1 SCHEDULE PA-23 INSURANCE REQUIREMENTS INSURANCE REQUIREMENTS...1 PART 1 - CONSTRUCTION PERIOD INSURANCE All Risk Builders Risk Wrap-up Liability Professional Errors and Omissions Contractor s Pollution Liability Other Construction Coverage Director s and Officers Legal Liability Insurance Crime Insureds...8 PART 2 - OPERATING PERIOD INSURANCE Commercial General Liability All Risk Property Boiler and Machinery Professional Errors and Omissions Director s and Officers Legal Liability Insurance Pollution Liability Crime Other Operation and Maintenance Coverage Insureds...16
2 SCHEDULE PA-23 INSURANCE REQUIREMENTS PART 1 - CONSTRUCTION PERIOD INSURANCE 1.1 All Risk Builders Risk All Risk Course of Construction (including without limitation earthquake, flood and tsunami) insurance on a replacement cost basis covering all DB Work, the Facility and all materials and equipment intended for permanent use in the Facility or incidental to the DB Work, including on and off-site installation, permissions to operate except under revenue type operations, prevention of access and off premises power interruption, which coverage will include the following terms: to be in an amount of not less than: DELETED for damage to, or loss of, the Facility, including delay in startup, and extra-expense to reduce delay in start-up; with the following sublimits: (A) (B) (C) (D) (E) (F) (G) (H) (I) (J) (K) (L) (M) DELETED offsite installations; DELETED fire fighting expense; DELETED off premises services interruption; DELETED cost of demolition; DELETED valuable papers; DELETED extra expediting expense unrelated to delay in start-up; DELETED offsite storage; DELETED by-laws coverage; DELETED debris removal; DELETED unnamed locations/offsite storage; DELETED temporary structures; DELETED inland transit; and DELETED professional fees; the premium for the direct damage insurance coverage will be based on the estimated total insured value of $746,000,000, part of the completed value of the Facility;
3 - 2 - minimum deductibles, per occurrence, in the amounts set out below: for earthquake and tsunami, DELETED of insured value at the time of loss, but not less than DELETED and a maximum of DELETED for direct damage resulting from flood, water damage, inundation, testing and commissioning, DELETED and for direct damage resulting from all other insured perils, DELETED; (e) delay in start-up coverage with a minimum waiting period of DELETED for all perils; exclusions for: (vii) war terrorism; nuclear or radioactive contamination; data and cyber; faulty work, material construction and design but will cover resulting damage from perils not excluded; transmission and distribution lines outside insured operations premises; mould/pollution; (viii) corrosion and rust, but with coverage for corrosion and rust resulting from damage from perils not excluded; and (f) provide for interim payments in the event of any loss. 1.2 Wrap-up Liability Wrap-up Liability insurance against claims for personal injury (including bodily injury and death) and property damage or loss occurring in connection with or as a result of the DB Work, which coverage will include the following terms: to be in an amount of not less than DELETED per occurrence and in the aggregate; a minimum deductible of DELETED per occurrence; exclusions for: injuries to employees in the course of employment;
4 - 3 - (vii) property in the DBFO Contractor s care, custody and control except during completed operations; use of owned motor vehicles required by law to be licensed; damage to the DB Work or the Facility except during completed operations; data and cyber; war; nuclear contamination; (viii) pollution; and (ix) mould; (e) include an extension of coverage for DELETED after the Total Completion Date for products and completed operations; include the following endorsements: (vii) broad form property damage/completed operations; premises and operations liability; elevator and hoist collision liability; blanket contractual liability; contingent employers liability; non-owned automobiles; cross liability and severability of interests clause; (viii) unlicensed equipment; (ix) (x) (xi) (xii) notice of claim; tenants legal liability (All Risk) (subject to a sublimit of DELETED); medical expenses (subject to a sublimit of DELETED); incidental non-owned aircraft and watercraft; (xiii) fire fighting expenses.
5 - 4 - (xiv) (xv) sudden and accidental pollution; and permission for partial road use; and (f) include coverage for terrorism. 1.3 Professional Errors and Omissions From the Date of this Agreement until six years after the Total Completion Date, project specific Professional Liability Errors and Omissions insurance for the Project, which may be written on a claims made form, which coverage will cover all professionals engaged or involved in the DB Work in a professional capacity and will include the following terms: to be in an amount of not less than DELETED per occurrence and DELETED in the aggregate; a minimum deductible of DELETED per occurrence; exclusions for: (vii) any dishonest, fraudulent, or criminal conduct committed intentionally by or at the direction of any insured; however, this exclusion will not apply to any insured, who did not commit, participate in or have knowledge of such conduct; any Claim made by any insured against any other insured; any insured s involvement as a partner, officer, director, stockholder, employer or employee of any business enterprise not named in the policy declarations; the design or manufacture of any products developed by the insured for multiple sale or mass distribution, including but not limited to computer programs or software; any express warranty or guarantee except to loss resulting from the failure to meet such warranty or guaranty if such loss would have resulted in the absence of such express warranty or guaranty; the insureds requiring, obtaining, maintaining or the insureds failure to require, obtain or maintain any bond, suretyship or any form of insurance, or any claim based upon or arising out the insureds advising or failing to advise with respect to the requiring, obtaining or maintaining of any bond, suretyship or any form of insurance; the insureds advising or requiring of, or failure to maintain or procure any financing or monies for payment of any portion of the Project, or of services or labour connected with the Project;
6 - 5 - (viii) for the cost to repair or replace any faulty workmanship, assembly, construction, erection, fabrication, installation or remediation if such work is performed in whole or in part by the insured or any organization or subsidiary or affiliate thereof which any insured operates or hold more than a 25% ownership interest in; or which operates or holds more than a 25% interest in any insured; (ix) (x) (xi) (xii) liability of others assumed by any insured under any contract or agreement; except this exclusion does not apply to the liability of others assumed under any written contract or agreement provided such liability is caused by a breach of professional duty in the rendering or failure to render professional services to others by the insured or for which the insured is legally liable as a result of the performance of others; punitive or exemplary damages, fines or penalties; except punitive or exemplary damages where payment is not held to be against public policy; any Claim for bodily injury sustained by any employee of any insured while engaged in employment by any insured, or by any person whose right to assert a Claim against the insured arises by reason of any employment, blood, marital or other relationship with the employee. any obligation for which an insured or any other party must pay under any unemployment, workers compensation, disability benefits, or other similar laws; (xiii) nuclear reaction, radiation or contamination, under any circumstances and regardless of cause, within or originating from a nuclear facility; and (xiv) terrorism; (e) (f) include as insureds all architects, engineers and other professionals engaged in DB Work; provide that the coverage is retroactive to the date on which DB Work commenced; and be non-cancellable except for material change to the scope of the Project or nonpayment of premiums. 1.4 Contractor s Pollution Liability Project specific Contractors Pollution and Environmental Impairment Liability insurance for the Project, which may be written on a claims made form, which coverage will include the following terms: to be in an amount of not less than DELETED per occurrence and in the aggregate;
7 - 6 - a minimum deductible of DELETED per occurrence; include coverage for: environmental impairment liability; third party bodily injury; property damage liability (including remediation and clean-up costs); and DELETED coverage after the Total Completion Date for completed operations; and exclusions for: (vii) any pre-existing conditions; professional services; employer s liability; intentional and wilful non-compliance; nuclear material and liability; asbestos and lead; biological agents; (viii) damage to the Work (other than completed operations); (ix) (x) (xi) (xii) data and cyber risks; terrorism; war; and mould. 1.5 Other Construction Coverage Business Automobile Liability insurance which coverage will include the following terms: to be in an amount of not less than DELETED; include coverage for third party property damage and bodily injury (including accident benefits) arising out of the use of any automobile used in connection with the Project; and
8 - 7 - exclusions as set out in the standard ICBC form. If aircraft are used in the performance of DB Work, Aircraft Liability insurance (including owned and non-owned aircraft) which coverage will include the following terms: to be in an amount of not less than DELETED; and a minimum deductible of DELETED If watercraft are used in the performance of DB Work, Watercraft Liability insurance covering all watercraft used in the Project which coverage will include the following terms: to be in an amount of not less than DELETED; and a minimum deductible of DELETED. Contractors Equipment insurance which coverage will include the following terms: to be in an amount of not less than actual cash value of such equipment; a minimum deductible of DELETED; and exclusions in the standard CCDC form. (e) Marine Cargo insurance (if any marine cargo) on a world-to-world basis which coverage will include the following terms: to be in an amount of not less than the value of the shipment; a minimum deductible of DELETED; and include coverage for: (A) (B) materials to be used in the Project against loss or damage for customary all risk marine perils (including war, strikes, riots and civil commotion while in transit); and protection for business interruption in the form of Advance Loss of Profits insurance. 1.6 Director s and Officers Legal Liability Insurance Director s and Officer s Legal Liability and Corporate Indemnification insurance for the DBFO Contractor and the Principal Contractors, which coverage will include the following terms: to be in an amount of not less than DELETED;
9 - 8 - a minimum deductible of DELETED for corporate reimbursement and no deductible thereafter; and exclusions for criminal activity. 1.7 Crime Crime (employee dishonesty) insurance with coverage on the following terms: be in an amount of not less than DELETED; a minimum deductible of DELETED per occurrence; include: (vii) coverage for fraudulent or dishonest employees of the Operator; broad form money and securities, money orders and counterfeit paper; depositor s forgery; computer fraud and funds transfer fraud; audit expenses; credit card forgery; and custodial endorsement extending protection to third parties; and exclusions for data/cyber. 1.8 Insureds The following policies for the insurance required under this Part 1 of Schedule PA-23 must include the following persons as insureds and must otherwise comply with the following: subject to section 1.8(e) of this Part 1 of Schedule PA-23, the policies of insurance described in section 1.1 All Risk Builders Risk of this Part 1 of Schedule PA-23 must include the following persons as named insureds as their respective interests may appear: TransLink; TransLink Indemnified Persons; DBFO Contractor and all Partners; DBFO Contractor Indemnified Persons; Contractors, subcontractors, equipment suppliers and material men, of every tier; Senior Lenders (or their security agent or security trustee on their behalf); Fraser River Port Authority; Her Majesty the Queen in right of Canada;
10 - 9 - Her Majesty the Queen in right of the Province of British Columbia; Greater Vancouver Regional District; Greater Vancouver Water District; Greater Vancouver Sewerage and Drainage District; City of Surrey; Township of Langley; District of Maple Ridge; District of Pitt Meadows; Landowners of Facility Lands other than TransLink; and must designate TransLink as first loss payee (subject to the provisions of Project Agreement sections 17.25, and 17.27); the policies for the insurance described in the following sections of this Part 1 of Schedule PA-23: 1.2 Wrap-Up Liability 1.4 Contractors Pollution and Environmental Impairment Liability must include the following persons as named insureds: TransLink; DBFO Contractor and all Partners; and must include the following persons as additional insureds: TransLink Indemnified Persons; Persons for whom TransLink is in law responsible; DBFO Contractor Indemnified Persons; Persons for whom the DBFO Contractor is in law responsible; Senior Lenders (or their security agent or security trustee on their behalf); Fraser River Port Authority; Her Majesty the Queen in right of Canada; Her Majesty the Queen in right of the Province of British Columbia; Greater Vancouver Regional District; Greater Vancouver Water District; Greater Vancouver Sewerage and Drainage District; City of Surrey; Township of Langley; District of Maple Ridge; District of Pitt Meadows; Landowners of Facility Lands other than TransLink; the policies for the insurance described in the following sections of this Part 1 of Schedule PA-23: 1.5 Aircraft Liability 1.5 Watercraft Liability
11 must include the following persons as additional insureds: TransLink; TransLink Indemnified Persons; Persons for whom TransLink is in law responsible; DBFO Contractor and all Partners; DBFO Contractor Indemnified Persons; Persons for whom the DBFO Contractor is in law responsible; Senior Lenders (or their security agent or security trustee on their behalf); Fraser River Port Authority; Her Majesty the Queen in right of Canada; Her Majesty the Queen in right of the Province of British Columbia; Greater Vancouver Regional District; Greater Vancouver Water District; Greater Vancouver Sewerage and Drainage District; City of Surrey; Township of Langley; District of Maple Ridge; District of Pitt Meadows; Landowners of Facility Lands other than TransLink; the policies for the insurance described in the following sections of this Part 1 of Schedule PA-23: 1.2 Wrap-Up Liability 1.4 Contractor s Pollution and Environmental Improvement Liability 1.5 Aircraft Liability 1.5 Watercraft Liability must in addition protect the interest of all participants, direct or indirect, in the DB Work including architects, engineers, consultants, contractors, subcontractors, trade contractors, equipment suppliers, material suppliers and their respective agents and employees, as additional insureds where applicable; and (e) the policies for the insurance described in section 1.1 All Risk Builders Risk of this Part 1 of Schedule PA-23 must name the following persons as named insureds as their respective interests may appear with respect to the coverage for delay in start-up, and extra-expense to reduce delay in start-up, provided by those policies: TransLink; DBFO Contractor and all Partners; Senior Lenders (or their security agent or security trustee on their behalf); and must designate TransLink as first loss payee (subject to the provisions of Project Agreement sections 17.25, and 17.27);
12 PART 2 - OPERATING PERIOD INSURANCE 2.1 Commercial General Liability Commercial General Liability insurance fully insuring against liability with respect to the OMR Work or the Facility or the TransLink Assets during the OMR Term including, without limitation, coverage for the activities and operations conducted by the DBFO Contractor and those persons for whom the DBFO Contractor is in law responsible and any other person on the Facility Lands or the Facility performing OMR Work on behalf of the DBFO Contractor or those for whom the DBFO Contractor is in law responsible, against claims for personal injury (including bodily injury and death) and property damage or loss howsoever arising during the OMR Term including without limitation out of the OMR Work or the use and operation of the Facility and the TransLink Assets, which coverage will include the following terms: to be in an amount of not less than DELETED; a minimum deductible of DELETED per occurrence, provided that if, in respect of any Insurance Adjustment Period as defined in section of the Project Agreement, the DBFO Contractor can demonstrate to the satisfaction of TransLink, acting reasonably, that the Commercial General Liability insurance can be obtained for that Insurance Adjustment Period with a lower minimum deductible per occurrence for the same premium cost as would be payable for such insurance with a minimum deductible of DELETED per occurrence, and that the policy for such insurance otherwise meets all the applicable requirements of the Project Agreement, then for that Insurance Adjustment Period the Commercial General Liability insurance may be obtained with the lower minimum deductible per occurrence; include coverage for: (vii) products and completed operation liability; sudden and accidental pollution; broad form property damage; premises and operations liability; elevator and hoist collision liability; blanket contractual liability; contingent employers liability; (viii) non-owned automobile liability; (ix) cross liability and severability of interests clause;
13 (x) (xi) employees as additional insureds; and terrorism; and exclusions for: asbestos; data and cyber; and mould. 2.2 All Risk Property All Risk Property Insurance (including without limitation earthquake, flood and tsunami) on a replacement cost basis covering the Facility, which coverage will include the following terms: to be in an amount of not less than DELETED (index linked); minimum deductibles in the amounts set out below for claims arising from the following: for earthquake and tsunami, DELETED of insured value at the time of loss, but not less than DELETED; for direct damage resulting from flood, water damage and inundation, DELETED and for direct damage resulting from all other insured perils, DELETED; include coverage for: business interruption on a gross income basis for DELETED (but excluding a waiting period of the first 10 days). Gross income for each year of the OMR Term (each, a Subject Year ) shall be the greatest of: (A) (B) (C) the aggregate of the scheduled Capital Payments and OMR Payments payable during the year of the OMR Term immediately following the Subject Year; the total amount of toll revenue estimated to be received or receivable in respect of use of the Bridge during the Subject Year, as determined by TransLink acting reasonably; and the total amount of toll revenue estimated to be received or receivable in respect of use of the Bridge during the year of the OMR Term immediately following the Subject Year, as determined by TransLink acting reasonably;
14 permission to complete; electronic data processing, on and off-site exposures; terrorism; extra expense; and valuable papers; exclusions for: war; nuclear contamination; data and cyber; and mould; and (e) provide for interim payments in the event of any loss. 2.3 Boiler and Machinery Boiler and Machinery insurance for all boilers, pressure vessels, electrical and mechanical machines on a comprehensive basis which coverage will include the following terms: to be in an amount of not less than DELETED (index linked) including property damage, and business interruption on a gross income basis for 12 months (but excluding a waiting period of the first 72 hours) as provided in section 2.2 of this Part 2 of Schedule PA-23; a minimum deductible of DELETED per occurrence; and exclusions for: data/cyber; and loss or damage covered by warranty, guarantee or professional liability. 2.4 Professional Errors and Omissions Professional Liability Errors and Omissions insurance, which may be written on a claims made form, which coverage will cover all professionals engaged or involved in the OMR Work in a professional capacity and will include the following terms: to be in an amount of not less than DELETED per occurrence; a minimum deductible of DELETED per occurrence; and
15 exclusions for: (vii) penalties, fines or liquidated and ascertained damages; insured vs. insured claims; bankruptcy, insolvency, liquidation or receivership of the insured; liability of others assumed by the insured under contract or agreement, except to the extent that the insured would have otherwise been liable for any errors, omissions or negligent acts of the insured s employees or subconsultants; express warranties or guarantees given by the insured; nuclear contamination; the performance of a service not usual or customary for professional architects or engineers unless specifically agreed by the insurer; and (viii) terrorism. 2.5 Director s and Officers Legal Liability Insurance Director s and Officer s Legal Liability and Corporate Indemnification insurance for the DBFO Contractor and the Principal Contractors, which coverage will include the following terms: to be in an amount of not less than DELETED; a minimum deductible of DELETED for corporate reimbursement and no deductible thereafter; and exclusions for criminal activity. 2.6 Pollution Liability Pollution and Environmental Impairment Liability insurance for the Project, which may be written on a claims made form, which coverage will include the following terms: to be in an amount of not less DELETED per occurrence and in the aggregate; a minimum deductible of DELETED per occurrence; coverage for third party bodily injury and property damage liability, including remediation and clean-up costs, and underground storage tanks; exclusions for: radiation over specified levels;
16 asbestos; lead paint; and mould; and (e) provision to allow for a DELETED discovery period after the Termination Date to apply to claims made after the Termination Date the cause of which arose before the Termination Date. 2.7 Crime Crime (employee dishonesty) insurance with coverage on the following terms: be in an amount of not less than DELETED; a minimum deductible of DELETED per occurrence; include: (vii) coverage for fraudulent or dishonest employees of the Operator; broad form money and securities, money orders and counterfeit paper; depositor s forgery; computer fraud and funds transfer fraud; audit expenses; credit card forgery; and custodial endorsement extending protection to third parties; and exclusions for data/cyber. 2.8 Other Operation and Maintenance Coverage Business Automobile Liability insurance which coverage will include the following terms: to be in an amount of not less than DELETED include coverage for third party property damage and bodily injury (including accident benefits) arising out of the use of any automobile used in connection with the Project; and exclusions as set out in the standard ICBC form.
17 If aircraft are used to perform OMR Work, Aircraft Liability insurance (including owned and non-owned aircraft) which coverage will include the following terms: to be in an amount of not less than DELETED; and a minimum deductible of DELETED per occurrence. If watercraft are used to perform OMR Work, Watercraft Liability insurance covering all watercraft used in the Project which coverage will include the following terms: to be in an amount of not less than DELETED; a minimum deductible of DELETED per occurrence; and exclusions as set out in the standard Marine Underwriters clauses. Contractors Equipment insurance which coverage will include the following terms: to be in an amount of not less than actual cash value of such equipment; a minimum deductible of DELETED; and exclusions in the standard CCDC form. 2.9 Insureds The following policies of insurance required under this Part 2 of Schedule PA-23 must include the following persons as insureds and must otherwise comply with the following: subject to section 2.9 of this Part 2 of Schedule PA-23, the policies for the insurance described in the following sections of this Part 2 of Schedule PA-23: 2.2 All Risk Property 2.3 Boiler and Machinery must include the following persons as named insureds as their respective interests may appear: TransLink; TransLink Indemnified Persons; DBFO Contractor and all Partners; DBFO Contractor Indemnified Persons; Contractors, subcontractors, equipment suppliers and material men, of every tier; Senior Lenders (or their security agent or security trustee on their behalf); Fraser River Port Authority; Her Majesty the Queen in right of Canada;
18 Her Majesty the Queen in right of the Province of British Columbia; Greater Vancouver Regional District; Greater Vancouver Water District; Greater Vancouver Sewerage and Drainage District; City of Surrey; Township of Langley; District of Maple Ridge; District of Pitt Meadows; Landowners of TransLink Lands other than TransLink; and must designate TransLink as first loss payee (subject to the provisions of Project Agreement sections 17.25, and 17.27); the policies for the insurance described in the following sections of this Part 2 of Schedule PA-23: 2.1 Commercial General Liability 2.6 Pollution and Environmental Impairment Liability must include the following persons as named insureds: TransLink; DBFO Contractor and all Partners; and must include the following persons as additional insureds: TransLink Indemnified Persons; Persons for whom TransLink is in law responsible; DBFO Contractor Indemnified Persons; Persons for whom the DBFO Contractor is in law responsible; Senior Lenders (or their security agent or security trustee on their behalf); Fraser River Port Authority; Her Majesty the Queen in right of Canada; Her Majesty the Queen in right of the Province of British Columbia; Greater Vancouver Regional District; Greater Vancouver Water District; Greater Vancouver Sewerage and Drainage District; City of Surrey; Township of Langley; District of Maple Ridge; District of Pitt Meadows; Landowners of TransLink Lands other than TransLink; the policies for the insurance described in the following sections of this Part 2 of Schedule PA-23: 2.8 Aircraft Liability 2.8 Watercraft Liability
19 must include the following persons as additional insureds: TransLink; TransLink Indemnified Persons; Persons for whom TransLink is in law responsible; DBFO Contractor and all Partners; DBFO Contractor Indemnified Persons; Persons for whom the DBFO Contractor is in law responsible; Senior Lenders (or their security agent or security trustee on their behalf); Fraser River Port Authority; Her Majesty the Queen in right of Canada; Her Majesty the Queen in right of the Province of British Columbia; Greater Vancouver Regional District; Greater Vancouver Water District; Greater Vancouver Sewerage and Drainage District; City of Surrey; Township of Langley; District of Maple Ridge; District of Pitt Meadows; Landowners of TransLink Lands other than TransLink; and the policies for the insurance described in the following sections of this Part 2 of Schedule PA-23; 2.2 All Risk Property 2.3 Boiler and Machinery must include the following persons as named insureds as their respective interests may appear with respect to the coverage for business interruption provided by those policies: TransLink; DBFO Contractor and all Partners; Senior Lenders (or their security agent or security trustee on their behalf); and must designate TransLink as first loss payee (subject to the provisions of Project Agreement sections 17.25, and 17.27).
SCHEDULE 11 INSURANCE REQUIREMENTS
SCHEDULE 11 SCHEDULE 11 DBFO AGREEMENT INSURANCE REQUIREMENTS 1. GENERAL 1.1 Capitalized Terms Capitalized terms used in this Schedule have the definitions as set out in the Agreement to Design, Build,
More informationSCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INSURANCE REQUIREMENTS... 1
SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INSURANCE REQUIREMENTS... 1 1.1 Project Specific Construction Period Insurance... 1 1.2 Additional Construction Period Insurance... 1 1.3 Operating Period Insurance
More informationSCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION... 1. 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS...
SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION... 1 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 2.1 Wrap-Up Liability Insurance... 1 2.2 Course of Construction Coverage...
More informationSCHEDULE 11 INSURANCE REQUIREMENTS
SCHEDULE 11 INSURANCE REQUIREMENTS 1. GENERAL 1.1 Capitalized Terms Capitalized terms used in this Schedule have the definitions as set out in the Agreement to Design, Build, Finance and Maintain Three
More informationSCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1
i SCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 1.1 Wrap-Up Liability Insurance... 1 1.2 Course of Construction Coverage... 2 1.3 Other Construction
More informationSCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. INTERPRETATION... 1. 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS...
SCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. INTERPRETATION... 1 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 2.1 Construction Wrap-Up General Liability Insurance...
More informationMAIN CIVIL WORKS CONTRACT SCHEDULE 13 INSURANCE TABLE OF CONTENTS
MAIN CIVIL WORKS CONTRACT SCHEDULE 13 INSURANCE TABLE OF CONTENTS 1 INTERPRETATION... 1 1.1 Definitions... 1 2 CONTRACTOR PROVIDED INSURANCE COVERAGE... 1 3 BC HYDRO PROVIDED INSURANCE COVERAGE... 2 4
More informationTOWNSHIP OFFICIALS OF ILLINOIS RISK MANAGEMENT ASSOCIATION
TOWNSHIP OFFICIALS OF ILLINOIS RISK MANAGEMENT ASSOCIATION TOIRMA SUMMARY OF COVERAGES as of 6/1/2014 I. PROPERTY COVERAGES A. BUILDINGS AND CONTENTS Covers all the real and personal property owned by
More informationEDUCATION (K-12) OWNER INSURED CONSTRUCTION PROJECTS
EDUCATION (K-12) OWNER INSURED CONSTRUCTION PROJECTS Insurance and Indemnification Clauses (to be included in Supplementary Conditions to the CCDC 2 2008 Contracts for Education (K-12) projects insured
More informationMINNESOTA STATE COLLEGES AND UNIVERSITIES General Insurance Requirements for Contractors & Vendors
Certificate of Liability Insurance, Form ACORD25: Following are the insurance requirements of the State of Minnesota acting through its Board of Trustees of the Minnesota State Colleges and Universities,
More informationHEALTH OWNER INSURED CONSTRUCTION PROJECTS
HEALTH OWNER INSURED CONSTRUCTION PROJECTS Insurance and Indemnification Clauses (to be included in Supplementary Conditions to the Design - Build Stipulated Price Contract 14-2000 for Health projects
More informationHow To Insure A Nuclear Plant
SCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. INTERPRETATION... 1 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 2.1 Construction Wrap-Up General Liability Insurance...
More informationAPPENDIX 8 INSURANCE REQUIREMENTS
APPENDIX 8 INSURANCE REQUIREMENTS Policy Term: Policy Limit: Sub Limits: Coverage Extensions / Conditions: Insured Perils: FDOT Self Insurance BUILDERS RISK Required when performing Construction Work Builders
More informationSchedule 12 - Insurances
RFP Version There are two parts to this Schedule 12: Part A Insurances applicable to the D&C Phase; and Part B Insurances during the O&M Phase. [State Note: The State in its discretion may procure any
More informationEXHIBIT Y INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT Y INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Required Prior to Final Completion of the Project Assets Except as set forth below,
More informationSCHEDULE 17. Insurance Requirements. Part 1 Insurance Requirements applicable to the Phase 2 Work
SCHEDULE 17 Insurance Requirements Part 1 Insurance Requirements applicable to the Phase 2 Work Capitalized terms used in this Schedule which are not otherwise defined shall have the meanings given to
More informationHow To Insure A Project In The Uk
Schedule 15A: Insurance Part 1 Required Insurances Sub-part 1 Design and Construction Phase The policies to be taken out by the Contractor, or caused to be taken out by the Major Sub-contractor, and maintained
More informationEXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS
EXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS 1. Builder s Risk Insurance During Construction At all times during the period from the Operating Commencement Date until the last Service Commencement Date and
More informationSAMPLE 1. GC17 INDEMNIFICATION. (a) (i) (ii) -1-6sgc.doc
1. GC17 INDEMNIFICATION Except as provided in the Contractor shall be liable for, and shall indemnify and hold harmless the Owner against all claims, demands, losses, costs, damages, actions, suits or
More informationHEALTH CONTRACTOR INSURED CONSTRUCTION PROJECTS
HEALTH CONTRACTOR INSURED CONSTRUCTION PROJECTS Insurance and Indemnification Clauses (to be included in Supplementary Conditions to the CCDC 2 2008 Contracts for Health projects with an Estimated Project
More information3. GC 25 WORKPLACE HEALTH, SAFETY AND COMPENSATION COMMISSION
1. GC17 INDEMNIFICATION Except as provided in the Contractor shall be liable for, and shall indemnify and hold harmless the Owner against all claims, demands, losses, costs, damages, actions, suits or
More informationEXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and
More informationMAINE STATE HOUSING AUTHORITY INSURANCE REQUIREMENTS FOR MULTI-FAMILY AND SUPPORTIVE HOUSING
MAINE STATE HOUSING AUTHORITY INSURANCE REQUIREMENTS FOR MULTI-FAMILY AND SUPPORTIVE HOUSING The following insurance requirements apply to all multi-family residential rental projects and supportive housing
More informationAPPENDIX 7 INSURANCE REQUIREMENTS 1. GENERAL INSURANCE REQUIREMENTS APPLIES TO ALL POLICIES
APPENDIX 7 INSURANCE REQUIREMENTS 1. GENERAL INSURANCE REQUIREMENTS APPLIES TO ALL POLICIES The mortgage shall contain a covenant binding the mortgagor to maintain adequate liability, fire, and extended
More informationGeneral Liability Insurance
General Liability Insurance Insurance Company: Alberta School Boards Insurance Exchange (ASBIE) Insuring Agreement ASBIE agrees to pay on behalf of the Subscriber all sums that they are legally obligated
More informationEXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and
More informationEXHIBIT K Insurance Requirements
EXHIBIT Insurance Requirements Subject to approval by the City's Risk Manager of the insurers and policy forms, and further subject to HUD's rights under the HUD Documents during the term of the HUD Documents,
More information"I" INSURANCE CONDITIONS
"I" INSURANCE CONDITIONS I_insur_conditions.pdf Issued on July 16, 2009 I N D E X PART I GENERAL INSURANCE CONDITIONS (GIC)...1 GIC 1 INDEMNIFICATION...1 GIC 2 CONTRACTOR...1 GIC 3 INSURANCE PROCEEDS...1
More informationSection 00 73 16 2014-02-06 Insurance Conditions
Section Cover Page Section 00 73 16 2014-02-06 Use this Section to specify for construction contracts when Section 00 72 00 - General Conditions of Contract is used. Use this Section as is; do not modify
More informationPUBLIC AND PRODUCTS LIABILITY INSURANCE SCHEDULE TO THE POLICY
PUBLIC AND PRODUCTS LIABILITY INSURANCE SCHEDULE TO THE POLICY INSURED: POLICY NO: BUSINESS: PERIOD OF INSURANCE: From: To: (both dates inclusive) INDEMNITY LIMITS: Section A: Section B: Section C: EXCESS:
More informationTHIS ADDENDUM IS TO BE READ WITH AND CONSTITUTES PART OF THE TENDER DOCUMENTS.
ADDENDUM WSP Project No. 141-21285-00 Addendum No.: 2 Date: May 11, 2015 Contract No.: 13-006 Owner: Consultant: Number of Pages Project Name Hamilton International Airport WSP Canada Inc. 6 (including
More informationPUBLIC & PRODUCTS LIABILITY INSURANCE
PUBLIC & PRODUCTS LIABILITY INSURANCE ASSURED: SCHEDULE TO THE POLICY POLICY NUMBER: BUSINESS: PERIOD OF INSURANCE: From: To: (both dates inclusive) INDEMNITY LIMITS: Section: A: Section B: Section C:
More informationAttachment 12 Insurance
Attachment 12 Insurance PART A DESIGN/BUILD PERIOD INSURANCES PART A(I): RTD DESIGN/BUILD PERIOD INSURANCES 1. OWNER CONTROLLED INSURANCE PROGRAM 1.1 Eligibility and Enrollment RTD shall procure an owner
More informationMidwives Association of British Columbia
Midwifery Practice Insurance Program Midwives Association of British Columbia Prepared by: Lee Fulsher, BA, CAIB Account Manager Direct Line: 604-699-2266 Email: lfulsher@shawsabey.com November 13, 2015
More informationChapter 1 Insurance Principals & Concepts 1
Contents Chapter 1 Insurance Principals & Concepts 1 Page I. The Concept of Insurance 1 What is Insurance? 1 II. Types of Property & Casualty Insurance 1 Parts of an Insurance Contract 2 Standardized Policies
More informationH. The Contractor shall not begin work under the contract until the required insurance has been obtained and approved by the Contracting Agency.
Insurance Requirements (1) General Requirements A. The Contractor shall obtain the insurance described in this section from insurers approved by the State Insurance Commissioner pursuant to RCW Title 48.
More informationINDEX. bonded contract, 289 insureds, 243. misrepresentation, 291 obtaining, 242
INDEX B non-conforming tender, 284 boiler and machinery insurance, performance bond 241 default by the obligee, 288 coverage, 243 failure to notify, 289 definition of the accident, 245 material variation
More informationARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE By Bruce H. Schoumacher
Querrey Harrow When Results Count. SM www.querrey.com Copyright 2005 Querrey & Harrow, Ltd. All Rights Reserved. ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE By Bruce H. Schoumacher Architects
More informationPHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS
PHILADELPHIA REDEVELOPMENT AUTHORITY INSURANCE REQUIREMENTS The individual or entity seeking to enter into a contract with the Philadelphia Redevelopment Authority or who is entering into a contract with
More informationGarage Liability Policy
Garage Liability Policy 8 0 0. 8 3 3. 3 4 2 7 w w w. c o n s t i t u t i o n a l. c o m GARAGE LIABILITY COVERAGE FORM TC-11 QUICK REFERENCE (Ed. 01-06) DECLARATIONS PAGE Name of Insurance Company Policy
More informationSCHEDULE D TAX COMPLIANCE DECLARATION FORM
SCHEDULE D TAX COMPLIANCE DECLARATION FORM The Ontario Government expects all proponents to pay their Provincial taxes on a timely basis. In this regard, proponents are advised that any contract with the
More informationAutomotive services features
Automotive services features Travelers Canada E-Clips Designed for specific occupancies which maintain or repair private passenger or small commercial vehicles. Feature coverages: 1. Pollution clean up
More informationPolicy Schedule. Construction/Erection All Risks and Third Party Liability insurance
Policy Schedule TYPE: Construction/Erection All Risks and Third Party Liability insurance PRINCIPAL INSURED: [Eni Iraq BV] and all subsidiary (including subsidiaries thereof), affiliated, associated and
More information"P" INSURANCE CONDITIONS CONSULTING AND PROFESSIONAL SERVICES
"P" INSURANCE CONDITIONS P_insur_conditions.pdf Issued on May 7, 2013 I N D E X PART I GENERAL INSURANCE CONDITIONS (GIC)... 3 GIC 2 CONSULTANT... 3 GIC 3 INSURANCE PROCEEDS... 4 GIC 4 CONSULTANTS RESPONSIBILITY
More informationCONSTRUCTION PROJECT - RENOVATIONS OVER $5 MILLION VALUE
CONSTRUCTION PROJECT - RENOVATIONS OVER $5 MILLION VALUE DESIGN BUILD CHART FOR RFP PURPOSES Updated: November, 2011 FILE NOTES (Not to be included on chart given to Manager): The UofC gets charged the
More information2013 INSURANCE MANUAL
2013 INSURANCE MANUAL All required insurance shall be in a form, amount, content and written by companies acceptable to the Georgia Department of Community Affairs (DCA) on behalf of Georgia Housing and
More informationINSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS 1. GENERAL PROVISIONS A. Indemnification. The Contractor shall indemnify and save harmless the City of Lincoln, Nebraska from and against all losses, claims,
More informationHow To Insure A Car In The United States
Save As UCIP COVERAGE SUMMARY EXHIBIT 1A THE REGENTS OF THE UNIVERSITY OF CALIFORNIA UNIVERSITY CONTROLLED INSURANCE PROGRAM (UCIP) This Exhibit summarizes the UCIP Commercial General Liability, Workers
More informationContract Works and What you need to Know
ACN 002 566 743 Brookvale Insurance Brokers Pty Ltd Contract Works and What you need to Know 1. The Need for Contract Works Insurance The growth of large-scale construction projects has been accompanied
More informationExhibit B (Incorporated into Construction Purchase Order Terms and Conditions) CONSTRUCTION CONTRACT INSURANCE REQUIREMENTS
Exhibit B (Incorporated into Construction Purchase Order Terms and Conditions) CONSTRUCTION CONTRACT INSURANCE REQUIREMENTS 1.1. Contractor shall maintain insurance underwritten by solvent insurance companies
More informationHEALTHCARE PROVIDERS WORKPLACE LIABILITY COVERAGE PART OCCURRENCE
HEALTHCARE PROVIDERS WORKPLACE LIABILITY COVERAGE PART OCCURRENCE THIS IS AN OCCURRENCE COVERAGE PART AND, SUBJECT TO ITS PROVISIONS, APPLIES ONLY TO ANY CLAIM WHICH IS THE RESULT OF INJURY OR DAMAGE THAT
More informationLIABILITY INSURANCE Particular Conditions for Industrial Operations S A M P L E
LIABILITY INSURANCE Particular Conditions for Industrial Operations Basic Coverage Coverage is provided within the scope of the policy conditions on the liability incurred by the Insured for third party
More informationAt minimum, Project Co will be required to ensure the following insurance coverage in relation to the D&C Phase:
Schedule 9 - Insurance Part A - D&C Phase insurance requirements Project Co will be required to effect or cause to be effected such appropriate insurances during the D&C Phase in accordance with Clause
More informationAUTOMOBILE LIABILITY & PHYSICAL DAMAGE COVERAGE AGREEMENT PART A GENERAL
AUTOMOBILE LIABILITY & PHYSICAL DAMAGE COVERAGE AGREEMENT PART A GENERAL I. The TASB Risk Management Fund (Fund) provides coverage as outlined in this Automobile Liability & Physical Damage Coverage Agreement.
More informationPublic Liability Insurance
Public Liability Insurance THE INSURED Name of Insured Are you registered for GST? What is your ABN? Have you claimed or intend to claim an input tax credit on the GST component of the premium applicable
More informationCoverages Required during Course of Construction.
18. INSURANCE. Grantor shall incorporate this Section in its entirety as a contractual requirement in any agreement for construction or alterations on or about the Property, and shall include a provision,
More informationa guide to construction insurance
Standard construction document CCDC 21 2000 a guide to construction insurance Canadian construction documents committee The Canadian Construction Documents Committee is a joint committee composed of owners
More informationAll Risks of physical loss or damage including Earthquake, Flood and Sewer Back-up, subject to the Policy exclusions
Insurance Summary Property Renewal August 1, 2012 to August 1, 201 Insurer Aon Protection Plus Policy- # RAP4001426 Perils Insured All Risks of physical loss or damage including Earthquake, Flood and Sewer
More informationCommercial Lines Exposure Checklist For:
Commercial Lines Exposure Checklist For: Client Name Date Coverage Has Coverage Need Coverage Not Applicable/ Miscellaneous Policices Aircraft Products Liability Aviation Bonds Breach of Privacy Credit
More informationBusiness Income Without Extra Expense
Business Income Without Extra Expense Table of Contents Section Page No. Premises Coverages 3 Additional Coverages 5 Limits Of Insurance 10 Waiting Period 10 Loss Determination 10 Loss Payment Option 11
More informationCC-EVER001-16 Exhibit I: Insurance Page I-1 EXHIBIT I INSURANCE REQUIREMENTS
CC-EVER001-16 Exhibit I: Insurance Page I-1 EXHIBIT I INSURANCE REQUIREMENTS SEC. 1. INSURANCE REQUIREMENTS The Concessioner shall obtain and maintain during the entire term of this Contract, at its sole
More informationSouth China Insurance Architects and Engineers Professional Liability Insurance
South China Insurance Architects and Engineers Professional Liability Insurance 103.03.05(103) 華 產 企 字 第 047 號 函 備 查 1. The Insurer will pay on behalf of the Insured the Loss which the Insured becomes
More informationBusiness Income With Extra Expense And Research And Development Income Coverage
Business Income With Extra Expense Table of Contents Section Page No. Premises Coverages 3 Additional Coverages 6 Limits Of Insurance 12 Waiting Period 12 Loss Determination 12 Duration Of Loss Research
More informationINSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $25,000
Page 1 of 9 DOCUMENT 00850 INDEMNIFICATION AND INSURANCE REQUIREMENTS EXHIBIT B-1 INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS ABOVE $25,000 Indemnity The Contractor shall indemnify, defend, and hold
More informationExhibit D CRANE AUCTION INDEMNIFICATION AND INSURANCE REQUIREMENTS
Exhibit D CRANE AUCTION INDEMNIFICATION AND INSURANCE REQUIREMENTS The insurance requirements below are dependent on the actions to be taken by the successful vendor(s) following the Port of Los Angeles
More informationBusiness Income With Extra Expense
Business Income With Extra Expense Table of Contents Section Page No. Premises Coverages 3 Additional Coverages 5 Limits Of Insurance 11 Waiting Period 11 Loss Determination 11 Loss Payment Option 12 Loss
More informationRequired Insurance Language for PRF Construction Contracts
Required Insurance Language for PRF Construction Contracts When working with legal counsel to affect a construction contract for new construction or for build-outs the Purdue Risk Management Department
More informationMISCELLANEOUS PROFESSIONAL INDEMNITY INSURANCE (Costs Inclusive). 1.2. Defence Costs Underwriters agree to pay all Defence Costs as defined below.
MISCELLANEOUS PROFESSIONAL INDEMNITY INSURANCE (Costs Inclusive). 1. INSURING AGREEMENTS 1.1 Insuring Clause Whereas the company, partnership or firm as stated in Item 1 of the Schedule (the Named Insured
More informationBrief #09.00. Latest Revision: 01/2011. Business Insurance
Brief #09.00 Latest Revision: 01/2011 Business Insurance Planning and operating a business must include adequate insurance coverage for the individual entrepreneur and/or company providing the product
More informationMAINTENANCE AGREEMENTS
1. ISSUANCE OF INSURANCE SCHEDULE 18 INSURANCE REQUIREMENTS MAINTENANCE AGREEMENTS All insurance coverage will be issued with insurers acceptable to the Minister, and issued by companies licensed to transact
More informationOklahoma Fire Protection Organization Insurance Programs
Oklahoma Fire Protection Organization Insurance Programs Available to Authorized Fire Departments Only Property Program & Auto Physical Damage Program General Information & Claims Procedures Coverage Period:
More informationInsurance Requirements for the City of Oshkosh
Insurance Requirements for the City of Oshkosh Revised: May 12, 2014 Revised: April 14, 2014 Revised: October 23, 2013 Revised: July 16, 2012 Revised: May 25, 2012 Revised: May 9, 2012 Revised: December
More informationEXHIBIT G INSURANCE REQUIREMENTS
EXHIBIT G INSURANCE REQUIREMENTS (a) Insurance Coverages The CM/GC shall obtain, at its expense, and keep in effect during the term of the Contract, the insurance coverages listed below. The insurance
More informationInsurance and the Construction Failure
Insurance and the Construction Failure 18 th Annual Construction SuperConference December 12, 2003 San Francisco, California James D. Hollyday hollydaj@pepperlaw.com 1 Introduction 1. Contract Drafting
More informationPOLICYHOLDER NOTICE YOUR NEW BUSINESSOWNERS POLICY
ST-7680 (Ed. 04-12) New policy look. Same quality. POLICYHOLDER NOTICE YOUR NEW BUSINESSOWNERS POLICY Thank you for renewing your insurance with Harleysville. Your business insurance for your garage operations
More informationInsurance Requirements for Contractors (Without Construction Risks)
Insurance Requirements for Contractors (Without Construction Risks) Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to
More informationINSURANCE REQUIREMENTS (A) This insert applies to the following State Contracts:
INSURANCE REQUIREMENTS (A) This insert applies to the following State Contracts: General Conditions of the Construction Contract Design/Bid/Build (SC-6.23), or Contractors Agreement Design/Bid/Build (SC-6.21),
More informationMinimum terms and limits
Insurance Coverage Requirement PROPERTY Church building, contents, fine arts, musical items, etal Minimum terms and limits Blanket limits for all property insured. No co-insurance clause Replacement cost
More informationExhibit I Insurance Requirements
Exhibit I Insurance Requirements The insurance sections of this Exhibit I and the Draft Concession contract are presented in a manner that outlines types and levels of insurance that Reclamation will consider
More informationEXHIBIT B CITY OF PHILADELPHIA AND PHILADELPHIA HOUSING DEVELOPMENT CORPORATION INSURANCE REQUIREMENTS
EXHIBIT B CITY OF PHILADELPHIA AND PHILADELPHIA HOUSING DEVELOPMENT CORPORATION INSURANCE REQUIREMENTS The Recipient will procure and maintain during the entire period of the contract, the types of insurance
More information國 泰 產 物 Public Liability Insurance Policy(Occurrence Form) 保 險 商 品 簡 介
A7 附 件 國 泰 產 物 Public Liability Insurance Policy(Occurrence Form) 保 險 商 品 簡 介 備 查 文 號 :103.12.25(103) 企 字 第 200-939 號 免 費 申 訴 電 話 :0800-036-599 查 閱 本 公 司 資 訊 公 開 說 明 文 件 網 址 :www.cathayholdings.com/insurance
More informationCovenants to Insure in Commercial Agreements. In House Training Seminar Presented by Satinder K. Sidhu March 8, 2013
Covenants to Insure in Commercial Agreements A Review of the CGL Policy In House Training Seminar Presented by Satinder K. Sidhu March 8, 2013 Introduction & Overview Examples of Covenants to Insure in
More informationInsurance Summary. Produced by : B. F. Lorenzetti & Assoc. (Ontario) Inc. 1565, Carling Avenue, bureau 606 Ottawa (Ontario) K1Z 8R1
Insurance Summary Produced by : B. F. Lorenzetti & Assoc. (Ontario) Inc. 1565, Carling Avenue, bureau 606 Ottawa (Ontario) K1Z 8R1 September 2006 NATIONAL INSURANCE PROGRAM THE NAVY LEAGUE OF CANADA The
More informationExhibit B Wharves Insurance And Indemnity Requirements of Construction Manager
Exhibit B Wharves Insurance And Indemnity Requirements of Construction Manager 1. Specific Insurance Requirements The following insurance shall be maintained in effect with limits not less than those set
More informationHow To Insure A School Property
Peach County School System Bid Specifications Liability and Property Insurance Fleet Insurance Optional Quote for Student Athletic Insurance April 10, 2015 SPECIAL NOTE TO BIDDERS Be sure your name, address,
More informationPREQUALIFICATION APPLICATION REQUIREMENTS
PREQUALIFICATION APPLICATION REQUIREMENTS To be eligible to bid and contract work with Webcor, subcontractors are required to be prequalified annually. If you have any questions, please contact Webcor
More informationWelcome To Palestine. Tareq Marea
Welcome To Palestine Tareq Marea Professional Indemnity Insurance Professional Liability Insurance (PLI), also called Professional Indemnity Insurance (PII) but more commonly known as Errors & Omissions
More informationinternational coverage summary
At CNA International we provide innovative, flexible and comprehensive insurance solutions for your Insured s expanding global needs. CNA International capabilities: CNA offers foreign coverage for your
More informationCommercial Property Insurance
Commercial Property Insurance Insurance Companies: Alberta School Boards Insurance Exchange Subscribing Insurers Insuring Agreement The Insurer agrees to pay the Insured named on the Coverage Summary for
More informationEXHIBIT G ROLLING OWNER CONTROLLED INSURANCE PROGRAM (ROCIP)
EXHIBIT G ROLLING OWNER CONTROLLED INSURANCE PROGRAM (ROCIP) 1.0 Definitions Certificate of Insurance: Contract: Contractor: Contractor insurance cost City (Sponsor): Owner Controlled Insurance Program
More informationPolicy. Professional Liability Insurance for the Members of the Ordre des ingénieurs du Québec. Endorsed by: Ordre des ingénieurs du Québec
DEFINITIONS ENCON Group Inc. Policy Professional Liability Insurance for the Members of the Ordre des ingénieurs du Québec Master Policy L66000 Endorsed by: Ordre des ingénieurs du Québec THE AGREEMENTS
More informationCOMMERCIAL PROFESSIONAL LIABILITY COVERAGE FORM
COMMERCIAL PROFESSIONAL LIABILITY COVERAGE FORM Various provisions in this policy restrict coverage. Read the entire policy carefully to determine rights, duties and what is and is not covered. Throughout
More informationIowa Association of Municipal Utilities. Safety Group Insurance Program
Iowa Association of Municipal Utilities Safety Group Insurance Program The IAMU Safety Group Since 1980, the Iowa Association of Municipal Utilities, Risk Management Consultants Ltd., and EMC Insurance
More informationItems 1-7 above shall not be subject to any of the following limiting or exclusionary endorsements:
Page 1 of 5 Supplier's Insurance. Before commencing the Work, and as a condition of any payment due under this Subcontract, Supplier shall, at its own expense, procure and maintain insurance on all of
More informationTHE 9 THINGS YOU MUST KNOW ABOUT PROPERTY AND GENERAL LIABILITY INSURANCE
BUYING SELLING AND LEASING of INVESTMENT REAL ESTATE THE 9 THINGS YOU MUST KNOW ABOUT PROPERTY AND GENERAL LIABILITY INSURANCE A Special Report Prepared By the HollywoodCommercialRealtor.com Copyright
More informationD3 Bus Wash Rehabilitation AC Transit Contract #2016-1372 SECTION 007316 INSURANCE REQUIREMENTS
SECTION 007316 INSURANCE REQUIREMENTS PART 1 - INSURANCE REQUIREMENTS 1.01 GENERAL A. Any person, firm or corporation Contractor authorizes to work upon the Property, including any subcontractor, shall
More informationSANTAM UMBRELLA LIABILITY
SANTAM UMBRELLA LIABILITY DEFINED EVENTS 1. Damages, costs, fees and expenses which the insured shall become legally liable to pay consequent upon Injury, Damage, Malice or Negligent Advice which occur
More informationAPPENDIX 6 INDEMNIFICATION, RELEASE AND INSURANCE
APPENDIX 6 1. Indemnification INDEMNIFICATION, RELEASE AND INSURANCE Concessionaire shall promptly indemnify, defend, hold harmless the Fairmount Park Conservancy (the Conservancy ) and the City of Philadelphia
More informationOCWIP Insurance Manual
Metropolitan Washington Airports Authority Owner Controlled Wrap-Up Insurance Program (OCWIP) OCWIP Insurance Manual NOVEMBER 2010 EDITION (Reporting Forms Revised 08/2011) This manual is a contract document
More informationEXHIBIT D INSURANCE REQUIREMENTS
A. INSURANCE Before performing any contract work, Contractor shall procure and maintain, during the life of the contract, unless otherwise specified, insurance listed below. The policies of insurance shall
More information