1 TOTAL MANAGEMENT PLANNING Strategies for Water Service Providers Presenters: Craig Teske Aneurin Hughes Rob Drury Principal Engineer (DNR) Manager, Asset (Cardno MBK) Manager, Infrastructure (DNR) 1.

2 TOTAL MANAGEMENT PLANNING A concept which encourages water service providers to:- utilise best practice planning; achieve least cost outcomes; and achieve whole-of-business sustainable management 2.

3 Total ning Guidelines (2000) Presentation Outline Water Service Infrastructure in Queensland Queensland Water Service Providers What is Total ning? TMP Development Challenges in Developing the Guidelines Typical TMP Documentation Structure TMP Guideline Structure Features of the Guidelines KRA Guidelines Links to other parts of the Water Industry Where to from Here? 3.

4 Queensland Water Service Infrastructure Extent:- Water-related infrastructure = $20 billion. $200 - $400 million new infrastructure per year. Urban water-related services:- $10,000 - $15,000 per household per year. Benefits:- Improved living conditions Regional and local economic development Minimisation of environmental degradation 4.

5 Queensland Water Service Providers WSP Category Rural Water Supply Boards Urban Water Supply Boards SunWater Local Governments Joint Local Governments Aboriginal Community Councils Torres Strait Island Community Councils 18 drainage boards 17 water supply boards (stockwater) 11 water supply boards (irrigation) 4 bore water boards 4 statutory water boards 1 (34 schemes) 125 operating over 400 water supply schemes and 250 sewerage schemes Number/Sub-Category 5.

6 Why TMP? Need for an overall, coordinated approach to ensure: - Sustainable essential services; Best practice to plan, design and build; Least-cost outcomes for the community. 6.

7 History of TMP Asset Guidelines developed -1989/91 TMP ning Guidelines developed TMP Manual published DCILGPS Subsidy to develop TMPs /95 Approved TMPs for full subsidy since 1996/7 TMP Guidelines are now being revised & updated TMP Guidelines complement Water Act

8 TMP Today TMP Manual (1994) - 2 volume document (process-based). Subsidy link to TMP - an incentive After December reduced subsidy if no TMP in place. 8.

9 Development of Guidelines Current Objectives Consultation with Local Government and rural service providers (TMP Workshop - November 1999) Additional TMP guidelines being developed by DNR (Cardno MBK developed draft Guidelines) DNR to finalise TMP guidelines - early 2001 (Consultation with relevant stakeholders) 9.

10 The Aim of the New TMP Guidelines For different types of Water Service Providers More outcome oriented, less prescriptive and easier to read More aligned with corporate objectives Provide methodologies for best practice and least-cost planning processes Complementary to the Water Act 2000 Integrated with other State Agency requirements (e.g. EPA) 10.

11 Aneurin Hughes (Cardno MBK) 11.

12 What does Total ning Mean? Smart Thinking Smart ning Smart Financing Smart Investment Smart Sustaining or Improving Services 12.

13 Challenges in Developing TMP Guidelines Diversity of WSPs Dispersed Autonomous Organisational sophistication, resources and skills Getting the balance right 13.

14 Total ning Guidelines (2000) Documentation Structure Guideline Structure Features of Guidelines KRA Guidelines Where to from Here? 14.

15 Basic TMP Structure Level Element Main Target Readership 1 Business (Overview) Elected representatives; executive management; regulators 2 Operational sub-plans, including action plans Operational management; regulators 3 Supporting documentation, including procedure manuals, reports, etc Operational supervisors; technical staff 15.

16 Typical TMP Structure BUSINESS BUSINESS MANAGEMENT MANAGEMENT PLAN PLAN Service Standards Financial Sustainability Asset Ecological Sustainability Risk Performance Organisation & Development KEY RESULT AREAS Service Standards Service Standards Financial Financial Water Demand Water Demand Water Loss Water Loss Environmental Environmental Risk Risk Performance Performance Assessment Assessment Human Resources Human Resources Drinking Water Drinking Water Quality Quality Infrastructure Infrastructure ning ning Overview Overview Asset Asset Evaluation and Evaluation and Renewal Renewal Asset Asset Procurement Procurement Operations Operations Effluent Effluent Biosolids Biosolids Quality Quality Information Information TYPICAL SUB-PLANS Maintenance Maintenance Sewer I/I Sewer I/I Trade Waste Trade Waste Water Source Water Source Energy Energy Community Consultation Marketing Customer Service Policy Service Level Agreements Water Supply Agreements with Major Customers Long-term Financial Model Financial Practice Manual Developer Contributions Policy Infrastructure Charges Pricing Policy Full Cost Pricing Strategy Metering Policy Water Conservation Strategy Strategic Infrastructure Detailed ning Studies Capital Works Program Project Evaluation Manual Infrastructure ning/ Design Guidelines Asset Registers Asset Valuation Reports Water Source Entitlements Water Allocations Outsourcing Strategy O&M Manuals Telemetry Strategy Environmental s under EPP (Water) Water Reuse Agreements Trade Waste Policy ERA Licenses Catchment s WAMPs Environmental Flow On-site Treatment Risk/Hazard Performance Reports Assessment Performance Monitoring Critical Infrastructure Benchmarking TMP Coordinator s Dam Safety Manual Counter Disaster s Quality Documented Systems Contingency s Insurance Policies Organisational Structure Staffing Training and Development Program WH&S Policy Commercialisation Policies TYPICAL SUPPORTING DOCUMENT- ATION 16.

17 Key Result Areas Key Result Area Service Standards Financial Sustainability Asset Ecological Sustainability Risk Performance Organisational and Development Typical Issues Covered Customer charters/guarantees, customer interaction, community consultation, drinking water guidelines Financial modelling, commercial objectives, tariff structures Full asset lifecycle from infrastructure planning to asset rehabilitation/disposal including demand management Environmental compliance, environmental management systems, effluent quality, effluent reuse, biosolids management, trade waste management Risk assessment, minimising risk exposure, risk monitoring Performance monitoring and compliance, quality management, information management Organisational culture, change management, staff development, industrial relations 17.

18 Guideline Structure Variation in WSPs: user friendly easily understood by range of target audiences outcome focussed but expresses State Government requirements flexibility to accommodate WSP processes readily updateable 18.

19 Features of Guidelines TMP guideline - Overview - Detailed KRA Guideline - Overview - Detailed Process and Content Guideline Development Level Prioritisation Methodology 19.

20 The Infrastructure ning Process Develop, adopt & refine infrastructure planning policies Collect & analyse supporting information Prioritise infrastructure investment program THE INFRASTRUCTURE PLANNING PROCESS Ensure linkages with other planning activities Document outputs of planning studies Project manage the infrastructure planning process Undertake planning studies 20.

21 Content Guideline - 1 Page Issues Covered Purpose Policies that May be Required Other TMP Elements Intimately Linked to Sub- External Issues Contributing to Current Operating Environment What Issues Need to be Considered in Summarising Status of Current Operations What Should be the Strategic Basis of the Suggested Performance Measures Supporting Documentation Further Reading 21.

22 Sub-: Water Demand Issues Covered in Sub- Supply metering; Water pricing; Customer education; Water-efficient hardware; Purpose of To provide an overview of the WSP s current water demand management practices. To outline the WSP s future objectives and initiatives in managing water demand. Irrigation efficiency; Water restrictions (consumption regulation); Supply reduction. What Policies may be Required What Other Total Elements are Linked Intimately to this Sub- What External Issues Contributing to the Current Operating Environment Need to be Considered What Issues Need to be Considered in Summarising the Status of Current Operations Pricing; Customer metering; Water use restrictions; Effluent reuse; Trade waste minimisation; Infrastructure service standards (re supply rates and pressures) Infrastructure Service Standards considers supply-side service parameters (eg supply rates and pressures) which influence demands. Financial considers implications of consumption-based pricing and falling demands. Infrastructure ning Overview takes account of deferring future headworks consequent on falling demands. Unaccounted-for Water provides for water audits which utilise demand data, and may incorporate common strategy(ies), eg pressure reduction. New developments in Government WaterWise program. Local Government Act requirements for two-part tariffs for certain urban supplies. Increasing encouragement of WSPs by governments to develop formal demand management programs, with some offering financial assistance on preparation and/or implementation. Progressive implementation of COAG pricing principles for irrigation water pricing. Requirements of EPP (water) for preparation of local government environmental plans on water conservation by June (This sub-plan and the Water Loss should jointly be formulated so as also to meet these requirements.) Consumption data from other WSPs for benchmarking current demands. Efficiency improvements in irrigation practices. Advances in efficiency of water appliances, irrigation equipment and other hardware. Scope of WSP s demand management program. Progress on environmental plan for water conservation under EPP (water), for local government WSPs. Status of customer education programs, eg, WaterWise. Extent of customer metering. Water consumption trends and benchmarking results. Current and planned pricing practices, and effects on consumption tends. Promoting of water-efficient hardware, improved irrigation practices, trade waste minimisation recycling and reuse, etc. d l i f l i 22.

23 What should be the Strategic Basis of the The strategic elements forming the basis of the plan should include: goal for asset management objective(s) for water demand management adopted KPIs management strategies and performance targets. The management strategies developed will be based on the identified key strategic issues and SWOT findings, including risk assessment, in respect of water demand management, and on the required TMP development level. Many WSPs are likely to require strategies for enhancing their customer educational and promotional programs; optimising water-pricing policies in terms of water demand and projected revenue; and minimising consumption on all WSP-owned properties. The strategies should be supported by detailed action plans that would cover up to a 3-year period. Suggested Performance Measures Outcome: Infrastructure investment cost (new works): base year cost ratio Output: Average water demand/customer Maximum day: average day demand ratio Peak hour: average day demand ratio Supporting Documentation These will depend on the WSP, but typically would include: current WaterWise (or similar) water conservation program; strategic demand management reports; and water consumption analysis/benchmarking reports. 23.

24 Development Level Levels 1-4 Based mainly on current cost of infrastructure Prioritisation of Strategies/Actions Suggested methodology based on assessment of benefits/risks 24.

25 KRA Guidelines Service Standards Financial Sustainability Asset Risk 25.

26 Relationship Between the Financial and the Model Financial INPUTS (from other TMP Sub-s) Operating revenue and expenditure Capital related revenue and expenditure Current cash position Asset values, depreciation Growth projections Model OUTPUTS Estimated impact on charges KPIs Optimised infrastructure investment program estimated future cash position 26.

27 SHIRE COUNCIL - WATER SUPPLY Growth and Demand Projections General Inputs CurrentEstimatedConnectedPopulation POPULATION 2,400 CurrentEstimatedNoofConnections CONNECTIONS 730 Variable Inputs Demographics Year 1999/ / / / / / / / / / /2010 ProjectedPopulationGrowthRate 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% %ChangeinGrowthinFlows 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% ExpenditureProjections- abovecpi Revenue ChangeinRatesandCharges 9.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% ChangeinNon-CapitalGrantsandSubsidies 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% ChangeinOtherRevenue -20.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Expenses ChangeinOperationsExpense -3.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% ChangeinMaintenanceCost 0.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% ChangeinandAdministrationExpense -14.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% ChangeinInfrastructurechargesincash 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% ForecastChangeinDonatedassets 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% ChangesinOtherExpenses 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 27.

28 SHIRE COUNCIL - WATER SUPPLY Operating Statement OPERATINGREVENUE Year 1999/ / / /2003 Water/Sewer RatesandCharges $ 714,500 $ 786,593 $ 794,459 $ 802,404 Other Revenue $ 3,000 $ 2,400 $ 2,400 $ 2,400 Total OperatingRevenue $ 717,500 $ 788,993 $ 798,035 $ 806,454 OPERATINGEXPENDITURE Operations $ 362,000 $ 351,140 $ 354,651 $ 358,198 MaintenanceCost $ - $ - $ - $ - andadministration $ 82,000 $ 70,520 $ 71,225 $ 71,937 Interest Expense $ 88,500 $ 61,134 $ 52,825 $ 43,550 Depreciation $ 413,840 $ 422,190 $ 439,113 $ 449,547 Other operatingexpenses(specifybywayof note) $ 17,500 $ 17,500 $ 17,500 $ 17,500 Total OperatingExpenditure $ 963,840 $ 922,484 $ 935,314 $ 940,732 OPERATINGSURPLUS/(DEFICIENCY) -$246,340 -$133,491 -$137,279 -$134,278 CAPITALRELATEDREVENUE Capital Grants andsubsidies $ - $ 333,480 $ 616,850 $ 272,000 Developer Contributions(Infrastructurecharges) $ - $ - $ - $ - Donatedassets $ - $ - $ - $ - Funds fromdisposal of Noncurrent assets $ - $ - $ - $ - Total Capital relatedrevenue $ - $ 333,480 $ 616,850 $ 272,000 CAPITALRELATEDEXPENSE Capital relatedexpense $ - $ - $ - $ - Abnormal andextraordinaryitems $ - $ - $ - $ - Total Capital RelatedExpense $ - $ - $ - $ - TOTALOPERATINGSURPLUS/(DEFICIENCY) -$246,340 $199,989 $479,571 $137, / / / / / / /2010 $ 810,428 $ 818,532 $ 826,717 $ 834,984 $ 843,334 $ 851,768 $ 860,285 Interest Revenue $0 $0 $1,176 $1,651 $3,934 $6,456 $9,105 $11,282 $17,734 $24,391 $31,581 Non-Capital GrantsandSubsidies $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2,400 $ 2,400 $ 2,400 $ 2,400 $ 2,400 $ 2,400 $ 2,400 $ 816,761 $ 827,388 $ 838,222 $ 848,667 $ 863,468 $ 878,559 $ 894,266 $ 361,780 $ 365,398 $ 369,052 $ 372,742 $ 376,470 $ 380,234 $ 384,037 $ - $ - $ - $ - $ - $ - $ - $ 72,657 $ 73,383 $ 74,117 $ 74,858 $ 75,607 $ 76,363 $ 77,127 $ 33,198 $ 21,644 $ 8,748 $ - $ - $ - $ - $ 453,214 $ 453,214 $ 455,714 $ 460,089 $ 460,089 $ 460,089 $ 460,089 $ 17,500 $ 17,500 $ 17,500 $ 17,500 $ 17,500 $ 17,500 $ 17,500 $ 938,348 $ 931,138 $ 925,130 $ 925,189 $ 929,665 $ 934,186 $ 938,752 -$121,587 -$103,750 -$86,908 -$76,522 -$66,197 -$55,627 -$44,486 $ 160,000 $ 160,000 $ 280,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 160,000 $ 160,000 $ 280,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $38,413 $56,250 $193,092 -$76,522 -$66,197 -$55,627 -$44,

29 2009/ / /2009 $0 -$50,000 -$100,000 -$150,000 -$200,000 -$250,000 -$300,000 Operating Surplus / / / / / / / / /2008 Year Charge per Connection Return on Equity $1, $ $ $ $ $ $ $ $ $ % 1999/ / / / / / / / / % -0.4% -0.6% -0.8% -1.0% -1.2% -1.4% -1.6% $- -1.8% 1999/ / / / / / / / / /2009 Year 2000/ /2000 $ $ $ $900,000 $800,000 $700,000 $600,000 $500,000 $400,000 $300,000 $200,000 $100,000 $- Infrastructure Investment Profile -2.0% Year 2008/ / / / / / / / /2008 Year New Capital Works Repl. Cap Wrks Debt Reserves $700,000 $1,800, / / / / / /2005 $600,000 $500,000 $400,000 $300,000 $200,000 $100,000 $- 2005/ / / / /2010 -$100,000 Year $1,600,000 $1,400,000 $1,200,000 $1,000,000 $800,000 $600,000 $400,000 $200,000 $0 2000/ /2000 $ $ $ 1999/ / / / / / / / / /2009 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 $0 Cash Movement (Closing Cash Bal) -$200,000 Year 2008/ / / / / / / / / /2008 Year SHIRE COUNCIL - WATER SUPPLY Graphs Return on Assets Reserves to Accumulated Depreciation 0.0% $12,000, / / / / / / / / / / % $10,000, % $8,000, % -0.8% $6,000, % -1.2% -1.4% $4,000,000 $2,000, % -1.8% -2.0% Year 1999/2000 $ $ $ $0 1999/ / / / / / / / / /2009 -$2,000,000 Year Reserves Accumulated Depreciation

30 SHIRE COUNCIL - WATER SUPPLY Check Sheet General Checklist HAVE YOU? gfedcb Identified Key Constraints? gfedcb Completed the Growth/Demand Projections? gfedcb Calculated & Entered Depreciaton and Replacement Cap X data? gfedcb Entered Base Yr Ops Revenue and Expense data? gfedcb Completed New Cap X Budget Automatic Check 1 - CASHFLOW Are Cashflows Positive (Y/N) Automatic Check 2 - BALANCE SHEET Does the Balance Sheet Balance? Does the Business Grow over time? Automatic Check 3 - OPERATING SURPLUS Does the Business Provide a return on funds invested? Automatic Check 4 - CAPITAL FUNDING Does the Capital Funding Sheet Balance? YES YES YES NO YES 30.

31 The Asset Process Dispose of Assets and De-register Replace or Rehabilitate Assets Set or Review Service Levels Strategically Modify Assets or Confirm Need for Assets Renew Assets Manage Demand Manage Demand for Asset and Non-Asset Solutions at a Detailed Level Optimise Asset Maintenance/ Rehabilitation/ Replacement Customer and Business Requirements Optimise Infrastructure Investment (Capital Works) Program Maintain Assets Procure Assets Design Asset Manage Demand Evaluate Asset Condition and Performance Operate Assets Register and Value Assets Construct Asset Optimise Operational Efficiency Monitor Costs 31.

32 Relationship Between Asset and Other Key Result Areas Business Strategic Direction. Asset M Asset/system performance. Service standards/levels will drive investment in new/replacement assets and O&M strategies. Infrastructure investment (new/replacement) costs, O&M costs, depreciation, renewals annuity. Financial targets to be achieved. Infrastructure investment to meet environmental requirements. Ecologically sustainability of O&M practices. Minimisation of water demands, energy and sewer overflows. Service Standards Financial Sustainability Ecological Sustainability Infrastructure extent, condition and performance. Infrastructure and service delivery related risks. Risk Asset related information Asset/system performance and condition Benchmarking and performance comparison Information management systems. Quality management systems. Performance Assessment Human resource requirements processes/procedures. Human resources. Organisation M & Development 32.

33 Integration of Risk and TMP Development Processes TMP Development Process (based on Reference 3) Simplified Risk Process (based on Reference 1) Establish context Establish context Determine Determine tentative tentative scope scope of of TMP TMP Collate Collate and and analyse analyse information information Collected information (eg SWOT analysis) as basis for summary risk treatment schedule Identify Identify risks risks Assess risks Analyse risks Analyse risks Confirm scope of TMP Confirm scope of TMP Evaluate Evaluate risks risks Prepare Prepare draft draft TMP TMP Finalise TMP Finalise TMP Prioritised strategies and controls for inclusion in relevant sub-plans Define Define risk risk treatment treatment strategies/controls strategies/controls Implement TMP Implement TMP 33.

34 Rob Drury (DNR) 34.

35 Links to COAG/NCP/Commercialisation 1. Councils are adopting a more rigorous infrastructure investment decision making processes, with non-asset based solutions, full lifecycle costs, risks and various alternatives being considered before deciding to construct infrastructure; 2. Need to optimise the performance and utilisation of existing infrastructure; 3. Need to ensure that infrastructure can sustain agreed customer service standards; and 4. Recognition that asset management is a core business function to support service delivery. 35.

36 Links to EPA The current TMP review process provides for approval as part of the TMP by DNR of Councils Environmental s for water and sewerage services required under the EPP (Water). The EMP would cover Sewer Inflow Infiltration, Demand, Trade Waste and Stormwater s. Material is currently being developed and negotiations are under way with EPA regarding how this will be put in place. 36.

37 Links to Performance Monitoring & Benchmarking A major part of the TMP is related to performance and improvement. The Performance Monitoring and Benchmarking (PM&B) process managed by DNR will provide not only the basis for the relevant sections of the TMP guidelines, but will provide the basic system and data for a Council developing a TMP for those Councils participating in the process. Similarly, much of the data utilised in the PM&B process will also be used when Service Providers develop Standards of Service required under the Water Act

38 Links to Water Use Efficiency and Conservation The TMP includes sub-plans for addressing other areas relating to best practice water use such as : Demand to manage and minimise water consumption and ensure it is included in future water demand planning as an option Unaccounted for water to manage and reduce water loss Water Source to monitor and manage water sources and catchments Energy to make best use reduce costs associated with power use 38.

39 TMP Approvals The Water Act 2000 requires the preparation of a Strategic Asset (SAMP). A full TMP will cover virtually all of the requirements of a SAMP. Hence, although a different approval process, a SAMP will require minimal extra work, reducing administrative duplication and the impact of compliance with the Act. The new TMP guidelines are thus being developed in conjunction with SAMP guidelines under the Act. 39.

40 TMP Links to Other Approvals Water Service Provider TMP Corporate/Business PM&B Key Result Areas and Sub s EPP (Water) SAMP s Under Water Act Possible WQMP Health Dept 40.

41 TMP/SAMP Relationship TOTAL MANAGEMENT PLAN Service Standards Financial Sustainability Asset Ecological Sustainability Risk Performance KEY RESULT AREAS Service Standards Financial Water Demand Unaccounted - for Water Environmental Risk Performance Assessment Drinking Water Quality Infrastructure ning Overview Asset Procurement Effluent Quality Asset Evaluation and Renewal Maintenance Operations Sewer I/I Biosolids Trade Waste Information TYPICAL SUB - PLANS Water Source Energy Community Consultation Long-term Financial Model Water Conservation Strategy Outsourcing Strategy Environmental s under EPP (Water) Risk / Hazard Assessment Performance Reports Marketing Customer Service Policy Service Level Agreements Water Supply Agreements with Major Customers Financial Practice Manual Developer Contributions Policy Infrastructure Charges Pricing Policy Full Cost Pricing Strategy Metering Policy Strategic Infrastructure Detailed ning Studies Capital Works Program Infrastructure ning / Design Guidelines Asset Registers Asset Valuation Reports Water Source Entitlements Water Allocations O & M Manuals Telemetry Strategy Water Re-use Agreements Trade Water Policy ERA Licenses Catchment s WAMP's Environmental Flow On-site Treatment Critical Infrastructure Dam Safety Counter Disaster s Documented Contingency s Insurance Policies Performance Monitoring Benchmarking TMP Coordinator's Manual Quality Systems TYPICAL SUPPORTING DOCUMENTATION & - s required for TMP - Supporting s (required in whole or in part) for Water Act

42 The Future of TMP S TMP s are becoming more holistic in the application and will provide: A tool to plan and manage water and sewerage infrastructure in a manner that provides the best outcomes for their customers A system for integrating different water management mechanisms into the overall planning process and ensuring all aspects of water planning is linked 42.

43 The Future of TMP S (cont ) A mechanism that will provide concurrent approval with legislative requirements of other Departments and the Water Act A system to ensure all parts of the water based infrastructure systems are planned in the most efficient, balanced manner with strong links between financial and technical issues. An ongoing plan to ensure water schemes are sustainable both financially and operationally. 43.

44 TOTAL MANAGEMENT PLANNING - a concept which encourages water service providers to utilise best practice planning, achieve least cost outcomes and whole-ofbusiness sustainable management 44.

45 Any Questions? 45.

Guidelines for Implementing Total Management Planning. Asset Management. WATER DEMAND MANAGEMENT Implementation Guide

Guidelines for Implementing Total Management Planning. Asset Management. WATER DEMAND MANAGEMENT Implementation Guide Guidelines for Implementing Total Management Planning Asset Management WATER DEMAND MANAGEMENT Implementation Guide 2 Asset Management: Water Demand Management - Implementation Guide TABLE OF CONTENTS

More information

WATER AND SEWERAGE FINANCIAL MANAGEMENT PLANNING

WATER AND SEWERAGE FINANCIAL MANAGEMENT PLANNING WATER AND SEWERAGE FINANCIAL MANAGEMENT PLANNING ABSTRACT Chris Adam, Cardno MBK (Qld) Pty Ltd In recent years, the utilities industries have been subject to far greater commercial scrutiny than ever before.

More information

Financial and Asset Management. Glossary of Terms and Abbreviations

Financial and Asset Management. Glossary of Terms and Abbreviations Financial and Asset Management Glossary of Terms and Abbreviations ABP see Annual Business Plan Accrual accounting: An accounting approach by which expenses, revenue, assets and liabilities are recognised

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23

LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 LONG TERM FINANCIAL PLAN (INTERIM) 2012/13 to 2022/23 INTRODUCTION Long term financial planning is a key element of the Integrated Planning and Reporting Framework. It is the mechanism that enables local

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

Long-Term Asset Management Plan 2011-2021

Long-Term Asset Management Plan 2011-2021 Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY City of Salisbury ASSET MANAGEMENT STRATEGY Version 6 June 2015 City of Salisbury Asset Management Strategy Document Control Document Control NAMS.PLUS Asset Management www.ipwea.org/namsplus Document

More information

CORPORATE PERFORMANCE MANAGEMENT GUIDELINE

CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 TABLE OF CONTENTS 1 Introduction... 3 1.1 Scope... 3 1.2 Purpose... 3 2 Performance Management Framework Overview... 4 3 Performance Management Framework...

More information

BUSINESS MANAGEMENT COMPLIANCE POLICY & MANUAL ADOPTED

BUSINESS MANAGEMENT COMPLIANCE POLICY & MANUAL ADOPTED F021 BUSINESS MANAGEMENT COMPLIANCE POLICY & MANUAL ADOPT... http://ln.burdekin.qld.gov.au/cis/policies.nsf/95f9bd5961a3b1aa4a2565a900141... Page 1 of 1 30/04/2013 Policy Register Category: Policy Number:

More information

HUNTER WATER CORPORATION. Greenprint For Sust ainable Urb an Wat er Managem ent

HUNTER WATER CORPORATION. Greenprint For Sust ainable Urb an Wat er Managem ent HUNTER WATER CORPORATION Greenprint For Sust ainable Urb an Wat er Managem ent NOVEMBER 2012 Table of Contents Message from the Managing Director 4 1. Introduction 5 1.1 Cities of the Future 5 1.2 Our

More information

Information Paper 16. Long-term Financial Plan (A Model Format for Financial Information)

Information Paper 16. Long-term Financial Plan (A Model Format for Financial Information) Information Paper 16 Long-term Financial (A Model Format for Financial Information) February 2008 LGA Long-term Financial (A Model Format for Financial Information) Information Paper Introduction The LGA

More information

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT Engineering Services POLICY DIRECTIVE This Asset Management policy will ensure that Asset Management is clearly recognised by Council and community in accordance

More information

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future

Asset Management Strategy (2013-2017) Doing things Differently A New Approach for a sustainable future Asset Management Strategy (2013-2017) A New Approach for a sustainable future Contents Introduction... 2 The Asset Management Vision, Policy Statement & Strategic Themes... 5 Part B The Asset Management

More information

Summary: Introduction

Summary: Introduction Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with

More information

Water Mains Rehabilitation Framework (NI) Northern Ireland Water

Water Mains Rehabilitation Framework (NI) Northern Ireland Water PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy Strategy Owner Manager Parks and Assets Engineering and Infrastructure Creation Date 27 March 2006 Revision Date 4 March 2015 Please check Council s Intranet to

More information

Financial Strategy 2016 2026

Financial Strategy 2016 2026 Financial Strategy 2016 2026 Table of Contents 1. Executive Summary and Overview... 4 1.1 Executive Summary... 4 1.1.1 The Financial Strategy and Long-Term Financial Forecast... 4 1.1.2 The Financial Strategy

More information

Bevan Faulkner Director, Asset Management

Bevan Faulkner Director, Asset Management SunWater Asset Management SunWater & It s Asset Management Strategies 1 INTRODUCTION TO SUNWATER Bevan Faulkner Director, Asset Management 2 Introduction to SunWater What is SunWater? Where did SunWater

More information

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

CGAM022.1/12/10. Asset Management Improvement Strategy 2010 Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT

More information

City of Canning. Asset Management Strategy 2015 2018

City of Canning. Asset Management Strategy 2015 2018 City of Canning Asset Management Strategy 2015 2018 Document Control Version No Version Date Description TRIM Reference 1.0 11 December 2012 Asset Management Strategy D12/68776 2.0 23 September 2015 Updated

More information

Financial Sustainability Information Paper 8. Long-term Financial Plans

Financial Sustainability Information Paper 8. Long-term Financial Plans Financial Sustainability Information Paper 8 Long-term Financial Plans Revised January 2012 Introduction This Information Paper is one of a series of Information Papers about Financial Sustainability and

More information

5 Year Strategic Asset Management Plan

5 Year Strategic Asset Management Plan Westernport Region Water Corporation 30 July 2007 Prepared for Westernport Region Water Corporation Prepared by Maunsell Australia Pty Ltd Level 9, 8 Exhibition Street, Melbourne VIC 3000, Australia T

More information

fëëìé=m~ééê aê~ñí=`çêéçê~íé=mä~å=omms=ó=omnm= 1. Issue Name 2. Contributors

fëëìé=m~ééê aê~ñí=`çêéçê~íé=mä~å=omms=ó=omnm= 1. Issue Name 2. Contributors 1. Issue Name Essential Infrastructure 2. Contributors Manager Operations & Maintenance, Design Service Manager, Manager Customer Service Business Performance, Senior Advisor Infrastructure Project, Senior

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Page 1 of 15 TABLE OF CONTENTS 1. INTRODUCTION...3 2. THE ASSET LIFECYCLE...3 2.1 Asset Planning...5 2.2 Asset Creation / Acquisition...6 2.3 Asset Operations...7 2.4 Asset Maintenance...7

More information

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project definition 5 2.1 Pre-design studies 7 3.0 Project brief 10 4.0 Accommodation

More information

Long Term Financial Planning

Long Term Financial Planning Long Term Financial Planning Framework and Guidelines Long Term Financial Planning Framework and Guidelines for Western Australian Local Governments p1. Contents Foreword 4 1. Introduction 7 2. Purpose

More information

Sustaining Local Assets. Local government asset management policy statement

Sustaining Local Assets. Local government asset management policy statement Sustaining Local Assets Local government asset management policy statement December 2003 ISBN 0 646 42106 9 Authorised by the Victorian Government Address: Local Government Victoria Department for Victorian

More information

INTEGRATED PLANNING AND REPORTING

INTEGRATED PLANNING AND REPORTING Government of Western Australia Department of Local Government INTEGRATED PLANNING AND REPORTING Framework and Guidelines Integrated Planning and Reporting Framework and Guidelines p1. Contents Foreword

More information

What will it be; define the value

What will it be; define the value Level 2 Frame Facility: Greenfield Power Plant with Carbon Capture All 6 Project Phases All aspects for the relevant facility Stage Identify (Concept Study) Evaluate (Pre-Feasibility Study) Define (Feasibility/FEED

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Adopted May 2011 Table of Contents Page 1. Introduction 3 2. Purpose 4 3. Asset Register System 4 4. Asset Management Working Group 4 5. Asset Management Plans 5 6. Condition

More information

Information Paper 9. Local Government Financial Indicators

Information Paper 9. Local Government Financial Indicators Information Paper 9 Local Government Financial Indicators November, 2006 Introduction Formal financial statements contain a wealth of information. Unfortunately their detail and format often mean it is

More information

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1.

Asset Management. Framework and Guidelines. Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Asset Management Framework and Guidelines Part 2 - Asset Management Guidelines for Western Australian Local Governments p1. Contents Foreword 4 Part 1 Asset Management Framework 5 1. Introduction 7 2.

More information

Wandering Council Draft Plant Asset Management Plan

Wandering Council Draft Plant Asset Management Plan Wandering Council Draft Plant Asset Management Plan TABLE OF CONTENTS EXECUTIVE SUMMARY... 2 Context... 2 1 INTRODUCTION... 2 1.1 Background... 2 1.2 Goals and Objectives of Asset Management... 3 1.3 Pla

More information

4 Adoption of Asset Management Policy and Strategy

4 Adoption of Asset Management Policy and Strategy 4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are

More information

NSW Water and Sewerage Strategic Business Planning Guidelines

NSW Water and Sewerage Strategic Business Planning Guidelines NSW Water and Sewerage Strategic Business Planning Guidelines Leading policy and reform in sustainable water management Publisher NSW Office of Water Level 18, 227 Elizabeth Street GPO Box 3889 Sydney

More information

Inquiry into Access of Small Business to Finance

Inquiry into Access of Small Business to Finance Inquiry into Access of Small Business to Finance Reference http://www.aph.gov.au/senate/committee/economics_ctte/small_business_10/ index.htm The current structure of the financial system means that large

More information

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 ASSET MANAGEMENT STRATEGY 2010-2020 November 2009 1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 4. WESTERN AUSTRALIAN ASSET MANAGEMENT IMPROVEMENT PROGRAM

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Guide to Integrated Strategic Asset Management

Guide to Integrated Strategic Asset Management Guide to Integrated Strategic Asset Management Issue date: 14 November 2011 Acknowledgements This guide is based on the Australasian Procurement and Construction Council Inc. s (APCC) publication, Asset

More information

LEETON SHIRE COUNCIL

LEETON SHIRE COUNCIL LEETON SHIRE COUNCIL LONG TERM FINANCIAL PLAN 2012-2022 Leeton Shire Council 23 25 Chelmsford Place LEETON NSW 2705 Phone (02) 69530911 Fax (02) 69533337 council@leeton.nsw.gov.au www.leeton.nsw.gov.au

More information

Australian Renewable Energy Agency. Agency resources and planned performance

Australian Renewable Energy Agency. Agency resources and planned performance Australian Renewable Energy Agency Agency resources and planned performance 169 ARENA Budget Statements AUSTRALIAN RENEWABLE ENERGY AGENCY Section 1: Agency overview and resources... 171 1.1 Strategic

More information

ASSET MANAGEMENT POLICY

ASSET MANAGEMENT POLICY : SHIRE OF MOUNT MAGNET ASSET MANAGEMENT POLICY Version 1.1 April 2013 Asset Management Policy Document Control Rev No Date Revision Details Author Reviewer Approver 0 November 2012 Original final document

More information

QCA Pricing Practices Recommendations SunWater Implementation Plan

QCA Pricing Practices Recommendations SunWater Implementation Plan QCA Pricing Practices Recommendations SunWater Implementation Plan September 2012 Table of Contents Overview... 3 Implementation Plan - QCA Pricing Practices Recommendations... 4 1. Improved Planning...

More information

8 Forecast water sales and customer numbers

8 Forecast water sales and customer numbers 8 Forecast water sales and customer numbers Our decisions on Hunter Water s forecast metered water sales and customer numbers are an important part of the price review. Prices for individual services are

More information

PC13 Information Requirements Chapter 5 Financial Model and Financial Tables Issued 13 December 2011 - Version 01

PC13 Information Requirements Chapter 5 Financial Model and Financial Tables Issued 13 December 2011 - Version 01 PC13 Information Requirements Chapter 5 Financial Model and Financial Tables Issued 13 December 2011 - Version 01 Contents Chapter 5 - Financial Model and Financial Tables... 3 5.1. Table 5.1 Charge caps

More information

Water Supply and Sewerage Strategic Business Planning and Financial Planning Check List July 2014

Water Supply and Sewerage Strategic Business Planning and Financial Planning Check List July 2014 Water Supply and Sewerage Strategic Business Planning and Financial Planning Check List July 2014 The Strategic Business Plan (SBP) addresses 3 elements of the Best-Practice Management of Water Supply

More information

Release: 1. CHCCM703A Apply effective case management practice

Release: 1. CHCCM703A Apply effective case management practice Release: 1 CHCCM703A Apply effective case management practice CHCCM703A Apply effective case management practice Modification History Not Applicable Unit Descriptor Descriptor This unit describes the knowledge

More information

Financial Statement Presentation. Introduction. Staff draft of an exposure draft

Financial Statement Presentation. Introduction. Staff draft of an exposure draft Financial Statement Presentation Staff draft of an exposure draft Introduction The project on financial statement presentation is a joint project of the International Accounting Standards Board (IASB)

More information

GOVERNMENT RESPONSE TO ESCOSA S FINAL REPORT INQUIRY INTO 2008-09 METROPOLITAN AND REGIONAL WATER AND WASTEWATER PRICING PROCESS

GOVERNMENT RESPONSE TO ESCOSA S FINAL REPORT INQUIRY INTO 2008-09 METROPOLITAN AND REGIONAL WATER AND WASTEWATER PRICING PROCESS TO ESCOSA S FINAL REPORT INQUIRY INTO 2008-09 METROPOLITAN AND REGIONAL WATER AND WASTEWATER PRICING PROCESS AREA OVERVIEW and ESCOSA identifies an alternative top-down approach to an input based, or bottom

More information

Fiskville Training College

Fiskville Training College Fiskville Training College Community update CFA Fiskville CFA s Fiskville Training College, located at 4549 Geelong-Ballan Road, plays a vital role in training Victoria s firefighters and emergency service

More information

Stormwater harvesting

Stormwater harvesting Stormwater harvesting How to collect and re-use stormwater from Sydney Water s stormwater system Most of the stormwater pipes and channels in the Sydney metropolitan area are the responsibility of local

More information

EREP Toolkit. Module 2 of 5: A management systems approach to resource efficiency

EREP Toolkit. Module 2 of 5: A management systems approach to resource efficiency EREP Toolkit Module 2 of 5: A management systems approach to resource efficiency Publication 1224 April 2008 1 Contents Definitions and terms 3 Units 3 1. Purpose of this document 4 1.1 How to use this

More information

A Regional Approach to the Planning and Delivery of the RHOF and MOICDP in Queensland

A Regional Approach to the Planning and Delivery of the RHOF and MOICDP in Queensland CheckUP & QAIHC Working in Partnership A Regional Approach to the Planning and Delivery of the RHOF and MOICDP in Queensland Background CheckUP, in partnership with the Queensland Aboriginal and Islander

More information

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 NAMS.PLUS Burnie City Council Asset Strategy Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID:

More information

Long Term Financial Plan 2014 2023 Adopted December 2013

Long Term Financial Plan 2014 2023 Adopted December 2013 Long Term Financial Plan 2014 2023 Adopted December 2013 District Council of Mallala CONTENTS 1 Introduction 1 2 Planning Framework 2 3 Assumptions 7 4 Summary & Financial Statements 10 Estimated Comprehensive

More information

Pricing Policy Statement - Excluded Retail Services. Introduction. Description of Excluded Services. Excluded Retail Services Offered in 2014/15

Pricing Policy Statement - Excluded Retail Services. Introduction. Description of Excluded Services. Excluded Retail Services Offered in 2014/15 Pricing Policy Statement - Excluded Retail Services Introduction SA Water s Water and Sewerage Retail Services: 2013-14 to 2015-16 Revenue Determination (ESCOSA, 2013, Section 2.2) requires SA Water to

More information

Australian Communications and Media Authority. Entity resources and planned performance

Australian Communications and Media Authority. Entity resources and planned performance Australian Communications and Media Authority Entity resources and planned performance 91 AUSTRALIAN COMMUNICATIONS AND MEDIA AUTHORITY Section 1: Entity overview and resources... 95 1.1 Strategic direction

More information

1 Fiscal strategy and outlook

1 Fiscal strategy and outlook 1 Fiscal strategy and outlook Features The 2015-16 Budget delivers the Government s election commitments, with key measures to revitalise the State economy and frontline service delivery, especially in

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: ian.falconer@uk.gt.com Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: will.g.simpson@uk.gt.com

More information

Draft Revenue and Financing Policy

Draft Revenue and Financing Policy Draft Revenue and Financing Policy Introduction The Local Government Act 2002 (LGA) requires every local authority to adopt a Revenue and Financing Policy and incorporate it into the LTP. The Revenue and

More information

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting

Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting Rebuilding Flood Damaged Roads in South East Queensland in the middle of the Coal Seam Gas Expansion/Explosion - A Local Governments Experience and Learning's David Pemberton davep@logit.com.au Mobile

More information

2. CORPORATE POLICIES 2.3 OTHER CORPORATE 2.3.11 Asset Management Policy

2. CORPORATE POLICIES 2.3 OTHER CORPORATE 2.3.11 Asset Management Policy 2. CORPORATE POLICIES Background & Issues Local Government across Australia is facing the challenge of building, operating and maintaining vital infrastructure necessary for the well-being of their communities.

More information

Recognition of Prior Learning (RPL) BSB51413 Diploma of Project Management

Recognition of Prior Learning (RPL) BSB51413 Diploma of Project Management Recognition of Prior Learning (RPL) BSB51413 Diploma of Project Management What is RPL? RPL recognises that you may already have the skills and knowledge needed to meet national competency standards. Instead

More information

Project Evaluation Guidelines

Project Evaluation Guidelines Project Evaluation Guidelines Queensland Treasury February 1997 For further information, please contact: Budget Division Queensland Treasury Executive Building 100 George Street Brisbane Qld 4000 or telephone

More information

Performance Management and Reporting

Performance Management and Reporting Management and Reporting Activity Management Plan Long Term Plan 2015 2025 3 December 2014 Quality Assurance Statement Christchurch City Council Civic Offices 53 Hereford Street PO Box 73015 Christchurch

More information

SOL PLAATJE LOCAL MUNICIPALITY

SOL PLAATJE LOCAL MUNICIPALITY SOL PLAATJE LOCAL MUNICIPALITY LONG TERM FINANCIAL PLANNING POLICY 1 P a g e TABLE OF CONTENTS TABLE OF CONTENTS... A 1. INTRODUCTION...1 2. PURPOSE OF THIS DOCUMENT...1 3. DEFINITIONS... 2 4. OBJECTIVES...

More information

LONG TERM FINANCIAL PLAN 2011/2012 2020/2021

LONG TERM FINANCIAL PLAN 2011/2012 2020/2021 LONG TERM FINANCIAL PLAN 2011/2012 2020/2021 INDEX TO CONTENTS 1. Long Term Financial Planning Defined 1.1 Purpose 1.2 Principles 1.3 CEO Statement on Financial Sustainability 2. Impacts upon the Current

More information

DRAFT. Wastewater Asset Management Plan. Southland District Council 2015-2025

DRAFT. Wastewater Asset Management Plan. Southland District Council 2015-2025 DRAFT Wastewater Asset Management Plan Southland District Council 2015-2025 Version 2.0 - November 2014 274 Document Control: Version Notes Authors Reviewed Issued Approved by 1.0 Approved by APAC for

More information

FNS40211 CERTIFICATE IV FINANCIAL SERVICES BOOKKEEPING

FNS40211 CERTIFICATE IV FINANCIAL SERVICES BOOKKEEPING FNS40211 CERTIFICATE IV FINANCIAL SERVICES BOOKKEEPING POWER UP YOUR CAREER WITH A QUALIFICATION THAT MAKES A DIFFERENCE It is a must have qualification for individuals who possess significant theoretical

More information

9.1 Draft Revenue and financing policy

9.1 Draft Revenue and financing policy 1. Policy purpose and overview The purpose of the Revenue and financing policy is to provide predictability and certainty about sources and levels of funding available to the council. It explains the rationale

More information

Quick Guide: Meeting ISO 55001 Requirements for Asset Management

Quick Guide: Meeting ISO 55001 Requirements for Asset Management Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get

More information

State of Queensland. Published by the Department of Infrastructure and Planning, September 2010, 100 George Street, Brisbane Qld 4000.

State of Queensland. Published by the Department of Infrastructure and Planning, September 2010, 100 George Street, Brisbane Qld 4000. Looking forward. Delivering now. The Department of Infrastructure and Planning leads a coordinated Queensland Government approach to planning, infrastructure and development across the state. State of

More information

Framework for Long Term Financial and Asset Management Planning for all Tasmanian Councils

Framework for Long Term Financial and Asset Management Planning for all Tasmanian Councils TASMANIAN STATE GOVERNMENT and LOCAL GOVERNMENT ASSOCIATION OF TASMANIA Framework for Long Term Financial and Asset Management Planning for all Tasmanian Councils FINAL REPORT September 2009 Document Control

More information

Asset Management Plan

Asset Management Plan Wandering Shire Council Roads Asset Management Plan TABLE OF CONTENTS 1 Executive Summary... 2 Context... 2 Questions you may have... 4 2. INTRODUCTION... 5 2.1 Background... 5 2.2 Goals and objectives

More information

National Water Initiative Pricing Principles Table of contents

National Water Initiative Pricing Principles Table of contents National Water Initiative Pricing Principles Table of contents Introduction... 2 1. Principles for the recovery of capital expenditure... 4 2. Principles for urban water tariffs... 9 3. Principles for

More information

Rehabilitation Management Systems. Julian Hodder National Workers Compensation & HSE Manager May 2013

Rehabilitation Management Systems. Julian Hodder National Workers Compensation & HSE Manager May 2013 Rehabilitation Management Systems Julian Hodder National Workers Compensation & HSE Manager May 2013 Australia and New Zealand s leading waste management provider > Australian publicly listed company with

More information

Asset Management Plan Overview

Asset Management Plan Overview Council Strategy Asset Management Plan Overview City of Albany 2013 File Ref: CM.STD.6 Synergy Ref: NMP1331749 102 North Road, Yakamia WA 6330 Version: 25/06/2013 PO Box 484, ALBANY WA 6331 Tel: (08) 9841

More information

Long Term Financial Plan

Long Term Financial Plan Gladstone Regional Council Long Term Financial Plan Revision No. 6 02/2016 1 Our Charter We are Gladstone Regional Council. Our Vision Our vision is to be the best local government in Queensland. Our Purpose

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Glenorchy City Council Asset Management Strategy for Infrastructure Assets Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control

More information

Advanced Financial Accounting

Advanced Financial Accounting Advanced Financial Accounting Sample Paper 2 Questions & Suggested Solutions Page 1 of 27 INSTRUCTIONS TO CANDIDATES PLEASE READ CAREFULLY Candidates must indicate clearly whether they are answering the

More information

Shire of Northam. Strategic Community Plan 2012-2022

Shire of Northam. Strategic Community Plan 2012-2022 commerce lifestyle heritage Shire of Northam Strategic Community Plan 2012-2022 TABLE OF CONTENTS The Strategic Community Plan is the principal planning document for the Shire of Northam and will provide

More information

ROADING ASSET MANAGEMENT PLAN

ROADING ASSET MANAGEMENT PLAN ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Information Paper 10. Debt Management

Information Paper 10. Debt Management Information Paper 10 Debt Management February 2007 Introduction Local Government financial statements, like those of other spheres of government and the corporate sector, include a good many items of considerable

More information

December 2004 Paper 2004/21

December 2004 Paper 2004/21 The Scottish Environment Protection Agency (SEPA) and Sustainable Development Statutory Guidance to SEPA made under Section 31 of the Environment Act 1995 December 2004 Paper 2004/21 Crown copyright 2005

More information

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project evaluation 5 3.0 Project feasibility 7 3.1 Defining the objectives

More information

Recognition of Prior Learning (RPL) Kit. BSB50607 Diploma of Human Resources Management

Recognition of Prior Learning (RPL) Kit. BSB50607 Diploma of Human Resources Management Recognition of Prior Learning (RPL) Kit BSB50607 Diploma of Human Resources Management Applicant: Date: Diploma of Human Resources Management RPL Kit 1 Applicant declaration: I have completed the following

More information

How To Improve Water Week

How To Improve Water Week Water Week - Session 24 Building is Easy, Maintaining is Not - 2 NRW Reduction in Developing Countries: The World Bank's Perspective Jan G. Janssens Energy and Water Department The World Bank Washington

More information

Collaborative development of evaluation capacity and tools for natural resource management

Collaborative development of evaluation capacity and tools for natural resource management Collaborative development of evaluation capacity and tools for natural resource management Helen Watts (Adaptive Environmental Management, formerly NSW Department of Environment and Climate Change) Sandra

More information

Guideline for preparing an Environmental and Social Management Plan

Guideline for preparing an Environmental and Social Management Plan Guideline for preparing an Environmental and Social Management Plan NZ Transport Agency www.nzta.govt.nz Version 1: April 2014 ISBN 978-0-478-41934-4 (online) Copyright information This publication is

More information

Asset Management Policy. Sutherland Shire Council. Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1

Asset Management Policy. Sutherland Shire Council. Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1 Asset Management Policy Sutherland Shire Council Council Online - IM/Policies - Policies & Forms - IM/Policy Asset Management1 Document review and approval This document has been approved by Subject matter

More information

Senior Asset Capability Engineer Electrical

Senior Asset Capability Engineer Electrical Senior Asset Capability Engineer Electrical PO6 Permanent - Ipswich Based About the position Reporting to the Principal Asset Capability, as the Senior Asset Capability Engineer you will be responsible

More information

Asset Management: A Best Practice

Asset Management: A Best Practice Asset Management: A Best Practice Purpose Introduction This guide will help you understand: The definition of Asset Management. Why asset management is important to your utility. The best practices in

More information

The National Health Plan for Young Australians An action plan to protect and promote the health of children and young people

The National Health Plan for Young Australians An action plan to protect and promote the health of children and young people The National Health Plan for Young Australians An action plan to protect and promote the health of children and young people Copyright 1997 ISBN 0 642 27200 X This work is copyright. It may be reproduced

More information

Best Practice Asset Management

Best Practice Asset Management Case Study Best Practice Asset Management An example of an Activity Management Plan, published by the Working Group Case Study AMP 01-2014 The Working Group was established by the Road Efficiency Group

More information

Asset Management Plan. High-performing and sustainable assets

Asset Management Plan. High-performing and sustainable assets Asset Management Plan High-performing and sustainable assets DISTRIBUTION SCHEDULE Revision No. Date Distribution Reference R1.4 18 October 2012 Issued to KPMG R1.5 19 October 2012 Issued to KPMG R1.6

More information