The Logical Framework Approach
|
|
|
- Miranda Copeland
- 9 years ago
- Views:
Transcription
1 JANUARY 2004 KARI ÖRTENGREN A summary of the theory behind the LFA method The Logical Framework Approach
2
3 Content 1. Background LFA, an objective-oriented planning tool What is the purpose of LFA? What is regarded as success in a project? The different steps in the LFA method Definition of each of the nine steps in the LFA analysis Why have the different steps in the LFA analysis? Roles and responsibilities when making an LFA analysis A project-planning workshop The advantages offered by the LFA method Appendix A: Example of a Problem Tree Appendix B: Bus company/example one of an LFA matrix Appendix C: Example of an LFA matrix, Project: Drinking water Appendix D: Risk analysis questions Appendix E: Logical question list Appendix F: List of References
4 Published by Sida 2003 Methods Development Unit Author: Kari Örtengren/Project Design AB Printed by Edita Sverige AB, 2004 Art. no.: SIDA1489en ISBN This publication can be downloaded/ordered from 2
5 1. Background LFA, the Logical Framework Approach, is an instrument for objectiveoriented planning of projects. The method may also be used for analysis, assessment, follow-up and evaluation of projects. What the method is used for depends on the role of its users and their needs. Sida, like many other donor agencies, has decided to use, and to encourage its cooperation partners to use the LFA method, as an instrument to improve the planning, implementation, monitoring and evaluation of a development intervention. The systematic application of the method, with good judgement and sound common sense, can help to improve the quality, and hence the relevance, feasibility and sustainability of development cooperation. An ideal situation when planning a project is when the owner of the project (the cooperation partner) and the development partners (e.g. donors and consultants) are clear about their respective roles and when the project owner, the cooperation partner, assumes the main responsibility for the planning, implementation and follow-up of the project. Hence true local ownership should exist. The owner of a project is always the local organisation (the cooperation partner). Promoting local/recipient ownership of projects and programmes is recognised as a key issue in the strategy for sustainable development cooperation. LFA is based on the idea that the user, the project owner, assumes the main responsibility for the planning process. However, assistance with planning may be needed and useful. LFA has the aim of improving the quality of project operations and can only achieve this if the user has a good grasp of the method and uses it throughout the entire project cycle. Therefore, it is useful to start cooperation by integrating information on LFA in the dialogue between the parties concerned. Most steps in the LFA method are often used during participatory workshops. However, if this is not possible, appendix E includes examples of questions which could be used in the practical application of LFA in the dialogue between the project counterparts, during meetings with different stakeholders. The aim of this booklet is that it should provide guidance for the cooperation partners in project planning procedures. It contains a description of the theory of LFA, which summarises approaches and principles, the 3
6 different planning steps and how they are implemented, and the different roles in a planning procedure. If further information on the method is needed, there is plenty more to be found on the Internet, logical framework approach. 4
7 2. LFA, an objectiveoriented planning tool 2.1 What is the purpose of LFA? LFA is used to: 1) identify problems and needs in a certain sector of society 2) facilitate selecting and setting priorities between projects 3) plan and implement development projects effectively 4) follow-up and evaluate development projects. What the method is used for depends on the role of and the needs of its users. LFA was developed during the 1960s and has been widely spread all over the world since the 1970s. Today it is used by private companies, municipalities and by all most all international development organisations, when assessing, and making follow-ups and evaluations of projects/programmes. The UN-system, German GTZ, Canadian Cida, USAID, Norwegian NORAD and Sida all encourage their counterparts to use the LFA method when planning, implementing and evaluating a process of change, a project/programme. Note the different needs for LFA, depending on the role a party may have. The international donor agencies use the method for assessing, following up and evaluating projects and programmes, while implementing parties use the method for planning, implementing and following up projects/programmes. LFA is: An instrument for logical analysis and structured thinking in project planning A framework, a battery of questions which, if they are used in a uniform way, provide a structure for the dialogue between different stakeholders in a project. A planning instrument, which encompasses the different elements in a process of change (problems, objectives, stakeholders, plan for implementation 5
8 etc).the project plan may be summarised in a LFA matrix, the log frame, (see appendix B and C) An instrument to create participation/accountability/ownership Common sense. Objective-oriented planning means that the point of departure of the planning process is the problem analysis, which leads to the objectives and finally makes it possible to choose the relevant activities. Hence, before making a plan of activities, an analysis of the problems and objectives is necessary. The LFA is not a control instrument and thus does not replace different control systems such as environmental assessment studies, gender analysis or financial control systems. The LFA method should be used during all phases of a project cycle (i.e. during preparation, implementation and evaluation). When the LFA analysis has been performed, the plans made with the aid of the analysis should be used and followed-up actively at each project meeting. Normally, it is necessary to make certain adjustments throughout the project implementation phase. The LFA method must be used with flexibility and with a great sense of feeling of what is required in each situation. The LFA is a suitable tool to use for capacity development, the effort to facilitate for individuals, groups or organisations to better identify and deal with development challenges 1, by facilitating a discussion among stakeholders to identify obstacles to change. During the problem analysis the needs and approaches for different forms of capacity development can be recognized and made transparent. The problem analysis shows whether professional knowledge is needed among the individuals involved, or whether it is necessary to use a broader approach for example to strengthen organisations, or whether there is a need to improve institutional frameworks (legislation or policies). One basic idea in the LFA method is that one should not start talking about what one wants to do (the activities), but about the problem that needs to be solved and about what one wants to achieve/the objectives. 2.2 What is regarded as success in a project? The LFA method has been developed from experience gained of what makes projects successes or failures. Evaluations of projects have shown that certain factors are very significant for achieving good goal fulfilment. 1 Sida and other international organizations have made a number of studies of Capacity Development. Hence, there is a great deal of information on this important topic to be found on the Internet. 6
9 The factors of success for good goal fulfilment most frequently mentioned in evaluations of projects/programmes include: the commitment of all parties involved the project owner s sense of ownership and responsibility, definite roles for all parties involved (division of work & responsibilities), realism, realistic objectives, specific and clear goal fulfilment, specific links between what is done within the framework of the project (the activities) and what will be achieved (the objectives), capacity, the project group s ability to deal with risks, flexibility to adjust processes if conditions change, projects in which the users (beneficiaries) have participated in and exerted an influence on the planning of the project. When looking at the above list, it can be noticed that a correct and appropriate application of the LFA method would certainly improve the possibility of ensuring that all these factors are taken into consideration. 2.3 The different steps in the LFA method The LFA method contains nine different steps: 1 Analysis of the project s Context 2 Stakeholder Analysis 3 Problem Analysis/Situation analysis 4 Objectives Analysis 5 Plan of Activities 6 Resource Planning 7 Indicators/Measurements of Objectives 8 Risk Analysis and Risk Management 9 Analysis of the Assumptions An objective-oriented project planning process, such as LFA, is made in the nine different steps presented above. 2 Different stakeholders/parties have different roles and are needed for different parts of the planning procedure (see 2.6). There is an interrelationship between the different steps. They may not be gone through one by one and then finalised. The project group may need to go back and revise one of the earlier steps, such as the objective analysis, after having received more information through the later steps in the procedure. For example, when making the risk analysis, new activities may have to be included in the plan of activities. 2 Some LFA guidelines have another number of steps in the method. In such cases the guidelines have, for example, integrated the plan of resources (step 6) with the plan of activity (step 5), and/or the analysis of the assumptions (step 9) with the risk analysis (step 8). It is clearer for the reader /user to have 9 separate steps, as used in these guidelines. 7
10 It is important to adapt the framework of the analysis, the different steps, to each situation and to be flexible. All the steps shall not be gone through by all the different categories of stakeholders. (See chapter 2.6). Further, it is it not always necessary that all the steps have to be completed before certain decisions are made. For example, it can be difficult to draw up an activity plan initially for a programme of sector support (SWAP). However, it is nonetheless important that the relevant participants make an analysis of stakeholders, problems and objectives for the sector at an early stage when planning major programmes such as programmes of sector support. 2.4 Definition of each of the nine steps in the LFA analysis Step 1 Context analysis the project s environment/background information All projects/processes of change are part of a wider context. The project is influenced continuously by different economic, social and political processes taking place in society. It is essential that the project group has a clear picture of the context when planning the project. What environment will the project be implemented in? What external factors are important for the fulfilment of the project s objectives? It is therefore necessary to make an initial overall scanning of the project s context (an exhaustive analysis of risks and assumptions is made later, in steps 8 9). This step is often performed by making a study, for example of a sector or a region etc, and/or by making a SWOT analysis (SWOT stands for an analysis of strengths, weaknesses, opportunities and threats 3 ). Making a SWOT analysis of, for example, an organisation would preferably be done in an initial stage of a participatory project planning workshop. The result would give a broad idea of where the organisation stands. In the project document, the context analysis is presented under the chapter Background or Information on the sector. Avoid making additional studies, if they are not necessary! Very suitable updated information on a sector, a region, stakeholders etc may be available on the Internet or in other studies provided by ministries or from donor organisations. The background information should be gathered as close to the owner of the problem as possible. When analysing the context of a project Ask questions! Relevant information needs to be put together in order to obtain good background information on the project in its entirety. Step 2 Stakeholder Analysis/Participation Analysis those who should be involved when planning and implementing the project. Stakeholders are those who are influenced by and exert an influence on those things that take place in the project directly or indirectly. They can be individuals or organisations and they can be both for or against a change. 3 SWOT analysis was invented by an American author, Philip Kotler, in the1960s. Originally it was intended to be a marketing management tool for analysing the possibilities of marketing new products. However, during the last few years it has also been used frequently for analysing organisations in development projects. Kotler s book Marketing Management analysis, planning and control was published in New editions have been published on several occasion. 8
11 Different stakeholders have different opportunities to exert an influence on a project. A survey of the project s stakeholders and their relationship to the project is an important part of the project planning process. Stakeholders can be divided up into four main groups: 1. Beneficiaries/Target group 2. Implementers 3. Decision-makers 4. Financiers Some stakeholders may belong to several of the above-mentioned groups. During the project planning process, information should be obtained from all the different stakeholder groups. All of them have important information to give to the future project group. For the project group it is crucial to structure all the reasons/causes of problems in order to find sustainable solutions. This can only be done with the aid of the information gathered from local stakeholders. When making a stakeholder analysis, think broadly of those who are influenced by or exert an influence on the activities that take place in the sector! Do not forget to include the information from important stakeholders, such as the target group, when planning a project. The different stakeholders combined knowledge about the situation is a key to the identification of appropriate solutions. The stakeholder analysis should be made by local personnel. A time-saving and efficient method of collecting information from different stakeholders is through a planning workshop, a so-called GOPP (Goal Oriented Project Planning) or LFA workshop, during which a summary is made by the different stakeholders of WHY a project is necessary and WHAT shall be achieved by the project (see chapter 3 A project planning workshop ). Step 3 Problem Analysis/Situation Analysis an analysis of the problem that shall be solved by the project and the reasons for its existence Prior to prescribing a relevant medicine or cure, a doctor needs to meet the patient and find out why, the reasons for,the person is in pain a pill might not cure the patient for good. A number of projects are started in which the solution is given, without an analysis being made of the focal problem and its causes and effects. The causes are analysed in order to find the reasons for the focal problem and, thereby, the solutions/the relevant activities. The effects demonstrate the arguments (the needs) for implementing the change/the project. A complex problem is easier to deal with if its causes and effects are thoroughly analysed. The causes could be divided into several groups of problems or clusters. Sometimes this has the effect that, in the end, the project is divided into different projects. If the project is to be manageable, 9
12 limitations must be imposed and priorities set, see assumptions (step 9). The priorities are based on relevance, needs, mandate and resources. Focus is important. However, before setting the priorities, it is necessary to get a total picture of the situation by making a complete problem analysis. The basic questions that a problem analysis should answer are the following: What is the main/focal problem that shall be solved with the aid of the project? (Why is a change/a project needed?) What are the causes of this problem? (Why does it exist?) What effects does the problem have? (Why is it important to solve the problem?) Who is affected by the problem and Who owns the problem? A problem analysis is sometimes made by drawing a so-called problem tree during a participatory workshop. The problem analysis is made by having the stakeholders writing down the problems (causes and effects), which are related to the subject, on yellow notes and placing these paper notes on a wall in an organised, structured way. This procedure makes it possible to clearly visualise the causes of the focal problem and its effects and to find out how different problems are related to each other (see example of a problem tree in appendix A). As mentioned above, the causes of the problem shall be treated by the activities, which are implemented within the framework of the project. The effects are handled automatically by treating the causes of the focal problem. Hence, no separate activities are needed for handling the effects. In the problem tree, the causes are the roots of the focal problem, which, in turn, is symbolised by the trunk of the tree. The effects of the problem form the top of the tree. (For an example of a simple problem tree, see appendix A). As with weeds, their roots must be tackled if they are to disappear. A problem tree is always read from the bottom up. The problems below lead to the problems above. When the project group later starts to plan the activities, they should try to eliminate as many causes as possible by activities. It is important to find the relevant activities in order to eliminate the causes of the problem. Often several activities are needed in order to eliminate one problem, one cause. The possibilities of solving the focal problems are higher the further down in the tree the causes are tackled by activities. In other words, the further down towards the bottom of the tree, in the roots, we tackle the problems, the better the possibilities are of solving the focal problem in a sustainable way and hence, the more relevant the project plan becomes. A problem analysis should preferably be made during a workshop to which different stakeholders are invited. 10
13 When establishing relationships between causes and effects, avoid taking up/writing lack of, for example lack of funds, as a problem. These types of statements are called absent solutions. They do not describe the current negative situation. It is not the lack of funds in itself that is the problem. It is rather what the lack of funds leads to that is the problem. Another example of an absent solution is lack of pesticides in agriculture. Replace this by the problem the seeds are being attacked by vermin. Otherwise there is a risk that there will be a tendency to see just one solution to the problem. In the above-mentioned case, the acquisition of pesticides would then be the solution to the problem. The problem would not be opened up to alternative solutions with statements beginning lack of.... One should always extend one s thinking to find solutions. There might be several different solutions. Another mistake often experienced during problem analysis is inadequate problem specification, when a problem is specified in insufficient detail so that the true nature of the problem is not described. A good example is poor management. This problem needs to be broken down in order to understand what the real problem is. The management problem might include poor financial control, poor administrative skills, poor planning of human resources or weak IT strategy etc. During the workshop, ensure that the stakeholders write one problem per note a problem and not a solution and that it is clear and understandable to everybody. Without a problem analysis it will be very complicated, if possible at all, to find the right sustainable solutions (activities) to solve a problem. The problem analysis has to be made by the relevant stakeholders, including the owners of the problem, the people who know the situation, not by consultants or financing agencies. Please consult the example of a problem tree in appendix A. Step 4 Objective Analysis the picture of the future situation When the stakeholders have identified the problems that the project shall contribute to eliminating, it is time to develop the objectives, to make an objective tree/analysis. If care has been taken on the problem analysis, the formulation of objectives shall not result in any difficulties. The objective analysis is the positive reverse image of the problem analysis. During the objectives analysis, the project group should set three levels of objectives: Overall objectives Project purpose Results 11
14 The relationship between the problem analysis and the objective analysis Problem tree Objective tree Effects Development Objectives Focal problem Project Purpose/Immediate Objective Causes Immediate results/outputs Activities When arranging a workshop, the problems (problem analysis) are written on yellow cards and made into a problem tree, while the objectives (objective analysis) are written on green cards. The colours of the cards make it easier to clearly visualise the analysis. The objectives should answer the following questions: What shall the project contribute to achieving in the long run? Why is the project important? What are the long-term policy objectives to which the project will contribute? (Overall Objectives) What is the project-owner s picture of the ideal situation? It is expected that the purpose will be be achieved as a direct effect of the project s results. It clarifies why the target group needs the project. What is the focus of this project? (Project Purpose) Which different components/sub-goals are needed in order to achieve the purpose and the overall objectives? (Results) Hence, the objectives are explanations of what the project is going to achieve in the short, medium and in the long run. A more comprehensive explanation of the three levels of objectives is given below: 1. Goal/Overall Objectives/Development Objectives: The highest level of objectives is the overall objective, which states the direction the project shall take, i.e. the changes which will take place in the long term partly as a result of the project. One example of an overall objective is increased incomes for small scale farmers or higher completion rates for girls in primary education, improved social welfare or poverty reduction. It cannot be expected that this goal will be achieved until possibly some 5 10 years after the project has ended. The goals constitute the long-term vision for the project owner. 12
15 Moreover, external factors outside the scope of the project are important for the fulfilment of the overall objectives. Hence, this objective level is often difficult to measure. It is difficult to assess how much one particular project has had an influence on, for example, improvements in welfare in a society. Therefore, the use of indicators is often avoided at the overall objective level. Overall objectives/development objectives/goals: State the long-term social and/or economic (impact) benefits to which the project will contribute, and describe why the project is important for the beneficiaries and for the society. 2. The Project Purpose/Immediate Objective: The project purpose is the very reason why the project is needed. The purpose describes the situation which is expected to prevail if the project delivers the expected results, and the assumptions made of the external factors, which must act together with the project. The project purpose and the results shall be: Specific, Measurable, Approved by the project owner and the project group Realistic Time-bound The abbreviation SMART objectives is often used. The project purpose is the objective that should have been achieved directly or one to three years after the end of the project. If it is achieved, the causes of the problem will have been eliminated and, hence, the focal problem itself will disappear. Example: The purpose of an agricultural project can, for example, be: Improved labour productivity for crop X achieved by Y farmers, or a primary health care project can have as its purpose: Health hazards (in respect of certain diseases) for the population in area X reduced by 30%... Project Purpose/Immediate Objective: States the expected outcomes, or direct effects, of the project. These are the benefits which the beneficiares derive from the project. The purpose states why the project is needed by the beneficiaries. 13
16 3. Results/Outputs: The outputs are the direct results of the activities that are implemented within the framework of the project. The outputs/results are a description of the value of the services/products produced by the project within the framework of what the project stakeholders can guarantee. Outputs are actual, tangible results that are a direct consequence of the project s activities. Several activities are often necessary in order to reach one result/output. Results, as well as the project purpose, should be SMART (Specific, Measurable, Approved; Realistic and Time-Bound). Example of results: An output of an agricultural project can be, for example, that the farmers in the area can use more efficient methods to cultivate maize. For a health care project, an output/result can be, for example, Higher quality in the information on mother and child care for the people living in X region. For a transport project, an output can be, for example: Improved transport between A and B. Results/Outputs: States the service(s) the beneficiaries will receive from the project. What the project will be responsible for delivering. The three above-mentioned levels of objectives: overall objectives, purpose and results, differ in respect of time/when they shall be achieved and the possibilities available to the project owner and the rest of the project group to exert an influence on their fulfilment. The fulfilment of objectives at the higher levels naturally requires goal fulfilment at the lower levels. An important rule of thumb is that the problem that the project s stakeholders have identified as the core or focal problem of the project shall correspond to the project purpose. For further examples of the objectives, please consult the LFA matrix, see appendix B and C. Step 5 Plan of Activities means to achieve the objectives, means to eliminate the causes of the focal problem Activities constitute the means to achieve the goals. Hence, they are not the goals themselves of the project! One common mistake made in project documents is to focus attention on the activities of the project and to confuse them with the goals. It is not possible to draw up a relevant activity plan until a problem analysis and an objective analysis have been made. If the activities are planned and implemented in a suitable way, the results will be achieved. This, in turn, will lead to the achievement of the project purpose and, in the long term, will also influence the overall objectives. The activities shall tackle the causes/reasons of the focal or core problem(s), the roots of the tree. The activities are the work that is done by those involved in the project. 14
17 Examples of activities are: A three-day seminar on economic statistics for 12 statisticians responsible for financial accounting at the Statistical Agency Elaboration of school material in mathematics for primary schools students Construction of a primary health care clinic The plan of activities is drawn up by the project group with guidance from the problem analysis made by the stakeholders and based on the objective analysis. The project group has usually obtained advice for activities from the participants at the initial planning workshop. N.B. It will be necessary to add activities to the plan of activities when the project group has made the risk management plan (see below). Step 6 Plan of Resources, inputs in order to implement the activities Before the project starts, the project group needs to make a detailed plan of the resources which are needed to implement the project. The project plan, including the plan of resources, is formulated in the Scope of Work, an appendix to a contract. Resources provided for implementing activities within the framework of the project can consist of: Technical expertise (local and/or foreign expertise: what kind of know-how is needed to support the development of capacity) equipment /spare parts /training in the use of the equipment premises funds time Financing for the project can be provided in different forms, for example grants, funds or credits. It can sometimes be the case that the resources provided by the local cooperation partner are not described in the contract, for example the financing of local costs, local staff, premises etc etc. An unspecified division of responsibilities may create problems during the implementation of the project. The budget, particularly in respect of cost-sharing should also preferably be decided before the start of the project and be clearly stated in the contract. Time is an important resource, often planned too optimistically. If equipment is needed, the equipment has to be adapted to local conditions and training in the use of the equipment should be integrated as an activity in the project plan. Step 7 Indicators measurements of results Is the project achieving its goals? To answer this question, the project group needs to identify indicators, which make it possible to measure the progress of the project at different levels. Establishing a suitable indicator for an objective is a way of ensuring that an objective becomes specific, realistic and tangible. There should be at least as many indicators as 15
18 there are results and some for the project purpose. An indicator may be, for example, a statistical source if it is possible to see from the statistics that a change has occurred as a result of the project. It is important to think about the following when establishing indicators of the fulfilment of objectives and results: What shall the project achieve in the terms of quality? What shall the project achieve in terms of quantity? During which period of time? When shall the fulfilment of objectives have taken place? Which group is the target group? Which geographical region or sector is affected by the project? The process of setting up indicators reveals whether the objectives are non-specific and unrealistic. The project owner, the cooperation partner, is the stakeholder that can best establish indicators. Try to find several indicators to measure each result and the project purpose and try to find easy understandable indicators. An indicator shall be objectively verifiable. In other words, anybody shall be able to measure the results. It shall be clear where data for measurement purposes can be found. (State sources of verification in the project document. For examples of sources of verification, see column in appendix B). In order to see if the situation has improved as a result of the project, it is necessary to know the basic facts about the situation prior to project start. Hence, it may be necessary to make a so-called baseline study. What is the picture before we start, what values exist? Without a study of this type, it is difficult to measure the results after the project has been implemented. There are indicators for all types of projects, even HR/D (Human Rights and Democracy) projects, for example: increased membership of political parties greater access to media increase in percentage of voters registered change in population believing in equal rights etc.. Some of these proposed indicators need to be evaluated through interviews. Indicators for HR/D projects need to capture the complexity of the process. Hence it is advised that participatory indicators should be used. For more examples of indicators, please consult appendix B and C, the LFA matrix, and/or study the Internet. 16
19 Step 8 Risk Analysis and Risk Management analysis of the risks affecting the project s objectives and plans to avoid these risks. The persons/the project group that are responsible for the project must identify, analyse and assess different factors, which, in different ways, affect the possibilities available to the project to achieve its objectives. An analysis of possible critical external and internal factors /risks gives us an opportunity to assess the conditions that the project is working under. In the risk analysis it can be the case that so-called killing factors arise, i.e. factors that make goal fulfilment in a project impossible, for example political developments in the country. (See appendix D, risk analysis schedule). After having made a risk analysis, project management has to make a risk management plan, i.e. a plan of how to avoid the potential risks. Include risk management in the project plan, as activities to overcome risks. External factors/risks: These are risks that exist outside the framework of the project (for example political developments, natural disasters, corruption etc.) It is most often the case that the project group cannot exert an influence on these risks. If they are triggered off, these external risks can lead to difficulties in fulfilling the objectives of the project, some of them might even be killing factors, see appendix D, Risk Analysis Step by Step. Internal factors/risks: These are risks of the type that are possible for the project to exercise control over. They can be practical matters such as delays in deliveries, personnel turnover etc. In most cases project management can minimise the effects of these internal risks. The project group should preferably take the opportunity to let the stakeholders make the first risk analysis during an initial workshop. However, the project group must make a revised risk analysis when the detailed project plan has been finalised, looking at each result set and determining the risks of not achieving the result. This usually has the effect that new activities (in order to avoid risks) need to be included in the project plan. Hence, a risk management plan is made, a plan of how to deal with the risks. Step 9 Assumptions- factors important for goal fulfilment, but outside the project s scope A project does not exist in a social, economic and political vacuum. For its success it is dependent on norms, laws, ordinances, policies, political will and commitment, allocation of funds etc. This is what is normally referred to as the institutional situation in a country. It is not always possible for the project group to exert an influence on this situation and it creates assumptions for the project, which can be favourable or not so favourable. These assumptions should be analysed through the problem analysis before the project is started. A project s priorities should be set with reference to resources, mandate, limits and with reference to what the project group needs to rely on/assume that other parties/projects are handling. 17
20 Example of assumptions: Provided that a new traffic law is approved by the Parliament, the number of road accidents may decrease by x%. The project group assumes that the law will be approved. However, it has no power to ensure that the law is approved or not. Assumptions are set at the different levels in the objective hierarchy. An assumption for achieving a project purpose may be, for example, a longlasting stable political situation. Project management is aware that the political situation is important for the project s objective fulfilment. However, it is unable to exert an influence on the political situation. It may only assume that a stable political situation prevails, if it is a reasonable assumption. If it is not a reasonable assumption, it might be a risk, and the project group has to analyse whether a change in the political situation is a killing risk/factor (see appendix D). If the project group considers the political situation to be a killing factor, that it is most possible that a change will occur on the political scene, it might be necessary to postpone the implementation of the project. If an assumption is found to be a risk, i.e. that nobody else will deal with this factor, but the project group knows that it is a very important factor in order to achieve the results, then the project group needs to consider if it should include activities dealing with this risk (in order to avoid the risk occurring) in the plan of activities. Assumptions are included in the project document for fulfilment of each objective level. (See step 4 above and in the matrix appendix A). The project group is aware that the assumptions are important for fulfilment of the objectives. However, it is not possible to include all the possible scenarios in the project. Assumptions are the causes of the focal problem which are important for goal fulfilment, but which the project group does not have direct control over. However, the project group assumes that others are dealing with these causes. The project group has to look at the causes in the problem analysis and consider which causes that may not be possible for them to handle. These causes are nevertheless important for goal fulfilment. The assumptions are set with regard to the resources and the mandate the project group has, and with regard to what the project group knows that others are handling. The project group should state the assumptions in the project proposal. The assumptions have to be realistic, otherwise they are considered to be risks and should be handled in the risk management plan. 18
21 2.5 Why have the different steps in the LFA analysis? Relevance, Feasibility and Sustainability Relevance: With the assistance of steps 1 4 (context, problem analysis, stakeholder analysis, objective analysis), we can make sure that we are doing the right thing, by involving the relevant stake-holders, dealing with the right problems and establishing the correct objectives, which enables us to select the right activities at a later stage. These steps ensure that the project idea is relevant in a problem-solving perspective. Feasibility: With the assistance of steps 5 7 (activity plan, resource planning, indicators of objective fulfilment), we can see that we are doing things in the right way, that the programme is feasible, with the right activities and with sufficient resources (personnel, equipment, budget, time) to solve the problem. Sustainability: With the aid of steps 8 9 (analysis of risks and assumptions), we can assess whether the project can continue by itself, without external support, and that the project purpose is sustainable in the long-term. 2.6 Roles and responsibilities when making an LFA analysis It is very important to observe that the right stakeholders perform the right steps in the planning process/analysis of the project. For example, it is the project owner, the beneficiaries, the implementers and the decisionmakers etc, the local stakeholders in the partner country that primarily shall make: the stakeholder analysis, the problem analysis, the objectives analysis the risk analysis. the analysis of the assumptions It is neither the consultant nor the financier who owns the problem which shall be solved. These parties are not sufficiently well informed, and hence cannot and should not perform these steps. However, financing agencies and/or consultants may assist in the project planning process by, for instance, providing expertise in the LFA method and suggesting solutions to the problem (plan of activities and plan of resources). Involving the wrong parties, or not involving different stakeholders in the different steps in the project planning process, is a common mistake made in project planning. This has the consequence that cause-and-effect relationships are incorrectly analysed, which leads to a situation in which incorrect activities are implemented to solve the wrong problems. The effect will be that the results/objectives are never achieved. Giving the wrong treatment to a patient may have fatal effects 19
22 Sincere cooperation and a correct division of roles in the planning process prior to implementation increase the likelihood of smooth implementation and the degree of local ownership and readiness to work towards sustainable results. The division of roles and responsibilities can vary due to the character of the project and the availability of skilled officers, but the main principle is that the local cooperation partner shall bear the main responsibility for both planning and implementation to as great an extent as possible. 20
23 3. A project-planning workshop Visualisation is a powerful tool Arranging a project-planning workshop is an efficient way of avoiding mistakes in the planning procedure. The advantages of a workshop are: That the most important stakeholders are invited and together make their voices heard. The possibility for the stakeholders to decide on a joint and structured picture on the situation and what the needs are /the problems are (the cause and effect relations). A process, which creates consensus on the issue. Arriving at a joint understanding of the situation makes it possible to focus and avoid conflicts during implementation of the project. To obtain local ownership and ensure that responsibilities are assumed by the relevant stakeholders The workshop is a time-saving and a cost efficient method of obtaining good insight into the situation, which could replace some studies. An initial project-planning workshop is usually arranged for two to four days, depending on the project and the needs. During the workshop the broad group of stakeholders normally go through the following steps in an LFA analysis: A problem analysis (step 3) A revised stakeholder analysis, (step 2) A proposal for an objectives analysis (step 4) Producing proposals for indicators for the project purpose (step 7) Draft proposals to the project group for a plan of activities (step 5) An initial risk analysis (step 8) Proposals on assumptions (step 9) The purpose of an initial planning workshop (a goal-oriented project planning workshop, GOPP-workshop, or an LFA workshop) is to clarify WHY a change (why a project) is needed and to gain consensus on WHAT shall be done. 21
24 The programme for an initial workshop may be slightly different for different workshops, since it should always be adapted to the needs of the stakeholders and to the situation. Hence, the LFA steps taken during a workshop may vary, but the problem analysis is always included. The results of the workshop should be presented in a report, which may include a first draft of an LFA matrix. The results of the initial workshop should be taken into consideration by the future project group, when it plans the details of the project. After a GOPP workshop has been held, the project group should perform a more detailed planning process, in which a detailed project plan is drawn up on HOW the project shall be implemented, including a specific activity plan, a time schedule, a detailed resource analysis, risk management plan, budget etc. This defines the entire scope of work. This is usually referred to as a management workshop or management planning process, which specifies in detail HOW the project shall be implemented. Recommendations with regard to initial project planning workshops A GOPP workshop may preferably be arranged with the assistance of an independent facilitator (moderator), who should know LFA and facilitating well. The moderator is responsible for the planning process during the workshop. The moderator should be independent of the future project. He or she does not need to know the field, the sector, but should be fully conversant with the planning method, LFA. It may even be an advantage if the moderator does not know the field, the subject, since he or she will ask for clarifications, which the stakeholders may take for granted. Successful project planning needs clear answers. There are certified moderators in several countries. The donor organisation can usually provide the group with lists of names of facilitators. Prior to the workshop, an initial stakeholder analysis has to be made in order to find out who should be invited to the workshop. The stakeholders are fully familiar with the situation and hence they do not have to make preparations in advance. For practical reasons and to enable everyone to participate actively, no more than 25 persons should attend the workshop. A workshop usually takes 2 4 days, depending on the needs and the project. A workshop should preferably start with an introduction to LFA theory, about one-two hours. The next step is normally the problem analysis, which may take a day or even more. The problem analysis is normally followed by the objective analysis, proposals to the future project group for activities, risk analysis, assumptions and proposals for indicators. Revise the stakeholder analysis, consider whether some stakeholders were not invited, who need to provide more information. Most of the workshop takes place in the form of a plenary session; however, parts could preferably be arranged as group activities and then later presented and discussed in plenum. 22
25 Ensure that the workshop is held in a big conference room, with a large wall surface. Bring pens, lots of notepaper in different colours, scotch tape, an overhead projector/powerpoint projector (for the presentation of the LFA theory) and a large piece of paper to cover the wall for the problem analysis and objective analysis. A draft report on the results of the workshop should be written. Normally this is done by the moderator/facilitator. The report is mainly written for the project group, but is naturally distributed to all the stakeholders who participated in the workshop. The report is not a complete project plan, but represents the initial planning document and it will be used for the final part of the planning procedure, the detailed planning by the project group. During the management workshop, the how-workshop, the project group identifies the details of the project and draws up the final project plan. The basis of the management workshop is the outcome of the initial GOPP workshop. The LFA steps dealt with in a management workshop are: A revised stakeholder analysis (step 2) A revised objective analysis (step 4) A plan of activity (step 5) A plan of resources (step 6) Establishing the indicators for the objectives (step 7) A risk analysis including a risk management plan (step 8) Establishing the assumptions (step 9) If it is used, the final log frame (matrix) is completed after the management workshop. There are advantages in having separate workshops, since different stakeholders have different roles and mandates. Further, time for reflection is needed between the workshops. The project group needs to be formed and the necessary resources need to be discussed and verified. 23
26 4. The advantages offered by the LFA method When all the nine steps in the LFA analysis have been performed as described above, the foundations have been laid for successful project/ programme implementation, provided naturally that the external risks do not change/occur adversely and that the plan is followed wisely. Always bear in mind that the LFA analysis can and should be adapted to the prevailing situation. However, always with a participatory approach. The LFA work is mainly the responsibility of the development partner/the recipient organisation. Naturally, assistance, if needed, may be provided by, for example, the financier. The target group of the project should always, whenever possible, participate in the planning and implementation of the project. The method should be applied flexibly and with a level of ambition, which, in each situation, is ultimately determined by the recipient, after consultation with other parties involved in the project. If LFA is based on reality and applied with sound common sense, the development assistance given will be used more efficiently and will be of greater benefit. Sida does not seek to force fixed models for the use of LFA on recipients. If, for one reason or another, the LFA analysis cannot be performed at a workshop, a LFA battery of questions can provide support for the parties involved. (See appendix E). In principle, most donors request the same information prior to making a decision on project support. Hence they request their cooperation partners to provide information on relevance, feasibility and sustainability by using a goal-oriented project planning method such as LFA. The project proposal should include information on: The context The stakeholder The problem The objectives The plan of activities The resources needed The risk analysis and a risk management plan The assumptions 24
27 Further, a plan of exit, how to prepare for the take-over of the project, needs to be prepared and included in a project plan, which is part of sustainability analysis. For a financing agency the purpose of using LFA for the assessment of a project proposal is to identify weaknesses or gaps in the design of the programme/project. These gaps will relate to the relevance, feasibility and sustainability of the project. Hence, it is necessary for a project owner to use a goal-oriented project planning method in order to receive finance for well-planned projects/programmes. Later in the project cycle, during the evaluation, the connection between the terminology used in evaluations and the terminology used in the LFA method becomes clear. If the project has not been planned properly, with clear objectives and indicators, it will be very difficult to succeed in achieving the objectives in the implementation phase and finally, it will be difficult to evaluate the results. Relationship between evaluation criteria and the LFA terminology (see LFA matrix) Sustainability Overall objectives Project Purpose Results Activities Relevance/Impact Effectiveness Efficiency Resources/Means To sum up, it should be mentioned that, provided that it is used correctly and wisely and is adapted to the prevailing situation, the LFA method will: Make a dialogue possible between all parties involved (beneficiaries, implementers, decision-makers and financiers) Offer a tool for the identification of problems and correct solutions to problems Contribute to clarifying and concretising the project s objectives and to specifying correct activities that are necessary to realise the objectives Facilitate the production of follow-up reports and evaluations Create a joint approach to the project, reducing complexity. Ensure that the ownership of the project ends up with the partner in co-operation Make the implementation of the project more efficient, reduce the amount of time required and make the project/programme sustainable. 25
28 Improve the conditions for relevance, feasibility and sustainability of projects and programs. LFA is common sense, a structured way of obtaining answers to essential questions! How the LFA method works depends very much on its users. LFA is no better and no worse than its users 26
29 Appendix A: Example of a Problem Tree Loss of confidence in the bus company EFFECTS Financial losses for passengers Passengers are hurt or killed People arrive late Frequent bus accidents FOCAL PROBLEM Drivers are not Bad condition of Bad condition of CAUSES careful enough vehicles roads Unqualified Hectic Vehicles Insufficient Not Poor drivers schedule are too old maintenance prioritised mainten. Poor planning / administration at the bus company NB: This example is taken from a book on LFA written by NORAD See references. However, some important changes have been made to NORADs problem tree in order to show examples of several deeper root causes of the focal problem, Frequent bus accidents. It is very important to find the fundamental causes of a focal problem in order to find the sustainable solutions. Often some causes and effects are identified when a real problem analysis is made during a workshop with all important stakeholders participating. Keep on asking the question WHY a problem (a cause) exists until there are no more answers. In order to arrive at sustainable solutions the project group needs to tackle the problems at the bottom of the tree. It is crucial to find out what the real obstacles are to the realisation of change! The problem tree above should be elaborated further with the local stakeholders, in respect of both causes and effects. 27
30 Appendix B: Bus company/example one of an LFA matrix 28
31 Appendix C: Example of an LFA matrix, Project: Drinking water Intervention logic Objectively measurable and verifiable indicators Sources of verifications Important assumptions Development objectives/goal Target groups health shall improve 20% fewer cases of diarrhea, scabies, eye infections, malaria, blood parasites (bilharzias) and malnutrition Reports from health clinics in the project area Project objective/ Purpose Consumption of clean water shall increase from x to y and the use of latrines from a to b xx water points erected and xx latrines constructed and their use recorded Project half yearly reports Water sources remain unpolluted Primary health care and education are still provided Results/ Outputs 1. 50% of the target group supplied with sufficient quantities of clean water % of existing water points in the target area repaired Maintenance and repair organization commences operations % of households in the target area supplied with latrines Hygienic habits of the target group improved Water points taken into operation; water quality tested % of existing water points in working order All water points included in the maintenance programme Latrines built and used correctly Target groups habits more hygienic Project personnel who visit all construction sites when the installations are complete Project half-yearly reports Reports from the District Development Fund Reports from the District Council Half-yearly reports from the Min of Health Examinations of the target group which is given training in health matters Maintenance system will continue to function Action to be taken: budget for current costs to be established at the health authority Target group is willing to adopt new habits in respect of water and sanitation Action to be taken: methods used for the active participation of the target group Activities 1.1 Train xx personnel 1.2 Designate xx places for water points 1.3 Procure materials 1.4 Drill and construct xx wells Train xx water groups 2.2 Acquire materials 2.3 Repair xx old water points Form maintenance organization 3.2 Establish a costcoverage mechanism Acquire materials 4.2 Train xx builders 4.3 Identify target group 4.4 Build xx latrines Survey present habits of hygiene 5.2 Train in hygiene Project and costs Foreign financing Capital goods Operating costs Infrastructure Technical assistance (4 technicians) Total cost District euro Total cost District euro Total foreign cost euro Local financing Personnel (unit at local health authority) Infrastructure Maintenance Operating costs Local currency Total cost District Total cost District Total local cost in local currency Total local cost in euro Total cost for Sweden and Rec. Country in euro Necessary capital goods, materials and personnel are available Action to be taken: study to be made Target group will cooperate Action to be taken: target group participates in planning, implementation and follow-up Implementing organization fulfils its obligations Action to be taken: health authorities sign an agreement Inputs/ Resources Conditions 1. Adequate supply of ground water of good quality 2. Government continues to support the project 29
32 Appendix D: Risk analysis step by step The project group should analyse the risks, one by one, identified by the project group and other stakeholders, as shown below. 1. Will this factor/risk affect the implementation of the project or make the objectives unachievable? Yes = Continue No = Ignore 2. Is it possible that the identified obstacle/risk will occur? Yes = Continue Perhaps = Continue No = Ignore 3. Will anyone outside the project deal with the obstacle/risk? No = Continue Perhaps = Continue Yes = Ignore 4. Can project management deal with the obstacle/risk? If the answer to question no. 4 is: YES = then the project group has to allocate resources and integrate activities in the plan in order to avoid the risk NO = then The project group has to monitor the obstacle carefully since the obstacle can be a killing factor and NO = then The project group needs to plan alternative strategies for implementation in order to avoid the obstacle (The project group has to make a risk management plan) 30
33 Appendix E: Logical question list A project outline or project description, which has been elaborated by the recipient, should elucidate the answers to the following questions. The use of the question list should not be regarded as a formal exercise, but as a way to inspire logical analysis. The questions or those which are relevant to the issue should be applied flexibly and with common sense. The questions are based on the Logical Framework Approach (LFA) method. 0. Background: Country and Sector 0.1What are the country s basic development problems? (cf. the country s development policy, Sida s country analysis and country strategy). Is the proposed project relevant in this context? 0.2What are the problems in the particular sector? (cf the country s sector policy, any available sector analyses, results reports and results analyses) 1. Analysis of Participants/Stakeholders 1.1 Which agencies, organisations, groups and people will influence/be influenced by the project, directly or indirectly? Define their roles in relation to each other. 1.2 Describe the target group (sex, age, income, work situation, etc) and analyse effects on different parts of the target group. 1.3 In what way does the target group participate in the planning, implementation and follow-up of the project? To what extent does the project group own the project? 1.4 How will the effects of the project help/hinder weak/poor people or groups? 1.5 How are men and women each affected by the project? 1.6 Can any groups be affected negatively? 31
34 2. Problem Analysis 2.1 What does the problem (or problems) in question consist of? Why is a project needed? (It is necessary to reach a common definition of the main problem together with the participants in the discussion.) The problem or problems should be defined with regard to the project s proposed target group and not only defined at the macro level. 2.2 What are the causes and the effects of the main problem identified by the stakeholders? 2.3 Why is it not possible for the country/target group to solve the problem itself? Why is development assistance necessary? 2.4 Are there any background studies which have analysed the problem area? 3. Analysis of Objectives (Stipulate in concrete terms the objectives at different levels: development objectives or sector objectives, project objectives/purpose, results, activities). The objectives should be specific, attainable, relevant, realistic, limited in time, and preferably measurable. 3.1 What are the development goals in the sector, which this project should help to achieve? 3.2 What is the project s objective/purpose in concrete, realistic and if possible measurable terms? (The objective of the project shall be to remove the causes of the main problem, which has been identified.) 3.3 What effects is the project expected to give rise to, in relation to its development objectives? Why is the planned project important for the target group, the region, the country? 3.4 What is the project s relationship with other development efforts being made in the sector? 3.5 What concrete results should the activities lead to? What goods or services are the project expected to supply to the target group? 3.6 Does the sum of the outputs/results of the project lead to the fulfilment of the project objective? 4. Internal and External Risk Factors 4.1 What factors, or conflicts of interest both internal and external can prevent, make it difficult, or delay the implementation of the project? 4.2 Assess the external risks (conflicts or other disruptive factors) and the extent to which they are likely to affect the project. What can be done about them? 4.3 Is there any decisive factor which is a precondition for the success of the project? What are the plans of the partner country to deal with any such factors? 4.4 What negative side-effects can the project bring about? 4.4Have alternative strategies been considered to reach the planned project objective/purpose and to avoid the risks? (a risk management plan) 32
35 5. Project Organisation and Implementation 5.1 What resources (human, financial and material) have been allocated at activity level to guarantee that the project can be implemented? 5.2 What is the situation in respect of organisational capacity and institutional capacity, including administrative and managerial skills and capacity? 5.3 Has the division of roles and responsibilities between the parties been clearly defined? 5.4 Will the target group be trained in the operation and management of the project activities? 5.5 What other projects are being implemented by the Government, non-governmental organisations and other donors in the same sector? Is there any danger of duplication or conflict? Time Schedule 5.6 Have specific dates been determined for the planned start and completion of each activity? 5.7 Is there a specific date and a plan for the phasing-out of the project? Budget and Financing 5.8 Is the budget for the project and its activities realistic and comprehensive? Does it include local costs? Is it clear who is paying for what? 5.9 How is the recipient country participating in the financing of the project? Are there other donors financing parts of the same project? 5.10 What measures have been planned to finance operation and maintenance costs locally when development assistance has been phased out? 6. Analysis of Preconditions for Economically Sound and Sustainable Development 6.1 Is there a policy and legislation to back up the project? 6.2 Is there sufficient management, personnel and institutional capacity, as well as financial resources, to keep the activity running in the longterm? 6.3 Is the level of technology adapted to the conditions prevailing in the country? 6.4 Has an environmental impact assessment been made? This list of questions was originally included in Guidelines for the Application of LFA in Project Cycle Management, Sida Methods Development Unit, 1996, Berit Rylander och Erik Illes. Some changes have been made to the original list. 33
36 Appendix F: List of References Logical Framework Approach (LFA), en sammanfattning av LFA teorin (in Swedish), Kari Örtengren, 2003 Supporting Ownership, Sida Evaluation 02/33:1 Promoting Sustainable Livelihoods, a report from the task force on poverty reduction, Sida, 1996 Goal Oriented Project Planning, Facilitator Training Identification Workshop, PCM Group Råd och anvisningar vid tillämpning av LFA under en projektcykel, Jerker Carlsson, Berit Rylander och Erik Illes, 1999/Draft Logical Framework Approach, A flexible tool for participatory development, DANIDA1996 Guidelines for the Application of LFA in Project Cycle Management, Sida Methods Development Unit, 1996, Berit Rylander och Erik Illes Manual Project Cycle Management, European Commission, European Aid Co-operation Office, March 2001 Sidas Guidelines for the Application of LFA in Project Cycle Management, Sida/ METOD 1996 Appendix A and B: Problem tree and LFA matrix NORAD Handbook for objectives-oriented planning/fourth Edition, The Logical Framework Approach, 1999 Appendix C: Example of an LFA matrix, Project: Drinking water LFA matrix, example taken from Sida s Guidelines for the Application of LFA in Project Cycle Management, Sida/METOD
37 Appendix D: Risk Analysis Sida s Guidelines for the Application of LFA in Project Cycle Management, Sida/METOD 1996 Appendix E: Logical Question List LFA Questions taken from Sida s Guidelines for the Application of LFA in Project Cycle Management, Sida/METOD
38 36
39
40 Halving poverty by 2015 is one of the greatest challenges of our time, requiring cooperation and sustainability. The partner countries are responsible for their own development. Sida provides resources and develops knowledge and expertise, making the world a richer place. SWEDISH INTERNATIONAL DEVELOPMENT COOPERATION AGENCY SE Stockholm Sweden Phone: +46 (0) Fax: +46 (0) [email protected],
Using the logical framework matrix
Using the logical framework matrix Defining the M&E Strategy for a programme/project A logical framework Clearly defined results and risks Performance indicators and means of verification An M&E plan for
Logical Framework Analysis and Problem tree. 21 st March 2013
Logical Framework Analysis and Problem tree 21 st March 2013 Overview Explanation of purpose and benefits of Logical Frameworks Develop a problem tree analysis linking roots causes effects (exercise) Logic
The Logical Framework Approach An Introduction 1
The Logical Framework Approach An Introduction 1 1. What is the Logical Framework Approach? 1.1. The background The Logical Framework Approach (LFA) was developed in the late 1960 s to assist the US Agency
Problem Tree Analysis
Problem Tree Analysis What is it? The Problem Tree method is a planning method based on needs, however it is not a mechanical translation of problems into objectives. While going through the process, taking
Designing Projects and Project Evaluations Using The Logical Framework Approach
Designing Projects and Project Evaluations Using The Logical Framework Approach written by Bill Jackson for the IUCN Monitoring and Evaluation Initiative October 1997 Founded in 1948 as the International
STRATEGIC PLANNING BACKGROUND AND PRACTICE
Module 2 STRATEGIC PLANNING BACKGROUND AND PRACTICE 1 John Glazebrook STRATEGIC PLANNING Introducing SWAp for Environment Belgrade, 24-25 July 2012 Today Look at Why do Strategic Planning? A mixture of
Introduction to Monitoring and Evaluation. Using the Logical Framework Approach
Introduction to Monitoring and Evaluation Using the Logical Framework Approach Developed and Presented by: Umhlaba Development Services Umhlaba Development Services Noswal Hall, Braamfontein, Johannesburg,
Social Return on Investment
Social Return on Investment Valuing what you do Guidance on understanding and completing the Social Return on Investment toolkit for your organisation 60838 SROI v2.indd 1 07/03/2013 16:50 60838 SROI v2.indd
PARC. Evaluation Series No.1 The Logical Framework
PERFORMANCE ASSESSMENT RESOURCE CENTRE PARC Evaluation Series No.1 The Logical Framework By w PARC Evaluation Series No. 1: The Logical Framework Looking back over the last year and the conferences where
Objective Oriented Planning Module 1. Stakeholder Analysis
III. Stakeholder Analysis Stakeholders are people, groups, or institutions, which are likely to be affected by a proposed project (either negatively or positively), or those which can affect the outcome
Table of contents PREFACE TO THE FOURTH EDITION...1
i Table of contents PREFACE TO THE FOURTH EDITION...1 SECTION 1 - INTRODUCTION... 3 LFA IS A TOOL FOR IMPROVING THE QUALITY OF PROJECTS...4 LFA ENHANCES PLANNING, ANALYSIS AND COMMUNICATION....6 DEFINING
Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.
Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for
Framework for Managing Programme Performance Information
Framework for Managing Programme Performance Information Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Managing
6 Essential Characteristics of a PLC (adapted from Learning by Doing)
6 Essential Characteristics of a PLC (adapted from Learning by Doing) 1. Shared mission, vision, values, goals Educators in a PLC benefit from clarity regarding their shared purpose, a common understanding
GUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu [email protected]
GUIDELINES FOR PILOT INTERVENTIONS www.ewaproject.eu [email protected] Project Lead: GENCAT CONTENTS A Introduction 2 1 Purpose of the Document 2 2 Background and Context 2 3 Overview of the Pilot Interventions
Measuring the Impact of Volunteering
Measuring the Impact of Volunteering Why is measuring the impact of volunteering important? It is increasingly important for organisations or groups to describe the difference that volunteering makes to,
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development
Presentation. How to fill out a Log Frame
Presentation How to fill out a Log Frame Structure of a Logframe Matrix HORIZONTAL LOGIC VERTICAL LOGIC Intervention Logic Objectively verifiable indicators of achievement Sources and means of verification
Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification
II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,
The Framework for Strategic Plans and Annual Performance Plans is also available on www.treasury.gov.za
Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Strategic Plans and Annual Performance Plans is also available
Supporting effective teamwork
Supporting effective teamwork A checklist for evaluating team performance CHAPTER 26 : HATCHED Margaret Kilvington and Will Allen Summary Teams can be instruments for achieving changes in culture and practice
KEY PERFORMANCE INFORMATION CONCEPTS
Chapter 3 KEY PERFORMANCE INFORMATION CONCEPTS Performance information needs to be structured to demonstrate clearly how government uses available resources to deliver on its mandate. 3.1 Inputs, activities,
Planning, Monitoring and Evaluating Programmes and Projects
Planning, Monitoring and Evaluating Programmes and Projects Introduction to Key Concepts, Approaches and Terms Working Draft Version 1 March 2000 Global Monitoring and Evaluation Initiative Jim Woodhill
Child Selection. Overview. Process steps. Objective: A tool for selection of children in World Vision child sponsorship
Sponsorship in Programming tool Child Selection Objective: A tool for selection of children in World Vision child sponsorship We ve learned some things about selecting children. It is not a separate sponsorship
STRATEGIC PLANNING TEN-STEP GUIDE. Planning is a critical component of good business and good management of business.
STRATEGIC PLANNING TEN-STEP GUIDE THE IMPORTANCE OF PLANNING Planning is a critical component of good business and good management of business. Planning helps assure that a business remains relevant and
The Second Action Plan on. Information Security Measures for. Critical Infrastructures. Safety as a matter of course for our daily lives
The Second Action Plan on Information Security Measures for Critical Infrastructures Safety as a matter of course for our daily lives - Safe and secure social infrastructure for everybody - February 3,
STAGE 6 MONITORING AND EVALUATING CHILD PROTECTION POLICIES AND PROCEDURES
STAGE MONITORING AND EVALUATING CHILD PROTECTION POLICIES AND PROCEDURES Overview In stages - we have learnt how to introduce, develop and implement child protection policies and procedures and to confront
Periodic risk assessment by internal audit
Periodic risk assessment by internal audit I Introduction The Good Practice Internal Audit Manual Template, developed by the Internal Audit CoP of Pempal, defines the importance and the impact that an
4. Critical success factors/objectives of the activity/proposal/project being risk assessed
ARTC Risk Management Work Instruction 2: 1. Conduct Risk Assessment Workshop This Work Instruction provides general guidelines for conducting a generic Risk Assessment workshop. The instructions supplement
Table 1. Some key differences between Planning and Strategy Development
1. Introduction and concepts Strategy development and planning are closely related. Both are concerned with the future activities of a project or organisation. Where planning is meant to identify concrete
Section 4: Key Informant Interviews
UCLA CENTER FOR HEALTH POLICY RESEARCH Section 4: Key Informant Interviews Purpose Key informant interviews are qualitative in-depth interviews with people who know what is going on in the community. The
The Vision of an Organisation. The Vision of an Organisation. 1. Introduction. 2. Why organisations need a vision
1. Introduction Nowadays, having a vision is a must in the management of organisations. In complex, changing environments, organisations must regularly shape and reshape their own understanding of what
Guidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014
Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway
Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund
EUROPEAN COMMISSION AGRICULTURE DIRECTORATE-GENERAL Guidelines for the mid term evaluation of rural development programmes 2000-2006 supported from the European Agricultural Guidance and Guarantee Fund
Planning and Writing Essays
Planning and Writing Essays Many of your coursework assignments will take the form of an essay. This leaflet will give you an overview of the basic stages of planning and writing an academic essay but
COMMUNICATION STRATEGY FOR THE UNIVERSITY OF GOTHENBURG
STYRDOKUMENT Dnr F V 2014/71 COMMUNICATION STRATEGY FOR THE UNIVERSITY OF GOTHENBURG Published Decision-maker Responsible body medarbetarportalen.gu.se/styrdokument Vice-Chancellor Kommunikationsenheten
INTOSAI. Performance Audit Subcommittee - PAS. Designing performance audits: setting the audit questions and criteria
INTOSAI Performance Audit Subcommittee - PAS Designing performance audits: setting the audit questions and criteria 1 Introduction A difficult phase in performance auditing is planning and designing. In
Institute of Chartered Accountants Ghana (ICAG) Paper 2.2 Management Accounting
Institute of Chartered Accountants Ghana (ICAG) Paper. Management Accounting Final Mock Exam Marking scheme and suggested solutions DO NOT TURN THIS PAGE UNTIL YOU HAVE COMPLETED THE MOCK EXAM ii Management
PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS
PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS 1 Table of Contents Background A. Criteria B. Definition C. Rationale D. Initiator E. Timing F. Planning G. Involvement of the Independent
ARB's overarching goals The Board has identified two objectives from the Act which underpin all of our work:
Architects Registration Board Communications Strategy Introduction Effective communication is key to the work of the Architects Registration Board (ARB), enabling the organisation to build and maintain
Making a positive difference for energy consumers. Competency Framework Band C
Making a positive difference for energy consumers Competency Framework 2 Competency framework Indicators of behaviours Strategic Cluster Setting Direction 1. Seeing the Big Picture Seeing the big picture
the role of the head of internal audit in public service organisations 2010
the role of the head of internal audit in public service organisations 2010 CIPFA Statement on the role of the Head of Internal Audit in public service organisations The Head of Internal Audit in a public
Logical Framework: Making it Results-Oriented
1 of 11 2001-04-05 09:58 Logical Framework: Making it Results-Oriented Table of Contents 1. Introduction 2. Purpose of Guide 3. The LFA Process 4. The Logical Framework Structure 5. The Vertical Logic
THE EU DISABILITY STRATEGY 2010-2020. Analysis paper
THE EU DISABILITY STRATEGY 2010-2020 Analysis paper 1. Introduction Back in 2003 and as a result of the European Year of People with Disabilities, the European Commission adopted a long-term EU Disability
Planning for monitoring and evaluation activities during the programme's lifetime
Developing a Monitoring and Evaluation Plan for Food Security and Agriculture Programmes Planning for monitoring and evaluation activities during the programme's lifetime Text-only version In this lesson
Dutch Accreditation Council (RvA) Policy rule Nonconformities. Corrective action
Dutch Accreditation Council (RvA) Policy rule Nonconformities and Corrective action Document code: RvA-BR004-UK Version 2, 23-1-2015 RvA policy guidelines describe the RvA rules and the policy on specific
Guidelines for Gender Sensitive Programming Prepared by Brigitte Leduc and Farid Ahmad
Guidelines for Gender Sensitive Programming Prepared by Brigitte Leduc and Farid Ahmad November 2009 What is a Gender-Sensitive Programming Process? Gender is a critical factor that determines an individual
Chapter 6 Experiment Process
Chapter 6 Process ation is not simple; we have to prepare, conduct and analyze experiments properly. One of the main advantages of an experiment is the control of, for example, subjects, objects and instrumentation.
NGO Self-assessment through a SWOT exercise
NGO Self-assessment through a SWOT exercise Step 1: Analyse your NGO s Capacity > page 2 Step 2: Do the SWOT Exercise > page 5 Step 3: Make a Strategic Plan > page 8 Step 4: Implement, Monitor, Evaluate
Evaluation policy and guidelines for evaluations
Evaluation policy and guidelines for evaluations IOB October 2009 Policy and Operations Evaluation Department IOB October 2009 Policy and Operations Evaluation Department IOB October 2009 Policy and O
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage
DFID CORE COMPETENCY FRAMEWORK
DFID CORE COMPETENCY FRAMEWORK DFID s Core Competency Framework presents competencies in three clusters as shown below. The red cluster groups the work-related competencies, the green has peoplerelated
7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers
Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4
Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual
Equal Rights and Treatment for Roma in Moldova and Ukraine Project Management Methodology Manual WELCOME TO THE COUNCIL OF EUROPE PROJECT MANAGEMENT METHODOLOGY In July 2001, the Council of Europe launched
STAKEHOLDER ANALYSIS. Objective: To develop an understanding of stakeholder analysis methods
STAKEHOLDER ANALYSIS Objective: To develop an understanding of stakeholder analysis methods STRUCTURE OF SESSION Introduction How to do stakeholder analysis Using the findings 1 INTRODUCTION What is stakeholder
Performance Management at Sida
Internal Audit 05/05 Performance Management at Sida Wiveca Holmgren Arne Svensson Department for Evaluation and Internal Audit Performance Management at Sida Wiveca Holmgren Arne Svensson Internal Audit
Strategic Plan Development Workshop. A facilitation guide. Girls Not Brides: The Global Partnership to End Child Marriage
Strategic Plan Development Workshop A facilitation guide Girls Not Brides: The Global Partnership to End Child Marriage February 2016 1 Table of Contents Introduction... 3 Workshop agenda... 4 Before you
QUALITY IN EVERYDAY WORK. Quality Guide for the Teacher Education College Version 2.7
QUALITY IN EVERYDAY WORK Quality Guide for the Teacher Education College Version 2.7 Updates: Organisational change 1.1.2009 JAMK s mission and vision 5.1.2010 Planning and development discussion practices
Rwanda. Strategy for Sweden s development cooperation with 2015 2019 MFA
MINISTRY FOR FOREIGN AFFAIRS, SWEDEN UTRIKESDEPARTEMENTET Strategy for Sweden s development cooperation with Rwanda 2015 2019 MFA 103 39 Stockholm Telephone: +46 8 405 10 00, Web site: www.ud.se Cover:
Evaluability Assessment Template
Evaluability Assessment Template Evaluability Assessment Template An Evaluability Assessment examines the extent to which a project or a programme can be evaluated in a reliable and credible fashion. An
PLANNING UNIT PRIME MINISTER S DEPARTMENT
HANDBOOK For Logical Framework Analysis ECONOMIC PLANNING UNIT PRIME MINISTER S DEPARTMENT FOREWORD The Logical Framework Approach (LFA) will be used for formulating and preparing development programmes
TERMS OF REFERENCE FOR THE EVALUATION OF SECTOR SUPPORT IN THE WATER SECTOR.
TERMS OF REFERENCE FOR THE EVALUATION OF SECTOR SUPPORT IN THE WATER SECTOR. 1. Background information 1.1. Sector-wide approach in Dutch bilateral aid The sector-wide approach has been developed as a
7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS
7. ASSESSING EXISTING INFORMATION 6. COMMUNITY SYSTEMS AND LEVEL INFORMATION MONITORING NEEDS: OF THE INFORMATION RIGHT TO ADEQUATE GAP ANALYSIS FOOD 7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY MANAGEMENT OF PERFORMANCE INFORMATION POLICY AND PROCEDURES DOCUMENT ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive
The definition of stakeholders includes both winners and losers and those involved or excluded from decision-making processes.
Stakeholder analysis is the identification of (key) stakeholders in a planning or change process, an assessment of their interests and the way in which these interests are likely to affect the planning
HUMAN RESOURCES FOR HEALTH A KEY PRIORITY FOR THE MINISTRY OF HEALTH
HUMAN RESOURCES FOR HEALTH A KEY PRIORITY FOR THE MINISTRY OF HEALTH BACKGROUND In line with a global awakening of the imminent crisis in human resources for health, the WHO country office has reflected
Monitoring and Evaluation of. Interventions
Monitoring and Evaluation of Sports in Development (SiD) Interventions presented by: Pamela K. Mbabazi, Ph.D. Faculty of Development Studies, Department of Development Studies Mbarara University of Science
QUALITY IN EVERYDAY WORK
QUALITY IN EVERYDAY WORK Quality Guide for the Teacher Education College Version 2.5 Updates: Organisational change 1.1.2009 JAMK s mission and vision 5.1.2010 Planning and development discussion practices
Il Project Cycle Management :A Technical Guide The Logical Framework Approach
European Institute of Public Administration - Institut européen d administration publique Il Project Cycle Management :A Technical Guide The Logical Framework Approach learning and development - consultancy
Action Plan 2013-2014
SAMHÄLLSVETARKÅREN VID LUNDS UNIVERSITET Action Plan 2013-2014 Approved by the Executive Council on May 30th, 2013 Table of Contents 1. Purpose... 2 2. Introduction... 2 3. Areas of Focus... 3 3.2 Communications
2016 Charter School Application Evaluation Rubric. For applications submitted to The Louisiana Board of Elementary and Secondary Education
2016 Charter School Application Evaluation Rubric For applications submitted to The Louisiana Board of Elementary and Secondary Education 2016 Charter School Application Evaluation Rubric The purpose of
USING THE EVALUABILITY ASSESSMENT TOOL
USING THE EVALUABILITY ASSESSMENT TOOL INTRODUCTION The ILO is committed to strengthening the Office-wide application of results-based management (RBM) in order to more clearly demonstrate its results
Rio Political Declaration on Social Determinants of Health
Rio Political Declaration on Social Determinants of Health Rio de Janeiro, Brazil, 21 October 2011 1. Invited by the World Health Organization, we, Heads of Government, Ministers and government representatives
Performance Monitoring Tools
Performance Monitoring Tools M&E training for MoHSW & Business Coalition on HIV/AIDS Material adapted from USDOL/ILO HIV/AIDS Workplace Education programme Session Objectives Participants will be able
TERMS OF REFERENCE FOR STRATEGIC PLANNING & MANAGEMENT EXPERT
TERMS OF REFERENCE FOR STRATEGIC PLANNING & MANAGEMENT EXPERT 1. Background The agency responsible for statistical information in Ghana is the Ghana Statistical Service (GSS) established in 1985 by PNDC
An introduction to impact measurement
An introduction to impact measurement Contents 1 Introduction 2 Some definitions 3 Impact measurement at BIG 4 Setting impact measures for programmes APPENDICES A External Resources (separate document)
Monitoring, Evaluation and Learning Plan
Monitoring, Evaluation and Learning Plan Cap-Net International Network for Capacity Building in Sustainable Water Management November 2009 The purpose of this document is to improve learning from the Cap-Net
INFORMATION FOR OBSERVERS
30 Cannon Street, London EC4M 6XH, United Kingdom Tel: +44 (0)20 7246 6410 Fax: +44 (0)20 7246 6411 E-mail: [email protected] Website: www.iasb.org International Accounting Standards Board This document is
Strategic Planning. Strategic Planning
4 Strategic Planning Strategic Planning 1 4 TABLE OF CONTENTS Strategic Planning 3... What is Strategic Planning? 3... Why do Strategic Planning? 4... Assessing Your Strategic Planning 5... Developing
Professional Graduate Business School Standards
Professional Graduate Business School Standards Japan University Accreditation Association Legend In this Standards, related regulations are abbreviated as follows: Ordinance No. 11 : Ordinance for Enforcement
Consultation and Engagement Strategy
Consultation and Engagement Strategy Contents: 1. Introduction 2 2. Purpose 3 3. Aims and Objectives 4 4. Key principles 5 5. Delivery of the Strategy 6 6. Action Plan 2011-12 7 Appendix 1 Understanding
GUIDE ON DEVELOPING SERVICE STANDARDS
GUIDE ON DEVELOPING SERVICE STANDARDS Contents 1. Background... 3 2. Why the Guide/ Toolkit?... 4 3. Service Delivery Planning Value Chain Components... 4 4. Definition and types of Service Standards...
4. PROJECT PREPARATION THE LOGICAL FRAMEWORK APPROACH AND LOGICAL FRAMEWORK MATRIX
4. PROJECT PREPARATION THE LOGICAL FRAMEWORK APPROACH AND LOGICAL FRAMEWORK MATRIX 4.1 Introduction The Logical Framework Approach (LFA) is a specific strategic planning methodology that can be used to
Writing Reports BJECTIVES ONTENTS. By the end of this section you should be able to :
Writing Reports By the end of this section you should be able to : O BJECTIVES Understand the purposes of a report Plan a report Understand the structure of a report Collect information for your report
Global framework. Safety, health and security for work-related international travel and assignments
Global framework Safety, health and security for work-related international travel and assignments 3 Global framework Safety, health and security for work-related international travel and assignments International
DATA COLLECTION CHALLENGES
DATA COLLECTION CHALLENGES Sasha Hurrell This essay is part of a series of papers commissioned by The Partnering Initiative through its Case Study Project to develop insights into the process of researching/writing
Calculation of Risk Factor Using the Excel spreadsheet Calculation of Risk Factor.xls
Calculation of Risk Factor Using the Excel spreadsheet Calculation of Risk Factor.xls Events, Impact and Software Validation Table of Contents Many software products in complex computer systems like LIS
EUROPEAN COMMISSION JOINT RELEX SERVICE FOR THE MANAGEMENT OF COMMUNITY AID TO NON-MEMBER COUNTRIES (SCR)
EUROPEAN COMMISSION JOINT RELEX SERVICE FOR THE MANAGEMENT OF COMMUNITY AID TO NON-MEMBER COUNTRIES (SCR) Resources, relations with the other institutions, evaluation, and information Evaluation Project
1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3
TABLE OF CONTENTS 1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3 4 DETAILED OVERVIEW OF THE PROGRESS... 4 4.1 Progress on Component 1 -
Achieve. Performance objectives
Achieve Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants.
Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014
the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed
Part 1. MfDR Concepts, Tools and Principles
Part 1. Concepts, Tools and Principles 3 Overview Part 1. MfDR Concepts, Tools and Principles M anaging for Development Results (MfDR) is multidimensional, relating back to concepts about how to make international
Svenska Handelsbanken AB FI Ref. 13-1783 through Chair of Board Service no. 1. Finansinspektionen's decision (to be issued on 19 May 2015 at 08.
18 May 2015 DECISION Svenska Handelsbanken AB FI Ref. 13-1783 through Chair of Board Service no. 1 106 70 STOCKHOLM Remark and administrative fine Finansinspektionen's decision (to be issued on 19 May
How the Ministry of Education managed the 2008 national school bus transport tender process. Report to the Ministry of Education October 2009
How the Ministry of Education managed the 2008 national school bus transport tender process Report to the Ministry of Education October 2009 Contents 1: Introduction... 3 What is school transport?... 3
DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES
Ref. Ares(2014)571140-04/03/2014 DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES EXECUTIVE SUMMARY January 2014 TABLE OF CONTENTS Introduction 1. RATIONALE FOR BUDGET SUPPORT 1.1 What is Budget Support?