Requirements for Local Procurement in Borrowing Countries. 1
|
|
|
- Shanon Simpson
- 9 years ago
- Views:
Transcription
1 Requirements for Local Procurement in Borrowing Countries. 1 General Aspects 1. Scope of the regulatory framework The procurement regulatory framework should preferably address all government contracts (including those that may be financed out of fiscal resources, e.g., concessions). 2. Transparency Transparency is best achieved by government agencies through the use of effective advertising, public bid opening, objective bid evaluation criteria, independent evaluation consistent with the stipulations of the bidding documents, award to a qualified bidder having submitted the lowest evaluated bid without negotiations, publication of award results, fair and speedy protest handling process, and disclosure of signed contracts and prices. Procedural rules play an important role, particularly when it comes to open competitive bidding. In turn, these procedural rules impose the use of well-formulated bidding documents that will result in bid submissions free from qualifications. The same rules should exclude any provision or mechanism that could affect the transparency of the process. Procurement procedures other than open competitive bidding must be restricted within appropriate limits. 3. Balance between public and private partners Modern procurement regulations attempt to provide losing bidders with an effective way to submit contract award protests. More generally, private partners in government contracts are expected to be proactive in implementing competitive mechanisms and should be the guardians of those mechanisms exactly in the same manner as government agencies. Private partners must be offered fair contract conditions. Certain institutional mechanisms have a critical role to play in the balance between partners and in the transparency of the process. 4. Exceptions and waivers To the extent that exceptions and waivers are needed by a government agency in order to proceed in a timely manner with its procurement, procurement regulations may include specific exceptions to contract law for example, termination for convenience. The 1 In a meeting of the multilateral development banks (MDB) heads of procurement, held March 25-27, 2002, in Washington, this subject was discussed and the matters related here were agreed on as a common platform for multilateral development banks (MDBs) working in the same countries (especially when analyzing local procedures as part of Country Procurement Assessments Reports). The platform would also be used by the World Bank when discussing Memoranda of Understanding for Implementation of SWAPs with other banks, bilateral donors, and governments. 1
2 regulations should also provide for any waiver needed in the context of international agreements. Specific Aspects Below are listed several specific aspects that were discussed among the multilateral development banks and the common approach recommended. 1. Registration of Bidders. There is general agreement that Registration of Bidders as a condition for bidding is not a good practice, and all banks do not accept it for ICB. However, some countries require registration prior to bidding as a due diligence process to screen bidders legal and fiscal capacity or as a means for prequalification, especially for civil works. Mandatory registration is a cumbersome procedure that does not reflect changes in capacity achieved by potential candidates. Consequently, when mandatory registration is used, it is critical to conduct it rigorously, and to immediately respond to any request for registration or registration updating. Some specific points to consider include: (a) National Registration of Bidders Acceptance. The issue here is the transparency of the process. System assessments would focus on its transparency and ensure that this is not discriminatory against any prospective bidder. Centralized or by agency. The registry may be centralized or decentralized, provided the system is acceptable to the Bank. Foreigners and national bidders. Foreign bidders should be allowed to register. Moreover, when a bidding process takes place, foreign bidders should be allowed to bid, even without registration, leaving registration for after award and before signature of contract. (b) Requirements Legal and commercial situation. This is the basic information for registration. Ideally this minimum information could be the basic requirement. Fiscal situation. Some countries laws require bidders to keep their fiscal situation up-to-date in the registry. This is acceptable to the Bank. Financial qualification. Some countries require this information for qualification of bidders. Since the financial situation is specific to each bidding process, this is not a good practice. If used, it should be restricted only to civil works contracts. Technical qualification. Same as for the financial qualification. (c) Registry How to register. There should be an assessment of registration procedures before the Bank accepts the process. Bidders should be allowed to register by mail and, if the conditions in the country allow, through the Internet. Frequency of updating. Registration should remain permanently open to bidders, including for updating information at any time. No deadline for specific bidding processes should be imposed. Time taken for registration. Should be reasonable. 2
3 Advertisement. Registration should not be used as a substitute for advertisement when open competition is required. However, when advertising for civil works, borrowers could indicate the required minimum category of contractor specified in the registration system. 2. Open Bid National Competitive Bidding. Procedural rules play an important role particularly when it comes to open competitive bidding. They should impose the use of well-formulated bidding documents, which will result in bid submissions that are free from qualifications. Those procedures or rules are as follows: (a) Effective advertisement Advertisement should be broad enough (using the appropriate media), giving enough time to bidders to prepare their bid. To the extent possible, bidding opportunities should also be advertised electronically. The minimum requirement should be: Newspaper. Mandatory publication in one local newspaper, in addition to the official gazette (if existent). Web page. If the borrower (or the country) has a Web page, all bidding opportunities should be advertised. The Bank should also provide incentives for advertisement in UN Development Business and the Development Gateway or other electronic venues. The publication in the Web may be a substitute for the publication in Newspapers (b) Eligibility Eligibility criteria and procedures should not deny bidders access to a bidding process or an award for reasons that are not related to their qualification to carry out the contract. Consequently, the procedures should: Be based on the ability of bidders to carry out the contract. Not restrict foreign bidders; Allow local blacklisting for fraud and corruption to be carried out with due process, but with rights for accused firms to defend themselves and Bank to assess and rule on defense. Guarantee that government-owned enterprises acting as bidders should demonstrate that they are legally and financially autonomous and operate under commercial law, and are not selected or contracted by their reporting authority. (c) Qualification of bidders The procedures should define postqualification as the preferred rule. Prequalification should be restricted to civil works and be applied particularly for large or complex contracts or for special cases with due justification. Procedures should define postqualification as the rule, and the cases where prequalification should be applied. These rules should include satisfactory past performance of bidders. The review of bidders qualification should be conducted by examining whether the bidder does or does not meet qualification criteria and not by using a point system reflecting the bidders qualification. Review of bidders qualification should be conducted separately from the evaluation of their bids. 3
4 Preselection as distinct from prequalification should not be accepted. (Prequalification means that all candidates should be invited to bid, whereas preselection means that the government agency is free to invite any of those candidates but does not have to invite all of them.) No bidder should be disqualified on grounds of insignificant bureaucratic procedures. (d) Standard bidding documents Standard bidding documents are of paramount importance for transparency, speed of the process, increased competition, and fostering of capacity (standardization of procedures). The Bank, other donors working in the country, and the government should agree on a common standard bidding document to be used in all local open bidding processes. The documents should include the following items: (1) Instruction to Bidders and Selection Process Minimum of 30 days to submit bid; Bids may be submitted by post or by hand; Budget the maximum amount of budgetary resources available for the bidding process could be disclosed (if local legislation so requires) Clear instructions on how to buy bidding documents, indicating address and price. However, bidders who decide at their own risk to submit a bid without having bought the bidding documents should not be disqualified. Clarifications to bidding documents should be in writing only. Amendments to bidding documents should be advertised with the same procedure used to advertise the original bidding documents. There should be at least a week interval between the publication of the last amendment and the date for bid submission. Bid forms should be substantially similar to those used for ICB, with appropriate flexibility with respect to design. Countries should be encouraged to use one envelope as with ICBs. Where local laws do not define the number of envelopes, the Bank should require one envelope. However, if the local law requires two envelopes, this is acceptable, provided adequate safeguards against retaining the second envelope unopened are incorporated in the twoenvelope procedures and effective bid protest mechanisms are in place for the due processing of bid complaints. Bid evaluation criteria should be nondiscriminatory. They should be disclosed and rigorously quantified in monetary terms to define the lowest evaluated bidder. Quantifying bid evaluation criteria in monetary terms is the only method that leads to transparent evaluation and allows bidders to submit an effective protest to the awarding authority. (2) Language (bidding documents and contract). the language of commercial use in the country. (3) Bid prices. Bidding documents should define price and payment conditions, including (a) the local (or any internationally used) currency that could be used; (b) the method of payment; and (c) price adjustment procedures, preferably using an adjustment formula. (All contracts for countries with high inflation should 4
5 have price adjustment; for countries with a stable currency, price adjustment should be included for contracts longer than 12 months.) Price adjustment formulas should not be used in bid evaluation. (4) Bid security. When required, bid security should follow the generally accepted practice used in the local market (securities issued by banks or by sureties). Alternative methods (such as automatic penalty to bidders failing to honor a bid) in lieu of bid securities would be acceptable. (5) Liquidated damages. Should be similar to the ICB document. (6) Complaints. Modern procurement regulations attempt to provide to losing bidders an effective way to submit protests pertaining to contract award. The goal in the protest handling system should be: Complaints should be accepted at any time. Those received before bids are submitted should be addressed before bid opening. All others should be taken into account, but the response should be announced only after award is recommended. The borrower should have an administrative process for dealing with complaints, including an independent reviewer to review the procuring agency s responses to complaints. Protests should be submitted to an independent entity and not simply to the supervisor of the contracting agency. Specifically, tender committees, which are the arm of the government, can only conduct administrative reviews. Their membership does not allow for arbitration or quasi-arbitration of the dispute, and therefore an independent protest mechanism should be provided to review award disputes before the contract award is final. When protests are submitted before award they may lead to reconsidering the award of the contract; when protests are submitted after the award, their only consequence should be the bidder s entitlement to compensatory damages for the cost of bid preparation. The government may create regulations requiring protestors to deposit a guarantee against frivolous complaints. (7) Bid opening. Public bid opening of all bids, and recording of the opening in minutes signed by all bidders in attendance, is required. In addition: Late bids should be rejected and returned unopened. Procedures for bid opening should be the same as those used for ICB. Minutes should follow the same procedure as for ICB. Safeguard of price envelope: when two envelopes are used the bidding documents should specify where and how the price envelope would be safely kept. (8) Confidentiality. After bid opening and until contract award, all information about bids and their evaluation should be confidential. For transparency reasons, 5
6 the evaluation report and all nonproprietary information could be made available to the public after an award recommendation has been published. (9) Evaluation of bids. Bids should be evaluated by an independent evaluation committee, taking special consideration for: Clarification of bids (should follow the same procedures used for ICB). Responsiveness (should follow the same procedures used for ICB). Qualification of the bidder should be conducted separately from the evaluation of its bid. Lowest evaluated cost criteria the award should be made to the bidder having submitted the lowest evaluated responsive bid. Use of a point system to evaluate bids scoring is an indirect way to express the outcome of the technical analysis of the bid, consequently, a point system should not be accepted. 2 Rejection of all bids: borrower may reject all bids if (a) all bids are not responsive; (b) the price offered by the lowest bidder is substantially higher than the confirmed good estimate for the contract; (c) the process was not competitive (for example, countries could decide that a bidding process was noncompetitive if fewer than three were actually offered). (10) Preference to some classes of bidders. Preference to some classes of bidders may be acceptable in national bidding, provided it is required by law and procedures for the application of such preference in bid evaluation are properly defined and acceptable. Nonquantified bid evaluation criteria, such as the scope of the lots or the value of the products to be domestically subcontracted (which would affect the predictability of the evaluation), or use of any other form of nonquantified preference would not be acceptable. (11) Award criteria The award should be made to the bidder having submitted the lowest evaluated responsive bid, provided that bidder has been determined to be qualified in accordance with predisclosed criteria. Award of contract should be without negotiations, since negotiations would lead bidders not to submit their best bid at the time of bid submission and would affect the perception of transparency (which is one of the main benefits deriving from public bidding). (12) Standard contract implementation. Bidding documents should include standard contracts. The contract documents should identify the scope of work to be performed, the goods to be supplied, the rights and obligations of the borrower and of the supplier or contractor, as well as how the contract will be implemented and supervised. In addition the following provisions should be included: 2 A point system may better suited for complex systems; however, it would be extremely exceptional that such procurement would not follow ICB. 6
7 Payments (a) the method of payment should be the same as defined in the bidding document; (b) the currency of payment should be the same as that of the bid prices except when as a proxy for price adjustment a harder currency is used for bid price but payments are made in the currency of the Borrower at the exchange rate applicable on the date of payment; (c) the employer should automatically pay interest for late payments; (d) price adjustment procedures should be used, preferably using an adjustment formula Performance security a guarantee for satisfactory performance of the contractor or supplier should be included either in the form of a performance security or retention of payment. Performance securities should follow the generally accepted practice used in the local market (securities issued by banks or by sureties). Settlement of disputes contracts should include a system for settlement of disputes. In very large contracts the use of a Dispute Resolution Board (or a Dispute Resolution Expert in large contracts) should be encouraged before disputes are submitted to arbitration or to courts. (13) E-procurement. Borrowers should be encouraged to move to electronic bidding, provided the local conditions of infrastructure, government agencies capacity, and business community capacity permits. Borrowers may move to E- procurement in steps, moving from less complex to more complex scenarios. The following scenarios are foreseen: E-disclosure the use of a Web site for disclosing business opportunities, making bidding documents available to bidders, disclosing bid results, and making public disclosure of contract texts and prices. The Bank would need to assess the system and authorize it to become an official source of information. E-purchasing the use of a website (centralized, decentralized or using private providers for E-markets) for procurement of high-volume-lowvalue types of contracts, where usually only the price is proposed. The Bank would need to assess the system and agree on its use for this type of bidding process. E-tendering the use of a website for procurement of complex procurement and high-value-low-volume type of procurement, where a technical and financial proposal is submitted. The Bank would need to assess the system and agree on its use, especially in view of technical, legal, and registration issues. 3. Reserved Invitations Private Bidding or Shopping. Procurement procedures other than open competitive bidding should be restricted within appropriate limits. Restricted bidding may be appropriate for small value contracts and situations in which there is only a small number of potential candidates. However, this should not be considered as a substitute for open bidding (or NCB), since it is restricted. This method should be subjected to the following minimum requirements: (a) Number of invitees and criteria for selection. 7
8 Minimum of three proposals received; however, the process should be open to whoever wants to bid, even if not invited. If possible firms should not be invited more than once, unless other firms do not exist. (b) Standard request for bids Simplified document asking for proposals by letter, fax, or electronic means. (c) Evaluation Minimum price; or Combination of price and delivery time, in which case delivery time would be evaluated in monetary terms, and added to price. Minimum overall evaluated price would result in award. (d) E-procurement if possible, e-purchasing should be preferred. 4. Direct Contracting. This should be used only in exceptional cases with due justification to be kept on record. The justification should specify the reasons for the direct contracting and who has approved it. The conditions justifying direct contracting are: (a) Spare parts from the original manufacturer of the equipment. (b) Only one manufacturer exists for the required good. (c) Emergency, such as natural disasters. (d) Small-value contract. 5. Local Consultants Selection Process. Procedures that will be used for selection of consultants and the conditions under which each of them can be used should also be spelled out in the manual. The main methods should include Quality and Cost-Based Selection (QCBS), Selection Based on Consultant Qualifications (CQ), single source, and selection of individual consultants. General issues to be considered include: (a) Standard RFP and standard contract; (b) Means of preparing shortlists; and (c) Award criteria highest combined score (for example, technical 80 percent and price 20 percent for QCBS) 8
PROCUREMENT GUIDELINES FOR PROJECTS FINANCED BY THE NORDIC INVESTMENT BANK
Adopted by the Board of Directors on 1 September 2011 with entry into force as of 20 September 2011 PROCUREMENT GUIDELINES FOR PROJECTS FINANCED BY THE NORDIC INVESTMENT BANK Contents Definitions... 1
Project Implementation: Procurement & Contract Management. April 2012
& Contract Management April 2012 & Contract Management We would like to acknowledge the contribution of the Programme Management Department in the preparation of this presentation that will introduce some
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and
North American Development Bank. Prequalification of Contractors
North American Development Bank Prequalification of Contractors PREQUALIFICATION NOTE This note is prepared for the exclusive use of the borrower (the purchaser in this document) and should not be included
E-Tendering Requirements for MDB Financed Procurement October 2005
E-Tendering Requirements for MDB Financed Procurement October 2005 e-gp MDB e-tendering Requirements October 2005 1 Introduction Borrowing countries are increasingly inclined to use electronic procurement
The Procurement Guidelines of. the Japanese Grant Aid. (Type I-G)
The Procurement Guidelines of the Japanese Grant Aid JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) 1 Table of Contents PART I Basic Principles... 4 I-1 Introduction... 4 I-2 Parties Concerned... 4 I-3
North American Development Bank. Bid Evaluation Procedures
North American Development Bank Bid Evaluation Procedures BID EVALUATION PROCEDURES TABLE OF CONTENTS The Bidding Process Introduction Preliminary Actions and General Concerns Contract data sheet Responsible
International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya
International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya PRE-QUALIFICATION TENDER NO. IPSTC/PREQ/2014/2015/043 FOR PROVISION OF PLUMBING SERVICES FOR 2014/2015 July, 2014
How To Get A Project Financed By The International Bank For Development And Reconstruction
GUIDELINES PROCUREMENT UNDER IBRD LOANS AND IDA CREDITS May 2004 GUIDELINES PROCUREMENT UNDER IBRD LOANS AND IDA CREDITS May 2004 Copyright 2004 The International Bank for Reconstruction and Development
GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS
GUIDE FOR EVALUATION PROCEDURES FOR EMPLOYMENT OF CONSULTANTS UNDER JAPANESE ODA LOANS Japan International Cooperation Agency (JICA) December 2006 (Amended December 2009) version 1.0 CONTENTS INTRODUCTION...
Guidelines Selection and Employment of Consultants by World Bank Borrowers
Guidelines Selection and Employment of Consultants by World Bank Borrowers January 1997 Revised September 1997, January 1999, and May 2002 Guidelines Selection and Employment of Consultants by World Bank
E-Tendering Requirements for MDB Financed Procurement November 2009
E-Tendering Requirements for MDB Financed Procurement November 2009 MDB e-tendering Requirements November 2009 1 Introduction Borrowing countries are increasingly inclined to use electronic procurement
METHODOLOGY FOR ASSESSING PROCUREMENT SYSTEMS (MAPS)
METHODOLOGY FOR ASSESSING PROCUREMENT SYSTEMS (MAPS) February 00 INTRODUCTION Increasing the effectiveness, efficiency and transparency of procurement systems is an on-going concern of governments and
PROCUREMENT GUIDELINES
PROCUREMENT GUIDELINES APRIL 2015 ASIAN DEVELOPMENT BANK Procurement Guidelines APRIL 2015 ASIAN DEVELOPMENT BANK Creative Commons Creative Commons Attribution-NonCommercial-NoDerivs 3.0 IGO license (CC
2.2 All purchases for supplies, services (including construction) and equipment.
St. Mary s General Hospital Kitchener, Ontario ========================================================================== Supply Chain Guidelines ==========================================================================
FOR PROCUREMENT OF SUPPLIES, WORKS AND SERVICES. September 2011
FOR PROCUREMENT OF SUPPLIES, WORKS AND SERVICES September 2011 COUNCIL OF EUROPE DEVELOPMENT BANK GUIDELINES FOR PROCUREMENT OF SUPPLIES, WORKS AND SERVICES INTRODUCTION The Guidelines for Procurement
Procurement of Works Smaller Contracts
STANDARD BIDDING DOCUMENTS Procurement of Works Smaller Contracts The World Bank Washington, D.C. May 2004 ii Revisions The features of May 2004 Procurement Guidelines have been incorporated. iii Preface
SAMPLE FORM OF EVALUATION REPORT SELECTION OF CONSULTANTS
SAMPLE FORM OF EVALUATION REPORT SELECTION OF CONSULTANTS The World Bank Washington, D.C. October 1999 iii Preface 1 Consultants 2 employed by Bank Borrowers and financed by the World Bank or under
STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS)
STANDARD PRE-QUALIFICATION DOCUMENT FOR THE PROCUREMENT OF WORKS (MAJOR CONTRACTS) Pre-qualification Ref: Issue Date: [Insert Title of Project] [Insert Reference] [Insert Date] Public Procurement Authority
Law No. 67 for the year 2010
Disclaimer This English translation of the Law No. 67 for the year 2010 has been reviewed by Zulficar & Partners Law Firm and Trowers & Hamlins in association with Nour Law Office. Neither The Ministry
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT
City of Vallejo REQUEST FOR PROPOSAL WORKERS COMPENSATION CLAIMS AUDIT Date original issued: September 28, 2015 Qualifications Statements due: The City of Vallejo will consider Proposals submitted in response
Prequalification Document for Procurement of Works
STANDARD PROCUREMENT DOCUMENT Prequalification Document for Procurement of Works Caribbean Development Bank September 2007 ii Foreword This Standard Procurement Document Prequalification Document for Procurement
North American Development Bank. Model Prequalification Document: Prequalification of Contractors
North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried
ISLAMIC DEVELOPMENT BANK. Guidelines for Procurement of Goods and Works Under ISLAMIC DEVELOPMENT BANK FINANCING
ISLAMIC DEVELOPMENT BANK Guidelines for Procurement of Goods and Works Under ISLAMIC DEVELOPMENT BANK FINANCING June 2005 Table of Contents 1 GENERAL PRINCIPLES...1 1.1 PURPOSE OF THE GUIDELINES...1 1.2
Tender Documents. Procurement of Works Medium Contracts (LUMP SUM CONTRACTS)
Tender Documents Procurement of Works Medium Contracts (LUMP SUM CONTRACTS) Public Procurement Board Accra, Ghana October 2003 Table of Contents Introduction...1 Invitation for Tenders...2 Table of Clauses...6
REQUEST FOR PROPOSAL (RFP)
REQUEST FOR PROPOSAL (RFP) Bid Event Number: EVT0001204 Date Mailed: February 9, 2012 Closing Date: March 15, 2012, 2:00 PM Procurement Officer: Constance S Schuessler Telephone: 785-296-1171 E-Mail Address:
All references to procurement value amounts in this Policy exclude applicable sales taxes.
Originator: Director, Financial Services Financial Policy and Procedures Approved by: Maxim Jean-Louis, President Chief Executive Officer Effective Date: August 17, 2015 Replaces: April 1, 2012 Procurement
KENYA NETWORK INFORMATION CENTRE TENDER TO PROVIDE: CONSULTANCY SERVICES TO PROVIDE ARBITRATION SERVICES RFP NO: KENIC/RFP/16/09/2014
KENYA NETWORK INFORMATION CENTRE TENDER TO PROVIDE: CONSULTANCY SERVICES TO PROVIDE ARBITRATION SERVICES RFP NO: KENIC/RFP/16/09/2014 DATED: 16 th SEPTEMBER 2014 KENYA NETWORK INFORMATION CENTRE P.O BOX
Guidelines (Rules) for the Procurement of Services 1
Southern African Development Community Project Preparation and Development Facility Guidelines (Rules) for the Procurement of Services 1 Revision 1 November 2013 1 Adapted from the African Development
Act 663 Public Procurement Act, 2003
ARRANGEMENT OF SECTIONS Sections PART I ESTABLISHMENT OF THE BOARD 1. Public Procurement Board 2. Object of the Board 3. Functions of the Board 4. Membership of the Board 5. Term of office 6. Meetings
GUIDELINES: SELECTION AND EMPLOYMENT OF CONSULTANTS BY WORLD BANK BORROWERS
GUIDELINES: SELECTION AND EMPLOYMENT OF CONSULTANTS BY WORLD BANK BORROWERS May 2004 Revised October 1, 2006 & May 1, 2010 This is a MS Word version of the official Consultant Guidelines. If altered, this
An organization which employs, or is about to employ, any of the above, has a financial or other interest in the firm selected for award.
85.36 Procurement (a) States. When procuring property and services under a grant, a State will follow the same policies and procedures it uses for procurements from its non-federal funds. The State will
PREQUALIFICATION DOCUMENT FOR SUPPLIERS OF GOODS AND SERVICES ITEM:..
1 PREQUALIFICATION DOCUMENT FOR SUPPLIERS OF GOODS AND SERVICES FOR THE PERIOD JULY 2014 TO JUNE 2016 PRE QUALIFICATION NO: CMD/PREQ/ /2014-2016 ITEM:.. NAME OF APPLICANT:. Centre for Multiparty Democracy
PUNJAB SKILLS DEVELOPMENT FUND PRE-QUALIFICATION OF CONTRACTORS FOR RENTAL VEHICLES
PUNJAB SKILLS DEVELOPMENT FUND PRE-QUALIFICATION OF CONTRACTORS FOR RENTAL VEHICLES House # 125, Abu Baker Block, New Garden Town, Lahore Pakistan. Phone: +92-42-35913540-41 Fax: +92-42-35913539 Contents
CGIAR PROCUREMENT OF GOODS, WORKS AND SERVICES GUIDELINES
Consultative Group on International Agricultural Research (CGIAR) CGIAR PROCUREMENT OF GOODS, WORKS AND SERVICES GUIDELINES FINANCIAL GUIDELINES SERIES, NO. 6 Revised April 2008 Financial Guidelines Series
How To Get Construction Procurement Services
Construction Procurement William C. Charvat, AIA, CSI Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 The procurement of construction services brings together the team
PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01)
PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS (Ref No. Secy/PPC/CVL/01) Inland Water Transport Development Company (IWTDC) No. 34-A, Street 27, Valley Road, Westridge, Rawalpindi Ph # 051-5491494-95,
SUMMER FOOD SERVICE PROGRAM Procurement Standards
OFFICE OF SUPERINTENDENT OF PUBLIC INSTRUCTION Child Nutrition Services Old Capitol Building, PO BOX 47200 OLYMPIA, WA 98504-7200 (360) 725-6200 TTY (360) 664-3631 SUMMER FOOD SERVICE PROGRAM Procurement
Standard Tender Evaluation Format. Selection Of Consultants
STANDARD TENDER DOCUMENTS Standard Tender Evaluation Format Selection Of Consultants Public Procurement Board Accra, Ghana. i Preface 1 Procurement under projects financed from the Public Funds of the
TENDER NO. REA/2014-2015/NT/060
REA-STD DOCUMENT- Small Works - SECTION I: INVITATION FOR TENDERS (IFT) TENDER NO. REA/2014-2015/NT/060 TENDER DOCUMENT FOR THE PROPOSED ADDITIONAL CIVIL WORKS TO THE RURAL ELECTRIFICATION AUTHORITY OFFICES
UNIVERSITY HOSPITAL POLICY
UNIVERSITY HOSPITAL POLICY SUBJECT: PURCHASING SERVICES TITLE: PURCHASING PROCESS Responsible Executive: Executive Director, Supply Chain Management Responsible Office: Supply Chain Management CODING:
24 CFR PART 85 85.36 Procurement. States. Procurement standards.
85.36 Procurement. (a) States. When procuring property and services under a grant, a State will follow the same policies and procedures it uses for procurements from its non-federal funds. The State will
NATIONAL INDUSTRIAL TRAINING AUTHORITY
NATIONAL INDUSTRIAL TRAINING AUTHORITY TENDER FOR SUPPLY, INSTALLATION, IMPLEMENTATION, TESTING, TRAINING AND COMMISSIONING OF AN ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM TENDER NO: NITA/29/2014-2015
So You Want to Do Business with the Saudi Government
So You Want to Do Business with the Saudi Government Doing business with the Saudi government can be as cumbersome and time consuming as dealing with any national government. Moreover, doing business with
THE PUBLIC PROCUREMENT (SELECTION AND EMPLOYMENT OF CONSULTANTS) REGULATIONS, 2005
Public procurement (Selection and Employment of Consultants) THE UNITED REPUBLIC OF TANZANIA THE PUBLIC PROCUREMENT (SELECTION AND EMPLOYMENT OF CONSULTANTS) REGULATIONS, 2005 THE PUBLIC PROCUREMENT (SELECTION
PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/2015
PREQUALIFICATION DOCUMENT FOR PROVISION OF WEBSITE HOSTING AND MAINTENANCE SERVICES - TENDER NO KENAS NO/19/2013/201 KENYA ACCREDITATION SERVICE P.O BOX 47400-00100 NAIROBI KENYA Tel: 0787 39 679 or 072
CONTRACT MANAGEMENT POLICY
CONTRACT MANAGEMENT POLICY Division I : General provisions 1. Purpose The Town of Kirkland hereby establishes various rules pertaining to contract management with a view to promoting transparency, fairness,
Project Administration Instructions
Project Administration Instructions PAI No. 2.03 Page 1 of 15 GENERAL PROCEDURE FOR SELECTING AND ENGAGING CONSULTANTS 1. This project administration instruction (PAI) contains general procedures for the
Tender Evaluation and Contract Award
Brief 9 January 2011 Public Procurement Tender Evaluation and Contract Award C O N T E N T S Key principles governing the process of evaluation of tenders How does an evaluation panel operate? How does
Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14
Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014
Republic of Albania. Law. No. 9643 dated 20.11.2006. On Public Procurement. the People s Assembly of the Republic of Albania
Republic of Albania Law No. 9643 dated 20.11.2006 On Public Procurement the People s Assembly of the Republic of Albania in accordance with Articles 78 and 83, point 1 of the Constitution with a proposal
Doing business with the European Commission Tips for potential contractors
Doing business with the European Commission Tips for potential contractors EUROPEAN COMMISSION Text A business opportunity for you C O N T E N T S Doing business with the European Commission Tips for potential
GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM
GOVERNMENT OF GUYANA STANDARD REQUEST FOR PROPOSAL SELECTION OF CONSULTANTS/FIRM 1 Standard Bidding Document Version Control v0-1 STANDARD REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS/FIRM Introduction
Standard Bidding Documents. Procurement of Works
Standard Bidding Documents Procurement of Works FIDIC This electronic document prepared by The World Bank is intended to fulfill the objectives of para. 2.12 of Guidelines: Procurement under IBRD Loans
GUIDELINES PROCUREMENT UNDER IBRD LOANS AND IDA CREDITS
GUIDELINES PROCUREMENT UNDER IBRD LOANS AND IDA CREDITS May 2004 Revised October 1, 2006 & May 1, 2010 document no longer holds its official status The May 2004 revised October 2006 Guidelines have been
HACC, Central Pennsylvania s Community College Harrisburg, Pa.
RFP15-03 Integrated Marketing Communications Services HACC, Central Pennsylvania s Community College Harrisburg, Pa. Request for Proposal RFP15 03 For Integrated Marketing Communications Services Issued:
STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS
WORKS STANDARD BIDDING DOCUMENTS UNDER JAPANESE ODA LOANS PROCUREMENT OF WORKS Japan International Cooperation Agency (JICA) October 2012 version 1.1 i Preface These Standard Bidding Documents for Procurement
ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1
ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1 1. GENERAL PRINCIPLES If the implementation of an Action requires procurement by the Beneficiary, the contract
STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts)
STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT (Works, Heavy Equipment, Supply and Installation Contracts) Table of Contents Page INTRODUCTION 3 SECTION I - Invitation for prequalification... 4 SECTION
CONSULTANTS. African Development Bank. Rules and Procedures for the Use of Consultants. Procurement and Fiduciary Services Department
CONSULTANTS African Development Bank Rules and Procedures for the Use of Consultants Procurement and Fiduciary Services Department May 2008 Edition, Revised July 2012 Those wishing to submit comments or
REQUEST FOR PROPOSALS
Table of Contents March 2012 REQUEST FOR PROPOSALS DISASTER RECOVERY/BUSINESS CONTINUITY SERVICES Soliciting detailed proposals for the development of plans to meet a variety of contingencies REQUEST FOR
Procurement Policy Review Feedback Summary
The World Bank Procurement Policy Review Feedback Summary Date: NOVEMBER 10, 2014 (afternoon session with Government agencies and PMUs) Location (City, Country): HANOI, VIETNAM Total Number of Participants:
Request for Proposal For: CQ5 Java Developer. ABA Information Systems April 11, 2013. Table of Contents
Request for Proposal For: CQ5 Java Developer ABA Information Systems April 11, 2013 Table of Contents Bid Timetable [2] 1.0 General Information [3] 2.0 Proposal Requirements [6] 3.0 Criteria for Selection
ISLAMIC DEVELOPMENT BANK. Guidelines for the Use of Consultants Under ISLAMIC DEVELOPMENT BANK FINANCING
ISLAMIC DEVELOPMENT BANK Guidelines for the Use of Consultants Under ISLAMIC DEVELOPMENT BANK FINANCING June, 2005 Table of Contents 1. General Principles... 1 1.1 Purpose of the Guidelines... 1 1.3 Relationship
STANDARD EVALUATION CRITERIA HANDBOOK FOR PREQUALIFICATION AND BIDDING
Version Control v0-1 STANDARD EVALUATION CRITERIA HANDBOOK FOR PREQUALIFICATION AND BIDDING Procurement of Goods Works and Services (except Consulting Services) Cooperative Republic of Guyana May 2009
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AUDIT MANAGEMENT SOFTWARE AND SERVER
i B I D D I N G D O C U M E N T SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AUDIT MANAGEMENT SOFTWARE AND SERVER TENDER NO. KRA/PFM/NCB-025/2009-2010 TIMES TOWER BUILDING P.O. BOX 48240 00100 TEL:
15-213. Procurement practices of school districts and charter schools; definitions
ARIZONA AUTHORITY 15-213. Procurement practices of school districts and charter schools; definitions A. The state board of education shall adopt rules prescribing procurement practices for all school districts
Contents: 1 General. 1 General. 2 Tenderer s obligations. 3 The Procuring Department s undertakings. Republic of Botswana. OF TENDER Feb 2006
PUBLIC PROCUREMENT AND ASSET DISPOSAL BOARD STANDARDISED CONDITIONS OF TENDER Feb 2006 Contents: 1 General 2 Tenderer s obligations 3 The Procuring Department s undertakings 1 General Actions 1 The Procuring
Policies for the Selection and Contracting of Consultants financed by the Inter-American Development Bank GN-2350-9 March 2011
Policies for the Selection and Contracting of Consultants financed by the Inter-American Development Bank GN-2350-9 March 2011 Table of Contents Acronyms... iii I. Introduction... 1 Purpose... 1 General
Standard Request for Proposals. Selection of Consultants
STANDARD PROCUREMENT DOCUMENTS Standard Request for Proposals Selection of Consultants The Islamic Development Bank March 2012 This document is subject to copyright. This document may be used and reproduced
How to Do Business with the African Development Bank
How to Do Business with the African Development Bank A Primer for U.S. Businesses Learn the Procurement Process Identify Opportunities Access Financing Advocacy Center Visit www.buyusa.gov/afdb Call +216
CONTRACT MANAGEMENT POLICY TOWN OF HAMPSTEAD
CONTRACT MANAGEMENT POLICY TOWN OF HAMPSTEAD Division I: General provisions 1. Purpose The Town of Hampstead hereby establishes various rules pertaining to contract management with a view to promoting
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts
CDO WORKFORCE INVESTMENT BOARD. REPLACES CDO Workforce Investment Board Procurement Policy, dated 9/30/05
CDO WORKFORCE INVESTMENT BOARD POLICY #07-03: Local Procurement of Goods and Services DATE: November 14, 2007 APPLIES TO: Use of WIA Title I-B funds REPLACES CDO Workforce Investment Board Procurement
Annex I. RFP Instructions to Proposers TABLE OF CONTENTS
Annex I RFP Instructions to Proposers TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 General... 3 1.2 Eligible Proposers... 4 1.3 Cost of Proposal... 6 2. SOLICITATION DOCUMENTS... 6 2.1 Contents of Sollicitation
BANK Of ZAMBIA Tender for the Construction of a False Roof and Maintenance of Emergency Staircase at Old Bank of Zambia Building
1 BANK Of ZAMBIA Tender for the Construction of a False Roof and Maintenance of Emergency Staircase at Old Bank of Zambia Building Contract No. BOZ/PC/PMS/30/2012 Source of Funds Bank of Zambia Bank of
Contract Standing Orders and Procedure - A Guide For Council Employees
Hampshire County Council Constitution Part 3:F Contract Standing Orders 1. Interpretation 2. Status of, and Compliance with, Contract Standing Orders 3. Approval to Commence Procurement 4. Contract Value
Principles and Procedures. Applicable to. The Procurement of. Consulting Services. Under. Transaction Advisory Services Provided by
Principles and Procedures Applicable to The Procurement of Consulting Services Under Transaction Advisory Services Provided by Asian Development Bank November 2013 This document has been prepared for ADB
CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE
CONTRACTOR PREQUALIFICATION REQUIREMENTS GENERAL CONTRACTORS, MECHANICAL/PLUMBING SUBCONTRACTORS & ELECTRICAL SUBCONTRACTORS FOR THE SANTEE SCHOOL DISTRICT 1 .......... 2 1. Effective January 1 st, 2014,
PROVISION OF LEGAL SERVICES
COUNTY GOVERNMENT OF WAJIR P.O BOX 9-70200. WAJIR,KENYA PRE QUALIFICATION DOCUMENT FOR PROVISION OF LEGAL SERVICES TENDER NUMBER WCG/PT/023/2016-2018 March, 2016 WAJIR COUNTY Page 1 of 17 Table of Contents
PUBLIC PROCUREMENT CONTRACTS
PUBLIC PROCUREMENT CONTRACTS Public authorities conclude contracts to ensure the supply of works and delivery of services. These contracts, concluded in exchange for remuneration with one or more operators,
Note:The below translation is unofficial. The Arabic original is the recognized text for the legal purposes.
Note:The below translation is unofficial. The Arabic original is the recognized text for the legal purposes. DECREE NO.37 OF 2002 WITH RESPECT TO PROMULGATING THE IMPLEMENTING REGULATIONS OF THE LAW REGULATING
Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School
Carmel Unified School District Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School January 4, 2016 1 NOTICE REGARDING PREQUALIFICATION FOR BLEACHER AND PRESSBOX
REQUEST FOR PROPOSAL FOR ACQUISITION OF INSURANCE COVER FOR THE CENTRAL BANK OF LESOTHO
REQUEST FOR PROPOSAL FOR ACQUISITION OF INSURANCE COVER FOR THE CENTRAL BANK OF LESOTHO TENDER NAME: ACQUISITION OF INSURANCE COVER FOR THE CENTRAL BANK OF LESOTHO REFERENCE NUMBER: CBL/FNC/8/C/TC/03/20I5
Project Procurement Guidelines
Project Procurement Guidelines These Procurement Guidelines were adopted by the Executive Board of IFAD at its 100th Session in September 2010. Table of contents Definitions 3 I. Introduction A.Background
I N T R O D U C T I O N THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES.
I N T R O D U C T I O N Public Procurement means: THE PROCESS OF ACQUIRING GOODS WORKS AND SERVICES BY GOVERNMENT PROCURING ENTITIES. This process includes purchasing, hiring, leasing or any other contractual
Copyright Government of Botswana
CHAPTER 42:08 - PUBLIC PROCUREMENT AND ASSET DISPOSAL: SUBSIDIARY LEGISLATION INDEX TO SUBSIDIARY LEGISLATION Public Procurement and Asset Disposal (Independent Complaints Review Committee) Regulations
PROCUREMENT STANDARD OPERATING PROCEDURES (SOP)
PROCUREMENT STANDARD OPERATING PROCEDURES (SOP) TABLE OF CONTENTS 1. RESPONSIBILITY 1.1 Responsibility for Acquisition 1.2 Responsibility for Procurement Planning 2. REQUISITION 2.1 Requisitions for Supplies,
PROVISION AMENDMENT/S
GPPB Resolution ORIGINAL PROVISION AMENDMENT/S Comment/s 08-2011 Section 1.5 Annex E of the IRR of RA 9184 In claiming for any Variation Order, the contractor shall, within seven (7) calendar days after
Prequalification for Works, Major Equipment and Industrial Installations
PROCUREMENT GUIDANCE NOTE Prequalification for Works, Major Equipment and Industrial Installations 2005 European Bank for Reconstruction and Development This edition includes the amendments as summarised
HCAOG Records Retention Policies & Procedures
HCAOG Records Retention Policies & Procedures Draft September 2015 HUMBOLDT COUNTY ASSOCIATION OF GOVERNMENTS 611 I Street, Suite B Eureka, CA 95501 www.hcaog.net RECORDS MANAGEMENT These procedures are
COUNTY OF DUTCHESS OFFICE OF CENTRAL AND INFORMATION SERVICES DIVISION OF CENTRAL SERVICES 27 HIGH STREET POUGHKEEPSIE, NEW YORK 12601 (845) 486-3670
COUNTY OF DUTCHESS OFFICE OF CENTRAL AND INFORMATION SERVICES DIVISION OF CENTRAL SERVICES 27 HIGH STREET POUGHKEEPSIE, NEW YORK 12601 (845) 486-3670 The Division of Central Services has developed this
Costa Rica Negotiated M&A Guide
Costa Rica Negotiated M&A Guide Corporate and M&A Law Committee Contact Juan Manuel Godoy Consortium Laclé & Gutiérrez San José, Costa Rica [email protected] Coordinator Rafael Alvarado-Riedel
REQUEST FOR PROPOSAL: A NEW AUDITING SOLUTION FOR WINDOWS FILE AND DATABASE SERVERS
REQUEST FOR PROPOSAL: A NEW AUDITING SOLUTION FOR WINDOWS FILE AND DATABASE SERVERS Issued: TABLE OF CONTENTS 1. Introduction...3 1.1 Purpose...3 1.2 Background...3 1.3 Scope of Work...3 1.4 Current Infrastructure...3
External Strategic Sourcing Policy
External Strategic Sourcing Policy Effective: November 6, 2009 Revised: September 2015 TABLE OF CONTENTS 1. OVERVIEW... 4 2. APPLICATION AND SCOPE... 4 3. OBJECTIVES... 5 3.1 Accountability... 5 3.2 Demand