1 IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of a submission and further submissions by MIGHTY RIVER POWER LIMITED in respect of the PROPOSED WAIKATO REGIONAL POLICY STATEMENT STATEMENT OF EVIDENCE OF FRASER SCOTT WHINERAY

2 1. INTRODUCTION 1.1 My name is Fraser Scott Whineray. I am the General Manager Operations for Mighty River Power Limited ( Mighty River Power or the Company ) and have been with Mighty River Power since October As General Manager Operations I have overall responsibility for Mighty River Power s generation assets (geothermal, thermal, hydro) and their interface with the wholesale electricity market and transmission into the national grid. In terms of the generation assets in the Waikato Region, I have overall responsibility for the management, operation, and maintenance of the Waikato Hydro Scheme and the Company s geothermal assets whether wholly or partly owned (Rotokawa, Nga Awa Purua and Mokai). 1.3 Prior to working for Mighty River Power, I worked for Carter Holt Harvey Limited as Director Operational Improvement. Earlier in my career I have held a number of senior positions in the dairy industry and spent five years with Credit Suisse First Boston in New Zealand and abroad. 1.4 I hold a Bachelor of Chemical and Process Engineering from the University of Canterbury, a Postgraduate Diploma in dairy science and technology from Massey University, and a Master of Business Administration from Cambridge University. I am a member of the Institute of Directors in New Zealand and a non-executive Director of Opus International Consultants. 1.5 I am presenting this statement of evidence on behalf of Mighty River Power 1.6 The purpose of my evidence is to introduce Mighty River Power and to provide context to its submissions and evidence to the Waikato Regional Council's Proposed Regional Policy Statement (Proposed RPS). 1.7 Specifically, in my evidence I will: (a) (b) (c) provide a brief overview of Mighty River Power; describe the scale of the electricity generation activities undertaken by Mighty River Power in the Waikato Region; illustrate the importance of electricity to society and the value placed on a Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 2

3 reliable supply of electricity; (d) (e) (f) describe the utilisation of renewable energy resources for electricity generation in the region; explain how the Waikato Hydro Scheme has shaped the Waikato River valley as we know it today; and outline the history and the role that the Waikato Hydro Scheme and the geothermal power stations have played in the Waikato regional community and economy and for the country as a whole. 2. MIGHTY RIVER POWER LIMITED 2.1 Mighty River Power is a State-Owned Enterprise and has the statutory objective of being a successful business that exercises corporate responsibility 1 and leadership in sustainable management and in the utilisation of natural, physical and renewable resources Mighty River Power is the fourth largest electricity generator in New Zealand and the third largest retailer (based on customer numbers), selling electricity through its retail business Mercury Energy. As a major electricity generator, Mighty River Power has an important role in providing a sustainable and secure energy supply to its customers. This is achieved through a diverse and expanding portfolio of generation assets throughout the North Island which in 2011 produced 6,833 giga watt hours (GWh), representing approximately 17.5% of New Zealand s current electricity needs. 3 During the 2011 financial year the Company generated 96% of its electricity from renewable hydro and geothermal resources, 4 with most of this generation located in the Waikato Region. 2.3 Mighty River Power is a significant participant in New Zealand s electricity sector. It has an expanding portfolio of generation assets, with the Waikato Hydro Scheme representing the majority of its generation production. There has been steady growth in its geothermal capacity which now represents 1 Section 4, State Owned Enterprise Act Mighty River Power Statement of Corporate Intent. 3 Mighty River Power Limited Annual Report 2011, p18. 4 Ibid, p2. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 3

4 approximately 30 percent of the company s generation capacity. The Company s generation assets play pivotal roles in terms of both contributing to meeting national electricity demand and to maintaining the security of supply. 2.4 Mighty River Power s generation assets encompass hydro, geothermal and thermal (gas) power stations as follows: Renewable Electricity Generation Assets (a) (b) (c) (d) (e) The Waikato Hydro Scheme has eight dams and nine power stations (with a total of thirty-nine generating units) with a total rated dependable capacity of approximately 1048 megawatts. Lake Taupo storage is an integral part of the scheme. There is a 34 MW wholly owned geothermal power station at Rotokawa near Taupo and a 140 MW geothermal power station also located at Rotokawa and named Nga Awa Purua which is 75% owned by Mighty River Power and 25% owned by Tauhara North No 2 Trust. It was opened in May A 25% shareholding in the geothermal power station at Mokai near Taupo. The Tuaropaki Trust has the remaining 75% ownership of the plant and Mighty River Power also operates the station. A 106MW wholly owned geothermal power station at Kawerau. Exploration geothermal wells have been drilled at Ngatamariki and the Company has obtained resource consents and is building a further 80 MW geothermal development on the Ngatamariki geothermal field. 2.5 In addition, the Company has obtained consents for a wind energy project for the Turitea wind farm on the Tararua Ranges, Palmerston North and is about to commence consent hearings for a proposed wind farm at Puketoi in the Manawatu-Wanganui region. 2.6 Together, Mighty River Power s Waikato Hydro Scheme and geothermal power stations can generate on average 6,200 GWh of electricity each year or about 16% of the country s required electricity at current demand levels. For the period July 1992 to June 2009 annual generation from the Waikato Hydro Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 4

5 Scheme averaged 4,000GWh. 5 This is all renewable energy supporting the Government s target of 90% renewable generation by 2025 as outlined in the Government s New Zealand Energy Strategy Thermal Generation Assets 2.7 Mighty River Power s non-renewable generation portfolio consists of a 175 MW gas fired cogeneration plant at Southdown, Auckland. 2.8 Figure 1 below shows the location of each of Mighty River Power s generation assets as well as the site of the Company s current geothermal development project at Ngatamariki. Figure 1 Location of Mighty River Power s Generation Assets and Future Geothermal Development Site 5 Mighty River Power Limited Annual Report 2011, p19. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 5

6 3. THE IMPORTANCE OF ELECTRICITY 3.1 Electricity is an essential non-substitutable commodity in any modern economy. New Zealand s economic and social wellbeing are inextricably dependent on a secure and cost effective electricity supply system. This is also the case in every other developed country. 3.2 The remote geographic location of New Zealand results in the need for the electricity system to be self reliant and the methods of generation to be diverse and stable. It is not economically or technically viable to source electricity from other countries. 3.3 There are substitute products for some uses (for example gas for heating and cooking) but for many others (for example home appliances and industrial machinery) there is no practical alternative to electricity. The vast majority of economic activity is dependent on an adequate supply of domestically produced electricity. 3.4 Historically New Zealanders have benefited from relatively low electricity prices due to the dominance of low variable cost hydro generation and the abundance of cheap natural gas (primarily from the now depleting Maui gas field) to run various thermal plants. 3.5 New Zealand has a substantial renewable hydro-electricity generation base 6 upon which it relies for solid support to the electricity system thereby underpinning our primary sector industries and at the same time delivering environmental benefits. 3.6 The Waikato region is rich in energy resources with major resources in hydro, geothermal and coal. The region is the country s premier electricity province with almost 40% of installed generation capacity and the potential to generate up to 50% of New Zealand s total electricity when required. Energy is a master resource a fundamental driver of economic prosperity, both within the Waikato region and around the world. 7 6 The Ministry for Economic Development recorded in September 2011 that hydro met 53.3% of the national demand for electricity and geothermal 12.2% 7 Waikato Regional Energy Forum Waikato Regional Energy Strategy, p5. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 6

7 3.7 So the Waikato Hydro Scheme plays a fundamental role in ensuring security of supply for the region and nation as well as shaping the contribution electricity makes to the regional economy. 4. SECURITY OF ELECTRICITY SUPPLY 4.1 Security of electricity supply is crucial when considering the current and future status of the electricity market and can be grouped into the following: (a) (b) (c) Generation capacity - Ensuring generation capacity satisfies current and future electricity demand. Diversity of supply - Ensuring an appropriate balance of generation capacity across fuel options in order to operate an economically efficient electricity system. Diversity reduces exposure to energy supply disruptions or price shocks that are associated with fossil fuels. Reliability of supply - Ensuring consistent and secure access to various fuel types water, gas, geothermal fluids and coal. Ability to store fuel is important in this regard to cover risks from fluctuations in fuel supply and electricity demand. 4.2 Security of supply will be maintained in New Zealand by ensuring; all available plant is operational, maintaining a sufficient pipeline of new generation to meet future demand, and to replace retired plant that has become uneconomic or technologically obsolete (e.g. Marsden B Power Station at Marsden Point, Whangarei). In this way the generation profile remains diverse with a mix of renewable and thermal plant to react to climatic and economic conditions. 4.3 Like all equipment, turbines and generators have downtime, both planned maintenance and unplanned outages, which must be undertaken with consideration of other generating plants and transmission infrastructure throughout the country for national system security to be maintained. 4.4 The Waikato Region is strategically located adjacent to New Zealand s highest electricity demand centres and where much of the country s electricity demand growth is anticipated. Central North Island geothermal and hydro generation is well placed to supply these demand centres with the added benefit of reduced Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 7

8 transmission losses and risks and enhanced supply security. Geothermal energy provides reliable baseload generation as it is not weather dependent. As well, the inherent capacity of hydro to start or stop producing energy within minutes further strengthens the importance of its location close to demand centres with fluctuating load profiles and the ability to cover other large plant failures and/or failures in power or gas transmission. Lake Taupo is the only significant hydro storage reservoir in the North Island. 4.5 The importance of Lake Taupo and the Waikato Hydro System to national security of supply was particularly demonstrated during early 2008 and In 2008 outages in the Cook Strait cable and thermal power stations 8 around the country meant that generation from the Waikato Hydro Scheme responded to national demand, during a period of drought. The additional use of the water from Lake Taupo coupled with low in-flows combined to bring the lake to near minimum operating range. Once Waikato Hydro Scheme storage fell to low levels, national demand had to be satisfied from thermal generation. A similar situation has arisen this year given low inflow into South Island Hydro lakes resulting in a greater reliance on North Island hydro and thermal generation. 4.6 It is essential to the provision of a secure supply of electricity for the New Zealand economy that all generation, particularly our hydro resources, remain available, not only because this provides one of the least cost methods of generating electricity, but because it reduces the need to burn fossil fuels which result in much higher national carbon emissions. 5. THE WAIKATO HYDRO SCHEME 5.1 At 425 km, the Waikato River is the longest river in New Zealand with a large and natural catchment area of approximately 14,443km². The catchment of the Waikato Hydro Scheme includes the diversions associated with the Tongariro Power Scheme, which adds another 654km 2 to the overall Waikato catchment and increases the Waikato River flow by approximately 19%, at the Taupo Control Gates. 9 8 Such as coal, gas and oil fired generation plants. 9 Evidence of Dr Ross Woods for the Waikato Regional Council to the Environment Court Hearing on Variation 6 Water Allocation to the operative Waikato Regional Plan. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 8

9 5.2 The Waikato River flows from an elevation of 357 m at the Lake Taupo Control Gates to 22 m at the base of Karapiro Power Station, a difference of 335 m over a distance of 186 km or a falling average gradient of just over 0.2%. Between Hamilton and the outlet of Port Waikato, the average gradient is 0.01% (one metre fall in each 10,000 metres). This is illustrated in Figure 2 below which shows the profile of the Waikato River between Lake Taupo, to Karapiro and Port Waikato. Figure 2 Waikato Hydro Scheme Long Section 5.3 The damming of the Waikato River in various locations has provided some control over the discharge from Lake Taupo and formed eight long, narrow reservoirs in each of the flooded river valleys, although the upper part of the river between Lake Taupo and Lake Ohakuri remains largely riverine. For all power stations between Ohakuri and Karapiro the tailrace of the upstream dam is the headwaters of the downstream reservoir, and as a result there are no riverine sections left in that portion of the river, as shown in Figure 2 above. 5.4 I will now describe the scale of the infrastructure that makes up the Waikato Hydro Scheme running from Lake Taupo down to the Karapiro Dam. : (a) The Taupo Gates structure is made up of six vertical concrete gates each able to be operated independently of each other. The gates are controlled Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 9

10 remotely from Mighty River Power s Hamilton office as are all hydraulic gates and generators for the power stations which make up the Scheme. The lifting mechanisms for the gates are located in the median strip under State Highway 1 which passes over the gates structure (as shown below). There is also an historic wooden building which houses control and automation equipment as well as an emergency generator. Taupo Control Gates, Taupo, New Zealand; Mighty River Power Image Library (b) Aratiatia is the first power station in the Scheme downstream of Taupo Gates and was constructed between 1959 and At the power station, water is passed through a tunnel and then into a surge tank. The surge tank has the ability to hold eighteen million litres of water. From the tank, three steel penstocks move the water to the three turbines which then drive generators to produce electricity. Due to the small reservoir storage capacity at Aratiatia, water is only stored for a short period of time before it is released. There are also timed releases to enable tourists to view the Aratiatia Rapids, regarded as one of the Waikato River s outstanding scenic features attracting over 60,000 visitors per year. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 10

11 Aratiatia Rapids, Taupo, New Zealand; Mighty River Power Image Library Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 11

12 (c) Ohakuri is an earth dam with concrete gravity sections for the intake and spill structures. Built between 1956 and 1961, the power station is located below the dam and contains four turbines which move water to the generators to produce electricity. Ohakuri Dam and Power Station, Ohakuri, New Zealand; Mighty River Power Image Library (d) Atiamuri was the fifth dam to be built in the Waikato Hydro Scheme between 1953 and The dam has both concrete and earth gravity sections with four steel penstocks being used to move water from the dam to the turbines. The concrete section of the dam comprises about 118,000 cubic metres of concrete and the earth dam section comprises about 312,000 cubic metres of material. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 12

13 Atiamuri Power Station, Atiamuri, New Zealand; Mighty River Power Image Library (e) The Whakamaru dam and power station was constructed between 1949 and Whakamaru is a concrete and earth gravity dam which relies on its bulk to hold back the water behind it. The dam comprises 270,000 cubic metres of concrete, 1000 tonnes of reinforcing steel and about 69,000 cubic metres of spoil which makes up the earth dam. The power house is located directly below the dam and is fed water by four steel penstocks which take the water to the turbines. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 13

14 Whakamaru Dam and Power Station, Whakamaru, New Zealand; Mighty River Power Image Library (f) Maraetai has two power stations. Operationally these stations are regarded as a single unit. The concrete arch dam spans the Waikato River gorge and has the Maraetai I power station (constructed between 1946 and 1953) located directly below it. This power station goes across the entire length of the dam with five intake gates being located below the surface water to allow water through the steel penstocks and into the turbines. A long canal directs water from Lake Maraetai to Maraetai II power station (constructed between 1959 and 1961) which is located half a kilometre from the first power station on the left river bank. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 14

15 Maraetai Dam and Power Stations, Maraetai, New Zealand; Mighty River Power Image Library (g) Waipapa was the sixth dam built in the Waikato Hydro Scheme (between 1955 and 1961) and is made up of an earth gravity dam. The dam has three concrete penstocks incorporated in it which moves the water into the powerhouse and turbines before discharging the water back into the Waikato River. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 15

16 Waipapa Power Station, Waipapa, New Zealand; Mighty River Power Image Library (h) The Arapuni power station was the first government built and oldest hydroelectric station on the Waikato River. The power house and swing bridge are protected under the Historic Places Act The power house is made of reinforced concrete and is home to eight generators. The Arapuni dam is a concrete gravity arch dam which diverts the Waikato River through eight steel penstocks into the power station which are located at the base of the gorge. A road runs across the dam structure. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 16

17 Arapuni Dam and Power Station, Arapuni, New Zealand; Mighty River Power Image Library Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 17

18 (i) Karapiro was the second dam to be built on the Waikato River between 1940 and 1947 and is the last dam and power station in the Waikato Hydro Scheme. The dam is a concrete arch dam which has a single lane, public road on top. The power station is located below the dam on the right hand side. There are three steel penstocks which convey the water from Lake Karapiro to the turbines in the power station. The building of the dam created Lake Karapiro which is a world renowned rowing venue and is used for a variety of other recreational uses such as waka ama and power boats. Karapiro Dam and Power Station, Karapiro, New Zealand; Mighty River Power Image Library In 1992, the trapping and transferring of young eels (elvers) commenced at Karapiro Dam because this was the furthest upstream eels in the Waikato River were able to reach following construction of the Waikato Hydro Scheme. The program enables eels to be transferred into all the hydro lakes except Aratiatia and has created a sustainable commercial and customary fishery. In addition, Mighty River Power is voluntarily undertaking a downstream eel migration research project at Karapiro Dam. This project aims to provide a means for safe migration for adult eels from Lake Karapiro into the lower Waikato River. The challenge to find a practical solution to the Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 18

19 issue of allowing downstream migrating eels past Hydro dams is an international one. 5.2 The details of the Waikato Hydro Scheme are set out in Table 1 below, which illustrates the benefits of the significant change in storage capacity for the Waikato Hydro Scheme with the addition of the Taupo Control Gates. Lake Taupo working storage is 855 million m 3 compared to total river storage capacity of approximately 71 million m 3, which equates to 92% and 8% respectively. 5.3 I note that although the operating storage capacity of the system may seem large, the storage range of 1.4 metres is small relative to the inflows and outflows from Lake Taupo which means the storage volume of Lake Taupo turns over every 4.3 weeks on average. To explain this another way, storage is very limited relative to the power generation output of the hydro scheme. Almost all of the water that passes through the system is used for generation to meet New Zealand s electricity demand. Table 1 - Waikato Hydro Scheme Information Taupo Gates Aratiatia Ohakuri Atiamuri Whakamaru Maraetai Waipapa Arapuni Karapiro Total Commissioned No No Generation units None 3x31MW 4x28MW 4x21MW 4x25MW 10x36MW 3x18MW 4x21MW 4x21.6MW 3x36MW GWh per year N/A ,002 Operating storage capacity* million m 3 Dependable Capacity (2011) ,048 Replacement Value 2011 in NZ$ million No No *Based on normal operating ranges , The water flow and generation output of the Waikato Hydro Scheme is augmented by the Tongariro Power Scheme, which uses diverted and natural catchment water flows to generate up to 360 MW and the diversion water then provides an additional 30m 3 /s to be used down the Waikato Hydro Scheme. 10 Excluding Taupo. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 19

20 5.5 The Waikato Hydro Scheme infrastructure has largely been in place for over 70 years and is now embedded in the natural landscape providing a range of ecological, social and economic benefits to the region and the country. The basic infrastructure has a long life expectancy and has had significant financial investment put into it to keep it operating safely and to enhance efficiency. That investment is planned to continue over the next decade at a cost of about $500m. 5.6 Associated with the dams and power stations are settlements that were established during construction and became permanent towns to accommodate operational staff for the Scheme. Some of these villages remain (such as Whakamaru, Mangakino, Atiamuri and Wairakei) and function as local lakeside communities and some have become well known as tourist attractions and sporting venues (such as Karapiro). Other towns, such as Waipapa and Maraetai no longer exist. Operation of the stations which make up the Waikato Hydro Scheme is now carried out using telecommunication networks from the Hamilton or Auckland office Control centres 5.7 Table 2 below shows the surface area, total volume and storage volume of Lake Taupo and the Waikato Hydro Lakes. These figures are based on 2001 operating levels. The lakes, with the exception of Lake Taupo, have been created through the Waikato Hydro Scheme. Each of the Waikato Hydro Scheme s eight dams has resulted in the establishment of lake environments which have become integrated into the ecology of the catchments and which today support a wide range of recreational activities and commercial enterprises. The reservoirs, dams and powerhouses have become an accepted part of the landscape associated with the river and the activities that occur on and around it. Table 2 Information concerning Lake Taupo and the Waikato Hydro Lakes 11 Lake Area (km 2 ) Lake Area (km 2 ) Taupo 611 Maraetai 4.1 Aratiatia 0.6 Waipapa 1.5 Ohakuri 13.7 Arapuni 9.4 Atiamuri 2.4 Karapiro 7.6 Whakamaru Mighty River Power (2001) Taupo Waikato Resource Consents Application and Assessment of Environmental Effects. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 20

21 5.8 The construction of the dams and lakes has extended access to the river for the surrounding communities which have heightened the amenity value of the Region for activities such as boating, fishing, hunting, tramping, rowing and other sporting and recreational activities. The wetland habitats that are now established at the lake margins are of great biodiversity benefit to the river and surrounding areas. Such values can be maintained because use of the water for generation does not typically peak at low flow times of the year unlike other uses such as summer pasture irrigation. 5.9 In my view it is very unlikely that the removal of the Waikato Hydro Scheme would be justified within the next century as to do so would: (c) (d) (e) negatively impact on the reliability of electricity supply for both the Waikato Region and the nation as a whole; drastically alter the environment which has grown both within and on the margins of the Waikato River; negate the significant investment that has occurred and continues to occur to ensure the safe and efficient operation of the Waikato Hydro Scheme. 6. THE HISTORY OF THE WAIKATO HYDRO SCHEME 6.1 The hydro potential of the Waikato River was recognised in the early 1900s, and plans were drawn up from about 1935 onward for the development of the river for hydro-electricity generation. 12 This development was undertaken by the Governments of the day to meet the economic and social needs of a growing, increasingly electricity dependent society particularly in the years immediately following World War Two. 6.2 Leading up to World War Two there were considerable electricity shortages experienced throughout New Zealand, as demand grew due to a number of factors including expansion in the dairy industry and the introduction of electric milking machines, and the intensification of general commercial and residential electricity use. 12 Martin J E (Ed.) (1998) People, Politics and Power Stations - Electric Power Generation in NZ (2nd Edition) (Electricity Corporation of New Zealand, Wellington). Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 21

22 Powerhouse camouflage during World War II, Photo 5933; Mighty River Power Archives 6.3 The first power station on the Waikato River was the privately built Horahora Power Station, (commissioned in 1913), with a capacity to generate 6.3 MW, to supply electricity to the gold mining activities in Waihi. The picture below illustrates what this reach of the Waikato River looked like before the Horahora dam was built. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 22

23 24 August 1905; Sir George Grey Special Collections, Auckland Libraries, AWNS The project was a run of river generator with no controllable storage. By 1925 it had been taken over by the Government and expanded to a total output of 10.3 MW. However with population growth and the developing economy demanding more electricity, a larger scale development and better utilisation of the hydro potential on the Waikato River was required. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 23

24 Karapiro Dam with Lake Karapiro behind and Karapiro Village to the left, Karapiro, New Zealand; Mighty River Power Image Library 6.5 The Waikato Hydro Scheme that we see today is operated in a closely integrated manner to maximise the value, in terms of electricity generation, to be gained from the available fall between Taupo and Cambridge. 6.6 One of the key components of the operation of the Waikato Hydro Scheme is the existence of the Taupo Control Gates commissioned in In constructing the Taupo Control Gates a new channel was cut for the river and the gates structure installed. This channel and gates arrangement has a hydraulic capacity of approximately 300m 3 /s, depending on the level of Lake Taupo, which is significantly greater than the natural channel maximum flow rate of some 200 m 3 /s. This has resulted in a much greater degree of flexibility for the whole Waikato Hydro Scheme than would have been possible had the natural outlet for Lake Taupo been retained. This increased outlet volume also helps to mitigate the impacts of naturally occurring high flow events. Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 24

25 6.7 The role of the Waikato Hydro Scheme in meeting New Zealand s electricity demands has varied over time. Up until the late 1950s the Scheme was responsible for most power generation in the North Island, providing a mix of base load and peak generation depending on consumer demand. As thermal capacity was added and the Cook Strait cable installed the role of the Waikato Hydro Scheme changed to less of a base load characteristic and to an increased peaking and load responding role to meet increasing demand. The output of the Scheme has been dominated by catchment inflows and by the availability of water in storage (principally Lake Taupo). 6.8 The roles played by the Waikato Hydro Scheme in the past illustrate the flexibility of the Scheme to adapt to a range of future roles within the electricity market dependent upon the generation mix of the day. The Scheme has been used to complement the generation mix by utilising the storage available and the responsive generation capacity for both long time periods resulting from mismatched demand and capacity or over short time periods to respond to various constraints in the overall system capacity. 7. GEOTHERMAL ELECTRICITY GENERATION 7.1 As previously noted, Mighty River Power either wholly owns, or owns in conjunction with Maori Land Trusts, and operates a number of geothermal power stations in the Waikato region. The Company generally supports the geothermal provisions outlined in Chapter 9 of the Proposed Regional Policy Statement as they promote the sustainable utilisation of the Regional Geothermal Resource in an appropriate way. 7.2 I will now provide an outline of the existing geothermal power stations which utilise the renewable energy resources of the Rotokawa and Mokai Development Geothermal Systems, and an overview of the construction work being undertaken on the Ngatamariki Development Geothermal System. Rotokawa and Nga Awa Purua 7.3 The Rotokawa geothermal system is located about 14 km northeast of Taupo and 9 km east of Wairakei. The associated thermal area has a number of geothermal surface features. The energy potential of the Rotokawa geothermal Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 25

26 system was recognised in the early 1950s and drilling has identified a large high-temperature resource of about 18 km 2 with an energy potential assessed as 300 MW. 7.4 Geothermal energy production is from wells drilled to a depth of around 2.0 to 2.5 km, with temperatures up to 320 C, and fluid is reinjected in separate wells at depths of 2.5 to 3.1 km. Some 33 wells have been drilled at Rotokawa and currently 12 are operating as production wells and 8 as injection wells. 13 Production wells are located outside of the power station enclosure, with steam gathering systems conveying two phase fluids to the power stations. 7.5 A 25 MW power station was commissioned at Rotokawa in 1997 and subsequently expanded to 34 MW in Annual generation is about 270 GWh which provides electricity for up to 35,000 residential homes. 7.6 Nga Awa Purua power station is New Zealand's second largest geothermal power station and is also located in the Rotokawa Geothermal Field. Nga Awa Purua has three stages of steam separation and is therefore referred to as a triple flash plant. At the time of installation, Nga Awa Purua, at an approximate nominal 140MW net output, had the largest single shaft geothermal turbine of any flash plant in the world. 7.7 The power station is a joint venture between Mighty River Power (75%) and the Tauhara North No 2 Trust (25%). The $430 million project first generated electricity on 18 January 2010, and was officially opened by Prime Minister John Key on 15 May It provides electricity for up to 140,000 residential homes (which is greater than the number of homes in the urban areas of both Napier and Hastings with some electricity left over). 7.8 The combined dependable capacity of the Nga Awa Purua and Rotokawa power stations is 173MW. Power is transmitted from the Rotokawa power station to a 33kV line connecting to the Trust Power network at the Centennial Drive substation. The Rotokawa station is also connected to the Transpower substation located adjacent to the Nga Awa Purua power station providing a connection from both power stations to the National Grid 220kV lines. Work is 13 Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 26

27 currently underway to construct the Nga Tamariki power station switch yard in this location also. Nga Awa Pura, Taupo; Mighty River Power Image Library Mokai 7.9 The Mokai power station was commissioned in 2000 and is located on the Mokai geothermal field, 30km northwest of Taupo. The power station was the first in New Zealand to be fully owned by a Maori trust (the Tuaropaki Trust which subsequently placed its assets in the Tuaropaki Power Company). Mighty River Power is contracted to operate and maintain the geothermal power station which had an initial installed capacity of 56 MW Mighty River Power holds a 25% share in Tuaropaki Power Company. A 39 MW expansion of similar design was commissioned in A further 17 MW binary plant extension was installed at the station in 2007 to take account of the changing steam/water ratios from production wells to bring the plant to a Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 27

28 dependable capacity 113MW output. Annual generation is about 930 GWh and provides electricity for up to 110,000 residential homes. Ngatamariki 7.11 Ngatamariki is a proposed geothermal power station being developed by Mighty River Power in conjunction with Tauhara North No.2 Trust. It is located approximately 17 km north east of Taupo and is expected to cost $466 million and is currently under construction. To date 11 wells have been drilled on the system. It has a planned capacity of 82MW and is expected to be completed by mid Ngatamariki under construction, Taupo; Mighty River Power Image Library Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 28

29 8. SUMMARY AND CONCLUSION 8.1 Electricity is an essential non-substitutable commodity. 8.2 New Zealand s economic and social wellbeing are inextricably dependent on a reliable and secure supply of electricity. 8.3 Generation assets located in the central North Island are strategically located to meet existing and future demand in the upper North Island where population and economic activity is greatest. 8.4 Geothermal and hydro generation operated by Mighty River Power contributes on average 6200 GWh or electricity supply annually representing 16% of the Country s requirements making an on-going contribution to the national target of 90% renewable generation by Geothermal generation is reliable baseload generation while hydro is particularly flexible and adaptable to changing supply and demand conditions. 8.6 Power development in the Waikato Region has played a foundational role in the establishment of communities and regional economy. Hydro reservoirs in particular provide nationally recognised amenities including recreation and sporting activities. 8.7 It is unrealistic to formulate policy for the Waikato Catchment without broad recognition of the Waikato Hydro Scheme. I have described the scale of the infrastructure involved and the way in which the scheme shapes the water bodies and landscapes that now form the Waikato Valley as it is known today. Fraser Whineray 19 March 2012 Evidence of Fraser Whineray for the Proposed Waikato RPS Hearings Page 29

5 Generation assumptions

5 Generation assumptions 5 Generation assumptions 5.1 Introduction 5.2 Generation assumptions 5.3 Use of the generation assumptions 5.1 Introduction This chapter sets out the planning assumptions used to forecast future electricity

More information

ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource

ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource NEW PO Box 11-595 ZEALAND GEOTHERMAL Tel: 64-9-474 2187 ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource Current Status, Costs and Advantages of Geothermal East

More information

Disclaimer. This presentation does not constitute financial advice.

Disclaimer. This presentation does not constitute financial advice. Page 1 Mighty River Power Interim Results 2012 Disclaimer The information in this presentation was prepared by Mighty River Power Limited with due care and attention with every effort made to ensure its

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand Journal of Hydrology (NZ) 44 (2): 131-135, 2005 New Zealand Hydrological Society (2005) NOTE Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand W. E. Bardsley Department

More information

12 ENERGY. 12.1 Introduction

12 ENERGY. 12.1 Introduction 12 Energy 12.1 Introduction Otago is a hydro-electric power producing region and a major exporter of electricity in New Zealand today. The two large existing hydro-electric schemes in the region, Roxburgh

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information

Manage water resources for on site hydro-electricity generation

Manage water resources for on site hydro-electricity generation Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system

Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system Solar PV panels fitted to roofs Yearly cost of production Cost per kwh 12.5p Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system 430 per system Solar energy can be

More information

23 November 2011. Contact Energy Geothermal update November 2011

23 November 2011. Contact Energy Geothermal update November 2011 Contact Energy Geothermal update November 2011 Disclaimer This presentation may contain projections or forward looking statements regarding a variety of items. Such forward-looking statements are based

More information

GEOTHERMAL ENERGY THE OPPORTUNITY

GEOTHERMAL ENERGY THE OPPORTUNITY GEOTHERMAL ENERGY THE OPPORTUNITY Foreword New Zealand has a long and successful history in the development of geothermal resources. The earliest installation at Wairakei reflected the first such project

More information

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros: P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation

More information

23.1 RENEWABLE ENERGY

23.1 RENEWABLE ENERGY Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.

More information

Genesis Energy s customer focused strategy is delivering on business performance

Genesis Energy s customer focused strategy is delivering on business performance Genesis Energy s customer focused strategy is delivering on business performance INTRODUCTION This disclosure includes market and operational information for Genesis Power Limited, trading as Genesis Energy,

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site

Developing Ocean Energy in Ireland. Belmullet Wave Energy Test Site Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn

More information

Benefits of Geothermal Energy By Dr. Silas Simiyu

Benefits of Geothermal Energy By Dr. Silas Simiyu Benefits of Geothermal Energy By Dr. Silas Simiyu Introduction Geo means Thermal means Intoduction The Earth Crust Mantle Outer core Inner core Is renewable and sustainable Reservoir managed well (Re-injection)

More information

Station #1 Interpreting Infographs

Station #1 Interpreting Infographs Energy Resources Stations Activity Page # 1 Station #1 Interpreting Infographs 1. Identify and explain each of the energy sources (5) illustrated in the infograph. 2. What do the white and black circles

More information

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling

More information

RESPONSE TO PUB ORDER 117/06. PUB Order 117/06 Directive 6

RESPONSE TO PUB ORDER 117/06. PUB Order 117/06 Directive 6 RESPONSE TO PUB ORDER 117/06 PUB Order 117/06 Directive 6 6. Manitoba Hydro shall file a General Rate Application for the fiscal years 2007/08 and 2008/09 by no later than August 1, 2007 which shall include

More information

A Resource Guide to In State Hydropower Production

A Resource Guide to In State Hydropower Production A Resource Guide to In State Hydropower Production Thursday, October 11, 2007 Fairfax, VT Hydro Facility Owned & Operated by CVPS Published by: Winooski, VT Winooski One Hydro Electric Facility Introduction

More information

Sample Micro Hydro Initial Report

Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.

More information

12.5: Generating Current Electricity pg. 518

12.5: Generating Current Electricity pg. 518 12.5: Generating Current Electricity pg. 518 Key Concepts: 1. Electrical energy is produced by energy transformations. 2. Electrical energy is produced from renewable and non-renewable resources. 4. Electrical

More information

4 Water supply description

4 Water supply description 4 Water supply description A description of the drinking-water system is equally applicable to large utilities with piped distribution systems, piped and non-piped community supplies, including handpumps

More information

Develop new energy products. Encourage low carbon development. Build knowledge,

Develop new energy products. Encourage low carbon development. Build knowledge, KAWERAU DISTRICT COUNCIL Economic 2011 to 2014 Kawerau District Council recognises that the town s industrial base is its foundation, and supports its expansion. To this end the Council has an operative

More information

Revised Government Policy Statement on Electricity Governance

Revised Government Policy Statement on Electricity Governance Microsoft House 3-11 Hunter Street PO Box 1925 Wellington 6001 New Zealand 8 October 2003 Tel: 04 496-6555 Fax: 04 496-6550 www.businessnz.org.nz Mr Ross Milner Resources and Networks Branch Ministry for

More information

EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA

EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA EVALUATION OF GEOTHERMAL ENERGY AS HEAT SOURCE OF DISTRICT HEATING SYSTEMS IN TIANJIN, CHINA Jingyu Zhang, Xiaoti Jiang, Jun Zhou, and Jiangxiong Song Tianjin University, North China Municipal Engineering

More information

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION MULTI-DAM SYSTEMS AND THEIR OPERATION J.J. Cassidy Consulting Hydraulic and Hydrologic Engineer, Concord, California, USA Keywords: Dams, reservoirs, rivers, water storage, dam safety, floods, environment,

More information

Electricity Insight NEW ZEALAND S ENERGY OUTLOOK. Preview of key insights: Exploring the uncertainty in future electricity demand and supply

Electricity Insight NEW ZEALAND S ENERGY OUTLOOK. Preview of key insights: Exploring the uncertainty in future electricity demand and supply NEW ZEALAND S ENERGY OUTLOOK Electricity Insight Exploring the uncertainty in future electricity demand and supply Preview of key insights: Lower demand growth and excess supply should put strong downward

More information

The 500 MW Sale to WPS and the 250 MW Sale to MP as described in the Term Sheets in effect. Keeyask for a 2018/19 ISD (In-Service Date)

The 500 MW Sale to WPS and the 250 MW Sale to MP as described in the Term Sheets in effect. Keeyask for a 2018/19 ISD (In-Service Date) MANITOBA HYDRO 2009/2010 POWER RESOURCE PLAN Date: September 16, 2009 The purpose of this power resource plan is: To provide a recommended long-term development plan, and To provide an alternative long-term

More information

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : sunilfah@iitr.ernet.in

More information

Conventional Energy Sources

Conventional Energy Sources 9.2 Conventional Energy Sources Key Question: What benefits and problems come with common sources of energy? Hints The word plant here is not the kind that grows out of the ground. In this section, plants

More information

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community. www.fortisbc.

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community. www.fortisbc. Welcome to our open house Thanks for coming Please sign in and help yourself to refreshments Integrated System Plan (ISP) Looks ahead 20 years to identify the energy and infrastructure needs of our customers

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

What are the Benefits?

What are the Benefits? Micro hydro power system introduction Not everyone is lucky enough to have a source of running water near their homes. But for those with river-side homes or live-on boats, small water generators (micro-hydro

More information

Module 7 Forms of energy generation

Module 7 Forms of energy generation INTRODUCTION In rich countries like Australia, our standard of living is dependent on easily available energy. Every time you catch a bus, turn on a light or watch television energy is being used up. Over

More information

Commonly asked Question about Green Power, and Kit Carson Renewable Energy Program.

Commonly asked Question about Green Power, and Kit Carson Renewable Energy Program. Commonly asked Question about Green Power, and Kit Carson Renewable Energy Program. What is Green PowerlRenewable Energy? Some examples of green power are energy that is produced by wind, solar, biomass

More information

Energy Productivity & Pricing

Energy Productivity & Pricing Energy Productivity & Pricing Markets for energy, renewable energy and carbon Dr Jenny Riesz February 2014 2 Average electricity retail prices Electricity price rises CSIRO Future Grid (2013) Change and

More information

Case Study 5 Use of Wind Turbine Technology

Case Study 5 Use of Wind Turbine Technology Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity

More information

Bondholders Report. Six months ended 30 September 2010

Bondholders Report. Six months ended 30 September 2010 Six months ended 30 September 2010 Bondholders Report We would like to thank you for your investment in our business. We d also like for you to get to know us a bit better. This short report summarises

More information

5-Minute Refresher: RENEWABLE ENERGY

5-Minute Refresher: RENEWABLE ENERGY 5-Minute Refresher: RENEWABLE ENERGY Renewable Energy Key Ideas Renewable energy is a source of energy that can be used and replenished naturally in a relatively short period of time. Non renewable energy

More information

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last

More information

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Presented by M.M.C. Ferdinando, Secretary, Ministry of Power and Energy R.J. Gunawardana, Additional General Manager (Transmission),

More information

FACT SHEET. NEM fast facts:

FACT SHEET. NEM fast facts: (NEM) operates on one of the world s longest interconnected power systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Asian Journal on Energy and Environment

Asian Journal on Energy and Environment As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable

More information

Parliamentary Resolution

Parliamentary Resolution Parliamentary Resolution on a Strategic Regional Plan for the years 2014 2017 The Parliament of Iceland approves a resolution to instruct the Government to implement a Strategic Regional Plan for the years

More information

FACT SHEET 6: HYDRO ELECTRICITY

FACT SHEET 6: HYDRO ELECTRICITY FACT SHEET 6: HYDRO ELECTRICITY Hydro comes from the Greek word hydra, meaning water. Hydro electricity is electricity produced from the energy contained in the downhill flow of water from rivers and lakes.

More information

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)

Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO) Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential

More information

Introduction to Ontario's Physical Markets

Introduction to Ontario's Physical Markets Introduction to Ontario's Physical Markets Introduction to Ontario s Physical Markets AN IESO MARKETPLACE TRAINING PUBLICATION This document has been prepared to assist in the IESO training of market

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks.

Western Australia and the Northern Territory are not connected to the NEM, primarily due to the distance between networks. Australia has one of the world s longest alternating current (AC) systems, stretching from Port Douglas in Queensland to Port Lincoln in South Australia and across the Bass Strait to Tasmania a distance

More information

Introduction to Architecture. Lesson 13: Hoover Dam

Introduction to Architecture. Lesson 13: Hoover Dam Introduction to Architecture Lesson 13: Hoover Dam Back in 2010, my family and I flew to California and then drove to the Grand Canyon via the Hoover Dam. Named after President Herbert Hoover, the Hoover

More information

ADVANTAGES AND DISADVANTAGES OF ENERGY SOURCES. Prepared by Sandra Vasa-Sideris, PhD, Southern Polytechnic State University, for use by students

ADVANTAGES AND DISADVANTAGES OF ENERGY SOURCES. Prepared by Sandra Vasa-Sideris, PhD, Southern Polytechnic State University, for use by students ADVANTAGES AND DISADVANTAGES OF ENERGY SOURCES Prepared by Sandra Vasa-Sideris, PhD, Southern Polytechnic State University, for use by students Questions to consider Where are the nonrenewable sources

More information

Electricity Rates Forecasting:

Electricity Rates Forecasting: Electricity Rates Forecasting: Muskrat Falls Will Options: Stabilize Rates for Consumers Legal S92A, Good Faith and Regulatory Proceedings in Quebec Department of Natural Resources October 2012 Department

More information

Management discussion of financial results for the 6 months ended 31 December 2013

Management discussion of financial results for the 6 months ended 31 December 2013 Management discussion of financial results for the 6 months ended 31 December 2013 Financial results for the 6 months ended 31 December 2013 Key financial information 6 months ended 6 months ended Variance

More information

Adapting to a changing climate and energy future

Adapting to a changing climate and energy future Adapting to a changing climate and energy future Our policy position: Yarra Ranges Council acknowledges scientific advice concerning climate change and the need to mitigate and adapt to its impacts. Council

More information

Germany Energy efficiency report

Germany Energy efficiency report Germany Energy efficiency report Objectives: 231 TWh of end-user energy savings by 216 Overview 29 2-29 (% / year) Primary intensity (EU=1) 1 99 + -1.3% - CO 2 intensity (EU=1) 16 - -1.6% - CO 2 emissions

More information

petratherm Explorer and Developer of Geothermal Energy Renewable Energy 2007 Impetus for Economic Energy Market Transformation REGA Forum

petratherm Explorer and Developer of Geothermal Energy Renewable Energy 2007 Impetus for Economic Energy Market Transformation REGA Forum Renewable Energy 2007 Impetus for Economic Energy Market Transformation REGA Forum Economic Challenges for Geothermal Energy in Australia Presented By: Terry Kallis, Managing Director Explorer and Developer

More information

CIRCULAR 2009. ircular PLANNING SERIES

CIRCULAR 2009. ircular PLANNING SERIES 5 HIERARCHY CIRCULAR 2009 OF DEVELOPMENTS ircular PLANNING SERIES Scottish Planning Series CIRCULAR 5 2009 Hierarchy of Developments July 2009 Crown copyright 2009 ISSN 0141-514X ISBN 978 0 7559 7572 3

More information

Hydropower. Corps Hydro Plants Non-Federal Plants

Hydropower. Corps Hydro Plants Non-Federal Plants Hydropower Corps Hydro Plants Non-Federal Plants at Corps Dams The U.S. Army Corps of Engineers is the largest owner/operator of hydroelectric powerplants in the United States and one of the largest in

More information

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage

ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage DOEIID-10360 Distribution Category: UC-22S ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage M. J. Sale G. F. Cada

More information

look A closer Have you ever wanted to look into what makes up electricity prices and find out how the electricity market works? at electricity prices

look A closer Have you ever wanted to look into what makes up electricity prices and find out how the electricity market works? at electricity prices Electricity prices explained Have you ever wanted to look into what makes up electricity prices and find out how the electricity market works? Then this information may help because it s important to Contact

More information

Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam

Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam ICON WATER AND QUEANBEYAN CITY COUNCIL Summary Report 8006314 25 June 2015 Initial Asssessment of Potential Flood

More information

Renewable Choice Energy

Renewable Choice Energy Catawba College Table of Contents About Renewable Choice The Problem: Electricity Production Today The Solutions: Renewable Energy Sources Renewable Energy Credits (RECs) Who can participate in Renewable

More information

Fiscal Year 2011 Resource Plan

Fiscal Year 2011 Resource Plan Salt River Project Fiscal Year 2011 Resource Plan Page 1 Last summer SRP hosted three resource planning workshops for a diverse group of stakeholders and customers to explain the planning process, discuss

More information

Geneva, 17-19 March 2009 COUNTRY REPORT: MALAWI

Geneva, 17-19 March 2009 COUNTRY REPORT: MALAWI CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Multi-Year Expert Meeting on Services, Development and Trade: The Regulatory and Institutional

More information

Discover. Waitaki. Meridian Energy s hydro dam

Discover. Waitaki. Meridian Energy s hydro dam Discover Waitaki Meridian Energy s hydro dam Auckland Activity guide Skiing Fishing Canals Wellington Christchurch Waitaki Dunedin Lake Pukaki Tekapo B Tekapo A Lake Tekapo Tekapo Lookout Picnic Water

More information

Statement for the Record

Statement for the Record Statement for the Record Kevin R. Hennessy Director Federal, State and Local Affairs New England Dominion Resources, Inc. Infrastructure Needs for Heat and Power Quadrennial Energy Review Task Force April

More information

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal. 413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above

More information

Hybrid Renewable Energy Systems for North-Eastern Poland

Hybrid Renewable Energy Systems for North-Eastern Poland Hybrid Renewable Energy Systems for North-Eastern Poland * Janusz PIECHOCKI, Piotr SOLOWIEJ, Maciej NEUGEBAUER Department of Electrical, Power, Electronic and Control Engineering, University of Warmia

More information

What do we already know about Bradford-on-Avon community area?

What do we already know about Bradford-on-Avon community area? What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist

More information

How To Plan For A New Power Plant In Manitoba

How To Plan For A New Power Plant In Manitoba Meeting Manitobans Electricity Manitoba is growing and is expected to continue doing so. Over the last years the province has enjoyed an expanding population and economy. These increases have led to many

More information

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC).

Who are we? *Based on an average annual domestic household electricity consumption of 4,700KWh (DECC). Who are we? We re one of the world s leading power and gas companies. Here in the UK, we supply energy to more than 5 million customers, generate enough electricity for around 8 million homes and employ

More information

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World...

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World... ESBI Company Profile ESB International Bringing Energy Innovation to the World... ESB International ESBI is one of Europe s most progressive and commercially focused electricity consultancy firms with

More information

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT ROOSEVELT WATER CONSERVATION DISTRICT RESPONSE TO ARIZONA POWER AUTHORITY REQUEST FOR INFORMATION DATED SEPTEMBER 12, 2012 PRESENTED OCTOBER 24, 2012 RWCD is an irrigation district that was established

More information

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011

Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 Climate Change: A Local Focus on a Global Issue Newfoundland and Labrador Curriculum Links 2010-2011 HEALTH Kindergarten: Grade 1: Grade 2: Know that litter can spoil the environment. Grade 3: Grade 4:

More information

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question 2 The Fremont School District uses oil to heat school buildings. Go Green! is a new project the district will implement. The superintendent has

More information

Alternative and Renewable Energy. Christopher Nicholson section: AD Last 4 # of SIN: 5001

Alternative and Renewable Energy. Christopher Nicholson section: AD Last 4 # of SIN: 5001 Alternative and Renewable Energy Christopher Nicholson section: AD Last 4 # of SIN: 5001 Current Primary Energy Sources Current Primary Energy Sources The pie chart on the left depicts global sources of

More information

How to Earn the LEED Green Power Credit

How to Earn the LEED Green Power Credit 3D EG REES WH ITE PAPER How to Earn the LEED Green Power Credit Using on-site and off-site renewable energy to mitigate the impact of greenhouse gas emissions associated with a LEED project s energy use

More information

NUCLEAR FUEL CYCLE ROYAL COMMISSION. Advantages and disadvantages of different technologies and fuel sources; risks and opportunities

NUCLEAR FUEL CYCLE ROYAL COMMISSION. Advantages and disadvantages of different technologies and fuel sources; risks and opportunities NUCLEAR FUEL CYCLE ROYAL COMMISSION Submission on Issues Paper 3: Advantages and disadvantages of different technologies and fuel sources; risks and opportunities 3.8 What issues should be considered in

More information

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES The Electricity, Gas, Water and Waste Services Division comprises units engaged in the provision of electricity; gas through mains systems; water; drainage; and sewage services. This division also includes

More information

Three main techniques are used to exploit the heat available: geothermal aquifers, hot dry rocks and ground-source heat pumps.

Three main techniques are used to exploit the heat available: geothermal aquifers, hot dry rocks and ground-source heat pumps. GEOTHERMAL ENERGY TECHNOLOGY DESCRIPTION Geothermal energy is the natural heat that exists within the earth and that can be absorbed by fluids occurring within, or introduced into, the crustal rocks. Although,

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

Deep geothermal FAQ s

Deep geothermal FAQ s What is geothermal energy? Deep geothermal FAQ s What is the deep geothermal resource in Cornwall? What are the benefits for Cornwall? What are Engineered/Enhanced Geothermal Systems (EGS) or Hot Dry Rocks?

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Provincial Renewable Energy Project (RRP SOL 46014) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Grid-connected electricity is generated and

More information

SSE s criteria used for GHG emissions reporting

SSE s criteria used for GHG emissions reporting SSE s criteria used for reporting 1 Introduction This document details the annual greenhouse gas emissions reporting approach used by SSE Plc to report the tonnes of carbon dioxide equivalent (CO2e) during

More information

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007 CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted

More information

Hedging Natural Gas Prices

Hedging Natural Gas Prices Hedging Natural Gas Prices Luke Miller Assistant Professor of Finance Office of Economic Analysis & Business Research School of Business Administration Fort Lewis College Natural Gas Industry U.S. natural

More information

GLOBAL RENEWABLE ENERGY MARKET OUTLOOK 2013

GLOBAL RENEWABLE ENERGY MARKET OUTLOOK 2013 GLOBAL RENEWABLE ENERGY MARKET OUTLOOK 213 FACT PACK GUY TURNER HEAD OF ECONOMICS AND COMMODITIES APRIL 26, 213 GLOBAL RENEWABLE ENERGY MARKET OUTLOOK, 26 APRIL 213 1 INTRODUCTION This year s Global Renewable

More information

Contact Energy Limited. Improving our resource management system

Contact Energy Limited. Improving our resource management system Contact Energy Limited Improving our resource management system 1 Resource Management Reform 2013 This submission by Contact Energy Limited (Contact) is in response to the Discussion Document: Improving

More information

Powerco Limited Pricing Guide 2015 ANNUAL REPORT 2015

Powerco Limited Pricing Guide 2015 ANNUAL REPORT 2015 ANNUAL REPORT 2015 PRICING GUIDE 2015 1 CONTENTS Introduction Page 03 Who we are Page 04 The Electricity Industry Page 05 Our Pricing Policy Page 08 How Powerco Performs Page 10 Pricing Methodology Page

More information

DANISH DISTRICT ENERGY PLANNING EXPERIENCE

DANISH DISTRICT ENERGY PLANNING EXPERIENCE MOWAT ENERGY, A RESEARCH HUB AT THE MOWAT CENTRE, AT THE REQUEST OF THE ONTARIO MINISTRY OF ENERGY FUTURE INNOVATION IN ENERGY PLANNING: A SPECIAL SESSION TO ADVISE ON ONTARIO S LONG-TERM ENERGY FUTURE

More information

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada An Introduction to Micro- Hydropower Systems Natural Resources Canada Ressources naturelles Canada Introduction Hydropower technology has been around for more than a century. Hydropower comes from converting

More information

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) - Glossary of Terms Avoided Cost - The incremental cost Flint Energies would pay for the next kilowatt-hour of power in the open marketplace for energy. Flint Energies Board of Directors sets this Avoided

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

STRADA ENERGY INTERNATIONAL LIMITED INVESTOR PRESENTATION

STRADA ENERGY INTERNATIONAL LIMITED INVESTOR PRESENTATION STRADA ENERGY INTERNATIONAL LIMITED INVESTOR PRESENTATION JANUARY 2016 THE COMPANY Privately owned Geothermal Energy Company Headquartered in Jersey, Channel Islands, with global operations Highly experienced

More information

Living & Working Managing Natural Resources and Waste

Living & Working Managing Natural Resources and Waste Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable

More information

Electricity in New Zealand

Electricity in New Zealand Electricity in New Zealand Contents Consumers 2 Retail 6 Wholesale 10 Transmission and system operation 14 Generation 18 Distribution 24 Foreword The Electricity Industry Act 2010 changed the shape and

More information