Social Safeguards Report
|
|
|
- Randolph Craig
- 9 years ago
- Views:
Transcription
1 Social Safeguards Report IND: 145 MW Grid-connected Solar Project Draft Social Safeguards Audit Report August 2012 This report is made publicly available in accordance with ADB's Public Communications Policy (2005). It does not necessarily reflect the views of ADB.
2 Social Safeguards Audit Report 20 MWp Hiraco Solar Power Project August 2012 Prepared by Hiraco Renewable Energy Private Limited The company hereby acknowledges that as per the mandate letter signed between company and Ernst & Young (E&Y) on 6 th January 2012, E&Y has assisted the company in preparation of the Social Safeguard Audit Report based on data and information provided by the company to E&Y. Hiraco Renewable Energy Private Limited Page 1
3 Draft: Social Safeguards Audit Report Contents 1. Introduction Project Description Need for the Project Project Location Project Status Objectives and Scope of the Report Methodology Audit Findings Involuntary Resettlement Land Requirements for the Project Land Acquisition Process & Compensation Land or Right of Way (ROW) Requirements for Associated Facilities Extent of Involuntary Resettlement Impacts Applicable Regulations governing transfer of land to the Project Audit Findings: Indigenous Peoples Project Context Consultation and Participation Audit Findings: Other Social Considerations Conclusions and Recommendations Conclusions Recommendations...19 Appendix 1. Photos of the Hiraco site...20 Photograph showing the safety office at the project site...22 Photograph showing use of PPEs by the workers during the concrete mixing work...22 Hiraco Renewable Energy Pvt. Ltd. Page 2
4 Draft: Social Safeguards Audit Report 1. Introduction 1.1 Project Description Hiraco Renewable Energy Private Limited (HREPL) was incorporated on 4 November 2010 to setup a solar PV power project with capacity of 20 MWp at villages Bapodar & Kerala, District Porbandar in the state of Gujarat (India). The project is implemented under the Solar Power Policy 2009 of Gujarat. Crystalline Silicon PV solar cells shall be used in the project to generate electricity. HREPL (the Company ) has already signed a Power Purchase Agreement (PPA) for 25 years with Gujarat Urja Vikas Nigam Limited (GUVNL) with permission from Government of Gujarat, for sale of the power generated from the project. Table 1: Project details SI. No Particulars Descriptions 1 Project site Hiraco 2 Village Name (s) Bapodar & Kerala 3 District Name Porbandar 4 Name of the state Gujarat 5 Latitude (North) 6 Longitude (East) 7 Road Accessibility Road connectivity via Porbandar 8 Nearest Airport Porbandar 9 Nearest City Porbandar 10 Land available (Hectares) Water requirement (LPD) 10, Annual Global Irradiance (kwh/m 2 ) Type of PV Module Cr-Si 14 Proposed Capacity (MW) 20 MWp 15 Capacity of each module proposed (Wp) 230 to Total number of PV modules Inverter model Sunny central 800KW 3 Phase PCU 18 Annual electricity supplied to grid (MWh) Annual Plant Load factor (%) Project Cost (Million INR) 2365 A social safeguards review was conducted for the Project on 26 February 2012 to check the project s compliance to the ADB 2009 Safeguards Policy Statement (SPS) Safeguards Requirements (SR) on 2 Involuntary Resettlement and (SR) 3 on Indigenous Peoples. The review comprised of site visit to the plant area, including the labour camps, canteen facility, the access road leading to the site; informal discussions with few of the landowners and local community members; meetings with the management at Corporate Office in Delhi; and review of available project documentation. The site photos are attached as Appendix 1. Hiraco Renewable Energy Pvt. Ltd. Page 3
5 Draft: Social Safeguards Audit Report 1.2 Need for the Project Fast economic growth of the state of Gujarat has resulted in increase in electricity consumption by the industrial and commercial sectors. With the current available capacity, Gujarat is not in a position to meet its requirement either in energy requirement terms or peak capacity requirement terms. Energy requirements of the Gujarat state has increased from MU in FY to MU in FY with an energy shortfall of 3149 MU in FY The Electricity Act 2003 stipulates minimum percentage of energy to be derived out of renewable energy sources which shall be binding on all states. Also the Gujarat Electricity Regulatory Commission has made it mandatory for distribution licenses in the state to purchase a fixed percentage of their total power procurement through renewable energy sources, both solar and non solar. 1.3 Project Location The project is located at Latitude (North) and Longitude (East). The site is located in villages Bapodar & Kerala, District Porbandar of the state of Gujarat, India. The location of the project is at an elevation of about metres from the mean sea level.. The project location has well established connectivity and accessibility through road, rail, air and port. Overall the project area is flat with gentle slope. Figure 1 and 2 depicts the map of the region indicating the project location. Figure 1: District map of Porbandar (Gujarat) marking the project location (Source: Detailed Project Report) Hiraco Renewable Energy Pvt. Ltd. Page 4
6 Draft: Social Safeguards Audit Report Figure 2: Satellite view of Village Bapodar & Kerala (Porbandar), Gujarat (Source: Detailed Project Report) 1.4 Project Status The current project status, outlining the sequence of major activities and the time required for engineering, construction, installation and commissioning of the 20MWp solar PV power plant is provided below. The project commissioned on 18 April Hiraco Renewable Energy Pvt. Ltd. Page 5
7 Draft: Social Safeguards Audit Report Table 2: Implementation schedule of the project Activity Oct'11 Nov'11 Dec'11 Jan'12 Feb'12 Mar'12 Apr'12 Hiraco Foundations Modules Shipment at Indian Port- Hanwha Discharge and Custom Clearance Module Availability at site Structure Availability Structures Erection Module Erection Inverters Shipment Inverters at Site (SMA watt) Inverter Room / LT Room - Building ready Inverters Erection TL availability Testing and commissioning Erection by Areva Date of Commissioning 18 April Objectives and Scope of the Report This report is prepared to assess the compliance of the 20 MWp Solar Power Project at Hiraco with the 2009 ADB Safeguards Policy Statement, Social Analysis in Private Sector Projects, 2009, ADB s Gender and Development Policy, 1998, Social Protection Requirements as per ADB s Social Protection Strategy 2001 and IFC Performance Standards. The social compliance audit that was conducted on 26 February 2012 at the project site at Hiraco, District Porbander, Gujarat had the following objectives: Identify past or present concerns related to impacts on involuntary resettlement (physical or economic displacement) and ethnic minorities/indigenous Peoples; Hiraco Renewable Energy Pvt. Ltd. Page 6
8 Draft: Social Safeguards Audit Report Determine whether project actions were in accordance with ADB s SR2 and SR3 principles and requirements; and Prepare a corrective action plan (CAP) containing necessary remedial actions (if any) This report provides the observations and recommendations on the above. 1.6 Methodology The following activities were undertaken for the purpose of conducting this audit: Data collection from secondary sources such as Forest Atlas and published GOIs data from 2001 population census statistics data, as well as from authorities such as Gujarat Department of Social Justice and Empowerment, and other Departments. Preparation of checklist for collecting project related information against ADB guidelines Review of national and local laws / regulations and procedures relating to land acquisition, employment of labour etc. Review of land allocation documents, permits and other relevant available documents Site visit to the plant area, labour camps, canteen facility etc. Interviews on a sample basis with the following: Employees at the site Contract labour including their family members staying at the labour camps Local community people around the site Land owners Hiraco Renewable Energy Pvt. Ltd. Page 7
9 Draft: Social Safeguards Audit Report 2. Audit Findings Involuntary Resettlement 2.1 Land Requirements for the Project The total land required for the Project s solar power generation facility is Hectares (ha). The land has been acquired from two villages namely Bapodar and Kerala. Out of the total land area, the PV module array has been established on ha, while 1.21 ha was required for the balance structures such as the control room building and switchyard. The remaining ha is an open area. Table 3: Land details Village Type of Landuse Prior Area acquisition (Hectares) Bapodar Agriculture Kerala Agriculture Total in 2.2 Land Acquisition Process & Compensation The land acquired for the project site is totally private land and has been purchased on a voluntary basis (willing seller-willing buyer basis) from the land owners. A third party (land arranger) was appointed by the Company for helping in the purchase of land for the project. The land was purchased from twenty four (24) major land owners having their land in Bapodar and Kerala. The compensation rate offered and paid to the land owners on an average was INR 200 per square metre of land which was more than the existing Government circle rates of INR 69 to 80 per square metre of land depending upon the time of purchase. The payment of compensation and land registration process was completed during the period from May January 2012 Discussions with land owners on a sample basis during site visit indicated that the land sold for the project was not much productive for them because of the higher salt concentration in the ground water. As per the land owners, the sale of land came as an opportunity to earn income from an otherwise unproductive land. Also, as per the landowners, there were other productive plots that were available with them. Mostly cash crops such as cotton and groundnuts are cultivated in the region. 2.3 Land or Right of Way (ROW) Requirements for Associated Facilities The solar power plant will be using the following associated facilities: access roads, transmission lines and sub-station. The project will utilize the existing public roads; no new roads will be built as part of this project. The power generated from the solar power plant is evacuated through a 66kV transmission line (approximately 13.5 km in length) to Rana Kandorna Sub-Station of GETCO. The Rana Kandorna substation is shared with Moser Baer Energy & Development Limited. Hiraco Renewable Energy Pvt. Ltd. Page 8
10 Draft: Social Safeguards Audit Report As the project is planned under the Solar Power Policy (2009) of the state of Gujarat, and as per the terms of Power Purchase Agreement, it is the responsibility of GETCO to arrange, provide and maintain the power transmission evacuation facilities upto the 66 kv switchyard of the project. However, in the interest of meeting the commissioning schedule for the project, It was agreed between GETCO and the Company that the Company would manage the construction of transmission lines under the overall supervision and approval of GETCO. GETCO will reimburse the transmission line expenses to SPVs on the basis of GETCO SOR (schedule of rates) while the supply of towers, overhead conductors and other items issued as free issue items for such works. The Construction of the 66kV 13.5km Transmission Line from Hiraco to Substation of GETCO at Rana Kandorna to be reimbursed by GETCO required the setting up of 40 towers. Each tower footing required 75 sq.m. of land. For setting up of transmission line towers, approximately 50 landowners have been compensated. A total compensation of around INR 8million has been paid or approximately INR 0.15mn per tower footing. The period of payments to landowners and tower erection was in December 2011 to February- March No further land acquisition or involuntary resettlement issues are expected from the use of the substations which have been in existence for more than 10 years. The transmission line is shared with 15 MW Solar Power Project namely Moser Baer Energy and Development Limited. The Company has awarded transmission line contract to contractors who are nominated and approved by GETCO. Under these contracts the works have been executed under the supervision of GETCO engineers and in line with GETCO existing policies and frameworks. Table 4 Information on Associated Facilities Associated Facilities Responsible Agency Existing or New Access Road Existing Village Existing Road (State Govt.) Transmission Line Owner - GETCO New till substation. Date of Completion : 15 th April 2011 Substation Owner - GETCO Existing Type of Land Existing Village Road (Kuttcha Type) Private Agricultural and Govt. Land 2.4 Extent of Involuntary Resettlement Impacts There were no permanent inhabitants dwelling on the site as confirmed by interviews with the local community during the site visit. As per the community members, there were only five temporary shelters/sheds at the project site which were used by the farmers/field workers for taking rest during work breaks. Two out of the five structures are retained for use in the project activities while others have been demolished. The compensation for the shelters was taken into consideration during the land purchase agreement with the land owner. The project site is located far from the coast line and no banders or fishing communities were affected. The project also does not require land acquisition of gauchar or grazing land or any state-owned wastelands. Given the characteristics of the site as Hiraco Renewable Energy Pvt. Ltd. Page 9
11 Draft: Social Safeguards Audit Report described above, the construction and operation of the power generation site is not expected to have involuntary resettlement impacts. The project has complied with the national laws and regulations on land acquisition and has incorporated National Resettlement and Rehabilitation Policy (2007) and ADB s SPS (2009) as follows: Compensation for temporarily shelters has been considered during the land purchase agreement with the land owners Meaningful consultations with affected people in the issues of land acquisition, or loss of livelihood, if any, have been conducted Figure: Stakeholder consultation held on Nov 10, 2011 Employment opportunities have been provided to few of the project affected people and local villagers during project construction activities Established a grievance redressal mechanism to receive and facilitate resolution of the concerns of affected persons. Please refer section 5(i) for details on community grievance redressal mechanism 2.5 Applicable Regulations governing transfer of land to the Project The land transfer to the project has been done as per section 55 of the Saurashtra Gharkhed Tenancy Settlement and Agriculture Land Ordinance 1949 (as amended in ) applicable in Gujarat. Section 55 outlines the provisions for the Sale of land for bonafide industrial purpose. The following table shows how the acquisition has complied with the provisions of this ordinance: 1 See amendment available from Hiraco Renewable Energy Pvt. Ltd. Page 10
12 Draft: Social Safeguards Audit Report Provisions Status of Compliance (1) Nothing in section 54 shall prohibit the sale or the agreement for the sale of land for which no permission is required under sub-section (1) of section 65B of the Bombay Land Revenue Code, 1879 in favour of any person for use of such land by such person for a bonafide industrial purpose: Provided that (a) The land is not situated within the urban agglomeration as defined in clause (n) of section 2 of the Urban Land (Ceiling and Regulation) Act, (b) Where the area of the land proposed to be sold exceeds ten hectares, the person to whom the land is proposed to be sold in pursuance of this sub-section shall obtain previous permission of the Industries Commissioner, Gujarat state or such other officer, as the State Government may, by an order in writing, authorize in this behalf, (c) The area of the land proposed to be sold shall not exceed four times the area on which construction for a bonafide industrial purpose is proposed to be made by the purchaser: Provide that any additional land which may be required for pollution control measures or required under any relevant law for the time being in force and certified as such by the relevant authority under that law shall not be taken into account for the purpose of computing four times the area, (d) Where the land proposed to be sold is owned by a person belonging to the Scheduled Tribe, the sale shall be subject to the provisions of section 73AA of the Bombay Land Revenue Code, (2) (a) Where the land is sold to a person in pursuance of sub section (1) (here in after referred to as the purchaser ), he shall within thirty days from the date of the purchase of the land for a bonafide industrial purpose, send a notice of such purchase in such form along with such other particulars as may be prescribed, to the Collector and endorse a copy there of to the Mamlatdar. (b) Where the purchaser fails to send the notice and other particulars to the Collector under clause (a) within the period specified therein, he shall be liable to pay, in addition to the non-agricultural assessment leviable under this Ordinance, such fine not exceeding two thousand rupees as the collector may, subject to rules made under this Ordinance, direct. (c) Where, on receipt of the notice of the date of purchase for the use of land for a bonafide industrial purpose and other particulars sent by the purchaser under clause (a), the Collector, after making such inquiry as he deems fit Not Applicable (NA) Permission has been obtained from the Industries Commissioner for the project No land has been purchased from person belonging to the Scheduled Tribe.. All the landowners from whom land was purchased were from the Hindu community other than SC or ST. The Notice of Collector and endorsement of registered sale deeds are being complied with the completion of land acquisition for the [project. (i) is satisfied that the purchaser of such land has Certificate will be issued once the validity purchased the land for a bonafide industrial purpose process under Section 2A is complete in conformity with the provisions of sub-section (1), he shall issue a certificate to that effect to the purchaser in such form and within such time as may be prescribed, (ii) is not so satisfied, he shall, after giving the purchaser an opportunity of being heard, refuse to issue such certificate and on such refusal, the sale of the land to the purchaser shall be deemed to be in contravention of Section 54. Hiraco Renewable Energy Pvt. Ltd. Page 11
13 Draft: Social Safeguards Audit Report 3. Audit Findings: Indigenous Peoples 3.1 Project Context The total land acquired by HREPL falls within the villages of Bapodar and Kerala situated in Ranavav Taluk, Porbandar District, Gujarat State. a) Village Bapodar Bapodar is a mid-sized village located in the district of Porbandar, Gujarat (India). Bapodar is at a distance of around 14 km from its Taluka - Ranavav and around 22 km from district Porbandar. As per the records of Census 2001, the village has a population of about 1729 persons living in around 367 households. Population wise Bapodar village has around equal male -female ratio. Around 70% of the village population consists of the Hindu community. The Hindu castes in the village include Nagar Brahman, Maidh or Mer- Kshatriya and Krushaks etc. All the landowners from whom land was purchased were from the Hindu community not belonging to Scheduled Tribes. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 1729 Male Population 848 Female Population 881 b) Village Kerala Kerala is a small village located in the district of Porbandar, Gujarat (India) and is located adjacent to village Bapodar. It is at a distance of around 12 km from district Porbandar and 346 km distance from the main city Gandhinagar (Gujarat). As per the records of Census 2001, the village has a population of about 368 persons living in around 78 households. Around 70% of the village population consists of the Hindu community. The Hindu castes include Nagar Brahman, Maidh or Mer-Kshatriya and Krushaks etc. All the landowners from whom land was purchased were from the Hindu community not belonging to Schedule tribes. Population wise Kerala village has around equal male - female ratio. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 368 Male Population 195 Female Population 173 Hiraco Renewable Energy Pvt. Ltd. Page 12
14 Draft: Social Safeguards Audit Report Demographic details of the Porbandar District as per Census 2001: Total Population Male Population Female Population Total Workers 215,134 Main Workers Marginal Workers 41,540 Non-Workers 321,701 Literate Population Literate (Male) Literate (Female) The project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the lands where the project s solar power generation facility are being constructed are not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The project is therefore expected to be classified as category C for both involuntary resettlement and IPs. 4. Consultation and Participation During project construction, the Company held meetings and public consultations with the residents of Bapodar and Kerala villages. The Company made a presentation on the proposed project, development prospects, project impacts and measures to mitigate possible negative impacts. The prospects of improving social and economic status of the region as a result of a successful project implementation as well as corporate social responsibility (CSR) activities of the Company were also discussed. The CSR activities proposed by the Company and to be taken up during the operational phase of the project include: Community development programmes Education programme for children Women Empowerment programmes During the site visit, discussions were undertaken on an informal basis with a group of 7-8 community members from Kerala and Bapodar villages who confirmed that they were made aware of the project by the Company. Some persons in the village had already been contracted as security guards for the project. They indicated their satisfaction with the project which will bring more jobs to the village and opportunities to set up small businesses for construction and operational workers. 5. Audit Findings: Other Social Considerations Other social considerations addressed in this review are related to employee engagement, gender relations, provision of facilities for labour force and safety. Hiraco Renewable Energy Pvt. Ltd. Page 13
15 Draft: Social Safeguards Audit Report a) Employee Engagement HREPL has an existing human resource policy and manual covering employee benefits, equal opportunity, non discrimination, grievance mechanism and others that needs to be followed by all employees including contract workers at the site location. These include procedures for hiring and recruiting, probation, training, performance review, promotion, insurance, salary and compensation, resignation, lay-off and retrenchment, leave and vacation, and superannuation, which follow Indian labour laws. The policies have been displayed at the HREPL site in local language for the awareness of the workers. Most of the construction labours at site are employed on contractual basis. Worker committees have also been formed at the site location on health and safety, harassment and abuse and grievance handling for consultation with the workers. The preference of the company is to hire local labour during project construction provided they meet the required selection criteria. It also has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws and covers ILO standard. b) Labour Influence Construction phase During construction phase, there has been an influx of working labour population and a labour colony is being constructed with basic amenities for the labour working on the project. The peak labour population is approximately laborers for three months and may have an impact on the social fabric of the area surrounding the project. However, this impact is envisaged to be insignificant due to the following reasons: Temporary labour colonies, equipped with basic amenities, have been situated in the areas already acquired for the project. The impact is temporary in nature as it is restricted to the construction phase of the project. After construction phase, the areas acquired by labour colonies shall be reverted to the status at the preconstruction phase. Therefore, conflict of the migrating labour with locals will not take place during the construction phase. Operation Phase No impact on the local life pattern is envisaged due to operational phase of the project. c) Gender and Development Hiraco Renewable Energy Pvt. Ltd. Page 14
16 Draft: Social Safeguards Audit Report Women were also involved during the community consultation process held during the construction phase of the project. However, no issues or concerns were raised by the women participants during the consultation process. No adverse impact could be envisaged on women in the nearby villages due to the solar power project. The Company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The clause includes the following: Local labour to be hired as much as possible; Ensure labour related regulations are met; In case of outside labour, ensure that their working conditions as well as camps meet local regulations and best practice; Health and safety training of the labour, raising awareness about STDs, HIV and maintaining behavior standards while moving in the community should be a priority Community should be consulted at regular intervals. Any complaints or concerns with respect to labour should be addressed without delay The project manager ensured compliance jointly with team and contractors duing the construction phase of the project. The Company has proposed to initiate women empowerment programmes in the nearby villages during the operational phase of the project. However no such initiative has been under taken till now. On an average, 5 % of female workers were employed during the construction phase of the project. Seven contractual workers are currently employed during the operation phase. Female workers are not employed during the operational phase of the project, as the activity of cleaning the solar panels is carried out during night time only and for security reasons, male workers are employed. Further, as the project site is located at remote location, female workers are not employed for safety reasons. However, during day time, few female workers are employed for house-keeping in the project office and cutting grass in the fields. Currently, two female workers are employed for such activities. The maximum number of female workers employed during the construction phase of the project was around 40. All the female workers were hired on contract basis. Separate accommodation facility has been provided to female workers staying with their families at the labour camp. Migrant workers who brought their families during the construction phase of the project were provided separate accommodation facility in the labour camp. In order to ensure health and safety of such workers and their families, the company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. d) Working Conditions Adequate steps have been taken to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work, by minimizing, so far as is reasonably practicable, the causes of hazards inherent in the working environment Regular health and safety trainings are provided to workers at site Fire mock drills are being conducted to ensure that all workers in the unit are familiar with the site s overall evacuation procedures Separate mobile toilet facilities for men and women, and drinking water facility have been provided to workers at site locations e) Prohibition of child labour Hiraco Renewable Energy Pvt. Ltd. Page 15
17 Draft: Social Safeguards Audit Report No instance of child labour or young worker was observed at the time of the site visit The company has strict policy in place not to employ anyone below the age of 18 years. These policies and procedures conform to the provisions of the relevant ILO standards. The HR policy for contract workers also restricts the employment of child labour by contractors. f) Payment of wages Minimum wages are paid to the workers at site as per the applicable minimum wages in Porbandar, Gujarat All eligible workers have been covered under ESI (Employees State Insurance) & EPF (Employees Provident Fund) schemes The workers are paid equal wages for similar kind of work regardless of gender. Equal pay for equal work for workers regardless of gender g) Freedom of association Workers in the Company are free to join or form trade unions of their own choice and bargain collectively as per the Trade Unions Act, However, the workers were not associated with any trade union during the construction phase of the project. In the current operational phase of the project, the number of workers is presently limited to seven and they are also not associated with any trade union. The Company has developed a parallel means for independent and free association and bargaining for the workers by the formation of worker committees including adequate representation from management and workers. Worker committees have been formed to help workers raise concerns they may have with regard to plant working conditions and also increase their involvement in improving the work environment of the plant. The committees comprising representation from management and workers include: 1) Health & Safety 2) Anti -Sexual Harassment 3) Grievance Handling h) Working Hours Workers are not required to work in excess of 48 hours per week at the site location and are provided with at least one day off for every 7 days period on average. This is in compliance with the national laws on working hours. The laws include: Contract Labour (Regulation and Abolition) Act, 1970 The Building & Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 i) Grievance Management System Environmental and social grievances were handled in accordance with the project grievance redressal mechanism defined under the HR policy for contractors. The Grievance Redressal Mechanism (GRM) for the project provides an effective approach for complaints and resolution of issues made by the affected community in a reliable way. This mechanism was established prior to construction and will remain active Hiraco Renewable Energy Pvt. Ltd. Page 16
18 Draft: Social Safeguards Audit Report throughout the life cycle of the project. Open and transparent dialogue will be maintained with project affected persons as and when needed, in compliance with ADB safeguard policy requirements. The major objectives of the Grievance Redressal Mechanism System are to: create a platform / process for prevailing proactive Industrial Relations; make people accountable for timely redressal of grievances; establish a robust process for addressing contract worker grievances; create a healthy working atmosphere and drive active engagement at contract worker level; have a strategy, supporting long-term business requirements at site; prevent minor disagreements developing into more serious disputes later on; defend against legal intervention A Grievance Redressal Committee (GRC) was formed at the project site to ensure affected people s grievances on both environmental and social concerns are adequately addressed and facilitate timely project implementation. The GRC included have the following members: Project head; Liasoning officer Site In charge/admin; Land seller Grievance Redressal Mechanism for workers The Company has a robust grievance management system that drives proactive industrial relation (IR) environment, enabling fair opportunity to contract workers to appeal against a grievance through a systematic process. The process includes the following: Step 1: Maintenance of Grievance Registers: Grievance Redressal registers were kept at following locations: Register No. 1: Kept in Time Office. Register No. 2 onwards: Kept at various locations of the Plant as decided by the local HR Head. Step 2: Communication of Grievance Redressal Mechanism All contract workers informed / communicated to register their Grievances in Grievance Redressal Registers, at the convenient locations. These Grievances registered / recorded in the registers are studied, analyzed and appropriate solution to query / grievances shall be responded to concerned contract workers by Time Office In-Charge, at least twice a week. The company will endeavor to resolve the aggrieved contract worker within 3 days of the grievance registered. Hiraco Renewable Energy Pvt. Ltd. Page 17
19 Draft: Social Safeguards Audit Report Grievance Redressal Mechanism for Local Community o The Project Head is responsible for capturing, identifying, maintaining enquiries associated with community grievance in a register, and communicating progress to the concerned community member. o A Register shall contain information such as date, time, location and names of villager and grievance; if any. The record will summarize what information was provided to or discussed with the individual land seller. At the site, there were 4 recorded grievances from the community. The grievances recorded were mainly requests for the Company to undertake activities like lighting facility to local temple, repair of roads, etc. There were no grievances related to land acquisition. j) Labour Camps The labour working on site is provided with temporary labour camps, which are close to the site. The labour camp facility is availed by the migrant workers and workers not residing in the nearby villages. Few of the workers are also staying with their family members including children at the camp. Separate shelters have been provided to such families. The labour camps have been provided with basic amenities like drinking water and electricity facility for the workers. 6. Conclusions and Recommendations 6.2 Conclusions Based on the review of available documentation and information gathered during the site visit, there are no outstanding compensation issues with respect to the acquisition of land for the Project s solar power generation facility. The Project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the land where the Project s solar power generation facility has been constructed is not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The information gathered from the available documents and discussions with relevant HREPL staff and affirmation from the HREPL management regarding their continued harmonious relationship with the communities in the Project area are considered sufficient to support the social compliance audit findings relevant to social safeguards. With respect to ADB s SPS, the Project s categorization on involuntary resettlement and indigenous peoples should be categorized as C respectively, and no corrective action plan will be required. Other social dimensions, such as recruitment of HREPL employees, local labour engagement through contracts and need based CSR initiatives based on community consultation by HREPL, are found to be satisfactory. The company has existing policies and procedures (e.g., human resource policy, contractual arrangements with contractors) to address potential concerns and issues. During implementation of the Project, the Hiraco Renewable Energy Pvt. Ltd. Page 18
20 Draft: Social Safeguards Audit Report Company is expected to apply the same policies and procedures as those the company maintains, and it will be required to monitor and report to ADB on contractor s engagement of local employees and labours following the relevant clauses on contractor s agreement and the Company s human resources policy. 6.2 Recommendations The need based CSR initiatives based on community consultations may be initiated during the operation phase. Hiraco Renewable Energy Pvt. Ltd. Page 19
21 Draft: Social Safeguards Audit Report Appendix 1. Photos of the Hiraco site Photograph showing consultation with the community members to address their project related concerns and need of the community Hiraco Renewable Energy Pvt. Ltd. Page 20
22 Draft: Social Safeguards Audit Report Photograph showing washing facility provided to workers during the construction phase Photograph showing the drinking water storage tank at the project site during construction phase Photographs showing the existing access roads leading to the site Hiraco Renewable Energy Pvt. Ltd. Page 21
23 Draft: Social Safeguards Audit Report Photograph showing the safety office at the project site Photograph showing use of PPEs by the workers during the concrete mixing work Hiraco Renewable Energy Pvt. Ltd. Page 22
24 Social Safeguards Audit Report 25 MWp Chattel Solar Power Project August 2012 Prepared by Chattel Construction Private Limited The company hereby acknowledges that as per the mandate letter signed between company and Ernst & Young (E&Y) on 6 th January 2012, E&Y has assisted the company in preparation of the Social Safeguard Audit Report based on data and information provided by the company to E&Y. Chattel Construction Private Limited Page 1
25 Contents 1. Introduction Project Description Need for the Project Project Location Project Status Objectives and Scope of the Report Methodology Audit Findings Involuntary Resettlement Land requirements for the Project Land acquisition process and compensation Land or Right of Way (ROW) Requirements for Associated Facilities Extent of Involuntary Resettlement Impacts Applicable Regulations governing transfer of land to the Project Audit Findings: Indigenous Peoples Project Context Consultation and Participation Audit Findings: Other Social Considerations...14 a) Employee Engagement...14 b) Labour Influence...15 c) Gender and Development...15 d) Working Conditions...16 e) Prohibition of child labour...16 f) Payment of wages...16 g) Freedom of association...17 h) Working Hours...17 i) Grievance Management System...17 j) Labour Camps Conclusions and Recommendations Conclusions Recommendations...19 Appendix 1: Photos of the site...20 Chattel Construction Private Limited Page 2
26 1. Introduction 1.1 Project Description Chattel Construction Private Limited (CCPL) was incorporated on June 22, 2010 to setup a 25 MWp solar photovoltaic power project at villages Kathada, Ahmedgadh and Savda, District Surendranagar in the state of Gujarat (India). The project is implemented under the Solar Power Policy 2009 of Gujarat. Multi Crystalline Silicon PV solar cells shall be used in the project to generate electricity. CCPL ( the company ) has already signed a PPA for 25 years with Gujarat Urja Vikas Nigam Limited (GUVNL) with permission from Government of Gujarat, for sale of power generated from the project. The project is expected to be commissioned by end of September Table.1: Project details SI. No Particulars Descriptions 1 Project site Chattel 2 Village Name Kathada, Ahmedgadh and Savda 3 District Name Surendranagar 4 Name of the state Gujarat 5 Latitude North 6 Longitude East 7 Road Accessibility Road connectivity via Ahmedabad 8 Nearest Airport Ahmedabad 9 Nearest City Ahmedabad 10 Land available (Hectares) Water requirement (LPD) 13, Annual Global Irradiance (kwh/m 2 ) Type of PV Module Multi Crystalline 14 Proposed Capacity (MW) 25 MWp 15 Total no of PV modules (Number) Inverter model Bonfiglioli RPS TL 1220 PCU 17 Annual electricity supplied to grid (MWh) 18 Annual Plant Load factor (%) Project Cost (Million INR) A social safeguards review was conducted for the Project on 25 February 2012 to check the project s compliance to the ADB 2009 Safeguards Policy Statement (SPS) Safeguards Requirements (SR) on 2 Involuntary Resettlement and (SR) 3 on Indigenous Peoples. The review comprised of site visit to the plant area, including the labour camps, canteen facility, the access road leading to the site; informal discussions with few of the landowners and local community members; meetings with the management at Corporate Office in Delhi; and review of available project documentation. The site photos are attached as Appendix 1. Chattel Construction Private Limited Page 3
27 1.2 Need for the Project Fast economic growth of the state of Gujarat has resulted in increase in electricity consumption by the industrial and commercial sectors. With the current available capacity, Gujarat is not in a position to meet its requirement either in energy requirement terms or peak capacity requirement terms. Energy requirements of the Gujarat state has increased from MU in FY to MU in FY with an energy shortfall of 3149 MU in FY The Electricity Act 2003 stipulates minimum percentage of energy to be derived out of renewable energy sources which shall be binding on all states. Also the Gujarat Electricity Regulatory Commission has made it mandatory for distribution licenses in the state to purchase a fixed percentage of their total power procurement through renewable energy sources, both solar and non solar. 1.3 Project Location The project is located at North altitude and East longitudes. The site is located in Kathada, Ahmedgadh and Savda villages in Surendranagar District in the state of Gujarat, India. The surface topography is almost flat. Hence, limited site preparation/leveling activity is needed to make the land flat as per the requirements of solar PV power plant. The entire area is shadow free as there are no shading elements like mountains, large sand dunes, etc on the site. Figure 1 and 2 depicts the map of the region indicating the project location. Figure 1: District map of Gujarat and Surendranagar district marking the project location (Source: Detailed Project Report and Chattel Construction Private Limited Page 4
28 Figure 2: Satellite view of Village Zainabad-- Prominent village in the project area (Surendranagar district), Gujarat 1.4 Project Status An implementation schedule, outlining the sequence of major activities and the time required for engineering, construction, installation and commissioning of the 25MWp solar PV power plant is provided below. The solar plant is scheduled to be commissioned and start exporting power to the grid by end of September Chattel Construction Private Limited Page 5
29 Table.2:Project implementation schedule 1.5 Objectives and Scope of the Report This report is prepared to assess the compliance of the 25 MWp solar power project at Chattel with the 2009 ADB Safeguards Policy Statement, Social Analysis in Private Sector Projects, 2009, ADB s Gender and Development Policy, 1998, Social Protection Requirements as per ADB s Social Protection Strategy 2001 and IFC Performance Standards. The social compliance audit that was conducted on 24 February 2012 at the project site at Chattel, District Surendranagar, Gujarat had the following objectives: Identify past or present concerns related to impacts on involuntary resettlement (physical or economic displacement) and ethnic minorities/indigenous Peoples; Determine whether project actions were in accordance with ADB s SR2 and SR3 principles and requirements; and Prepare a corrective action plan (CAP) containing necessary remedial actions (if any) 1.6 Methodology The following activities were undertaken for the purpose of conducting this audit: Chattel Construction Private Limited Page 6
30 Data collection from secondary sources such as Forest Atlas and published GOIs data from 2001 population census statistics data, as well as from authorities such as Gujarat Department of Social Justice and Empowerment, and other Departments. Preparation of checklist for collecting project related information against ADB guidelines Review of national and local laws / regulations and procedures relating to land acquisition, employment of labour etc. Review of land allocation documents, permits and other relevant available documents Site visit to the plant area, labour camps, canteen facility etc. Interviews on a sample basis with the following: o Employees at the site o Contract labour including their family members staying at the labour camps o Local community people around the site o Land owners Chattel Construction Private Limited Page 7
31 2. Audit Findings Involuntary Resettlement 2.1 Land requirements for the Project The total land available for the Project s solar power generation facility is Hectares (ha). The land has been acquired from 42 landowners from three villages Kathada, Savda and Ahmedgadh. Out of the total land area, the PV module array has been established in ha, while 1.21 ha was required for the balance structures such as the control room and switchyard. The remaining ha is an open area including road coverage. Table.3: Land details Village Type of Landuse Prior acquisition Area in (Hectares) Kathada Agriculture Savada Agriculture Ahmedgadh Agriculture 5.16 Total Land acquisition process and compensation The land acquired for the project site is totally private land and has been purchased on a voluntary basis (willing seller-willing buyer basis) from the land owners. A third party (land arranger) was appointed by the Company for helping in the purchase of land for the project. The land was purchased from forty two (42) land owners in Kathada, Savda and Ahmedgadh. The compensation rate offered and paid to the land owners on an average was INR 51 per square metre of land which was more than the existing Government circle rates of INR 48 to 50 per square metre of land depending upon the time of purchase. The payment of compensation and land registration process was completed during the period from October 2011 to January Discussions with land owners on a sample basis during site visit indicated that the land sold for the project was not much productive for them because of the higher salt concentration in the ground water. As per the land owners, the sale of land came as an opportunity to earn income from an otherwise unproductive land. The payment provided against the land purchased has helped these farmers to find alternative land in a more fertile area or start an alternate livelihood Also, as per the landowners; there were other productive plots that were available with them. Mostly cash crops such as cotton and groundnuts are cultivated in the region. 2.3 Land or Right of Way (ROW) Requirements for Associated Facilities The solar power plant will be using the following associated facilities: access roads, transmission lines and sub-station. The project will utilize the existing village road; no new roads will be built as part of this project. The power generated from the proposed solar power plant would be evacuated through a 66kV transmission line to an existing sub-station (Patdi) of GETCO, situated about 7.6 km from the project site.as the project is planned under the Solar Power Policy (2009) of the state of Gujarat, and as per the terms of Power Purchase Agreement, it is the responsibility of GETCO to arrange, provide and maintain the power Chattel Construction Private Limited Page 8
32 transmission evacuation facilities upto the 66 kv switchyard of the project. However, in the interest of meeting the commissioning schedule for the project, it was agreed between GETCO and the Company that the Company would manage the construction of transmission lines under the overall supervision and approval of GETCO. The Construction of the 66 kv approx. 7.6 km transmission line from Chattel to the Patdi GETCO substation will require the setting up of 34 towers. Each tower footing required 75 sq.m of land. The cost of transmission line will be borne by CCPL. For setting up of transmission line towers, 36 landowners have been compensated. A total compensation of around INR 3.5 Million has been paid or approximately INR 0.1 Million per tower footing. The period of payments to landowners and tower erection was December 2011 April No further land acquisition or involuntary resettlement issues are expected from the use of the substations which have been in existence for more than 10 years. The construction of transmission is being concluded and expected to be complete by September To that effect, the Company has awarded transmission line contract to contractors who are nominated and approved by GETCO. Under these contracts the works have been executed under the supervision of GETCO engineers and in line with GETCO existing policies and frameworks. Table 4 Information on Associated Facilities Associated Facilities Responsible Agency Existing or New Access Road Existing Village Existing Road (State Govt.) Transmission Line Owner : GETCO New till substation : Expected date of Completion : 20 th September.2012 Substation Owner: GETCO Existing Type of Land Agriculture Private Agriculture & Govt. Waste Land 2.4 Extent of Involuntary Resettlement Impacts There were no permanent or temporary inhabitants dwelling on the site as confirmed by interviews with the local community/village residents during the site visit. The project site is located far from the coast line and no banders or fishing communities were affected. The project also does not require land acquisition of gauchar or grazing land or any state-owned wastelands. Given the characteristics of the site as described above, the construction and operation of the power generation site is not expected to have involuntary resettlement impacts. The project has complied with the national laws and regulations on land acquisition and has incorporated ADB s SPS (2009) as follows: Meaningful consultations with affected people in the issues of land acquisition, or loss of livelihood, if any, have been conducted Employment opportunities have been provided to few of the project affected people and local villagers during project construction activities Chattel Construction Private Limited Page 9
33 Established a grievance redressal mechanism to receive and facilitate resolution of the concerns of affected persons. Please refer section 5(i) for details on community grievance redressal mechanism. 2.5 Applicable Regulations governing transfer of land to the Project The land transfer to the project has been done as per section 55 of the Saurashtra Gharkhed Tenancy Settlement and Agriculture Land Ordinance 1949 (as amended in ) applicable in Gujarat. Section 55 outlines the provisions for the Sale of land for bonafide industrial purpose. The following table shows how the acquisition has complied with the provisions of this ordinance: Provisions (1) Nothing in section 54 shall prohibit the sale or the agreement for the sale of land for which no permission is required under sub-section (1) of section 65B of the Bombay Land Revenue Code, 1879 in favour of any person for use of such land by such person for a bonafide industrial purpose: Provided that (a) The land is not situated within the urban agglomeration as defined in clause (n) of section 2 of the Urban Land (Ceiling and Regulation) Act, (b) Where the area of the land proposed to be sold exceeds ten hectares, the person to whom the land is proposed to be sold in pursuance of this sub-section shall obtain previous permission of the Industries Commissioner, Gujarat state or such other officer, as the State Government may, by an order in writing, authorize in this behalf, (c) The area of the land proposed to be sold shall not exceed four times the area on which construction for a bonafide industrial purpose is proposed to be made by the purchaser: Provide that any additional land which may be required for pollution control measures or required under any relevant law for the time being in force and certified as such by the relevant authority under that law shall not be taken into account for the purpose of computing four times the area, (d) Where the land proposed to be sold is owned by a person belonging to the Scheduled Tribe, the Not Applicable (NA) Status of Compliance Permission has been obtained from the Industries Commissioner for the project. Attached No land has been purchased from person belonging to the Scheduled Tribe.. All the 1 See amendment available from Chattel Construction Private Limited Page 10
34 Provisions sale shall be subject to the provisions of section 73AA of the Bombay Land Revenue Code, (2) (a) Where the land is sold to a person in pursuance of sub section (1) (here in after referred to as the purchaser ), he shall within thirty days from the date of the purchase of the land for a bonafide industrial purpose, send a notice of such purchase in such form along with such other particulars as may be prescribed, to the Collector and endorse a copy there of to the Mamlatdar. (b) Where the purchaser fails to send the notice and other particulars to the Collector under clause (a) within the period specified therein, he shall be liable to pay, in addition to the non-agricultural assessment leviable under this Ordinance, such fine not exceeding two thousand rupees as the collector may, subject to rules made under this Ordinance, direct. (c) Where, on receipt of the notice of the date of purchase for the use of land for a bonafide industrial purpose and other particulars sent by the purchaser under clause (a), the Collector, after making such inquiry as he deems fit (i) is satisfied that the purchaser of such land has validity purchased the land for a bonafide industrial purpose in conformity with the provisions of sub-section (1), he shall issue a certificate to that effect to the purchaser in such form and within such time as may be prescribed, (ii) is not so satisfied, he shall, after giving the purchaser an opportunity of being heard, refuse to issue such certificate and on such refusal, the sale of the land to the purchaser shall be deemed to be in contravention of Section 54. Status of Compliance landowners from whom land was purchased were from the Hindu community other than Scheduled Tribe The Notice of Collector and endorsement of registered sale deeds are being complied with the completion of land acquisition for the project. Certificate will be issued once the process under Section 2A is complete Chattel Construction Private Limited Page 11
35 3. Audit Findings: Indigenous Peoples 3.1 Project Context The total land acquired by CCPL falls within the villages namely Kathada, Savda and Ahmedgadh in Surendranagar District, Gujarat State. Almost 70% of the villagers belong to the Hindu community. The prominent castes include Darbari, and Bramhins. Village-Kathada Kathada is a mid-sized village located in the district of Surendranagar, Gujarat (India). It is located at a distance of around 68 km from its District Main City Surendranagar and 86 km from its State Capital Gandhinagar. As per the records of Census 2001, the village has a population of about 1,766 persons living in around 354 households. Based on the population, it can be noted that Kathada village has a healthy sex ratio. Most of the landowners from whom land was purchased belonged to the Hindu community not belonging to Scheduled Tribes. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 1,766 Male Population 884 Female Population 882 Village-Savda Savda is a mid-sized village located in the district of Surendranagar, Gujarat (India). It is located at a distance of around 58 km from its District Main City Surendranagar and 96 km from its State Capital Gandhinagar. As per the records of Census 2001, the village has a population of about 1,528 people living in around 302 households. Population wise, Savda village has a healthy sex ratio. Land for the project site was purchased from only two landowners community from the village belonging to the Hindu and Muslim community respectively Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 1,528 Male Population 804 Female Population 724 Chattel Construction Private Limited Page 12
36 Village- Ahmedgadh Ahmedgadh is one of the smallest Villages in Dasada Taluk in Surendranagar District in Gujarat State. Ahmedgadh is at a distance of 71 km from its District Main City Surendranagar and around 84 km from its State Main City Gandhinagar. As per the records of Census 2001, the village has a population of about 264 persons living in around 51households. Based on the population, it can be noted that Ahmedgadh village has a healthy sex ratio. All the landowners from whom land was purchased belonged to the Hindu community not belonging to Scheduled Tribes. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 264 Male Population 147 Female Population 117 Demographic details of the Surendranagar District as per Census 2001: Total Population 1,515,148 Male Population 787,650 Female Population 727,498 Total Workers Main Workers 512,038 Marginal Workers 135,571 Non-Workers 867,539 Literate Population Literacy Rate Literate (Male) 487,094 Literate (Female) 294,061 Number of SC (Largest Three) Mahyavansi etc. 83,092 Bhambi etc. 51,060 Bhangi etc. 14,289 Number of ST (Largest Three) Padhar 10,916 Bhil etc 2,133 General Tribes 363 The project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the lands where the project s solar power generation facility are being constructed are not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The project is Chattel Construction Private Limited Page 13
37 therefore expected to be classified as category C for both involuntary resettlement and IPs. 4. Consultation and Participation During project construction, the Company held meetings and public consultations with the residents of Kathada, Savda and Ahmedgadh Villages. The Company made a presentation on the proposed project, development prospects, project impacts and measures to mitigate possible negative impacts. The prospects of improving social and economic status of the region as a result of a successful project implementation as well as corporate social responsibility (CSR) activities of the Company were also discussed. The CSR activities proposed by the Company and to be taken up during the operational phase of the project include: Solar light for temple Assistance for village schools Transportation facility Women Empowerment Programmes Drinking water facility During the site visit, discussions were undertaken on an informal basis with a group of 7-8 community members from Kathada, Savda and Ahmedgadh villages who confirmed that they were made aware of the project by the Company. They indicated their satisfaction with the project which will bring more jobs to the village and opportunities to set up small businesses for construction and operational workers. 5. Audit Findings: Other Social Considerations Other social considerations addressed in this review are related to employee engagement, gender relations, provision of facilities for labour force and safety. a) Employee Engagement CCPL, has an existing human resources policy and manual covering employee benefits, equal opportunity, non discrimination, grievance mechanism and others that needs to be followed at all site locations. These include procedures for hiring and recruiting, probation, training, performance review, promotion, insurance, salary and compensation, resignation, lay-off and retrenchment, leave and vacation, and superannuation, which follow Indian labour laws. The policies have been displayed at the CCPL site in local language for the awareness of the workers. Most of the construction labourers at site are employed on contractual basis. Worker committees have also been formed at the site location on health and safety, harassment and abuse and grievance handling for consultation with the workers. The preference of the company is to hire local labour during project construction provided they meet the required selection criteria. It also has a standard clause in the contractor s Chattel Construction Private Limited Page 14
38 agreements, binding the contractor to comply with the local labour laws and covers ILO standard. b) Labour Influence Construction phase During construction activities, there will be a sizeable influx of population and labour colony is being constructed with basic amenities for the labour working on the project. The peak labour population is approximately laborers for three months and may have an impact on the social fabric of the area surrounding the project. This will have an effect on social fabric of the area surrounding the project. However, this impact is envisaged to be insignificant due to the following reasons: Temporary labour colonies, equipped with basic amenities, have been situated in the areas already acquired for the project. The impact is temporary in nature as it is restricted to the construction phase of the project. After construction phase, the areas acquired by labour colonies shall be reverted to the status at the preconstruction phase. Therefore, conflict of the migrating labour with locals, will not take place during the construction phase. Operation Phase No impact on the local life pattern is envisaged due to operational phase of the project. c) Gender and Development Women were also involved during the community consultation process held during the construction phase of the project. However, no issues or concerns were raised by the women participants during the consultation process. No adverse impact could be envisaged on women in the nearby villages due to the solar power project. The Company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The clause includes the following: Local labour to be hired as much as possible; Ensure labour related regulations are met; In case of outside labour, ensure that their working conditions as well as camps meet local regulations and best practice; Health and safety training of the labour, raising awareness about STDs, HIV and maintaining behavior standards while moving in the community should be a priority Community should be consulted at regular intervals. Any complaints or concerns with respect to labour should be addressed without delay Chattel Construction Private Limited Page 15
39 The project manager ensured compliance jointly with team and contractors during the construction phase of the project. The Company has proposed to initiate women empowerment programmes in the nearby villages during the operational phase of the project. On an average, 5 %- 7% of female workers out of total workforce are employed during the construction phase of the project. The maximum number of female workers employed during the construction phase of the project was around 40. All the female workers were hired on contract basis. Separate accommodation facility has been provided to female workers staying with their families at the labour camp. Migrant workers who brought their families during the construction phase of the project were provided separate accommodation facility in the labour camp. In order to ensure health and safety of such workers and their families, the company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. d) Working Conditions Adequate steps have been taken to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work, by minimizing, so far as is reasonably practicable, the causes of hazards inherent in the working environment Regular health and safety trainings are provided to workers at site Fire mock drills are being conducted to ensure that all workers in the unit are familiar with the site s overall evacuation procedures Separate toilet facilities for men and women, and drinking water facility have been provided to workers at site locations e) Prohibition of child labour No instance of child labour or young worker was observed at the time of the site visit The company has strict policy in place not to employ anyone below the age of 18 years. These policies and procedures conform to the provisions of the relevant ILO standards. The HR policy for contract workers also restricts the employment of child labour by contractors f) Payment of wages Minimum wages are paid to the workers at site as per the applicable minimum wages in Surendranagar, Gujarat All eligible workers have been covered under ESI (Employees State Insurance) & EPF (Employees Provident Fund) schemes Chattel Construction Private Limited Page 16
40 The workers are paid equal wages for similar kind of work regardless of gender. g) Freedom of association Workers in the Company are free to join or form trade unions of their own choice and bargain collectively as per the Trade Unions Act, However, the workers were not associated with any trade union during the construction phase of the project. The Company has developed a parallel means for independent and free association and bargaining for the workers by the formation of worker committees including adequate representation from management and workers. Worker committees have been formed to help workers raise concerns they may have with regard to plant working conditions and also increase their involvement in improving the work environment of the plant. Three committees formed comprising representation from management and workers were formed include 1) Health & Safety Committee 2) Anti -Sexual Harassment Committee 3) Grievance Handling Committee h) Working Hours Workers are not required to work in excess of 48 hours per week at the site location and are provided with at least one day off for every 7 days period on average. This is in compliance with the national laws on working hours. The laws include: Contract Labour (Regulation and Abolition) Act, 1970 The Building & Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 i) Grievance Management System Environmental and social grievances were handled in accordance with the project grievance redressal mechanism defined under the HR policy for contractors. The Grievance Redressal Mechanism (GRM) for the project provides an effective approach for complaints and resolution of issues made by the affected community in a reliable way. This mechanism was established prior to construction and will remain active throughout the life cycle of the project. Open and transparent dialogue will be maintained with project affected persons as and when needed, in compliance with ADB safeguard policy requirements. The major objectives of the Grievance Redressal Mechanism System are to: create a platform / process for prevailing proactive Industrial Relations; make people accountable for timely redressal of grievances; establish a robust process for addressing contract worker grievances; create a healthy working atmosphere and drive active engagement at contract worker level; Chattel Construction Private Limited Page 17
41 have a strategy, supporting long-term business requirements at site; prevent minor disagreements developing into more serious disputes later on; defend against legal intervention A Grievance Redressal Committee (GRC) was formed at the project site to ensure affected people s grievances on both environmental and social concerns are adequately addressed and facilitate timely project implementation. The GRC is comprised the following members: Project head; Liasoning officer Site In charge/admin; Land seller /Local Community Member The Company has a robust grievance management system that drives proactive industrial relation (IR) environment, enabling fair opportunity to contract workers to appeal against a grievance through a systematic process. The process includes the following: Step 1: Maintenance of Grievance Registers: Grievance Redressal registers are kept at following locations: Register No. 1: Kept in Time Office. Register No. 2 onwards: Kept at various locations of the Plant as decided by the local HR Head. Step 2: Communication of Grievance Redressal Mechanism All contract workers informed / communicated to register their Grievances in Grievance Redressal Registers, at the convenient locations. These Grievances registered / recorded in the registers studied, analyzed and appropriate solution to query / grievances responded to concerned contract workers by Time Office In-Charge, at least twice a week. The Company shall endeavor to provide resolution to the aggrieved contract worker within 3 days of the grievance registered. Grievance Redressal Mechanism for Local Community The Project Head is responsible for capturing, identifying, maintaining enquiries associated with community grievance in a register, and communicating progress to the concerned community member. A Register containing information such as date, time, location and names of villager and grievance; if any. The record will summarize what information was provided to or discussed with the individual land seller or local community member. At the Chattel site, there are no grievances related to land acquisition or from local community. Chattel Construction Private Limited Page 18
42 j) Labour Camps The labour working on site is provided with temporary labour camps, which are close to the site. The labour camp facility is availed by the migrant workers and workers not residing in the nearby villages. Few of the workers are also staying with their family members including children at the camp. Separate shelters have been provided to such families. The labour camps have been provided with basic amenities like drinking water and electricity facility for the workers. 6. Conclusions and Recommendations 6.1 Conclusions Based on the review of available documentation and information gathered during the site visit, there are no outstanding compensation issues with respect to the acquisition of land for the Project s solar power generation facility. The Project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the land where the Project s solar power generation facility has been constructed is not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The information gathered from the available documents and discussions with relevant CCPL staff and affirmation from the CCPL management regarding their continued harmonious relationship with the communities in the Project area are considered sufficient to support the social compliance audit findings relevant to social safeguards. With respect to ADB s SPS, the Project s categorization on involuntary resettlement and indigenous peoples should be categorized as C respectively, and no corrective action plan will be required. Other social dimensions, such as recruitment of CCPL employees, local labour engagement through contracts and need based CSR initiatives based on community consultation by CCPL, are found to be satisfactory. The company has existing policies and procedures (e.g., human resource policy, contractual arrangements with contractors) to address potential concerns and issues. During implementation of the Project, the Company is expected to apply the same policies and procedures as those the company maintains, and it will be required to monitor and report to ADB on contractor s engagement of local employees and labours following the relevant clauses on contractor s agreement and the Company s human resources policy. 6.2 Recommendations The need based CSR initiatives based on community consultations may be initiated during the operation phase. Regular Compliance check on the provision of PPE s to the labourers is important safety concern. Chattel Construction Private Limited Page 19
43 Appendix 1: Photos of the site Photograph showing the module installation work Photograph showing the switchyard area Chattel Construction Private Limited Page 20
44 Photograph showing toilet facility for female workers Photograph showing storage area Chattel Construction Private Limited Page 21
45 Social Safeguards Audit Report 25 MWp Sandland Solar Power Project August 2012 Prepared by Sandland Real Estate Private Limited The company hereby acknowledges that as per the mandate letter signed between company and Ernst & Young (E&Y) on 6th January 2012, E&Y has assisted the company in preparation of the Social Safeguard Audit Report based on data and information provided by the company to E&Y. Sandland Real Estate Private Limited Page 1
46 Contents 1. Introduction Project Description Need for the Project Project Location Objectives and Scope of the Report Methodology Audit Findings Involuntary Resettlement Land requirements for the Project Land acquisition process and compensation Land or Right of Way (ROW) Requirements for Associated Facilities Extent of Involuntary Resettlement Impacts Applicable Regulations governing transfer of land to the Project Audit Findings: Indigenous Peoples Project Context Consultation and Participation Audit Findings: Other Social Considerations...14 a) Employee Engagement...14 b) Labour Influence...15 c) Gender and Development...15 d) Working Conditions...16 e) Prohibition of child labour...16 f) Payment of wages...17 g) Freedom of association...17 h) Working Hours...17 i) Grievance Management System...17 j) Labour Camps Conclusions and Recommendations Conclusions Recommendations...20 Attachment 1. Photos of the site...20 Sandland Real Estate Private Limited Page 2
47 1. Introduction 1.1 Project Description Sandland Real Estate Pvt Ltd was incorporated on February 25, 2010 to setup a solar PV power project with capacity of 25 MWp at village Alwada and Khimat, District Banaskantha in the state of Gujarat (India). The project is implemented under the Solar Power Policy 2009 of Gujarat. Thin Film PV solar cells shall be used in the project to generate electricity. Sandland Real Estate Pvt Ltd ( the company ) has already signed a PPA for 25 years with Gujarat Urja Vikas Nigam Limited (GUVNL) with permission from Government of Gujarat, for sale of power generated from the project. Table.1: Project details SI. No Particulars Descriptions 1 Project site Sandland 2 Village Name Alwada and Khimat 3 District Name Banaskantha 4 Name of the state Gujarat 5 Latitude North 6 Longitude East 7 Road Accessibility Road connectivity via Ahmedabad 8 Nearest Airport Ahmedabad 9 Nearest City Ahmedabad 10 Land available (Hectares) Water requirement (LPD) 15, Annual Global Irradiance (kwh/m 2 ) Type of PV module Thin Film 14 Proposed Capacity (MW) 25 MWp 15 Total no of PV modules (Number) Inverter model Sunny central 800KW Phase 3 CPU 17 Annual electricity supplied to grid (MWh) 18 Annual Plant Load factor (%) Project Cost (Million INR) A social safeguards review was conducted for the Project on 24 February 2012 to check the project s compliance to the ADB 2009 Safeguards Policy Statement (SPS) Safeguards Requirements (SR) on 2 Involuntary Resettlement and (SR) 3 on Indigenous Peoples. The review comprised of site visit to the plant area, including the labour camps, canteen facility, the access road leading to the site; informal discussions with few of the landowners and local community members; meetings with the management at Corporate Office in Delhi; and review of available project documentation. The site photos are attached as Attachment1. Sandland Real Estate Private Limited Page 3
48 1.2 Need for the Project Fast economic growth of the state of Gujarat has resulted in increase in electricity consumption by the industrial and commercial sectors. With the current available capacity, Gujarat is not in a position to meet its requirement either in energy requirement terms or peak capacity requirement terms. Energy requirements of the Gujarat state has increased from MU in FY to MU in FY with an energy shortfall of 3149 MU in FY The Electricity Act 2003 stipulates minimum percentage of energy to be derived out of renewable energy sources which shall be binding on all states. Also the Gujarat Electricity Regulatory Commission has made it mandatory for distribution licenses in the state to purchase a fixed percentage of their total power procurement through renewable energy sources, both solar and non solar. 1.3 Project Location The project is located at North altitude and East longitudes. The site is located in Alwada and Khimat in Banaskantha district of the state of Gujarat, India. The surface topography is almost flat. Hence, limited site preparation/ leveling activity is needed to make the land flat as per the requirements of solar PV power plant. The entire area is shadow free as there are no shading elements like mountains, large sand dunes, etc. on the site. Figure 1 and 2 depicts the map of the region indicating the project location. Figure 1: District map of Gujarat and Banaskantha district marking the project location (Source: Detailed Project Report and Sandland Real Estate Private Limited Page 4
49 Figure 2: Satellite view of Village Alwada (Banaskantha), Gujarat (Source: Detailed Project Report) 1.4 Project Implementation Schedule: An implementation schedule, outlining the sequence of major activities and the time required for engineering, construction, installation and commissioning of the 25MWp solar PV power plant is provided below. The project was commissioned on 01 April Sandland Real Estate Private Limited Page 5
50 Table.2: Implementation schedule Activity Sandland July'11 Aug'11 Sep'11 Oct 11' Nov '11 Dec 11 Jan'12 Feb12 March 12 Foundations Module Availability at site Structure Availability Structures and Module Erection Inverters Shipment Inverters at Site Inverters Erection TL availability Testing and commissioning Erection by Areva Date of Commissioning (1 April 2012)* * However, 18 MW solar power plant was ready for commissioning but for transmission line on 27 January, Objectives and Scope of the Report This report is prepared to assess the compliance of the 25 MWp solar power project at Sandland with the 2009 ADB Safeguards Policy Statement, Social Analysis in Private Sector Projects, 2009, ADB s Gender and Development Policy, 1998, Social Protection Requirements as per ADB s Social Protection Strategy 2001 and IFC Performance Standards. The social compliance audit that was conducted on 25 February 2012 at the project site at Sandland, District Banaskantha, Gujarat had the following objectives: Identify past or present concerns related to impacts on involuntary resettlement(physical or economic displacement) and ethnic minorities/indigenous Peoples; Determine whetherproject actions were in accordance with ADB s SR2 and SR3 principles and requirements; and Prepare a corrective action plan (CAP) containing necessary remedial actions (if any) Sandland Real Estate Private Limited Page 6
51 1.6 Methodology The following activities were undertaken for the purpose of conducting this audit: Data collection from secondary sources such as Forest Atlas and published GOIs data from 2001 population census statistics data, as well as from authorities such as Gujarat Department of Social Justice and Empowerment, and other Departments. Preparation of checklist for collecting project related information against ADB guidelines Review of national and local laws / regulations and procedures relating to land acquisition, employment of labour etc. Review of land allocation documents, permits and other relevant available documents Site visit to the plant area, labour camps, canteen facility etc. Interviews on a sample basis with the following: o Employees at the site o Contract labour including their family members staying at the labour camps o Local community people around the site o Land owners Sandland Real Estate Private Limited Page 7
52 2. Audit Findings Involuntary Resettlement 2.1 Land requirements for the Project The total land required for the Project s solar power generation facility is 84.58Hectares (ha). The land has been acquired from two villages namely Alwada and Khimat from 52 major landowners. Out of the total land area, the PV module array has been established in ha, while 0.81ha was required for the balance structures such as the control room and switchyard. The remaining 21.45ha is an open area including road coverage. Table.3: Land details Village Type of Landuse Prior acquisition Area in (Hectares) Alwada Agriculture Khimat Agriculture Total Land acquisition process and compensation The land acquired for the project site is totally private land and has been purchased on a voluntary basis (willing seller-willing buyer basis) from the land owners. A third party (land arranger) was appointed by the Company for helping in the purchase of land for the project. The land was purchased from fifty two (52) major land owners in Awada and Khimat. The compensation rate offered and paid to the land owners on an average was INR 197 per square metre of land which was more than the existing Government circle rates of INR 65 to 75 per square metre of land depending upon the time of purchase. The payment of compensation and land registration process was completed during the period from May January Discussions with land owners on a sample basis during site visit indicated that the land sold for the project was not much productive for them because of the higher salt concentration in the soil. As per the land owners, the sale of land came as an opportunity to earn income from an otherwise unproductive land. The payment provided against the land purchased has helped these farmers to find alternative land in a more fertile area or start an alternate livelihood. Mostly cash crops such as cotton are cultivated in the region. 2.3 Land or Right of Way (ROW) Requirements for Associated Facilities The solar power plant will be using the following associated facilities: access roads, transmission lines and sub-station. The project will utilize the existing public roads; no new roads will be built as part of this project. As per the power purchase agreement (PPA) signed with GUVNL, the power evacuation is at 66kV connecting to GETCO State Transmission Utility (STU) system. The power generated from the solar power plant is evacuated through a 66kV transmission line (approximately 2.5 km in length) to Khimat Sub-Station of GETCO. As the project is planned under the Solar Power Policy (2009) of the state of Gujarat, and as per the terms of Power Purchase Agreement, it is the responsibility of GETCO to arrange, provide and Sandland Real Estate Private Limited Page 8
53 maintain the power transmission evacuation facilities upto the 66 kv switchyard of the project. However, in the interest of meeting the commissioning schedule for the project, it was agreed between GETCO and the Company that the Company would manage the construction of transmission lines under the overall supervision and approval of GETCO. GETCO will reimburse the transmission line expenses to SPVs on the basis of GETCO SOR (schedule of rates) while the supply of towers, overhead conductors and other items issued as free issue items for such works. The Construction of the 66kV 2.5km Transmission Line from Project site to Sub-Station of GETCO at Khimat to be reimbursed by GETCO which required the setting up of 13 towers. Each tower footing required 75sq.m. of land. For setting up of transmission towers, 17 landowners have been compensated. A total compensation of around INR 1.7 million has been paid or approximately INR 0.13mn per tower footing. The period of payments to landowners and tower erection was in December 2011 to February-March No further land acquisition or involuntary resettlement issues are expected from the use of the substations which have been in existence for more than 10 years. The transmission line was completed on 20th March The Company has awarded transmission line contract to contractors who are nominated and approved by GETCO. Under these contracts the works have been executed under the supervision of GETCO engineers and in line with GETCO existing policies and frameworks. Table 4 Information on Associated Facilities Associated Facilities Responsible Agency Existing or New Access Road Existing Village Existing Road (State Govt.) Transmission Line Owner : GETCO New till substation. Date of Completion : 20 th March 2012 Substation Owner : GETCO Existing Type of Land Agriculture Private Agriculture and Govt. Land 2.4 Extent of Involuntary Resettlement Impacts There were no permanent or temporary inhabitants dwelling on the site as confirmed by interviews with the local community/village residents during the site visit. The project site is located far from the coast line and no banders or fishing communities were affected. The project also does not require land acquisition of gauchar or grazing land or any state-owned wastelands. Given the characteristics of the site as described above, the construction and operation of the power generation site is not expected to have involuntary resettlement impacts. The project has complied with the national laws and regulations on land acquisition and has incorporated ADB s SPS (2009) as follows: Meaningful consultations with affected people in the issues of land acquisition, or loss of livelihood, if any, have been conducted Employment opportunities have been provided to few of the project affected people and local villagers during project construction activities Sandland Real Estate Private Limited Page 9
54 Established a grievance redressal mechanism to receive and facilitate resolution of the concerns of affected persons. Please refer section 5(i) for details on community grievance redressal mechanism. 2.5 Applicable Regulations governing transfer of land to the Project The land transfer to the project has been done as per section 55 of the Saurashtra Gharkhed Tenancy Settlement and Agriculture Land Ordinance 1949 (as amended in ) applicable in Gujarat. Section 55 outlines the provisions for the Sale of land for bonafide industrial purpose. The following table shows how the acquisition has complied with the provisions of this ordinance: Provisions (1) Nothing in section 54 shall prohibit the sale or the agreement for the sale of land for which no permission is required under sub-section (1) of section 65B of the Bombay Land Revenue Code, 1879 in favour of any person for use of such land by such person for a bonafideindustrial purpose: Provided that (a) The land is not situated within the urban agglomeration as defined in clause (n) of section 2 of the Urban Land (Ceiling and Regulation) Act, (b) Where the area of the land proposed to be sold exceeds ten hectares, the person to whom the land is proposed to be sold in pursuance of this sub-section shall obtain previous permission of the Industries Commissioner, Gujarat state or such other officer, as the State Government may, by an order in writing, authorize in this behalf, (c) The area of the land proposed to be sold shall not exceed four times the area on which construction for a bonafide industrial purpose is proposed to be made by the purchaser: Provide that any additional land which may be required for pollution control measures or required under any relevant law for the time being in force and certified as such by the relevant authority under that law shall not be taken into account for the purpose of computing four times the area, (d) Where the land proposed to be sold is owned by a person belonging to the Scheduled Tribe, the sale shall be subject to the provisions of section 73AA of the Bombay Land Revenue Code, (2) (a) Where the land is sold to a person in pursuance of sub section (1) (here in after referred to as the purchaser ), he shall within thirty days from the date of the purchase of the land for a bonafideindustrial purpose, send a notice of such purchase in such form along with such other particulars as may be prescribed, to the Collector and endorse a copy there of to the Mamlatdar. Status of Compliance Not Applicable (NA) Permission has been obtained from the Industries Commissioner for the project No land has been purchased from person belonging to the Scheduled Tribe.. All the landowners from whom land was purchased were from the Hindu community other than Scheduled Tribe The Notice of Collector and endorsement of registered sale deeds are being complied with the completion of land acquisition for the project. 1 See amendment available from Sandland Real Estate Private Limited Page 10
55 Provisions (b) Where the purchaser fails to send the notice and other particulars to the Collector under clause (a) within the period specified therein, he shall be liable to pay, in addition to the non-agricultural assessment leviable under this Ordinance, such fine not exceeding two thousand rupees as the collector may, subject to rules made under this Ordinance, direct. (c) Where, on receipt of the notice of the date of purchase for the use of land for a bonafideindustrial purpose and other particulars sent by the purchaser under clause (a), the Collector, after making such inquiry as he deems fit (i) is satisfied that the purchaser of such land has validity purchased the land for a bonafideindustrial purpose in conformity with the provisions of sub-section (1), he shall issue a certificate to that effect to the purchaser in such form and within such time as may be prescribed, (ii) is not so satisfied, he shall, after giving the purchaser an opportunity of being heard, refuse to issue such certificate and on such refusal, the sale of the land to the purchaser shall be deemed to be in contravention of Section 54. Status of Compliance Certificate will be issued once the process under Section 2A is complete 3. Audit Findings: Indigenous Peoples 3.1 Project Context The total land acquired by SREPL falls within the villages namely Alwada and Khimat in Banaskantha District, Gujarat State. The villagers belong to the Hindu community. The prominent castes include Kshatriyas, Vaishya, Krushak, and Brahmins. All the landowners from whom land was purchased belonged to the Hindu community. Village-Alwada Alwada is mid-sized village located in the district of Banaskantha, Gujarat (India). Alwada is located at a distance of 31 km from its district Banaskantha and 157 km from its State Capital Gandhinagar. Based on the population, it is found that Alwada village has a healthy sex ratio. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 3,528 Male Population 1,828 Female Population 1,700 Sandland Real Estate Private Limited Page 11
56 Village-Khimat Khimat is a populated village in Dhanera Taluk, BanasKantha District, Gujarat State. Khimat is 16.8 km far from its Taluk Main Town Dhanera and around 25 km distance from its District Main City BanasKantha. It is located 148 km distance from its State Main City Gandhinagar. As per the records of Census 2001, the village has a population of about 6959 persons living in around 1183 households. Population wise, the village has a healthy sex ratio. Majority of the village population consists of the Hindu community. The Hindu castes in the village include Nagar Brahman, Darbari etc. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 6,959 Male Population 3,684 Female Population 3,275 Demographic details of the Banaskantha District as per Census 2001: Total Population 2504,244 Male Population 1,297,404 Female Population 1,206,840 Total Workers Main Workers 830,579 Marginal Workers 261,622 Non-Workers 1,412,043 Literate Population 1,037,619 Literacy Rate Literate (Male) 699,080 Literate (Female) 338,539 Number of SC (Largest Three) Bhambi etc. 158,332 Bhangi etc. 39,435 Mahyavansi 33,884 Number of ST (Largest Three) Bhil etc. 203,077 Generic Tribes etc. 1,830 Padhar 185 The project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the lands where the project s solar power generation facility are being constructed are not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The project is therefore expected to be classified as category C for both involuntary resettlement and IPs. Sandland Real Estate Private Limited Page 12
57 4. Consultation and Participation During project construction, the Company held meetings and public consultations with the residents of Alwada and Khimat villages. The Company made a presentation on the proposed project, development prospects, project impacts and measures to mitigate possible negative impacts. The prospects of improving social and economic status of the region as a result of a successful project implementation as well as corporate social responsibility(csr) activities of the Company were also discussed. The CSR activities proposed by the Company and to be taken up during the operational phase of the project include: Upgradation of village drainage system. Supply of teaching aids, books, and uniforms to schools. Maintenance of village street lighting Women Empowerment Programmes Photos of the consultation conducted are shown below: Sandland Real Estate Private Limited Page 13
58 Figure: Stakeholder consultation held on 21 December During the site visit, discussions were undertaken on an informal basis with a group of 7-8 community members from Alwada and Khimat villages who confirmed that they were made aware of the project by the Company. They indicated their satisfaction with the project which will bring more jobs to the village and opportunities to set up small businesses for construction and operational workers. 5. Audit Findings: Other Social Considerations Other social considerations addressed in this review are related to employee engagement, gender relations, provision of facilities for labour force and safety. a) Employee Engagement SREPL has an existing human resources policy and manual covering employee benefits, equal opportunity, non discrimination, grievance mechanism and others that needs to be followed at all site locations. These include procedures for hiring and recruiting, probation, training, performance review, promotion, insurance, salary and compensation, resignation, lay-off and retrenchment, leave and vacation, and superannuation, which follow Indian labour laws. The policieshave been displayed at the SREPLsite in local language for the awareness of the workers. Most of the construction labourers at site are employed on contractual basis.worker committees have also been formed at the site location on health and safety, harassment and abuse and grievance handling for consultation with the workers. Sandland Real Estate Private Limited Page 14
59 The preference of the Company is to hire local labour during project construction provided they meet the required selection criteria. It also has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws and covers ILO standard. b) Labour Influence Construction phase During construction activities, there has been a sizeable influx of population and labour colony is being constructed with basic amenities for the labour working on the project. The peak labour population is approximately labourers for three monthsand may have an impact of the social fabric of the area surrounding the project. However, this impact is envisaged to be insignificant due to the following reasons: Temporary labour colonies, equipped with basic amenities, have been situated in the areas already acquired for the project. The impact is temporary in nature as it is restricted to the construction phase of the project. After construction phase, the areas acquired by labour colonies shall be reverted to the status at the preconstruction phase. Therefore, conflict of the migrating labour with locals, will not take place during the construction phase. Operation Phase No impact on the local life pattern is envisaged due to operational phase of the project. c) Gender and Development No women participated in the stakeholder consultations undertaken with the villagers near the project site. However, no adverse impact could be envisaged on women in the nearby villages due to the solar power project. The Company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The clause includes the following: Local labour to be hired as much as possible; Ensure labour related regulations are met; In case of outside labour, ensure that their working conditions as well as camps meet local regulations and best practice; Health and safety training of the labour, raising awareness about STDs, HIV and maintaining behavior standards while moving in the community should be a priority Community should be consulted at regular intervals. Any complaints or concerns with respect to labour should be addressed without delay The project manager ensured compliance jointly with team and contractors during the construction phase of the project. Sandland Real Estate Private Limited Page 15
60 The Company has proposed to initiate women empowerment programmes in the nearby villages during the operational phase of the project. However no such initiative has been under taken till now. On an average, 5 % of female workers were employed during the construction phase of the project. Seven contractual workers are currently employed during the operation phase. Female workers are not employed during the operational phase of the project, as the activity of cleaning the solar panels is carried out during night time only and for security reasons, male workers are employed. Further, as the project site is located at remote location, female workers are not employed for safety reasons. However, during day time, few female workers are employed for housekeeping in the project office and cutting grass in the fields. Currently, 2 female workers are employed for such activities. The maximum number of female workers employed during the construction phase of the project was around 40. All the female workers were hired on contract basis. Separate accommodation facility has been provided to female workers staying with their families at the labour camp. Migrant workers who brought their families during the construction phase of the project were provided separate accommodation facility in the labour camp. In order to ensure health and safety of such workers and their families, the company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. d) Working Conditions Adequate steps have been taken to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work, by minimizing, so far as is reasonably practicable, the causes of hazards inherent in the working environment Regular health and safety trainings are provided to workers at site Fire mock drills are being conducted to ensure that all workers in the unit are familiar with the site s overall evacuation procedures Separate mobile toilet facilities for men and women, and drinking water facility have been provided to workers at site locations e) Prohibition of child labour No instance of child labour or young worker was observed at the time of the site visit The company has strict policy in place not to employ anyone below the age of 18 years.these policies and procedures conform to the provisions of the relevant ILO standards.the HR policy for contract workers also restricts the employment of child labour by contractors Sandland Real Estate Private Limited Page 16
61 f) Payment of wages Minimum wages are paid to the workers at site as per the applicable minimum wages in Banaskantha, Gujarat All eligible workers have been covered under ESI (Employees State Insurance) & EPF (Employees Provident Fund) schemes The workers are paid equal wages for similar kind of work regardless of gender. g) Freedom of association Workers in the Company are free to join or form trade unions of their own choice and bargain collectively as per the Trade Unions Act, However, the workers were not associated with any trade union during the construction phase of the project. The Company has developed a parallel means for independent and free association and bargaining for the workers by the formation of worker committees including adequate representation from management and workers. Worker committees have been formed to help workers raise concerns they may have with regard to plant working conditions and also increase their involvement in improving the work environment of the plant. Three committees comprising representation from management and workers were formed include 1) Health & Safety Committee 2) Anti -Sexual Harassment Committee 3) Grievance Handling Committee h) Working Hours Workers are not required to work in excess of 48 hours per week at the site location and are provided with at least one day off for every 7 days period on average. This is in compliance with the national laws on working hours. The laws include: Contract Labour (Regulation and Abolition) Act, 1970 The Building & Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 i) Grievance Management System Environmental and social grievances were handled in accordance with the project grievance redressal mechanism defined under the HR policy for contractors. The Grievance Redressal Mechanism (GRM) for the project provides an effective approach for complaints and resolution of issues made by the affected community in a reliable way. This mechanism was established prior to construction and will remain active throughout the life cycle of the project. Open and transparent dialogue will be maintained with project affected persons as and when needed, in compliance with ADB safeguard policy requirements. Sandland Real Estate Private Limited Page 17
62 The major objectives of the Grievance Redressal Mechanism System are to: create a platform / process for prevailing proactive Industrial Relations; make people accountable for timely redressal of grievances; establish a robust process for addressing contract worker grievances; create a healthy working atmosphere and drive active engagement at contract worker level; have a strategy, supporting long-term business requirements at site; prevent minor disagreements developing into more serious disputes later on; defend against legal intervention A Grievance Redressal Committee (GRC) was formed at the project site to ensure affected people s grievances on both environmental and social concerns are adequately addressed and facilitate timely project implementation. The GRC is comprised the following members: Project head; Liasoning officer Site In charge/admin; Land seller/local Community Member The Company has a robust grievance management system that drives proactive industrial relation (IR) environment, enabling fair opportunity to contract workers to appeal against a grievance through a systematic process. The process includes the following: Step 1: Maintenance of Grievance Registers: Grievance Redressal registers are kept at following locations: Register No. 1: Kept in Time Office. Register No. 2 onwards: Kept at various locations of the Plant as decided by the local HR Head. Step 2: Communication of Grievance Redressal Mechanism All contract workers informed / communicated to register their Grievances in Grievance Redressal Registers, at the convenient locations. These Grievances registered/recorded in the registers studied, analyzed and appropriate solution to query/grievances responded to concerned contract workers by Time Office In-Charge, at least twice a week. The Company shall endeavor to provide resolution to the aggrieved contract worker within 3 days of the grievance registered. Grievance Redressal Mechanism for Local Community The Project Head is responsible for capturing, identifying, maintaining enquiries associated with community grievance in a register, and communicating progress to the concerned community member. Sandland Real Estate Private Limited Page 18
63 A Register containing information such as date, time, location and names of villager and grievance; if any. The record will summarize what information was provided to or discussed with the individual land seller or local community member. At the Sandland site, the only request from local community was for the renovation of village temple which was addressed by the Sandland SPV. There were no grievances related to land acquisition. j) Labour Camps The labour working on site is provided with temporary labour camps, which are close to the site. The labour camp facility is availed by the migrant workers and workers not residing in the nearby villages. Few of the workers are also staying with their family members including children at the camp. Separate shelters have been provided to such families. The labour camps have been provided with basic amenities like drinking water and electricity facility for the workers. 6. Conclusions and Recommendations 6.1 Conclusions Based on the review of available documentation and information gathered during the site visit, there are no outstanding compensation issues with respect to the acquisition of land for the Project s solar power generation facility. The Project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the land where the Project s solar power generation facility has been constructed is not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The information gathered from the available documents and discussions with relevant SREPL staff and affirmation from the SREPL management regarding their continued harmonious relationship with the communities in the Project area are considered sufficient to support the social compliance audit findings relevant to social safeguards. With respect to ADB s SPS, the Project s categorization on involuntary resettlement and indigenous peoples should be categorized as C respectively, and no corrective action plan will be required. Other social dimensions, such as recruitment of SREPL employees, local labour engagement through contracts and need based CSR initiatives based on community consultation by SREPL, are found to be satisfactory. The company has existing policies and procedures (e.g., human resource policy, contractual arrangements with contractors) to address potential concerns and issues. During implementation of the Project, the Company is expected to apply the same policies and procedures as those the company maintains, and it will be required to monitor and report to ADB on contractor s engagement of local employees and labours following the relevant clauses on contractor s agreement and the Company s human resources policy. Sandland Real Estate Private Limited Page 19
64 6.2 Recommendations The need based CSR initiatives based on community consultations may be initiated during the operation phase. Regular Compliance check on the provision of PPE s to the labourers is important safety concern. Appendix 1. Photos of the site Photograph showing solar panels at site Sandland Real Estate Private Limited Page 20
65 Photograph showing switchyard Photograph showing control room at site Sandland Real Estate Private Limited Page 21
66 Social Safeguards Audit Report 25 MWp Ganges Solar Power Project August 2012 Prepared by Ganges Green Energy Private Limited The company hereby acknowledges that as per the mandate letter signed between company and Ernst & Young (E&Y) on 6th January 2012, E&Y has assisted the company in preparation of the Social Safeguard Audit Report based on data and information provided by the company to E&Y. Ganges Green Energy Private Limited Page 1
67 Contents 1. Introduction Project Description Need for the Project Project Location Project Implementation Schedule: Objectives and Scope of the Report Methodology Audit Findings Involuntary Resettlement Land requirements for the Project Land acquisition process Land or Right of Way (ROW) Requirements for Associated Facilities Extent of Involuntary Resettlement Impacts Applicable Regulations governing transfer of land to the Project Audit Findings: Indigenous Peoples Project Context Consultation and Participation Audit Findings: Other Social Considerations...11 a) Employee Engagement...11 b) Labour Influence...12 c) Gender and Development...12 d) Working Conditions...13 e) Prohibition of child labour...13 f) Payment of wages...14 g) Freedom of association...14 h) Working Hours...14 i) Grievance Management System...14 h) Labour Camps Conclusions and Recommendations Conclusions Recommendations...17 Appendix 1: Photos of the site...18 Ganges Green Energy Private Limited Page 2
68 1. Introduction 1.1 Project Description Ganges Green Energy Private Limited (GGEPL) was incorporated on 31 October 2007 to set up a solar PV power project with capacity of 25 MWp at villages Dhank and Mervadar, District- Rajkot in the state of Gujarat (India). The project is implemented under the Solar Power Policy 2009 of Gujarat. Crystalline Silicon PV solar cells shall be used in the project to generate electricity. GGEPL (the Company ) has already signed a Power Purchase Agreement (PPA) for 25 years with Gujarat Urja Vikas Nigam Limited (GUVNL) with permission from Government of Gujarat, for sale of the power generated from the project. Table.1: Project details SI. No Particulars Descriptions 1 Project site Ganges 2 Villages Name Dhank & Mervadar 3 District Name Rajkot 4 Name of the state Gujarat 5 Latitude (North) 6 Longitude (East) 7 Road Accessibility The site is well connected with Upleta via MDR road 8 Nearest Airport Rajkot 9 Nearest City Upleta 10 Land available (Hectares) Water requirement (LPD) 15, Annual Global Irradiance (kwh/m 2 ) Type of PV modules Thin Film and crystalline silicon 14 Proposed Capacity (MW) 25 MWp 15 Capacities of modules proposed (MWp) a) First Solar (5 MW) b) DA (5 MW) c) MBSL (5MW) d) Hanwha ( 10 MW ) 16 Total no of PV modules (Number) Inverter model Sunny central 800KW 3 Phase PCU 18 Annual electricity supplied to grid (MWh) 19 Plant Load factor (%)-First year Project Cost (Million INR) A social safeguards review was conducted for the Project on 23 February 2012 to check the project s compliance to the ADB 2009 Safeguards Policy Statement (SPS) Safeguards Requirements (SR) on 2 Involuntary Resettlement and (SR) 3 on Indigenous Peoples.The review comprised of site visit to the plant area, including the labour camps, canteen facility, the Ganges Green Energy Private Limited Page 3
69 access road leading to the site; informal discussions with few of the landowners and local community members; meetings with the management at Corporate Office in Delhi; and review of available project documentation. The site photos are attached as Appendix Need for the Project Fast economic growth of the state of Gujarat has resulted in increase in electricity consumption by the industrial and commercial sectors. With the current available capacity, Gujarat is not in a position to meet its requirement either in energy requirement terms or peak capacity requirement terms. Energy requirements of the Gujarat state has increased from MU in FY to MU in FY with an energy shortfall of 3149 MU in FY The Electricity Act 2003 stipulates minimum percentage of energy to be derived out of renewable energy sources which shall be binding on all states. Also the Gujarat Electricity Regulatory Commission has made it mandatory for distribution licenses in the state to purchase a fixed percentage of their total power procurement through renewable energy sources, both solar and non solar. 1.3 Project Location The project is located at Latitude (North) and Longitude (East). The site is located in villages Dhank and Mervadar, District Rajkot in the state of Gujarat, India. The elevation of the proposed location is around 40 meters (m) and there is no significant difference in the land levelling across the area. Overall the area is flat with gentle slope. Figure 1 and 2 depicts the map of the region Figure 1: District map of State Gujarat and Rajkot district marking the project location (Source: Detailed Project Report and Ganges Green Energy Private Limited Page 4
70 Figure 2: Satellite view of Village Dhank and Mervadar (Rajkot), Gujarat (Source: Detailed Project Report) 1.4 Project Implementation Schedule: An implementation schedule, outlining the sequence of major activities and the time required for engineering, construction, installation and commissioning of the 25MWp solar PV power plant is provided below. 10 MWp was commissioned on 3 March 2012, while an additional 5 MWp was commissioned on 12 May The plant is expected to be 100% operational by end of August Ganges Green Energy Private Limited Page 5
71 1.5 Objectives and Scope of the Report This report is prepared to assess the compliance of the Project with the 2009 ADB Safeguards Policy Statement, Social Analysis in Private Sector Projects, 2009, ADB s Gender and Development Policy, 1998, Social Protection Requirements as per ADB s Social Protection Strategy 2001 and IFC Performance Standards. The social compliance audit that was conducted on 25 February 2012 at the project site at Ganges, District Rajkot, Gujarat had the following objectives: Identify past or present concerns related to impacts on involuntary resettlement (physical or economic displacement) and ethnic minorities/indigenous Peoples; Determine whether project actions were in accordance with ADB s SR2 and SR3 principles and requirements; and Prepare a corrective action plan (CAP) containing necessary remedial actions (if any) 1.6 Methodology The following activities were undertaken for the purpose of conducting this audit: Data collection from secondary sources such as Forest Atlas and published GOIs data from 2001 population census statistics data, as well as from authorities such as Gujarat Department of Social Justice and Empowerment, and other Departments. Ganges Green Energy Private Limited Page 6
72 Preparation of checklist for collecting project related information against ADB guidelines Review of national and local laws / regulations and procedures relating to land acquisition, employment of labour etc. Review of land allocation documents, permits and other relevant available documents Site visit to the plant area, labour camps, canteen facility etc. Interviews on a sample basis with the following: Employees at the site Contract labour including their family members staying at the labour camps Local community people around the site Land owners Ganges Green Energy Private Limited Page 7
73 2. Audit Findings Involuntary Resettlement 2.1 Land requirements for the Project The total land required for the Project s solar power generation facility is Hectares (ha). The land has been acquired from Adani Enterprises Limited. The acquired portions of land are in villages Dhank and Mervadar. Out of the total land area, the PV module array has been established in ha, while 1.21 ha was required for the balance structures such as the control room and switchyard. The remaining ha is an open area including road coverage. The said land has been acquired by GGEPL through various sale deeds executed with the erstwhile owners after the conversion of the said land into non-agricultural land. Table 3: Land details Village Type of Landuse Prior acquisition Area in (Hectares) Mervadar Non- Agriculture Dhank Non-Agriculture Total Land acquisition process The land acquired for the project site is totally private land and has been purchased from Adani Enterprises limited. The company paid INR 173 per sq.m to Adani Enterprises for the project land. The land by Adani Enterprises was purchased in year 1996 and during discussion for land acquisition with the management of Adani Enterprises, the company didn t encounter any grievances from local community. 2.3 Land or Right of Way (ROW) Requirements for Associated Facilities The solar power plant will be using the following associated facilities: access roads, transmission lines and sub-station. The project is located adjacent to the NH 8 highway road connecting to Upleta city, so no new roads would be required as a part of this project. The company plans to construct a 6 m wide road inside the plant for heavy vehicle movement and around 3 m wide road along the boundary wall for the movement of light vehicle. The power generated is pumped in 66kv transmission line which is less than 1 km long and the project is grid connected to Meharvadar substation in Dhak district. As the project is planned under the Solar Power Policy (2009) of the state of Gujarat, and as per the terms of Power Purchase Agreement, it is the responsibility of GETCO to arrange, provide and maintain the power transmission evacuation facilities upto the 66 KV switchyard of the project. However, in the interest of meeting the commissioning schedule for the project, it was agreed between GETCO and the Company that the Company would manage the construction of transmission lines under the overall supervision and approval of GETCO. GETCO will reimburse the transmission line expenses to SPVs on the basis of GETCO SOR (schedule of rates) while the supply of towers, overhead conductors and other items issued as free issue items for such works. Ganges Green Energy Private Limited Page 8
74 Construction of the 66kV approximately 1 km Transmission Line from Ganges to existing GEDA Meharvadar Sub-Station to be reimbursed by GETCO required the setting up of one (1) tower only on project land and the tower footing required 75 sq.m. of land. Thus, no ROW payment is applicable in this case. The period of payments to project landowners and tower erection was in December 2011 to February-March No further land acquisition or involuntary resettlement issues are expected from the use of the substations which have been in existence for more than 10 years. To that effect, the Company has awarded transmission line contract to contractors who are nominated and approved by GETCO. Under these contracts the works have been executed under the supervision of GETCO engineers and in line with GETCO existing policies and frameworks. The Meharvadar substation is shared with CBC Private Limited and Ganeshvani Private Limited. Table 4 Information on Associated Facilities Associated Facilities Responsible Agency Existing or New Type of Land Access Road State Govt. Existing Agriculture Transmission Line Owner : GETCO New till substation Project Date of land Completion : 28 February 2012 Substation Owner : GEDA Existing 2.4 Extent of Involuntary Resettlement Impacts The land has been purchased from Adani Enterprises Limited. The entire project land was fenced and there were no issues of any involuntary resettlement impacts. The project site is located far from the coast line and no banders or fishing communities were affected. The project also does not require land acquisition of gauchar or grazing land or any state-owned wastelands. 2.5 Applicable Regulations governing transfer of land to the Project The land so acquired is already a Non Agricultural land purchased from Adani Enterprises Limited and can be used for bonafide industrial purpose. 3. Audit Findings: Indigenous Peoples 3.1 Project Context The land for the solar project has been acquired from Adani Enterprises Limited. The acquired portions of land are in villages Dhank and Mervadar in Upleta Taluk, Rajkot District, Gujarat State. a) Village-Dhank Ganges Green Energy Private Limited Page 9
75 Dhank is one of the villages in Upleta Taluk, Rajkot District, Gujarat State. Dhank is around 18 kms from its Taluk main town Upleta and is located 88.8 kms distance from its District main city Rajkot. It is located around 305 kms distance from its State main city Gandhinagar. Nearby villages of Dhank are Pransla, Mervadar, Jal, Rabarika, and Tanasva. As per the records of Census 2001, the village has a population of about 7014 persons living in around 1408 households. Population wise Dhank village has around equal male - female ratio. Majority of the households rely on agriculture as their main source of income in the village. Population Details Total Population 7014 Male Population 3589 Female Population 3425 b) Village Mervadar Mervadar is one of the villages in Upleta Taluk, Rajkot District, Gujarat State. It is at a distance of around 5 kms from village Dhank. Mervadar is around 19 kms far from its Taluk main town Upleta and is located around 93 kms from its District main city Rajkot. It is located at a distance of around 309 kms from its State main city Gandhinagar. As per the records of Census 2001, the village has a population of about 2005 persons living in around 501 households. Population wise Mervadar village has around equal male - female ratio. Majority of the households rely on agriculture as their main source of income in the village. Population Details Total Population 2005 Male Population 998 Female Population 1007 Demographic details of the Rajkot District as per Census 2001: Total Population 3,169,881 Male Population 1,642,018 Female Population 1,527,863 Total Workers 1,244,806 Main Workers 1,076,436 Marginal Workers 168,370 Non-Workers 1,925,075 Literate Population 2,033,946 Literate (Male) 1,166,122 Literate (Female) 867,824 Number of SC (Largest Three) Mahyavansi etc. 134,846 Ganges Green Energy Private Limited Page 10
76 Bhambi etc. 73,355 Bhangi etc. 20,445 Number of ST (Largest Three) Bhil etc. 7,776 Patelia 2,287 Generic Tribes etc. 1,100 The project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, as the land has been purchased from Adani Enterprises, so there were no issues of Involuntary Resettlement or Indigenous People. The project is therefore expected to be classified as category C for both involuntary resettlement and IPs. 4. Consultation and Participation During project construction, the Company held meetings and public consultations with the residents of Dhank and Mervadar villages. During the public consultation meeting, the Company made a presentation on the proposed project, development prospects, project impacts and measures to mitigate possible negative impacts. The prospects of improving social and economic status of the region as a result of a successful project implementation as well as corporate social responsibility (CSR) activities of the Company were also discussed. The CSR activities proposed by the Company and to be taken up during the operational phase of the project include: Community development through training and information center establishment Children education - providing learning material, extracurricular activities Women empowerment strengthening SHGs, skill training During the site visit, discussions were undertaken on an informal basis with a group of 7-8 community members from Dhank and Mervedar villages who confirmed that they were made aware of the project by the Company. They indicated their satisfaction with the project which will bring more jobs to the village and opportunities to set up small businesses for construction and operational workers. 5. Audit Findings: Other Social Considerations Other social considerations addressed in this review are related to employee engagement, gender relations, provision of facilities for labour force and safety. a) Employee Engagement GGEPL, has an existing human resources policy and manual covering employee benefits, equal opportunity, non discrimination, grievance mechanism and others that needs to be followed at all site locations. These include procedures for hiring and recruiting, probation, training, performance review, promotion, insurance, salary and compensation, resignation, lay-off and retrenchment, leave and vacation, and superannuation, which follow Indian labour laws. The policies have been displayed at the GGEPL site in local language for the awareness of the workers. Most of the construction labourers at site are employed on contractual basis. Worker committees have also been formed at the site location on health Ganges Green Energy Private Limited Page 11
77 and safety, harassment and abuse and grievance handling for consultation with the workers. The preference of the company is to hire local labour during project construction provided they meet the required selection criteria. It also has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws and covers ILO standard. b) Labour Influence Construction phase During construction activities, there has been a sizeable influx of population and labour colony is being constructed with basic amenities for the labour working on the project. The peak labour population is approximately labourers for three months and may have an impact of the social fabric of the area surrounding the project. However, this impact is envisaged to be insignificant due to the following reasons: Temporary labour colonies, equipped with basic amenities, have been situated in the areas already acquired for the project. The impact is temporary in nature as it is restricted to the construction phase of the project. After construction phase, the areas acquired by labour colonies shall be reverted to the status at the preconstruction phase. Therefore, conflict of the migrating labour with locals, will not take place during the construction phase. Operation Phase No impact on the local life pattern is envisaged due to operational phase of the project. c) Gender and Development No women participated in the stakeholder consultations undertaken with the villagers near the project site. However, no adverse impact could be envisaged on women in the nearby villages due to the solar power project. The Company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The clause includes the following: Local labour to be hired as much as possible; Ensure labour related regulations are met; In case of outside labour, ensure that their working conditions as well as camps meet local regulations and best practice; Health and safety training of the labour, raising awareness about STDs, HIV and maintaining behavior standards while moving in the community should be a priority Ganges Green Energy Private Limited Page 12
78 Community should be consulted at regular intervals. Any complaints or concerns with respect to labour should be addressed without delay The project manager ensured compliance jointly with team and contractors during the construction phase of the project. The Company has proposed to initiate women empowerment programmes in the nearby villages during the operational phase of the project. However no such initiative has been under taken till now. On an average, 5 % of female workers were employed during the construction phase of the project. Female workers are not employed during the operational phase of the project, as the activity of cleaning the solar panels is carried out during night time only and for security reasons, male workers are employed. Further, as the project site is located at remote location, female workers are not employed for safety reasons. However, during day time, few female workers may be employed for housekeeping in the project office and cutting grass in the fields. Currently, no female workers have been employed for such activities. The maximum number of female workers employed during the construction phase of the project was around 50. All the female workers were hired on contract basis. Separate accommodation facility has been provided to female workers staying with their families at the labour camp. The migrant workers who brought their families during the construction phase of the project were provided separate accommodation facility in the labour camp. In order to ensure health and safety of such workers and their families, the company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. d) Working Conditions Adequate steps have been taken to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work, by minimizing, so far as is reasonably practicable, the causes of hazards inherent in the working environment Regular health and safety trainings are provided to workers at site Fire mock drills are being conducted to ensure that all workers in the unit are familiar with the site s overall evacuation procedures Separate mobile toilet facilities for men and women, and drinking water facility have been provided to workers at site locations e) Prohibition of child labour No instance of child labour or young worker was observed at the time of the site visit The company has strict policy in place not to employ anyone below the age of 18 years. These policies and procedures conform to the provisions of the relevant ILO standards. The HR policy for contract workers also restricts the employment of child labour by contractors Ganges Green Energy Private Limited Page 13
79 f) Payment of wages Minimum wages are paid to the workers at site as per the applicable minimum wages in Rajkot, Gujarat All eligible workers have been covered under ESI (Employees State Insurance) & EPF (Employees Provident Fund) schemes The workers are paid equal wages for similar kind of work regardless of gender. g) Freedom of association Workers in the Company are free to join or form trade unions of their own choice and bargain collectively as per the Trade Unions Act, However, the workers were not associated with any trade union during the construction phase of the project. The Company has developed a parallel means for independent and free association and bargaining for the workers by the formation of worker committees including adequate representation from management and workers. Worker committees have been formed to help workers raise concerns they may have with regard to plant working conditions and also increase their involvement in improving the work environment of the plant. The committees formed comprising representation from management and workers include 1) Health & Safety Committee 2) Anti -Sexual Harassment Committee 3) Grievance Handling Committee h) Working Hours Workers are not required to work in excess of 48 hours per week at the site location and are provided with at least one day off for every 7 days period on average. This is in compliance with the national laws on working hours. The laws include: Contract Labour (Regulation and Abolition) Act, 1970 The Building & Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 i) Grievance Management System Environmental and social grievances are handled in accordance with the project grievance redressal mechanism defined under the HR policy for contractors. The Grievance Redressal Mechanism (GRM) for the project provides an effective approach for complaints and resolution of issues made by the affected community due to project related activities (if any) in a reliable way. This mechanism was established prior to construction and will remain active throughout the life cycle of the project. Open and transparent dialogue will be maintained with project affected persons as and when needed, in compliance with ADB safeguard policy requirements. Ganges Green Energy Private Limited Page 14
80 The major objectives of the Grievance Redressal Mechanism System are to: create a platform / process for prevailing proactive Industrial Relations; make people accountable for timely redressal of grievances; establish a robust process for addressing contract worker grievances; create a healthy working atmosphere and drive active engagement at contract worker level; have a strategy, supporting long-term business requirements at site; prevent minor disagreements developing into more serious disputes later on; defend against legal intervention A Grievance Redressal Committee (GRC) was formed at the project site to ensure community member grievances (if any) on both environmental and social concerns are adequately addressed and facilitate timely project implementation. The GRC comprises the following members: Project head; Liasoning officer Site In charge/admin; Local Community Member Grievance Redressal Mechanism for workers The Company has a robust grievance management system that drives proactive industrial relation (IR) environment, enabling fair opportunity to contract workers to appeal against a grievance through a systematic process. The process includes the following: Step 1: Maintenance of Grievance Registers: Grievance Redressal registers are kept at following locations: Register No. 1: Kept at Time Office. Register No. 2 onwards: Kept at various locations of the Plant as decided by the local HR Head. Step 2: Communication of Grievance Redressal Mechanism All contract workers informed / communicated to register their Grievances in Grievance Redressal Registers, at the convenient locations. These Grievances registered / recorded in the registers are studied, analyzed and appropriate solution to query / grievances responded to concerned contract workers by Time Office In-Charge, at least twice a week. The Company shall endeavor to provide resolution to the aggrieved contract worker within 3 days of the grievance registered. Grievance Redressal Mechanism for Local Community Ganges Green Energy Private Limited Page 15
81 The Project Head is responsible for capturing, identifying, maintaining enquiries associated with community grievance in a register, and communicating progress to the concerned community member. A Register containing information such as date, time, location and names of villager and grievance; if any. The record will summarize what information was provided to or discussed with the community member. At the Ganges site, the two requests from local community were related to upgradation of road adjacent to project boundary and these were suitably addressed by the Ganges SPV. There were no grievances related to land acquisition. j) Labour Camps The labour working on site is provided with temporary labour camps, which are close to the site. The labour camp facility is availed by the migrant workers and workers not residing in the nearby villages. Few of the workers are also staying with their family members including children at the camp. Separate shelters have been provided to such families. The labour camps have been provided with basic amenities like drinking water and electricity facility for the workers. 6. Conclusions and Recommendations 6.1 Conclusions Based on the review of available documentation and information gathered during the site visit, there are no outstanding compensation issues with respect to the acquisition of land for the Project s solar power generation facility. The Project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, as the land has been purchased from Adani Enterprises, so there were no issues of Involuntary Resettlement or Indigenous People. The project is therefore expected to be classified as category C for both involuntary resettlement and IPs. The information gathered from the available documents and discussions with relevant GGEPL staff and affirmation from the GGEPL management regarding their continued harmonious relationship with the communities in the Project area are considered sufficient to support the social compliance audit findings relevant to social safeguards. With respect to ADB s SPS, the Project s categorization on involuntary resettlement and indigenous peoples should be categorized as C respectively, and no corrective action plan will be required. Other social dimensions, such as recruitment of GGEPL employees, local labour engagement through contracts and need based CSR initiatives based on community consultation by GGEPL, are found to be satisfactory. The company has existing policies and procedures (e.g., human resource policy, contractual arrangements with Ganges Green Energy Private Limited Page 16
82 contractors) to address potential concerns and issues. During implementation of the Project, the Company is expected to apply the same policies and procedures as those the company maintains, and it will be required to monitor and report to ADB on contractor s engagement of local employees and labours following the relevant clauses on contractor s agreement and the Company s human resources policy. 6.2 Recommendations The need based CSR initiatives based on community consultations may be initiated during the operation phase. Regular Compliance check on the provision of PPE s to the labourers is important safety concern. Ganges Green Energy Private Limited Page 17
83 Appendix 1: Photos of the site Photographs showing the different areas of the project site Ganges Green Energy Private Limited Page 18
84 Photographs showing the stakeholder consultation conducted at the project site Ganges Green Energy Private Limited Page 19
85 Social Safeguards Audit Report 25 MWp Responsive Solar Power Project August 2012 Prepared by Responsive SUTIP Limited The company hereby acknowledges that as per the mandate letter signed between company and Ernst & Young (E&Y) on 6th January 2012, E&Y has assisted the company in preparation of the Social Safeguard Audit Report based on data and information provided by the company to E&Y. Responsive SUTIP Limited Page 1
86 Contents 1. Introduction Project Description Need for the Project Project Location Project Implementation Schedule Objectives and Scope of the Report Methodology Audit Findings Involuntary Resettlement Land requirements for the Project Land acquisition process and compensation Land or Right of Way (ROW) Requirements for Associated Facilities Extent of Involuntary Resettlement Impacts Applicable Regulations governing transfer of land to the Project Audit Findings: Indigenous Peoples Project Context Consultation and Participation Audit Findings: Other Social Considerations...14 a) Employee Engagement...14 b) Labour Influence...14 c) Gender and Development...15 d) Working Conditions...16 e) Prohibition of child labour...16 f) Payment of wages...16 g) Freedom of Association...16 h) Working Hours...16 i) Grievance Management System...17 h) Labour Camps Conclusions and Recommendations Conclusions Recommendations...19 Appendix A. Photos of the site...19 Responsive SUTIP Limited Page 2
87 1. Introduction 1.1 Project Description Responsive SUTIP Limited was incorporated on 04 February, 2010 to setup a solar PV power project with capacity of 25 MWp (Megawatt Peak) at villages Kamalpur and Rajpar, District Surendranagar in the state of Gujarat (India). The project is implemented under the Solar Power Policy 2009 of Gujarat. Multi Crystalline Silicon PV solar cells shall be used in the project to generate electricity. Responsive SUTIP ( the company ) has already signed a PPA for 25 years with Gujarat Urja Vikas Nigam Limited (GUVNL) with permission from Government of Gujarat, for sale of power generated from the project. The project is under construction and is expected to be commissioned by end of September Table.1: Project details SI. No Particulars Descriptions 1 Project site Responsive 2 Village Name Kamalpur and Rajpar 3 District Name Surendranagar 4 Name of the state Gujarat 5 Latitude (North) 6 Longitude (East) 7 Road Accessibility Road connectivity via Ahmedabad 8 Nearest Airport Ahmedabad 9 Nearest City Ahmedabad 10 Land available (Hectares) Water requirement (LPD) 13, Annual Global Irradiance (kwh/m 2 ) Type of PV module Multi Crystalline solar PV module 14 Proposed Capacity (MW) 25 MWp 15 Total no of PV modules (Number) Inverter model Bonfiglioli RPS TL 1220 PCU 17 Annual electricity supplied to grid MWh (MWh) 18 Annual Plant Load factor (%)- First year 19 Project Cost A social safeguards review was conducted for the Project on 22 February 2012 to check the project s compliance to the ADB Social Safeguards Policy Statement (SPS) Safeguards Requirements (SR) on 2 Involuntary Resettlement and (SR) 3 on Indigenous Peoples. The review comprised of site visit to the plant area, including the labour camps, canteen facility, the access road leading to the site; informal discussions with few of the landowners and Responsive SUTIP Limited Page 3
88 local community members; meetings with the management at Corporate Office in Delhi; and review of available project documentation. The site photos are attached as Appendix Need for the Project Fast economic growth of the state of Gujarat has resulted in increase in electricity consumption by the industrial and commercial sectors. With the current available capacity, Gujarat is not in a position to meet its requirement either in energy requirement terms or peak capacity requirement terms. Energy requirements of the Gujarat state has increased from MU in FY to MU in FY with an energy shortfall of 3149 MU in FY The Electricity Act 2003 stipulates minimum percentage of energy to be derived out of renewable energy sources which shall be binding on all states. Also the Gujarat Electricity Regulatory Commission has made it mandatory for distribution licenses in the state to purchase a fixed percentage of their total power procurement through renewable energy sources, both solar and non solar. 1.3 Project Location The project is located at Latitude North altitude and East longitudes. The site is located in villages Kamalpur and Rajpar, District Surendranagar of the state of Gujarat, India. The project location has well established connectivity and accessibility through road and rail network. Viramgaon is the nearest town from the project site in the Surendranagar district. The surface topography is almost flat. Hence, limited site preparation/leveling activity is needed to make the land flat as per the requirements of solar PV power plant. The entire area is shadow free as there are no shading elements like mountains, large sand dunes, etc on the site. Figure 1 and 2 depicts the map of the region indicating the project location. Responsive SUTIP Limited Page 4
89 Figure 1: District map of Gujarat and Surendranagar district marking the project location (Source: Detailed Project Report and Figure 2: Satellite view of Villages Kamalpur and Rajpar (Surendranagar) Gujarat (Source: Detailed Project Report) 1.4 Project Implementation Schedule The project implementation schedule, outlining the sequence of major activities and the time required for engineering, construction, installation and commissioning of the 25MWp solar PV project is provided below. Currently, the project is under construction phase. The project is scheduled to be commissioned by end of September Responsive SUTIP Limited Page 5
90 Table.2:Project implementation schedule 1.5 Objectives and Scope of the Report This report is prepared to assess the compliance of the 25 MWp solar power project at Responsive with the 2009 ADB Safeguards Policy Statement, Social Analysis in Private Sector Projects, 2009, ADB s Gender and Development Policy, 1998, Social Protection Requirements as per ADB s Social Protection Strategy 2001 and IFC Performance Standards. The social compliance audit that was conducted on 22 February 2012 at the project site at Responsive, District Surendranagar, Gujarat had the following objectives: Identify past or present concerns related to impacts on involuntary resettlement (physical or economic displacement) and ethnic minorities/indigenous Peoples; Determine whether project actions were in accordance with ADB s SR2 and SR3 principles and requirements; and Prepare a corrective action plan (CAP) containing necessary remedial actions (if any) Responsive SUTIP Limited Page 6
91 1.6 Methodology The following activities were undertaken for the purpose of conducting this audit: Data collection from secondary sources such as Forest Atlas and published GOIs data from 2001 population census statistics data, as well as from authorities such as Gujarat Department of Social Justice and Empowerment, and other Departments. Preparation of checklist for collecting project related information against ADB guidelines Review of national and local laws / regulations and procedures relating to land acquisition, employment of labour etc. Review of land allocation documents, permits and other relevant available documents Site visit to the plant area, labour camps, canteen facility etc. Interviews on a sample basis with the following: o Employees at the site o Contract labour including their family members staying at the labour camps o Local community people around the site o Land owners Responsive SUTIP Limited Page 7
92 2. Audit Findings Involuntary Resettlement 2.1 Land requirements for the Project The total land available for the Project s solar power generation facility is Hectares (ha). The land has been acquired from 24 landowners of villages Kamalpur and Rajpar. Out of the total land area, the PV module array shall be established in ha, while 1.21 ha was required for the balance structures such as the control room and switchyard. The remaining ha is an open area including road coverage. Table.3: Land details Village Type of Landuse Prior acquisition Area in (Hectares) Kamalpur Agriculture Rajpar Agriculture Total Land acquisition process and compensation The land acquired for the project site is totally private land and has been purchased on a voluntary basis (willing seller-willing buyer basis) from the land owners. The land was purchased from twenty four (24) land owners in Kamalpur and Rajpar. The compensation rate offered and paid to the land owners on an average was INR 58 per square metre of land which was more than the existing Government circle rates of INR 49 to 53 per square metre of land depending upon the time of purchase. The payment of compensation and land registration process was completed during the period from September 2011 March Discussions with land owners on a sample basis during site visit indicated that the land sold for the project was not much productive for them because of the saltwater ingression in the area. As per the land owners, the sale of land came as an opportunity to earn income from an otherwise unproductive land. The payment provided against the land purchased has helped these farmers to find alternative land in a more fertile area or start an alternate livelihood. Also, as per the landowners, there were other productive plots that were available with them. Mostly cash crops such as cotton and caster are cultivated in the region. 2.3 Land or Right of Way (ROW) Requirements for Associated Facilities The solar power plant will be using the following associated facilities: access roads, transmission lines and sub-station. The project will utilize the existing public roads; no new roads will be built as part of this project. The power generated from the proposed solar power plant would be evacuated through a 66KV transmission line to an existing Sub-Station (Kamalpur) of GETCO, situated about 6 km from the project site. As the project is planned under the Solar Power Policy (2009) of the state of Gujarat, and as per the terms of Power Purchase Agreement, it is the responsibility of GETCO to arrange, provide and maintain the power transmission evacuation facilities upto the 66 KV switchyard of the project. However, in Responsive SUTIP Limited Page 8
93 the interest of meeting the commissioning schedule for the project, it was agreed between GETCO and the Company that the Company would manage the construction of transmission lines under the overall supervision and approval of GETCO. GETCO will reimburse the transmission line expenses to SPVs on the basis of GETCO SOR (schedule of rates) while the supply of towers, overhead conductors and other items issued as free issue items for such works. The Construction of the 66 kv about 6 km transmission line from Responsive to the existing Kamalpur GETCO substation to be reimbursed by GETCO required the setting up of 25 towers. Each tower footing required 75 sq.m of land. For setting up of transmission line towers, around landowners are involved and a total compensation payment of around INR 2.5 Million is expected to be paid to the landowners. The expected construction period for transmission tower erection is August to September 2012 and the payments to landowners shall be made with the progress of the transmission line. No further land acquisition or involuntary resettlement issues are expected from the use of the substations which have been in existence for more than 15 years. The transmission line is shared with 25 MW Solar Power Project namely Ujjawala Power Private Limited. To that effect, the Company has awarded transmission line contract to contractors who are nominated and approved by GETCO. Under these contracts the work is being executed under the supervision of GETCO engineers and in line with GETCO existing policies and frameworks. The Kamalpur substation is shared with Ujjawala Power Private Limited. Table 4 Information on Associated Facilities Associated Responsible Existing or Facilities Agency New Access Road Existing Village Existing Road (State Govt.) Transmission Line Owner : GETCO New till substation Expected Date of Completion : 20 th September 2012 Substation Owner :GETCO Existing 2.4 Extent of Involuntary Resettlement Impacts Type of Land Agriculture Private Agriculture and Govt. Land There were no permanent or temporary inhabitants dwelling on the site as confirmed by interviews with the local community/village residents during the site visit. The project site is located far from the coast line and no banders or fishing communities were affected. The project also does not require land acquisition of gauchar or grazing land or any state-owned wastelands. Given the characteristics of the site as described above, the construction and operation of the power generation site is not expected to have involuntary resettlement impacts. The project has complied with the national laws and regulations on land acquisition and has incorporated ADB s SPS (2009) as follows: Responsive SUTIP Limited Page 9
94 Meaningful consultations with affected people in the issues of land acquisition, or loss of livelihood, if any, have been conducted Employment opportunities have been provided to few of the project affected people and local villagers during project construction activities Established a grievance redressal mechanism to receive and facilitate resolution of the concerns of affected persons. Please refer section 5(i) for details on community grievance redressal mechanism. 2.5 Applicable Regulations governing transfer of land to the Project The land transfer to the project has been done as per section 55 of the Saurashtra Gharkhed Tenancy Settlement and Agriculture Land Ordinance 1949 (as amended in ) applicable in Gujarat. Section 55 outlines the provisions for the Sale of land for bonafide industrial purpose. The following table shows how the acquisition has complied with the provisions of this ordinance: Provisions (1) Nothing in section 54 shall prohibit the sale or the agreement for the sale of land for which no permission is required under sub-section (1) of section 65B of the Bombay Land Revenue Code, 1879 in favour of any person for use of such land by such person for a bonafide industrial purpose: Provided that (a) The land is not situated within the urban agglomeration as defined in clause (n) of section 2 of the Urban Land (Ceiling and Regulation) Act, (b) Where the area of the land proposed to be sold exceeds ten hectares, the person to whom the land is proposed to be sold in pursuance of this sub-section shall obtain previous permission of the Industries Commissioner, Gujarat state or such other officer, as the State Government may, by an order in writing, authorize in this behalf, (c) The area of the land proposed to be sold shall not exceed four times the area on which construction for a bonafide industrial purpose is proposed to be made by the purchaser: Provide that any additional land which may be required for pollution control measures or required under any relevant law for the time being in force and certified as such by the relevant authority under that law shall not be taken into account for the Not Applicable (NA) Status of Compliance Permission has been obtained from the Industries Commissioner for the project 1 See amendment available from Responsive SUTIP Limited Page 10
95 Provisions purpose of computing four times the area, (d) Where the land proposed to be sold is owned by a person belonging to the Scheduled Tribe, the sale shall be subject to the provisions of section 73AA of the Bombay Land Revenue Code, (2) (a) Where the land is sold to a person in pursuance of sub section (1) (here in after referred to as the purchaser ), he shall within thirty days from the date of the purchase of the land for a bonafide industrial purpose, send a notice of such purchase in such form along with such other particulars as may be prescribed, to the Collector and endorse a copy there of to the Mamlatdar. (b) Where the purchaser fails to send the notice and other particulars to the Collector under clause (a) within the period specified therein, he shall be liable to pay, in addition to the non-agricultural assessment leviable under this Ordinance, such fine not exceeding two thousand rupees as the collector may, subject to rules made under this Ordinance, direct. (c) Where, on receipt of the notice of the date of purchase for the use of land for a bonafide industrial purpose and other particulars sent by the purchaser under clause (a), the Collector, after making such inquiry as he deems fit (i) is satisfied that the purchaser of such land has validity purchased the land for a bonafide industrial purpose in conformity with the provisions of sub-section (1), he shall issue a certificate to that effect to the purchaser in such form and within such time as may be prescribed, (ii) is not so satisfied, he shall, after giving the purchaser an opportunity of being heard, refuse to issue such certificate and on such refusal, the sale of the land to the purchaser shall be deemed to be in contravention of Section 54. Status of Compliance No land has been purchased from person belonging to the Scheduled Tribe.. All the landowners from whom land was purchased were from the Hindu community other than Scheduled Tribe The Notice of Collector and endorsement of registered sale deeds are being complied with the completion of land acquisition for the project. Certificate will be issued once the process under Section 2A is complete Responsive SUTIP Limited Page 11
96 3. Audit Findings: Indigenous Peoples 3.1 Project Context The total land acquired by Responsive SUTIP Limited falls in two villages namely Kamalpur and Rajpar in Surendranagar District, Gujarat State. Almost 70% of the villagers belong to the Hindu community. The prominent castes include Darbari, and Brahmins. Village-Kamalpur Kamalpur is a small village located in the district of Surendranagar, Gujarat (India). Kamalpur is around 27 km far from its Taluk Main Town Dasada, and is located at a distance of around 48 km from the district Surendranagar. As per the records of Census 2001, the village has a population of about 955 persons living in around 199 households. Population wise, the village has a healthy sex ratio. Around 70% of the village population consists of the Hindu community while the remaining population consists of Muslim community. The Hindu castes in the village include Nagar Brahman, Darbari etc. Most of the landowners from whom land has been acquired belong to the Hindu community not belonging to Scheduled Tribes. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 955 Male Population 502 Female Population 453 Village-Rajpar Rajpar is a mid-sized village located in the district of Surendranagar, Gujarat (India). Rajpar is located at a distance of 84 km from Gandhinagar. As per the records of Census 2001, the village has a population of about 1062 persons living in around 197 households. Based on the population it can be noted that the village has a healthy sex ratio. Around 70% of the village population consists of the Hindu community while the remaining population consists of Muslim community. The Hindu castes in the village include Nagar Brahman, Darbari etc. The landowners from whom land was acquired are equally distributed between the Hindu and Muslim communities. However none of them belong to the ST community. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Responsive SUTIP Limited Page 12
97 Population Details Total Population 1062 Male Population 556 Female Population 506 Demographic details of the Surendranagar District as per Census 2001: Total Population 1,515,148 Male Population 787,650 Female Population 727,498 Total Workers Main Workers 512,038 Marginal Workers 135,571 Non-Workers 867,539 Literate Population Literacy Rate Literate (Male) 487,094 Literate (Female) 294,061 Number of SC (Largest Three) Mahyavansi etc. 83,092 Bhambi etc. 51,060 Bhangi etc. 14,289 Number of ST (Largest Three) Padhar 10,916 Bhil etc 2,133 General Tribes 363 The project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the lands where the project s solar power generation facility are being constructed are not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The project is therefore expected to be classified as category C for both involuntary resettlement and IPs. 4. Consultation and Participation During project construction, the Company held informal meetings and public consultation with the residents of Kamalpur and Rajpar Villages. The Company made a presentation on the proposed project, development prospects, project impacts and measures to mitigate possible negative impacts. The prospects of improving social and economic status of the region as a result of a successful project implementation as well as corporate social responsibility (CSR) activities of the Company were also discussed. The CSR activities proposed by the Company and to be taken up during the operational phase of the project include: Solar light for temple Assistance for village schools Women empowerment programmes Responsive SUTIP Limited Page 13
98 Transportation facility Drinking water facility During the site visit, discussions were undertaken on an informal basis with a group of 7-8 community members from Kamalpur and Rajpur villages who confirmed that they were made aware of the project by the Company. They indicated their satisfaction with the project which will bring more jobs to the village and opportunities to set up small businesses for construction and operational workers. 5. Audit Findings: Other Social Considerations Other social considerations addressed in this review are related to employee engagement, gender relations, provision of facilities for labour force and safety. a) Employee Engagement Responsive SUTIP, has an existing human resources policy and manual covering employee benefits, equal opportunity, non discrimination, grievance mechanism and others that needs to be followed at all site locations. These include procedures for hiring and recruiting, probation, training, performance review, promotion, insurance, salary and compensation, resignation, lay-off and retrenchment, leave and vacation, and superannuation, which follow Indian labour laws. The policies have been displayed at the Responsive SUTIP site in local language for the awareness of the workers. Most of the construction labourers at site are employed on contractual basis. Worker committees have also been formed at the site location on health and safety, harassment and abuse and grievance handling for consultation with the workers. The preference of the company is to hire local labour during project construction provided they meet the required selection criteria. It also has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws and covers ILO standard. b) Labour Influence Construction phase During construction activities, there will be a sizeable influx of population and labour colony is being constructed with basic amenities for the labour working on the project. The peak labour population is approximately laborers for three months and may have an impact on the social fabric of the area surrounding the project. However, this impact is envisaged to be insignificant due to the following reasons: Temporary labour colonies, equipped with basic amenities, have been situated in the areas already acquired for the project. The impact is temporary in nature as it is restricted to the construction phase of the project. After construction phase, the areas acquired by labour colonies shall be reverted to the status at the preconstruction phase. Responsive SUTIP Limited Page 14
99 Therefore, conflict of the migrating labour with locals, will not take place during the construction phase. Operation Phase No impact on the local life pattern is envisaged due to operational phase of the project. c) Gender and Development Women were also involved during the community consultation process held during the construction phase of the project. However, no issues or concerns were raised by the women participants during the consultation process. No adverse impact could be envisaged on women in the nearby villages due to the solar power project. The Company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The clause includes the following: Local labour to be hired as much as possible; Ensure labour related regulations are met; In case of outside labour, ensure that their working conditions as well as camps meet local regulations and best practice; Health and safety training of the labour, raising awareness about STDs, HIV and maintaining behavior standards while moving in the community should be a priority Community should be consulted at regular intervals. Any complaints or concerns with respect to labour should be addressed without delay The Company has proposed to initiate women empowerment programmes in the nearby villages during the operational phase of the project. On an average, 5 % of female workers out of total workforce are employed during the construction phase of the project. The maximum number of female workers employed during the construction phase of the project was around 40. All the female workers were hired on contract basis. Separate accommodation facility has been provided to female workers staying with their families at the labour camp. Migrant workers who brought their families during the construction phase of the project were provided separate accommodation facility in the labour camp. In order to ensure health and safety of such workers and their families, the company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The project manager ensured compliance jointly with team and contractors during the construction phase of the project. Responsive SUTIP Limited Page 15
100 d) Working Conditions Adequate steps have been taken to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work, by minimizing, so far as is reasonably practicable, the causes of hazards inherent in the working environment Regular health and safety trainings are provided to workers at site Fire mock drills are being conducted to ensure that all workers in the unit are familiar with the site s overall evacuation procedures Separate mobile toilet facilities for men and women, and drinking water facility have been provided to workers at site locations e) Prohibition of child labour No instance of child labour or young worker was observed at the time of the site visit The company has strict policy in place not to employ anyone below the age of 18 years. These policies and procedures conform to the provisions of the relevant ILO standards. The HR policy for contract workers also restricts the employment of child labour by contractors f) Payment of wages Minimum wages are paid to the workers at site as per the applicable minimum wages in Surendranagar, Gujarat All eligible workers have been covered under ESI (Employees State Insurance) & EPF (Employees Provident Fund) schemes The workers are paid equal wages for similar kind of work regardless of gender. g) Freedom of Association Workers in the Company are free to join or form trade unions of their own choice and bargain collectively as per the Trade Unions Act, However, the workers were not associated with any trade union during the construction phase of the project. The Company has developed a parallel means for independent and free association and bargaining for the workers by the formation of worker committees including adequate representation from management and workers. Worker committees have been formed to help workers raise concerns and also increase their involvement in improving the work environment of the plant. The committees formed comprising representation from management and workers include 1) Health & Safety Committee 2) Anti -Sexual Harassment Committee 3) Grievance Handling Committee h) Working Hours Workers are not required to work in excess of 48 hours per week at the site location and are provided with at least one day off for every 7 days period on average. This is in compliance with the national laws on working hours. The laws include: Responsive SUTIP Limited Page 16
101 Contract Labour (Regulation and Abolition) Act, 1970 The Building & Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 i) Grievance Management System Environmental and social grievances are handled in accordance with the project grievance redressal mechanism defined under the HR policy for contractors. The Grievance Redressal Mechanism (GRM) for the project provides an effective approach for complaints and resolution of issues made by the affected community in a reliable way. This mechanism established prior to construction will remain active throughout the life cycle of the project. Open and transparent dialogue will be maintained with project affected persons as and when needed, in compliance with ADB safeguard policy requirements. The major objectives of the Grievance Redressal Mechanism System are to: create a platform / process for prevailing proactive Industrial Relations; make people accountable for timely redressal of grievances; establish a robust process for addressing contract worker grievances; create a healthy working atmosphere and drive active engagement at contract worker level; have a strategy, supporting long-term business requirements at site; prevent minor disagreements developing into more serious disputes later on; defend against legal intervention A Grievance Redressal Committee (GRC) was formed at the project site to ensure affected people s grievances on both environmental and social concerns are adequately addressed and facilitate timely project implementation. The GRC comprises the following members: Project head; Liasoning officer Site In charge/admin; Land seller Grievance Redressal Mechanism for workers The Company has a robust grievance management system that drives proactive industrial relation (IR) environment, enabling fair opportunity to contract workers to appeal against a grievance through a systematic process. The process includes the following: Step 1: Maintenance of Grievance Registers: Grievance Redressal registers are kept at following locations: Register No. 1: Kept in Time Office. Responsive SUTIP Limited Page 17
102 Register No. 2 onwards: Kept at various locations of the Plant as decided by the local HR Head. Step 2: Communication of Grievance Redressal Mechanism All contract workers informed / communicated to register their Grievances in Grievance Redressal Registers, at the convenient locations. These Grievances registered / recorded in the registers are studied, analyzed and appropriate solution to query / grievances to be responded to concerned contract workers by Time Office In-Charge, at least twice a week. The Company shall endeavor to provide resolution to the aggrieved contract worker within 3 days of the grievance registered. Grievance Redressal Mechanism for Local Community The Project Head is responsible for capturing, identifying, maintaining enquiries associated with community grievance in a register, and communicating progress to the concerned community member. A Register containing information such as date, time, location and names of villager and grievance; if any. The record will summarize what information was provided to or discussed with the individual land seller or local community member. j) Labour Camps The labour working on site is provided with temporary labour camps, which are close to the site. The labour camp facility is availed by the migrant workers and workers not residing in the nearby villages. Few of the workers are also staying with their family members including children at the camp. Separate shelters have been provided to such families. The labour camps have been provided with basic amenities like drinking water and electricity facility for the workers. 6. Conclusions and Recommendations 6.1 Conclusions Based on the review of available documentation and information gathered during the site visit, there are no outstanding compensation issues with respect to the acquisition of land for the Project s solar power generation facility. The Project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the land where the Project s solar power generation facility has been constructed is not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The information gathered from the available documents and discussions with relevant Responsive SUTIP staff and affirmation from the Responsive SUTIP management regarding their continued harmonious relationship with the communities in the Project area are considered sufficient to support the social compliance audit findings relevant to social safeguards. With respect to ADB s SPS, the Project s categorization on Responsive SUTIP Limited Page 18
103 involuntary resettlement and indigenous peoples should be categorized as C respectively, and no corrective action plan will be required. Other social dimensions, such as recruitment of Responsive SUTIP employees, local labour engagement through contracts and need based CSR initiatives based on community consultation by Responsive SUTIP, are found to be satisfactory. The company has existing policies and procedures (e.g., human resource policy, contractual arrangements with contractors) to address potential concerns and issues. During implementation of the Project, the Company is expected to apply the same policies and procedures as those the company maintains, and it will be required to monitor and report to ADB on contractor s engagement of local employees and labourers following the relevant clauses on contractor s agreement and the Company s human resources policy. 6.2 Recommendations Regular Compliance check on the provision of PPE s to the labourers is important safety concern. Appendix 1. Photos of the Responsive site Photograph of office facility Responsive SUTIP Limited Page 19
104 Photograph of storage facility Responsive SUTIP Limited Page 20
105 Social Safeguards Audit Report 25 MWp Ujjawala Solar Power Project August 2012 Prepared by Ujjawala Power Private Limited The company hereby acknowledges that as per the mandate letter signed between company and Ernst & Young (E&Y) on 6th January 2012, E&Y has assisted the company in preparation of the Social Safeguard Audit Report based on data and information provided by the company to E&Y. Ujjawala Power Private Limited Page 1
106 Contents 1. Introduction Project Description Need for the Project Project Location Project Implementation Schedule Objectives and Scope of the Report Methodology Audit Findings Involuntary Resettlement Land requirements for the Project Land acquisition process and compensation Land or Right of Way (ROW) Requirements for Associated Facilities Extent of Involuntary Resettlement Impacts Applicable Regulations governing transfer of land to the Project Audit Findings: Indigenous Peoples Project Context Consultation and Participation Audit Findings: Other Social Considerations...14 a) Employee Engagement...14 b) Labour Influence...14 c) Gender and Development...15 d) Working Conditions...15 e) Prohibition of child labour...15 f) Payment of wages...16 g) Freedom of Association...16 h) Working Hours...16 i) Grievance Management System...16 h) Labour Camps Conclusions and Recommendations Conclusions Recommendations...18 Appendix A. Photos of the site...19 Ujjawala Power Private Limited Page 2
107 1. Introduction 1.1 Project Description Ujjawala Power Private Limited (UPPL) was incorporated on 15 September 2010 to setup a 25 MWp solar PV power project at village Kamalpur, District Surendranagar in the state of Gujarat (India). The project is implemented under the Solar Power Policy 2009 of Gujarat. Multi Crystalline Silicon PV solar cells shall be used in the project to generate electricity. UPPL ( the company ) has already signed a PPA for 25 years with Gujarat Urja Vikas Nigam Limited (GUVNL) with permission from Government of Gujarat, for sale of power generated from the project. Table.1: Project details SI. No Particulars Descriptions 1 Project site Ujjawala 2 Village Name Kamalpur 3 District Name Surendranagar 4 Name of the state Gujarat 5 Latitude (North) 6 Longitude (East) 7 Road Accessibility Road connectivity via Ahmedabad 8 Nearest Airport Ahmedabad 9 Nearest City Ahmedabad 10 Land available (Hectares) Water requirement (LPD) Annual Global Irradiance (kwh/m 2 ) Type of PV Module Multi crystalline solar PV module 14 Proposed Capacity (MW) 25 MWp 15 Total no of PV modules (Number) Inverter model 800KW 3 Phase PCU 17 Annual electricity supplied to grid (MWh) 18 Annual Plant Load factor (%) Project Cost (Million INR) A social safeguards review was conducted for the Project on 22 February 2012 to check the project s compliance to the ADB Social Safeguards Policy Statement (SPS) Safeguards Requirements (SR) on 2 Involuntary Resettlement and (SR) 3 on Indigenous Peoples. The review comprised of site visit to the plant area, including the labour camps, canteen facility, the access road leading to the site; informal discussions with few of the landowners and local community members; meetings with the management at Corporate Office in Delhi; and review of available project documentation. The site photos are attached as Appendix1. Ujjawala Power Private Limited Page 3
108 1.2 Need for the Project Fast economic growth of the state of Gujarat has resulted in increase in electricity consumption by the industrial and commercial sectors. With the current available capacity, Gujarat is not in a position to meet its requirement either in energy requirement terms or peak capacity requirement terms. Energy requirements of the Gujarat state has increased from MU in FY to MU in FY with an energy shortfall of 3149 MU in FY The Electricity Act 2003 stipulates minimum percentage of energy to be derived out of renewable energy sources which shall be binding on all states. Also the Gujarat Electricity Regulatory Commission has made it mandatory for distribution licenses in the state to purchase a fixed percentage of their total power procurement through renewable energy sources, both solar and non solar. 1.3 Project Location The project is located at Latitude North altitude and East longitudes. The site is located in village Kamalpur, District Surendranagar of the state of Gujarat, India. The project location has well established connectivity and accessibility through road and rail network. Viramgaon is the nearest town from the project site in the Surendranagar district. The surface topography is almost flat. Hence, limited site preparation/leveling activity is needed to make the land flat as per the requirements of solar PV power plant. The entire area is shadow free as there are no shading elements like mountains, large sand dunes, etc on the site. Figure 1 and 2 depicts the map of the region indicating the project location. Figure 1: District map of Gujarat and Surendranagar district marking the project location (Source: Detailed Project Report and Ujjawala Power Private Limited Page 4
109 Figure 2: Satellite view of Village Kamalpur (Surendranagar), Gujarat (Source: Detailed Project Report) 1.4 Project Implementation Schedule The project implementation schedule, outlining the sequence of major activities and the time required for engineering, construction, installation and commissioning of the 25MWp solar PV project is provided below. Currently, the project is under construction phase. The project is scheduled to be commissioned by end of September Table.2:Project implementation schedule Ujjawala Power Private Limited Page 5
110 1.5 Objectives and Scope of the Report This report is prepared to assess the compliance of the 25 MWp solar power project at Responsive with the 2009 ADB Safeguards Policy Statement, Social Analysis in Private Sector Projects, 2009, ADB s Gender and Development Policy, 1998, Social Protection Requirements as per ADB s Social Protection Strategy 2001 and IFC Performance Standards. The social compliance audit that was conducted on 22 February 2012 at the project site at Responsive, District Surendranagar, Gujarat had the following objectives: Identify past or present concerns related to impacts on involuntary resettlement (physical or economic displacement) and ethnic minorities/indigenous Peoples; Determine whether project actions were in accordance with ADB s SR2 and SR3 principles and requirements; and Prepare a corrective action plan (CAP) containing necessary remedial actions (if any) 1.6 Methodology The following activities were undertaken for the purpose of conducting this audit: Ujjawala Power Private Limited Page 6
111 Data collection from secondary sources such as Forest Atlas and published GOIs data from 2001 population census statistics data, as well as from authorities such as Gujarat Department of Social Justice and Empowerment, and other Departments. Preparation of checklist for collecting project related information against ADB guidelines Review of national and local laws / regulations and procedures relating to land acquisition, employment of labour etc. Review of land allocation documents, permits and other relevant available documents Site visit to the plant area, labour camps, canteen facility etc. Interviews on a sample basis with the following: o Employees at the site o Contract labour including their family members staying at the labour camps o Local community people around the site o Land owners Ujjawala Power Private Limited Page 7
112 2. Audit Findings Involuntary Resettlement 2.1 Land requirements for the Project The total land required for the Project s solar power generation facility is Hectares (ha). Presently, ha land has been acquired from 8 landowners of village Kamalpur in Surendranagar district, Gujarat. Out of the total land area required for the project, the PV module array shall be established in 42.9 ha, while 1.21 ha will be required for the balance structures such as the control room and switchyard. The remaining 6.47 ha is an open area including road coverage. Table.3: Land details Village Type of Landuse Prior acquisition Area in (Hectares) Kamalpur Agriculture Total Land acquisition process and compensation The ha of land acquired so far for the project site is totally private land and has been purchased on a voluntary basis (willing seller-willing buyer basis) from the land owners. The ha land was purchased from eight (8) land owners in Kamalpur village. The compensation rate offered to these land owners on an average was INR 68 per square metre of land which was more than the existing Government circle rates of INR 49 to 53 per square metre of land depending upon the time of purchase. The land acquisition and registration process for the balance land is expected to be completed by August 2012, post which, the ground clearing shall commence. Discussions with land owners on a sample basis during site visit indicated that the land sold for the project was not much productive for them because of the salt water ingression in the area. As per the land owners, the sale of land came as an opportunity to earn income from an otherwise unproductive land. The payment provided against the land purchased has helped these farmers to find alternative land in a more fertile area or start an alternate livelihood. Also, as per the landowners, there were other productive plots that were available with them. Mostly cash crops such as cotton and caster are cultivated in the region. 2.3 Land or Right of Way (ROW) Requirements for Associated Facilities The solar power plant will be using the following associated facilities: access roads, transmission lines and sub-station. The project will utilize the existing public roads; no new roads will be built as part of this project. The power generated from the proposed solar power plant would be evacuated through a 66KV transmission line to an existing Sub-Station (Kamalpur) of GETCO, situated about 6 km from the project site. As the project is planned under the Solar Power Policy (2009) of the state of Gujarat, and as per the terms of Power Ujjawala Power Private Limited Page 8
113 Purchase Agreement, it is the responsibility of GETCO to arrange, provide and maintain the power transmission evacuation facilities upto the 66 KV switchyard of the project. However, in the interest of meeting the commissioning schedule for the project, it was agreed between GETCO and the Company that the Company would manage the construction of transmission lines under the overall supervision and approval of GETCO. GETCO will reimburse the transmission line expenses to SPVs on the basis of GETCO SOR (schedule of rates) while the supply of towers, overhead conductors and other items issued as free issue items for such works. The Construction of the 66 kv about 6 km transmission line from Ujjawla to the existing Kamalpur GETCO substation to be reimbursed by GETCO required the setting up of 25 towers. Each tower footing required 75 sq.m of land. For setting up of transmission line towers, around landowners are involved and a total compensation payment of around INR 2.5 Million is expected to be paid to the landowners. The expected construction period for transmission tower erection is August to September 2012 and the payments to landowners shall be made with the progress of the transmission line. No further land acquisition or involuntary resettlement issues are expected from the use of the substations which have been in existence for more than 15 years. The transmission line is shared with 25 MW Solar Power Project namely Responsive Sutip Limited. The transmission line is under construction and expected to be completed by the month of September To that effect, the Company has awarded transmission line contract to contractors who are nominated and approved by GETCO. Under these contracts the work is being executed under the supervision of GETCO engineers and in line with GETCO existing policies and frameworks. The transmission line and the Kamalpur substation are shared with Responsive Power Private Limited. Table 4 Information on Associated Facilities Associated Responsible Existing or Facilities Agency New Access Road Existing Village Existing Road (State Govt.) Transmission Line Owner : GETCO New till substation Expected Date of Completion : 20 th September 2012 Substation Owner :GETCO Existing 2.4 Extent of Involuntary Resettlement Impacts Type of Land Agriculture Private Agriculture and Govt. Land There were no permanent or temporary inhabitants dwelling on the site as confirmed by interviews with the local community/village residents during the site visit. The project site is located far from the coast line and no banders or fishing communities were affected. The project also does not require land acquisition of gauchar or grazing land or any state-owned wastelands. Given the characteristics of the site as described above, the construction and operation of the power generation site is not expected to have involuntary resettlement impacts. Ujjawala Power Private Limited Page 9
114 The project has complied with the national laws and regulations on land acquisition and has incorporated ADB s SPS (2009) as follows: Meaningful consultations with affected people in the issues of land acquisition, or loss of livelihood, if any, have been conducted Employment opportunities have been provided to few of the project affected people and local villagers during project construction activities Established a grievance redressal mechanism to receive and facilitate resolution of the concerns of affected persons. Please refer section 5(i) for details on community grievance redressal mechanism. 2.5 Applicable Regulations governing transfer of land to the Project The land transfer to the project has been done as per section 55 of the Saurashtra Gharkhed Tenancy Settlement and Agriculture Land Ordinance 1949 (as amended in ) applicable in Gujarat. Section 55 outlines the provisions for the Sale of land for bonafide industrial purpose. The following table shows how the acquisition has complied with the provisions of this ordinance: Provisions (1) Nothing in section 54 shall prohibit the sale or the agreement for the sale of land for which no permission is required under sub-section (1) of section 65B of the Bombay Land Revenue Code, 1879 in favour of any person for use of such land by such person for a bonafide industrial purpose: Provided that (a) The land is not situated within the urban agglomeration as defined in clause (n) of section 2 of the Urban Land (Ceiling and Regulation) Act, (b) Where the area of the land proposed to be sold exceeds ten hectares, the person to whom the land is proposed to be sold in pursuance of this sub-section shall obtain previous permission of the Industries Commissioner, Gujarat state or such other officer, as the State Government may, by an order in writing, authorize in this behalf, (c) The area of the land proposed to be sold shall not exceed four times the area on which construction for a bonafide industrial purpose is proposed to be made by the purchaser: Provide that any additional land which may be required for Not Applicable (NA) Status of Compliance Permission has been obtained from the Industries Commissioner for the project 1 See amendment available from Ujjawala Power Private Limited Page 10
115 Provisions pollution control measures or required under any relevant law for the time being in force and certified as such by the relevant authority under that law shall not be taken into account for the purpose of computing four times the area, (d) Where the land proposed to be sold is owned by a person belonging to the Scheduled Tribe, the sale shall be subject to the provisions of section 73AA of the Bombay Land Revenue Code, (2) (a) Where the land is sold to a person in pursuance of sub section (1) (here in after referred to as the purchaser ), he shall within thirty days from the date of the purchase of the land for a bonafide industrial purpose, send a notice of such purchase in such form along with such other particulars as may be prescribed, to the Collector and endorse a copy there of to the Mamlatdar. (b) Where the purchaser fails to send the notice and other particulars to the Collector under clause (a) within the period specified therein, he shall be liable to pay, in addition to the non-agricultural assessment leviable under this Ordinance, such fine not exceeding two thousand rupees as the collector may, subject to rules made under this Ordinance, direct. (c) Where, on receipt of the notice of the date of purchase for the use of land for a bonafide industrial purpose and other particulars sent by the purchaser under clause (a), the Collector, after making such inquiry as he deems fit (i) is satisfied that the purchaser of such land has validity purchased the land for a bonafide industrial purpose in conformity with the provisions of sub-section (1), he shall issue a certificate to that effect to the purchaser in such form and within such time as may be prescribed, (ii) is not so satisfied, he shall, after giving the purchaser an opportunity of being heard, refuse to issue such certificate and on such refusal, the sale of the land to the purchaser shall be deemed to be in contravention of Section 54. Status of Compliance No land has been purchased from person belonging to the Scheduled Tribe. All the landowners from whom land was purchased were from the Hindu community other than Scheduled Tribe The Notice of Collector and endorsement of registered sale deeds are being complied with the completion of land acquisition for the project. Certificate will be issued once the process under Section 2A is complete Ujjawala Power Private Limited Page 11
116 3. Audit Findings: Indigenous Peoples 3.1 Project Context The total land acquired by Ujjawala Power Private Limited falls in the village Kamalpur in Surendranagar District, Gujarat State. Almost 70% of the villagers belong to the Hindu community. The prominent castes include Darbari, and Brahmins. Village-Kamalpur Kamalpur is a small village located in the district of Surendranagar, Gujarat (India). Kamalpur is around 27 km far from its Taluk Main Town Dasada, and is located at a distance of around 48 km from the district Surendranagar. As per the records of Census 2001, the village has a population of about 955 persons living in around 199 households. Population wise, the village has a healthy sex ratio. Around 70% of the village population consists of the Hindu community while the remaining population consists of Muslim community. The Hindu castes in the village include Nagar Brahman, Darbari etc. Most of the landowners from whom land has been acquired belong to the Hindu community not belonging to Scheduled Tribes. Majority of the households rely on agriculture as their main source of income in the village. Based on our discussions with the local community members on a sample basis, it was observed that no person belonging to scheduled tribe was currently residing in the village. Population Details Total Population 955 Male Population 502 Female Population 453 Demographic details of the Surendranagar District as per Census 2001: Total Population 1,515,148 Male Population 787,650 Female Population 727,498 Total Workers Main Workers 512,038 Marginal Workers 135,571 Non-Workers 867,539 Literate Population Literacy Rate Literate (Male) 487,094 Literate (Female) 294,061 Ujjawala Power Private Limited Page 12
117 Number of SC (Largest Three) Mahyavansi etc. 83,092 Bhambi etc. 51,060 Bhangi etc. 14,289 Number of ST (Largest Three) Padhar 10,916 Bhil etc 2,133 General Tribes 363 The project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the lands where the project s solar power generation facility are being constructed are not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The project is therefore expected to be classified as category C for both involuntary resettlement and IPs. 4. Consultation and Participation During project construction, the Company held informal meetings and public consultations with the residents of Kamalpur Village. The Company made a presentation on the proposed project, development prospects, project impacts and measures to mitigate possible negative impacts. The prospects of improving social and economic status of the region as a result of a successful project implementation as well as corporate social responsibility (CSR) activities of the Company were also discussed. The CSR activities proposed by the Company and to be taken up during the operational phase of the project include: Solar light for temple Assistance for village schools Women empowerment programmes Transportation facility Drinking water facility During the site visit, discussions were undertaken on an informal basis with a group of 7-8 community members from Kamalpur village who confirmed that they were made aware of the project by the Company. They indicated their satisfaction with the project which will bring more jobs to the village and opportunities to set up small businesses for construction and operational workers. Ujjawala Power Private Limited Page 13
118 5. Audit Findings: Other Social Considerations Other social considerations addressed in this review are related to employee engagement, gender relations, provision of facilities for labour force and safety. a) Employee Engagement UPPL has an existing human resources policy and manual covering employee benefits, equal opportunity, non discrimination, grievance mechanism and others that needs to be followed at all site locations. These include procedures for hiring and recruiting, probation, training, performance review, promotion, insurance, salary and compensation, resignation, lay-off and retrenchment, leave and vacation, and superannuation, which follow Indian labour laws. The policies have been displayed at the UPPL site in local language for the awareness of the workers. Most of the construction labourers at site are employed on contractual basis. Worker committees have also been formed at the site location on health and safety, harassment and abuse and grievance handling for consultation with the workers. The preference of the company is to hire local labour during project construction provided they meet the required selection criteria. It also has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws and covers ILO standard. b) Labour Influence Construction phase During construction activities, there is expected to be a sizeable influx of population and labour colony is proposed to be constructed with basic amenities for the labour working on the project. The peak labour population is envisaged to be approximately laborers for three months and may have an impact on the social fabric of the area surrounding the project. However, this impact is envisaged to be insignificant due to the following reasons: Temporary labour colonies, equipped with basic amenities, will be provided during the project s construction phase The impact is temporary in nature as it is restricted to the construction phase of the project. After construction phase, the areas acquired by labour colonies shall be reverted to the status at the preconstruction phase. Therefore, conflict of the migrating labour with locals, will not take place during the construction phase. Operation Phase Ujjawala Power Private Limited Page 14
119 No impact on the local life pattern is envisaged due to operational phase of the project. c) Gender and Development Women were also involved during the community consultation process held for the project. However, no issues or concerns were raised by the women participants during the consultation process. No adverse impact could be envisaged on women in the nearby villages due to the solar power project. The Company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The clause includes the following: Local labour to be hired as much as possible; Ensure labour related regulations are met; In case of outside labour, ensure that their working conditions as well as camps meet local regulations and best practice; Health and safety training of the labour, raising awareness about STDs, HIV and maintaining behavior standards while moving in the community should be a priority Community should be consulted at regular intervals. Any complaints or concerns with respect to labour should be addressed without delay The Company has proposed to initiate women empowerment programmes in the nearby villages during the operational phase of the project. Migrant workers who bring their families during the construction phase of the project will be provided separate accommodation facility in the labour camp. In order to ensure health and safety of such workers and their families, the company has a standard clause in the contractor s agreements, binding the contractor to comply with the local labour laws. The project manager shall ensure compliance jointly with team and contractors during the construction phase of the project. d) Working Conditions Adequate steps shall be taken to prevent accidents and injury to health arising out of, associated with, or occurring in the course of work, by minimizing, so far as is reasonably practicable, the causes of hazards inherent in the working environment Regular health and safety trainings will be provided to workers at site Fire mock drills will be conducted to ensure that all workers in the unit are familiar with the site s overall evacuation procedures Separate mobile toilet facilities for men and women, and drinking water facility will be provided to workers at site locations e) Prohibition of child labour The company has strict policy in place not to employ anyone below the age of 18 years. These policies and procedures conform to the provisions of the relevant ILO Ujjawala Power Private Limited Page 15
120 standards. The HR policy for contract workers also restricts the employment of child labour by contractors. f) Payment of wages Wages shall be paid to the workers at site as per the applicable minimum wages in Surendranagar, Gujarat All eligible workers shall be covered under ESI (Employees State Insurance) & EPF (Employees Provident Fund) schemes The workers shall be paid equal wages for similar kind of work regardless of gender. g) Freedom of Association Workers in the Company are free to join or form trade unions of their own choice and bargain collectively as per the Trade Unions Act, In case workers are not associated with trade unions, the worker committees shall be formed to help workers raise concerns and also increase their involvement in improving the work environment of the plant. The committees comprising representation from management and workers shall include: 1) Health & Safety Committee 2) Anti -Sexual Harassment Committee 3) Grievance Handling Committee h) Working Hours Workers shall not be required to work in excess of 48 hours per week at the site location and will be provided with at least one day off for every 7 days period on average. This is in compliance with the national laws on working hours. The laws include: Contract Labour (Regulation and Abolition) Act, 1970 The Building & Other Construction Workers (Regulation of Employment and Conditions of Service) Act, 1996 i) Grievance Management System Environmental and social grievances are handled in accordance with the project grievance redressal mechanism defined under the HR policy for contractors. The Grievance Redressal Mechanism (GRM) for the project provides an effective approach for complaints and resolution of issues made by the affected community in a reliable way. This mechanism established prior to construction will remain active throughout the life cycle of the project. Open and transparent dialogue will be maintained with project affected persons as and when needed, in compliance with ADB safeguard policy requirements. The major objectives of the Grievance Redressal Mechanism System are to: create a platform / process for prevailing proactive Industrial Relations; make people accountable for timely redressal of grievances; Ujjawala Power Private Limited Page 16
121 establish a robust process for addressing contract worker grievances; create a healthy working atmosphere and drive active engagement at contract worker level; have a strategy, supporting long-term business requirements at site; prevent minor disagreements developing into more serious disputes later on; defend against legal intervention A Grievance Redressal Committee (GRC) was formed at the project site to ensure affected people s grievances on both environmental and social concerns are adequately addressed and facilitate timely project implementation. The GRC comprises the following members: Project head; Liasoning officer Site In charge/admin; Land seller Grievance Redressal Mechanism for workers The Company also has a robust grievance management system that drives proactive industrial relation (IR) environment, enabling fair opportunity to contract workers to appeal against a grievance through a systematic process. The process includes the following: Step 1: Maintenance of Grievance Registers: Grievance Redressal registers to be kept at following locations: Register No. 1: Kept in Time Office. Register No. 2 onwards: Kept at various locations of the Plant as decided by the local HR Head. Step 2: Communication of Grievance Redressal Mechanism All contract workers informed / communicated to register their Grievances in Grievance Redressal Registers, at the convenient locations. These Grievances registered / recorded in the registers are studied, analyzed and appropriate solution to query / grievances to be responded to concerned contract workers by Time Office In-Charge, at least twice a week. The Company shall endeavor to provide resolution to the aggrieved contract worker within 3 days of the grievance registered. Grievance Redressal Mechanism for Local Community The Project Head is responsible for capturing, identifying, maintaining enquiries associated with community grievance in a register, and communicating progress to the concerned community member. Ujjawala Power Private Limited Page 17
122 A Register containing information such as date, time, location and names of villager and grievance; if any. The record will summarize what information was provided to or discussed with the individual land seller or local community member. No grievance has been recorded at Ujjawala site, related to land acquisition. j) Labour Camps The labour working on site shall be provided with temporary labour camps, which are close to the site. The labour camp facility is expected to be availed by the migrant workers and workers not residing in the nearby villages. The labour camps shall be provided with basic amenities like drinking water and electricity facility for the workers. 6. Conclusions and Recommendations 6.1 Conclusions Based on the review of available documentation and information gathered during the site visit, there are no outstanding compensation issues with respect to the acquisition of land for the Project s solar power generation facility. The Project construction and operation will not in any way affect the dignity, human rights, livelihood systems and culture of the residents of the village. Moreover, the land where the Project s solar power generation facility is to be constructed is not owned, used, occupied, or claimed as ancestral domain or asset of any tribal groups. The information gathered from the available documents and discussions with relevant UPPL staff and affirmation from the UPPL management regarding their harmonious relationship with the communities in the Project area are considered sufficient to support the social compliance audit findings relevant to social safeguards. With respect to ADB s SPS, the Project s categorization on involuntary resettlement and indigenous peoples should be categorized as C respectively, and no corrective action plan will be required. The company has existing policies and procedures (e.g., human resource policy, contractual arrangements with contractors) to address potential concerns and issues. During implementation of the Project, the Company is expected to apply the same policies and procedures as those the company maintains, and it will be required to monitor and report to ADB on contractor s engagement of local employees and labourers following the relevant clauses on contractor s agreement and the Company s human resources policy. 6.2 Recommendations Regular compliance check on the provision of PPE s to the labourers is an important safety concern. Ujjawala Power Private Limited Page 18
123 Appendix 1. Photos of the Ujjawala site Photograph showing the Project Land Photograph showing the Project Land Photographs showing existing access road leading to the site Ujjawala Power Private Limited Page 19
Environmental and Social Monitoring Report
Environmental and Social Monitoring Report Project Number: 44932-054 July 2015 INDIA: 145 MW Grid Connected Solar Project Sand Land Real Estate Private Limited Safeguards Monitoring Report (April 2013
Table of International Standards Related to Human Rights at the Marlin Mine
APPENDIX E Table of International Standards Related to Human Rights at the Marlin Mine Consultation International Human Right Instruments International Good Practice Standards and Guidance GRI (G3 & MMSS)
Ethical Sourcing Policy
Ethical Sourcing Policy Index 1.0 Policy Statement... 2 2.0 Organisational Scope and Compliance... 2 3.0 Policy Purpose... 3 4.0 The ETI Base Code... 3 5.0 Guiding Principles... 4 6.0 Identify suitable
CODE OF ETHICAL POLICY
CODE OF ETHICAL POLICY POLICY STATEMENT The BBC is committed to ensuring a high standard of ethical and environmental trade practices, including the provision of safe working conditions and the protection
PR 5: Land Acquisition, Involuntary Resettlement and Economic Displacement
34 Environmental and Social Policy PR 5: Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or
Code of Conduct. Version 3, November 2009 BSCI 2.3-11/09
Code of Conduct Version 3, November 2009 BSCI 2.3-11/09 All rights reserved. No part of this publication may be reproduced, translated, stored in a retrieval system, or transmitted, in any form or by any
Grievance Management Guidance Note
May 2012 1 Grievance Management Guidance Note 1 EBRD S REQUIREMENTS 1.1 PERFORMANCE REQUIREMENT (PR) 10 INFORMATION DISCLOSURE AND STAKEHOLDER ENGAGEMENT Key Bank requirements relating to grievance management
Performance Standard 8:
Overview of Performance Standards on Environmental and Social Sustainability 1. IFC s Sustainability Framework articulates the Corporation s strategic commitment to sustainable development, and is an integral
DELHI ELECTRICITY REGULATORY COMMISSION
DELHI ELECTRICITY REGULATORY COMMISSION DELHI ELECTRICITY REGULATORY COMMISSION (RENEWABLE PURCHASE OBLIGATION AND RENEWABLE ENERGY CERTIFICATE FRAMEWORK IMPLEMENTATION) REGULATIONS, 2011 No. Dated:. NOTIFICATION
Code of Conduct Sourcing & Supply Chain FAU-F-SPG-2400/EN
Code of Conduct Sourcing & Supply Chain FAU-F-SPG-2400/EN Background Faurecia, a global automotive supplier, is committed to growth founded on socially-responsible actions and behaviors in all countries
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker
KERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Notification No. 2096/KSERC/CT/2014 Dated, Thiruvananthapuram 10 th June 2014. In exercise of the powers conferred under sections 66, 86 (1) (e) and 181 of
External Sustainability Audits Program Manual Version 1.0, April 2013
Sustainability in the Supply Chain External Sustainability Audits Program Manual Version 1.0, April 2013 Siemens AG 2013 All rights reserved. siemens.com/sustainability Table of content 1 Program Background
Code of Corporate Social Responsibility
Code of Corporate Social Responsibility It is Maxim s policy to conduct its business in accordance with all applicable laws, rules and regulations of the jurisdictions in which it does business. In addition,
SAINSBURY S SUPERMARKETS LTD. Code of Conduct For Ethical Trade. Sainsbury s Supermarkets Ltd. 2013 1
SAINSBURY S SUPERMARKETS LTD Code of Conduct For Ethical Trade Sainsbury s Supermarkets Ltd. 2013 1 CONTENTS Sainsbury s Code of Conduct for Ethical Trade... 3 1.1. Introduction... 3 1.2. Scope... 3 1.3.
DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015
DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes
SHRIRAM TRANSPORT FINANCE COMPANY LIMITED. Business Responsibility Policy
SHRIRAM TRANSPORT FINANCE COMPANY LIMITED INTRODUCTION Business Responsibility Policy Shriram Transport Finance Company Limited ( the Company ), conscious about its social, environmental and economic responsibilities
HIRING OF ACCOUNTANTS
HIRING OF ACCOUNTANTS Sealed tenders are invited from experienced and reputed Manpower Agencies for outsourcing of the services of 2 (two) Accountants for work in the Ministry as detailed below: Requirement
THE MURREE-KAHUTA DEVELOPMENT AUTHORITY ACT, 1986
1 of 8 6/2/2011 4:18 PM THE MURREE-KAHUTA DEVELOPMENT AUTHORITY ACT, 1986 (Pb. Act I of 1987) C O N T E N T S SECTIONS CHAPTER I PRELIMINARY 1. Short title, extent and commencement. 2. Definitions. CHAPTER
Contents 1 Editorial Policy 2 Overview of Honda 3 Message from the President and CEO 4 Special Feature 5 Sustainability Management
Performance Report 1 Environment 2 Safety 3 Quality 4 Human Resources 5 Social Activity Supply Chain 7 8 Assurance 9 Financial Data General Standard Disclosures 7 Strategy and Analysis Organizational Profile
Table of GRI indicators
2013 Sustainability Report > Table of GRI indicators Table of GRI indicators The following table of GRI-G3.1 indicators includes a brief description of each, reference to the page in the 2013 Sustainability
Disposal Schedule for Functional records of Retirement Benefits Fund. Disposal Authorisation No. 2416
Disposal Schedule for Functional records of Retirement Benefits Fund Disposal Authorisation No. 2416 TABLE OF CONTENTS INTRODUCTION Page 4 Archives legislation Page 4 Schedule elements and arrangement
To whom application is to be filed
SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED 6-1-50, Corporate Office/Mint Compound/Hyderabad 063. www.tssouthernpower.com, email:[email protected] As per TELANGANA SOLAR POWER POLICY
Kingfisher Global Reporting Initiative Index
Kingfisher Global Reporting Initiative Index Our report contains some standard disclosures from the Global Reporting Initiative Sustainability Reporting Guidelines. This Index is intended to aid comparison
Hiring and Firing in India
Global Journal of Finance and Management. ISSN 0975-6477 Volume 6, Number 6 (2014), pp. 523-528 Research India Publications http://www.ripublication.com Hiring and Firing in India 24- Pritam Road Dalanwala
1. LEGAL REQUIREMENTS
Code of Conduct INTRODUCTION This Code of Conduct is applicable to all suppliers, their subcontractors and other business partners that do business with H&M Hennes & Mauritz AB (publ.), registered in Sweden,
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission
ACCELL GROUP N.V. CODE OF CONDUCT FOR SUPPLIERS
ACCELL GROUP N.V. CODE OF CONDUCT FOR SUPPLIERS This Code of Conduct for Suppliers (the "Code of Conduct") was drawn up by the Board of Directors of Accell Group NV on 11 February 2013. This Code of Conduct
Claims Management Services Regulation. Conduct of Authorised Persons Rules 2014
Claims Management Services Regulation Conduct of Authorised Persons Rules 2014 Effective from 1 October 2014 Contents Introduction 1 Definitions 1 General Rules Principles 2 Conduct of Business 2 Professional
G.O.MS.No. 8 Dated 12.02.2015 Read the following:-
GOVERNMENT OF ANDHRA PRADESH ABSTRACT ENERGY, INFRASTRUCTURE & INVESTMENT DEPARTMENT - Development of Solar Power in Andhra Pradesh Andhra Pradesh Solar Power Policy, 2015 Orders Issued. ------------------------------------------------------------------------------------------------------------
CODE OF CONDUCT. - Euro Sko Norge AS -
CODE OF CONDUCT - Euro Sko Norge AS - Introduction At Euro Sko Norge AS we promote decent working and environmental standards in our supply chains. We cooperate closely with our suppliers and business
Publication of Vacancy Notice Programme Manager Legal Background Ref.: TA-LEGAL-AD6-2013
Publication of Vacancy Notice Programme Manager Legal Background Ref.: TA-LEGAL-AD6-2013 Job Framework JOB PROFILE Job Title: Job Location: Area of activity: Grade: AD 6 Status: Job Content Overall purpose:
PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to December 2, 2015. It is intended for information and reference purposes only. This
Performance Standard 8:
Overview of Performance Standards on Environmental and Social Sustainability 1. IFC s Sustainability Framework articulates the Corporation s strategic commitment to sustainable development, and is an integral
Publication of Vacancy Notice Research Officer Ref.: CA-RESOF-FGIV-2013
Publication of Vacancy Notice Research Officer Ref.: CA-RESOF-FGIV-2013 1. Job Framework Job Title: Job Location: Area of activity: Function Group: Status: 2. Job Content JOB PROFILE Research Officer Vienna,
Performance Standard 2 V2 Labor and Working Conditions
Introduction 1. Performance Standard 2 recognizes that the pursuit of economic growth through employment creation and income generation should be balanced with the protection for basic rights of workers.
Construction CONSTRUCTION
135 R. English CONSTRUCTION Construction GOOD PRACTICE POINTERS Identify stakeholders most likely to be affected by construction. Notify local stakeholders of construction activities and changes to schedules.
PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.
PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to December 2, 2015. It is intended for information and reference purposes only. This
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT GUIDANCE DOCUMENT Each section contains general information on why the standard was set (Yellow text boxes). In many cases, the standards
The Nordic Alcohol Monopolies Code of Conduct Preamble
The Nordic Alcohol Monopolies Code of Conduct Preamble The Nordic Alcohol Monopolies (NAMs) started a cooperation concerning ethical principles in the supply chain in 2008. The joint objective for the
NEED FOR LEGISLATION REGULATING PLACEMENT/ EMPLOYMENT AGENCIES. Background statement of objects and reasons
NEED FOR LEGISLATION REGULATING PLACEMENT/ EMPLOYMENT AGENCIES Prepared by National commission for Women Background statement of objects and reasons The issue of exploitation of women and children domestic
A Guide to Pre-Application Advice and Fees and Planning Performance Agreements
A Guide to Pre-Application Advice and Fees and Planning Performance Agreements V3 Sept 2014 Contents 1. Introduction 2. The Benefits of Pre-Application Advice 3. How do I obtain pre-application advice?
CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems
Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field
Customer Compensation Policy
Date approved: 5 May 2014 Approved by: Chief Executive 1. Introduction 1.1 Southway Housing Trust (Southway) will provide high quality services to our customers and aim to get things right first time.
Chapter Sixteen. Labor
Chapter Sixteen Labor Article 16.1: Statement of Shared Commitment 1. The Parties reaffirm their obligations as members of the International Labor Organization (ILO) and their commitments under the ILO
Pre-Application Planning Advice
Pre-Application Planning Advice Guidance Note and Schedule of Fees Regeneration and Planning (Development Management) December 2014 The Development Management Service is responsible for the determination
The Association offers a factoring service to homeowners whose properties
PARAGON HOUSING ASSOCIATION LIMITED POLICY: POLICY AREA: FACTORING POLICY FINANCE AND INVESTMENT DATE APPROVED: 21 ST AUGUST 2013 DATE NEXT REVIEW: AUGUST 2018 Contents 1. Introduction 2. Aims 3. Objectives
Claims Management Services Regulation. Conduct of Authorised Persons Rules 2013 (2)
Claims Management Services Regulation Conduct of Authorised Persons Rules 2013 (2) Effective from 8 July 2013 Contents Introduction 1 Definitions 1 General Rules Principles 2 Conduct of Business 2 Professional
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI Draft Maharashtra Electricity Regulatory Commission (Net Metering for Rooftop Solar Systems) Regulations, 2015 Electricity Act, 2003 No. MERC / Legal
ONTARIO REGULATION proposed to be made under the
Caution: This draft regulation is provided solely to facilitate dialogue concerning its contents. Should the decision be made to proceed with the proposal, the comments received during consultation will
Criteria for the payment of Country Money
(A). Criteria for the payment, tax free, of country money to workers in the Construction industry and the Electrical Contracting sector. Practice up to September 2007 1. Introduction The payment of tax-free
SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems
SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems Contents Introduction 3 How solar PV power systems work 4 Solar modules 5 Is solar power
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT. No. Dated: October, 2009 NOTIFICATION (DRAFT)
DRAFT MODEL REGULATIONS for STATE ELECTRICITY REGULATORY COMMISSION UNDER SETION 86 (1) (e) OF THE ACT No. Dated: October, 2009 NOTIFICATION (DRAFT) In exercise of powers conferred under sections 61, 66,
KERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION Dated 24 th January 2014 NOTICE Notice is hereby given that Kerala State Electricity Regulatory Commission has published the Draft Kerala State Electricity
32/1/2013-14/PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division
Annexure-A 32/1/2013-14/PVSE(Part-II) Ministry of New and Renewable Energy SPV Off Grid Division Scheme: Installation of 10,000 nos. of solar photovoltaic water pumping systems for irrigation purpose implemented
PROTECTION OF EMPLOYEES (TEMPORARY AGENCY WORK) ACT, 2012. GUIDANCE
PROTECTION OF EMPLOYEES (TEMPORARY AGENCY WORK) ACT, 2012. GUIDANCE Brief Overview Purpose of the Guidance document This guidance document is intended to assist Agency Workers, Hirers of Agency Workers,
INDONESIA - LAW ON WATER RESOURCES,
Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in
Prepared by NITIN BHATIA & downloaded from www.nitinbhatia.in
1. Sale Deed/Title deed /Mother deed/conveyance Deed Description: A sale deed acts as the main legal document for evidencing sale and transfer of ownership of property in favour of the buyer, from the
Secretary-General s bulletin Prohibition of discrimination, harassment, including sexual harassment, and abuse of authority
United Nations ST/SGB/2008/5 Secretariat 11 February 2008 Secretary-General s bulletin Prohibition of discrimination, harassment, including sexual harassment, and abuse of authority The Secretary-General,
Cederroth Corporate Code of Conduct
Cederroth Corporate Code of Conduct Introduction Cederroth believes that we have an important role to play in the deve lopment of a sustainable society. We therefore work with a strong commitment to environmental
150 Watts. Solar Panel. one square meter. Watts
Tool USE WITH Energy Fundamentals Activity land art generator initiative powered by art! 150 Watts 1,000 Watts Solar Panel one square meter 600 Watts SECTION 1 ENERGY EFFICIENCY 250 Watts 1,000 Watts hits
P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification
Procedure Application, Audit and Certification Document No. P-01 Version 9.00 Date of Issue Nov 02, 2015 Reviewed & Approved by Name Designation Signature Date Kaushal Goyal Managing Director Nov 02, 2015
PROJECT : LAKE TURKANA WINDFARM ACCESS ROAD REHABILITATION COUNTRY : KENYA EXECUTIVE SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN
PROJECT : LAKE TURKANA WINDFARM ACCESS ROAD REHABILITATION COUNTRY : KENYA Project reference: P-KE-FZ0-001 EXECUTIVE SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN Head of team: M. GABISCH Investment
BUSINESS ETHICS POLICY
2.1 Background a. Established in 2008, MMTC-PAMP India is among the world s most advanced gold and silver refining and minting facilities. The company is set up as a joint venture between India s MMTC
Cabinet Member (Finance and Resources) (Gary Layzell)
Agenda Item No. REPORT TO: Cabinet Member (Finance and Resources) DATE: 25 March 2015 SERVICE AREA: REPORTING OFFICER: SUBJECT: WARD/S AFFECTED: FORWARD PLAN REF: Finance Benefits Services Manager (Gary
LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK
LOAN NUMBER 3150-ARM(SF) LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 5 SEPTEMBER 2014 ARM 46416 LOAN AGREEMENT
Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC
Draft Solar Energy Purchase Agreement (EPA) subject to approval by TNERC This agreement made at on this day of Two thousand between M/s. (Solar Power Generator name and address) hereinafter called the
TCO Certified Self-assessment Questionnaire
! TCO Certified Self-assessment Questionnaire A.7.2 Senior Management Representative, Socially Responsible Manufacturing Introduction: Completion of this Self-assessment Questionnaire is required under
Human Rights and Responsible Business Practices. Frequently Asked Questions
Human Rights and Responsible Business Practices Frequently Asked Questions Introduction The need for companies to understand and address human rights as a responsible business practice is growing. For
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR
RAJASTHAN ELECTRICITY REGULATORY COMMISSION JAIPUR NOTIFICATION 23 rd December, 2010 No.RERC/Secy/Reg. 82 : In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity Act,
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
Vattenfall s Code of Conduct for Suppliers
Vattenfall s Code of Conduct for Suppliers Introduction Vattenfall provides energy for today s society and contributes to the energy system of tomorrow. We are committed to conducting our business activities
Note The amendments described in this circular will be published in the Immigration New Zealand Operational Manual in due course.
21 July 2015 IMMIGRATION NEW ZEALAND INSTRUCTIONS: Amendment Circular No. 2015/07 To: All Manual Holders AMENDMENTS TO THE IMMIGRATION NEW ZEALAND OPERATIONAL MANUAL Introduction This circular outlines
Ceres Unified School District INDEPENDENT CONTRACTOR AGREEMENT 2013-2014
Ceres Unified School District INDEPENDENT CONTRACTOR AGREEMENT 2013-2014 THIS CONTRACT is hereby entered into by the Ceres Unified School District, hereinafter referred to as DISTRICT, and CONTRACTOR MAILING
Sustainable Supplier Charter. UNIT4 Business Procedures
UNIT4 Business Procedures Table of Contents OUR VISION... 3 IMPLEMENTATION... 3 2. ETHICS: POLICY AND PRINCIPLES... 3 2.1 LOYALTY... 3 2.2 CODE OF CONDUCT... 4 2.3 INDEPENDENCE, BRIBERY AND CORRUPTION...
AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES. THIS AGREEMENT, effective this 20th day of April in the year, 2015, between:
AGREEMENT BETWEEN COUNTY AND CONTRACTOR FOR GOODS AND SERVICES THIS AGREEMENT, effective this 20th day of April in the year, 2015, between: MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS, a political subdivision
VODAFONE CODE OF ETHICAL PURCHASING
VODAFONE CODE OF ETHICAL PURCHASING As one of the world's largest telecommunications companies, Vodafone has a significant role to play in enriching people s lives. We also understand that we have a significant
Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification
Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Protocol] is maintained on the Bonsucro website: www.bonsucro.com.
Termination of employment legislation digest
Please note that this country profile might not reflect the current state of the law on termination of employment. For updated information, you are invited to consult the EPLex database. Termination of
VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province
Due Diligence Report November 2014 VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province Quyet Tien Upper Secondary School Prepared by the Ministry of Education and Training,
Apple Supplier Code of Conduct
Apple Supplier Code of Conduct Apple is committed to ensuring that working conditions in Apple s supply chain are safe, that workers are treated with respect and dignity, and that manufacturing processes
LEGAL SCHEME REGULATIONS
LEGAL SCHEME REGULATIONS These Regulations came into force on 1 July 2014. 1 Introduction 1.1 These Regulations govern the Union s legal Scheme. The Rules of the Union set out your other rights and entitlements.
FOR PROPERTY LOSS AND DAMAGE 1
13-20-801. Short title Colorado Revised Statutes Title 13; Article 20; Part 8: CONSTRUCTION DEFECT ACTIONS FOR PROPERTY LOSS AND DAMAGE 1 This part 8 shall be known and may be cited as the Construction
Memorandum Potentially Affected AIA Contract Documents AIA Document A105 2007 AIA Document B105 2007 Important Information
Memorandum Important information related to requirements of state or local laws to include additional provisions in residential construction contracts Potentially Affected AIA Contract Documents AIA Document
EMPLOYMENT LAW OUTLOOK 2016
//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// EMPLOYMENT LAW OUTLOOK 2016 International HR
CHAPTER 13 COMPLIANCE
CHAPTER 13 COMPLIANCE By a Trading Member / Clearing Member 13.1 Annual Accounts and Audit 13.1.1 Every trading member / clearing member shall prepare annual accounts for each financial year ending on
Be it enacted by the People of the State of Illinois,
AN ACT concerning education. Be it enacted by the People of the State of Illinois, represented in the General Assembly: Section 1. This amendatory Act may be referred to as the Performance Evaluation Reform
CAYMAN ISLANDS. Supplement No. 2 published with Gazette No. 21 of 21st October, 2013. HEALTH INSURANCE LAW. (2013 Revision)
CAYMAN ISLANDS Supplement No. 2 published with Gazette No. 21 of 21st October, 2013. HEALTH INSURANCE LAW (2013 Revision) Law 15 of 1997 consolidated with Laws 28 of 2001, 13 of 2003, 13 of 2004, 9 of
SAMPLE SERVICES CONTRACT
SAMPLE SERVICES CONTRACT The parties to this contract are the SAN DIEGO COUNTY WATER AUTHORITY, a county water authority, (the Water Authority) and, [a / an], having its principal place of business at
Compliance by Parties with Statement of Labor Values
Compliance by Parties with Statement of Labor Values As part of the compliance audit conducted for the Report, Paul Hastings examined whether the Parties complied with the standards set forth in the Statement
A SCHEME FOR THE PROJECT OF PARA-LEGAL VOLUNTEERS
NATIONAL LEGAL SERVICES AUTHORITY A SCHEME FOR THE PROJECT OF PARA-LEGAL VOLUNTEERS (Under the Plan of Action for the year 2009-2010) The Project of Para-Legal Volunteers is aimed at imparting legal awareness
Karnataka Private Medical Establishments Act. 2007
Karnataka Private Medical Establishments Act. 2007 Dr. S. B. N.PRAKASH Former district and sessions judge, Now the professor of Law. National Law school of India University. Bangalore. What the law stated
ISO 26000. May 7-9 2008. Sustainability Reporting Today: The Readers Verdict. Updated with linkage tables for GRI s G3 Practices and G3.
GRI and : How to use the GRI Guidelines in conjunction with pics ends ools GRI GRI Research Research & Development Series Series The Amsterdam Global Conference on May 7-9 2008 Sustainability Today: The
GENERAL TERMS AND CONDITIONS
GENERAL TERMS AND CONDITIONS Contents A. SCOPE...3 B. CONFIDENTIALITY, NAME, INTELLECTUAL PROPERTY AND TAX EXEMPT STATUS OF THE WTO...3 B.1. Confidentiality...3 B.2. Use of the name, logo or official seal
SOCIAL AND ETHICAL CHARTER FOR OUR SUPPLIERS
SOCIAL AND ETHICAL CHARTER FOR OUR SUPPLIERS CARREFOUR S COMMITMENT FOR RESPONSIBLE TRADE. 4 SOCIAL AND ETHICAL CHARTER FOR OUR SUPPLIERS CARREFOUR SOCIAL AND ETHICAL RESPONSIBILITY The Carrefour group,
CODE OF CONDUCT FOR PREVENTION OF INSIDER TRADING. (Amended version as approved by the Board of Directors of the Company)
I. PREAMBLE CODE OF CONDUCT FOR PREVENTION OF INSIDER TRADING (Amended version as approved by the Board of Directors of the Company) The Securities and Exchange Board of India (Prohibition of Insider Trading)
