Attachment N.1 SAPN_PUBLIC Houston Kemp Depreciation Report June 2015

Size: px
Start display at page:

Download "Attachment N.1 SAPN_PUBLIC Houston Kemp Depreciation Report June 2015"

Transcription

1 Attachment N.1 SAPN_PUBLIC Houston Kemp Depreciation Report June 2015

2 Analysis of Different Approaches to Calculating Remaining Lives Report for SA Power Networks June 2015 HoustonKemp.com

3 Contact Us Level 40, 161 Castlereagh Street Sydney NSW 2000 Phone: Disclaimer This report is for the exclusive use of the HoustonKemp client named herein. There are no third party beneficiaries with respect to this report, and HoustonKemp does not accept any liability to any third party. Information furnished by others, upon which all or portions of this report are based, is believed to be reliable but has not been independently verified, unless otherwise expressly indicated. Public information and industry and statistical data are from sources we deem to be reliable; however, we make no representation as to the accuracy or completeness of such information. The opinions expressed in this report are valid only for the purpose stated herein and as of the date of this report. No obligations is assumed to revise this report to reflect changes, events or conditions, which occur subsequent to the date hereof. All decisions in connection with the implementation or use of advice or recommendations contained in this report are the sole responsibility of the client. HoustonKemp.com

4 Contents 1. Introduction Statement of credentials 3 2. Project Context 4 3. Different Depreciation Approaches Opening RAB and capex by type/year (baseline approach) The WARL approach The average depreciation approach WARL of capex only approach 9 4. Assessment of different approaches Assessment of illustrative SA Power Networks asset classes Total depreciation allowance Conclusion 15 A1. Terms of Reference 16 A2. Curriculum Vitae 17 HoustonKemp.com 1

5 Figures Figure 1: Value of assets for distribution lines ($million, ) 8 Figure 2: Value of Low Voltage System asset class ($million, ) 11 Figure 3: Difference between the capital revenues under the baseline approach and other depreciation approaches Low Voltage System asset class ($million, ) 12 Tables Table 1: Standard life and remaining asset life (as at 1 July 2015) for key asset classes 10 Table 2: Regulatory depreciation under the different depreciation approaches ($m, nominal) 14 HoustonKemp.com 2

6 1. Introduction I have prepared this report at the request of Minter Ellison on behalf of SA Power Networks. The context of this report is that on 30 April 2015, the Australian Energy Regulator (AER) released its preliminary decision on SA Power Networks regulatory proposal for the 2015/16 to 2019/20 regulatory control period. As part of its preliminary decision, the AER reviewed SA Power Networks proposed method for calculating regulatory depreciation. The AER agreed with most aspects of SA Power Networks methodology, except for SA Power Networks proposed method for calculating the remaining life of assets forecast to exist at 1 July Minter Ellison has requested that we: 1 1. Review the AER's decision on regulatory depreciation 2. Identify and describe: the depreciation methodology used by SA Power Networks in its regulatory proposal; the depreciation methodology used by the AER in making its decision on regulatory depreciation; and other suitable methodologies that could be used to calculate regulatory depreciation for the purpose of Chapter 6 of the Rules. 3. Compare and advise on the merits of the depreciation methodologies we identify. This report is structured as follows: section 2 describes the project context, including SA Power Networks proposed approach and the AER s rationale for its decision; section 3 sets out our assessment of a range of approaches to estimating the remaining life of existing assets including those proposed by SA Power Networks and the AER; and section 4 examines the results. 1.1 Statement of credentials This report has been prepared by Brendan Quach with assistance from Martin Chow. 2 Brendan Quach is a Senior Economist at HoustonKemp. Brendan Quach has fifteen years of experience as an economist, specialising in regulatory and financial modelling and the cost of capital for network businesses. Brendan has recently advised Grid Australia, Energy Networks Association, Sydney Water, the Queensland Competition Authority, Brisbane Airport, Actew Water and Rio Tinto Coal Australia on a range of finance and modelling issues. Curriculum vitae of Brendan Quach is attached to this report at Appendix B. In preparing this report, the author Brendan Quach (herein after referred to as I or my or me ) confirms that I have made all the inquiries that I believe are desirable and appropriate and that no matters of significance that I regard as relevant have, to my knowledge, been withheld from this report. I acknowledge that I have read, understood and complied with the Federal Court of Australia s Practice Note CM 7, Expert Witnesses in Proceedings in the Federal Court of Australia. I have been provided with a copy of the Federal Court of Australia s Practice Note CM 7, Expert Witnesses in Proceedings in the Federal Court of Australia, dated 4 June 2013, and my report has been prepared in accordance with those guidelines. 1 The terms of reference for this project provided by Minter Ellison s is reproduced in Appendix A to this report. 2 Martin Chow is an Economist in HoustonKemp s Sydney office. HoustonKemp.com 3

7 2. Project Context Regulated businesses are able to recover the cost of their investment in assets through an allowance for regulatory depreciation over the economic life of the relevant assets. Regulatory depreciation is calculated as depreciation minus the indexation of the Regulatory Asset Base (RAB). The regulatory depreciation allowance must comply with the requirements of the National Electricity Rules, namely: 1) the schedules must depreciate using a profile that reflects the nature of the assets or category of assets over the economic life of that asset or category of assets; 3 2) the sum of the real value of the depreciation that is attributable to any asset or category of assets over the economic life of that asset or category of assets (such real value being calculated as at the time the value of that asset or category of assets was first included in the regulatory asset base for the relevant distribution system) must be equivalent to the value at which that asset or category of assets was first included in the regulatory asset base for the relevant distribution system; and 4 3) the economic life of the relevant assets and the depreciation methods and rates underpinning the calculation of depreciation for a given regulatory control period must be consistent with those determined for the same assets on a prospective basis in the distribution determination for that period. 5 SA Power Networks submitted its regulatory proposal for the regulatory control period to the AER on 30 October 2014, which included its proposed regulatory depreciation schedules. A key element of SA Power Networks proposed regulatory depreciation schedules was the adoption of the average depreciation approach to calculating the remaining asset lives of each asset group. This approach has previously been accepted by the AER for ETSA Utilities and the Queensland distributors. 6 This approach resulted in a depreciation allowance of $936.0 million ($ nominal) for the regulatory period. 7 The AER rejected SA Power Networks proposed methodology for calculating regulatory depreciation and instead determined a regulatory depreciation allowance of $533.7 million ($ nominal), a reduction of $402.3 million ($ nominal) from SA Power Networks proposal. A portion of this reduction in the depreciation allowance was due to the AER s decision on other aspects of the regulatory proposal such as forecast capex. Notwithstanding these changes, a substantial portion of the reduction was due to the AER s rejection of SA Power Networks average depreciation approach for calculating the remaining lives of existing assets. 8 Instead, in its draft decision, the AER calculated remaining asset lives using a weighted average remaining life (WARL) approach. 9 3 NER, cl (b)(1) 4 NER, cl (b)(2) 5 NER, cl (b)(3) 6 Page 224, AER, Draft decision Queensland Draft distribution determination to , 25 November 2009; and page 234, AER, Final decision Queensland distribution determination to , May Page 167, AER, Final decision South Australia distribution determination to , May Page 5-8, AER, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April We note that the AER accepted substantially all other aspects of SA Power Networks calculation of the depreciation schedules namely the proposed asset categories, the use of straight-line depreciation and proposed standard asset lives for new capex (other than for light vehicles). 9 A detailed description of this approach is set out in section 4.1 of this report. HoustonKemp.com 4

8 The AER reached this decision following its assessment of whether the WARL or the average depreciation approach better reflected the: 10 remaining lives that better reflect the economic life of the combined assets depreciation schedules for the asset classes that better reflect the nature of the assets over their economic lives Ensuring that assets are depreciated in a manner that reflects their economic life safeguards against intergenerational equity issues. 11 That is, profiles that unjustifiably bring forward depreciation result in today s customers paying a greater proportion of the asset s costs than future generations. On the other hand, profiles that unjustifiably defer depreciation result in future generations of customers paying a greater proportion of the asset s costs to the benefit of today s customers. Both cases give rise to intergenerational equity issues, although the AER only alludes to concerns with the bringing forward of depreciation. The AER states that: 12 The most accurate way of estimating remaining asset lives is to track every asset individually. That is, record each asset added to the RAB and track its value over time. In its preliminary decision for SA Power Networks the AER also sets out two secondary considerations, namely: administrative complexity, which was highlighted by the AER as a reason to not track individual assets; 13 and the benefits of having a smoother depreciation profile in the long run by not tracking assets individually. 14 We agree with the AER that individually tracking every asset would be the most accurate method for calculating the true remaining asset lives, 15 thereby, avoiding any intergenerational equity issues. Further, we agree that the primary assessment of whether the depreciation schedules for a category of assets satisfy the requirements of clause 6.5.5(b)(1) of the NER is whether they reflect, with sufficient accuracy, the economic lives of the underlying assets within that category. However, in our opinion, little or no weight should be placed on the secondary considerations raised by the AER in its preliminary decision as they are not factors that the AER is permitted to have regard to under clause 6.5.5(b) of the NER. If a DNSP proposes a more complex approach to calculating its depreciation schedules that more accurately reflects the underlying assets, it cannot be said to be overly excessive in terms of its administration from the DNSP s perspective. In terms of the administrative burden on the AER, we note that checking the accuracy of a depreciation model is a substantially less burdensome task than developing the model. This suggests that an approach proposed by a DNSP will not be overly burdensome for the regulator, even if it involves further work. 10 Page 5-13, AER, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April Footnote 26, page 5-13, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April Page 5-12, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April Page 5-12, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April Footnote 23, page 5-12, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April That is, the remaining asset lives if assets were not aggregated into asset categories and were not recalculated at each reset. HoustonKemp.com 5

9 With respect to the AER s desire to smooth depreciation schedules, in our view this objective is misplaced. The reasons for our conclusion are that: as a distribution network, SA Power Networks has thousands of individual assets, and so no one asset is likely to materially impact its depreciation schedules; most individual assets are replaced with similar assets which would offset any fall in depreciation; to the extent that the AER is concerned about volatility, it is volatility in revenues or prices which concern customers, not volatility in depreciation; and the AER s post-tax revenue model (PTRM) smooths SA Power Networks revenues over a five year period, and so minimises the extent that lumpy depreciation results in revenue volatility. In the following section we assess four depreciation schedules to see which approach best matches the economic life of the underlying assets. HoustonKemp.com 6

10 3. Different Depreciation Approaches There are several approaches that can be used to calculate remaining lives. The ideal approach would be to calculate depreciation for each asset individually. This approach would provide a depreciation schedule that is most aligned with the underlying mix of assets because it avoids the compromises implicit with any averaging methodology. In this section we consider four approaches that simplify the calculation of depreciation by aggregating assets into categories or groups. Based on the asset classes that have been proposed by SA Power Networks and accepted by the AER, we have examined four approaches, namely: 1. where the opening RAB and capex incurred in each individual year in the regulatory period are treated separately (baseline approach); 2. the weighted average remaining life (WARL) approach; 3. the average depreciation approach; and 4. the WARL approach, where the opening RAB and capex incurred during the regulatory period are treated separately (WARL of capex only approach). 3.1 Opening RAB and capex by type/year (baseline approach) The baseline approach is the approach closest to calculating depreciation for each asset individually. Under the baseline approach assets in existence at 1 July 2010 are depreciated using real straight line depreciation over the remaining asset lives adopted for the regulatory period. Capital expenditure in each regulatory year is grouped by asset type and then separately depreciated over their standard economic lives. In our opinion, there are a number of distinct advantages of the baseline approach including: the baseline approach does not combine 1 July 2010 assets with assets from subsequent regulatory control periods and reduces the compromises associated with using a single remaining asset life for assets with disparate economic lives; the depreciation allowance associated with all capital expenditure from 2010/11 will be equivalent to that calculated if all new assets had been individually depreciated; 16 and in the longer term, when 1 July 2010 assets are fully depreciated, SA Power Networks depreciation schedules will align with the ideal approach, ie, equivalent to having all assets individually depreciated. We note that this asset value profile was used by the AER to assess the merits of using a WARL or an average depreciation approach. Figure 1 replicates the AER s analysis for SA Power Networks Distribution Lines asset class. 16 On the presumption that the current standard lives are accurate. HoustonKemp.com 7

11 Figure 1: Value of assets for distribution lines ($million, ) $2,000 $1,800 $1,600 $1,400 $1,200 $1,000 $800 $600 $400 $200 $0 Opening RAB at start of Capex Capex Capex Capex Capex Figure 1 illustrates that a single remaining asset life (which would produce straight line reduction asset values) cannot perfectly match the economic lives of a group of assets with disparate economic lives. In other words, no single remaining asset life can correctly depreciate all of SA Power Networks Distribution Lines assets that is composed of: new investments that occurred during the period, which have a remaining life at 1 July 2015 of close to 55 years; and assets in existence at the start of the regulatory period, which have a remaining life at 1 July 2015 of 16.1 years. 3.2 The WARL approach The WARL approach involves calculating the remaining life for each asset class as at 30 June 2015 based on: the weighted average remaining life (by value) of assets which existed before the regulatory control period; and capex incurred during the regulatory period. In practice, the remaining asset life is calculated as: Where ARL i = RL i AV i AV t i HoustonKemp.com 8

12 ARL i RL i AV i is the average remaining life of asset group i, at the end of the regulatory period; is the remaining life at the end of the regulatory period of assets in group i, including the opening RAB; and is the value of assets at the end of the regulatory period of assets in group i, including the opening RAB. 3.3 The average depreciation approach The average depreciation approach proposed by SA Power Networks in its October 2014 regulatory proposal calculates the remaining life for each asset class as the asset value as at 30 June 2015 divided by average forecast regulatory depreciation for the regulatory period. In practice, the remaining life is calculated as: ARL i = RAVi Dep i t 0.2 Where ARL i RAV i Dep t i is the average remaining life of asset group i, at the end of the regulatory period; is the real value of assets at the end of the regulatory period of assets in group i, including the opening RAB; and is the sum real value of depreciation over the following regulatory period, for all assets in group i, in existence at the end of the current regulatory period. 3.4 WARL of capex only approach The WARL of capex only approach represents a more refined version of the WARL approach it separates the opening RAB and capex incurred. For each asset type, the WARL of capex only approach calculates a remaining life for the opening RAB, and a remaining life for capex incurred during the regulatory period. Consequently, the outputs from this approach involve less averaging when compared to the WARL and average depreciation approach, and offer results that are more aligned with the business underlying asset mix. Specifically, this approach: retains the asset groups that existed at the start of the regulatory period - the remaining life of these asset groups is simply 5 years less than that specified in the last determination; and combines capex of each asset group over the period into a new asset category with the remaining asset lives of these groups calculated using the AER s preferred WARL approach. In other words, under this approach the business would comply with the AER s preferred methodology for determining remaining lives. However, by separating existing assets from new capex SA Power Networks avoids combining assets with disparate economic lives. Consequently, this approach provides a deprecation allowance that more closely aligns to the underlying economic lives of assets. We note that this approach was proposed by TransGrid and was accepted by the AER in its final decision for the regulatory control period of Page 5-7, AER, Final Decision TransGrid Determination to , Attachment 5. HoustonKemp.com 9

13 4. Assessment of different approaches In this section we assess the four identified depreciation approaches, namely: 1. where the opening RAB and capex incurred in each individual year in the regulatory period are treated separately (baseline approach); 2. the weighted average remaining life (WARL) approach; 3. the average depreciation approach; and 4. the WARL approach, where the opening RAB and capex incurred during the regulatory period are treated separately (WARL of capex only approach). The remaining lives for key asset types under the different approaches are shown in Table 1. Table 1: Standard life and remaining asset life (as at 1 July 2015) for key asset classes Asset type Standard Life WARL approach Average depreciation approach WARL of capex only approach Assets held at 30 June 2010 Assets acquired post 30 June 2010 Sub-Transmission Lines Distribution Lines Substations Distribution Transformers LVS Communications Contributions Land Substation land Easements Buildings Vehicles 15 years Vehicles 10 years Light vehicles IT Assets Plant & Tools/Office Furniture WIP n/a n/a n/a n/a n/a Equity raising costs Source: HoustonKemp analysis Note: Please note that these results were prepared for comparison between the different approaches, and may differ slightly from SA Power Networks Revised Proposal. HoustonKemp.com 10

14 Further note: This table does not tabulate the remaining asset lives calculated under the baseline approach. However, the remaining asset lives associated with the baseline approach are depicted in Figure 2. We have assessed each of these depreciation approaches by: replicating the analysis undertaken by the AER in its preliminary determination and assessed the impact of the various depreciation approaches on the asset values of illustrative asset categories; and determining the total depreciation allowance of SA Power Networks. 4.1 Assessment of illustrative SA Power Networks asset classes As noted above, the AER in its preliminary determination assessed the WARL and average depreciation approaches against the baseline approach. This is because the baseline approach produces results that are most refined, and so most reflective of the nature of assets owned by SA Power Networks. We note that the AER assessed the asset values of the Low Voltage System assets in its preliminary decision. We have replicated this analysis in Figure 2 below. Figure 2: Value of Low Voltage System asset class ($million, ) $600 $500 $400 $300 $200 $100 $0 Opening RAB at start of Capex Capex Capex Capex Capex RAB - WARL approach RAB - Avg. Depreciation approach RAB - WARL of capex only approach Note: the bar chart in the figure represents the outcomes under the baseline approach HoustonKemp.com 11

15 In addition to projecting asset values through time we have also calculated the annual capital costs (depreciation and return on capital) 18 under different depreciation approaches. Figure 3 shows the difference between annual capital costs under the baseline approach and those associated with: the WARL depreciation approach; the average depreciation approach; and the WARL of capex depreciation approach. Figure 3: Difference between the capital revenues under the baseline approach and other depreciation approaches Low Voltage System asset class ($million, ) $30 $25 $20 $15 $10 $5 $0 -$5 -$10 -$15 -$20 RAB - WARL approach RAB - Avg. Depreciation approach RAB - WARL of capex only approach Figure 2 again illustrates that a single remaining asset life (which would produce a straight line reduction in asset values) cannot perfectly match the economic lives of a group of assets with disparate economic lives. In other words, no single remaining asset life can correctly depreciate all of SA Power Networks Distribution Lines assets that is composed of: new investments that occurred during the period, which have a remaining life at 1 July 2015 of close to 55 years; and assets in existence at the start of the regulatory period, which have a remaining life at 1 July 2015 of 16.1 years. 18 A pre-tax real WACC of 3.48 per cent as reported in SA Power Networks preliminary determination PTRM HoustonKemp.com 12

16 Further we also note that the AER in its preliminary determination had the following observations: 19 the true economic lives of LVS assets in existence at 30 June 2015 are anticipated to be fully depreciated by 2070/71 (ie, in 55 years, at the end of the economic life of Low Voltage System (LVS) assets acquired in 2014/15); under the WARL approach, the asset value starts above the value when the assets are tracked individually, but drops below it in later years and will fully depreciate the assets after 34 years; and the average depreciation approach appears to match the true depreciation of assets over the first 8 years. However, from then it significantly increases above the required level before falling significantly below, with the result being that all assets are fully depreciated within 18 years. The AER concludes from these observations that: 20 We consider the WARL approach best deals with this issue, producing a more balanced outcome in the long run. In the example, the period when the asset value is higher than if assets where tracked individually (years 1 23) is matched by the period when the asset value is lower than if the assets were tracked individually (years 24 54). The average depreciation approach does not involve any balancing of the kind that occurs under the WARL approach, and it leads to an inappropriate outcome. It does not recognise that existing assets (the black columns) expire after 9.7 years (noted by the kink in the columns of the individually tracked assets). So, it continues to depreciate this asset class as if the old assets still existed, and it results in accelerated depreciation of all assets. In our opinion, these conclusions are not supported by the observed projection of the asset value of Low Voltage System assets. Rather as illustrated by Figure 3, the difference between the capital revenues under the baseline approach and those: under the WARL approach results in SA Power Networks: > substantially under recovering capital revenues from customers over the first nine years; > substantially over recovering capital revenues from customers over the years 10 to 33; and > from years 34 to 54 substantially under recovering capital revenues from customers; under the average depreciation approach results in SA Power Networks: > correctly recovers capital revenues from customers over the first eight years; > over the years 9 to 18 substantially over recovering capital revenues from customers; and > from years 19 to 54 substantially under recovering capital revenues from customers; under the WARL of capex approach results in SA Power Networks generally recovering the correct amount of capital revenues. In other words, both the WARL and average depreciation approaches will give rise to substantial intergenerational equity issues, with customers over time either paying substantially more or less than what would be warranted if assets were more accurately depreciated. Consequently, neither approach is obviously better than the other in terms of minimising intergenerational equity issues. In contrast, a DNSP that adopted either the baseline approach or the WARL of capex depreciation approach does not give rise to any intergenerational equity issues. 19 Page 5-16, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April Pages 5-16 and 5-17, Preliminary Decision SA Power Networks determination to , Attachment 5 (Regulatory depreciation), April HoustonKemp.com 13

17 4.2 Total depreciation allowance We have also considered the impact of different depreciation approaches on SA Power Networks total depreciation allowance. Table 2 sets out the regulatory depreciation allowance under each approach for the regulatory period, based on the numbers contained in SA Power Networks revised proposal. Table 2: Regulatory depreciation under the different depreciation approaches ($m, nominal) Depreciation Approach Total Baseline approach $133.9 $205.9 $218.1 $233.3 $249.8 $1,041.0 WARL approach $106.7 $129.0 $153.2 $172.0 $162.3 $723.1 Avg. depreciation approach $156.8 $181.1 $207.5 $232.9 $258.0 $1,036.2 WARL of capex only approach $130.5 $204.1 $224.3 $241.7 $220.4 $1,021.0 Note: Please note that these results were prepared for comparison between the different approaches, and may differ slightly from SA Power Networks Revised Proposal. The results are generally consistent with the conclusions arising from the analysis above of the depreciation of individual asset categories. Notably, the WARL approach materially underestimates the SA Power Networks depreciation allowance over the regulatory period by $318 million, by providing a total depreciation allowance of $723 million, compared to the more accurate estimate of $1,041 million under the baseline approach. The WARL approach underestimates the depreciation allowance because of the substantial difference (as shown in Table 1) in the economic lives of a number of important asset categories as at 1 July 2015 including: Distribution Lines where the remaining life of pre-1 July 2010 is 16.1 years, compared to the remaining life for new capex of 53.1 years; Substations where the remaining life of pre-1 July 2010 is 13.3 years, compared to the remaining life for new capex of 43.0 years; Distribution Transformers where the remaining life of pre-1 July 2010 is 13.0 years, compared to the remaining life for new capex of 42.8 years; and Low Voltage System where the remaining life of pre-1 July 2010 is 9.7 years, compared to the remaining life for new capex of 53.1 years. As illustrated by Figure 1, where there is a substantial disparity between the remaining asset lives and standard lives, together with a substantial pre-1 July 2010 asset value, then the WARL approach will materially underestimate the depreciation allowance of the combined asset group over the regulatory control period. We also note that there is no material difference between the total depreciation allowances provided by the WARL of capex only approach and the baseline approach. Finally the average depreciation approach will closely match SA Power Networks correct total depreciation allowance over the regulatory control period, although we note that the depreciation allowance would diverge materially in subsequent years. HoustonKemp.com 14

18 4.3 Conclusion Our analysis clearly shows that a single remaining asset life cannot generate a depreciation allowance that accurately reflects a group of assets with disparate economic lives. Consequently, depreciation schedules that are generated by combining existing assets (with short remaining lives) and new capital expenditure will result in substantial intergenerational equity issues. Consequently, we recommend that SA Power Networks adopts either: the baseline approach, which results in the depreciation for all post 1 July 2010 capital expenditure being precisely calculated, while assets in existence at 1 July 2010 are depreciated over the remaining asset lives determined in SA Power Networks 2010 final decision; or the WARL of capex only approach, which separately calculates for each asset category the economic lives of existing assets and new capex over each regulatory period thereby avoiding the distortions associated with combining assets with disparate economic lives. Furthermore, we disagree with the AER s conclusion that the WARL approach results in a balanced outcome in the long run. As shown in Figure 3 the WARL approach will result in substantial intergenerational equity issues, with customers periodically either underpaying or overpaying the capital related costs of each asset group. In addition, we show in Table 2 that the WARL approach will underestimate SA Power Networks total depreciation allowance by $318 million over the regulatory period. HoustonKemp.com 15

19 A1. Terms of Reference Houston Kemp: Terms of Reference We refer you to the AER's Preliminary Determination for SA Power Networks for the 2015/ /20 regulatory control period, and in particular the AER's decision on regulatory depreciation and its reasons in Attachment 5 to the Preliminary Determination (the Depreciation Decision). You are asked to: 1. Review the Depreciation Decision. 2. Identify and describe: (a) the depreciation methodology used by SA Power Networks in its regulatory proposal; (b) the depreciation methodology used by the AER in making the Depreciation Decision; and (c) other suitable methodologies that could be used to calculate regulatory depreciation for the purpose of Chapter 6 of the Rules. 3. Compare and advise on the merits of the depreciation methodologies described in your report. Please note that the Federal Court of Australia has guidelines for expert witnesses, a copy of which can be found at: In preparing your report, please: (a) read the guidelines (paying particular attention to those relating to an expert's duty to the court in section 1); and (b) ensure that you satisfy the requirements set out in section 2 (where applicable). HoustonKemp.com 16

20 A2. Curriculum Vitae Brendan Quach Senior Economist HoustonKemp Economists PO Box Q933 Queen Victoria Building Sydney NSW Website: houstonkemp.com A2.1 Overview Brendan has worked a consulting economist, specialising in network economics and finance in Australia, New Zealand and Asia Pacific region. Over the last 13 years Brendan has advised clients on the application of regulatory principles to airports, ports, telecommunications electricity transmission and distribution networks, water networks and gas pipelines. He has provided advice on application of the building block approach, incentive mechanisms, operating and capital allowances, financing and asset valuation to businesses, a regulators and governments. Brendan is a specialist in the cost of capital for use in regulatory price reviews and contract arbitrations. He has authored reports on all aspects of the cost of capital including equity estimation techniques, the impact of tax imputation credits, and estimating benchmark debt costs. A2.2 Qualifications AUSTRALIAN NATIONAL UNIVERSITY Bachelor of Economics (High Second Class Honours) AUSTRALIAN NATIONAL UNIVERSITY Bachelor of Laws A2.3 Career Details HOUSTONKEMP Economist, Sydney NERA ECONOMIC CONSULTING Economist, Sydney AUSTRALIAN CHAMBER OF COMMERCE AND INDUSTRY HoustonKemp.com 17

21 A2.4 Finance 2015 Sydney Water Estimates of the equity beta for a benchmark water utility Provided an expert report to be submitted to the NSW economic regulator (IPART) on empirical evidence of the equity beta for a water utility in the UK and North America Sale of the Port of Melbourne Cost of capital and financial modelling Provided strategic advice to Victorian Department of Treasury and Finance on the financial implications of different regulatory regimes. Provided a indicative cost of capital estimate for the port TransGrid Cost of Capital Co-authored two expert reports submitted by TransGrid in support of its revenue proposal. The expert report covered all aspects of the new cost of capital framework, including return on equity estimates generated by the CAPM, Black CAPM, the Fama-French three-factor model, and DGMs, and the approach method of transitioning to a trailing average cost of debt Sydney Water Corporation Cost of capital estimation Preparation of two expert reports for submission to the Independent Pricing and Regulatory Tribunal (IPART) on the framework for determining the weighted average cost of capital for infrastructure service providers Queensland Competition Authority Price review Undertook an independent quality assurance assessment of the models used to calculate regulated revenues for Queensland water utilities. The review considered: the formulation of the WACC; the intra year timing of cash flows; and the structural, computational and economic integrity of the models Gilbert + Tobin/Rio Tinto Coal Australia Assistance in drafting expert report on port prices Analysis and expert reports prepared in the context of an arbitration concerning the price to be charged for use of the coal loading facilities at Abbott Point Coal Terminal. Issues addressed included asset valuation, cost of capital, forecast operation and maintenance costs and the economic interpretation of building block regulation Ashurst/Brisbane Airport Corporation Draft access undertaking Advice, analysis and expert report on the weighted average cost of capital (WACC) in the context of the preparation of a draft access undertaking specifying the basis for determining a ten year price path for landing charges necessary to finance a new parallel runway at Brisbane airport. HoustonKemp.com 18

22 2012 APA GasNet Assistance in drafting cost of capital submission Provided drafting assistance and strategic advice to APA on GasNet s cost of capital submission to the AER for the Victorian principal gas transmission network APA Brisbane to Roma Pipeline Assistance in drafting cost of capital submission Provided drafting assistance and strategic advice to APA on the Brisbane to Roma Pipeline cost of capital submission to the AER Energy Networks Association Rate of return framework guideline Co-authored a number of expert reports submitted to the Australian Energy Regulator on the rate of return framework guideline. These report considered a range of financial issues including: the applicability of various financial models to the estimation of the cost of equity; the estimates of the cost of equity from the Black CAPM; estimates of the historic market, size and value premiums; and the payout ratio of created imputation credits Energy Networks Association Advice on the new rate of return framework Advice to the Energy Networks Association on the appropriate the implications of the new allowed rate of return framework to apply to electricity and gas transmission and distribution businesses. This report considered a range of financial models and other information that the regulator should have regard to when setting the regulated return on equity Victorian Gas Networks Black Capital Asset Pricing Model Brendan co-authored a report that examined whether a version of the Black CAPM is better able than an empirical version of the Sharpe-Lintner (SL) CAPM to produce an estimate of the cost of equity that meets the requirements of Rule 87 (1) of the National Gas Rules (NGR). Following an examination of Australian financial data we concluded that an empirical version of the Black CAPM is better able than an empirical version the SL CAPM Energy Networks Association Review of Economic Regulation of Network Service Providers Advice and expert reports submitted to the Australian Energy Market Commission on the new allowed rate of return framework to apply to electricity and gas transmission and distribution businesses, as proposed by the Australian Energy Regulator and the Energy Users Rule Change Committee. HoustonKemp.com 19

23 Energy Networks Association Review of Economic Regulation of Network Service Providers Advice and expert reports submitted to the Australian Energy Market Commission on the expenditure and incentive frameworks to apply to electricity transmission and distribution businesses, as proposed by the Australian Energy Regulator Multinet Gas and SP AusNet - Gas Distribution Report on the market risk premium Co-authored a report that examined a number of issues arising from the draft decision on Envestra s access proposal for the SA gas network. The report considered whether: the historical evidence supported the use of a long term average of 6 per cent; there is any evidence to warrant a MRP at it long term average; and the evidence relied on by the AER to justify its return to a MRP of 6 per cent Dampier to Bunbury Natural Gas Pipeline - Gas Transmission Cost of equity of a regulated natural gas pipeline Co-authored two reports that updated the cost of equity for a gas transmission business and responded to issues raised by the regulator in its draft decision. The report re-estimated the cost of equity of a gas distribution business using the Sharpe Lintner CAPM, Black CAPM, Fama-French three-factor model and a zero beta version of the Fama- French three-factor model Queensland Competition Authority Weighted Average Cost of Capital (WACC) for SunWater Retained to provide two expert reports on the WACC for SunWater a Queensland rural infrastructure business. The first report considered issues pertaining to whether a single or multiple rates of return can be applied across SunWater s network segments. The second report focuses market evidence on the appropriate rate of return for SunWater Mallesons Stephens Jaques/ActewAGL Distribution Determining the averaging period Assisted in the development of an expert report that considered the economic and financial matters arising from the Australian Energy Regulator s decision to reject ActewAGL s proposed risk free rate averaging period Industry Funds Management/Queensland Investment Corporation Due diligence, Port of Brisbane Brendan was retained to advise on various regulatory and competition matters likely to affect the future financial and business performance of the Port of Brisbane, in the context of its sale by the Queensland government. HoustonKemp.com 20

24 2010 Dampier to Bunbury Natural Gas Pipeline (DBNGP) - Gas Transmission Cost of equity of a regulated natural gas pipeline Co-authored a report that examined four well accepted financial models to estimate the cost of equity for a gas transmission business. The report of estimating the cost of equity of a gas distribution business using the Sharpe Lintner CAPM, Black CAPM, Fama-French three-factor model and a zero beta version of the Fama-French three-factor model Jemena - Gas Distribution Cost of equity of a regulated natural gas distribution network Co-authored two reports on the use of the Fama-French three-factor model to estimate the cost of equity for regulated gas distribution business. The report examined whether the Fama-French three-factor model met the dual requirements of the National Gas Code to provide an accurate estimate of the cost of equity and be a well accepted financial model. Using Australian financial data the report also provided a current estimate of the cost of equity for Jemena WA Gas Networks Cost of equity of a regulated natural gas distribution network Co-authored a report that examined a range of financial models that could be used to estimate the cost of equity for a gas distribution business. The report of estimating the cost of equity of a gas distribution business using the Sharpe Lintner CAPM, Black CAPM, Fama-French three-factor model and Fama-French two-factor model. The report examined both the domestic and international data Jemena and ActewAGL Cost of equity of a regulated natural gas distribution network Co-authored a report on alternative financial models for estimating the cost of equity. The report examined the implication of estimating the cost of equity of a gas distribution business using the Sharpe Lintner CAPM, Black CAPM and Fama-French models. The report examined both the domestic and international data Prime Infrastructure Sale of Dalrymple Bay Coal Terminal (DBCT) Brendan provided regulatory advice to a number of potential bidders for the assets of DBCT. Advice included an assessment of the rate of return parameters, depreciation, regulatory modelling and the regulatory arrangements in Queensland Joint Industry Associations - APIA, ENA and Grid Australia Weighted Average Cost of Capital for a regulated energy network Assisted in the drafting of the Joint Industry Associations submission to the Australian Energy Regulator s weighted average cost of capital review. The submission examined the current market evidence of the cost of capital for Australian regulated electricity transmission and distribution businesses. HoustonKemp.com 21

25 2008 Joint Industry Associations - APIA, ENA and Grid Australia Weighted Average Cost of Capital for a regulated energy network Expert report for the Joint Industry Associations on the value of imputation credits. The expert report was attached to their submission to the Australian Energy Regulator s weighted average cost of capital review. The report examined the current evidence of the market value of imputation credits (gamma) created by Australian regulated electricity transmission and distribution businesses. A2.5 Regulation 2015 Ergon Energy Review of regulatory depreciation Provided Ergon with an internal strategy paper assessing different methods for calculating the remaining lives of asset or groups of assets Ausgrid Application of the AER s efficiency benefit sharing scheme Brendan provided expert advice to Ausgrid on the estimation of the efficiency carry-forward to be applied in the period. This advice extended to strategic advice on the implications of the AER s Better Regulation new EBSS Johnson Winter & Slattery/ATCO GAS Application of depreciation options under the new gas rules Assisted in the drafting of an expert report on depreciation options consistent with the new gas rules for ATCO Gas for submission to the Economic Regulation Authority of Western Australia Energy Networks Association Submission to the AER s Proposed Efficiency Incentive Schemes Brendan led a team that undertook to quantitatively investigate the incentive properties of the Australian Energy Regulator s (AER s) proposed efficiency schemes. The output of this assignment was an expert report to the AER s Better Regulation issues paper and internal advice to the ENS on the implications on aspects of the draft determination Actew Corporation Interpretation of economic terms Advice on economic aspects of the draft and final decisions of the Independent Competition and Regulatory Commission in relation to the price controls applying to Actew. HoustonKemp.com 22

26 Gilbert + Tobin/Rio Tinto Coal Australia Assistance in drafting expert report on port prices Analysis and expert reports prepared in the context of an arbitration concerning the price to be charged for use of the coal loading facilities at Abbott Point Coal Terminal. Issues addressed included asset valuation, cost of capital, forecast operation and maintenance costs and the economic interpretation of building block regulation ACTEW Water Review of regulatory models Brendan provided strategic and analytical advice to ACTEW on its regulatory models. The analysis included analysis of the risks and challenges of adopting a post-tax revenue model and the application of expenditure incentive mechanisms Queensland Competition Authority Review of the retail water regulatory models Brendan undertook an independent quality assurance assessment of the financial models relied on by the QCA to set the regulated revenues of SunWater. The review considered: SunWater s Financial model, a model used by SunWater to calculate future electricity prices, an renewals annuity model, as well as the QCA s regulatory model. These models established a set of recommended prices for each of the 30 irrigation schemes operated by SunWater for the period 2014 to Queensland Competition Authority Review of the retail water regulatory models Undertook an independent quality assurance assessment of the models used to calculate regulated revenues for Queensland Urban Utilities, Allconnex Water, and Unitywater. The review considered: the formulation of the WACC; the intra year timing of cashflows; and the structural, computational and economic integrity of the models Queensland Competition Authority Review of the wholesale water regulatory models Undertook an independent quality assurance assessment of the models used to calculate regulated revenues for LinkWater, Seqwater; and WaterSecure. The review considered: the formulation of the WACC; the intra year timing of cashflows; and the structural, computational and economic integrity of the models Minter Ellison /UNELCO Review of regulatory decision by the Vanuatu regulator Assisted in the development of an expert report on a range of matters arising from the Vanuatu regulator s decision to reset electricity prices under four concession contracts held by UNELCO. The matters considered included the methodology employed to calculate the new base price, the appropriateness of the rate of return, the decision by the regulator to reset future prices having regard to past gains/losses. HoustonKemp.com 23

27 2010 Orion Energy, New Zealand Information disclosure regime Provided advice and assistance in preparing submissions by Orion to the New Zealand Commerce Commission, in relation to the Commission s proposed weighted average cost of capital for an electricity lines businesses. Issues addressed included the financial model used to calculate the required return on equity, the appropriate term for the risk free rate and the WACC parameter values proposed by the Commission Grid Australia Amendments to the AER s transmission revenue and asset value models Developed and drafted a submission to the AER on the proposed amendments to the AER's post-tax revenue model (PTRM) and roll forward model (RFM). The proposal focused on a number of suggestions to simplify and increase the usability of the existing models CitiPower and Powercor Victorian Electricity Distribution Network Reliability Incentive Mechanism (S-factor) Brendan was engaged by CitiPower and Powercor to provide advice on the proposed changes to the operation of the reliability incentive mechanism and was subsequently engaged to analysis the final version of the new arrangements. The advice considered the effects of the proposed changes to the operation of the two distribution network service providers. Specifically, how the S-factors would be changed and implications this has to the revenue streams of the two businesses. A comparison was also made with the current ESC arrangements to highlight the changes to the mechanism Electricity Transmission Network Owners Forum (ETNOF) Amendments to the AER s transmission revenue and asset value models Developed and drafted a submission to the AER on the proposed post-tax revenue model (PTRM) and roll forward model (RFM) that would apply to all electricity transmission network service providers (TNSPs). The proposal focused ensuring that the regulatory models gave effect to the AER s regulatory decisions and insures that TNSPs have a reasonable opportunity to recover their efficient costs. HoustonKemp.com 24

PRELIMINARY DECISION CitiPower distribution determination 2016 20

PRELIMINARY DECISION CitiPower distribution determination 2016 20 PRELIMINARY DECISION CitiPower distribution determination 2016 20 Attachment 8 Corporate income tax October 2015 8-0 Attachment 8 Corporate income tax CitiPower determination 2016 20 Commonwealth of Australia

More information

A=RAUSTRALIAN. Draft decision. TransGrid transmission determination. 2015-16 to 2017-18. Attachment 8: Corporate income tax.

A=RAUSTRALIAN. Draft decision. TransGrid transmission determination. 2015-16 to 2017-18. Attachment 8: Corporate income tax. END.028.001.0047 Draft decision TransGrid transmission determination 2015-16 to 2017-18 Attachment 8: Corporate income tax November 2014 ENERGY A=RAUSTRALIAN REGULATOR END.028.001.0047_002 Commonwealth

More information

Queensland Competition Authority SunWater Working Capital Allowance

Queensland Competition Authority SunWater Working Capital Allowance Queensland Competition Authority SunWater Working Capital Allowance Final report 23 August 2011 Contents 1. Introduction 2 1.1 Context 2 1.2 Terms of reference 2 2. Working capital allowances 3 2.1 The

More information

A guide to the AER s review of gas network prices in Victoria

A guide to the AER s review of gas network prices in Victoria A guide to the AER s review of gas network prices in Victoria March 2013 Commonwealth of Australia 2013 This work is copyright. Apart from any use permitted by the Copyright Act 1968, no part may be reproduced

More information

Revenue proposal 2014/15 2018/19. responsive efficient price aware

Revenue proposal 2014/15 2018/19. responsive efficient price aware Revenue proposal 2014/15 2018/19 responsive efficient price aware TRANSGRID REVENUE PROPOSAL 2014/15-2018/19 Contents 1. 2. 3. Executive Summary 1.1 Capital Expenditure 7 1.2 Operating Expenditure 9 1.3

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Revocation and substitution submission Attachment 6-12 Frontier Economics - The appropriate use of

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Revocation and substitution submission Attachmet 5-4 Asset base roll-forward and depreciation Public

More information

Depreciation Options for ATCO Gas Expert report of Gregory Houston ATCO Gas Australia

Depreciation Options for ATCO Gas Expert report of Gregory Houston ATCO Gas Australia Expert report of Gregory Houston ATCO Gas Australia 13 March 2014 NERA Economic Consulting Darling Park Tower 3 201 Sussex Street Sydney NSW 2000 Tel: 61 2 8864 6500 Fax: 61 2 8864 6549 www.nera.com NERA

More information

National Electricity Amendment (Network Support Payments and Avoided TUoS for Embedded Generators) Rule 2011

National Electricity Amendment (Network Support Payments and Avoided TUoS for Embedded Generators) Rule 2011 RULE DETERMINATION National Electricity Amendment (Network Support Payments and Avoided TUoS for Embedded Generators) Rule 2011 Commissioners Pierce Henderson Spalding 22 December 2011 JOHN PIERCE Chairman

More information

SUBMISSION ON THE AER'S DRAFT DISTRIBUTION DETERMINATION 2011-2015, APPENDIX P: DEBT RAISING COSTS

SUBMISSION ON THE AER'S DRAFT DISTRIBUTION DETERMINATION 2011-2015, APPENDIX P: DEBT RAISING COSTS SUBMISSION ON THE AER'S DRAFT DISTRIBUTION DETERMINATION 2011-2015, APPENDIX P: DEBT RAISING COSTS 19 August 2010 119476207 This submission sets out CitiPower Pty (CitiPower) and Powercor Australia Limited's

More information

RULE DETERMINATION Rule Proponents

RULE DETERMINATION Rule Proponents RULE DETERMINATION National Electricity Amendment (Economic Regulation of Network Service Providers) Rule 2012 National Gas Amendment (Price and Revenue Regulation of Gas Services) Rule 2012 Rule Proponents

More information

Appendix 2 Weighted Average Cost of Capital

Appendix 2 Weighted Average Cost of Capital Appendix 2 Weighted Average Cost of Capital 1 Introduction This Appendix 2 sets out Vodafone Australia s calculation of the Weighted Average Cost of Capital ( WACC ) used in determining the capital costs

More information

Jemena Gas Networks (NSW) Ltd

Jemena Gas Networks (NSW) Ltd Jemena Gas Networks (NSW) Ltd 2015-20 Access Arrangement Response to the AER's draft decision and revised proposal Appendix 7.7 - Historical estimates of the Market Risk Premium Public 27 February 2015

More information

Electricity Networks Service Standards: An Overview

Electricity Networks Service Standards: An Overview Electricity Networks Service Standards: An Overview A Report for the NSW Department of Premier and Cabinet 2 September 2014 Final Report HoustonKemp.com Report Author/s Ann Whitfield Tom Graham Contact

More information

Possible future retail electricity price movements: 1 July 2012 to 30 June 2015

Possible future retail electricity price movements: 1 July 2012 to 30 June 2015 ELECTRICITY PRICE TRENDS FINAL REPORT Possible future retail electricity price movements: 1 July 2012 to 30 June 2015 22 March 2013 Reference: EPR0029 Electricity price trends report EMBARGO until 22 March

More information

However, to ensure that JGN can continue attracting necessary funds, we depart from the AER s guideline by estimating:

However, to ensure that JGN can continue attracting necessary funds, we depart from the AER s guideline by estimating: 9. RATE OF RETURN Box 9 1 Key messages rate of return Receiving a fair rate of return is essential for JGN to continue to invest in its $3,042.9M network in a manner that best supports our customers long-term

More information

APPENDIX 7.4. An updated estimate of the required return on equity

APPENDIX 7.4. An updated estimate of the required return on equity APPENDIX 7.4 An updated estimate of the required return on equity Energex revised regulatory proposal July 2015 An updated estimate of the required return on equity REPORT PREPARED FOR ENERGEX June 2015

More information

Jemena Electricity Networks. Cost Allocation Method

Jemena Electricity Networks. Cost Allocation Method Final decision Jemena Electricity Networks Cost Allocation Method February 2010 i 1 Commonwealth of Australia 2010 This work is copyright. Apart from any use permitted by the Copyright Act 1968, no part

More information

VICTORIAN ELECTRICITY DISTRIBUTION NETWORK SERVICE PROVIDERS ANNUAL PERFORMANCE REPORT 2010

VICTORIAN ELECTRICITY DISTRIBUTION NETWORK SERVICE PROVIDERS ANNUAL PERFORMANCE REPORT 2010 VICTORIAN ELECTRICITY DISTRIBUTION NETWORK SERVICE PROVIDERS ANNUAL PERFORMANCE REPORT 2010 May 2012 Commonwealth of Australia 2012 This work is copyright. Apart from any use permitted by the Copyright

More information

AEMC Electricity Price Trends report released

AEMC Electricity Price Trends report released AEMC Electricity Price Trends report released AUSTRALIAN ENERGY MARKET COMMISSION LEVEL 5, 201 ELIZABETH STREET SYDNEY NSW 2000 T: 02 8296 7800 E: AEMC@AEMC.GOV.AU W: WWW.AEMC.GOV.AU The Australian Energy

More information

Retail Operating Costs A REPORT PREPARED FOR THE ECONOMIC REGULATION AUTHORITY OF WESTERN AUSTRALIA. March 2012

Retail Operating Costs A REPORT PREPARED FOR THE ECONOMIC REGULATION AUTHORITY OF WESTERN AUSTRALIA. March 2012 Retail Operating Costs A REPORT PREPARED FOR THE ECONOMIC REGULATION AUTHORITY OF WESTERN AUSTRALIA March 2012 Frontier Economics Pty. Ltd., Australia. i Frontier Economics March 2012 Public Retail Operating

More information

12 April 2007. Hedging for regulated AER

12 April 2007. Hedging for regulated AER 12 April 2007 Hedging for regulated businesses AER Project Team Tom Hird (Ph.D.) NERA Economic Consulting Level 16 33 Exhibition Street Melbourne 3000 Tel: +61 3 9245 5537 Fax: +61 3 8640 0800 www.nera.com

More information

THE RATE OF RETURN FOR ELECTRICITY DISTRIBUTION NETWORKS DISCUSSION PAPER

THE RATE OF RETURN FOR ELECTRICITY DISTRIBUTION NETWORKS DISCUSSION PAPER THE RATE OF RETURN FOR ELECTRICITY DISTRIBUTION NETWORKS DISCUSSION PAPER INDEPENDENT PRICING AND REGULATORY TRIBUNAL OF NEW SOUTH WALES I NDEPENDENT PRICING AND REGULATORY TRIBUNAL OF NEW SOUTH WALES

More information

2013 Residential Electricity Price Trends

2013 Residential Electricity Price Trends FINAL REPORT 2013 Residential Electricity Price Trends 13 December 2013 Reference: EPR0036 Final Report Inquiries Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E: aemc@aemc.gov.au

More information

ISBN 978-0-7246-5379-9. Copyright

ISBN 978-0-7246-5379-9. Copyright Comparison of Australian Standing Offer Energy Prices as at 1 July 2015 Printed October 2015 Office of the Tasmanian Economic Regulator Level 3, 21 Murray Street, Hobart TAS 7000 GPO Box 770, Hobart TAS

More information

Medical Billing and Profit Growth in Australia - 2014

Medical Billing and Profit Growth in Australia - 2014 FULL YEAR RESULTS 30 JUNE 2014 14 August 2014 IAN LITTLE MANAGING DIRECTOR Full Year Results 30 June 2014 14 August 2014 2013-14 Highlights Change on 2012-13 Net Profit after Tax $153.0M 42% Total Revenue

More information

Reducing electricity costs through Demand Response in the National Electricity Market

Reducing electricity costs through Demand Response in the National Electricity Market Reducing electricity costs through Demand Response in the National Electricity Market A report funded by EnerNOC CME is an energy economics consultancy focused on Australia's electricity, gas and renewables

More information

REGULATORY ACCOUNTING GUIDELINES FOR TRINIDAD AND TOBAGO ELECTRICITY COMMISSION DRAFT FOR CONSULTATION

REGULATORY ACCOUNTING GUIDELINES FOR TRINIDAD AND TOBAGO ELECTRICITY COMMISSION DRAFT FOR CONSULTATION REGULATORY ACCOUNTING GUIDELINES FOR TRINIDAD AND TOBAGO ELECTRICITY COMMISSION DRAFT FOR CONSULTATION January 2008 C O N T E N T S Page No. 1. Overview 1 2. Introduction 3 3. RIC s Regulatory Framework

More information

GAAR 2013-2017. Submission Assurance Plan. Version number: Version 1.0. Date published: June 2011

GAAR 2013-2017. Submission Assurance Plan. Version number: Version 1.0. Date published: June 2011 GAAR 2013-2017 Submission Assurance Plan Version number: Version 1.0 Status: Author: Final Date published: June 2011 File name: GAAR 2013-2017 Submission Assurance Plan 1.1 1 Authorised by: Signature:

More information

Review of the Energy Savings Scheme. Position Paper

Review of the Energy Savings Scheme. Position Paper Review of the Energy Savings Scheme Position Paper October 2015 Contents Executive summary... 3 Energy Savings Scheme Review Report package... 3 Expanding to gas... 3 Target, penalties and duration...

More information

Putting the customer back in front

Putting the customer back in front December 2012 Putting the customer back in front How to make electricity cheaper The housing we d choose Tony Wood Grattan Institute Support Grattan Institute Report No. 2012-09, December 2012 Founding

More information

END.027.001.0003. Electricity distribution network service providers. Annual benchmarking report

END.027.001.0003. Electricity distribution network service providers. Annual benchmarking report END.027.001.0003 Electricity distribution network service providers Annual benchmarking report November 2014 END.027.001.0003_002 Commonwealth of Australia 2014 This work is copyright. In addition to any

More information

The primary reason for JEN making this request is that the F&A paper that was published on 29 May 2009 (old F&A paper) is outdated.

The primary reason for JEN making this request is that the F&A paper that was published on 29 May 2009 (old F&A paper) is outdated. 30 January 2014 By email: chris.pattas@aer.gov.au Mr Chris Pattas General Manager - Network Operations and Development Australian Energy Regulator Level 35, 360 Elizabeth Street Melbourne Victoria 3000

More information

Debt raising transaction costs - Ergon Energy

Debt raising transaction costs - Ergon Energy Debt raising transaction costs - Ergon Energy June, 2014 Table of Contents 1. Executive Summary... 1 1.1 Allowance for debt raising transaction costs relating to the debt component of the RAB... 1 1.2

More information

Possible Future Trends in Residential Electricity Prices 2013-14 through 2015-16: Network Cost Drivers

Possible Future Trends in Residential Electricity Prices 2013-14 through 2015-16: Network Cost Drivers Possible Future Trends in Residential Electricity Prices 2013-14 through 2015-16: Network Cost Drivers DISCLAIMER This report has been prepared for the Australian Energy Market Commission (AEMC) as an

More information

Final decision. Priorities and objectives of electricity transmission network service provider performance reports

Final decision. Priorities and objectives of electricity transmission network service provider performance reports Final decision Priorities and objectives of electricity transmission network service provider performance reports March 2009 Commonwealth of Australia 2009 This work is copyright. Apart from any use permitted

More information

n/e/r/a INTERNATIONAL COMPARISON OF UTILITIES REGULATED POST TAX RATES OF RETURN IN: NORTH AMERICA, THE UK, AND AUSTRALIA A Report Prepared by NERA

n/e/r/a INTERNATIONAL COMPARISON OF UTILITIES REGULATED POST TAX RATES OF RETURN IN: NORTH AMERICA, THE UK, AND AUSTRALIA A Report Prepared by NERA INTERNATIONAL COMPARISON OF UTILITIES REGULATED POST TAX RATES OF RETURN IN: NORTH AMERICA, THE UK, AND AUSTRALIA A Report Prepared by NERA March 2001 Sydney Project Team: Greg Houston Tom Hird Nicola

More information

The required return on equity for regulated gas and electricity network businesses

The required return on equity for regulated gas and electricity network businesses The required return on equity for regulated gas and electricity network businesses Report for Jemena Gas Networks, ActewAGL Distribution, Ergon, and Transend 27 May 2014 Level 1, South Bank House Cnr.

More information

Submission on the Senate Inquiry into the performance and management of electricity network companies

Submission on the Senate Inquiry into the performance and management of electricity network companies Submission on the Senate Inquiry into the performance and management of electricity network companies 18 December 2014 Submission on the Senate Inquiry into The performance and management of electricity

More information

HOW ARE ELECTRICITY PRICES SET IN AUSTRALIA?

HOW ARE ELECTRICITY PRICES SET IN AUSTRALIA? HOW ARE ELECTRICITY PRICES SET IN AUSTRALIA? Electricity prices faced by Australian households and small businesses are highly regulated. In states connected to the National Electricity Market (NEM) New

More information

Office of the Rail Access Regulator. Contents

Office of the Rail Access Regulator. Contents 1 A Brief Comparison of the WA Rail Access Code approach to calculating ceiling cost with the conventional Depreciated Optimised Replacement Cost methodology 18 July 2002 Contents 1. Purpose Of Paper 2.

More information

AER Submission. Competition Policy Review Draft Report

AER Submission. Competition Policy Review Draft Report AER Submission Competition Policy Review Draft Report November 2014 1 Introduction The AER is Australia s national energy regulator and an independent decision-making authority. Our responsibilities are

More information

Changes in regulated electricity prices from 1 July 2012

Changes in regulated electricity prices from 1 July 2012 Independent Pricing and Regulatory Tribunal FACT SHEET Changes in regulated electricity prices from 1 July 2012 Based on Draft Determination, 12 April 2012 The Independent Pricing and Regulatory Tribunal

More information

Information Requirements: Business Plan. Trinidad & Tobago Electricity Commission

Information Requirements: Business Plan. Trinidad & Tobago Electricity Commission Information Requirements: Business Plan June 01, 2011 May 31, 2016 Trinidad & Tobago Electricity Commission November 2010 This document is one of a series of discussion papers exploring a specific aspect

More information

Causes of residential electricity bill changes in Victoria, 1995 to 2013. prepared for: Victorian Electricity Distribution Businesses

Causes of residential electricity bill changes in Victoria, 1995 to 2013. prepared for: Victorian Electricity Distribution Businesses Causes of residential electricity bill changes in Victoria, 1995 to 2013 prepared for: Victorian Electricity Distribution Businesses DISCLAIMER This report has been prepared for the Victorian electricity

More information

Review of the Approach to Capital Investments

Review of the Approach to Capital Investments Review of the Approach to Capital Investments September 2011 This paper examines the RIC s current approach to assessing capital expenditure (Capex), reviews T&TEC s actual Capex and compares this with

More information

NSW Electricity Network and Prices Inquiry. Final Report

NSW Electricity Network and Prices Inquiry. Final Report Final Report December 2010 Contents 1 Introduction and overview... 3 1.1 Current trends in electricity prices... 3 1.2 The drivers of price increases... 3 1.3 Summary of options for easing pressure on

More information

2014 Residential Electricity Price Trends

2014 Residential Electricity Price Trends FINAL REPORT 2014 Residential Electricity Price Trends To COAG Energy Council 5 December 2014 Reference: EPR0040 2014 Residential Price Trends Inquiries Australian Energy Market Commission PO Box A2449

More information

Energy Networks. Association: Debt financing costs

Energy Networks. Association: Debt financing costs pwc.com.au Energy Networks Association: Debt financing costs Energy Networks Association June, 2013 Disclaimer This Report has been prepared by PricewaterhouseCoopers Australia (PwC) at the request of

More information

Submission to the Essential Services Commission. Modernising Victoria s Energy Licence Framework Issues Paper

Submission to the Essential Services Commission. Modernising Victoria s Energy Licence Framework Issues Paper Submission to the Essential Services Commission Modernising Victoria s Energy Licence Framework Issues Paper Executive Summary Clean Energy Council (CEC) welcomes the review of Victoria s regulatory framework

More information

Transmission Price Control Review: Updated Proposals and Smithers & Co. Ltd.: Report on the Cost of Capital. Response to consultation

Transmission Price Control Review: Updated Proposals and Smithers & Co. Ltd.: Report on the Cost of Capital. Response to consultation Transmission Price Control Review: Updated Proposals and Smithers & Co. Ltd.: Report on the Cost of Capital Response to consultation Prepared by Ian Rowson, IMR Solutions On behalf of: BG Gas Services

More information

Information Paper. Investigation into prices for electricity and water services in the ACT

Information Paper. Investigation into prices for electricity and water services in the ACT Information Paper Investigation into prices for electricity and water services in the ACT DECEMBER 2002 INDEPENDENT COMPETITION AND REGULATORY COMMISSION INFORMATION PAPER INVESTIGATION INTO PRICES FOR

More information

TAKING PRESSURE OFF GAS PRICES

TAKING PRESSURE OFF GAS PRICES SEPTEMBER 2014 TAKING PRESSURE OFF GAS PRICES FIXING AUSTRALIA S ENERGY POLICY DISTORTION THE AUSTRALIAN DOMESTIC GAS ENVIRONMENT FIGURE 1: MAP OF GAS INFRASTRUCTURE, REGIONAL GAS MARKETS AND MAJOR GAS

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Attachment 7-12 - Independent analysis of augmentation expenditure Public 30 April 2015 AER augex

More information

MEMORANDUM. Re: Technical input to the ACCC submission relationship between the regulatory asset base and the renewals annuity

MEMORANDUM. Re: Technical input to the ACCC submission relationship between the regulatory asset base and the renewals annuity MEMORANDUM To: Peter McGahan From: Jeff Balchin Director Date: 4 July 2008 Re: Technical input to the ACCC submission relationship between the regulatory asset base and the renewals annuity A. Introduction

More information

Retailer Margins in Victoria s Electricity Market. Discussion Paper

Retailer Margins in Victoria s Electricity Market. Discussion Paper Retailer Margins in Victoria s Electricity Market Discussion Paper May 2013 An appropriate citation for this paper is: Essential Services Commission 2013, Retailer Margins in Victoria s Electricity Market

More information

Cost of debt consistent with the NGR and NGL

Cost of debt consistent with the NGR and NGL Cost of debt consistent with the NGR and NGL Dr. Tom Hird March 2014 Table of Contents Executive summary... 1 A benchmark debt management strategy must be defined... 1 The ERA s methodology does not define

More information

state of the energy market 2012

state of the energy market 2012 State of the energy market 2012 state of the energy market 2012 Australian Energy Regulator Level 35, The Tower, 360 Elizabeth Street, Melbourne Central, Melbourne, Victoria 3000 Email: AERInquiry@aer.gov.au

More information

Change in regulated retail gas prices from 1 July 2015

Change in regulated retail gas prices from 1 July 2015 Independent Pricing and Regulatory Tribunal FACT SHEET Change in regulated retail gas prices from 1 July 2015 June 2015 Across NSW, regulated retail gas prices will decrease by an average 3.9% (including

More information

Draft Decision. Approach to compliance with the National Energy Retail Law, Rules and Regulations

Draft Decision. Approach to compliance with the National Energy Retail Law, Rules and Regulations Draft Decision Approach to compliance with the National Energy Retail Law, Rules and Regulations December 2010 Commonwealth of Australia 2010 This work is copyright. Apart from any use permitted by the

More information

Queensland s Unsustainable Electricity Pricing Methodology

Queensland s Unsustainable Electricity Pricing Methodology Queensland s Unsustainable Electricity Pricing Methodology Submission to the QCA and Queensland Government in relation to the 2011-12 BRCI Electricity Price Determination 10 February 2011 Page 1 of 12

More information

Promoting the long term interests of electricity customers. IPART s submission SCER on network policies and regulation

Promoting the long term interests of electricity customers. IPART s submission SCER on network policies and regulation Promoting the long term interests of electricity customers IPART s submission SCER on network policies and regulation Electricity October 2012 Inquiries regarding this document should be directed to a

More information

ECCV Submission to the Australian Energy Regulator (AER) Victoria Electricity Pricing Review July 2015

ECCV Submission to the Australian Energy Regulator (AER) Victoria Electricity Pricing Review July 2015 ECCV Submission to the Australian Energy Regulator (AER) Victoria Electricity Pricing Review July 2015 The Ethnic Communities Council of Victoria (ECCV) appreciates the opportunity to submit comments to

More information

Submission to the Independent Pricing and Regulatory Tribunal. ~ Draft Report & Determination - Retail tariffs & charges for electricity 2010-2013 ~

Submission to the Independent Pricing and Regulatory Tribunal. ~ Draft Report & Determination - Retail tariffs & charges for electricity 2010-2013 ~ Submission to the Independent Pricing and Regulatory Tribunal ~ Draft Report & Determination - Retail tariffs & charges for electricity 2010-2013 ~ February 2010 NSW Farmers Association Level 25, 66 Goulburn

More information

Rule change request. 18 September 2013

Rule change request. 18 September 2013 Reform of the distribution network pricing arrangements under the National Electricity Rules to provide better guidance for setting, and consulting on, cost-reflective distribution network pricing structures

More information

2016 2020 Price Reset. Appendix H Service target performance incentive scheme

2016 2020 Price Reset. Appendix H Service target performance incentive scheme Appendix H Service target performance incentive scheme April 2015 Table of contents 1 SERVICE TARGET PERFORMANCE INCENTIVE SCHEME... 3 1.1 Reliability of supply targets... 3 1.2 SAIFI definition... 5 1.3

More information

Measuring the Debt Risk Premium

Measuring the Debt Risk Premium Australian Energy Regulator Discussion Paper on Measuring the Debt Risk Premium A Response by The Major Energy Users Inc October 2010 Assistance in preparing this submission by the Major Energy Users Inc

More information

LEGISLATIVE COUNCIL INQUIRY INTO THE LEASING OF ELECTRICITY INFRASTRUCTURE NSW GOVERNMENT SUBMISSION

LEGISLATIVE COUNCIL INQUIRY INTO THE LEASING OF ELECTRICITY INFRASTRUCTURE NSW GOVERNMENT SUBMISSION LEGISLATIVE COUNCIL INQUIRY INTO THE LEASING OF ELECTRICITY INFRASTRUCTURE NSW GOVERNMENT SUBMISSION Executive Summary The NSW Government s Rebuilding NSW Plan will turbocharge the NSW economy by investing

More information

Review of PIRSA s Cost Recovery Policy and practices, including their application to the Fisheries and Aquaculture Industries Primary Industries and

Review of PIRSA s Cost Recovery Policy and practices, including their application to the Fisheries and Aquaculture Industries Primary Industries and Review of PIRSA s Cost Recovery Policy and practices, including their application to the Fisheries and Aquaculture Industries Primary Industries and Regions SA 29 July 2015 Contents Executive Summary...

More information

Changes in regulated electricity prices from 1 July 2012

Changes in regulated electricity prices from 1 July 2012 Independent Pricing and Regulatory Tribunal FACT SHEET Changes in regulated electricity prices from 1 July 2012 Based on Final Determination, 13 June 2012 The Independent Pricing and Regulatory Tribunal

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

NSW Business Chamber Submission to the Special Commission of Inquiry into Electricity Transactions

NSW Business Chamber Submission to the Special Commission of Inquiry into Electricity Transactions 29 June 2011 Special Commission of Inquiry Electricity PO Box A1150 SYDNEY SOUTH 1235 1. The NSW Business Chamber welcomes the opportunity to make a submission to the NSW Government s Special Commission

More information

Directlink Joint Venture. Directlink Revenue Proposal. Attachment 6.1. Transitional approach to estimating the cost of debt

Directlink Joint Venture. Directlink Revenue Proposal. Attachment 6.1. Transitional approach to estimating the cost of debt Directlink Joint Venture Directlink Revenue Proposal Attachment 6.1 Transitional approach to estimating the cost of debt May 2014 Introduction The benchmark efficient entity of the allowed rate of return

More information

UTILITY REGULATOR WATER. Water & Sewerage Services Price Control 2015-21

UTILITY REGULATOR WATER. Water & Sewerage Services Price Control 2015-21 Water & Sewerage Services Price Control 2015-21 Final Determination Annex A Financing Investment December 2014 Contents Page Water and Sewerage Services Price Control 2015-21 Final Determination Annex

More information

1 Fiscal strategy and outlook

1 Fiscal strategy and outlook 1 Fiscal strategy and outlook Features The 2015-16 Budget delivers the Government s election commitments, with key measures to revitalise the State economy and frontline service delivery, especially in

More information

Ausgrid Network Pricing Proposal For the Financial Year Ending June 2013. May 2012

Ausgrid Network Pricing Proposal For the Financial Year Ending June 2013. May 2012 Ausgrid Network Pricing Proposal For the Financial Year Ending June 2013 May 2012 Table of Contents PART 1 APPROACH TO PRICE SETTING 1. INTRODUCTION AND OVERVIEW... 4 2. BACKGROUND... 6 3. PRICING METHODOLOGY...

More information

APRIL 2014 ELECTRICITY PRICES AND NETWORK COSTS

APRIL 2014 ELECTRICITY PRICES AND NETWORK COSTS APRIL 2014 ELECTRICITY PRICES AND NETWORK COSTS 1 WHAT MAKES UP THE RETAIL ELECTRICITY BILL? Retail electricity bills are made up of a number of components: Wholesale costs reflecting electricity generation

More information

AusNet Transmission Group Pty Ltd

AusNet Transmission Group Pty Ltd AusNet Transmission Group Pty Ltd Transmission Revenue Review 2017-2022 Appendix 3A: Stakeholder Engagement Forums Summaries Submitted: 30 October 2015 First Stakeholder Forum Summary Transmission Revenue

More information

Causes of residential electricity bill changes in Victoria, 1995 to 2014. prepared for: Victorian Electricity Distribution Businesses

Causes of residential electricity bill changes in Victoria, 1995 to 2014. prepared for: Victorian Electricity Distribution Businesses Causes of residential electricity bill changes in Victoria, 1995 to 2014 prepared for: Victorian Electricity Distribution Businesses DISCLAIMER This report has been prepared for the Victorian Electricity

More information

Equity Beta for a Benchmark Australian Water Network Service Provider

Equity Beta for a Benchmark Australian Water Network Service Provider Equity Beta for a Benchmark Australian Water Network Service Provider A report for Sydney Water June 2015 HoustonKemp.com Report Author/s Greg Houston Brendan Quach Simon Wheatley Dale Yeats Contact Us

More information

Valuation Mobile networks

Valuation Mobile networks ITU EXPERT-LEVEL TRAINING ON NETWORK COST MODELING FOR ASIA AND PACIFIC COUNTRIES LEVEL II Valuation Mobile networks Bangkok, Thailand, 15-19 November 2010 Note: The views expressed in this paper are those

More information

1. a) How effective is the current Climate Change Act 2010 in driving climate change action by:

1. a) How effective is the current Climate Change Act 2010 in driving climate change action by: Public Submission Review of Climate Change Act 2010 City of Melbourne Questions 1. a) How effective is the current Climate Change Act 2010 in driving climate change action by: Government? (tick one only)

More information

Investment. Phillip Street, Sydney. Capability Statement

Investment. Phillip Street, Sydney. Capability Statement Investment ADVISORY services Australia Phillip Street, Sydney Capability Statement Optus Centre, Macquarie Park Investment Advisory Services OVERVIEW CBRE s Investment Advisory Services team provides a

More information

TABCORP HALF YEAR RESULTS PRESENTATION

TABCORP HALF YEAR RESULTS PRESENTATION Tabcorp Holdings Limited ACN 063 780 709 5 Bowen Crescent Melbourne Australia 3004 GPO Box 1943 Melbourne Australia 3001 Telephone 61 3 9868 2100 Facsimile 61 3 9868 2300 Website www.tabcorp.com.au 4 February

More information

Review of Metropolitan Melbourne s water companies proposed expenditure

Review of Metropolitan Melbourne s water companies proposed expenditure pwc.com.au Essential Services Commission Review of Metropolitan Melbourne s water companies proposed expenditure April 2013 Final findings Disclaimer In preparing this Report we have only considered the

More information

Energex. Statement of expected price trends. 1 July 2014 to 30 June 2015. -1-2014/15 Statement of expected price trends

Energex. Statement of expected price trends. 1 July 2014 to 30 June 2015. -1-2014/15 Statement of expected price trends Energex Statement of expected price trends 1 July 2014 to 30 June 2015-1- 2014/15 Statement of expected price trends Version control Version Date Description 1.0 16 June 2013 Published on Energex s website

More information

BUSINESS SA Submission to AER on proposed

BUSINESS SA Submission to AER on proposed Submission to AER on proposed Australian Gas Networks Access Arrangement (2016-21) Contents Introduction... 3 Executive Summary... 3 Stakeholder Engagement... 4 Reliability and Price in South Australia

More information

Tasmanian Transmission Revenue Proposal

Tasmanian Transmission Revenue Proposal Tasmanian Transmission Revenue Proposal An overview for Tasmanian electricity consumers Regulatory control period 1 July 2014 30 June 2019 Tasmanian Networks Pty Ltd About TasNetworks We are Tasmania s

More information

The NSW Business Chamber (the Chamber) welcomes the opportunity to comment on IPART s Pricing VET under Smart and Skilled draft report.

The NSW Business Chamber (the Chamber) welcomes the opportunity to comment on IPART s Pricing VET under Smart and Skilled draft report. 23 August 2013 Dr Peter J Boxall AO, Chairman Independent Pricing and Regulatory Tribunal PO Box Q290 QVB Post Office NSW 1230 By email Dear Dr Boxall, Pricing VET under Smart and Skilled The NSW Business

More information

A Note on the Historical Equity Risk Premium

A Note on the Historical Equity Risk Premium Report prepared for the Australian Energy Regulator A Note on the Historical Equity Risk Premium John C. Handley University of Melbourne Final 17 October 2008 1. INTRODUCTION Pursuant to the National Electricity

More information

A fair comparison: PIAC submission to the Productivity Commission Inquiry, Electricity Network Regulation

A fair comparison: PIAC submission to the Productivity Commission Inquiry, Electricity Network Regulation A fair comparison: PIAC submission to the Productivity Commission Inquiry, Electricity Network Regulation 23 April 2012 Bev Hughson, Darach Energy Consulting Services Carolyn Hodge, Senior Policy Officer,

More information

The Risk-free Rate and the Market Risk Premium

The Risk-free Rate and the Market Risk Premium Discussion Paper The Risk-free Rate and the Market Risk Premium November 2012 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile (07) 3222

More information

Meter installation, alteration and abolishment fees

Meter installation, alteration and abolishment fees Meter installation, alteration and abolishment fees Effective January 2015 Australian Capital Territory New South Wales Queensland South Australia Victoria Page 1 of 7 Australian Capital Territory Fees

More information

Network Pricing and Enabling Metering Analysis. Prepared by ENERGEIA for the Energy Networks Association

Network Pricing and Enabling Metering Analysis. Prepared by ENERGEIA for the Energy Networks Association Network Pricing and Enabling Metering Analysis Prepared by ENERGEIA for the Energy Networks Association November 2014 Executive Summary Rising electricity bills across the country over the past five years

More information

Review of Asset Values, Costs and Cost Allocation of Western Australian Urban Water and Wastewater Service Providers

Review of Asset Values, Costs and Cost Allocation of Western Australian Urban Water and Wastewater Service Providers Review of Asset Values, Costs and Cost Allocation of Western Australian Urban Water and Wastewater Service Providers General Principles and Methodology March 2005 Report to the Economic Regulation Authority,

More information

Presiding Commissioner Regulatory Burdens: Social and Economic Infrastructure Services Productivity Commission GPO Box 1428 Canberra City ACT 2601

Presiding Commissioner Regulatory Burdens: Social and Economic Infrastructure Services Productivity Commission GPO Box 1428 Canberra City ACT 2601 2 April 2009 Presiding Commissioner Regulatory Burdens: Social and Economic Infrastructure Services Productivity Commission GPO Box 1428 Canberra City ACT 2601 Dear Madam MATTERS RAISED IN PRODUCTIVITY

More information

Pricing Methodology 1. 1 July 2009 to 30 June 2014. April 2010

Pricing Methodology 1. 1 July 2009 to 30 June 2014. April 2010 Pricing Methodology 1 1 July 2009 to 30 June 2014 April 2010 1 TransGrid s Pricing Methodology as approved by the Australian Energy Regulator ( AER ). This document outlines the pricing methodology that

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Attachment 8-5 Huegin report on benchmarking, rate of change and productivity Public 30 April 2015

More information

Network Pricing Trends

Network Pricing Trends Network Pricing Trends Queensland Perspective 20 January 2015 Foreword This report has been prepared for Infrastructure Partnerships Australia (IPA). Its purpose is to help build community understanding

More information