1 Civil. Eng. And Env. Syst. Month 2004, Vol. 00, pp FORENSIC PROJECT MANAGEMENT: THE UNDERLYING CAUSES OF REWORK IN CONSTRUCTION PROJECTS PETER E. D. LOVE a, and DAVID J. EDWARDS b a We-B Centre, School of Management Information Systems, Edith Cowan University, Churchlands, Perth, WA 6018, Australia; b Department of Civil and Building Engineering, Loughborough University, Loughborough, Leicestershire, LE11 3TU, UK (Received 29 March 2004; In final form 22 June 2004) Construction professionals recognize that rework is a significant factor contributing to poor project performance, yet little is known about its antecedents and consequently it remains an innate problem. Because factors that contribute to its occurrence are not fully understood, the derivation of appropriate strategies for its reduction is problematic. Therefore, a comprehensive appreciation of the mechanisms that cause rework will enable project performance improvements to be made. Two longitudinal case studies were undertaken to determine the antecedents of rework. Based on the findings presented, strategies for reducing the incidence of rework are identified and discussed. This paper contributes to study of quality in construction by identifying the underlying factors that influence rework in projects. Keywords: Australia; Contract documentation; Design firms; Quality; Rework INTRODUCTION Rework is defined as the unnecessary effort of re-doing a process or activity that was incorrectly implemented at the first time. Within the construction industry, rework has been identified as a significant factor that contributes to cost increases and schedule delays on projects (Love, 2002a). Previous research has generally focused on quantifying Q1 rework costs and identifying apparent rather than root causes (e.g. Burati et al., 1992; Willis and Willis, 1996; Josephson and Hammarlund, 1999; Josephson et al., 2002). Little is known about the antecedents of rework in construction projects. Consequently, potential improvements in project performance are curtailed. According to the Australian Procurement and Construction Committee, various industry development initiatives have focused on addressing the symptoms rather than the causes of poor project performance (APCC, 1997). The implementation of emergent management fads (e.g. such partnering and supply chain management) in the hope of eliminating problems deeply rooted in the psyche of construction practice will, not by default, lead to the improvements sought (Love et al., 2002). These problems must be understood in a holistic manner and to that Corresponing author. [email protected] ISSN print; ISSN online # 2004 Taylor & Francis Ltd DOI: /
2 2 P. E. D. LOVE AND D. J. EDWARDS end it is therefore necessary to examine what actually happens in construction (Koskela, 2000). By gaining an understanding of the problematic mechanisms causing rework, advancement toward its reduction can be made. In this paper, the antecedents of rework events that occurred in two construction projects are examined. Based on the findings presented, strategies for reducing the incidence of rework are identified and discussed. REWORK IN CONSTRUCTION There have only been a limited number of studies that have sought to determine rework costs in construction projects. For example, Table I provides estimates of rework costs that have been reported in the construction and the engineering management literature. A prominent feature of the data is the disparities among rework cost estimates. These variations derive as a result of differences in definitions, in particular scope, data collection methods used, and whether rework is calculated as a proportion of project or contract value (Tab. I). For example, Hammarlund and Josephson (1991) found defects to be 6% of production cost, Q1 whereas Burati et al. (1992) report quality deviations to be 12.4% of project value. Defects also arise during a building s maintenance period and can range from 3% to 5% of the contract s value (STATT, 1989). While the calculation of rework can be arduous and time-consuming task, there is as imperative need for rework definition and measurement before an accurate assessment of Q1 direct costs can be made. Barber et al. (2000) found that when indirect costs are considered, the total cost of rework can be as high as 23% of contract value. Love (2002b) found that indirect rework costs could have a multiplier effect of up to five times the actual (direct) cost of rectification. Design-related changes, errors, and omissions in contract documentation have contributed significantly to rework (Love et al., 1999a; Love and Li, 2000). In particular, client design changes are frequent, and generate costly ripple effects that create delay and disruption throughout the project supply chain (Ibbs and Allen, 1995). Specifically, projects appear to progress smoothly until nearing completion, when errors made earlier are discovered, necessitating costly rework (Cooper, 1993; Eden et al., 2000). Such rework transpires as overtime, additional hiring of resources (including labour and plant), schedule slippage, and reductions in project scope or quality (Li et al., 2000). The adverse consequences of these difficulties include reduced profit, loss of market share and reputation, increased turnover of management and workforce, lower productivity, higher costs, and, all too frequently, costly litigation between participants over responsibility for overruns and delays (Ackermann et al., 1997; Eden et al., 2000). Management in the Design Firm Gardiner (1994) and Powell (1997) have suggested that the insularity and aversion of architectural organizations to management has resulted in poor service quality and their marginalization within the industry. Powell (1997, p. 84) states, architects still cling to the notion that their future lies in building original works of art to last forever. Symes et al. (1995, p. 55) concluded from their study that without more training in how to manage a firm and adapt to the needs of their customers most architects may well be doomed to work in small practices and thereby be further marginalized in the building process. Likewise, engineering design consultants have been confronted by a similar dilemma (Tilley and McFallen, 2000).
3 FORENSIC PROJECT MANAGEMENT 3 TABLE I Summary of reported rework studies. Author Country Descriptor Costs Comments Cusack (1992) Australia Rework 10% Identified errors in design documentation to be the primary cause of rework Q1 Burroughs (1993) Australia Rework 5% Reported the causes of rework in major project were due to poor documentation Q1 produced by design consultants. Burroughs (1993) also revealed that a concreting subcontract experienced a cosy increase of 31% due to rework Q1 Lomas (1996) Australia Rework.1% Rework less than 1% when a QA system is implemented. Lomas reported that rework costs were approximately 5% prior to the introduction of QA Q1 CIDA ( CIDA (1995) found that projects with a formal quality management system in place Q1 1995) Australia Rework 6.5% recorded lower levels of rework. The average cost of rework as a percentage of contract value for projects with a quality system was found to be 0.72%. Whereas those projects without a quality system in place have been found to have an average cost of rework 6.5%. Project procured using lump sum contracts were found to have rework costs as high as 15% of contract value Love et al. (1999a,b,c) Australia Rework 3.15% Residential project procured using a traditional lump sum contract. Changes initiated by the client and end-user, as well as errors, and omissions in contract documentation were found to be the primary causes of rework 2.4% Warehouse project procured using a design and construct method. End-user design changes, errors, and omissions in contract documentation and poor planning identified as causes of rework Q1 Love (2002a) Australia Rework 6.4% Sampled 161 projects and found the mean direct and indirect rework costs were found to be 6.4% and 5.6% of the original contract value, respectively. Rework costs were found not to significantly vary with project type and procurement method used Q1 Cnudde (1991) Belgium Non-conformance 10% 20% Reported that 46% of total deviation costs were created during design, compared to 22% for construction deviations, which were due to poor execution of work Q1 CIDB (1989) Singapore Rework 5% 10% CIBD stated that a proper quality management system would cost in the range of 0.1 to 0.5% of total project cost and return a saving of 3% Nylén (1996) Sweden Quality failure 10% This research examined quality failure costs in four major railway-engineering projects. In the four cases studies, 232 failures during the production phase of the project were identified, which account for 10% of each project s production costs. It was found that 10% of failures contributed to 90% of failure costs. 51% of failure originated from design due to communication problems between client and consultants Hammarlund and Josephson (1991) Sweden Quality failure 6% 79% of failure costs were attributed 20% of the failures that were recorded. Approximately 34% of failures were attributed to ineffective site management, 20% to design, and 13% to poor communication. It was found that 10% of production time was spent remedying failures (continued)
4 4 P. E. D. LOVE AND D. J. EDWARDS TABLE I Continued Author Country Descriptor Costs Comments Josephson and Hammarlund (1999) Defects 2.3% 9.3% This study examined the defect costs of seven building projects. The number of defects that occurred ranged from 283 to % of defect costs were found to originate from design (design team), 45% originated from on-site (site management/ subcontractors) and 20% from materials, plant and equipment. Lack of motivation due to carelessness or forgetfulness was attributed as a cause of 50% of defect costs Farrington (1987) USA Quality deviation 12.4% Design changes, errors and omissions averaged 78% of total deviations and 79% of total deviation costs. Construction deviations averaged 16% of total deviations. These findings also reported in Burati et al. (1992) Q1 Willis and Willis (1996) USA Quality deviation 3.3% Willis and Willis reported that the total cost of quality, which is the costs of prevention and appraisal plus cost of failure and correction was 12% of project cost: 8.7% prevention and appraisal costs and 3.3% deviation correction Abdul-Rahman (1993) UK Non-conformance 2.5% In a water treatment plant 62 non-conformances were identified. Not all nonconformances could be identified due to resource constraints and availability of site personnel. Estimated cost of non-conformance to be 6% of project cost Non-conformance 5% In a highway project 72 non-conformances were identified. The reported figure of 5% did not include material wastage and head office overheads. Non-conformances were attributable to the subcontractor, construction and design-related issues Q1 Barber et al. (2000) UK Quality failure 3.6% Examined the quality failure costs of two highway projects that were procured using a Design Build Finance Operate contractual arrangement 6.6% Revealed that quality failure costs were 16% and 23% of contract value. These estimates include the costs of delay. When these are removed then it was estimated that quality failure costs were 3.6% and 6.6%. Design-related failures accounted for 50% failures % of contract value. % of project value.
5 FORENSIC PROJECT MANAGEMENT 5 The strategic positioning of a construction organization is founded on its ability to differentiate its unique service or the product from that produced by competitors (Barrett, 1993). In responding to marginalization, many design organizations have become leaner in order to adapt to the increasingly volatile and competitive market environment (Richardson, 1996). Rather than compete on service quality offered, design organizations have adopted a market-driven strategy based on their fees (Rounce, 1998). According to DeFraites (1989), a major determinant of project quality is the overall level of professional services provided. DeFraites (1989) states that the process of professional services selection and Q1 subsequent fees negotiated will influence service quality provided. Abolnour (1994) found a negative correlation between the actual fees charged and documentation quality, that is, project costs increase when design fees are reduced. Conversely, Hoxley (2000) acknowledges the importance of fees, but does not consider them to be a significant factor that influences service quality. All organizations involved in the procurement of construction, especially those providing professional services, should embrace a quality culture (Oakland and Aldridge, 1995; Bubshait et al., 1999). The absence of a quality focus in design organizations has meant that the concept of service quality has not received serious recognition (Love et al., 2000). Consequently, contractors and subcontractors (who are customers in the supply chain), tend to act as quality buffers and therefore burdened with the identification of quality deviations in contract documentation. Contract Documentation Contract documentation quality may be compromised when a firm submits a low design fee for a project, especially when design tasks are subject to time boxing (Love et al., 2000). That is, a fixed period of time may be allocated to complete each task, irrespective of whether the documentation or each individual task is complete or not. Poor workload planning within design organizations can also contribute to time boxing and result in inadequate time to prepare complete design documents (Coles, 1990; Rounce, 1998). Moreover, Coles (1990) noted that use of inexperienced staff that lack technical knowledge could lead to errors and omissions in contract documentation being made. Findings resulting from a study on the technical design of buildings found the most frequent causes of severe deviations during design were attributable to deficient planning and/or resource allocation, deficient or missing input and changes (Sverlinger, 1996). Rounce (1998) suggests a number of poor management practices contribute to the generation of rework and waste in architectural firms. These include:. jobs not having projected drawing lists to quantify the design workload;. jobs not having design programmes based on project drawing lists and therefore specific design deliverables are unable to be identified;. difficulty in estimating the physical progress of design;. uncertainty in advising other designers/quantity surveyors (QS)/clients/contractors when information is likely to be available;. difficulty in justifying resources required to in-house managers based on actual workload; and. lack of specific procedures (non-administrative) generally to control the design process in programme terms. Q1 Tilley and McFallen (2000) found that unrealistic client demands for earlier completion of projects was a major contributing factor to the production of incomplete and erroneous contract documentation. Lack of attention to management and providing a poor quality service
6 6 P. E. D. LOVE AND D. J. EDWARDS by design consultants has resulted in rework becoming a norm and profits being eroded within architectural firms (Gardiner, 1994). Specific rework activities that contribute to reducing profit levels in architectural firms include (Rounce, 1998):. re-design due to an inadequate client brief;. changes arising from unchecked drawing;. re-design due to inappropriate drawing scale; and. attending to client driven design changes. To reduce rework in architectural firms, a re-examination of the way business should be conducted and suitable focus given to prevention. This inward appraisal should strive to eliminate unnecessary drawing revisions, work to a structured programme that identifies specific design deliverables and minimize management problems in the design process that contribute to resource wastage (Rounce, 1998). Quality Management Rounce (1998) recommended that an architectural firm s profitability can be improved by ameliorating internal management practices through quality management, particularly quality assurance (QA). To be effective, architectural firms would see non-conformance costs, as a percentage of their project fee, reduced by as much as 45% (Rounce, 1998). Contrastingly, Tilley and McFallen (2000) and Love and Sohal (2002) found that many Australian design organizations have no formal QA system in place and did not consider certification to ISO 9000 to be an important management function. The Building Research Establishment in the UK identified the need for a formal and systematic approach to quality control in construction (BRE, 1981). In particular, a number of factors were found to hamper construction quality of buildings, these included the fact that:. achievement of good quality relies mainly on the motivation and commitment of site management;. site management inevitably has insufficient time for quality management;. management structures have considerable impact on quality achieved, yet the contractual arrangement has little influence on the level of quality achieved;. insufficient information provided by design organizations restricted the contractor s ability to achieve quality;. the quality performance measure was considered to be a low priority; and. a lack of client involvement in the project hindered quality achievements. Both design and contracting organizations have an active role to play in improving quality during the project s design and production phases, though the extent of involvement is dependent upon the method of procurement used. Therefore, quality control programmes implementation is a prerequisite requirement within organizations that seek to improve overall project quality. Findings published by the BRE (1982) provided the impetus for examining how quality management can be implemented by design organizations, during the early stages of a project. The BRE provided demonstrable evidence that the introduction of quality management practices could stimulate significant cost benefits. Figure 1 reveals that at least 15% savings on total construction costs can be achieved through eliminating rework (BRE, 1982). Jaafari (1996) suggests that the QA practice, developed by contractors, has been based on post-production quality control and resultantly this has meant increased costs without commensurate savings. In stark contrast, Lomas (1996) of Barclay Construction Ltd (Australia) reported that prior to the implementation of QA system, their rework costs were 5% of
7 FORENSIC PROJECT MANAGEMENT 7 FIGURE 1 Cost and benefit of quality management. contract value; this being reduced to 1% following QA implementation. Lomas (1996) found that QA contributed to an aggregate company saving to in excess of Australian dollar 4.2 million in 1996, which equates to approximately 1% of their turnover. CIDA (1995) noted that projects with a formal quality management system in place record lower levels of rework. The average cost of rework, as a percentage of contract value, for projects with a quality system can be as low as 0.72%. Conversely, projects without a quality system in place have an average rework cost of 6.5% of contract value. Burati et al. (1989) argue that when total quality management (TQM) is applied holistically in conjunction with reward schemes, rework can be significantly reduced or eliminated. Factors identified during construction that contribute to rework include (e.g., Josephson and Hammarlund, 1999):. poor management and employee training;. low skill level of subcontractors;. lack of supervision and on-site inspection;. damage due to carelessness;. poor planning and coordination of on-site resources; and. poor workmanship and use of materials. Although design related issues form a significant proportion of rework costs, a greater number of rework-related incidents tend to occur during construction and therefore likely to increase indirect costs due to consequential disruption and delays (Love, 2001). To gain an in-depth understanding about how and why rework occurs, two longitudinal case study projects were undertaken. Q2 RESEARCH METHODOLOGY A case study is exploratory in nature, based on interviews and relies heavily on verbal reports and unobtrusive observation as primary data sources. This methodology should be used to investigate the technical aspects of a contemporary phenomenon within a real life context
8 8 P. E. D. LOVE AND D. J. EDWARDS Q1 (Yin, 1984). It is particularly useful when the boundaries between phenomenon and context are difficult to ascertain and when multiple sources of evidence are used (Yin, 1984). A case study can provide analytical rather than pure statistical generalizations and can capture the complexity and dynamism of organizational settings in projects. Theory in this instance can be defined as a set concepts and generalizations about the antecedents of rework. Because there is limited knowledge about the antecedents of rework in construction projects, the case study approach seems best suited to this research work. Case Study Selection Construction contractors operate at the interface between the design and construction process, and were thus the focal point for this research. The contractor participating in this research was the first building and construction company to be certified to the dual standards of ISO 9001/AS 3901 and AS 2990 Category A in Australia. Since certification in 1991, the company has developed and implemented an effective continuous improvement program that has reduced project rework and thus improved its market position. The authors established personal contact with senior management within the contracting organization to explain the nature, purpose and scope of the research, which was to determine the causes and costs of rework in construction projects. During initial discussions, two projects were about to commence on-site. Consequently, these two projects became the subject of the research. These were:. Residential Apartments (Project A): This project consisted of two residential blocks of sixstoreys, which comprised of 43 units on the edge of Brisbane s Central Business District, in Queensland. Underground car parking, a landscaped podium and swimming pool are among the facilities and features incorporated into this development. The project had a contract value of Australian dollar million, a contract period of 43 weeks and was delivered using a traditional lump sum procurement method. Five weeks of extensions of time (EOT) was granted but was delivered, 8 weeks ahead of the re-scheduled completion date. While the project was delivered ahead of time, cost overruns were experienced due to contract change orders and defects. The project experienced a direct cost overrun equating to an additional 10.05% (Australian dollar 1,105,900) of the original contract value. Change orders as result of additions initiated by the client and occupiers accounted for 7.35% (Australian dollar 806,356) and 3.15% (Australian dollar 345,504) were a direct result of rework. In fact, rework can take the form of a change order if it directly influences a project s progress and causes disruption. In this case, change orders that resulted in direct rework accounted for 2.7% (Australian dollar 299,544) of the original contract value. The remaining 0.45% (Australian dollar 45,960) of rework costs were due to errors and minor defects that were the responsibility of the contractor and subcontractors.. Warehouse, Solvent and Book Repository (Project B): This project consisted of a two-storey warehouse at a major university campus in Brisbane, Queensland. The project provides facilities for car parking, the storage of solvents and books. The project had a contract value of Australian dollar 4.45 million, a contract period of 30 weeks and was delivered using a design and construct procurement method. The contractor was awarded the contract on March 20, Construction began on-site on April 15, Eight weeks of EOT was granted, and the project was delivered two weeks ahead of the re-scheduled completion date. The project was delivered ahead of time but cost overruns were experienced due to change orders and defects. Change orders initiated by the client and occupiers contributed to a project cost increase of
9 FORENSIC PROJECT MANAGEMENT % (Australian dollar, 319,333). Direct rework costs were found to be 2.40% of contract value, with the client and occupiers being accountable for 0.5% (Australian dollar 22,280), the contractor 1.46% (Australian dollar 65,223) and subcontractors 0.43% (Australian dollar 19,390) of the costs incurred in the project. Specific details about the rework costs that were incurred in these projects can be found Love and Sohal (2003). Data Collection Data was collected throughout the construction phase. Each site was visited between one and three times a week throughout the project duration for periods lasting anywhere between 2 and 5 h. The time allocated for collating data varied because during the project s early stages rework incidents reported or identified by the project managers were sparse. Two block visits of 4 days were also conducted for each project and timed to coincide with periods of increased site activity. As the projects progressed, rework began to emerge, and consequently a considerable amount of time was required to collate information from various sources. In some instances, the researcher relied on personal industry experience to identify rework events were uncovered while reading through contract documentation. Before events were categorized as rework, each rework item was validated by the project manager, site foreman, or contracts administrator. Every attempt was made not to disrupt the project workflow, for example, visits were usually undertaken at 7.00 a.m. to enable complete access to contract documentation. Between 7.00 and 7.30 a.m. unstructured interviews with the project manager/contract administrator were conducted to discuss the project s performance, problems, and to identify any rework that had occurred. During times of intense construction activity on-site, visits were undertaken between p.m. to collate information from documentary sources. Interviews with subcontractors, site management, and design consultants occurred in their site offices and on certain occasions, at their head offices. Interviews sought to identify and obtain additional information about particular rework events, corroborate evidence and any other interpretations of events that occurred. When concluding interviews, notes were given to each interviewee to check for discrepancies and eliminate any interviewer bias. RESEARCH FINDINGS In this section, examples of rework events and the underlying factors that contributed to their occurrence are identified. These include:. lack of understanding for end-user requirements;. poor contract documentation and low consultant fees;. poor standard of workmanship;. lack of a quality focus; and. poor supervision and inspection. Each event is discussed in turn before commencing the general discussion. Lack of Understanding for End-User Requirements In project A, purchasers of apartments initiated the majority of design changes, though some changes also occurred due to oversights in design and constructability. Client initiated
10 10 P. E. D. LOVE AND D. J. EDWARDS changes, such as changes to wall finishes, light fittings, and internal wall layouts began to impact the programme, project cost and the motivation of site management and subcontractors. The contractor requested, on several occasions, for the client s project manager to implement a design freeze, which was refused, as the requirements for purchasers had not been finalised. Thus, the contractor requested an EOT for 5 weeks, which was subsequently granted. In project B, almost all of the client/occupier-initiated rework that arose was attributable to poor or inadequate occupier consultation. The Building and Grounds Division of the University along with representatives from several internal committees that had been established were supposed to examine the requirements and needs of the facility s occupants. In addition, a process of pro-active consultation with respect to the building s spatial layout and functionality was supposed to occur between a representative from each committee and occupiers. However despite the provision of a client feedback loop system, occupiers were rarely consulted about their requirements and needs. Consequently, occupiers demanded changes to be undertaken. For example, the external window that was installed for the male toilets was comprised of clear glass. The occupiers representative did not approve of this and consequently requested a tint be installed, even though the window was 7 m above ground level. According to the client s project manager, occupiers were divorced from the decisionmaking process because a bureaucratic structure had been established through the several levels of consultative committees that assumed vicarious authority. Consequently, many occupiers were dissatisfied with their lack of involvement in the decision-making process. To reduce costs some elements were deleted from the project without prior occupier approval. For example, the occupants required glazing in a partition wall, which was subsequently documented because the contractor had not informed the architect of this decision. The glazing was deleted at the request of the contractor, as it was not included in their contract. In fact, the client s project manager had informed the contractor that this item was to be deleted prior to the project s commencement on-site. When representatives of the occupiers inspected the facility they then discovered that the glazing had been omitted. They immediately requested that the glazing be installed. The contractor agreed to this request as long as the client body agreed to pay for the cost of the glazing. Approval was granted, but at a cost of Australian dollar The client s project manager s lack of consultation with occupiers caused a degree of disharmony within the client organization, as different by stakeholder agendas by stakeholder were being pursued. This disharmony was directed at the contractor, who was perceived to be the culprit for cutting costs and not building the facility to their requirements. However, the offender in this instance was the client s project manager who was confronted with a difficult dichotomy, that is, by having to satisfy occupiers requirements while simultaneously reduce project costs. Poor Contract Documentation and Low Consultant Fees In both projects, the contractor and design consultants actively sought future from clients. Consequently, they had to be competitive as well as demonstrate an inherent ability to undertake the project successfully. Continuation in workload juxtaposed with a keen desire to solicit future work meant that short-term sacrifices were made. Fees and profits were therefore reduced and staff subjected to increased pressure to perform the tasks that were thrust upon them. Interviews with the contractor, subcontractors, and purchasers in project A revealed that errors and omissions within the design documentation contributed to design-related rework. The contractor suggested that the project team had not been effectively coordinated
11 FORENSIC PROJECT MANAGEMENT 11 and integrated by the client s project manager during the project s design phases. The architect had designed and began documenting the project before the engineering consultants were appointed and therefore did not give due consideration to the mechanical, electrical, and hydraulic service requirements. Poor coordination of drawings during design process resulted in service clashes occurring. When the architect was probed about why these clashes rose, it was revealed that inadequate time combined with the use of inexperienced personnel contributed to errors in documentation. Moreover, the late inclusion of the engineering consultants in the project resulted in them to having to design and document services around the architectural design. In one case, the architect specified that the floor to soffit in the basement slab to be 2.1 m. Although this clearance corresponded with the minimum requirement identified by the building code, no allowance was made for the inclusion of basement hydraulics (stormwater and sewer drainage). Thus, the basement hydraulics systems had to be re-designed, so as to conform to the building code. Dimensions for the basement architectural drawings significantly differed between sections, elevations, and plans. The foreman noticed these errors during excavation works and reported them immediately to all parties involved. This meant that the hydraulics engineer had to hastily develop an alternative solution to the problem otherwise the project s critical path would have been adversely affected. The solution developed resulted in a change order being issued for Australian dollar 24,239. When the contract documentation for subcontract packages for both projects had been produced, the foremen and contract administrators checked its content for any inconsistencies. As a safeguard, the contractor also relied on their subcontractors to identify anomalies contained within their tender documents. Upon identification of errors and omissions the design consultants were required to spend additional time clarifying and rectifying the erroneous documentation. In project B, the pressure to produce documentation in the tight time frame required by the contractor took its toll on all the design consultants who were unable to meet the unrealistic demands. Instead of the consultant firms providing additional resources to the project, staff were required to work longer hours. This proved to be a stressful and demoralising experience. The constant and immediate pressure to rework documentation, as well as progress with the documentation of other subcontract packages further exacerbated the situation and led to additional errors. As the design consultants became more familiar with this research, they began to converse more freely about their internal management practices. An architect stated that recent graduates (in preference to more senior architects) were used to produce documentation in order to maximise profitability. Another important factor was that the design consultants involved in both projects were not certified to ISO 9000 and no design checks, verifications or reviews were undertaken prior to the documentation leaving their respective offices. Poor Standard of Workmanship A large number of errors occurring on-site, on both projects, required rework. Many were due to the subcontractor s poor quality workmanship or carelessness. A predominant number of faults were minor and therefore did not significantly impact the project s performance in terms of time or cost. For example, while the piling subcontractor was inserting pile foundations the plant operator reversed the pile rig into a pile that had already been inserted and subsequently damaged it. Instead of trying to rectify the damaged pile, it was decided to re-install another at an additional cost of Australian dollar 2000 was borne by the subcontractor. An error made by one subcontractor can have an adverse impact on succeeding trades. For example, the blockwork subcontractor constructed 2 m high core-filled block wall in the
12 12 P. E. D. LOVE AND D. J. EDWARDS building s basement. Upon inspection, the foreman noticed that the wall was offset and therefore required dismantling, and re-building. This error was identified on a Friday morning and threatened to cause a major project delay because the first floor concrete slab was scheduled to be poured the following day. The blockwork, formwork and reinforcement subcontractor worked together to complete the required critical path task without any hesitation or complaint. The blockwork subcontractor stated that these things happen. The apprentice got the set-out wrong; it s easily done when you re learning. However, the subcontractor suggested that the contractor s foreman should have also checked the wall s alignment before blocks were laid. The subcontractors had worked with each other previously and had developed a good work relationship. In a time of crisis, these subcontractors expressed their solidarity by assisting their colleagues to rectify any problem encountered. The estimated cost of demolishing the wall was Australian dollar 1000, and Australian dollar 2700 to re-erect it, of which Australian dollar 500 was attributable to the formwork subcontractor, Australian dollar 1600 to the blockwork subcontractor and Australian dollar 600 for reinforcement. These additional sums of money may appear to be negligible yet, the subcontractors involved were relatively small firms and such a loss was treated with the utmost concern. Dynamic interpersonal relations played a significant part in the distribution of the financial responsibility borne by the subcontractors for the additional work. Although three separate firms were involved in the demolition and re-construction of the wall, the individuals involved were part of an effective and cohesive informal group that had formed over 10 years of working together on previous projects. The contractor s project manager had known the subcontractors for nearly 20 years and previously worked for the formwork subcontractor as a carpenter, along with the blockwork and reinforcement subcontractors. Being in a position of power and control, the project manager adopted a paternalistic role to managing the subcontractors by being supportive and providing constructive advice when required; this contributed to the esprit de corps amongst those on-site. As soon as the misalignment of the wall was noticed, the project manager rallied the subcontractors together and informed them of the urgency to demolish and re-construct it. As the rework task was relatively straightforward, the project manager s leadership style appeared to become more structured, as specific details and instructions were given on the wall s re-construction. The salience of the task indicated that individuals were committed to rectifying the error with little concern about the financial implications imposed upon them. Implicitly, the highly effective inter-organizational and interpersonal relations that had been established over a period of time acted as an effective mechanism for preventing conflict, and a subsequent monetary claim. Moreover, the blockwork subcontractor indicated that over time, both the formwork and reinforcement subcontractors would need their help in future. Lack of a Quality Focus Poor workmanship by a concrete subcontractor in project B was identified as a principal reason for the poor quality concrete finish within the lift shaft. This resulted in a change order being issued to the painting subcontractor, for which the main contractor paid the cost. The external walls of the lift shaft were supposed to be left exposed, but the foreman decided that they should be painted to improve their aesthetic appearance. The contract administrator refused to pay the painting subcontractor for these additional costs because there was no formal instruction to do so, but the foreman disagreed. The foreman and contract administrator proceeded to enter into confrontational discourse about who was responsible for the additional cost of painting. Essentially, the contract administrator focused upon saving money, whereas the foreman focused upon getting the
13 FORENSIC PROJECT MANAGEMENT 13 job done. It transpired that the contractor administrator had not been made aware that the concrete subcontractor had undertaken additional work, at no additional cost, at the request of the foreman some weeks prior to the completion of the lift shaft. The foreman s instruction had not been formally documented even though this was a prerequisite requirement of the project QA system. Resultantly, the contract administrator was not formally notified that the work had been undertaken. This may have left the contracts administrator in a quandary, especially if the foreman was allocated to another project or some unfortunate event happened to him. The foreman stated that rework was not documented due to the time required to issue instructions to subcontractors. In remedying these incidents, so called deals, which were similar in nature to the aforementioned, were made on site with subcontractors. The fluidity and arbitrary nature of the foreman s actions generated unnecessary conflict, albeit unintentionally, as the pressures for early completion and to reduce project costs impaired his communication and decision-making. Matters that were considered trivial negatively impacted upon contractor and subcontractor relations, as the costs for painting should have been attributed to the concrete subcontractor. Upon discovering the foreman s deals with subcontractors, the contractor s project manager instructed the foreman to document all future instructions given so as to reduce the risks of disputes and potential cost increases. In doing so, additional rework costs occurring could be easily identified. Although the consequences of the rework did not adversely impact project cost and schedule, conflict did arise and relations with the subcontractor were, at times, severely jeopardized. Poor Supervision and Inspection For both projects the subcontractor s work was not inspected by the foreman on a regular basis, which meant that poor workmanship went unnoticed until later in the project. By this time, many of the subcontractors had left the site and had to return to rectify their work. For example, a 10-m length of fascia channel had only been partly painted, and the scaffolding had been removed. This resulted in the painting subcontractor having to return to site, and hire additional scaffold to complete the work that should have cost only Australian dollar 20 to rectify. It was estimated that the indirect cost associated with rectifying this defect were: (i) Travelling time (2 Australian dollar 35 h 21 ) Australian dollar 70 (ii) Hire of scaffold (1/2 a Australian dollar 200) Australian dollar 200 (iii) Loss of productivity (5 Australian dollar 35 h 21 ) Australian dollar 180 Total Australian dollar 450 Here, the indirect cost was a staggering 22 1=2 times the actual cost of rectification! Numerous defects identified before the project s hand-over were incomplete items of work; that is, they had been installed incorrectly. They were considered to be defects because they did not conform to the original requirements stipulated in the contract specification. An analysis of the defects listed prepared by the contractor for both projects indicated that only a minority of the defects identified were technical in origin. For example, in project B a shelving system showed signs of deflection without a load being imposed on it and needed replacing. Poor planning was a common and recurrent factor that contributed to incomplete work. According to an electrical subcontractor, the pressure to complete critical task activities on time meant that non-critical activities were rectified at the end of the project.
14 14 P. E. D. LOVE AND D. J. EDWARDS DISCUSSION Design Management Considering the findings identified from the case studies, rework prevention should begin by focusing on change mitigation. Clients cannot always be explicit about their requirements at the project s outset because of the many different interests that have to be satisfied. Therefore, a degree of change can be expected in a project (O Brien, 1998). With an effective project scoping strategy in place, which has been based upon a strategic needs analysis (Wyatt and Smith, 2000) and quality function deployment (QFD) (Karma, 1999), clients should freeze the scope of their project as early as possible to minimise the risk of cost and schedule increases. Constructability and value management (VM) programmes should be undertaken after the baseline scope has been developed. Love (2001) has shown that design scope freezing, VM, constructability analysis, and teambuilding are key strategies for reducing rework, particularly design-related changes. Although design scope freezing may be a useful tool to reduce change, it can also increase change if the scoping process has been ineffectively undertaken (Love, 2001). Dell Isola (1997) states that VM should be performed as early as possible in the project development process if management seek to curtail the investment, that is, required to implement a change. After the project scope has been developed, a VM study should be undertaken with the entire project team, including the contractors and relevant subcontractors so as to improve project constructability and reduce the potential for change. Design is an iterative process and therefore design changes are inevitable, if a realistic solution to a problem is to be developed. Fundamentally, the creative leap is more a process of building a bridging concept between the problem and the solution (Lawson, 1994). To find an acceptable design solution requires a team-based approach to problem solving (Miller, 1993; Sonnenwald, 1996). Once the solution is identified a design team will invariably try to make it work, especially if members have some form of input into the design process a process known as satisfying (Akin, 1986). This is, however, contrary to the conventional-based approach, where an architect identifies several possible solutions and each is evaluated and refined until a proposed solution is considered acceptable (March, 1976). This process can be time-consuming and frustrating for some clients, especially those who are inexperienced, as many are unable to define their specific requirements. Simply understanding the client s problem and translating such into a design that can be effectively documented and constructed is one of the panaceas for reducing change initiated rework. A lack of input into finding a mutually beneficial problem solution and being involved at a later stage of the project s development may discourage a sense of project ownership amongst design team members. This can lead to ineffective design coordination at respective interfaces, which can inadvertently translate into errors and omissions being contained within contract documentation. Q1 Auditing Contract Documentation Because documentation errors were not detected until particular activities had commenced on-site, rework and delays to subcontracts occurred. It is was not possible to pin-point exactly who was primarily responsible for causing rework, but those organizations who paid rectification costs could be readily identified (refer to Love and Li, 2000). To be reduce rework, organizations must assume responsibility for their actions. As organizations learn the total cost of rework, they take positive action to prevent its future occurrence.
15 FORENSIC PROJECT MANAGEMENT 15 The effect, however, of poor service quality is not always visible. In construction, particularly with respect to design consultants, rework may not transpose as an obvious physical waste but rather hidden additional management time and labour man-hours. Design-related rework was the most costly (Love and Li, 2000). Yet design consultants did not pay for the errors and omissions that resulted from production of documentation. In the event of determining design liability, however, an enormous amount of auditing is required to apportion blame (Uff, 1991). Gaafar and Perry (1999) suggest that the extent of liability is not necessarily dependent upon who does what, but rather who accepts liability? In other words, the contract, that is, used for appointing design consultants, contractors, or specialist subcontractors) is important in identifying who is fundamentally responsible for the rework. In the case studies presented, access to specific contract conditions was restricted. However, considering the nature of the contract that was used (a modified version of a standard form of contract (AS2124)), the design consultants liability was based on their ability to provide reasonable skill and care. Design consultants should take reasonable care to ensure that the information, that is, approved for construction is correct. Furthermore, documents should be regularly checked and cross-referenced with other design consultants who are involved with the project. Love (2001), however, found that these practices are not regularly undertaken in Australian projects, as the fees of design consultants are considered to be so low that only a minimal service can be provided. Poor coordination and integration of design team members with respect to contract documentation contributed to rework significantly. In the case studies, problems of coordination appeared where design consultants were reluctant to sanction the approval of each other s work. Figure 2 illustrates the cause and effect by time and location of errors in a project. Such errors reside within the processes of individual firms, the design process and the interfaces between design team members. It can be seen that there is a time delay, as well as a change in organisational location, before the symptom a dimensional error in the drawings is identified by the foreman (or other site personnel) during construction onsite. Here, effort and time is expended in attempting to correct the specific symptom. The processes that generated the error(s) may also continue to create additional problems that appear later and therefore may have a significant affect on project schedule as well as the morale and motivation of the workforce. FIGURE 2 Cause and effect separated by time and location.
16 16 P. E. D. LOVE AND D. J. EDWARDS This dynamic structure reinforces itself by consuming resources for problem solving and decreases the capability to invest in upstream work to remove problem causes. The ephemeral nature of construction projects often results in organizations only ever working together once, which constrains the formation of trust and the development of harmonious relations. Moreover, construction projects generally do not have mechanisms (e.g. audits) to learn from mistakes that they have made (Love and Sohal, 2002). Hence, the cause and effect of rework is inseparable, which may be a plausible explanation as to why there has been limited attention given to determining the causes and costs of rework by construction organizations. Lost profit and increased pressure to rectify initial errors may result in the firms upstream in the procurement process being reactive to the problems that arise and insufficient resources to address the specific cause. In fact, the organization may be unable to identify and prevent specific causes because they do not have the tools and techniques to do so. In this instance, there is a severe limitation placed on the ability of firms to reduce errors, when improvement efforts are restricted to having the foreman and subcontractors being the problem-solvers. Managing Design and Documentation Risk When there is insufficient time to complete contract documentation, the design team should provide the contractor with an assessment of design status and the potential for change (CII, 1990). This information enables the contractor to provide a realistic tender price and project programme as well as establish the mechanisms and procedures for administrating changes. Systematic and formalized meetings that aim to utilize the knowledge, judgement, and experience of project teams should be undertaken to classify and identify any potential risks so that strategies and actions for their minimization can be implemented (Chapman, 1998). In essence, effective risk management requires the project team to shift their emphasis from expecting project success to seriously considering its possible failure (Conroy and Soltan, 1998). According to Mak et al. (1998), however, there is a lack of appreciation toward a systematic approach to identifying and quantifying any risks that may be contained within contract documentation. This is because contract documentation is supposed to have been prepared in a diligent and professional manner and thus be error-free. In reality, this is not the case, as design consultants are reluctant to expose themselves to any potential liability. Because uncertainty requires a contingency, it is important to quantify the contingency levels necessary to cover any real construction project risks that exist (Mak and Picken, 2000). A common practice is to use hidden contingencies in project estimates to cover for any cost overruns. However, excessive project budgets can permit the inefficient and ineffective use of resources. Conducting a risk audit of contract documentation prior to its release to the contractor would ensure that changes, errors, and omission are kept to a minimum. As part of the auditing process, clients should sign-off work as the design progresses and alerted to the consequences associated with initiating a change. Essential changes should be reviewed and authorized through a systematic and structured scope and change control program that has been developed by the client s representative in conjunction with the project team. The Need for a Quality Focus The case studies revealed that design consultants (and to so extent, contractors) lack of quality focus significantly affects project cost performance. The prevention of poor quality was not considered an issue and resultantly external failures occurred downstream during production. This is because many construction organizations do not implement QA
17 FORENSIC PROJECT MANAGEMENT 17 effectively or that they do understand how quality management activities can improve business performance (Love and Sohal, 2002). Some organizations have become so disheartened with QA in that they resist investing further time and finance into other quality practices. This is understandable to a certain extent, when considering the way that QA has been adopted by the industry. However, organizations must realize that QA is only the starting point and the benefits of becoming quality focused will only arise through the continued investment of resources and time. Measuring quality in the project s design phase is arguably difficult because all too often the designer is not the final user assessing the product s quality performance (Abdul- Rahman, 1993). Arge (1995) suggests that direct and constant communication between the architect and client/end-user is a critical factor that can affect the final product s quality. Furthermore, Arge (1995) suggests that if architects are to deliver clients/ end-users quality architecture, they must improve their internal management practices and consider limiting the commissions they undertake. Contractors are the custodians of the production process hence, they must receive the right information, to enable them to manage their subcontractors. Incomplete, conflicting, inappropriate, or changed information causes rework, which can delay the project s progress. Contractors quality systems are unable to prevent errors and omissions, which originate from consultants, nor can they thwart changes, but they can provide prevention mechanisms and give early warnings of poor quality. To ensure quality in contract documentation, design consultants, and particularly contractors when using design and construct methods, should give greater attention to the following quality management practices:. the requirements of clients and end-users;. producing correct and complete drawings and specification;. coordinating and checking contract documentation (including inter-organisational coordination);. conducting design verification through design analysis reviews;. controlling changes (e.g. scope freezing); and. committing to providing a quality service. By giving adequate attention to these preventative items design QA can be improved, which in turn will reduce errors, and omissions. Moreover, to produce good quality contract documentation an organization has to harness the skills of the right people at the right time and integrate and coordinate their work with other organizations involved with a project (Hollis, 1993). TQM explicitly encourages inter-organisational integration through partnership formation and therefore acts as a mechanism for reducing any potential conflict during project s design and construction. Training and Skill Development Lack of knowledge and carelessness contributed to errors occurring in the projects, both of which can be corrected (Hellard, 1991). Human resources should be given appropriate attention since they are capable of producing and preventing errors. Oakland and Sohal (1996) indicate that effective human resource management is an integral component of TQM and therefore provides the foundation for error prevention. Although Love and Sohal (2002) found no significant relationship between training and rework costs, evidence from the normative literature clearly demonstrates that investment in training can reduce rework costs (Mandal et al., 2000). Improved training and skill development can improve the competence base of site management and subcontractors. Efficient management of the
18 18 P. E. D. LOVE AND D. J. EDWARDS construction process can lead to minimum variability, minimum waste, and maximum use of resources. Achieving effective quality management demands an understanding of process variability and the necessary actions to prevent it. According to Abdul-Rahman (1993, p. 231) the tradition of if it meets specification then it s ok is no longer applicable in construction projects. However, this philosophy clearly continues to thrive. To improve business performance and thus secure future contracts, organisations should aspire to exceed client expectations by reducing process variability. The corollary to this is that clients should provide incentives to organizations that reduce project process variability. Supervision and Inspection On-site Site management and subcontractors can play an active role in reducing errors by providing ameliorated supervision and leadership on-site. Site personnel (such as the foreman) invariably assume the role of production inspectors and therefore possess knowledge, on the causes and prevention of rework. During construction, the foreman is the project driver, as they direct the specific work that needs to be undertaken (Howell et al., 1993). Unfortunately, foremen (and other project personnel) are often reluctant to impart their knowledge because their advice is unlikely to be given the recognition it deserves (Ashford, 1992). Yet ultimately, site personnel can reduce rework that is attributable to human error or poor workmanship. Shimbun (1990) suggests that individuals should use the following major inspection techniques to prevent defects:. judgement separate defective products from good ones;. informative determine the cause of a defect and provide feedback into the process; and. source correct a mistake before it manifests itself as a defect. Site foremen should see quality problems as an opportunity to improve performance and therefore should be encouraged to identify their causes as a precursor to developing mechanisms to prevent their recurrence. According to Ozeki (1990) a classification for identifying problems may include those related to:. worker skill and attitude;. the workplace quality system;. lack of motivation to solve problems;. problems in workplace culture; and. problems that originate from design, the manufacturer or supplier. In adopting the above classification, foremen should not be treated as quality inspectors but rather teachers who can convince those making errors that it is safe to report them (Ballard, 1997). Failure to recognise the separation of cause and effect is an important barrier to learning, which needs to be overcome if rework is to be reduced. Q3 Production Planning Poor planning and coordination on the contractor s behalf can directly influence the resource planning of subcontractors. Therefore, both the contractor and subcontractor need to work together to ensure that when planned activities deviate, remedies are available to minimise possible disruption and delays. In deriving effective remedies to reduce variability and stabilise the flow of work activities, the traditional approach to project planning must be re-examined (Ballard, 1994).
19 FORENSIC PROJECT MANAGEMENT 19 Ballard and Howell (1997) state that the traditional approach to project planning is effective for informing people about what should be done, as it is used to monitor and enforce conformance of did to should. This can work well until something goes wrong and then a chain reaction of unforeseen events can take place. For example, an architect fails to provide approvals for shop drawings; this can delay the fabrication process, and the delivery of materials to site, which may have impact on the project s critical path. As the available float disappears from the schedule, increasing pressure is placed on people involved within that specific chain to minimize the delay s impact. This can further exacerbate matters and increase the likelihood of errors being made as people work harder to meet the program dates. Hence, Ballard and Howell (1997) argue that if the traditional approach to planning worked perfectly then did would always match should. Research undertaken by Ballard and Howell (1997) has revealed that what actually is undertaken differs significantly from what should have been done by one-third in projects. In other words, approximately 33% of planned activities were not completed within the planned period due to inappropriate drawings and a lack of materials. When project rework occurs, the contractor and subcontractors must learn how to pro-actively manage the situation by utilizing the last planner approach. The last planner is responsible for the operational planning of the production process (Ballard, 1994). Therefore, stabilising the work environment begins by learning to make and keep commitments to doing what should be done, only to the extent it can be done. The foreman is typically the last planner and should select only those activities that can and will be done rather than those activities that should be done to compensate the project s schedule for the rework that has occurred. Working closely with subcontractors will enable the foreman to determine the resources needed for what can be done (Ballard, 2000). If what should be done is addressed instead, then the site workforce may inherit the uncertainty and variation of workflow that have not been prevented. This may result in a high degree of non-productive time and a de-motivated workforce. The last planner approach shields the site workforce from up-steam variation and uncertainty and therefore improves the ability to control capability and variability of the workface. CONCLUSION Superficially, the reasons for rework appeared to be relatively straightforward. However, a closer examination the rework events presented revealed that an intricately complex interwoven array of factors contributed to its occurrence. In fact, it was impossible to identify a specific cause and effect relationship in the case studies undertaken because of the interdependency of work arrangements, dynamic social interactions between project participants, and the socio-economic and political structure that existed between the client and their occupiers. Notwithstanding this, an attempt was made to determine the antecedents of rework that occurred in the project. The change orders initiated by clients, errors, and omissions in contract documentation, and poor planning appear to be generic factors that can induce rework to occur. Rework not only contributes to cost and schedule growth but also can have an adverse affect on intra- and inter-organizational relations and the psychological well-being of individuals (e.g. stress). To reduce rework in projects it has been suggested that attention should be given to a number of design and production management strategies. These include:. understanding and identifying client and end-user requirements and implementing techniques for mitigating change;
20 20 P. E. D. LOVE AND D. J. EDWARDS. auditing contract documentation and provide a risk assessment for the potential of change and errors;. implementation of quality management practices;. implementation of training programmes to enhance skills and knowledge; and. the use of the last planner approach during the production planning process. The introduction of these strategies into the design and production management process is deemed to be relatively a straightforward task; albeit, they do not require significant changes to current practice. The major challenge, however, lies with design consultants they must realize that that to ameliorate their documentation, emphasis needs to be placed on design quality management practices and not simply advocating for higher fees from their clients. References Abdul-Rahman H., The Management and Cost of Quality for Civil Engineering Projects. PhD Thesis, University of Manchester Institute of Science and Technology (UMIST), Manchester, UK, Ackermann F., Eden C., Williams T., Modelling litigation: mixing qualitative and quantitative approaches, Interfaces, 1997, 27(2), Akin O., Psychology and Architectural Design, Pion, London, Arge K., Architectural quality, Building Research and Information, 1995, 23(4), Ashford J. L., The Management of Quality in Construction, E & F Spon, London, Australian Procurement and Construction Council (APCC), Construct Australia: Building a Better Construction Industry in Australia, The Australian Procurement and Construction Council Inc, Deakin West, ACT, Australia, Ballard G., The Last Planner, Northern Californian Construction Institute Monterey, California, Ballard G., Lean construction and EPC performance improvement, in Lean Construction, L. Alarcón (editor), Balkema, 1997, Ballard G. Phase Scheduling, White Paper #7, Lean Construction Institute, 27th April, 2000, Available at Ballard G., Howell G., Shielding production: an essential step in production control, ASCE Construction Engineering and Management, 1997, 124(1), Barrett P., Profitable Practice Management for the Construction Professional, E & F Spon, London, UK, Bubshait A. A., Farooq G., Jannadi M. O., Assaf S. A., Quality practices in design firms, Construction Management and Economics, 1999, 17, Building Research Establishment (BRE), Quality Control on Building Sites, Current Paper 7/81, BRE, Garston, UK, Building Research Establishment (BRE), Quality in Traditional Housing An Investigation into Faults and their Avoidance, BRE, Garston, UK, Chapman R. J., Effectiveness of working group risk identification and assessment techniques, International Journal of Project Management, 1998, 16(6), Coles E. J., Design Management: A Study of Practice in the Building Industry, The Chartered Institute of Building, Occasional Paper No.42, UK, 1990, 32. Conroy G., Soltan H., ConSERV, a project specific risk management concept, International Journal of Project Management, 1998, 16(6), Construction Industry Institute (CII), The Impact of Changes on Construction Cost and Schedule, Construction Industry Institute (CII), The University of Texas at Austin, Austin Texas, Publication 6th 10th April 1990, USA. Cooper K. G., The rework cycle: benchmarking for the project manager, Project Management Journal, 1993, 24(1), DeFraites A. A. Jr., Fee versus quality, ASCE Journal of Professional Issues in Engineering, 1989, 115(2), Dell Isola A., Value Engineering: Practical Applications for Design, Construction, Maintenance and Operations, RS Means, Kingston, MA, Eden C., Williams T., Howick S., The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects, Journal of the Operational Research Society, 2000, 51(3), Gaafar H. K., Perry J. G., Limitation of design liability for contractors, International Journal of Project Management, 1999, 17(5), Gardiner J., Management of design documentation, where do we go from here? in Construction and Management, Recent Advances, R. R. Wakefield, D. G. Carmichael (editors), Balkema, Rotterdam, 1994, Gray C., Hughes W. P. Building Design Management, Butterworth-Heinemann, Oxford, UK, Hammarlund Y., Josephson P. E., Sources of quality failures in building, European Symposium on Management, Quality and Economics in Housing and Other Building Sectors, Lisbon, Portugal, September 30th October 4th, 1991, Q4 Q4
21 FORENSIC PROJECT MANAGEMENT 21 Hellard R. B. Total quality management in construction practice, in Practice Management: New Perspectives for the Construction Professional, P. Barrett, R. Males (editors), E & F Spon, London, 1991, 213. Hollis W., Design in the service sector, Managing Service Quality, 1993, 3(3), Howell G., Laufer A., Ballard G., Interaction between sub-cycles: one key to improved methods, ASCE Journal of Construction, Engineering and Management, 1993, 119(4), Hoxley M., Are competitive fee tendering and construction professional service quality mutually exclusive, Construction Management and Economics, 2000, 18(5), Ibbs C. W., Allen W. E., Quantitative Impacts of Project Change. Source Document 108, Construction Industry Institute, The University of Texas at Austin, Texas, USA, Jafaari A., Human factors in the Australian construction industry: towards total quality management, Australian Journal of Management, 1996, 21(2), Josephson P-E., Hammarlund Y. The causes and costs of defects in construction. A study of seven building projects, Automation in Construction, 1999, 8(6), Josephson P.-E., Larsson B., Li H., Illustrative benchmarking rework and rework costs in Swedish construction industry, ASCE Journal of Management in Engineering, 2002, 18(2), Karma J. M., Client Requirements Processing for Concurrent Life-Cycle Design and Construction, Unpublished PhD Thesis, University of Teeside, Newcastle, UK, Koskela L., An Exploration Towards a Production Theory and its Application to Construction, VTT Technical Research Centre of Finland, Espoo, Finland, Lawson B., How Designers Think: The Design Process Demystified, Architectural Press, Butterworth Heinemann, Li H., Love P. E. D., Drew D., Modelling the effects of prolonged overtime work on project cost and quality, Engineering Construction and Architectural Management, 2000, 7(3), Lomas K., Quality pays, Engineers Australia, February, 1996, 26. Love P. E. D., Determinants of Rework in Australian Construction Projects, Unpublished PhD Thesis, Monash University, Melbourne, Australia, Love P. E. D., Influence of project type and procurement method on rework costs in building construction projects, ASCE Journal of Construction Engineering and Management, 2002a, 128(1), Love P. E. D., Auditing the indirect consequences of rework in construction: a case based approach, Managerial Auditing Journal, 2002b, 17(3), Love P. E. D., Sohal A. S., Influence of organisational learning practices on rework costs in projects, Proceedings of the Eight International Conference on ISO 9000 & TQM (Change Management), Centre for Management Quality Research (CMQR) at RMIT University, RMIT Storey Hall, Melbourne, Australia, 13th 15th April Love P. E. D., Sohal A. S., Capturing rework costs in projects, Managerial Auditing Journal, 2003, 18(4), Love P. E. D., Li H., Mandal P., Rework: a symptom of a dysfunctional supply-chain, European Journal of Purchasing and Supply Management, 1999a, 5(1), Love P. E. D., Mandal P., Li H., Determining the causal structure of rework in construction projects, Construction Management and Economics, 1999b, 17(4), Love P. E. D., Smith J., Li H., The propagation of rework benchmark metrics for construction, International Journal of Quality and Reliability Management, 1999c, 16(7), Love P. E. D., Smith J., Treloar G., Li H., Some empirical observations of service quality in construction, Engineering Construction and Architectural Management, 2000, 7(2), Love P. E. D., Holt G. D., Li H., Triangulation in construction management research, Engineering, Construction and Architectural Management, 2002, 9(4). Mak S., Picken D., Using risk analysis to determine construction project cost contingencies, ASCE Journal of Construction Engineering and Management, 2000, 126(2), Mak S., Wong J., Picken D., The effect on contingency allowances of using risk analysis in capital cost estimating. a Hong Kong case study, Construction Management and Economics, 1998, 16(6), Mandal P., Love P. E. D., Shah K., Propagation of quality costs to formulate quality improvement strategies, Fifth International Conference on ISO 9000 & TQM School of Business, HK Baptist University & Productivity & Quality Research Centre, National University of Singapore, Singapore, 25th 27th April 2000, March L., The logic of design and the question of value, in The Architecture of Form, L. March (editor), Cambridge University Press, Cambridge, UK, Miller L. G., Concurrent Engineering Design: Integrating the Best Practices for Process Improvement, Society of Manufacturing Engineers, Dearbon, MI, Nylén K-O., Cost of Failure in a Major Civil Engineering Project, Licentiate Thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden, O Brien J., Construction Change Orders: Impact, Avoidance and Documentation, McGraw-Hill, NY, Oakland J. S., Aldridge A. J., Quality management in civil and structural engineering consulting, International Journal of Quality and Reliability Management, 1995, 12(3), Oakland J. S., Sohal A. S., Total Quality Management: Text with Cases, Asia Pacific Edition, Butterworth- Heinemann, Melbourne, Australia, Ozeki K., Handbook of Quality Tools The Japanese Approach, Productivity Press, Inc., Q5 Q6
22 22 P. E. D. LOVE AND D. J. EDWARDS Powell C., Responding to marginalisation, Architectural Research Quarterly, 1997, 2, Richardson B., Marketing for Architects and Engineers: A New Approach, E & F Spon, London, UK, Rounce G., Quality, waste, and cost consideration in architectural building design management, International Journal of Project Management, 1998, 16(2), Shimbun N. K., Poka-Yoka Improving Product Quality by Preventing Defects, Productivity Press Inc., USA, Sonnenwald D. H., Communication roles that support collaboration during the design process, Design Studies, 1996, 17(3), STATT, Rationellt Byggande Metoder, Hjälpmedel och Maskiner (in Swedish), Utlandsrapport from the Swedish Attaché of Technology, (STATT) 8906, Stockholm, Sweden, Svelinger P.-O., Organisatorisk samordning vid projektering (Organisational Coordination in the Design Phase). Report 44, Institution för byggnadsekonomi och byggnadsoganisation, Chalmers techiska högskola, Göteborg, Sweden, Symes M., Eley J., Seidal A. D., Architects and Their Practices: A Changing Profession, Butterworths, London, Tilley P. A., McFallan S. L., Design and Documentation Quality Survey Designers Perspectives, BCE DOC 00/113. CSIRO Building, Construction and Engineering, Melbourne, Australia, 2000 Uff J., The ICE conditions of contract. 6th Edition, New Thoughts of Old Issues. The International Construction Law Review, 1991, 8(2) Lloyds of London Press, Ltd. Wyatt R., Smith, J., Digital simulation of option-choice behaviour, Computers, Environment and Urban Systems, 2000, 24,
23 Journal... Civil Eng. And Env. Syst. Article ID GCEE TO: CORRESPONDING AUTHOR AUTHOR QUERIES - TO BE ANSWERED BY THE AUTHOR The following queries have arisen during the typesetting of your manuscript. Please answer the queries. Q1 The following references are cited in the text but are not present in the list. Please check Burati et al. (1992). Willis and Willis (1996). Barber et al. (2000). Love and Li (2000). Abolnour (1994). McFallen (1994). Lomas (1996). CIDA (1995); Yin (1984). Cusack (1992). Burroughs (1993). Cnudde (1991). CIDB (19989) Farrington (1996). Q2 Q3 Author please note that $ and $A have been changed to Australian dollar in all the occurrences. Shimbun (1988) has been changed to shimbus (1990) as per reference list. Please check. Q4 The following references are in the list but not cited in the text. Please check. APCC Gray and Hughes (2001). Q5 Please supply more details for Lomas (1996). Q6 Please supply page range for Love et al. (2002). Production Editorial Department, Taylor & Francis Ltd. 4 Park Square, Milton Park, Abingdon OX14 4RN Telephone: +44 (0) Facsimile: +44 (0)
24 Journal... Civil Eng. And Env. Syst. Article ID GCEE TO: CORRESPONDING AUTHOR AUTHOR QUERIES - TO BE ANSWERED BY THE AUTHOR The following queries have arisen during the typesetting of your manuscript. Please answer the queries. Q1 The following references are cited in the text but are not present in the list. Please check Burati et al. (1992). Willis and Willis (1996). Barber et al. (2000). Love and Li (2000). Abolnour (1994). McFallen (1994). Lomas (1996). CIDA (1995); Yin (1984). Cusack (1992). Burroughs (1993). Cnudde (1991). CIDB (19989) Q2 Farrington Author please (1996). note that $ and $A have been changed to Australian dollar in all the occurrences. Q3 Shimbun (1988) has been changed to Shimbun (1990) as per reference list. Please check. Q4 The following references are in the list but not cited in the text. Please check. APCC Gray and Hughes (2001). Q5 Please supply more details for Lomas (1996). Q6 Please supply page range for Love et al. (2002). Production Editorial Department, Taylor & Francis Ltd. 4 Park Square, Milton Park, Abingdon OX14 4RN Telephone: +44 (0) Facsimile: +44 (0)
Delay, Disruption and Acceleration Costs
Project Services Pty Ltd Delay, Disruption and Acceleration Costs Patrick Weaver FAICD, MCIOB, PMP Introduction Delay and disruption costs are common in the construction and engineering industries and
Competence Criteria for Member (MCIBSE)
Competence Criteria for Member (MCIBSE) FACTSHEET M21 The competence criteria for the Member grade of CIBSE (MCIBSE) is directly aligned to the Competence Statements issued by the Engineering Council,
Quality Management Subcontractor QM Guide-Section Two
SECTION TWO QUALITY MANAGEMENT SYSTEMS Version No 1. PREFACE This document has been developed to assist subcontractors to meet Monaco Hickeys (MHPL) Quality Management (QM) requirements whilst working
Procurement Strategy and Contract Selection
GUIDELINE Capital Works Management Framework Procurement Strategy and Contract Selection The suite of Capital Works Management Framework documents is available online www.hpw.qld.gov.au: The Capital Works
An Introduction to Risk Management. For Event Holders in Western Australia. May 2014
An Introduction to Risk Management For Event Holders in Western Australia May 2014 Tourism Western Australia Level 9, 2 Mill Street PERTH WA 6000 GPO Box X2261 PERTH WA 6847 Tel: +61 8 9262 1700 Fax: +61
Contractor Performance Report Scoring Guide
Report Main Roads Western Australia Table of Contents CONTRACTOR PERFORMANCE REPORT SCORING GUIDE... 3 1. APPLICATION... 3 2. REPORTING... 3 2.1 Objectives... 3 2.2 Frequency... 3 2.3 Responsibility...
Relationship Manager (Banking) Assessment Plan
Relationship Manager (Banking) Assessment Plan ST0184/AP03 1. Introduction and Overview The Relationship Manager (Banking) is an apprenticeship that takes 3-4 years to complete and is at a Level 6. It
Key Words: Flood Reconstruction, Resource Contracts, Coal Seam Gas, Contract Management, Project Management, Relationship Contracting
Rebuilding Flood Damaged Roads in South East Queensland in the middle of the Coal Seam Gas Expansion/Explosion - A Local Governments Experience and Learning's David Pemberton [email protected] Mobile
Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects
Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Dr. Rashad Zakieh (PMP) 27 April, 2010 Copyright Saudi Aramco, 2010. All rights reserved.
Quality Management Manual
Quality Management Manual CONTENTS 1 Introduction... 1 2 Scope... 1 3 Company quality policy... 1 4 The fundamentals of quality management... 2 4.1 The principles...2 4.2 Plan - Do - Check - Act...3 4.3
Engineering Council of South Africa
Government Gazette No. 26180, 2 April 2004 Page 1 of 30 Board Notice 42 of 2004 Engineering Council of South Africa Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the
Compliance Management Systems
Certification Scheme Y03 Compliance Management Systems ISO 19600 ONR 192050 Issue V2.1:2015-01-08 Austrian Standards plus GmbH Dr. Peter Jonas Heinestraße 38 A-1020 Vienna, Austria E-Mail: [email protected]
Chapter 3 Office of Human Resources Absenteeism Management
Office of Human Resources Absenteeism Management Contents Section A - Background, Objective and Scope............................ 24 Section B - Criterion 1 - Communicating Expectations.......................
Competence Criteria for Associate (ACIBSE)
Competence Criteria for Associate (ACIBSE) FACTSHEET A21 The competence criteria for the Associate grade of CIBSE (ACIBSE) is directly aligned to the Competence Statements issued by the Engineering Council,
CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR
CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR CIC/AppInsp The Construction Industry Council - Association of Consultant Approved Inspectors contract for the appointment of an approved inspector
Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry
Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry Steve Y. W. Lam and Conrad H. W. Tang Department of Land Surveying & Geo-Informatics Hong Kong Polytechnic University,
Corporate Risk Management Policy
Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire
P3M3 Portfolio Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction
Global Fund Competency Behaviors by Organisation Level 2016
Senior Manager (examples: Division Head, Department Head, Regional manager) Core Expertise Scope Applies both professional and management skills effectively and promotes processes and systems to encourage
Risk in Construction
Risk in Construction Market Research prepared for June 2014 In association with the Chartered Institution of Civil Engineering Surveyors, The Institution of Civil Engineers and the UK s leading Design
A Guide to Small Works. A brief explanation
A Guide to Small Works A brief explanation A Guide to House Extensions/Small Works - a brief explanation Small works are an ongoing, cherished part of DDC's activity and restricted only by distance. Here
1 OF 7. there will be few "surprises" as the work progresses.
1 OF 7 FP-G1.94 GUIDELINES FOR SUCCESSFUL SUPERVISION OF SCHOOL DISTRICT CAPITAL CONSTRUCTION PROJECTS There is no doubt that the successful completion of any capital construction project is the result
V1.0 - Eurojuris ISO 9001:2008 Certified
Risk Management Manual V1.0 - Eurojuris ISO 9001:2008 Certified Section Page No 1 An Introduction to Risk Management 1-2 2 The Framework of Risk Management 3-6 3 Identification of Risks 7-8 4 Evaluation
Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer
Conditions of Offer A1 The offer documents comprise the offer form, letter of invitation to offer (if any), these Conditions of Offer and Conditions of Contract (Works & Services), the Working with Queensland
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS. April 2008 1
Safety Regulation Group SAFETY MANAGEMENT SYSTEMS GUIDANCE TO ORGANISATIONS April 2008 1 Contents 1 Introduction 3 2 Management Systems 2.1 Management Systems Introduction 3 2.2 Quality Management System
Risk Mitigation In Construction Contracts
Risk Mitigation In Construction Contracts NITANK RASTOGI 1, Dr. M.K TRIVEDI 2 1 POST GRADUATE STUDENT ( M.E ), CIVIL ENGINEERING DEPARTMENT, MADHAV INSTITUTE OF TECHNOLOGY AND SCIENCE, GWALIOR (M.P), INDIA
A guide to appointing an architect
A guide to appointing an architect and to being a good client Hurditch Architecture, 24 Botallack, St Just, Penzance, Cornwall, TR19 7EP Page 1 of 7 RIBA Chartered Architects Architects act 1997 In the
The Concept of Project Success What 150 Australian project managers think D Baccarini 1, A Collins 2
The Concept of Project Success What 150 Australian project managers think D Baccarini 1, A Collins 2 1 Curtin University of Technology, Perth, Western Australia 2 Broad Construction Services, Perth, Western
Basic Guide. General Conditions of Contract for Construction Works (GCC 2004)
Basic Guide General Conditions of Contract for Construction Works (GCC 2004) February 2008 Preface The Construction Industry Development Board (CIDB) is a national body established by an Act of Parliament
Contents. Finding A Builder...9. Subcontractors...9 Quotes And Estimates...10. Owner Builders...11 Once Decided On A Builder...11
Contents Flow Chart for Typical Residential Building...5 Preparing Plans...6 Does My Work Require Development or Building Approval?...6 How Do I Get Development Approval?...6 How Do I Get Building Approval?...6
Dynamic Change Management for Fast-tracking Construction Projects
Dynamic Change Management for Fast-tracking Construction Projects by Moonseo Park 1 ABSTRACT: Uncertainties make construction dynamic and unstable, mostly by creating non value-adding change iterations
The Contract Scorecard
ARCHITECT ENGAGE OPERATE REGENERATE The Contract Scorecard Module 8 of the outsourcingtoolset outsourcingtoolset.com Contents 1 ABOUT THE OUTSOURCING TOOLSET AND THIS MODULE...1 1.1 THE OUTSOURCING TOOLSET...1
Improved Schedule Analysis Considering Rework Impact and Optimum Delay Mitigation
Improved Schedule Analysis Considering Rework Impact and Optimum Delay Mitigation by Mohamed Said A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the degree
These guidelines can help you in taking the first step and adopt a sustainability policy as well as plan your further sustainability communication.
SUSTAINABILITY POLICY AND COMMUNICATION GUIDELINES Why communicate about sustainability? IFU encourages all our investments to be transparent and informative about business and sustainability performance
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value
Managing construction procurement risks
CONSTRUCTION PROCUREMENT BEST PRACTICE GUIDELINE #A5 Construction Industry Development Board Pretoria - Head Office Tel: 012 482 7200 Fraudline: 0800 11 24 32 Call Centre: 0860 103 353 E-mail: [email protected]
Optimization of Software Quality using Management and Technical Review Techniques
Optimization of Software Quality using Management and Technical Review Techniques Inibehe Emmanuel Akpannah Post Graduate Student (MSc. Information Technology), SRM University, Chennai, India Abstract
THE RELATIONSHIP BETWEEN THE CLIENT, CLIENTS PROJECT TEAM AND THE EPCM PROJECT TEAM. Mr C. A. F. Sweet The South Institute of Mining and Metallurgy
THE RELATIONSHIP BETWEEN THE CLIENT, CLIENTS PROJECT TEAM AND THE EPCM PROJECT TEAM Mr C. A. F. Sweet The South Institute of Mining and Metallurgy The inter-relationship between these parties and the effect
What's Wrong with Project Management? Introduction. Welcome to the November 2009 INSIGHTS published by acumen7.
Welcome to the November 2009 INSIGHTS published by acumen7. The purpose of this newsletter is to bring you new perspectives on key subjects to stimulate your own thoughts and ideas. In each edition (which
CAPITAL PROJECTS IMPLEMENTATION
CAPITAL PROJECTS IMPLEMENTATION 2.4 Over the years, I have been reporting on the shortcomings encountered during implementation of projects. These include, among others, excessive delays, variation costs,
Improving the ACT Building Regulatory System
Improving the ACT Building Regulatory System Schedule of individual reform proposals Proposal Consultation responses Response Act/Regulation Design and Documentation 1.1 Minimum Design Documentation Guidelines
Corporate Standard. Contractor Management
Corporate Standard Contents Purpose... 2 Scope... 2 Definitions... 2 Background... 3 Specific Requirements... 4 Responsibilities... 11 Review Date... 11 References... 11 Date Issued July 2010 Management
6.0 Procurement procedure 1 Infrastructure
Page 6-1 6.0 Procurement procedure 1 Infrastructure 6.1 Overview Introduction Procurement procedure 1 Infrastructure consists of four parts: guidelines for understanding the strategic context for the procurement
PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS
PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS 2014 Public Sector Standard Conditions of Contract for Construction Works 2014 Building and Construction Authority First published 1995
CONTRACTOR DEFAULT & SURETY PERFORMANCE:
CONTRACTOR DEFAULT & SURETY PERFORMANCE: A PRACTICAL GUIDE FOR UNDERSTANDING AND NAVIGATING A BOND DEFAULT SITUATION TEXAS CITY ATTORNEYS ASSOCIATION SUMMER CONFERENCE JUNE 9-11, 2010 SOUTH PADRE ISLAND,
Sector Development Ageing, Disability and Home Care Department of Family and Community Services (02) 8270 2218
Copyright in the material is owned by the State of New South Wales. Apart from any use as permitted under the Copyright Act 1968 and/or as explicitly permitted below, all other rights are reserved. You
NEC Users Group Workshop Defined Cost
NEC Users Group Workshop Defined Cost [email protected]; July 2014 Turner & Townsend plc July 14 making the difference Introduction Practicalities in assessing of Defined Cost & Disallowed Cost Assumption
Procurement requirements for reducing waste and using resources efficiently
Guidance for building and civil engineering projects Procurement requirements for reducing waste and using resources efficiently Model procurement wording for clients and contractors to cut waste on construction
An Introduction to PRINCE2
Project Management Methodologies An Introduction to PRINCE2 Why use a Project Methodology and What Does PRINCE2 Enable? PRINCE - PRojects IN Controlled Environments - is a project management method covering
TO ALL CHIEF EXECUTIVE OFFICERS OF BANKS, BRANCHES OF FOREIGN BANKS AND MUTUAL BANKS
2004-09-20 BANKS ACT CIRCULAR 14/2004 TO ALL CHIEF EXECUTIVE OFFICERS OF BANKS, BRANCHES OF FOREIGN BANKS AND MUTUAL BANKS OUTSOURCING OF FUNCTIONS WITHIN BANKS This Office has received several approaches
CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED
CONCODE Guide to contract strategies for construction projects in the NHS 1995 STATUS IN WALES ARCHIVED For queries on the status of this document contact [email protected] or telephone 029 2031 5512
Gateway review guidebook. for project owners and review teams
Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the
A Guidance Note to. Conditions of Contract for Consultancy Services (2005)
A Guidance Note to Conditions of Contract for Consultancy Services (2005) This Guidance Note is based on a document prepared by the Auckland Region Contract Group, and verified by ACENZ, in February 2005.
ICE Legal Notes Series
ICE Legal Notes Series Legal Notes Reviewing the work of another Engineer and replacing another Engineer Institution of Civil Engineers www.ice.org.uk Published by the Institution of Civil Engineers (ICE).
This AGREEMENT made the... day of... between the HUNTER WATER CORPORATION (hereinafter called the Corporation ) and ...
MINOR WORKS NO.... This AGREEMENT made the... day of... between the HUNTER WATER CORPORATION (hereinafter called the Corporation ) and of... Hereinafter called the Developer ) It is agreed that the Developer
Safety Management Systems (SMS) guidance for organisations
Safety and Airspace Regulation Group Safety Management Systems (SMS) guidance for organisations CAP 795 Published by the Civil Aviation Authority, 2014 Civil Aviation Authority, CAA House, 45-59 Kingsway,
R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.
2 of 34 Revision Summary Revision Number Date Description of Revisions Initial issue of the document. Table of Contents Item Description Page 1. Introduction and Purpose... 5 2. Project Management Approach...
The Benefits of PLM-based CAPA Software
For manufacturers in industries that produce some of the world s most complex products, effective quality management continues to be a competitive advantage. Whether in automotive, aerospace and defense,
Construction Contracts
STATUTORY BOARD FINANCIAL REPORTING STANDARD SB-FRS 11 Construction Contracts This version of SB-FRS 11 does not include amendments that are effective for annual periods beginning after 1 January 2015.
INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS
Standard No. 13 INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS STANDARD ON ASSET-LIABILITY MANAGEMENT OCTOBER 2006 This document was prepared by the Solvency and Actuarial Issues Subcommittee in consultation
Level4. Civil Service Competency Framework 2012-2017. Level 4 Grade 7 and 6 or equivalent
Level4 Civil Service Competency Framework 2012-2017 About this framework We are introducing a new competency framework to support the Civil Service Reform Plan and the new performance management system.
Procurement guidance Prequalifying suppliers
Procurement guidance Prequalifying suppliers Procurement guidance: Prequalifying suppliers Page 2 of 21 Table of contents Table of contents... 2 Purpose of this Guide... 4 Who should read this Guide?...
The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees
The South African Council for the Project and Construction Management Professions Guideline Scope of Services and Tariff of Fees For Persons Registered in terms of the Project and Construction Management
Data Quality Assessment. Approach
Approach Prepared By: Sanjay Seth Data Quality Assessment Approach-Review.doc Page 1 of 15 Introduction Data quality is crucial to the success of Business Intelligence initiatives. Unless data in source
Insolvency practitioner regulation regulatory objectives and oversight powers
Insolvency practitioner regulation regulatory objectives and oversight powers Legislative changes introduced on 1 October 2015 December 2015 1 Contents Introduction Part 1: Overview of regulatory objectives
Relationship Manager (Banking) Assessment Plan
1. Introduction and Overview Relationship Manager (Banking) Assessment Plan The Relationship Manager (Banking) is an apprenticeship that takes 3-4 years to complete and is at a Level 6. It forms a key
Securing Information in an Outsourcing Environment (Guidance for Critical Infrastructure Providers) Executive Overview Supplement.
Securing Information in an Outsourcing Environment (Guidance for Critical Infrastructure Providers) Executive Overview Supplement June 2011 DISCLAIMER: This document is intended as a general guide only.
Making a positive difference for energy consumers. Competency Framework Band C
Making a positive difference for energy consumers Competency Framework 2 Competency framework Indicators of behaviours Strategic Cluster Setting Direction 1. Seeing the Big Picture Seeing the big picture
Procurement guidance Managing and monitoring suppliers performance
Procurement guidance Managing and monitoring suppliers performance Procurement guidance: Managing and monitoring suppliers performance Page 2 of 16 Table of contents Table of contents... 2 Purpose of the
ADAPTATION OF EMPLOYEES IN THE ORGANIZATION AND ITS IMPORTANCE IN TERMS OF HUMAN RESOURCE MANAGEMENT
114 Management and Economics ADAPTATION OF EMPLOYEES IN THE ORGANIZATION AND ITS IMPORTANCE IN TERMS OF HUMAN RESOURCE MANAGEMENT Jaroslav NEKORANEC [email protected] Lenka NAGYOVÁ [email protected]
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission
An Introduction to. Metrics. used during. Software Development
An Introduction to Metrics used during Software Development Life Cycle www.softwaretestinggenius.com Page 1 of 10 Define the Metric Objectives You can t control what you can t measure. This is a quote
Pearson Education Limited 2003
156 Activities Activity 9.1 (PP. 357 358) [Project planning exercise] You are required to construct a project plan for the following information system development project. Your objective is to schedule
To be used in conjunction with the Invitation to Tender for Consultancy template.
GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small
Report Capital Works Procurement: The Selection of a Building Procurement Method
Report Capital Works Procurement: The Selection of a Building Procurement Method Research Project No: 2006-034-C-01 The research in this report has been carried out by Project Leader Researchers Project
Asset Management Systems Scheme (AMS Scheme)
Joint Accreditation System of Australia and New Zealand Scheme (AMS Scheme) Requirements for bodies providing audit and certification of 13 April 2015 Authority to Issue Dr James Galloway Chief Executive
Motivation Questionnaire
Motivation Questionnaire > Employee Motivation Report Name: Sample Report Date: 12 August 2009 Employee Motivation Report Introduction This report describes the factors that are likely to have an impact
GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES
GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES GENERAL CONDITIONS OF CONTRACT FOR MINOR WORKS PAGE 1 BASE D ON WA LOCAL GOVERNMENT ASSOCIATION MODEL 2010 TABLE OF CONTENTS 1 INTERPRETATION 2 RISE
Steel procurement in major projects: Guidance on the application of social issues. Purpose
Steel procurement in major projects: Guidance on the application of social issues Purpose 1. This is a practical guide on how to incorporate social issues in major projects with a significant steel component.
Construction Contracts
Compiled Accounting Standard AASB 111 Construction Contracts This compiled Standard applies to annual reporting periods beginning on or after 1 January 2009 that end on or after 30 June 2009. Early application
Applications and Benefits of Ethnographic Research
Hitachi Review Vol. 62 (2013), No. 6 317 Applications and Benefits of Ethnographic Research Case Study of Management System Upgrade for Power Plant Construction Site Takafumi Kawasaki Masaki Takano Kazuaki
A Review of the Integration of Brokerage Services in the South West
A Review of the Integration of Brokerage Services in the South West EXECUTIVE SUMMARY This report presents the findings of the research study, A Review of the Integration of Brokerage Services in the South
White paper. Corrective action: The closed-loop system
White paper Corrective action: The closed-loop system Contents Summary How corrective action works The steps 1 - Identify non-conformities - Opening a corrective action 6 - Responding to a corrective action
DAVID THOMAS LTD GUIDE TO COMPANY INSOLVENCY
DAVID THOMAS LTD GUIDE TO COMPANY INSOLVENCY Ver 1 Feb 2015 Phone : 09-215-6893 07-576-8832 021-124-6689 Email: [email protected] Introduction Welcome to our guide to liquidations. This guide is
Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) 7917134922 E-Mail: [email protected].
Edwin Lindsay Principal Consultant, Tel: + 44 (0) 7917134922 E-Mail: [email protected] Corrective and Preventative Action (CAPA) is a system of quality procedures required to eliminate the causes
Information Management Advice 35: Implementing Information Security Part 1: A Step by Step Approach to your Agency Project
Information Management Advice 35: Implementing Information Security Part 1: A Step by Step Approach to your Agency Project Introduction This Advice provides an overview of the steps agencies need to take
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1
Challenges of Intercultural Management: Change implementation in the context of national culture
12-ICIT 9-11/4/07 in RoC Going for Gold ~ Best Practices in Ed. & Public Paper #: 07-08 Page- 1 /7 Challenges of Intercultural Management: Change implementation in the context of national culture Prof.
MDB Harmonised Particular Conditions
FIDIC Plant and Design-Build Contract MDB Harmonised Particular Conditions 1. Introduction There is a need for FIDIC to provide sample Particular Conditions that render the General Conditions of the 1st
A Guide to Renovation and Repair Contract Warranties
A Guide to Renovation and Repair Contract Warranties By Gerald A. Dalrymple, PE A fter being retained to review the merits of several major disputes involving the scope of warranties in renovation and
Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF)
Management and Leadership Level 5 NVQ Diploma in Management and Leadership (QCF) 2014 Skills CFA Level 5 NVQ Diploma in Management and Leadership (QCF) Page 1 Level 5 NVQ Diploma in Management and Leadership
Topic 1 Introduction. to the Fundamentals of Project Management INTRODUCTION LEARNING OUTCOMES
Topic 1 Introduction to the Fundamentals of Project Management LEARNING OUTCOMES By the end of this topic, you should be able to: 1. Describe the nature of projects; 2. Identify the project life cycle;
Chapter 4 Section 2 - Emergency Excavation Permit Administration Procedure
Chapter 4 Section 2 - Emergency Excavation Permit Administration Procedure 1.0 Introduction 1.1 Under section 10C of the Land (Miscellaneous Provisions) Ordinance (LMPO), the Director of Highways (DHy)
Investors in People First Assessment Report
Investors in People First Assessment Report K.H.Construction Cambridge Assessor: Lesley E Ling On-site Date/s: 3 rd September 2008. Recognition Date: Contents 1. Introduction Page 2 2. Assessment and Client