SCCI SUPPORTING. SCCI2036 Palliative Care Clinical Data Set. Implementation Strategy. Project: SCCI2036 Palliative Care Clinical Data Set
|
|
- Lenard Palmer
- 7 years ago
- Views:
Transcription
1 Document filename: Project Manager SCCI2036 Implementation Strategy v0.3 Helen Bolton Project: SCCI2036 Palliative Care Clinical Data Set Owner Julia Verne Version 0.3 Author Malcolm Roxburgh Version issue date 30/06/2015 SCCI2036 Palliative Care Clinical Data Set Implementation Strategy
2 Amendment History: Version Date Amendment History First draft for comment /06/2015 Revisions following comments /06/2015 Minor revisions following internal HSCIC review - ensuring version numbering correct, date and version for SRO sign-off Reviewers: This document must be reviewed by the following: Name Title / Responsibility Date Version Katie Lindsey NEoLCIN Programme Manager 16/06/ Helen Bolton Palliative Care Data Project Manager 16/06/ Helen Bolton Palliative Care Data Project Manager 30/06/ Katie Lindsey NEoLCIN Programme Manager 30/06/ Approvals: This document must be approved by the following: Name Title / Responsibility Date Version Julia Verne SRO 26/06/ Document Control: The controlled copy of this document is held by the work area it covers. Any copies of this document held outside of that area, in whatever format (e.g. paper, attachment), are considered to have passed out of control and should be checked for currency and validity. Page 2 of 10
3 Contents 1 Introduction Purpose Overview of Current as is state Current Systems and Infrastructure Information Governance and N3/PDS Access Electronic Palliative Care Co-ordination Systems (EPaCCS) NCPC Minimum Data Set Summary of to be state Responsible Authority Data Flows Implementation Support Governance Processes for maintenance Implementation options and migration path Management approach for information governance and clinical safety issues.. 10 Page 3 of 10
4 1 Introduction 1.1 Purpose This strategy sets out the proposed approach to implementing the Palliative Care Clinical Data Set. The data-set is currently in piloting (during 2015/2016), with the outcome and findings of the pilot designed to facilitate the estimates of costs and timings required to roll-out the data capture to all providers of Specialist Palliative Care in England. At this stage, this document sets out thinking and options that will be considered based on pilot findings. 2 Overview of Current as is state. 2.1 Current Systems and Infrastructure Specialist palliative care is delivered by teams based in hospices and NHS acute hospitals. There are around 400 hospices in England, using a wide range of IT systems to record clinical information. Specialist palliative care services based in NHS hospitals also use a range of electronic and paper-based clinical record systems. Responses to the National Council for Palliative Care (NCPC) 2014 IT survey question which of these IT systems do you use? is shown in Fig 1. Fig 1 NCPC IT Survey % of respondents said they did not have a clinical IT system for recording patient information and 38% did not have a maintenance contract in place with their system supplier. Of those providers with a maintenance contract, around 66% reported that their contract covered costs of data field changes. Around 20% of respondents said that they intended to change their system in the next twelve months. 35 providers reported maintenance costs for their systems these are shown in (Fig 2). Page 4 of 10
5 Fig 2 Annual Maintenance Costs 2.2 Information Governance and N3/PDS Access In the 2014 NCPC survey, 77% of providers reported that they completed the NHS Information Governance Toolkit, 12% used an alternative system, and 12% did not use a system (n=190). 18% of providers responded that they did not have an N3 connection (n=166), and 37% said they could not access PDS lookup for NHS numbers (n=179). 62% responded that they asked for consent, with verbal consent the most prevalent (28%) 2.3 Electronic Palliative Care Co-ordination Systems (EPaCCS) There is an existing information standard, Palliative Care Co-ordination: core content (SCCI 1580) to support Electronic Palliative Care Co-ordination Systems (EPaCCS). These systems provide health and social care professionals with access to a shared record of people s wishes and preferences for palliative and end of life care and support patient choice, shared decision making, individual care planning and integration of care across sectors. This information standard, Palliative Care Coordination: core content - SCCI1580 is maintained by Public Health England. Currently 43% of clinical commissioning groups (CCGs) in England have an operational EPaCCS in place and an additional 25% have plans to introduce. It is expected that all EPaCCS provide access to specialist palliative care provider services. Care has been taken to ensure that this proposed standard and SCCI1580 are consistent, e.g. by sharing data items where possible. One of the barriers to a full implementation of EPaCCS has been that an estimated 50%+ of hospices do not currently have an N3 connection. Page 5 of 10
6 2.4 NCPC Minimum Data Set The Minimum Data Set (MDS) for Specialist Palliative Care Services is collected by NCPC on a yearly basis, with the aim to provide good quality, comprehensive data about hospice and specialist palliative care services on a continuing basis. It is the only annual data collection to cover patient activity in specialist services in the voluntary sector and the NHS in England, Wales and Northern Ireland. The MDS was developed in 1995 by NCPC and is currently commissioned by Public Health England and Hospice UK. The questions included in the MDS have been revised recently so that it remains as relevant and useful as possible. The MDS is a specification for aggregate activity reporting. It looks at a wide range of specialist palliative care issues, including inpatient activity, day care, community care, hospital support, bereavement support, outpatients, staffing, diagnoses and services for young people. Data is submitted annually to NCPC by around 65% of providers and an annual report is produced from this data. 3 Summary of to be state 3.1 Responsible Authority There is to be a single authority responsible for receiving a data-set compliant with SCCI2036 from all specialist palliative care services (n>500). During piloting this authority is to be Public Health England, but may change to the Health and Social Care Information Centre (HSCIC) for the full national collection. Progress and actions during piloting in 2015/2016 will provide NHS England with the basis on which to make this decision. These include: - Ensuring that there is a legal gateway in place to permit organisations to undertake a full national collection - Understanding the local and national costs associated with setting up and managing a national collection. - Determining the required timescales for setting up a collection in an organisation. NHS England should have a clear position on these before the standard is submitted for full approval. 3.2 Data Flows Fig 3 shows the data-flow that will form the basis for implementation planning, if the responsible authority for the full collection is Public Health England. Providers will be required to submit data at regular intervals, with the frequency of submission informed by the pilot findings. It is expected that the options for submissions are likely to be at 1 month, 3 months, 6 months or one year. Providers IT systems will be amended to comply with the standard during 2016/2017, and it is anticipated that most submissions will be through this route. Where providers do not have IT systems that can be amended to support the data standard, a web-based Data Entry Tool (DET) is being developed by Public Health Page 6 of 10
7 England and will be made available to support submission of data for those providers with inadequate IT capacity. Any communication of or about data containing patient identifiers outside the file submissions can be managed using a secure file transfer application. CyberArk is being used for the piloting. Regular, cleansed data-extracts are shared with the HSCIC. Data matching between this data and other health data (e.g. Hospital Episode Statistics (HES), Office for National Statistics (ONS) mortality files) will be required. The body responsible for this will be dependent on the ability to gain Information Governance (IG) approval from the relevant authorities in PHE and the HSCIC for managing this. Fig 3 To be data-flow with PHE as data controller. 3.3 Implementation Support For many palliative care providers there will be significant challenges in being ready to collect and submit a robust data-set by April The pilot will seek to estimate what support will be required to achieve this. The elements of support that will be quantified and costed by the pilot include: - Training for clinicians to support use of phase and functional status in clinical record keeping. - Training for clinicians to support use of ipos outcome measures in clinical record keeping. - Supplier costs that providers are likely to face. - Size, composition and cost of reporting function. Page 7 of 10
8 - Size and composition of a Programme Office to a. maintain all IG processes and documentation (e.g. data-sharing agreements) b. support IT supplier and local systems changes to support standard c. test extractions for conformity with standard. d. manage actions associated with maintenance of, and changes to, the Standard through SCCI. e. maintain and manage a Data Entry Tool (if required). Implementation Guidance will be developed, incorporating the learning and experiences from the pilot sites. This guidance will be published alongside the requirements specification for the information standard to support providers establishing a data collection and reporting system. A professional guidance and definitions document (Appendix E to the Requirements Specification) has been developed to support the pilot sites. This will be updated with information and learning from the pilot project and will be published as professional guidance to support the clinicians recording the data items in clinical record systems. 3.4 Governance Governance arrangements have been put in place for the development and testing of the data collection, and will be maintained in the national collection which is to be managed by PHE. A National Palliative Care Clinical Data Set Steering Group is chaired by the National Clinical Director for End of Life Care. The project is accountable to the Chief Knowledge Officer in Public Health England, to the Domain 2 Programme Board in NHS England and through the sponsor for the standard (Jane Allberry) in the Department of Health. Full details of the governance arrangements are provided in the SCCI2036 Requirements Specification. Page 8 of 10
9 Fig 3 The Expert Reference Group membership includes clinicians, professionals and people with experience and the Technical Reference Group membership includes representatives from the test sites. It is expected that similar governance arrangements will remain in place following approval of the information standard. The terms of reference and membership will be reviewed and updated to ensure that appropriate governance is in place. 3.5 Processes for maintenance As part of development of the information standard, procedures, approval and control requirements for maintaining the information standard will be specified. These will include processes for responding to queries arising from implementation, ensuring that the standard is kept up to date and fit for purpose and that the dataset items remain aligned to any changes in clinical practice or coding, and to policy requirements. 4 Implementation options and migration path As outlined above, the preferred option for the data collection element of this standard has not yet been confirmed as it will be informed from the pilot phase. This limits the ability to design a specific, detailed migration path at this stage. However, the following outline plan is proposed (indicative dates are given to assist in understanding of the proposed timeline, and are subject to change): 1. Communication and engagement with relevant NHS and voluntary sector providers, professional representative bodies and patient groups during autumn / winter 2013/14. Page 9 of 10
10 2. NHS England capital monies to support provider system readiness for commissioning the data set (Summer 2016). 3. PHE to seek use of legal gateway for patient data, probably through Confidentiality Advisory Group (CAG). (Autumn 2015). 4. NHS England to determine the requirements for further data set commissioning, and the managing body (late 2015). 5. Specification of information standard for final stage approval agreed by steering group. 6. HSCIC to test, and develop xml message.(jan-march 2016) 7. Full Stage Approval (April 2016) 8. Changes / upgrades are made to IT and administrative systems as necessary (2016/2017). 9. Providers that wish to use the web-based Data Entry Tool (DET) are registered and trained between October 2016 and March The anticipated deadline for compliance with the standard is April Management approach for information governance and clinical safety issues All outputs and processes associated with the standard including data management, quality and sharing will follow existing information governance frameworks, including the fundamental standard, ISB 1512 Information Governance Standards Framework. As the standard supports commissioning and secondary uses of data, there is no requirement for a clinical safety assessment during the pilot phase and prior to SCCI Need to Requirement acceptance. However, the pilot steering committee have appointed a clinical safety lead, who will review whether clinical safety issues may arise from changes to clinical record keeping, caused by the introduction of the standard. If this is considered a risk, a full patient safety assessment will be undertaken, and submitted with the documentation for final stage acceptance. Page 10 of 10
Specialist Palliative Care National Clinical Data Collection Pilot
Specialist Palliative Care National Clinical Data Collection Pilot Presenter: Katie Lindsey. Public Health England The vision...better data from specialist palliative care to: Support care delivery- adding
More informationSCCI Development Framework
Document filename: SCCI Development Framework Directorate / Programme SCCI Project Development Support Service Document Reference Project Manager [Manager] Status Approved Interim Owner Gwen Smith
More informationINFORMATION GOVERNANCE POLICY
INFORMATION GOVERNANCE POLICY Version: 3.2 Authorisation Committee: Date of Authorisation: May 2014 Ratification Committee Level 1 documents): Date of Ratification Level 1 documents): Signature of ratifying
More informationHealth and Social Care Information Centre
Health and Social Care Information Centre Information Governance Assessment Customer: Clinical Audit Support Unit of the Health and Social Care Information Centre under contract to the Royal College of
More informationIAAS Recommendation Report
Standardisation Committee for Care Information (SCCI) 30 April 2014 Agenda Item:09 For: (insert action/decision/info) IAAS Recommendation Report ISB 1513 Maternity Services Data Set (Amd 45/2012) IAAS
More informationInformation Governance Strategy
Information Governance Strategy THCCGCG9 Version: 01 The information governance strategy outlines the CCG governance aims and the key objectives of its governance policies. The Chief officer has the overarching
More informationUse and verification of the NHS number for all active patients.
Title: Reference No: Owner: Author: Use and verification of the NHS number for all active patients. NHSNYYIG-004 Director of Standards Information Governance Team First Issued On: March 2008 Latest Issue
More informationInformation Governance Policy
Information Governance Policy Version: 4 Bodies consulted: Caldicott Guardian, IM&T Directors Approved by: MT Date Approved: 27/10/2015 Lead Manager: Governance Manager Responsible Director: SIRO Date
More informationGeneral Practice Extraction Service (GPES)
General Practice Extraction Service (GPES) Customer: Health and Social Care Information Centre (HSCIC) Requirement: Patient Objections Management (POM) Customer Requirement Reference Number: NIC-228038-V5Z0L
More informationA fresh start for the regulation of independent healthcare. Working together to change how we regulate independent healthcare
A fresh start for the regulation of independent healthcare Working together to change how we regulate independent healthcare The Care Quality Commission is the independent regulator of health and adult
More informationINFORMATION GOVERNANCE POLICY
INFORMATION GOVERNANCE POLICY Name of Policy Author: Name of Review/Development Body: Ratification Body: Ruth Drewett Information Governance Steering Group Committee Trust Board : April 2015 Review date:
More informationGPES Independent Advisory Group Minutes
Meeting date: Thursday 13 December 2012 Location: Ambassadors Bloomsbury, 12 Upper Woburn Place, London WC1H 0HX Members in attendance: Name Neil Serougi Angus Dawson Joanne Bailey Eve Sariyiannidou MacDonald
More informationNHS Business Partners miniguide. Introductory guidance for NHS-commissioned healthcare providers from the independent and third sectors
NHS Business Partners Introductory guidance for NHS-commissioned healthcare Introductory guidance for NHS-commissioned healthcare NHS Business Partners Contents Section Description Page 1 Introduction
More informationSummary of the role and operation of NHS Research Management Offices in England
Summary of the role and operation of NHS Research Management Offices in England The purpose of this document is to clearly explain, at the operational level, the activities undertaken by NHS R&D Offices
More informationJob Description. Information Assurance Manager Band 8A TBC Associate Director of Technology Parklands and other sites as required
Job Description Job Title: Grade: Accountable to: Base: 1. JOB PURPOSE Information Assurance Manager Band 8A TBC Associate Director of Technology Parklands and other sites as required The purpose of the
More informationHSCIC Audit of Data Sharing Activities:
Directorate / Programme Data Dissemination Services Project / Work Data Sharing Audits Status Final Acting Director Chris Roebuck Version 1.0 Owner Rob Shaw Version issue date 19-Jan-2015 HSCIC Audit of
More informationINFORMATION MANAGEMENT AND TECHNOLOGY (IM&T) STRATEGY
INFORMATION MANAGEMENT AND TECHNOLOGY (IM&T) STRATEGY 1 INTRODUCTION 1.1 This Somerset Information Management and Technology (IM&T) Strategy outlines the strategic vision and direction for the development
More informationInformation Governance Policy
Information Governance Policy Version 1.1 Responsible Person Information Governance Manager Lead Director Head of Corporate Services Consultation Route Information Governance Steering Group Approval Route
More informationData Quality Policy SH NCP 2. Version: 5. Summary:
SH NCP 2 Summary: Keywords (minimum of 5): (To assist policy search engine) Target Audience: The Trust provides a framework to ensure all data that is recorded by the Trust is accurate and complies to
More informationAnnex C Data Quality Statement on Statistics Release: Adults with learning disabilities known to Scottish local authorities 2012 (esay)
Annex C Data Quality Statement on Statistics Release: Adults with learning disabilities known to Scottish local authorities 2012 (esay) Data quality The six dimensions of data quality as defined by the
More informationEmergency Care Weekly Situation Report Standard Specification
Title Emergency Care Weekly Situation Report Specification Document ID ISB 1607 Specification Sponsor Sarah Butler, DH Status FINAL Developer Paul Steele Version 1.0 Author Paul Steele Version Date 19/03/2014
More informationSenate. SEN15-P17 11 March 2015. Paper Title: Enhancing Information Governance at Loughborough University
SEN15-P17 11 March 2015 Senate Paper Title: Enhancing Information Governance at Loughborough University Author: Information Technology & Governance Committee 1. Specific Decision Required by Committee
More informationJOB PROFILE. Data Analyst & Information Governance Project Lead. Director of Finance & Support Services
JOB PROFILE Post:- Accountable to:- Data Analyst & Information Governance Project Lead Director of Finance & Support Services Responsible to:- Director of Finance & Support Services (SIRO) / Medical Director
More informationNATIONAL INSTITUTE FOR HEALTH AND CLINICAL EXCELLENCE CENTRE FOR CLINICAL PRACTICE QUALITY STANDARDS PROGRAMME
NATIONAL INSTITUTE FOR HEALTH AND CLINICAL EXCELLENCE CENTRE FOR CLINICAL PRACTICE QUALITY STANDARDS PROGRAMME standard topic: Specialist neonatal care Output: standard advice to the Secretary of State
More informationGloucestershire Hospitals
Gloucestershire Hospitals NHS Foundation Trust TRUST POLICY DATA QUALITY FAST FIND: For information on the Trust s Data Quality standards, see Section 7. For information on the Trust s computer systems,
More informationA Guide to Clinical Coding Audit Best Practice 2015-16
A Guide to Clinical Coding Audit Best Practice 2015-16 Authors: Clinical Classifications Service Contents 1 Introduction 3 1.1 Purpose of Document 3 1.2 Audience 3 1.3 Background 3 1.3.1 Information Governance
More informationDate: 30 th May 2013. Agenda Item: 5.5. Ian Mackenzie Director of Information and Estates REPORT AUTHOR:
TRUST BOARD IN PUBLIC Date: 30 th May 2013 Agenda Item: 5.5 REPORT TITLE: Information Governance Annual Report EXECUTIVE SPONSOR: Ian Mackenzie Director of Information and Estates REPORT AUTHOR: Sarah
More informationSALISBURY NHS FOUNDATIONTRUST
SALISBURY NHS FOUNDATIONTRUST PAPER SHC 1738 TITLE Information Governance Policy PURPOSE OF PAPER The Information Governance Policy was first approved in April 2005. It is currently due for review to ensure
More informationOutline Brief for Development of Strategic Estates Plan for Bristol, South Gloucester, North Somerset and Somerset Clinical Commissioning Groups
Item 13 Strategic Estates Planning Outline Brief for Development of Strategic Estates Plan for Bristol, South Gloucester, North Somerset and Somerset Clinical Commissioning Groups Phase 1: Priorities and
More informationNational Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP)
National Institute for Health Research Coordinated System for gaining NHS Permission (NIHR CSP) Operating Manual Please check the CRN Website for the latest version. Version: 6.0 Status: Consultation in
More informationINFORMATION GOVERNANCE STRATEGIC VISION, POLICY AND FRAMEWORK
INFORMATION GOVERNANCE STRATEGIC VISION, POLICY AND FRAMEWORK Policy approved by: Assurance Committee Date: 3 December 2014 Next Review Date: December 2016 Version: 1.0 Information Governance Strategic
More informationSLMS-IG16 Training Needs Analysis
SLMS-IG16 Training Needs Analysis Document Information Document Name SLMS-IG16 Training Needs Analysis Author Kristina Drew Issue Date 02/08/2013 Approved By Chair of SLMS IGSG Next review Three years
More informationNHS Greater Huddersfield Clinical Commissioning Group. Remuneration Committee. Terms of Reference
NHS Greater Huddersfield Clinical Commissioning Group Remuneration Committee Terms of Reference Version: 1.0 Committee Approved by: Governing Body NHS Greater Huddersfield CCG Date Approved 1 st May 2013
More informationIAPT Data Standard. Frequently Asked Questions
IAPT Data Standard Frequently Asked Questions Version 1.0 March 2012 IAPT FAQs 1.0-1 - Contents Section 1: About the IAPT Data Standard.. 3 Section 2: Who is responsible for doing what?. 5 Section 3: How
More informationTrust Board Report. Review of the effectiveness of the IM&T Committee
1. Introduction Trust Board Report Review of the effectiveness of the The meets every eight weeks, with a specific responsibility for governance, strategic direction, approval and direction of developments
More informationInformation Governance Policy Version - Final Date for Review: 1 October 2017 Lead Director: Performance, Quality and Cooperate Affairs
Information Governance Policy Version - Final Date for Review: 1 October 2017 Lead Director: Performance, Quality and Cooperate Affairs NOTE: This is a CONTROLLED Document. Any documents appearing in paper
More informationInformation Governance
Attach 8 Information Governance CCG Accredited Safe Haven Application Information Governance CCG Accredited Safe Haven Application 1 1. Introduction 1.1. From the 1st April 2013 new information governance
More informationACADEMIC POLICY FRAMEWORK
ACADEMIC POLICY FRAMEWORK Principles, Procedures and Guidance for the Development & Review of Academic Policies [V.1] Page 2 of 11 TABLE OF CONTENTS 1. FRAMEWORK OVERVIEW... 3 2. PRINCIPLES... 4 3. PROCESS...
More informationWorking with you to make Highland the healthy place to be
Highland NHS Board 2 June 2009 Item 5.3 POLICY FRAMEWORK FOR LONG TERM CONDITIONS/ANTICIPATORY CARE Report by Alexa Pilch, LTC Programme Manager, on behalf of Dr Ian Bashford, Medical Director and Elaine
More informationINFORMATION GOVERNANCE POLICY
Directorate of Performance Assurance INFORMATION GOVERNANCE POLICY Reference: DCP074 Version: 2.5 This version issued: 27/03/15 Result of last review: Minor changes Date approved by owner (if applicable):
More informationPandemic Influenza. NHS guidance on the current and future preparedness in support of an outbreak. October 2013 Gateway reference 00560
Pandemic Influenza NHS guidance on the current and future preparedness in support of an outbreak October 2013 Gateway reference 00560 Purpose of Guidance To provide an update to EPRR Accountable Emergency
More informationPoint of Care (PoC) Sign Up to the Start4Life Information Service for Parents (ISP):Requirements Specification
Document filename: Document Reference Information Services for Parents Programme Manager Kofi Yeboah Status Approved Owner Author Freya Lock, Pubilc Health England Ugo Ulebor Version 1.1 Version issue
More informationThe Health Research Authority. Janet Wisely. April 2015
The Health Research Authority Janet Wisely April 2015 The HRA as an organisation A Non-Departmental Public Body January 2015 Public sector employees on NHS terms Volunteer members of committees A Special
More informationProject Management Framework
Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project
More informationLexcel England and Wales v6 incorporating the Money Advice Service Quality Framework. Additional evidence, scheme rules and guidance
Lexcel England and Wales v6 incorporating the Money Advice Service Quality Framework The Law Society 2015 Contents Introduction... 3 1. Additional evidence required for MAS QF... 4 2. Additional scheme
More informationUpdate on NHSCB Key features of (proposed) NHSCB operating model for primary care
Aim to cover Update on NHSCB Key features of (proposed) NHSCB operating model for primary care NHSCB dental commissioning strategy all dental services Concept and context of local professional networks
More informationNorth West London CCGs:
North West London CCGs: The future of collaborative working update 1. Purpose of this paper 1.1 This paper contains recommendations for the future of Commissioning Support Services which require a final
More informationHSCIC Audit of Data Sharing Activities:
Directorate / Programme Data Dissemination Services Project Data Sharing Audits Status Approved Director Terry Hill Version 1.0 Owner Rob Shaw Version issue date 20/04/2016 HSCIC Audit of Data Sharing
More informationElectronic Palliative Care Co-Ordination Systems: Information Governance Guidance
QIPP Digital Technology Electronic Palliative Care Co-Ordination Systems: Information Governance Guidance Author: Adam Hatherly Date: 26 th March 2013 Version: 1.1 Crown Copyright 2013 Page 1 of 19 Amendment
More informationImproving end of life care in hospital
Improving end of life care in hospital 10 February 2014 Dr Martin McShane Director- Improving quality of life for people with LTCs Context 2 NHS Improving End of Life Care in hospitals What s the job?
More informationSCR Expert Advisory Committee
SCR Expert Advisory Committee Terms of Reference Judith Brodie, Chair August 2015 1 Copyright 2015, Health and Social Care Information Centre. Contents Contents 2 1. Background and Strategic Justification
More informationNHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July 2014. Dear Daniel, Nicola and Sue, Re: CCG Annual Assurance
NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT 24 th July 2014 Dear Daniel, Nicola and Sue, Re: CCG Annual Assurance Many thanks for meeting with us on 6 th June 2014 to discuss
More informationBrighton and Sussex University Hospital NHS Trust
Brighton and Sussex University Hospital NHS Trust Year Ending 31 March 2013 Annual Audit Letter July 2013 Ernst & Young LLP Executive summary Ernst & Young LLP 1 More London Place London SE1 2AF Tel: +44
More informationInformation Governance Plan
Information Governance Plan 2013 2015 1. Overview 1.1 Information is a vital asset, both in terms of the clinical management of individual patients and the efficient organisation of services and resources.
More informationNHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY INFORMATION GOVERNANCE TOOLKIT REPORT
NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY INFORMATION GOVERNANCE TOOLKIT REPORT 9.7 Date of the meeting 15/07/2015 Author Sponsoring Clinician Purpose of Report Recommendation J Green - Head
More informationQuality Impact Assessment. Executive summary
Report to Public Trust Board 28 th February 2013 Title Sponsoring Executive Director Author(s) Purpose Previously considered by Quality Impact Assessment Director of Quality and Safety/ Chief Nurse Director
More informationTERMS OF REFERENCE - MAJOR EVENTS PANEL
TERMS OF REFERENCE - MAJOR EVENTS PANEL OVERVIEW The Major Events Panel is a specialist advisory body to the UK Sport Board and its Major Events Team. Its main purpose is to represent the interests of
More informationInformation Governance Policy
BEXLEY CARE TRUST MANAGEMENT MANUAL Title: INFORMATION GOVERNANCE POLICY Originating Department: IT DEPARTMENT Authorised by: Risk Management Committee June 2008 Reference no: CA12 Date of Issue: JANUARY
More informationDementia. Post Diagnostic Support. HEAT Target
Q ue S T Q uality and E fficiency S upport Team Dementia Post Diagnostic Support HEAT Target Information Flow Mapping Guide February 2013 DRAFT ID: A5110749 Version: 5 Page 1 of 11 Contents 1.0 Background...
More informationProcess for advising on the feasibility of implementing a patient access scheme
Process for advising on the feasibility of implementing a patient access scheme INTERIM September 2009 Patient Access Schemes Liaison Unit at NICE P001_PASLU_Process_Guide_V1.3 Page 1 of 21 Contents (to
More informationService Definition: MooD Cloud Application Configuration & Evolution
Service Definition: MooD Cloud Application Configuration & Evolution MooD SaaS applications are highly configurable to enable close support for the specific needs of customer organisations and user communities.
More informationPrivacy Impact Assessment for Start4Life Information Service for Parents (S4L ISP)
Document filename: Privacy Impact Assessment Start4Life Information Service For Parents (S4L ISP) Directorate / Programme IG & Standards Project Information Service for Parents (ISP) Document Reference
More informationTaking Part Survey. Project Management and Governance
Project Management and Governance July 2012 Department for Culture, Media and Sport Taking Part is a National Statistic and has been produced to the standards set out in the Code of Practice for Official
More information2.1 We are progressing towards the implementation of the future model approved by Ascham Homes Board in November 2014.
Date: 18 th May 2015 Ascham Homes Board Agenda item: 6 Digital Service Design Update Author: Jo Murphy, Deputy Chief Executive Status: Public For: Decision Telephone: 020 8496 4023 1. PURPOSE 1.1 To provide
More informationInformation Governance Policy
Information Governance Policy REFERENCE NUMBER IG 101 / 0v3 May 2012 VERSION V1.0 APPROVING COMMITTEE & DATE Clinical Executive 4.9.12 REVIEW DUE DATE May 2015 West Lancashire CCG is committed to ensuring
More informationThe Regulatory Framework for Social Housing in England Governance and Financial Viability standard requirement: Governance Annual Assessment
East Thames Group The Regulatory Framework for Social Housing in England Governance and Financial Viability standard requirement: Governance Annual Assessment 1 Context 1.1 Under the Regulatory Framework,
More informationSouth East Coast Ambulance Service NHS Trust. Information Governance Working Group. Terms of Reference
South East Coast Ambulance Service NHS Trust Information Governance Working Group Terms of Reference 1. Constitution 1.1. The Board hereby resolves to establish a Working Group of the Risk Management &
More informationPatient Reported Outcome Measures (PROMs) Standards
Patient Reported Outcome Measures (PROMs) Standards A. Information Governance Requirement This Information Governance Requirement Standard covers four Areas: 1. NHS Systems Requirements, 2. Data Sharing,
More informationATHENA Ethical Framework (Version 1- February 2014)
ATHENA Ethical Framework (Version 1- February 2014) ATHENA is co-funded by the European Commission, Executive Research Agency, Seventh Framework Programme (SEC call FP7-SEC-2012.6.1.30) 1. Introduction
More informationGovernance. Information. Bulletin. Welcome to the nineteenth edition of the information governance bulletin
Welcome to the nineteenth edition of the information governance bulletin Our regular bulletin about information governance and the work of the IG transition programme Publication Gateway Reference: 02465
More informationPolicy: D9 Data Quality Policy
Policy: D9 Data Quality Policy Version: D9/02 Ratified by: Trust Management Team Date ratified: 16 th October 2013 Title of Author: Head of Knowledge Management Title of responsible Director Director of
More informationBusiness Relationship Manager IT Project and Programme Managers Hospice Managers Nursing Staff 3 rd Party Suppliers CIO Head of IT Infrastructure
Job Title: Informatics Business Analyst Department: IT Service Management, TDA Location: 89 Albert Embankment, London Responsible to: Head of IT Service Management Role Summary: This role will support
More informationIssue date: October 2009. Guide to the single technology appraisal process
Issue date: October 2009 Guide to the single technology appraisal process Guide to the single technology appraisal process Issued: October 2009 This document is one of a series describing the processes
More informationInformation Sharing Protocol
Information Sharing Protocol South Central PCTs, General Practices and Tribal Consulting Limited Commissioning Enablement Service (Analytics) Document Control Date Version Author Comment 08/02/10 0.1 A.
More informationShropshire Community Health Service NHS Trust Policies, Procedures, Guidelines and Protocols
Shropshire Community Health Service NHS Trust Policies, Procedures, Guidelines and Protocols Title Trust Ref No 1340-29497 Local Ref (optional) Main points the document covers Who is the document aimed
More informationComplaints Policy. Complaints Policy. Page 1
Complaints Policy Page 1 Complaints Policy Policy ref no: CCG 006/14 Author (inc job Kat Tucker Complaints & FOI Manager title) Date Approved 25 November 2014 Approved by CCG Governing Body Date of next
More informationInformation Governance Framework and Strategy. November 2014
November 2014 Authorship : Committee Approved : Chris Wallace Information Governance Manager CCG Senior Management Team and Joint Trade Union Partnership Forum Approved Date : November 2014 Review Date
More informationProject Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services
Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services January 2010 Contents Project Management Page Local Decontamination Units (LDUs) Construction Project Management...3
More informationwww.gov.uk/monitor The maternity pathway payment system: Supplementary guidance
www.gov.uk/monitor The maternity pathway payment system: Supplementary guidance Contents Introduction... 3 Inclusions and exclusions from the pathway payments... 4 Early pregnancy unit and emergency gynaecology
More informationNHS Newcastle Gateshead Clinical Commissioning Group. Information Governance Strategy 2015/16
NHS Newcastle Gateshead Clinical Commissioning Group Information Governance Strategy 2015/16 Document Status Equality Impact Assessment Document Ratified/Approved By Approved No impact NHS Quality, Safety
More informationTriennial Review of NHS Blood and Transplant (NHSBT) A Review of NHS Blood and Transplant (NHSBT) Call for Evidence
Triennial Review of NHS Blood and Transplant (NHSBT) A Review of NHS Blood and Transplant (NHSBT) Call for Evidence August 2015 Title: Triennial Review of NHS Blood and Transplant Call for Evidence Author:
More informationValidation of Revenue Funded Projects:
Validation of Revenue Funded Projects: The Key Stage Review Process Information Note to Projects December 2011 Page 1 of 5 Revenue Funded Projects Key Stage Review -process CONTENTS 1.1. Background...
More informationWales Patient Access Scheme: Process Guidance
Wales Patient Access Scheme: Process Guidance July 2012 (Updated September 2014) This guidance document has been prepared by the Patient Access Scheme Wales Group, with support from the All Wales Therapeutics
More informationInformation Governance Policy
Policy Policy Number / Version: v2.0 Ratified by: Audit Committee Date ratified: 25 th February 2015 Review date: 24 th February 2016 Name of originator/author: Name of responsible committee/individual:
More informationInformation Governance Strategy :
Item 11 Strategy Strategy : Date Issued: Date To Be Reviewed: VOY xx Annually 1 Policy Title: Strategy Supersedes: All previous Strategies 18/12/13: Initial draft Description of Amendments 19/12/13: Update
More informationSenior Governance Manager, North of England. North Tyneside CCG Quality and Safety Committee (01/12/15)
Corporate IG02: Data Quality Version Number Date Issued Review Date V4 07/12/2015 01/01/18 Prepared By: Consultation Process: Senior Governance Manager, North of England Commissioning CCG Quality & Safety
More informationBarking and Dagenham, Havering and Redbridge. An Accountable Care Partnership Building on Integration and successful collaborative working
Barking and Dagenham, Havering and Redbridge An Accountable Care Partnership Building on Integration and successful collaborative working Vision To accelerate improved health and wellbeing outcomes for
More informationReport of the Student Feedback Project Steering Group
Report of the Student Feedback Project Steering Group May 2003 Introduction 1. The Student Feedback Project Steering Group (SFPSG) was established in June 2002 in order to oversee: a. The development of
More informationLORD CHANCELLOR S CODE OF PRACTICE ON THE MANAGEMENT OF RECORDS UNDER
LORD CHANCELLOR S CODE OF PRACTICE ON THE MANAGEMENT OF RECORDS UNDER SECTION 46 OF THE FREEDOM OF INFORMATION ACT 2000 NOVEMBER 2002 Presented to Parliament by the Lord Chancellor Pursuant to section
More informationAn example of best practice HR strategy
An example of best practice HR strategy Summary The Big Lottery Fund wanted to implement a new organisational structure with the aims of developing management capability and streamlining the business structure
More informationElectricity Market Reform (EMR) Panel of Technical Experts for the Enduring Regime:
Electricity Market Reform (EMR) Panel of Technical Experts for the Enduring Regime: Terms of Reference 1. Background In 2013, the Electricity Market Reform (EMR) Delivery Plan set out Government s decisions
More informationInformation Governance Strategy and Policy. OFFICIAL Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.
Information Governance Strategy and Policy Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.0 Status: Final Revision and Signoff Sheet Change Record Date Author Version Comments
More informationGoverning Body Organisational Development Programme 2015/16
Governing Body Organisational Development Programme 2015/16 Governing Body meeting 5 February 2015 C Author(s) Julie Glossop, Senior Commissioning Manager Sponsor Idris Griffiths, Chief Operating Officer
More informationBOARD PAPER - NHS ENGLAND. Purpose of Paper: To inform the Board about progress on implementation of the Cancer Taskforce report.
Paper: PB.28.01.16/05 Title: Cancer Taskforce strategy implementation Lead Director: Bruce Keogh, National Medical Director Cally Palmer, National Cancer Director BOARD PAPER - NHS ENGLAND Purpose of Paper:
More informationInformation Governance Strategy 2015/16
Information Governance Strategy 2015/16 Ratified Governing Body (November 2015) Status Final Issued November 2015 Approved By Executive Committee (August 2015) Consultation Equality Impact Assessment Internal
More informationCOMPETITION LAW COMPLIANCE GUIDELINE. Adopted by the Board of Directors
COMPETITION LAW COMPLIANCE GUIDELINE Adopted by the Board of Directors 1. INTRODUCTION The competition laws are intended to preserve competition by prohibiting concerted practices that restrict competition,
More informationRevalidation of nurses and midwives
Revalidation of nurses and midwives An independent report by KPMG on the impact of revalidation on the health and care system for the Nursing and Midwifery Council (NMC) Appendices 10 August 2015 Contents
More informationTRUST POLICY FOR EMERGENCY PLANNING
TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author
More informationGuidance Document for HRA Statement of Activities for Participating NHS Organisations in England (version 4.1)
Guidance Document for HRA Statement of Activities for Participating NHS Organisations in England (version 4.1) What is the HRA Statement of Activities? The Statement of Activities is part of the application
More informationNHS Cumbria CCG Governing Body. 4 June 2014 17
NHS Cumbria CCG Governing Body Agenda Item 4 June 2014 17 Developing an Informatics strategy to support the 2-5 year strategic and operational plan Executive Summary/Purpose of report: The report sets
More information