1 Environmental Protection Technical Advice note 2 Electromagnetic Radiation EP(S) Guidance notes for developers and consultants July 2003 Produced by: Environmental Protection (Specialist) Team
2 ADVICE GUIDE FOR DEVELOPMENT NEAR TELECOMMUNICATION BASE STATIONS AND OTHER ELECTRONMAGNETIC RADIATION SOURCES Planning Context South Gloucestershire local plan (revised deposit draft) : Environmental protection Environmental pollution EP1 Development will not be permitted which would unacceptably harm the environment, or the health, safety and amenity of users of the site or surroundings land, as a result of pollution to water, air or soil, or through noise, vibration, light, heat or radiation. Additionally, development will not be permitted where users of it would be unacceptably affected by reason of proximity to existing land uses. The Council recognises public concern about the potential and perceived health risks from electromagnetic fields (EMFs) but acknowledges that research is as yet inconclusive. The Council will produce Supplementary Planning Guidance in this regard should scientific evidence emerge following adoption of the Plan which changes national guidance. In the meantime Policy EP1 will apply. In meeting its role in educating and raising public awareness, the Council attaches an advisory note to the decision notice of any planning permission granted in the vicinity of an overhead transmission line. This refers to the existence of the overhead line and states the current National Radiological Protection Board (NRPB) position regarding EMFs and research into possible health risks (P&T Committee resolution 30 May 1996). The advisory note also includes the NRPB s address and telephone number for further information. Telecommunications S4 Development of telecommunications facilities or apparatus other than that covered by permitted development rights under the town and country planning (general permitted development) order 1995 (as amended) will be permitted provided that:- a. development would not unacceptably prejudice residential amenities; and b. in the case of radio masts there is no possibility of erecting antennae on an existing building or other structures where that would meet the technical needs of the operator and minimise impact on the environment; and c. proposals are sited, designed and landscaped so as to minimise any negative impact on the built or natural environment in such a way as to achieve an acceptable balance between the technical needs of the operator and conservation of the environment; and d. there is no possibility of sharing facilities which would meet the technical needs of the applicant and minimise impact on the environment. where proposals would have an adverse impact on the landscape or on sites having nature conservation or archaeological value or buildings or features of historic, architectural or
3 townscape interest, they will only be permitted where they make a significant contribution to the telecommunications network and there is no suitable alternative location outside these areas which meets the technical needs of the operator. Introduction New Base Stations can be controversial and the applicant is normally expected to provide detailed and technical information to support the application. Similarly, the Council often requires detailed technical information for a proposed development near an existing base-station. The simple Advice Guide is intended to assist all applicants at an early stage in order to overcome any local difficulties, streamline applications and reduce the likelihood of later planning appeal. Most of the technical detail will be known to Base Station Operators and power companies and can be used as a checklist; other applicants, such as housing developers, we hope will find the guide helpful at the pre-application stage. Electromagnetic Radiation Sources EMR include Telecommunication Mast Base Stations and micro cell type antennae at low level; overhead power lines and transformer substations. General Requirements 1. Undertake early consultation with South Gloucestershire Council, and investigate the Local Plan * for the area. 2. Avoid sensitive locations: otherwise state the distance from the new proposal to the nearest EMR source; state the distance from the new EMR source to the nearest housing, school, hospital or other sensitive site. 3. Consult with the Health and Safety Executive HSE. 4. Provide a report to reflect relevant Planning and Policy Guidance PPG8 and include a non-technical summary. Specific Requirements 5. State maximum signal strength in public places and inside nearest buildings. 6. Submit appropriate results where available and applicable such as the National Database Survey of registered schools. 7. Confirm consultation with the HSE and submit an Operator s Risk Assessment ORA, under the Health and Safety Management Regulations.
4 8. For particularly sensitive development provide a Community Risk Assessment CRA to show signal strength, directivity, and beam of intensity. 9. State and compare the resultant exposure level to the UK National Radiological Protection Board NRPB Investigation levels; and to the International Committee on Non-ionising Reduction (ICNIRP) guidelines. 10. Ensure a planned maintenance program is set-up for the Base Station / EMR source, with checks on future exposure levels. The following has no official status however, Power Generators, Transmission Companies and Developers could also have regard to the following precautionary guidelines for separation distances between source and any occupied buildings. + Source Distance 400 kv line 40 metres 275 kv line 20 metres 132 kv line 15 metres Underground high voltage cables 5 metres Substation / Transformers 5 metres For the Local Plan the Council attaches an advisory note to any decision notice of any planning permission granted in the vicinity of an overhead transmission line. This refers to the existence of the overhead line and states the current National Radiological Protection Board (NRPB) position regarding Electromagnetic Fields EMFs and research into possible health risks. More information is also available on the NRPB website: publications@nrpb.org.uk * Local Plan references in the South Gloucestershire Local Plan (Revised Deposit Draft): June 2002 include: Chapter II: Service infrastructure S4 Telecommunications page A Stewart Group s Recommendation Policy EP1 Electricity page 324 Chapter 4: Environment Section 2 Environmental Protection - Policy EP1 Electromagnetic Fields EMFs page 76
5 + Included in Electromagnetic Radiation A Guide for Environmental Health Officers published by the Bristol, Gloucestershire and Somerset Environmental Monitoring Committee November 1996; ISBN Note This note is for information purposes only and has been produced to assist those considering the electromagnetic radiation issues relating to planning applications. For further detail on specific proposals, speak to a member of the Environmental Protection (Specialist) Team. As information and guidance develops, the content of the note may need to be revised and updated. Feedback Any comments on this guide would be gratefully received and will inform future drafts. Either write to the address below or on: neil.higgs@southglos.gov.uk Produced by: Environmental Protection (Specialist) Team Council Offices, Castle Street, Thornbury, South Gloucestershire, BS35 1HF Tel: Translations of this leaflet into languages read by local residents can be made available. Audiotape and large print versions can also be provided. For more information about translations contact: Website: Free internet access is available at all South Gloucestershire Libraries. Community Services
ITEM NO: 08 Application No. 11/00308/RTD Site Address: Site Location Plan (for identification purposes only, not to scale)
ITEM NO: 08 Application No. 11/00308/RTD Site Address: Proposal: Applicant: Agent: Ward: Owlsmoor Date Registered: 26 April 2011 Target Decision Date: 21 June 2011 Land Adjacent To Electricity Substation
More informationWireless Broadband: Health & Safety Information
Wireless Broadband: Health & Safety Information Introduction The increasing use of mobile phones and other wireless technology has been accompanied by public debate about possible adverse effects on health.
More informationELECTROMAGNETIC FIELDS AND PUBLIC HEALTH HEALTH AND SAFETY GUIDELINES #1
SINGAPORE, 16 AUGUST 2001 HEALTH SCIENCES AUTHORITY PRESS RELEASE ELECTROMAGNETIC FIELDS AND PUBLIC HEALTH HEALTH AND SAFETY GUIDELINES #1 THE EMF HEALTH ISSUE 1 Over the past years a large number of scientific
More informationTelecommunications Network Infrastructure
PLANNING, TRANSPORTATION & STRATEGIC ENVIRONMENT Telecommunications Network Infrastructure August 2005 Policies in the South Gloucestershire Council Local Plan support the growth of telecommunications
More informationMOBILE PHONE MASTS COUNCILLOR NORMAN NUNN-PRICE 25 NOVEMBER 2006
MOBILE PHONE MASTS COUNCILLOR NORMAN NUNN-PRICE 25 NOVEMBER 2006 Summary This paper is written in order to help the Working Party to formulate a practical policy on the siting of Mobile Phone Masts that
More informationEMR Exposure Limits & Assessment Methods for Mobile Phone Communications. Lindsay Martin Manager, Non-Ionising Radiation Section
EMR Exposure Limits & Assessment Methods for Mobile Phone Communications Lindsay Martin Manager, Non-Ionising Radiation Section Introduction How can we use Wireless Communication Safely? Wireless communication
More informationenvironment briefing02
PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The
More informationFixed Wireless Fact Sheet
National Broadband Network Fixed Wireless Fact Sheet What is the National Broadband Network? The National Broadband Network (NBN) is designed to provide high speed broadband access to 100 per cent of Australian
More informationAppendix 1. The Existing Regulatory Scheme Comprises:
The Existing Regulatory Scheme Comprises: A. An Act about management of the radiofrequency spectrum and other matters. The short title is Radiocommunications Act (Cth) No. 174 1992 as amended; B. An Act
More informationENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas
ENERGY NETWORKS ASSOCIATION Electricity Industry EMF Measurement Protocol for High Field Areas Contents 1 Introduction 1.1 Background 1.2 High Field Areas 2 High Field Area - Generation Businesses 2.1
More informationWhat are radio signals?
Mobile phones and other wireless technologies have become an integral part of everyday life. But does using a mobile phone regularly, or living near a base station, have any implications for our health?
More informationPre-application advice from the Planning and Development Service at Torridge District Council.
Pre-application advice from the Planning and Development Service at Torridge District Council. April 2015 Why seek pre-application advice? Open and constructive discussions are an opportunity for the Local
More informationDr MH Repacholi Co-ordinator. ordinator,, Radiation and Environmental Health World Health Organization, Geneva, Switzerland
Dr MH Repacholi Co-ordinator ordinator,, Radiation and Environmental Health World Health Organization, Geneva, Switzerland WHO EMF Project Scientific Evidence Risk Assessment Standards and Policies Risk
More informationWhat the experts say: The consensus of scientific opinion
What the experts say: The consensus of scientific opinion AMTA relies on the expert judgment of independent public health authorities, such as the World Health Organization, for assessments of safety and
More informationThis Code was drawn up and agreed by representatives of the following organisations:
Acknowledgements This Code was drawn up and agreed by representatives of the following organisations: Central Government Office of the Deputy Prime Minister Department of Trade and Industry Department
More informationEFFECTS OF ELECTROMAGNETIC FIELDS ON ORGANISMS AND PROTECTION PRINCIPLES
EFFECTS OF ELECTROMAGNETIC FIELDS ON ORGANISMS AND PROTECTION PRINCIPLES HANDAN TUNCEL İstanbul University, Cerrahpaşa Medical Faculty Department of Biophysics hntuncel@istanbul.edu.tr The electromagnetic
More informationsources in our environment i.e. Natural and man-made. The sun, earth and ionosphere are the natural source.
Electromagnetic Radiation (EMR) consist of waves of electric and magnetic energy moving together at the speed of light and sometimes is referred as electromagnetic field (EMF) They are basically two forms
More informationMobile use, radio signals and health
Mobile use, radio signals and health Mobile use, radio signals and health How does the mobile network work? Since the 1970s, the use of various types of radio transmitters has risen dramatically, to the
More informationNovember 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE
November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION The Council welcomes and encourages
More informationCharging for Pre-application Advice
Charging for Pre-application Advice Guidance Note - London Borough of Islington April 2016 1 Introduction The London Borough of Islington has a rich built heritage, a diverse community and high land values.
More informationSATELLITE DISHES. A Guide to Installation, Siting and Design Supplementary Planning Guidance
Supplementary Planning Guidance CONTENTS Introduction Westminster s Planning Policies Planning Regulations Is Planning Permission Required? Advice on Siting and Design Glossary of Terms Useful Addresses
More informationThe siting of a BTS on the proposed site will markedly increase the cellphone coverage in this area.
1. PROPOSED CELL PHONE FACILITY IN BOTTLE LAKE FOREST Officer responsible Parks Manager Author Kelly Hansen, Parks Planner John Allen, Consents Team Leader Corporate Plan Output: Consents 9.4.8 The purpose
More informationThe Salzburg Model: A Precautionary Strategy for Siting of Base Stations
The Salzburg Model: A Precautionary Strategy for Siting of Base Stations Dr. Gerd Oberfeld, Dr. Christoph König Federal State of Salzburg, Public Health Department, Environmental Health P.O. Box 527, A-5010
More informationA Survey of Radiation Levels Associated with Mobile and Wireless Communication Technology Masts in Public Areas in Kaduna Metropolis
International Journal of Emerging Engineering Research and Technology Volume 3, Issue, November 25, PP 7-2 ISSN 2349-4395 (Print) & ISSN 2349-449 (Online) A Survey of Radiation Levels Associated with Mobile
More informationVALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS
Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning
More informationETSI TR 101 870 V1.1.1 (2001-11)
TR 101 870 V1.1.1 (2001-11) Technical Report Fixed radio transmitter sites; Exposure to non-ionising electromagnetic fields; Guidelines for working conditions 2 TR 101 870 V1.1.1 (2001-11) Reference DTR/SAFETY-00004
More informationSupporting high quality development in Haringey- Our pre application advice services
Supporting high quality development in Haringey- Our pre application advice services Charges from 1 April 2015 Thank you for taking the time to consider the pre application advice services offered by Haringey
More informationRF safety at base station sites
RF safety at base station sites CONTENTS 1 Purpose and scope................................................. 2 2 Introduction........................................................ 2 3 Basic information...................................................
More information23.1 RENEWABLE ENERGY
Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.
More informationThe land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.
SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within
More informationStatement of the Chief Medical Health Officer
Statement of the Chief Medical Health Officer June, 2011 Health Concerns About Cellular Phone Transmission Antennae and Base Stations In 2005, in response to community concerns and after reviewing the
More informationPlanning application process improvements
Planning application process improvements Government response to consultation January 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement
More informationTHE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:
More informationRegulatory Compliance Services and Products
Regulatory Compliance Services and Products Compliance Testing EMC, Safety, Radio, Telecoms, EMF Consultancy & Research Regulatory Compliance, Management & RF Engineering Training Courses & Workshops Test
More informationCOMMUNICATIONS ALLIANCE LTD INDUSTRY CODE C564:2011 MOBILE PHONE BASE STATION DEPLOYMENT
COMMUNICATIONS ALLIANCE LTD INDUSTRY CODE C564:2011 MOBILE PHONE BASE STATION DEPLOYMENT Industry Code - Mobile Phone Base Station Deployment This Code was issued in draft form for public comment as DR
More informationLesson 1: Looking at risk. Mobiles: are they worth the risk? Rationale. Equipment. Starter
Mobiles: are they worth the risk? This series of lessons combines young people s interest in mobile phones with the opportunity to develop their understanding of the effect that microwaves may have on
More informationMobile Phones: Jargon Explained
Mobile Phones: Jargon Explained 2G 3G Aerial Second Generation Mobile Phone System. See GSM See Third Generation Mobile Phone System. Device designed to radiate and receive electromagnetic energy. Antenna
More informationPlanning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government
Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests
More informationChapter 8. Energy and Communications. Chapter 8 Energy and Communications
Chapter 8 Energy and Communications Chapter 8 Energy and Communications Aim: To encourage and support energy and communications efficiency and to achieve a reasonable balance between responding to central
More informationElectric and Magnetic Fields
Electric and Magnetic Fields Introduction For more than 30 years, considerable scientific research and public discussion have focused on the issue of electric and magnetic fields, or EMF, and health. Scientists
More informationWelsh Government. Practice Guide. Realising the potential of pre-application discussions
Welsh Government Practice Guide Realising the potential of pre-application discussions May 2012 Digital ISBN 978 0 7504 7623 2 Crown Copyright 2012 WG 15424 (2) Table of contents 1 Introduction...3 Background...3
More informationOrchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area.
Application No: 13/2596N Location: Proposal: Applicant: Expiry Date: Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET New Detached Double Garage Block with Integrated Garden Store and Loft Storage
More informationPre-application advice for planning applications. Planning Information. Leaflet 4
Pre-application advice for planning applications Planning Information Leaflet 4 Is pre-application available to everyone? Yes. We provide pre-application advice to anyone who is thinking about submitting
More informationDraft Telecommunication Infrastructure Policy (pertaining to Health, Land Use, Environmental and Heritage matters)
Draft Telecommunication Infrastructure Policy (pertaining to Health, Land Use, Environmental and Heritage matters) REVISION OF THE CELLULAR TELECOMMUNICATION INFRASTRUCTURE POLICY APPROVED IN 2002 CITY
More informationReal-life Applications of ICNIRP Guidelines to Various Human EMF Exposure Issues
Technical Forum Overview and Latest Development of Standards in Human Exposure to Electromagnetic Fields (EMF) Real-life Applications of ICNIRP Guidelines to Various Human EMF Exposure Issues Dr. Brian
More informationwithin body bioelectricity is a biofield. It is due to concentration gradient generated across membrane of the cell.
ABSRACT The thesis entitled A study of effects of electromagnetic radiation (EMR) on health is based on observing influence of electromagnetic fields around us. Electromagnetic radiation may have an effect
More informationPlanning Service. Advice Note: Pre-application Advice and Amendments to Submitted Applications
Planning Service Advice Note: Pre-application Advice and Amendments to Submitted Applications This note applies to all types of applications submitted under the provisions of the Town & Country Planning
More informationMobile Phone Base-Station Audit
Mobile Phone Base-Station Audit Audit site: Aylesbury Road Wing Leighton Buzzard Beds LU7 0NY The Office of Communications (Ofcom) is responsible for management of the civil radio spectrum in the UK. Following
More informationRWANDA APPROACH TO EMF RADIATION PROTECTION. Francis NGABO Director ICT Scarce Resources Management Rwanda Utilities Regulatory Authority RURA
RWANDA APPROACH TO EMF RADIATION PROTECTION Francis NGABO Director ICT Scarce Resources Management Rwanda Utilities Regulatory Authority RURA Italy, Turin 9 May 2013 OUTLINE Rwanda ICT Landscape EMF Protection
More informationSite Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners
Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment
More informationLTE: Technology and Health. 4G and Mobile Broadband
LTE: Technology and Health 4G and Mobile Broadband LTE Technology and Health Mobile Broadband typically refers to providing customers with high speed data while on the move. There are several technologies
More informationDesigned and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
More informationAccessing Buildings to Install Telecommunications Facilities
Australia s regulator for broadcasting, the internet, radiocommunications and telecommunications www.acma.gov.au Accessing Buildings to Install Telecommunications Facilities The Australian Communications
More informationNational Planning Policy for Waste
National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this
More informationNational and Major Developments
National and Major Developments An Agency Joint Statement on Pre-application Engagement A Joint Statement by Architecture and Design Scotland, Forestry Commission Scotland, Historic Scotland, Scottish
More informationINDUSTRY CODE ACIF C564:2004 DEPLOYMENT OF MOBILE PHONE NETWORK INFRASTRUCTURE
INDUSTRY CODE ACIF C564:2004 DEPLOYMENT OF MOBILE PHONE NETWORK INFRASTRUCTURE ACIF C564:2004 Deployment of Mobile Phone Network Infrastructure Industry Code This Code was issued in draft form for public
More informationdesign guidelines for development near high voltage overhead lines
design guidelines for development near high voltage overhead lines National Grid Company plc owns, operates and maintains the high-voltage electricity transmission network in England and Wales. It is part
More information74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790
74 Rivington Street Planning Statement JULY 2013 DP9 100 Pall Mall London SW1Y 5NQ Tel: 020 7004 1700 Fax: 020 7004 1790 CONTENTS Page 1.0 Introduction 1 2.0 Site Description 2 3.0 The Proposed Development
More informationIntroduction. Two storey & first floor rear extensions. two storey rear 1
Introduction This advice leaflet has been produced to help in the planning of your house extension, by identifying the main points to consider, in order to achieve an acceptable proposal. This leaflet
More informationNZQA registered unit standard 25268 version 3 Page 1 of 5
Page 1 of 5 Title Guard against the dangers of electromagnetic radiation while working on telecommunications network structures or sites Level 4 Credits 3 Purpose This unit standard covers the fundamental
More informationCONSERVATION AREAS. Residential Planning Guidelines DO I NEED PLANNING PERMISSION? Examples of Development that require Planning Permission
CONSERVATION AREAS Residential Planning Guidelines DO I NEED PLANNING PERMISSION? Examples of Development that require Planning Permission Windturbines will usually require planning permission Extensions
More information46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)
46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP) Main STEG departments involved in the ESAP: DEQ: Division for Equipment (responsible for implementing
More informationCouncil Policy for New Telecommunication Facilities
Council Policy for New Telecommunication Facilities 1. Purpose To establish policies and procedures for the installation of new telecommunication antennas, towers and related structures which emphasize
More informationREVIEW OF EXPOSURE LIMITS AND HEALTH CONCERNS SANTA ANA. Base Station Telecommunication Transmitters UNIFIED SCHOOL DISTRICT
SANTA ANA UNIFIED SCHOOL DISTRICT REVIEW OF EXPOSURE LIMITS AND HEALTH CONCERNS Base Station Telecommunication Transmitters Dr. Karl Rodenbaugh, Senior Scientist SCOPE OF SERVICES Review, Describe, Discuss,
More information4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
More informationAnnex to the joint statement: Exposure of the general public to radiofrequency fields
16 November 2009 Annex to the joint statement: Exposure of the general public to radiofrequency fields 1. Introduction This document presents typical exposure of the general public to radiofrequency (RF)
More informationDEPLOYMENT OF RADIOCOMMUNICATIONS INFRASTRUCTURE
INDUSTRY CODE DEPLOYMENT OF RADIOCOMMUNICATIONS INFRASTRUCTURE ACIF C564:2002 Industry Code Deployment of Radiocommunications Infrastructure This Code was first issued in draft form for comment as DR ACIF
More informationKeywords Mobile Tower Radiations, Electromagnetic Radiations, Signal Strength, Mobile Phone
Volume 5, Issue 1, January 2015 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Analysis of
More informationCellular Antenna Proposal Form
Cellular Antenna Proposal Form Islands Trust, Northern Office 700 North Road, Gabriola Island, BC V0R 1X3 Phone: 250-247-2063 Fax: 250-247-7514 www.islandstrust.bc.ca northinfo@islandstrust.bc.ca Be sure
More informationCOMMON REGULATORY OBJECTIVES FOR WIRELESS LOCAL AREA NETWORK (WLAN) EQUIPMENT PART 2 SPECIFIC ASPECTS OF WLAN EQUIPMENT
COMMON REGULATORY OBJECTIVES FOR WIRELESS LOCAL AREA NETWORK (WLAN) EQUIPMENT PART 2 SPECIFIC ASPECTS OF WLAN EQUIPMENT 1. SCOPE This Common Regulatory Objective, CRO, is applicable to Wireless Local Area
More informationHazardous radiation. Thesis shows correlation between deaths from cancer and location of mobile antennas
Hazardous radiation Thesis shows correlation between deaths from cancer and location of mobile antennas by Ann Rita Araújo (Belo Horizonte) link on the original: http://www.ufmg.br/boletim/bol1690/4.shtml
More informationMOBILE PHONE JAMMERS ACA Report
MOBILE PHONE JAMMERS ACA Report July 2003 Page 1 INTRODUCTION Following recent publicity surrounding the use of mobile phones in a NSW prison, the Australian Communications Authority (ACA) has further
More informationENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS
GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and
More informationExposure to Radio Waves near Mobile Phone Base Stations
NRPB-R Exposure to Radio Waves near Mobile Phone Base Stations S M Mann, T G Cooper, S G Allen, R P Blackwell and A J Lowe Abstract Measurements of power density have been made at 7 sites where people
More informationDraft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT
Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL
More informationWhat do we already know about Bradford-on-Avon community area?
What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist
More informationBasics of Sustainability. Environmental Impact Assessments (EIA)
Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6
More informationUnofficial Translation
Notification of the National Broadcasting and Telecommunications Commission on Characteristics and Categories of Radio and Television Broadcasting Business Pursuant to the Act on Organization to Assign
More informationPreparing for the NBN. Fixed Wireless Connections
Preparing for the NBN Fixed Wireless Connections Preparing for the NBN Congratulations on choosing to join the National Broadband Network Your new fixed wireless connection will give you access to world-class
More informationThe main purpose of the study was to answer the three following questions:
MEETING DATE: March 19, 2003 SUBJECT: Cellular Phones In The Subway RECOMMENDATION It is recommended that: 1. the Commission authorize staff to issue a Request for Expression of Interest (REOI) to determine
More informationCar Club Strategy. London Borough of Richmond upon Thames
Car Club Strategy London Borough of Richmond upon Thames December 2006 Page 1 of 16 Contents 1.0 Introduction 2.0 Policy Context 3.0 Sustainable Travel In Richmond 4.0 Car Clubs 5.0 Car Clubs in Richmond
More informationGSM Base Station Radiation Level: A Case Study of University of Nigeria Environment
INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 1, ISSUE 8, SEPTEMBER 212 ISSN 2277-8616 GSM Base Station Radiation Level: A Case Study of University of Nigeria Environment Mamilus. A.
More informationCoventry Development Plan 2016 Appendix 89. Glossary of Key Terms
Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable
More informationReference: 05/00928/FUL Officer: Mr David Jeanes
DEVELOPMENT CONTROL BOARD 5 January 2006 Reference: 05/00928/FUL Officer: Mr David Jeanes Location: Proposal: Applicant: Whiffens Farm Clement Street Sutton-At-Hone Kent BR8 7PQ Retrospective application
More informationWho is National Grid?
Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We
More informationEnvironmental Impact Assessment of Forestry Projects
Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer
More informationDevelopment in the Green Belt
PLANNING, TRANSPORTATION & STRATEGIC ENVIRONMENT Development in the Green Belt June 2007 This Supplementary Planning Document (SPD) outlines the purpose, importance and characteristics of the Green Belt
More informationAN ACT PUBLIC UTILITIES. Public Utilities Ch. 75
Public Utilities Ch. 75 CHAPTER 75 PUBLIC UTILITIES SENATE BILL 96-010 BY SENATOR Feeley; also REPRESENTATIVES Foster, Armstrong, Paschall, and Prinster. AN ACT CONCERNING LIMITATIONS ON THE POWERS OF
More informationPlease describe the proposal accurately and concisely. State the number of storeys proposed and the position of any extensions.
Householder Application for Planning Permission for Works or Extension to a Dwelling and for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990 1. Applicant Name and Address
More informationDevelopment proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
More informationApplication for Planning Permission for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990
Application for Planning Permission for Relevant Demolition in a Conservation Area Town and Country Planning Act 1990 1. Applicant Name and Address Please enter the Applicant Details, including full name
More informationOfficer Update Report. Section 1 Site Location Map
Officer Update Report Section 1 Site Location Map 1 Section 2 Application Summary Location Ward Proposal Application Applicant Agent 137 Stamford Street, London SE1 9NN Bishop s Retrospective change of
More informationHouseholder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990
Householder Application for Planning Permission for Works or Extension to a Dwelling Town and Country Planning Act 1990 1. Applicant Name and Address Please enter the Applicant Details, including full
More informationMobile Phones, Mobile Phone Masts and Health
Mobile Phones, Mobile Phone Masts and Health Standard Note: SN/SC/767 Last updated: 14 June 2005 Author: Edward White Science and Environment This note describes issues relating to the safety of mobile
More informationEldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE
WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This
More informationPre-Application Planning Advice
Pre-Application Planning Advice Guidance Note and Schedule of Fees Regeneration and Planning (Development Management) December 2014 The Development Management Service is responsible for the determination
More information2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant.
1. Purpose The Environmental Protection Act 1994 (EP Act) enables listing of land on the environmental management register (EMR) if either a notifiable activity has been or is being conducted, or the land
More informationA Guide to Pre-Application Advice and Fees and Planning Performance Agreements
A Guide to Pre-Application Advice and Fees and Planning Performance Agreements V3 Sept 2014 Contents 1. Introduction 2. The Benefits of Pre-Application Advice 3. How do I obtain pre-application advice?
More informationPlanning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.
15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places