The cash flow dynamics of private infrastructure project debt
|
|
|
- Maurice Hensley
- 9 years ago
- Views:
Transcription
1 The cash flow dynamics of private infrastructure project debt 1/36 The cash flow dynamics of private infrastructure project debt Empirical evidence and dynamic modeling Frédéric Blanc-Brude, PhD Director, EDHEC Risk -Asia A presentation prepared for NATIXIS InfraDay 18 th November 2015
2 The cash flow dynamics of private infrastructure project debt 2/36 Agenda 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 6 Portfolio example 7 Conclusions
3 The cash flow dynamics of private infrastructure project debt 3/36 Section outline 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 6 Portfolio example 7 Conclusions
4 The cash flow dynamics of private infrastructure project debt 4/36 The EDHEC/NATIXIS Research Chair Implementing the EDHEC roadmap for the creation of investment benchmarks in infrastructure debt (Blanc-Brude, 2014): 1 Define infrastructure debt instruments 2 Create an adequate valuation framework 3 Propose a standard for data collection 4 Collect data from creditors, investors and raw sources 5 Empirical validation of the technical framework 6 Build reference portfolios for performance benchmarking Provide benchmarks for asset allocation to infrastructure debt, asset-liability management, performance monitoring, relationship with ESG characteristics, etc
5 The cash flow dynamics of private infrastructure project debt 5/36 The EDHEC/NATIXIS Research Chair Implementing the EDHEC roadmap for the creation of investment benchmarks in infrastructure debt (Blanc-Brude, 2014): Define infrastructure debt instruments Create an adequate valuation framework Propose a standard for data collection Collect data from creditors, investors and raw sources Empirical validation of the technical framework Build reference portfolios for performance benchmarking Provide benchmarks for asset allocation to infrastructure debt, asset-liability management, performance monitoring, relationship with ESG characteristics, etc
6 The cash flow dynamics of private infrastructure project debt 6/36 Section outline 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 6 Portfolio example 7 Conclusions
7 The cash flow dynamics of private infrastructure project debt 7/36 Motivation: the role of DSCRs In the previous publication of the EDHEC/NATIXIS Chair (Blanc-Brude et al, 2014), we show that debt service cover ratio (DSCR) dynamics can give us powerful insights about credit risk in project finance; 1 The DSCR provides an unambiguous definition of hard and soft default points and of the probability of such credit events; 2 The distribution of the DSCR (mean/variance) provides a direct measure of distance to default, which is the workhorse of the structural credit risk approach (à la Merton et al); 3 Combined with the knowledge of the current debt service, covenants and project calendar, the (conditional) volatility of DSCR t provides a direct measure of the volatility of the firm s asset value; Documenting the empirical dynamics of debt service cover ratios in infrastructure projects is central to better understanding and benchmarking such instruments
8 The cash flow dynamics of private infrastructure project debt 8/36 Motivation: the role of DSCRs In Blanc-Brude et al (2014) we built a debt valuation model taking into account the embedded options found in project finance debt which, given a DSCR t dynamic, allows computing: 1 Debt value and period returns 2 PD and LGD 3 VaR and cvar (Expected Shortfall) 4 Effective duration Until now, we had assumed a lognormal distribution of DSCRs and two typical families of projects: contracted and merchant Each family exhibited a different dynamic, resulting from different ex ante choices made by creditors about financial structure, themselves the result of the underlying risk profile of the investment; In this new paper, we collect DSCR data and validate these hypotheses
9 The cash flow dynamics of private infrastructure project debt 9/36 Section outline 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 6 Portfolio example 7 Conclusions
10 The cash flow dynamics of private infrastructure project debt 10/36 Data collection For this paper, we build a dataset of realised DSCRs using data manually collected and verified from the audited statements of accounts of several hundred project companies, as well as DSCR certificate data reported by private contributors (banks, managers) We hand collected 15 years of realised DSCR data 1 more than 200 projects in Europe and the United States 2 covering two broad families or revenue risk: contracted income and merchant 3 covering seven sector groups, from the early 1990s to 2015
11 The cash flow dynamics of private infrastructure project debt 11/36 Data collection: DSCR calculations Histogram of DSCR1 We consider several definitions of the DSCR: DSCR 1 = C bank + C op + C IA DS senior (1) Frequency DSCR 2 = C bank + C op + C IA + C dd DS senior (2) DSCR 3 = C bank + C op + C IA + C dd C inv DS senior, (3) Frequency DSCR Histogram of DSCR2 where C bank, C op, C IA, C dd, and C inv denote cash at bank, cash from operating activities, cash withdrawal from investment account, cash from debt drawdowns, and cash invested physical investments, respectively Frequency DSCR Histogram of DSCR DSCR
12 The cash flow dynamics of private infrastructure project debt 12/36 Data collection: a first large sample Using the 3rd definition, we build the largest sample of DSCR observations available for research today But we are just getting started DSCR dataset Number of reporting firms Contracted Merchant Investment Start Year Year
13 The cash flow dynamics of private infrastructure project debt 13/36 Section outline 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 6 Portfolio example 7 Conclusions
14 The cash flow dynamics of private infrastructure project debt 14/36 Lognormal fit for contracted infrastructure DSCRs Descriptive results Empirical and theoretical dens Q Q plot Density Empirical quantiles Data Theoretical quantiles Empirical and theoretical CDFs P P plot CDF Empirical probabilities Data Theoretical probabilities We find that DSCRs are (almost) lognormal In each time period, up to the 90 th quantile, realised DSCR data can be fitted to a lognormal (Gaussian) process with a high degree of fit in each family of DSCRs This can be convenient for modelling expected DSCRs
15 The cash flow dynamics of private infrastructure project debt 15/36 Descriptive results 1 We find that the two families correspond to two statistcially different processes: their mean and volatility are different at the 1% confidence level 2 Differentiating by sector is much less informative and not sufficient to explain differences in realised mean and volatility of DSCRs; 3 We find that higher leverage is strongly related to lower levels of realised DSCR volatility: as theory predicts (?), in project finance high leverage is a signal of low asset risk; Descriptive statistics and linear regression models provide some important insights, but they fail to capture DSCR dynamics in full: the DSCRs of individual projects and families are highly non-linear, auto-regressive and heteroskedastic (their variance is not constant in time)
16 The cash flow dynamics of private infrastructure project debt 16/36 Section outline 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 51 Project families 52 Tracking individual projects 6 Portfolio example 7 Conclusions
17 The cash flow dynamics of private infrastructure project debt 17/36 State transitions Since the DSCRs of individual projects do not necessarily follow a smooth and continuous process, we take a two steps approach to modelling their dynamics First, we argue that the DSCR process can be in one one of three states at each point in time: 1 Default: DSCR<1, in which case debt service stops; 2 Risky: DSCR >1 and lower than 90 th quantile (DSCR 6 8), in which case the DSCR is lognormally distributed; 3 Safe: DSCR > 90 th quantile (DSCRs sometimes take very high values eg bond drawdown, final year before maturity, etc) in which case PD = 0 In the default and safe states, we can ignore the DSCR dynamics (debt is either being restructured or risk-free), the estimation problem boils down to estimating: 1 The probability of the DSCR process transiting from one state to another at each point in time; 2 The mean and volatility of the DSCR in the risky state at each point in time State transitions (probability matrices) are estimated using Bayesian techniques each time new state transitions are observed
18 The cash flow dynamics of private infrastructure project debt 18/36 State transitions Here, we show the estimated transition probabilities between the safe and risk states (conditional on no default at that time) We find that contracted projects that tend to transit to the safe state are increasingly likely to stay there We compute such state transition probabilities for all three states at each point in the life of project loans, in each family Probability (%) Transition Probabilities from the Safe State for Contracted Projects S >R S >S Operation Year
19 The cash flow dynamics of private infrastructure project debt 19/36 State transitions Probabilities of the Three States for Contracted Projects Probabilities of the Three States for Merchant Projects Probability (%) R S D Probability (%) R S D Operation Year Operation Year Individual state transition probabilities are combined to obtain state probabilities at each point in time (Markov Chain): contracted projects tend to stay in the normal risk state, whereas contracted projects have a significant chance of exhibiting very high DSCRs (the safe state), they are also mosre likely to be in default
20 The cash flow dynamics of private infrastructure project debt 20/36 DSCR mean/vol trajectories Once we know the state probabilities, we need to estimate the parameters of the DSCR distribution (mean/sd) in the risky state 45 Contracted Family Merchant Family DSCR Trajectories in Mean SD Plance t18 To each group of projects corresponds a typical trajectory of DSCR mean and volatility (like a set of x,y coordinates) which we can track using standard statistical techniques (here, particule filtering) SD(%) t2 t5 t2 t18 Each time we observe new realised DSCRs, we update our estimates of the parameters of the underlying distribution (the true mean and variance of DSCR t) 20 t Mean t0
21 The cash flow dynamics of private infrastructure project debt 21/36 DSCR distribution in the risky state DSCR Density for Contracted Projects DSCR Density for Merchant Projects 08 t 1 t 2 07 t 1 t 2 t 3 t 3 t 4 t 4 t 5 t 5 t 6 t 7 06 t 6 t 7 t 8 t 8 06 t 9 t 10 t 11 t t 9 t 10 t 11 t 12 t 13 t 13 t 14 t 14 t t 15 Density 04 Density DSCR DSCR Contrated DSCRs tend to keep the same distribution (slight increase in vol over time) while merchant DSCRs tend to increase significantly in time
22 The cash flow dynamics of private infrastructure project debt 22/36 DSCR distribution in the risky state DSCR Mean for Contracted and Merchant Families DSCR SD for Contracted and Merchant Families 30 Contracted Merchant 60 Contracted Merchant Mean DSCR SD (%) Operation Year Operation Year Contrated DSCR tend to keep the same distribution (slight increase in vol) while merchant DSCRs tend to increase significantly in time
23 The cash flow dynamics of private infrastructure project debt 23/36 From DSCR to PD From the DSCR distribution, we immediately get the conditional PD at each point in the future (here viewed from t 0) Soft PD is defined as Pr(DSCR t < 105) Probability of Hard Default Probability of Soft Default 4 Contracted Merchant 4 Contracted Merchant 3 3 PD (%) 2 PD (%) Operation Year Operation Year These are familiar profiles considering earlier results reported by Moody s (2015)
24 The cash flow dynamics of private infrastructure project debt 24/36 Tracking individual projects In the absence of well-diversified investment solutions, understanding individual project dynamics can be instrumental to measuring portfolio risk With the same filtering techniques, each observed DSCR allows updating both estimates of mean and standard deviation of the true DSCR process of individual projects Filtered DSCR Mean Filtered Standard Deviation 30 Observed DSCR True Mean Bayesian Mean 95% Conf Int 015 True Bayesian 25 DSCR 20 SD Operation Year Operation Year Here, the DSCR process collapses in year 11 following an unspecified shock (eg recession) Both the true volatility of the process is also significantly lower after the shock
25 The cash flow dynamics of private infrastructure project debt 25/36 Tracking individual projects Updating both estimates of mean and volatility matters as it is their combination which provides the required risk measures Distance to lockup, soft, and hard defaults Probabilities of Lockup, Soft, and Hard Defaults 20 DtL 10 DSCR<115 DtS DSCR<110 DtD DSCR< Distance to Default 10 Probability(%) Operation Year Operation Year Here, a 35% drop in the DSCR level is accompanied by a significant drop in DSCR vol: as a result DD and EL are unchanged (but equity risk is now higher)
26 The cash flow dynamics of private infrastructure project debt 26/36 Putting it all together We can dynamically measure the likelihood to be in a given state (default, risky, safe); We can dynamically estimate the parameters of the DSCR distribution in the risky state for families of projects at each point in time; We can update individual project parameters as their DSCR trajectory is realised, especially if they are shocked away from their original family trajectory; Hence, we can build forward-looking and realised measures of cash flows distributions
27 The cash flow dynamics of private infrastructure project debt 27/36 Section outline 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 6 Portfolio example 7 Conclusions
28 The cash flow dynamics of private infrastructure project debt 28/36 Portofolio example We use two sets of 16 loans with long maturities originated over an 8-year period representing USD10bn of capital deployed in both contracted and merchant infrastructure: very granular data about financial structure, covenants, etc We implement the DSCR model described above (Blanc-Brude et al, 2015) We apply the valuation model described in Blanc-Brude et al (2014); Blanc-Brude and Hasan (2015) We then observed realised payments and DSCRs, recompute forward looking (expected) DSCRs and debt service, and derive expected and realised portfolio values, risk and return measures Total Energy EnvSer GovSer Trans Europe US MENA Contracted Merchant N Date Size (USD) Tenor (Year) Value (USD) Contracted 16 [2002, 2007] [96M, 19B] [16, 30] 35B Merchant 16 [2002, 2010] [68M, 41B] [16, 28] 61B Total 32 [2002, 2010] [68M, 41B] [16, 30] 96B
29 The cash flow dynamics of private infrastructure project debt 29/36 Portfolio value, expected values Portfolio Value (Contracted) Portfolio Value (Merchant) 5 95% Conf Bounds 10 95% Conf Bounds Expected Value Expected Value 4 8 Billions of Dollars 3 2 Billions of Dollars Calendar Year Calendar Year Portfolios are value-weighted, discounting using the volatility-implied term structure of discount rates (see Blanc-Brude and Hasan, 2015)
30 The cash flow dynamics of private infrastructure project debt 30/36 Portfolio value, expected and realised values Portfolio Value (Contracted) Portfolio Value (Merchant) 5 95% Conf Bounds 10 95% Conf Bounds Expected Value Expected Value Realised Value Realised Value 4 8 Billions of Dollars 3 2 Billions of Dollars Calendar Year Calendar Year Portfolios are value-weighted, discounting using the volatility-implied term structure of discount rates (see Blanc-Brude and Hasan, 2015)
31 The cash flow dynamics of private infrastructure project debt 31/36 Portfolio risk measures Loss Profile (Contracted) Loss Profile (Merchant) 20 EL 20 EL VaR VaR cvar cvar Period Loss (%) 10 Period Loss (%) Calendar Year Project time With the full distribution of cash flows and a model to compute the distribution of portfolio loses, we can derive expected and extreme loss measures Highest levels of one-year 995% portfolio VaR range from 5 to 20% Solvency-2 relevance?
32 The cash flow dynamics of private infrastructure project debt 32/36 Expected and realised portfolio returns Excess Period Returns (Contracted) Excess Period Returns (Merchant) 8 95% Conf Bounds 15 95% Conf Bounds Expected Return Expected Return Realised Return Realised Return 6 10 Excess Return (%) 4 Excess Return (%) Calendar Year Calendar Year In expectation, returns exhibit a dynamic profile because the volatility profile of the debt service also decreases in time Realised returns exhibit a similar pattern Return correlation is 30% in the contracted family and 70% in the merchant family
33 The cash flow dynamics of private infrastructure project debt 33/36 Section outline 1 The EDHEC/NATIXIS Research Chair 2 Paper motivation: why focus on DSCRs? 3 Data collection 4 Descriptive results 5 Dynamic modelling 6 Portfolio example 7 Conclusions
34 The cash flow dynamics of private infrastructure project debt 34/36 Conclusions: we are getting closer An implementable framework for computing all the measures required to define infrastructure debt at the asset allocation level now exists The same framework can be used to monitor performance and calibrate prudential frameworks Some fundamental intuitions are validated 1 Existence of distinct families of underlying cash flow processes signaled by revenue risk profile and initial financial structuring choices 2 Gaussian nature of the free cash flow process in infrastructure project finance Diversification opportunities exist across the revenue risk profiles This framework predict PD and LGDs in line with the Moody s studies and allows going further and computing VaR, cvar, duration and excess returns Preliminary empirical tests confirm that a portfolio of infrastructure debt has a high risk/reward ratio and a dynamic, decreasing risk profile Diversification opportunities exist across the project lifecycle (greenfield vs brownfield) Path-dependency is an important characteristic of infrastructure investments, as long as portfolios of unlisted infrastructure are under-diversified measure project specific risk matters
35 The cash flow dynamics of private infrastructure project debt 35/36 Conclusions: Next steps 1 Data collection continues (more geographies, more granularity in the definition of families ) 2 Defining reference portfolios will require significant input form the industry: which benchmarks are useful? for what purpose? 3 What investment solutions are available / created in relation to such benchmarks?
36 The cash flow dynamics of private infrastructure project debt 36/36 References Blanc-Brude, F (2014, June) Benchmarking Long-Term Investment in Infrastructure EDHEC-Risk Position Paper Blanc-Brude, F and M Hasan (2015) The valuation of privately-held infrastructure equity investments EDHEC-Risk Publications January Blanc-Brude, F, M Hasan, and O R H Ismail (2014) Unlisted Infrastructure Debt Valuation Performance EDHEC-Risk Publications July Blanc-Brude, F, M Hasan, and T Whittaker (2015) Cash Flow Dynamics of Private Infrastructure Project Debt, Empirical evidence and dynamic modelling EDHEC-Risk Publications November Moody s (2015) Default and recovery rates for project finance bank loans, Technical report, Moody s Investors Service
Expected default frequency
KM Model Expected default frequency Expected default frequency (EDF) is a forward-looking measure of actual probability of default. EDF is firm specific. KM model is based on the structural approach to
Financial-Institutions Management
Solutions 3 Chapter 11: Credit Risk Loan Pricing and Terms 9. County Bank offers one-year loans with a stated rate of 9 percent but requires a compensating balance of 10 percent. What is the true cost
Models of Risk and Return
Models of Risk and Return Aswath Damodaran Aswath Damodaran 1 First Principles Invest in projects that yield a return greater than the minimum acceptable hurdle rate. The hurdle rate should be higher for
A liability driven approach to asset allocation
A liability driven approach to asset allocation Xinliang Chen 1, Jan Dhaene 2, Marc Goovaerts 2, Steven Vanduffel 3 Abstract. We investigate a liability driven methodology for determining optimal asset
Insights. Investment strategy design for defined contribution pension plans. An Asset-Liability Risk Management Challenge
Insights Investment strategy design for defined contribution pension plans Philip Mowbray [email protected] The widespread growth of Defined Contribution (DC) plans as the core retirement savings
Life Cycle Asset Allocation A Suitable Approach for Defined Contribution Pension Plans
Life Cycle Asset Allocation A Suitable Approach for Defined Contribution Pension Plans Challenges for defined contribution plans While Eastern Europe is a prominent example of the importance of defined
Credit Research & Risk Measurement
Credit Research & RISK MEASUREMENT Credit Research & Risk Measurement Leverage the market standard in credit analysis and utilize the latest risk management technology to improve the efficiency of your
Counterparty Credit Risk for Insurance and Reinsurance Firms. Perry D. Mehta Enterprise Risk Management Symposium Chicago, March 2011
Counterparty Credit Risk for Insurance and Reinsurance Firms Perry D. Mehta Enterprise Risk Management Symposium Chicago, March 2011 Outline What is counterparty credit risk Relevance of counterparty credit
Dr Christine Brown University of Melbourne
Enhancing Risk Management and Governance in the Region s Banking System to Implement Basel II and to Meet Contemporary Risks and Challenges Arising from the Global Banking System Training Program ~ 8 12
An introduction to Value-at-Risk Learning Curve September 2003
An introduction to Value-at-Risk Learning Curve September 2003 Value-at-Risk The introduction of Value-at-Risk (VaR) as an accepted methodology for quantifying market risk is part of the evolution of risk
Cost of Capital, Valuation and Strategic Financial Decision Making
Cost of Capital, Valuation and Strategic Financial Decision Making By Dr. Valerio Poti, - Examiner in Professional 2 Stage Strategic Corporate Finance The financial crisis that hit financial markets in
CREDIT RISK MANAGEMENT
GLOBAL ASSOCIATION OF RISK PROFESSIONALS The GARP Risk Series CREDIT RISK MANAGEMENT Chapter 1 Credit Risk Assessment Chapter Focus Distinguishing credit risk from market risk Credit policy and credit
Risk, Return and Cash Flow. Infrastructure Fund Investments
Risk, Return and Cash Flow Characteristics of Infrastructure Fund Investments Florian Bitsch Axel Buchner Christoph Kaserer CEFS-Infrastructure Finance Initiative sponsored by the European Investment Bank
Managing Risk/Reward in Fixed Income
INSIGHTS Managing Risk/Reward in Fixed Income Using Global Currency-Hedged Indices as Benchmarks In the pursuit of alpha, is it better to use a global hedged or unhedged index as a benchmark for measuring
Modified dividend payout ratio =
15 Modifying the model to include stock buybacks In recent years, firms in the United States have increasingly turned to stock buybacks as a way of returning cash to stockholders. Figure 13.3 presents
Chapter 11, Risk and Return
Chapter 11, Risk and Return 1. A portfolio is. A) a group of assets, such as stocks and bonds, held as a collective unit by an investor B) the expected return on a risky asset C) the expected return on
Moody s Analytics Solutions for the Asset Manager
ASSET MANAGER Moody s Analytics Solutions for the Asset Manager Moody s Analytics Solutions for the Asset Manager COVERING YOUR ENTIRE WORKFLOW Moody s is the leader in analyzing and monitoring credit
Risk and return (1) Class 9 Financial Management, 15.414
Risk and return (1) Class 9 Financial Management, 15.414 Today Risk and return Statistics review Introduction to stock price behavior Reading Brealey and Myers, Chapter 7, p. 153 165 Road map Part 1. Valuation
Chapter 6 The Tradeoff Between Risk and Return
Chapter 6 The Tradeoff Between Risk and Return MULTIPLE CHOICE 1. Which of the following is an example of systematic risk? a. IBM posts lower than expected earnings. b. Intel announces record earnings.
Analyzing Portfolio Expected Loss
Analyzing Portfolio Expected Loss In this white paper we discuss the methodologies that Visible Equity employs in the calculation of portfolio expected loss. Portfolio expected loss calculations combine
Meet challenges head on
Meet challenges head on Deal Advisory / Global We can help you master Financial Restructuring. Enhancing value through financial restructuring. / 1 Your vision. Our proven capabilities. Despite its challenges,
EIOPA-BoS-15-223. 29 September 2015
EIOPA-BoS-15-223 29 September 2015 Final Report on Consultation Paper no. 15/004 on the Call for Advice from the European Commission on the identification and calibration of infrastructure investment risk
Valuing Stock Options: The Black-Scholes-Merton Model. Chapter 13
Valuing Stock Options: The Black-Scholes-Merton Model Chapter 13 Fundamentals of Futures and Options Markets, 8th Ed, Ch 13, Copyright John C. Hull 2013 1 The Black-Scholes-Merton Random Walk Assumption
Capital Market Theory: An Overview. Return Measures
Capital Market Theory: An Overview (Text reference: Chapter 9) Topics return measures measuring index returns (not in text) holding period returns return statistics risk statistics AFM 271 - Capital Market
GN47: Stochastic Modelling of Economic Risks in Life Insurance
GN47: Stochastic Modelling of Economic Risks in Life Insurance Classification Recommended Practice MEMBERS ARE REMINDED THAT THEY MUST ALWAYS COMPLY WITH THE PROFESSIONAL CONDUCT STANDARDS (PCS) AND THAT
ING Insurance Economic Capital Framework
ING Insurance Economic Capital Framework Thomas C. Wilson Chief Insurance Risk Officer Kent University, September 5, 2007 www.ing.com Objectives of this session ING has been using economic capital internally
Calculating VaR. Capital Market Risk Advisors CMRA
Calculating VaR Capital Market Risk Advisors How is VAR Calculated? Sensitivity Estimate Models - use sensitivity factors such as duration to estimate the change in value of the portfolio to changes in
Understanding Fixed Income
Understanding Fixed Income 2014 AMP Capital Investors Limited ABN 59 001 777 591 AFSL 232497 Understanding Fixed Income About fixed income at AMP Capital Our global presence helps us deliver outstanding
Investment Risk Management Under New Regulatory Framework. Steven Yang Yu Muqiu Liu Redington Ltd
Investment Risk Management Under New Regulatory Framework Steven Yang Yu Muqiu Liu Redington Ltd 06 May 2015 Premiums written in billion RMB Dramatic growth of insurance market 2,500 Direct premium written
The Tangent or Efficient Portfolio
The Tangent or Efficient Portfolio 1 2 Identifying the Tangent Portfolio Sharpe Ratio: Measures the ratio of reward-to-volatility provided by a portfolio Sharpe Ratio Portfolio Excess Return E[ RP ] r
SCOR Papers. Using Capital Allocation to Steer the Portfolio towards Profitability. Abstract. September 2008 N 1
September 28 N 1 SCOR Papers Using Allocation to Steer the Portfolio towards Profitability By Jean-Luc Besson (Chief Risk Officer), Michel Dacorogna (Head of Group Financial Modelling), Paolo de Martin
Trading Liquidity and Funding Liquidity in Fixed Income Markets: Implications of Market Microstructure Invariance
Trading Liquidity and Funding Liquidity in Fixed Income Markets: Implications of Market Microstructure Invariance Albert S. Kyle Charles E. Smith Chair Professor of Finance, University of Maryland Presented
PEI: New Strategies for Risk Management in Private Equity
PEI: New Strategies for Risk Management in Private Equity Risk in non-traditional secondary strategies By Augustin Duhamel and Vidar Bergum, 17Capital Introduction As the private equity industry has matured,
CAPITAL STRUCTURE [Chapter 15 and Chapter 16]
Capital Structure [CHAP. 15 & 16] -1 CAPITAL STRUCTURE [Chapter 15 and Chapter 16] CONTENTS I. Introduction II. Capital Structure & Firm Value WITHOUT Taxes III. Capital Structure & Firm Value WITH Corporate
Option Pricing Applications in Valuation!
Option Pricing Applications in Valuation! Equity Value in Deeply Troubled Firms Value of Undeveloped Reserves for Natural Resource Firm Value of Patent/License 73 Option Pricing Applications in Equity
Seeking Alternatives. Senior loans an innovative asset class
Trends 09 10.11 Seeking Alternatives Senior loans an innovative asset class Dirk Wieringa, Alternative Investments Advisory Senior loans are an innovative asset class that provide a hedge against rising
Contents. List of Figures. List of Tables. List of Examples. Preface to Volume IV
Contents List of Figures List of Tables List of Examples Foreword Preface to Volume IV xiii xvi xxi xxv xxix IV.1 Value at Risk and Other Risk Metrics 1 IV.1.1 Introduction 1 IV.1.2 An Overview of Market
Master of Mathematical Finance: Course Descriptions
Master of Mathematical Finance: Course Descriptions CS 522 Data Mining Computer Science This course provides continued exploration of data mining algorithms. More sophisticated algorithms such as support
Basel Committee on Banking Supervision. An Explanatory Note on the Basel II IRB Risk Weight Functions
Basel Committee on Banking Supervision An Explanatory Note on the Basel II IRB Risk Weight Functions July 2005 Requests for copies of publications, or for additions/changes to the mailing list, should
IMPLEMENTATION NOTE. Validating Risk Rating Systems at IRB Institutions
IMPLEMENTATION NOTE Subject: Category: Capital No: A-1 Date: January 2006 I. Introduction The term rating system comprises all of the methods, processes, controls, data collection and IT systems that support
Aggregate Risk and the Choice Between Cash and Lines of Credit
Aggregate Risk and the Choice Between Cash and Lines of Credit Viral Acharya NYU Stern School of Business, CEPR, NBER Heitor Almeida University of Illinois at Urbana Champaign, NBER Murillo Campello Cornell
SEI s Approach to Asset Allocation
SEI s Approach to Asset Allocation Presented by: Jim Smigiel Managing Director and Portfolio Manager Portfolio Strategies Group What is diversification? Sharpe ratio? Peak Sharpe Ratio Loss of efficiency:
Chapter 10 Capital Markets and the Pricing of Risk
Chapter 10 Capital Markets and the Pricing of Risk 10-1. The figure below shows the one-year return distribution for RCS stock. Calculate a. The expected return. b. The standard deviation of the return.
Capital budgeting & risk
Capital budgeting & risk A reading prepared by Pamela Peterson Drake O U T L I N E 1. Introduction 2. Measurement of project risk 3. Incorporating risk in the capital budgeting decision 4. Assessment of
Recoveries on Defaulted Debt
Recoveries on Defaulted Debt Michael B. Gordy Federal Reserve Board May 2008 The opinions expressed here are my own, and do not reflect the views of the Board of Governors or its
Perspectives September
Perspectives September 2013 Quantitative Research Option Modeling for Leveraged Finance Part I Bjorn Flesaker Managing Director and Head of Quantitative Research Prudential Fixed Income Juan Suris Vice
DCF and WACC calculation: Theory meets practice
www.pwc.com DCF and WACC calculation: Theory meets practice Table of contents Section 1. Fair value and company valuation page 3 Section 2. The DCF model: Basic assumptions and the expected cash flows
Third Edition. Philippe Jorion GARP. WILEY John Wiley & Sons, Inc.
2008 AGI-Information Management Consultants May be used for personal purporses only or by libraries associated to dandelon.com network. Third Edition Philippe Jorion GARP WILEY John Wiley & Sons, Inc.
Introducing the Loan Pool Specific Factor in CreditManager
Technical Note Introducing the Loan Pool Specific Factor in CreditManager A New Tool for Decorrelating Loan Pools Driven by the Same Market Factor Attila Agod, András Bohák, Tamás Mátrai Attila.Agod@ Andras.Bohak@
Chapter 11 Options. Main Issues. Introduction to Options. Use of Options. Properties of Option Prices. Valuation Models of Options.
Chapter 11 Options Road Map Part A Introduction to finance. Part B Valuation of assets, given discount rates. Part C Determination of risk-adjusted discount rate. Part D Introduction to derivatives. Forwards
Statistics for Retail Finance. Chapter 8: Regulation and Capital Requirements
Statistics for Retail Finance 1 Overview > We now consider regulatory requirements for managing risk on a portfolio of consumer loans. Regulators have two key duties: 1. Protect consumers in the financial
A constant volatility framework for managing tail risk
A constant volatility framework for managing tail risk Alexandre Hocquard, Sunny Ng and Nicolas Papageorgiou 1 Brockhouse Cooper and HEC Montreal September 2010 1 Alexandre Hocquard is Portfolio Manager,
Basel Committee on Banking Supervision. Basel III counterparty credit risk - Frequently asked questions
Basel Committee on Banking Supervision Basel III counterparty credit risk - Frequently asked questions November 2011 Copies of publications are available from: Bank for International Settlements Communications
Spectrum Insights. Bond and stock market around the same size Australian bonds vs Australian stock market
Market capitalization $b Spectrum Insights Damien Wood, Principal JUNE 9, 2015 Corporate bonds often provides investors with an income stream that is above deposit rates, but less risky than dividends
Introduction to Options. Derivatives
Introduction to Options Econ 422: Investment, Capital & Finance University of Washington Summer 2010 August 18, 2010 Derivatives A derivative is a security whose payoff or value depends on (is derived
Beyond preferred stock valuation of complex equity and hybrid instruments
Beyond preferred stock valuation of complex equity and hybrid instruments ASA Advanced Business Valuation Conference October 2015 Amanda A. Miller, Ph.D. 4 June 2015 Amanda A. Miller, Ph.D. ([email protected])
Chapter 7. . 1. component of the convertible can be estimated as 1100-796.15 = 303.85.
Chapter 7 7-1 Income bonds do share some characteristics with preferred stock. The primary difference is that interest paid on income bonds is tax deductible while preferred dividends are not. Income bondholders
Sources of return for hedged global bond funds
Research commentary Sources of return for hedged global bond funds August 2012 Author Roger McIntosh Executive summary. The recent results in key bond market indices demonstrate the importance of a strategic,
Product Key Facts. PineBridge Global Funds PineBridge Global Emerging Markets Bond Fund. 22 December 2014
Issuer: PineBridge Investments Ireland Limited Product Key Facts PineBridge Global Funds PineBridge Global Emerging Markets Bond Fund 22 December 2014 This statement provides you with key information about
BERMUDA MONETARY AUTHORITY DETERMINATION OF DISCOUNT RATES FOR ECONOMIC BALANCE SHEET FRAMEWORK July 2015
BERMUDA MONETARY AUTHORITY DETERMINATION OF DISCOUNT RATES FOR ECONOMIC BALANC CE SHEET FRAMEWORK July 2015 Contents I. BACKGROUND... 3 II. DETERMINATION OF DISCOUNT RATES... 4 III. STANDARD APPROACH...
Effective Techniques for Stress Testing and Scenario Analysis
Effective Techniques for Stress Testing and Scenario Analysis Om P. Arya Federal Reserve Bank of New York November 4 th, 2008 Mumbai, India The views expressed here are not necessarily of the Federal Reserve
Portfolio Management for institutional investors
Portfolio Management for institutional investors June, 2010 Bogdan Bilaus, CFA CFA Romania Summary Portfolio management - definitions; The process; Investment Policy Statement IPS; Strategic Asset Allocation
RETURN ON CURRENT ASSETS, WORKING CAPITAL AND REQUIRED RATE OF RETURN ON EQUITY
Financial Internet Quarterly e-finanse 2014, vol. 10/nr 2, p. 1-10 10.14636/1734-039X_10_2_005 RETURN ON CURRENT ASSETS, WORKING CAPITAL AND REQUIRED RATE OF RETURN ON EQUITY Monika Bolek* 1 Abstract The
A Review of Cross Sectional Regression for Financial Data You should already know this material from previous study
A Review of Cross Sectional Regression for Financial Data You should already know this material from previous study But I will offer a review, with a focus on issues which arise in finance 1 TYPES OF FINANCIAL
Solvency II and Money Market Funds
Solvency II and Money Market Funds FOR INSTITUTIONAL INVESTORS ONLY NOT FOR USE BY OR DISTRIBUTION TO RETAIL INVESTORS Background The new European insurance regulatory framework, Solvency II, will require
MULTIPLE DEFAULTS AND MERTON'S MODEL L. CATHCART, L. EL-JAHEL
ISSN 1744-6783 MULTIPLE DEFAULTS AND MERTON'S MODEL L. CATHCART, L. EL-JAHEL Tanaka Business School Discussion Papers: TBS/DP04/12 London: Tanaka Business School, 2004 Multiple Defaults and Merton s Model
Listed Infrastructure Funds An Empirical Review
Listed Infrastructure Funds An Empirical Review Florian Bitsch, Eva Kasper Conference on Applied Infrastructure Research Berlin / Germany, 10.10.2009 Aufbau & Ausrichtung Listed Infrastructure Funds An
Asymmetry and the Cost of Capital
Asymmetry and the Cost of Capital Javier García Sánchez, IAE Business School Lorenzo Preve, IAE Business School Virginia Sarria Allende, IAE Business School Abstract The expected cost of capital is a crucial
Institute. Yale School of Management EDHEC-Risk Institute Asset Allocation and Investment Solutions Seminar
Institute Yale School of Management EDHEC-Risk Institute Asset Allocation and Investment Solutions Seminar 3-4 February 2016, Yale Campus (New Haven, CT) - USA Yale SOM-EDHEC-Risk Asset Allocation and
Subordinated Debt and the Quality of Market Discipline in Banking by Mark Levonian Federal Reserve Bank of San Francisco
Subordinated Debt and the Quality of Market Discipline in Banking by Mark Levonian Federal Reserve Bank of San Francisco Comments by Gerald A. Hanweck Federal Deposit Insurance Corporation Visiting Scholar,
FLOATING RATE BANK LOANS: A BREAK FROM TRADITION FOR INCOME-SEEKING INVESTORS
FLOATING RATE BANK LOANS: A BREAK FROM TRADITION FOR INCOME-SEEKING INVESTORS With about $713 billion in assets, the bank loan market is roughly half the size of the high yield market. However, demand
Item 7A. Quantitative and Qualitative Disclosures about Market Risk. Risk Management
Item 7A. Quantitative and Qualitative Disclosures about Market Risk. Risk Management Risk Management Policy and Control Structure. Risk is an inherent part of the Company s business and activities. The
Fixed Income Investor Presentation. July 2012
Fixed Income Investor Presentation July 2012 Cautionary Note on Forward Looking Statements Today s presentation may include forward-looking statements. These statements represent the Firm s belief regarding
Simple Linear Regression Inference
Simple Linear Regression Inference 1 Inference requirements The Normality assumption of the stochastic term e is needed for inference even if it is not a OLS requirement. Therefore we have: Interpretation
Total Beta. An International Perspective: A Canadian Example. By Peter J. Butler, CFA, ASA
Total Beta An International Perspective: A Canadian Example By Peter J. Butler, CFA, ASA Introduction: This article will highlight total beta s applicability for appraisers around the world. While I have
Response to European Commission Consultation Document on Undertakings for Collective Investment in Transferable Securities ( UCITS )
Association for Financial Markets in Europe Response to European Commission Consultation Document on Undertakings for Collective Investment in Transferable Securities ( UCITS ) 24 October 2012 The Association
Financial Planning Newsletter
Financial Planning Newsletter Structuring Your Portfolio for Future Success? Beware of Misleading, Misinterpreted & Out Dated Information Wealth Management Steinberg High Yield Fund Steinberg Equity Fund
Raffa Wealth Management s Qualified Plan due diligence process David Burgess, CFA, Senior Investment Manager
Raffa Wealth Management s Qualified Plan due diligence process David Burgess, CFA, Senior Investment Manager Introduction: Raffa Wealth Management believes that the key to a successful qualified plan are
1 Portfolio mean and variance
Copyright c 2005 by Karl Sigman Portfolio mean and variance Here we study the performance of a one-period investment X 0 > 0 (dollars) shared among several different assets. Our criterion for measuring
t = 1 2 3 1. Calculate the implied interest rates and graph the term structure of interest rates. t = 1 2 3 X t = 100 100 100 t = 1 2 3
MØA 155 PROBLEM SET: Summarizing Exercise 1. Present Value [3] You are given the following prices P t today for receiving risk free payments t periods from now. t = 1 2 3 P t = 0.95 0.9 0.85 1. Calculate
Benchmarking Low-Volatility Strategies
Benchmarking Low-Volatility Strategies David Blitz* Head Quantitative Equity Research Robeco Asset Management Pim van Vliet, PhD** Portfolio Manager Quantitative Equity Robeco Asset Management forthcoming
Chapter 5. Conditional CAPM. 5.1 Conditional CAPM: Theory. 5.1.1 Risk According to the CAPM. The CAPM is not a perfect model of expected returns.
Chapter 5 Conditional CAPM 5.1 Conditional CAPM: Theory 5.1.1 Risk According to the CAPM The CAPM is not a perfect model of expected returns. In the 40+ years of its history, many systematic deviations
Das Risikokapitalmodell der Allianz Lebensversicherungs-AG
Das Risikokapitalmodell der Allianz s-ag Ulm 19. Mai 2003 Dr. Max Happacher Allianz s-ag Table of contents 1. Introduction: Motivation, Group-wide Framework 2. Internal Risk Model: Basics, Life Approach
Should Life Insurers buy CoCo Bonds? - Regulatory Effects Implied by the Solvency II Standards
Should Life Insurers buy CoCo Bonds? - Regulatory Effects Implied by the Solvency II Standards Helmut Gründl, Tobias Niedrig International Center for Insurance Regulation (ICIR) and Center of Excellence
Understanding the Impact of Weights Constraints in Portfolio Theory
Understanding the Impact of Weights Constraints in Portfolio Theory Thierry Roncalli Research & Development Lyxor Asset Management, Paris [email protected] January 2010 Abstract In this article,