only at the edge, and unfold. Valley fold, connecting the tops of the angle bisectors, and unfold.

Valley fold 1/4 at the left side, again creasing only at the edge, and unfold. Valley fold, connecting the tops of the angle bisectors, and unfold. Triceratops by Jerry Harris 1. Begin with a square, white side up, with the vertical diagonal precreased. A square of 10" results in a model of approximately 5.8" long and 1.67" tall at the hip. 2. 3.

More information

The Penturner s Corner

The Penturner s Corner The Penturner s Corner For the past several months my articles have been geared to modifying slimlines. I do hope the articles have been helpful and several new modified slimline pens are being made. It

More information

WINDOW REPAIR MANUAL & REFERENCE GUIDE

WINDOW REPAIR MANUAL & REFERENCE GUIDE WINDOW REPAIR MANUAL & REFERENCE GUIDE TABLE OF CONTENTS DOUBLE HUNG & SINGLE HUNG PARTS 4-5 CASEMENT PARTS 6 SCREEN PARTS 7-8 HOW TO REMOVE TILT-IN SASH 9 HOW TO REMOVE A BALANCE 10 HOW TO INSTALL BALANCE

More information

TENSION ISSUES? ROLLER SEE PAGE 7

TENSION ISSUES? ROLLER SEE PAGE 7 ROLLER TENSION ISSUES? SEE PAGE 7 Roller Shade Installation Guide Important: If you have ordered a valance for your shade, you must first read the Valance Installation Guide found in your box. We make

More information

Mounting Printed Circut Boards (PCB) Toll Free: 1.866.849.3911 (US & Canada) Fax: 902.567.3336 Email: info@protocasedesigner.com

Mounting Printed Circut Boards (PCB) Toll Free: 1.866.849.3911 (US & Canada) Fax: 902.567.3336 Email: info@protocasedesigner.com Toll Free: 1.866.849.3911 (US & Canada) Fax: 902.567.3336 Email: info@protocasedesigner.com Designing enclosures to mount printed circuit boards (PCB) using Protocase Designer (All dimensions are in inches)

More information

Etch Drawing Preparation

Etch Drawing Preparation Etch Drawing Preparation Introduction Most etching companies prefer you to supply the drawing for your design in the form of a computer file. While some will still accept drawn or printed artwork, it is

More information

Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5

Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5 INSTALLATION GUIDE Installation Guide for the TJ LCG PRO Suspension System (Low Center of Gravity) Available 4 or 5 Take every precaution to make this installation a safe procedure. Make safety the number

More information

Assembly and Usage Instructions

Assembly and Usage Instructions Assembly and Usage Instructions A Product 5885 West Van Horn Tavern Road Columbia, MO 65203 www.caldwellshooting.com Instruction #1001667 Limited Warranty Every Caldwell product is warrantied to be free

More information

Simple Machines. What are simple machines?

Simple Machines. What are simple machines? Definitions to know: Simple Machines Work done when an applied force causes an object to move in the direction of the force Energy ability to cause change; can change the speed, direction, shape, or temperature

More information

Chapter 10 - Scaffolding Systems

Chapter 10 - Scaffolding Systems Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5

More information

Introduction to Autodesk Inventor for F1 in Schools

Introduction to Autodesk Inventor for F1 in Schools Introduction to Autodesk Inventor for F1 in Schools F1 in Schools Race Car In this course you will be introduced to Autodesk Inventor, which is the centerpiece of Autodesk s digital prototyping strategy

More information

LED Origami. Created by Becky Stern

LED Origami. Created by Becky Stern LED Origami Created by Becky Stern Guide Contents Guide Contents Overview Lotus Construction Frog Construction Pond Scene with ITO 2 3 4 16 33 Adafruit Industries http://learn.adafruit.com/led-origami

More information

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop

More information

FREEBIRD THE ORIGINAL D.I.Y. ORNITHOPTER! Tools and Glue. Required Materials

FREEBIRD THE ORIGINAL D.I.Y. ORNITHOPTER! Tools and Glue. Required Materials Do not try to make your ornithopter using "household materials". If you want it to fly, you have to build it right. FREEBIRD THE ORIGINAL D.I.Y. ORNITHOPTER! Wingspan: 16 inches Weight: 1/4 ounce The Ornithopter

More information

Assembly Instructions Basic Folding-Leg Box Frame Style

Assembly Instructions Basic Folding-Leg Box Frame Style Assembly Instructions Basic Folding-Leg Box Frame Style Basic Folding Leg Cornhole Board Concept 1 2 12 3 1 2 3 15 16 4 1 4 52 9 R1 3 4 6 21 48 12 1 4 Bolt Washer 9 13 16 35 Washer Double Nut CornholePlayers.net

More information

All seam allowances are 1/2 unless otherwise noted. All pattern pieces include the seam allowance. Please read all instructions before beginning.

All seam allowances are 1/2 unless otherwise noted. All pattern pieces include the seam allowance. Please read all instructions before beginning. This structured bag has lots of pretty detailing. It s large enough to carry all of your essentials as well. Make it in a great patchwork, or stick to a single fabric! All seam allowances are 1/2 unless

More information

1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS

1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS By Denny Williams Photos by Denny Williams 1958-64 WINDOW CHANNEL, WEATHERSTRIP & WHISKER STRIP REPLACEMENT FOR 2-DOOR SEDANS Denny Williams - Technical Writer Denny is first and foremost a dyed-in-thewool

More information

Ceiling Mounted Folding Attic Ladders Installation Instructions

Ceiling Mounted Folding Attic Ladders Installation Instructions Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:

More information

DRAWING INSTRUMENTS AND THEIR USES

DRAWING INSTRUMENTS AND THEIR USES Chapter - A DRAWING INSTRUMENTS AND THEIR USES Drawing Instruments are used to prepare neat and accurate Drawings. To a greater extent, the accuracy of the Drawings depend on the quality of instruments

More information

Go-kart for little race-drivers

Go-kart for little race-drivers Go-kart for little race-drivers Drill and drive. Go-kart What it lacks in speed, it more than makes up for in fun: the go-kart will excite little race-drivers. 1 Introduction It s only a go-kart, but it

More information

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview

More information

Fabricating a chassis from clad PCB board material

Fabricating a chassis from clad PCB board material Fabricating a chassis from clad PCB board material How many times have you started a project and the finished appearance is based on what box you had laying around, rather than what you would like to have?

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

EQUIPMENT SET UP RECURVE BOW

EQUIPMENT SET UP RECURVE BOW EQUIPMENT SET UP RECURVE BOW Archery Australia Inc Coaching and Standards Committee Proudly Sponsored By EQUIPMENT SET UP RECURVE BOW It is important that equipment to be used must be set up correctly

More information

Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005

Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005 Hinge Replacement & Hinge and Hardware Adjustment Guide for Andersen Frenchwood Hinged Patio Doors Manufactured Before November 2005 For ease of installation and continued enjoyment of your Andersen product,

More information

Instructions. Measuring for Shock Absorbers

Instructions. Measuring for Shock Absorbers Measuring for Shock Absorbers Instructions CAUTION: Safety glasses should be worn at all times when working with vehicles and related tools and equipment. Flex Ramp Suggested Tools: Fork Lift (or Flex

More information

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets... tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or

More information

How to Install UnderDeck The Original.

How to Install UnderDeck The Original. How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter

More information

Physical Data Visualization and Rapid Prototyping with the Genisys Xs

Physical Data Visualization and Rapid Prototyping with the Genisys Xs Physical Data Visualization and Rapid Prototyping with the Genisys Xs Jo Wozniak Research Programmer Date Issued: May 2001 The Beckman Institute Imaging Technology Group Technical Report 01-009 Copyright

More information

1998-2002 Suzuki Katana Fender Eliminator

1998-2002 Suzuki Katana Fender Eliminator 1998-2002 Suzuki Katana Fender Eliminator The following are instructions and illustrations on the installation of the custom fender elimination. 1 Begin by removing seat, both rear fairings, and tail light

More information

Introduction to Autodesk Inventor for F1 in Schools

Introduction to Autodesk Inventor for F1 in Schools F1 in Schools race car Introduction to Autodesk Inventor for F1 in Schools In this course you will be introduced to Autodesk Inventor, which is the centerpiece of Autodesk s Digital Prototyping strategy

More information

Gear PEPSI CAN STOVE INSTRUCTIONS

Gear PEPSI CAN STOVE INSTRUCTIONS Gear PEPSI CAN STOVE INSTRUCTIONS [NOTE: Updated Instructions are now available. The new stove is less likely to develop flame leaks and the fuel/air mixture is improved. Instructions for a simmer ring

More information

Universal Gauge Measuring System USERS MANUAL

Universal Gauge Measuring System USERS MANUAL Universal Gauge Measuring System 2002 Chief Automotive Technologies, Inc. Chief s Limited One-Year Warranty & Liability CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies, Inc.

More information

LEVEL I SKATING TECHNICAL. September 2007 Page 1

LEVEL I SKATING TECHNICAL. September 2007 Page 1 SKATING September 2007 Page 1 SKATING SKILLS The game of Ice Hockey is a fast-paced, complex, team sport, which demands quick thinking, fast reactions and special athletic skills. Skating is the most important

More information

The Bonelle Tool and Cutter Grinder

The Bonelle Tool and Cutter Grinder The Bonelle Tool and Cutter Grinder The grinder was constructed about 1987 and exhibited at the 89th Model Engineering exhibition where it was awarded a bronze medal (see ME Vol164 No 3868 page 273). Subsequently

More information

Cable Drum Installation

Cable Drum Installation 20 Cable Drum Installation COUNTERBALANCE None Shake the TorqueMaster spring tube gently to extend the winding shafts out about 5" on each side. For single spring applications, there will be no left hand

More information

SpaceClaim Introduction Training Session. A SpaceClaim Support Document

SpaceClaim Introduction Training Session. A SpaceClaim Support Document SpaceClaim Introduction Training Session A SpaceClaim Support Document In this class we will walk through the basic tools used to create and modify models in SpaceClaim. Introduction We will focus on:

More information

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair

Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair 49 Chapter 3 Installing Over-the-Post Railing on an L-Shaped Stair In this chapter: The Over-the-Post Balustrade System Determining the Rail Centerline Using Rail Bolts Making a Pitch Block Laying Out

More information

Power Window/Power Lock Installation. To begin with you will need all the parts listed below:

Power Window/Power Lock Installation. To begin with you will need all the parts listed below: Power Window/Power Lock Installation To begin with you will need all the parts listed below: From Donor Fiero: Fiero power window regulators Power window motors (Generic GM type part) -motors are riveted

More information

MGB Chrome Bumper Conversion

MGB Chrome Bumper Conversion MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different

More information

3D Drawing. Single Point Perspective with Diminishing Spaces

3D Drawing. Single Point Perspective with Diminishing Spaces 3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be

More information

How to Set Up Corvette IRS Rear Camber (basic do-at-home version)

How to Set Up Corvette IRS Rear Camber (basic do-at-home version) How to Set Up Corvette IRS Rear Camber (basic do-at-home version) by Lars Grimsrud Colorado Corvette Crazies (CCC) The Ultimate Corvette Tuning & Beer Drinking Fraternity Lafayette, CO Rev. B 3-24-05 This

More information

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C. R O A D M A S T E R, I N C. ROADMASTER, Inc. 6110 NE 127th Ave. Vancouver, WA 98682 16 6 18 Cable Tab 13 15 8 10 2 Cable Tab 1 11 9 17 14 360-896-0407 fax 360-735-9300 www.roadmasterinc.com ITEM QTY NAME

More information

Rebuild Instructions for 70001 and 70010 Transmission

Rebuild Instructions for 70001 and 70010 Transmission Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before

More information

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL Please read these instructions carefully and completely before attempting to install Hale Pet Doors; they will guide you through the steps

More information

Inclined Plane: Distance vs. Force

Inclined Plane: Distance vs. Force 1a Inclined Plane: Distance vs. Force Look at the inclined plane model you built for Card 2. It s a ramp, so it s easy to slide or roll things up and down it. As you noticed, it is a little more difficult

More information

DIY CABINET REFACING INSTALLATION GUIDE

DIY CABINET REFACING INSTALLATION GUIDE DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products

More information

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab

Installation Instructions GOOSENECK MOUNTING KIT Chevrolet/GMC 1500/2500/3500 All except 4-door Crew-Cab GOOSENECK MOUNTING KIT Equipment Required: Fastener Kit: F Wrenches: 3/4, 7/8, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers

More information

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE

KITCHENS. Tip PAGE 1 FITTING YOUR KITCHEN GUIDE. How to mark out a kitchen. Tools required for installing a kitchen STEP ONE STEP TWO STEP THREE FITTING YOUR KITCHEN GUIDE How to mark out a kitchen PAGE 1 Before starting on the installation, measure 870mm from the lowest point of the floor and mark a datum line around the room to indicate where

More information

PCB Design Guidelines for In-Circuit Test

PCB Design Guidelines for In-Circuit Test PCB Design Guidelines for In-Circuit Test With some forethought during the design and layout process, circuit boards can be easily, economically and reliably tested in a bed-of-nails environment. This

More information

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C. R O A D M A S T E R, I N C. MOUNTING BRACKET KIT 12 3 6 9 5 11 ITEM QTY NAME MATERIAL 1...4...1/2" x 1 1/2" BOLT... 350095-00 2...4...1/2" x 1 1/2" CARRIAGE BOLT... 350362-00 3...8...1/2" NUT... 350258-00

More information