1 CIO Briefing Repositories Project Implementation Strategy This report, prepared for CIO Michael Ridley, outlines a specific parallel-track strategy and short-term recommendations for expediting implementation of an integrated IT portfolio repository at the University of Guelph. This brief is a continuation of previous documents and discussions (see Appendix 1 for project chronology), and addresses a strategic priority (i.e. IT portfolio management) outlined in the icampus Strategic Plan and CIO s update for Guelph s new IT Decision Framework introduced the concept of IT portfolio management and its major components: IT Demand (i.e. initiatives and projects, both inprogress and proposed); IT Assets (i.e. applications and infrastructure services); and IT Resources (i.e. funding and staffing). While these components could be built separately, there are significant benefits to integrating the information from each category, and managing the information holistically. To address the stated goal of expediting implementation of an integrated solution, I recommend we terminate the internal (CCS/University Systems) development efforts which were reviewed in December (see IT PMO Repositories Management Brief, dated Dec.4, 2007). Continuing internal development with current CCS resource constraints would push availability of the portfolio repository back several months at best, and likely not provide many of the turn-key functions of an available commercial solution. A parallel-track approach for moving forward quickly is described below. It provides a means to leverage immediate opportunities, generate visibility of this initiative, and iteratively develop new processes, while minimizing the financial and resource requirements. Track One: Description: Track One will continue and complete an evaluation of commercial software solutions (i.e. automated tools) for addressing the University s IT portfolio management business objectives and functional requirements (separate document dated January 14/08). The intention of this track is to accelerate the evaluation, acquisition and implementation timeline of a workable PPM solution, minimizing out-of-pocket costs and contractual commitments. I have been researching the software vendors and products in the Project Portfolio Management marketplace for some time. An inventory and review of the major players has been completed, and includes the perspectives of independent researchers (Gartner and Forrester). The inventory/review is attached as a separate document. Page 1 of 5
2 Based on previous discussions, the focus of product evaluation is being limited to applications that are offered via the on demand (Software-as-a-Service) delivery model. This early decision significantly shrinks the number of products to be evaluated, and of course eliminates infrastructure acquisition, configuration and technical support from the project scope. It should also be noted here that the origins of most, if not all, PPM software products are based on project management. While the University would benefit from adopting a standardized project methodology and toolset, the focus of this evaluation is on the higher-level IT portfolio challenges (i.e. demand/project pipeline identification, prioritization, visibility, etc.), and achieving insight into our existing IT Assets (i.e. applications and infrastructure). An integrated IT Asset Management capability is not currently included in many PPM software solutions, and since this functionality is an important criterion in our evaluation, the field of vendors/products is further reduced. Potential Steps (not necessarily essential to complete every step): 1. Review independent research on alternative products and vendors. DONE. 2. Review vendors product data sheets, white papers, customer success stories, and references. DONE. 3. Attend on-line product demonstrations and webinars. DONE. 4. Short-list alternative vendors/products. DONE. 5. Attend in-person presentations and scripted walk-thru s. 6. Utilize vendors sandbox environments (if available) to test functionality and customization capability. 7. Identify one or two vendors for detailed examination. 8. Approve target (i.e. IT Demand) and scope of proof of concept and/or pilot project evaluation. 9. Determine number of project participants and roles. 10. Solicit proposals from vendors for pilot project engagement. 11. Target a single vendor to support a time-limited (30-60 days) pilot project on-demand service for evaluation purposes. 12. Prepare justification for selecting a single vendor for evaluation. 13. Pre-negotiate licensing terms of phased and full deployment scenarios. 14. Determine go/no go success criteria in advance of pilot project. 15. Negotiate agreement with targeted vendor for pilot project. 16. Conduct pilot project. 17. Complete project evaluation; go/no go decision for next phase. Track Two: Description: Track Two consists of a semi-automated process focused on the same targeted area of (Demand). This track can be executed Page 2 of 5
3 separately from Track One as a parallel/duplicate exercise, or in conjunction with Track One but focusing on process design. The recommended approach would expand in concentric circles the audience (both active participants and casual visitors), and develop processes which iteratively refine the portfolio management capabilities (i.e. deliverables and outcomes). Should this approach operate separately from the automated tool pilot project, it would utilize MS/Word, MS/Excel and Adobe PDF as the means to capture and store a (relatively static) repository, using the current Portfolio Management Office web-site for making the information available (N.B. without authentication). The advantage of this second approach is its simplicity, and capability of immediate startup independent of the Track One software evaluation process. Potential Steps: 1. Confirm that capturing IT DEMAND will be the focus of this exercise, and that information will be prioritized based on largest magnitude first. 2. Design initial data capture template (e.g. MS/Word, manual hard-copy, e- mails), including establishing the most important attributes desired. 3. Design the initial process for soliciting information for the repository, and establish a process for maintaining communications with information providers. 4. Start engaging potential contributors of information regarding IT demand on campus, beginning within the Office of the CIO, CIO Executive, CCS and Library management, the committees of the IT Decision Framework, and other potential stakeholders and information sources. 5. Assuming data attributes are being identified for most, if not all, types of IT demand, build the prototype demand repository in MS/Excel (N.B. first draft is already on PMO web-site), dividing the initiatives into status categories (e.g. proposed, approved, funded/resourced, in-progress, deferred, etc.). 6. Make the prototype repository available on the PMO web-site, and start to identify decision-making and collaboration opportunities, such as prioritization, funding support, project consolidation, and project review/cancellation. Summary: Both the Pilot Project software evaluation track and the semi-automated Track Two requires the engagement of a significant cross-section of the University community to be successful. A project resource to engage the community, assist with the software tool configuration, manage roles, populate the database(s), and continuously refine the information is recommended. The scope and size of the initiative will be severely constrained without dedicated resources. I recommend a one-year contractually-limited appointment be funded as soon as possible. Page 3 of 5
4 The resource could be a new hire or a secondment from another unit on campus. My recommendation is that a full-time resource is required. Optimistically, we will determine that the on-line repository can be largely self-sustaining with enthusiastic campus engagement (and sophisticated alerts to ensure data maintenance). However, implementing the additional components of, including Asset Management, will require sustained effort. Annual costs for the on demand software solution will depend upon the breadth of deployment, as the most common pricing model for PPM solutions is based on the number of users. This can be constrained in the earliest stage of adoption, depending upon the flexibility of licensing (i.e. passive observer users, vs. information contributors). A preliminary funding estimate ($50,000) for was previously provided, and this will be refined as vendor discussions continue. A tentative estimate for completion of the Pilot Project (including start-up assistance from the vendor) is $10,000. Upon completion of the above Tracks, processes will be refined and accepted. Depending upon the success of the Pilot Project assessment, a longer term commitment and expanded utilization would be initiated. Until the software solution decision is finalized, the MS/Excel repository can be sustained, and eventually ported into the on demand web-accessible service/database. At conclusion, we will ideally have a solution which provides the University with complete IT portfolio management capabilities (e.g. on-line demand/project creation, project status updates, project prioritization and approvals, on-line reporting and dashboards, etc.). My target for initiating production status of the IT Demand component is May 1, Page 4 of 5
5 Appendix 1 I.T. Portfolios Project Chronology: 2007-January-11: Hand-off from Kent Percival to University Systems; re-define Systems Architecture project into Applications and Infrastructure Repository) June-13: Working prototype of Application Repository demo d to CIO July-27: Repository Project Overview/Status Report issued to CIO Executive. Transition from prototype to alpha development stage. Three targeted areas (OVC, HR, Research) invited to participate Dec-4: Management Brief (and meeting) with CCS Executive Committee Jan-14: Software Project: Summary of Business Objectives, sponsorship, stakeholders and evaluation criteria (functional and non-functional). Page 5 of 5
IT Portfolio Management Software Project OBJECTIVES AND REQUIREMENTS
Introduction: IT Portfolio Management Software Project OBJECTIVES AND REQUIREMENTS This document summarizes the business objectives, project sponsorship, desired functionality and evaluation criteria (both
More informationWHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,
More informationComputing & Communications Services
2010 Computing & Communications Services 2010 / 10 / 04 Final Kent Percival, M.Sc., P.Eng. Defining the Value of the Business Analyst In achieving its vision, key CCS partnerships involve working directly
More informationDepartment of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
More informationHow IT Can Help Companies Make Better, Faster Decisions
How IT Can Help Companies Make Better, Faster Decisions How It Can Help Companies Make Better Faster Decisions Of the many different groups that make up a business organization sales, finance, human resources
More informationNIST Cloud Computing Program Activities
NIST Cloud Computing Program Overview The NIST Cloud Computing Program includes Strategic and Tactical efforts which were initiated in parallel, and are integrated as shown below: NIST Cloud Computing
More informationMaryland Health Benefit Exchange: Independent Verification and Validation (IV&V) Services Public Summary
Maryland Health Benefit Exchange: Independent Verification and Validation (IV&V) Services Public Summary Angarai International Monthly IV&V Report Report Month: August 2014 Delivery Date: September 15,
More informationOverview. Microsoft Office Enterprise Project Management Solution. In this article
Microsoft Office Enterprise Project Management Solution Overview Applies to: Microsoft Office Project 2007 Project Server 2007 In this article Manage and control all types of work Improve visibility and
More informationCreating a project management office (PMO)
Executive summary The project management was initially developed to define and maintain standards for project management in the organisation. In many organisations, the PMO has developed a strategic role
More informationProject Management Office Best Practices
Project Management Office Best Practices Agenda Maturity Models (Industry & PMO) PMO Areas of Expertise (Scale & Scope) Project Management Office Process Model Project Management Framework PMO Implementation
More information7 Practical insights for IT Asset Management
7 Practical insights for IT Asset Management Tauneel McKay Director Swiss Reinsurance Company Ltd Subbarao Chaganty Principal Consultant Infosys Ltd RELATE MANAGE.. Context KNOW. Consolidate the IT Asset
More informationCA Clarity PPM pro Business PMO a IT PMO. Petr Běhávka CA Technologies, Principal Consultant
CA Clarity PPM pro Business PMO a IT PMO Petr Běhávka CA Technologies, Principal Consultant What is the Goal for PPM? Grow Revenues & Profits Higher Revenues & Profits Visibility Control Reduce Costs Agility
More informationIT Governance. Key Initiative Overview
Michael Gerrard Research Vice President and Distinguished Analyst IT governance addresses two major topics: demand governance ( doing the right things ) and supply-side governance ( doing things right
More informationPHASE 1: INITIATION PHASE
PHASE 1: INITIATION PHASE The Initiation Phase begins when agency management determines that a business function requires enhancement through an agency information technology (IT) project and investment
More informationImplementing a Project Portfolio Management (PPM) Solution. Sean Hansen, PMP
Implementing a Project Portfolio Management (PPM) Solution Sean Hansen, PMP Agenda Introductions First Fresh from Microsoft Ignite Why Implement a PPM Tool (recap) Are You Ready for a PPM Implementation?
More informationThe Resource Management Life Cycle
The Resource Management Life Cycle Resource Planning for 2013 Revised November 2012 http://epmlive.com Contents Introduction...2 What is Resource Management?...2 Who Participates in Resource Management?...2
More informationIT Strategic Plan and Roadmap Governance and PMO Recommendations
Appendix M IT Strategic Plan and Roadmap Governance and PMO Recommendations City of Virginia Beach ComIT Master Technology Plan (Appendix M) 1 IT Strategic Plan and Roadmap IT Governance and PMO Recommendations
More informationNetwork for Change and Continuous Innovation 2014 National Conference. Enabling Effectiveness: Using Governance and Technology to Drive Improvement
Network for Change and Continuous Innovation 2014 National Conference Enabling Effectiveness: Using Governance and Technology to Drive Improvement Your Presenters Meggan Levitt Lead IT Program Manager
More informationAn Oracle White Paper May 2013. The Role of Project and Portfolio Management Systems in Driving Business and IT Strategy Execution
An Oracle White Paper May 2013 The Role of Project and Portfolio Management Systems in Driving Business and IT Strategy Execution Introduction The need to link strategy and project execution is not new.
More informationCore Security Improves Investment Decisions with CA Project & Portfolio Management
CUSTOMER SUCCESS STORY July 2013 Core Security Improves Investment Decisions with CA Project & Portfolio Management CLIENT PROFILE Industry: Technology Company: Core Security Employees: 200-plus Revenue:
More information2015-233-B. Request for Information (RFI) for Contract Management and Project Management Software Solutions
2015-233-B Request for Information (RFI) for Contract Management and Project Management Software Solutions SECTION 1 GENERAL INFORMATION 1.1 INTRODUCTION The Purchasing Department for the City of Plano,
More informationProject Management Office: Seeing the Whole Picture
Cloud Solutions for IT Management WHITE PAPER Project Management Office: Seeing the Whole Picture Project Portfolio Management gives PMOs the tools and techniques to get lean in lean times. Executive Summary
More informationStrategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director
Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology.......... June 2010 Ron Huston Director Message from the State Enterprise Portfolio Project
More informationSUMMARY PROFESSIONAL EXPERIENCE. IBM Canada, Senior Business Transformation Consultant
Doreen Funk, MA 191 Discovery Ridge Blvd SW, Calgary Cell: 587-434- 0811 E- mail: dorfunk@hotmail.com SUMMARY Senior management consultant with 20 years of experience in applying strategies and implementing
More informationStandardized Technology Evaluation Process (STEP) User s Guide and Methodology for Evaluation Teams. Sarah Brown May 2007
Standardized Technology Evaluation Process (STEP) User s Guide and Methodology for Evaluation Teams Sarah Brown May 2007 1 Table of Contents 1 Introduction 4 1.1 Purpose 4 1.2 Background 5 1.3 Intended
More informationORACLE PROJECT MANAGEMENT
ORACLE PROJECT MANAGEMENT KEY FEATURES Oracle Project Management provides project managers the WORK MANAGEMENT Define the workplan and associated resources; publish and maintain versions View your schedule,
More informationUniversity of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
More informationTECHNOLOGY SOLUTIONS FOR THE INTERNAL AUDITOR
TECHNOLOGY SOLUTIONS FOR THE INTERNAL AUDITOR (BUY VS BUILD) APRIL 17, 2015 LEVERAGING TECHNOLOGY FOR AUDIT Utilizing Software to Administrate Audit Process 40% 35% 30% 37% Tools Leveraged 32% 36% Yes
More informationE-commerce Project Governance Overview
Implementing Effective ERP Governance and Portfolio Management Walter Sevon Deputy CIO and Executive Director Technology Systems Division Jennifer Flagel Director of Technology Projects Enrollment Services
More informationG-Cloud II Services Service Definition Accenture Cloud PaaS Implementation Services AWS Beanstalk
G-Cloud II Services Service Definition Accenture Cloud PaaS Implementation Services AWS Beanstalk 1 Table of Contents 1. Scope of our Services... 3 2. Approach... 3 3. Assets and Tools... 4 4. Outcomes...
More informationSimplify And Innovate The Way You Consume Cloud
A Forrester Consulting October 2014 Thought Leadership Paper Commissioned By Infosys Simplify And Innovate The Way You Consume Cloud Table Of Contents Executive Summary... 1 Cloud Adoption Is Gaining Maturity
More informationNurturing Beyond Your Current Pipeline. TechTarget
Nurturing Beyond Your Current Pipeline Globally consistent trend: purchasing decisions shaped online before sales contact Over 2/3s of the buying process occurs before sales is even contacted (Sirius Decisions)
More informationAGILE SOFTWARE TESTING
AGILE SOFTWARE TESTING Business environments continue to rapidly evolve, leaving many IT organizations struggling to keep up. This need for speed has led to an increased interest in the Agile software
More informationEnterprise Project Management (EPM) from Microsoft
Enterprise Project Management (EPM) from Microsoft Microsoft Project Professional 2007 Microsoft Project Web Access 2007 Microsoft Project Server 2007 MS Project the Art of the possible - projects, programmes
More informationITS Project Management
ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS
More informationBusiness Intelligence
1 3 Business Intelligence Support Services Service Definition BUSINESS INTELLIGENCE SUPPORT SERVICES Service Description The Business Intelligence Support Services are part of the Cognizant Information
More informationCRM for Real Estate Part 2: Realizing the Vision
CRM for Real Estate Anne Taylor Contents Introduction... 1 Meet the Challenges... 2 Implementation Approach... 3 Demystifying CRM... 5 Conclusion... 7 Introduction Once the decision to implement a CRM
More informationcan you effectively plan for the migration and management of systems and applications on Vblock Platforms?
SOLUTION BRIEF CA Capacity Management and Reporting Suite for Vblock Platforms can you effectively plan for the migration and management of systems and applications on Vblock Platforms? agility made possible
More informationApplication Security Center overview
Application Security overview Magnus Hillgren Presales HP Software Sweden Fredrik Möller Nordic Manager - Fortify Software HP BTO (Business Technology Optimization) Business outcomes STRATEGY Project &
More informationChange Management Best Practices
General Change Management Best Practices Practice Area Best Practice Criteria Organization Change management policy, procedures, and standards are integrated with and communicated to IT and business management
More informationATS. The. The Staffing Agency s Guide to Buying an Applicant Tracking System
ATS The Advantage: The Staffing Agency s Guide to Buying an Applicant Tracking System 87 % of North American recruiting professionals agree that using ATS/CRM technology is important to the success of
More informationWelcome to online seminar on. Agile PLM Overview. Presented by: Mahender Bist Partner Rapidflow Apps Inc mbist@rapidflowapps.com.
Welcome to online seminar on Agile PLM Overview Presented by: Mahender Bist Partner Rapidflow Apps Inc mbist@rapidflowapps.com April, 2011 Rapidflow Apps - Introduction About Rapidflow Apps Oracle Gold
More informationAccenture and CA Technologies Clarity Offerings
and CA Technologies Clarity Offerings August 15, 2010 Analysts Place CA Clarity PPM in Leaders Position Gartner Magic Quadrant for IT Project and Portfolio Management 2008 * Forrester Wave : PPM Tools
More information1. Purpose and objectives
1. Purpose and objectives Identify and establish the driving force Long-term business goals Establish central deliveries of the implementation project Prioritize and plan with interim targets Delimitations
More informationPM Services. Portfolio Strategy, Design and Build
PM Services Portfolio Strategy, Design and Build Portfolio Strategy, Design and Build PM Services consultants will design an effective portfolio management system and works closely with client management
More informationPROJECT AUDIENCE REQUEST FOR PROPOSAL: Business Plan
CONTENTS Introduction Proposal Submission deadline Background Summary of Goals Project Details o Business Plan Participants Financial Planning o Business structure/leadership model Framework Board governance/structure
More informationGartner delivers the technology-related insight necessary for our clients to make the right decisions, every day.
Gartner s Value for Higher Education Clients Georgia Institute of Technology Gartner delivers the technology-related insight necessary for our clients to make the right decisions, every day. Allison Weil,
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationDeloitte and SuccessFactors Workforce Analytics & Planning for Federal Government
Deloitte and SuccessFactors Workforce Analytics & Planning for Federal Government Introduction Introduction In today s Federal market, the effectiveness of human capital management directly impacts agencies
More informationMicrosoft Infrastructure Assessment
GLOBAL KNOWLEDGE Microsoft Infrastructure Assessment Prepared For { Customer Logo } DOCUMENT VERSION Change Record Date Author Version Change Reference Reviewers Name Version Approved Position Date Distribution
More informationManaged Service Marketing
Managed Service Marketing Produce Deliver Design Measure Enterprise Marketing on an SMB Budget. The Problem: Your Prospects are Shopping Without You They self educate and do whatever it takes to thin the
More informationQlik UKI Consulting Services Catalogue
Qlik UKI Consulting Services Catalogue The key to a successful Qlik project lies in the right people, the right skills, and the right activities in the right order www.qlik.co.uk Table of Contents Introduction
More informationPROJECT CHARTER GUIDE
Treasury Board of Canada Secretariat Secrétariat du Conseil du Trésor du Canada Enhanced Management Framework for Information Technology PROJECT CHARTER GUIDE February 1999 Chief Information Officer Branch
More informationImprove Project Team Collaboration Using Microsoft Project Online
Improve Project Team Collaboration Using Microsoft Project Online Presented by Steven Vowles, PMP, CISA, MCTS Senior Program Director, Infor Consulting Services Global PMO April 29, 2016 1 Discipline!
More informationPractical Approaches to Achieving Sustainable IT Governance
Practical Approaches to Achieving Sustainable IT Governance Beyond Mandates: Getting to Sustainable IT Governance Best Practices Agenda IT Governance Definition IT Governance Principles IT Governance Decisions
More informationAsset management guidelines
Asset management guidelines 1 IT asset management (ITAM) overview Objective Provide a single, integrated view of agency assets in order to allow agencies to identify the asset location and assess the potential
More information2011 NASCIO Nomination Business Improvement and Paperless Architecture Initiative. Improving State Operations: Kentucky
2011 NASCIO Nomination Business Improvement and Paperless Architecture Initiative Improving State Operations: Kentucky Kevin Moore 6/1/2011 Executive Summary: Accounts Payable was a time consuming, inefficient
More informationA Final Report for City of Chandler Strategic IT Plan Executive Summary
A Final Report for City of Chandler 6 January 2004 Table of Contents 1. Executive Summary... 1 1.1 Background... 2 1.2 Chandler Business and IT Context... 3 1.3 Chandler s IT Strategic Direction... 5 1.4
More informationChoosing the Right Project and Portfolio Management Solution
Choosing the Right Project and Portfolio Management Solution Executive Summary In too many organizations today, innovation isn t happening fast enough. Within these businesses, skills are siloed and resources
More informationPROCUREMENTS SOLUTIONS FOR FINANCIAL MANAGERS
1 WHITE PAPER PROCUREMENT SOLUTIONS FOR FINANCIAL MANAGERS Bonitasoft s Business Process Management Suite (BPMS) helps financial managers and executives attain highly optimized processes, applications,
More informationCOMPUWARE CHANGEPOINT
COMPUWARE CHANGEPOINT Professional Services Automation (PSA) Compuware Changepoint PSA provides a single business management solution designed specifically to automate and integrate the processes of services
More informationUCPath Project Status Report
UCPath Project Status Report Report Date August 23, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Tony Lo has resigned as Project
More informationsolution brief September 2011 Can You Effectively Plan For The Migration And Management of Systems And Applications on Vblock Platforms?
solution brief September 2011 Can You Effectively Plan For The Migration And Management of Systems And Applications on Vblock Platforms? CA Capacity Management and Reporting Suite for Vblock Platforms
More informationMarket Landscape Report
Market Landscape Report Navigating the PM & PPM Software Sector DIANA ESKANDER Abstract The project management software market is understatedly crowded, with over 300 available options. And it is of utmost
More informationApplication Overhaul. Key Initiative Overview
Scott D. Nelson Research Managing Vice President This overview provides a high-level description of the Application Overhaul Key Initiative. IT leaders can use this guide to understand how to develop an
More informationMicrosoft Enterprise Project Management (EPM) Solution
Microsoft Enterprise Project Management (EPM) Solution Enterprise Project Management (EPM) Solution Version Comparison The Microsoft Enterprise Project Management (EPM) Solution ensures organizations select
More informationWorkforce Management Project Execution Best Practices
Workforce Management Project Execution Best Practices Avoiding Labor Pains Part 2 White Paper Analyst Frank Urbaniak Date of Publication: June 1, 2011 IHL Group 1064 Cedarview Lane Franklin, TN 37067 +1
More informationFight the Good Fight with Resource Capacity Management
Run smoothly. Change quickly. Achieve more. Cloud-based enterprise work management software Fight the Good Fight with Resource Capacity Management Nadia Skira Implementation Consultant Eclipse PPM Complimentary
More informationThe expression better, faster, cheaper THE BUSINESS CASE FOR PROJECT PORTFOLIO MANAGEMENT
Cloud Solutions for IT Management WHITE PAPER THE BUSINESS CASE FOR PROJECT PORTFOLIO MANAGEMENT How Progressive IT Organizations Are Using Hosted Solutions To Deliver On Time, On Budget, On Quota and
More informationBusiness intelligence requirements for IT: What every IT manager should know about business users real needs for BI
Business intelligence requirements for IT: What every IT manager should know about business users real needs for BI January 2011 p2 Business users and organizations need the ability to quickly analyze
More informationVisual Enterprise Architecture
Business Process Management & Enterprise Architecture Services and Solutions October 2012 VEA: Click About to edit Us Master title style Global Presence Service and Solution Delivery in 22 Countries and
More informationProject Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More informationSound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
More informationMicrosoft Enterprise Project Management. James Wright Christopher Pond
Microsoft Enterprise Project Management James Wright Christopher Pond EPM Solution: Executive Overview and Discussion 1 Agenda 9:30 09:45 Introduction 9:45 10:45 Microsoft Project Server 2010 James Wright
More informationIT Asset Inventory and Outsourcing: The Value of Visibility
BDNA WHITE PAPER IT Asset Inventory and Outsourcing: The Value of Visibility October 2007 bdnacorp.com U.S. Corporate Headquarters 650.625.9530 Europe, Middle East & Africa +33.1.42.27.10.71 Asia Pacific
More informationU.S. Department of Education Federal Student Aid
U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Stage Gate Review Process Description Version 1.3 06/30/2015 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Lifecycle
More informationERP. Key Initiative Overview
Jeff Woods Research Managing Vice President This overview provides a high-level description of the ERP Key Initiative. IT leaders can use this overview to better understand what they need to do to prepare
More informationSAP Consulting Providers - Top 20
sap TECHNOLOGY SPECIAL The Navigator for Enterprise Solutions MAY - 2014 CIOREVIEW.COM 20 Most Promising SAP Consulting Providers SAP in its present form, running in the veins of small, mid to large companies
More informationRapid Consumption and Deployment of SAP Software as Virtual Appliances Using SAP Cloud Appliance Library
Rapid Consumption and Deployment of SAP Software as Virtual Appliances Using SAP Cloud Appliance Library Sanjay Kulkarni, Chief Expert, Solution Management, Virtualization & Cloud Management May 2013 Customer
More informationProject and Portfolio Management Software Provider Request for Information
State of Florida Department of Revenue ISP Request for FDOR PPM Tool RFI #14/15 05 Reissued 1. Introduction The Florida Department of Revenue (the Department or FDOR ), hereby issues this Request for (
More informationLeveraging Office 365 for Project Collaboration Success
Leveraging Office 365 for Project Collaboration Success Fast Track to Project Collaboration Produced by: Caroll Ford Dux Raymond Sy, PMP, MVP Mike Taylor, PMP This document is provided as-is. Information
More informationWhy Choose TeamDynamix?
Why Choose TeamDynamix? The Leader in Project, Portfolio and Service Management Software in Higher Education. Barry University Barnard College Columbus State Community College Florida State University
More informationUp, Up, and Upgraded: New Features in GALILEO and More
Up, Up, and Upgraded: New Features in GALILEO and More Lauren Fancher and Katie Gohn GOLD/GALILEO Users Group Conference August 4, 2006 Upgrade Goals and Features Enhanced usability and ease of access
More informationSoftware Project Management Plan
Software Project Management Plan Julie Makelberge Julie.Makelberge@vub.ac.be November 3, 2010 Version Date Author Comment 1.0 02/11/2010 Julie Initial version 1.1 03/11/2010 Kevin Revision 1 Contents 1
More information2.1 The RAD life cycle composes of four stages:
2.1 The RAD life cycle composes of four stages: A typical RAD life cycle is composed of the following Stages 2.1.1. Requirements Planning; 2.1.2 User Design; 2.1.3 Rapid Construction; 2.1.4 Transition.
More informationOffice of the Chief Information Officer (CIO) University of Guelph Integrated Plan 2012/13-2016/17
Office of the Chief Information Officer (CIO) University of Guelph Integrated Plan 2012/13-2016/17 February 8, 2012 Submitted by: Catherine Steeves, CIO & Chief Librarian (Acting) Introduction: The initial
More informationHow To Manage Project And Portfolio Management In Microsoft Office 2010
Enterprise Project Management SOLUTIONS THAT LAST Challenges in PPM What is a Project? Why Project Management? Challenges in Project and Portfolio Management (PPM) Problems for PM and PPM Leaders Presentation
More informationVulnerability Assessment Service
Vulnerability Assessment Service Management Brief Introduction: Vulnerability Assessment (VA) is the process of determining the security status of the IT infrastructure. The objective of VA is to present
More informationMoving to the Cloud: NIST Vision and Initiatives
Moving to the Cloud: NIST Vision and Initiatives part of the US Federal Cloud Computing Strategy Dawn Leaf NIST Senior Executive for Cloud Computing March 16, 2011 Gaithersburg, Maryland, USA NIST Mission:
More informationTaking the Migraine Out of Migrations
Taking the Migraine Out of Migrations In our recent meeting with a senior IT executive, she shared that she accepted her current position a few years ago with the caveat, I ll do anything except data migrations.
More informationDITA Adoption Process: Roles, Responsibilities, and Skills
DITA Adoption Process: Roles, Responsibilities, and Skills Contents 2 Contents DITA Adoption Process: Roles, Responsibilities, and Skills... 3 Investigation Phase... 3 Selling Phase...4 Pilot Phase...5
More informationLow Risk Implementation. Part of the Insurance series: Benefits of a New Policy Administration System: Why Going Live is Not Enough
Low Risk Implementation Part of the Insurance series: Benefits of a New Policy Administration System: Why Going Live is Not Enough Abstract Insurance carriers are well versed in the risks associated with
More informationModule 6 Essentials of Enterprise Architecture Tools
Process-Centric Service-Oriented Module 6 Essentials of Enterprise Architecture Tools Capability-Driven Understand the need and necessity for a EA Tool IASA Global - India Chapter Webinar by Vinu Jade
More informationEstablishing Enterprise Portfolio and Project Management in a Shared Service Environment
Establishing Enterprise Portfolio and Project Management Author: Lynn Tyndall Date: October 14, 2008 Version: 1.0 1 of 8 Document Revision History Revision # Date Change Authorization Document Approval(s)
More informationRequest for Information Integrated Portfolio, Project & Management Information System Technical Assistance Unit RFI: TAU/01
Integrated Portfolio, Project & Management Information System Technical Assistance Unit RFI: TAU/01 TABLE OF CONTENT 1 Disclaimer... 4 2 Purpose... 4 3 Background... 4 4 Specific Objectives of this Document...
More informationG-Cloud II Services Service Definition Accenture Cloud SaaS Implementation Services Google Apps
G-Cloud II Services Service Definition Accenture Cloud SaaS Implementation Services Google Apps 1 Table of Contents 1. Scope of our Services... 3 2. Approach... 4 3. Assets and Tools... 5 4. Outcomes...
More informationIT Cost Reduction. Doing More with Less. Anita Ballaney, Vishwanath Shenoy, Michael Gavigan. Strategic IT cost reduction - Doing More with Less
IT Cost Reduction Doing More with Less Anita Ballaney, Vishwanath Shenoy, Michael Gavigan Strategic IT cost reduction - Doing More with Less The current economic climate will force all businesses to thoroughly
More information